Building Work Supervisors - Standard Registration Conditions

Size: px
Start display at page:

Download "Building Work Supervisors - Standard Registration Conditions"

Transcription

1 Building Work Supervisors - Standard Registration Conditions This document sets out scope of work conditions that will be used on your registration card. The document also provides a description of the work involved with each condition, and the qualification/experience pathways to obtain the scope of work condition. How to use: When you are making an application for registration as a building work supervisor, or looking to change the conditions of your current registration, you should: 1. Locate the condition(s) that best match for the scope of work you are seeking. 2. Examine the qualification/experience pathway(s) for each condition. 3. Indicate on your application, the condition and pathway number appropriate for your circumstances. Building work supervisor interview: If your pathway is linked to a building work supervisor interview, please complete the schedule on pages There are spaces for your answers on page 30 (Building Work Management), page 32 (Building Technology) and page 32 (Legislative Requirements). Page 1 of 35 Last updated 25 June 2014

2 NATIONAL CONSTRUCTION CODE BUILDING CLASSIFICATIONS CLASS Class 1 Class 1a NCC One or more buildings, which in association constitute A single dwelling being: (i) a detached house: or (ii) one of a group of two or more attached dwellings, each being a building, separated by a fire-resisting wall, including a row house, terrace house, town house or villa unit: Class 1b (i) a boarding house, guest house, hostel or the like: (A) with a total area of all floors not exceeding 300m2 measured over the enclosing walls of the Class 1b; and (B) in which not more than 12 persons would ordinarily be resident, or (ii) 4 or more single dwelling located on one allotment and used for short-term holiday accommodation which are not located above or below another dwelling or another Class of building other than a private garage. Class 2 Class 3 Class 4 Class 5 Class 6 Class 7a Class 7b Class 8 Class 9 Class 9A Class 9B Class 9C Class 10 Class 10A Class 10B Class 10C A building containing 2 or more sole-occupancy units each being a separate dwelling A residential building, other than a building of Class 1 or 2, which is a common place of long term or transient living for a number of unrelated persons, including (a) a boarding-house, guest house, hostel, lodging-house or backpackers accommodation; or (b) a residential part of a hotel or motel; or (c) a residential part of a school; or (d) accommodation for the aged, children or people with disabilities; or (e) a residential part of health-care building which accommodates members of staff; or (f) a residential part of a detention centre. A dwelling in a building that is Class 5,6,7,8 or 9 if it is the only dwelling in the building An office building used for professional or commercial purposes, excluding buildings of Class 6,7,8 or 9 A shop or other building for the sale of goods by retail or the supply of services direct to the public, including (a) an eating room, café, restaurant, milk or soft-drink bar; or (b) a dining room, bar area that is not an assembly building, shop or kiosk part of a hotel or motel; or (c) a hairdresser s or barber s shop, public laundry, or undertaker s establishment; or (d) market or sale room, showroom, or service station. A building which is a car park. A building which is for storage, or display of goods or produce for sale by wholesale. A laboratory, or a building in which a handicraft or process for production, assembling, altering, repairing, packing, finishing, or cleaning of goods or produce is carried on for trade, sale, or gain. A building of a public nature (a) a health-care building, including those parts of the building set aside as a laboratory; or (b) an assembly building, including a trade workshop, laboratory or the like in a primary or secondary school, but excluding any other parts of the building that are of another Class; or (c) an aged care building A non-habitable building or structure (a) a non-habitable building being a private garage, carport, shed, or the like; or (b) a structure being a fence, mast, antenna, retaining or free-standing wall, swimming pool, or the like; or (c) a private bushfire shelter. Page 2 of June 2014 Last updated

3 Standard condition list ADDITIONS ADDITIONS, ALTERATIONS & RENOVATIONS AIR CONDITIONING INSTALLATION LTD TO SPLIT SYSTEM AIR CONDITIONING INSTALLATION ALTERATIONS ALTERATIONS & RENOVATIONS ALUMINIUM WINDOW & DOOR INSTALLATION ANY BUILDING WORK BATHROOM RENOVATIONS BOARD FIXING & FLUSHING BOARD FIXING & FLUSHING LTD TO COMMERCIAL/INDUSTRIAL BOARD FIXING & FLUSHING LTD TO RESIDENTIAL BRICK PAVING BRICKLAYING & BLOCKLAYING BUILDING WORK LTD TO BUILDING WORK LTD TO NATIONAL CONSTRUCTION CODE CLASS 1 & 10 BUILDING WORK LTD TO NATIONAL CONSTRUCTION CODE CLASS 1 & 10 NOT EXCEEDING FOUR STOREY BUILDING WORK LTD TO NATIONAL CONSTRUCTION CODE CLASS 1 & 10 NOT EXCEEDING THREE STOREY BUILDING WORK LTD TO NATIONAL CONSTRUCTION CODE CLASS 1 & 10 NOT EXCEEDING TWO STOREY BUILDING WORK LTD TO NATIONAL CONSTRUCTION CODE CLASS 1 & 10 NOT EXCEEDING ONE STOREY BUILDING WORK LTD TO NATIONAL CONSTRUCTION CODE CLASS 2-9 BUILDING WORK LTD TO NATIONAL CONSTRUCTION CODE CLASS 2-9 NOT EXCEEDING FOUR STOREY BUILDING WORK LTD TO NATIONAL CONSTRUCTION CODE CLASS 2-9 NOT EXCEEDING THREE STOREY BUILDING WORK LTD TO NATIONAL CONSTRUCTION CODE CLASS 2-9 NOT EXCEEDING TWO STOREY BUILDING WORK LTD TO NATIONAL CONSTRUCTION CODE CLASS 2-9 NOT EXCEEDING ONE STOREY CABINET MAKING CARPENTRY CARPENTRY JOINERY CARPENTRY LTD TO SECOND FIX CARPORTS CIVIL CONSTRUCTION CIVIL CONSTRUCTION (MEDIUM) CIVIL CONSTRUCTION (LOW) COMMERCIAL BUILDING WORK LTD TO FITOUTS CONCRETING & STEELFIXING CONCRETE FLOOR PAVING CONCRETE PATH PAVING CONSTRUCTION WATERPROOFING COOL ROOMS DECKS DEMOLITION DEMOLITION LTD TO: EARTHWORKS CONSTRUCTION EARTHWORKS CONSTRUCTION LTD TO SITE PREPARATION, EXCAVATION & TRENCHING FENCING FENCING EXCLUDING BRICK & BRUSH FENCING LTD TO POST & RAIL FENCING LTD TO POST RAIL & TUBULAR FENCING LTD TO POST RAIL, TUBULAR EXCLUDING POOL FENCING FIXING OF CLADDING Page 3 of 35 Last updated 25 June 2014

4 FLOOR FINISHING FOOTING CONSTRUCTION GENERAL REPAIRS LTD TO NON STRUCTURAL BUILDING WORK GENERAL CONCRETE CONSTRUCTION GLAZING INSTALLATION OF CEILING INSULATION IN DWELLINGS INSTALLATION OF METAL FABRICATED PRODUCTS INSTALLATION OF PV SOLAR PANELS INSULATION JOINERY LIGHT STEEL FRAMING PAINTING PAINTING DECORATING PAVING PERGOLAS & VERAHS PERGOLAS & VERAHS LTD TO PREFABRICATED PERGOLAS VERAHS LTD TO PREFABRICATED STEEL FRAMED POOL FENCING RAINWATER TANK INSTALLATION LTD TO ABOVE GROUND RAINWATER TANK INSTALLATION RENOVATIONS RETAINING WALLS RETAINING WALLS LTD TO SLEEPER & DRYWALL 1M IN HEIGHT RETAINING WALLS LTD TO SLEEPER DRYWALL RETAINING WALLS LTD TO: 1M IN HEIGHT ROLLER DOORS, ROLLER SHUTTERS PANEL LIFT DOOR INSTALLATION ROOF PLUMBING ROOF RESTORATION ROOF RESTORATION LTD TO TILED ROOFS ROOF TILING SHADE SAILS SHEDS & GARAGES SHEDS GARAGES LTD TO PREFABRICATED SHOWER SCREENS BATHROOM FITTINGS SOLID PLASTERING SOLID PLASTERING LTD TO STAIRS & BALUSTRADES LTD TO: TIMBER, METAL, PLASTICS & GLASS CONSTRUCTION STEELFIXING STONEMASONRY STORMWATER DRAINAGE LTD TO 90MM STRUCTURAL STEEL ERECTION SWIMMING POOL CONSTRUCTION SWIMMING POOL CONSTRUCTION LTD TO: INSTALLATION OF PREFABRICATED POOLS SWIMMING POOL CONSTRUCTION LTD TO: THE INSTALLATION OF PUMPS, FILTRATION EQUIPMENT, CHLORINATORS, HEATERS ASSOCIATED PIPE WORK TILT PANEL CONSTRUCTION UNDERPINNING WALL & FLOOR TILING WATER PROOFING LTD TO BATHROOMS, LAUNDRIES, & BALCONIES SCHEDULE 2 (PART 2) BUILDING WORK SUPERVISORS REGISTRATION PERFORMANCE CRITERIA Page 4 of 35 Last updated 25 June 2014

5 Additions Expanding the floor area, below, at the same level and/or above an existing building and enclosing other areas without limitation. Additions, alterations & renovations Refer to definitions for (additions), (alterations) and (renovations). Air conditioning installation ltd to split system Refer (Air conditioning installation) but will be limited to high wall splits does not include air conditioning systems mounted in or on a roof. Air conditioning installation Installation of fixed appliances that circulates airflow within a building that provides heating and/or cooling of the building space (doesn t include the performance of associated electrical or plumbing unless registered to perform that work). Alterations Allows structural alterations to an existing building but excludes additions. Has no height or class of building restrictions. Alterations & Renovations Refer definitions for (Alterations), (renovations) Page 5 of 35 Last updated 25 June 2014

6 Aluminium window & door installation Installation of aluminium windows into existing openings includes installation of glass and automated doors. Does not allow increasing the height or width of openings. If alteration to height or width of openings is required refer to (alterations). Any building work All building work classes 1 to 10 buildings including all civil construction without limitation. 1 Bachelor of Construction Management & Economics (Delivered by University of SA) Demonstrated experience in at least 4 projects that combined, cover the scope of the registration condition. The Experience Log can be used to demonstrate experience. Detailed references on role and experience in civil construction, including details of major projects. 2 Douglas Mawson Institute of TAFE (Marleston Campus) Module Title Module Code Module Title Module Code Construction 1, ABC 001, 002, ABC 069, 070 2, 3 & & 004 Cost Control & Planning & Cost Control & Planning 2 Services 1 ABC 007 Building Quality ABC 059 Concepts 1 Materials 1 & 2 ABC 005, 006 Building Studio 3 ABC 117 Building Technology 1 & 2 Builders Working Drawings 1, 2 & 3 ABC 088, 089 ABC 061, 062 & 063 Timber Framing Design Formwork Design ABC 105 ABC 097 Building Quantities & Estimation 1, 2, 3 & 4 ABC 076, 077, 078 & 079 Structures 1 ABC 086 Page 6 of 35 Last updated 25 June 2014

7 Building Computing Applications & Applications 2 Residential Site Safety ABC 064, 107 ABC 102 Construction Planning 1 Building Site Surveying & Set Out 1 & 2 ABC 095 ABC 083, 084 Bathroom renovations Allows non-structural demolition of bathrooms laundries and WC, organisation of plumbers and electricians preparation for waterproofing and tiling and the organisation of finishing trades without restriction of class of building. Board fixing & flushing Includes the construction of non- structural wall frames, insulation of walls, fixing plasterboard, cornice and flushing and suspended ceilings. Board fixing & flushing ltd to commercial/industrial Includes the construction of non- structural wall frames, insulation of walls, fixing plasterboard, cornice and flushing, fire walls and suspended ceilings. s 1 BCG30298 Certificate III in General Construction (Wall and Ceiling Lining) 2 BCG31203 Certificate III in Wall and Ceiling Lining 3 CPC31208 Certificate III in Wall and Ceiling Lining 4 CPC31211 Certificate III in Wall and Ceiling Lining 5 Page 7 of 35 Last updated 25 June 2014

8 Board fixing & flushing ltd to residential Installation of plaster board, cornices and flushing. Brick paving All forms of segmental paving, whether brick, clay concrete or other type of paver includes site preparation, earthworks and finishing. (Does not include concrete path paving). Bricklaying & blocklaying All forms of manufactured brick or blocks no restriction in height or class of building does not include stone masonry (refer to definition for stone masonry). Includes undersetting. Building work ltd to Any endorsement that hasn t its own identifier. 1 CPC31608 Certificate III in Paving 2 CPC31611 Certificate III in Paving 3 1 BCG30698 Certificate III in General Construction (Bricklaying/Blocklaying) 2 BCG30103 Certificate III in Bricklaying/Blocklaying 3 CPC30108 Certificate III in Bricklaying/Blocklaying 4 CPC30111 Certificate III in Bricklaying/Blocklaying 5 Building Work Ltd to National Construction Code Class 1 & 10 Residential structures and outbuildings without height restriction as defined by the NCC. BCG40106 or CPC40108 or CPC40110 Certificate IV in Building and Construction (Building) OR Page 8 of 35 Last updated 25 June 2014

9 BCG40506 or CPC40508 Certificate IV in Building and Construction (Site Management) Completion of the following units of competency in addition to the above qualification: BCGBC5001A or CPCCBC5001A or CPCCBC5001B - Apply building codes and standards to the construction process for medium rise building projects And BCGBC5003A or CPCCBC5003A - Supervise the planning of on-site medium rise building or construction work And BCGBC5008A or CPCCBC5008A or CPCCBC5018A - Apply structural principles to the construction of medium rise buildings And BCGBC6001A or CPCCBC6001A or CPCCBC6001B - Apply building codes and standards to the construction process for large building projects And BCGBC6014A or CPCCBC6014A - Apply structural principles to the construction of large, high rise and complex buildings Demonstrated experience in at least 4 projects that combined, cover the scope of the registration condition. The Experience Log can be used to demonstrate experience. 2 Building Work Ltd to National Construction Code Class 1 & 10 not exceeding four storey Residential structures and outbuildings with height restriction as defined by the NCC. 1 Building Work Ltd to National Construction Code Class 1 & 10 not exceeding three storey Residential structures and outbuildings with height restriction as defined by the NCC. 1 BCG40106 or CPC40108 or CPC40110 Certificate IV in Building and Construction (Building) OR BCG40506 or CPC40508 Certificate IV in Building and Construction (Site Management) Demonstrated experience in at least 4 projects that combined, cover the scope of the registration Page 9 of 35 Last updated 25 June 2014

10 condition. The Experience Log can be used to demonstrate experience. 2 Douglas Mawson Institute of TAFE (Marleston Campus) Module Title Module Module Title Module Code Code Construction 1 & 2 ABC 001 Building Site Supervision ABC 082 & 002 Materials 1 ABC 005 Cost Control & Planning ABC 069 Building Technology 1 ABC 088 Timber Framing Design ABC 105 Builders Working Drawings 1 & 2 ABC 061 Structures 1 ABC 086 & 062 Building Quantities & Estimation 1 ABC 076 Building Site Surveying & ABC 083 & Building Quantities & Estimation 2 & 077 Set Out 1 Building Computing Applications ABC 064 Business Management for ABC 091 & 092 Builders 1 & 2 Residential Site Safety ABC 102 Plus demonstrated experience in supervising work commensurate with the registration. 3 Housing Industry Association of SA (HIA) Module Title Section Module Title Section Code Code Performance Requirements of a 1 Roof Tiling & Sheet Metal 12 Building Works Supervisor Roofing Documentation & Contract 2 Plumbing & Drainage 13 Administration Project Planning & Programming 3 Electrical 14 OH&S 4 Solid Plastering 15 Job Costing & Minor Estimating 5 Plasterboard Wall & Ceiling 16 Linings Building Regulations & Standards 6 Wet Area Construction 17 Quality Systems 7 Painting & Finishing Trades 18 Plan Reading & Interpretation 8 Landscaping 19 Footings & Slabs (1&2) 9 Insurances 20 Masonry Construction 10 Licensing & Registration 21 Framing 11 Plus demonstrated experience in supervising work commensurate with the registration. Page 10 of 35 Last updated 25 June 2014

11 4 Master Builders Association (MBA) Module Title Section Module Title Section Code Code Financial Management 5 Construction & Services 9 Site Controls 6 Quantities & Tendering 10 Plus demonstrated experience in supervising work commensurate with the registration. 5 Building Work Ltd to National Construction Code Class 1 & 10 not exceeding two storey Residential structures and outbuildings with height restriction as defined by the NCC. 1 Building Work Ltd to National Construction Code Class 1 & 10 not exceeding one storey Residential structures and outbuildings with height restriction as defined by the NCC. 1 Douglas Mawson Institute of TAFE (Marleston Campus) Module Title Module Module Title Module Code Code Construction 1 ABC 001 Building Site Supervision ABC 082 Materials 1 ABC 005 Building Site Surveying & Set Out 1 ABC 083 Builders Working Drawings 1 ABC 061 Structures 1 ABC 086 Cost Control & Planning ABC 069 Residential Site Safety ABC 102 Building Quantities & Estimation 1 ABC 076 Plus demonstrated experience in supervising work commensurate with the registration. Page 11 of 35 Last updated 25 June 2014

12 2 Building Work Ltd to National Construction Code Class 2-9 Commercial & Industrial structures without height restriction as defined by the NCC. 1 BCG40106 or CPC40108 or CPC40110 Certificate IV in Building and Construction (Building) OR BCG40506 or CPC40508 Certificate IV in Building and Construction (Site Management) Completion of the following units of competency in addition to the above qualification: BCGBC5001A or CPCCBC5001A or CPCCBC5001B - Apply building codes and standards to the construction process for medium rise building projects And BCGBC5003A or CPCCBC5003A - Supervise the planning of on-site medium rise building or construction work And BCGBC5008A or CPCCBC5008A or CPCCBC5018A - Apply structural principles to the construction of medium rise buildings And BCGBC6001A or CPCCBC6001A or CPCCBC6001B - Apply building codes and standards to the construction process for large building projects And BCGBC6014A or CPCCBC6014A - Apply structural principles to the construction of large, high rise and complex buildings Demonstrated experience in at least 4 projects that combined, cover the scope of the registration condition. The Experience Log can be used to demonstrate experience. 2 Building Work Ltd to National Construction Code Class 2-9 not exceeding four storey Commercial & Industrial structures with height restriction as defined by the NCC. 1 Page 12 of 35 Last updated 25 June 2014

13 Building Work Ltd to National Construction Code Class 2-9 not exceeding three storey Commercial & Industrial structures with height restriction as defined by the NCC. 1 BCG40106 or CPC40108 or CPC40110 Certificate IV in Building and Construction (Building) OR BCG40506 or CPC40508 Certificate IV in Building and Construction (Site Management) Completion of the following units of competency in addition to the above qualification: BCGBC5001A or CPCCBC5001A or CPCCBC5001B - Apply building codes and standards to the construction process for medium rise building projects And BCGBC5003A or CPCCBC5003A - Supervise the planning of on-site medium rise building or construction work And BCGBC5008A or CPCCBC5008A or CPCCBC5018A - Apply structural principles to the construction of medium rise buildings Demonstrated experience in at least 4 projects that combined, cover the scope of the registration condition. The Experience Log can be used to demonstrate experience. 2 Building Work Ltd to National Construction Code Class 2-9 not exceeding two storey Commercial & Industrial structures with height restriction as defined by the NCC. 1 Master Builders Association (MBA) Module Title Section Code Module Title Section Code Financial 5 Construction & Services 9 Management Site Controls 6 Quantities & Tendering 10 Plus demonstrated experience in supervising work commensurate with the registration. 2 Page 13 of 35 Last updated 25 June 2014

14 Building Work Ltd to National Construction Code Class 2-9 not exceeding one storey Commercial & Industrial structures with height restriction as defined by the NCC. 1 BCG40106 or CPC40108 or CPC40110 Certificate IV in Building and Construction (Building) OR BCG40506 or CPC40508 Certificate IV in Building and Construction (Site Management) Demonstrated experience in at least 4 projects that combined, cover the scope of the registration condition. The Experience Log can be used to demonstrate experience. 2 Douglas Mawson Institute of TAFE (Marleston Campus) Module Title Module Code Module Title Module Code Construction 1 & ABC 001 & 002 Building Site Supervision ABC Materials 1 ABC 005 Cost Control & Planning ABC 069 Building Technology 1 Builders Working Drawings 1 & 2 ABC 088 Timber Framing Design ABC 105 ABC 061 & 062 Structures 1 ABC 086 Building Quantities & Estimation 1 & Building Quantities & Estimation 2 Building Computing Applications ABC 076 & 077 ABC 064 Building Site Surveying & Set Out 1 Business Management for Builders 1 & 2 ABC 083 ABC 091 & 092 Residential Site ABC 102 Safety Plus demonstrated experience in supervising work commensurate with the registration. 3 Douglas Mawson Institute of TAFE (Marleston Campus) Module Title Page 14 of 35 Last updated 25 June 2014 Module Code Module Title Module Code

15 Construction 1, 2 & 3 ABC 001, Building Site Supervision ABC & 003 Materials 1 ABC 005 Cost Control & Planning ABC 069 Building Technology 1 Builders Working Drawings 1 & 2 Building Quantities & Estimation 1 & Building Quantities & Estimation 2 Building Computing Applications ABC 088 Timber Framing Design ABC 105 ABC 061 & 062 ABC 076 & 077 ABC 064 Structures 1 ABC 086 Building Site Surveying & Set Out 1 Business Management for Builders 1 & 2 ABC 083 ABC 091 & 092 Residential Site ABC 102 Safety Plus demonstrated experience in supervising work commensurate with the registration. 4 Cabinet making Onsite fabrication and installation of built in furniture, e.g. Kitchens, linen presses, laundry cupboards or the like. 1 BCF30200 Certificate III in Off-Site Construction (Joinery-Timber/Aluminium/Glass) 2 CPC31908 Certificate III in Joinery 3 CPC31911 Certificate III in Joinery 4 LMF Certificate III in Cabinet Making 5 Carpentry 1 st fix carpentry including floor, wall and roof framing, verandahs, pergolas, carports and 1 Page 15 of 35 Last updated 25 June 2014

16 decks using steel or timber. Includes light steel framing (refer to light steel framing definition) and some structural steel where required in timber framed construction, second fix carpentry eaves construction, fitting architraves and skirting, hanging doors and fitting door hardware No limitation of height or class of building. Carpentry and Joinery Same as (carpentry) including fitting of built in furniture as for (Cabinet making) and stair cases and windows no limitation of height of class of building. Carpentry ltd to second fix Installation of doors, locks, architraves and skirting and the installation eaves. Carports Refer to (pergolas & verandahs ) can be constructed of steel or timber. Civil construction BCG30798 Certificate III in General Construction (Carpentry - Framework/Formwork/Finishing) and BCG3018A Erect Steel Roof Trusses BCG3019A Construct & Erect Steel Wall Framing 2 BCG30203 Certificate III in Carpentry 3 CPC30208 Certificate III in Carpentry 4 CPC30211 Certificate III in Carpentry 5 CPC32008 Certificate III in Carpentry and Joinery 6 1 CPC32011 Certificate III in Carpentry and Joinery 2 CPC32008 Certificate III in Carpentry and Joinery 3 Page 16 of 35 Last updated 25 June 2014

17 Includes all civil work without restriction e.g. bridges, tunnels & major public road networks. Civil construction (Medium) Same as Civil Low plus land sub division, access roads and earthworks associated with installation of services for subdivisions. Civil construction (Low) Street scapes, paving of foot paths, car parks including stormwater, kerbing and gutters street scapes and earthworks incidental to these processes relocate services. Commercial building work ltd to fitouts Internal renovation including some structural alteration where it doesn t involve the alteration to the main structural fabric of the building of class 5-9 buildings refer to alterations and renovations 1 BCF30100 Certificate III in Off-Site Construction (Shopfitting) 2 CPC31808 Certificate III in Shopfitting 3 CPC31811 Certificate III in Shopfitting 4 CPC31812 Certificate III In Shopfitting Concreting & Steelfixing See separate general concrete construction & steel fixing conditions. 1 BCG31298 Certificate III in General Construction (Concreting/Steelfixing) 2 BCG30303 Certificate III in Concreting BCGSF2004B Place and fix reinforcement materials BCGSF3001B Apply reinforcement schedule 3 CPC30308 Certificate III in Concreting Page 17 of 35 Last updated 25 June 2014

18 CPCCSF2004A Place and fix reinforcement materials CPCCSF3001A Apply reinforcement schedule 4 CPC30311 Certificate III in Concreting CPCCSF2004A Place and fix reinforcement materials CPCCSF3001A Apply reinforcement schedule 5 CPC30313 Certificate III in Concreting And CPCCSF3001A Applying reinforcement schedule. Concrete floor paving Non-structural concrete floors such as shed floors or floors that are not part of the main building structure. Includes earthworks preparation. Concrete path paving Concrete work to paths and driveways without restriction. Includes earthworks preparation. Construction waterproofing All forms of water proofing of wet areas, balconies concrete roof and concourses, retaining walls and the like. 1 BCG31403 Certificate III in Waterproofing (General Construction) 2 CPC31408 Certificate III in Construction Waterproofing 3 CPC31411 Certificate III in Construction Waterproofing 4 Page 18 of 35 Last updated 25 June 2014

19 Cool rooms Installation of insulation panels forming a temperature controlled room. Decks Horizontal platform free standing or attached to ground level of a building. Demolition All forms of demolition. 1 BCG31098 Certificate III in General Construction (Demolition) 2 BCG30403 Certificate III in Demolition (General Construction) 3 CPC30408 Certificate III in Demolition 4 CPC30411 Certificate III in Demolition 5 CPC30413 Certificate III in Demolition Or CPC41013 Certificate IV in Demolition Demolition ltd to: All forms of demolition but may be restricted to a height or class of buildings. Earthworks construction All forms of earthworks without restriction. Page 19 of 35 Last updated 25 June 2014

20 Earthworks construction ltd to site preparation, excavation & trenching Earthworks related to site preparation for building sites, levelling, trenching for footings and other services, swimming pools, cellars and septic tanks or preparation for landscaping. Fencing All forms of fencing without limitation. Fencing excluding brick & brush All forms of fencing other than brick or brush. Fencing ltd to post & rail Includes colorbond, good neighbour, chain wire, paling and picket fences. Fencing ltd to post and rail & tubular Refer to fencing ltd to post and rail in addition to tubular including pool fences. Fencing ltd to post and rail, tubular excluding pool fencing Refer to fencing ltd to post and rail and tubular but excludes pool fences. Fixing of cladding Fixing all types of sheet external claddings. Page 20 of 35 Last updated 25 June 2014

21 Floor finishing Grinding, sanding and polishing timber or concrete floors, application of direct stick flooring. Footing construction Site preparation, trenching, installation of Damp Proof Membrane, installation of reinforcing and placing and finishing of concrete for footings and slabs. Includes underpinning. General repairs ltd to non structural building work Non structural repairs. Eg replace a broken piece of glass, repair a hole in a plaster board wall, fix a leaking gutter, replace a roof sheet or broken tile on a roof, timber repairs. General concrete construction Any concrete work without limitation. Includes site preparation, trenching, installation of Damp Proof Membrane, installation of reinforcing and placing and finishing of all concrete construction. Glazing Installation of glass, acrylic or other like materials into prepared openings. Installation of ceiling insulation in dwellings Installation of all types of insulation in residential ceilings only. (Mandatory qualification plus demonstration of experience for this condition). 1 CPCCCM1006A Work safely at heights CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry Page 21 of 35 Last updated 25 June 2014

22 Installation of metal fabricated products Includes hand rails in showers, ramps or disabled facilities, metal ramps, sheet metal splashbacks. Installation of PV solar panels Install support tilt systems for PV solar panels which include mounting frames, modifying or reinforcing roof framing, integrating the solar panel system with a pre-existing structure; erecting stand alone structures. The installation of PV solar panels and the connection to electricity supply must be completed by a registered electrician accredited by the Clean Energy Council.. Insulation Installation in all classes of buildings in walls and ceilings. Joinery Fitting of built in furniture as for cabinet making) includes installation of stair cases and windows no limitation of height of class of building. CPCCPB3014A Install batt insulation products Detailed references on role and experience in ceiling insulation work. 2 CPCCPB3027A Install ceiling insulation Detailed references on role and experience in ceiling insulation work. 1 AIBS-SA Roof Safety Course (Supplementary Training for SA Installers (to satisfy Schedule 3(15(3)(b)(iv) of the Development Regulations 2008)). 2 1 BCF30200 Certificate III in Off-Site Construction (Joinery-Timber/Aluminium/Glass) 2 CPC31908 Certificate III in Joinery 3 CPC31911 Certificate III in Joinery Page 22 of 35 Last updated 25 June 2014

23 4 CPC32008 Certificate III in Carpentry and Joinery 5 CPC31912 Certificate III In Joinery. Light steel framing Installation residential steel framing, steel framed curtain walls in commercial buildings and non-load bearing steel frames used in commercial fit out. Painting Painting internal and external with no restriction to class of building. Painting and decorating All painting and decorating no restriction to class of building (decorating includes such techniques as marbling, gold leaf, murals and wall papering. 1 BCG30798 Certificate III in General Construction (Carpentry - Framework/Formwork/Finishing) BCG3018A Erect Steel Roof Trusses BCG3019A Construct & Erect Steel Wall Framing 2 BCG30203 Certificate III in Carpentry 3 CPC30208 Certificate III in Carpentry 4 CPC30211 Certificate III in Carpentry 5 CPC32011 Certificate III in Carpentry and Joinery 6 CPC32008 Certificate III in Carpentry and Joinery 7 1 BCG30498 Certificate III in General Construction (Painting and Decorating) 2 BCG30603 Certificate III in Painting and Decorating 3 Page 23 of 35 Last updated 25 June 2014

24 CPC30608 Certificate III in Painting and Decorating 4 CPC30611 Certificate III in Painting and Decorating 5 Paving All forms of paving, segmental, concrete, bitumen pattern pave, spray on pave including site preparation, reinforcement and formwork. Pergolas & verandahs Installation of Pergolas & verandahs using steel or timber, licensee able to determine sizes, lengths, angles and set out. Pergolas & verandahs ltd to prefabricated Verandahs Pergolas and carports steel or timber but only if member sizes, spacing and fixings designed and supplied by professional designer. Pergolas and Verandahs ltd to prefabricated steel framed As for pergolas and verandahs but only in steel framed. Fixings designed and supplied by professional designer. Pool fencing 1 CPC31608 Certificate III in Paving 2 CPC31611 Certificate III in Paving 3 Page 24 of 35 Last updated 25 June 2014

25 Includes all types of pool fencing eg glass, tubular, footings, brackets and frames. Rainwater tank installation ltd to above ground Limited to above ground tanks only. Rainwater tank installation Installation of rainwater tanks without restriction. Renovations Non-structural makeovers of buildings or properties of all classes e.g. bathroom, kitchen or other room, doesn t alter the use of the room or remove walls doors or windows. Or shop fit out or office fit out in commercial buildings. Retaining walls All retaining walls without restriction. Includes preparation e.g. earthworks and drainage Retaining walls ltd to sleeper & drywall 1m in height Able to erect retaining walls of type and height shown. Retaining walls ltd to sleeper and drywall Able to erect retaining walls of type shown no height restriction. Page 25 of 35 Last updated 25 June 2014

26 Retaining walls ltd to: 1m in height All retaining walls but restricted to height. Roller doors, roller shutters and panel lift door installation Installation of all roller doors and shutters and panel lift doors. Roof plumbing Installation of metal roof cladding including gutters, down pipes sarking and restoration of metal roof. Includes the installation of skylights and whirly birds on metal roof on all classes of buildings. Roof restoration Repairing, cleaning, and painting metal and tiled roof no restriction to class of building. Roof restoration ltd to tiled roofs Refer to roof restoration but restricted to tiled roof. Roof tiling Installation of roof tiles. 1 BCG30898 Certificate III in General Construction (Roof Tiling) 2 BCG30803 Certificate III in Roof Tiling 3 CPC30808 Certificate III in Roof Tiling 4 CPC30811 Certificate III in Roof Tiling 5 Page 26 of 35 Last updated 25 June 2014

27 CPC30812 Certificate III in Roof Tiling Shade sails Installation of tensioned pliable fabric sun and/or water protection. Sheds & garages Sheds & garages in any form of construction. Sheds and garages ltd to prefabricated Restricted to steel framed prefabricated sheds & garages. Shower screens and bathroom fittings Installation of bathroom fittings eg shower screens, mirrors, hand rails shaving cabinets, towel rails and the like. Solid plastering Plastering walls internally where applicable and externally using sand and cement mixed on site including building up quoins and bands and white set plaster finish. Also includes texture coatings. 1 BCG30398 Certificate III in General Construction (Solid Plastering) 2 BCG31003 Certificate III in Solid Plastering 3 CPC31008 Certificate III in Solid Plastering 4 CPC31011 Certificate III in Solid Plastering 5 Page 27 of 35 Last updated 25 June 2014

28 Solid plastering ltd to Refer to solid plastering but may be limited to class of building. Stairs & balustrades ltd to: Timber, metal, plastics & glass construction Stairs & Balustrades limited to timber, metal, plastics & glass construction. 1 BCF30300 Certificate III in Off-Site Construction (Stairs) BCF3041A Cut and install glass 2 CPC32208 Certificate III in Joinery (Stairs) CPCCJN3005A Cut and install glass 3 CPC32211 Certificate III in Joinery (Stairs) CPCCJN3005A Cut and install glass Steelfixing Installing reinforcing requirements for structural concrete in all classes of building. 1 BCG31103 Certificate III in Steel Fixing 2 CPC31108 Certificate III in Steelfixing 3 CPC31111 Certificate III in Steelfixing 4 Stonemasonry Construction and undersetting of walls using natural stone (Non manufactured masonry units) in lieu of bricks or blocks. 1 BCF30600 Certificate III in Stonemasonry (Monumental/Installation) 2 Page 28 of 35 Last updated 25 June 2014

29 CPC32308 Certificate III in Stonemasonry (Monumental/Installation) 3 CPC32311 Certificate III in Stonemasonry (Monumental/Installation) 4 Stormwater drainage ltd to 90mm Installation of storm water pipes not exceeding 90mm in diameter. Structural steel erection Installation of heavy steel framework and light steel framing.. Swimming pool construction Construction of concrete pools or installation of prefabricated (fibreglass or the like) pools including all earthworks, pool plumbing, finishing of concrete surfaces, fencing and landscaping. Swimming pool construction ltd to: installation of prefabricated pools Refer to swimming pool construction but limited to installation of prefabricated pools. Installation of prefabricated pools like fibreglass or above ground pools. Swimming pool construction ltd to: the installation of pumps, filtration equipment, chlorinators, heaters and associated pipe work Installation of pumps, filtration equipment, chlorinators, heaters and associated pipe work Page 29 of 35 Last updated 25 June 2014

30 Tilt panel construction Manufacture on site and installation of precast panels. Includes the installation of precast panels manufactured off site. Underpinning Installation of additional under footing support. 1 BCG31298 Certificate III in General Construction (Concreting/Steelfixing) BCG3063A Carry out tilt slab construction 2 BCG30303 Certificate III in Concreting BCGSF2004B Place and fix reinforcement materials BCGSF3001B Apply reinforcement schedule BCGCO3008B Carry out tilt panel construction 3 CPC30308 Certificate III in Concreting CPCCSF2004A Place and fix reinforcement materials CPCCSF3001A Apply reinforcement schedule CPCCC03008A Carry out tilt panel construction CPCCCM1007A Carry out tilt-up work safely 4 CPC30311 Certificate III in Concreting CPCCSF2004A Place and fix reinforcement materials CPCCSF3001A Apply reinforcement schedule CPCCC03028A Carry out tilt panel construction CPCCCM2011A Carry out tilt-up work safely 5 CPC30313 Certificate III In Concreting And CPCCSF300A Apply reinforcement schedule CPCCO3048A Construct tilt panels on site CPCCCM1016A Identify requirements for safe tilt-up work Page 30 of 35 Last updated 25 June 2014

31 Wall & floor tiling All wall and floor tiling without restriction. 1 BCG30198 Certificate III in General Construction (Wall and Floor Tiling) 2 BCG31303 Certificate III in Wall and Floor Tiling 3 CPC31308 Certificate III in Wall and Floor Tiling 4 CPC31311 Certificate III in Wall and Floor Tiling 5 Water proofing ltd to bathrooms, laundries, & balconies As above. For all waterproofing applications, refer to Construction water proofing. 1 Also see construction waterproofing 2 Schedule 2 (Part 2) Building work supervisors registration performance criteria Building work supervisors registration performance criteria Regulation 11(2) provides that for the purposes of section 16 of the Act, to be entitled to be granted registration as a building work supervisor, a natural person must have qualifications or experience, or qualifications and experience, such that the person meets the performance criteria set out in the table below to the satisfaction of the Commissioner in relation to the kind of work that the registration would authorise the person to supervise. 1 Building Work Management UNIT Applying the principles of building work management in relation to the supervision of a building site. ELEMENT 1.1 Planning and organising on-site building work. PERFORMANCE CRITERIA Translate building designs and specifications into operational requirements Develop strategies for implementing building operations. Page 31 of 35 Last updated 25 June 2014

32 1.2 Determining the need for coordination and installation of temporary structures and facilities for building work Determine appropriate resources required including personnel, materials and equipment Determine the requirements for temporary structures and facilities Demonstrate a working knowledge of the most appropriate methods for provision of site facilities and preparation of detailed site layouts Coordinate the on-site approvals of temporary structures. 1.3 Preparing project schedules Prepare schedules for building work Arrange for and supervise the supply, erection, maintenance and removal of temporary structures and facilities Update schedules Prepare reports on current status Assess the need for and select measures to overcome delays. 1.4 Managing on-site building work Supervise on-site operations Administer subcontracts Administer progress claims Organise the supply and installation of materials and equipment Manage appropriate operational systems including occupational health and safety, accident and injury reporting, and industrial relations Plan, develop and oversee safe working systems for all site work Communicate effectively with personnel on and off the site. Page 32 of 35 Last updated 25 June 2014

33 Building Work Management In relation to the type of building work sought, explain how you meet the performance criteria set out above: 2 Building Technology Applying the principles of building technology to on-site building work. ELEMENT 2.1 Applying the principles of building work practice. UNIT Select and apply building principles and methods including (a) (b) (c) (d) appraisal of site conditions; erection and construction techniques; sequencing of trades; control of plant and equipment Demonstrate a working knowledge of (a) (b) (c) (d) the use of basic measuring techniques; PERFORMANCE CRITERIA the setting up and use of instruments to determine heights and levels; demolition methods; formwork design Interpret plans and specifications Produce simple working drawings suitable for on-site application Identify and select suitable materials. Page 33 of 35 Last updated 25 June 2014

34 2.1.6 Control the movement of materials on-site and their safe handling and storage Apply a basic understanding of (a) properties and behaviours of structural materials; (b) sectional properties of structural elements; (c) structural load calculations; (d) performance of beams, columns and bracing; (e) utilisation of roof truss systems Apply the basic principles of estimating and demonstrate a working knowledge of take-off quantities for (a) site works; (b) structure; (c) fit-out and finish Demonstrate a general knowledge of the process of the coordination of specialist services on-site. Building Technology In relation to the type of building work sought, explain how you meet the performance criteria set out above: 3 Legislative requirements Applying a detailed knowledge of legislative requirements in respect of on-site building work. ELEMENT 3.1 Applying the requirements of legislation, standards and codes relevant to on-site building work. UNIT Identify the range of legislation applying to building work. PERFORMANCE CRITERIA Page 34 of 35 Last updated 25 June 2014

35 Legislative requirements Apply the requirements of legislation and relevant standards and codes to the coordination and supervision of on-site building work Understand the requirements of relevant legislation, standards and codes to the performance of residential, commercial and industrial building work. In relation to the type of building work sought, explain how you meet the performance criteria set out above: Page 35 of 35 Last updated 25 June 2014

Trade Licensing Guide Queensland. Use this guide to verify which licensed trade you need for your home improvement job

Trade Licensing Guide Queensland. Use this guide to verify which licensed trade you need for your home improvement job Trade Licensing Guide Queensland Use this guide to verify which licensed trade you need for your home improvement job Is Your Tradesperson Licensed? Have you ever asked a tradesperson for their licence?

More information

Trade Licensing Guide Victoria. Use this guide to verify which licensed trade you need for your home improvement job

Trade Licensing Guide Victoria. Use this guide to verify which licensed trade you need for your home improvement job Trade Licensing Guide Victoria Use this guide to verify which licensed trade you need for your home improvement job Is Your Tradesperson Licensed? Have you ever asked a tradesperson for their licence?

More information

Higher Level Skills eligibility criteria

Higher Level Skills eligibility criteria Higher Level Skills eligibility criteria The Queensland Government has released funding for certain programs under their VET investment plan. One of the funding programs is the Higher Level Skills program.

More information

TAXABLE PAYMENTS FACTSHEET. If you run a business in the building and. construction industry then you ll soon need

TAXABLE PAYMENTS FACTSHEET. If you run a business in the building and. construction industry then you ll soon need If you run a business in the building and construction industry then you ll soon need to do your Taxable Payments reporting. This factsheet contains a summary of the key tax changes surrounding taxable

More information

When is a building permit required? Practice Notes Issued January This updates the previous Practice Note issued June 2006.

When is a building permit required? Practice Notes Issued January This updates the previous Practice Note issued June 2006. Issued January 2008 When is a building permit required? This updates the previous Practice te 2006-2 issued June 2006.. Summary Some building work is of such a minor nature that the protections and advantages

More information

B. RESIDENTIAL MASTER PLUMBER $ $ $

B. RESIDENTIAL MASTER PLUMBER $ $ $ FEE SCHEDULE FOR LICENSE Res. Non-Res. Out of State BUILDING CATEGORIES A. GENERAL CONTRACTOR (Unlimited Scope) B. BUILDING CONTRACTOR $ 100.00 $ 150.00 $ 300.00 Limited to construction and remodeling

More information

DUO Contemporary- Ash 1

DUO Contemporary- Ash 1 Renders are indicative only. - Min Block Width 186sqm Build Size DUO 186 - Contemporary- Ash 1 4 2 1 1 1 1 DUO 186(B) 12.5 Min Block Width 4 2 2 186sqm Build Size 1 1 1 ens ensuite master bed pavilion

More information

Project Specifications

Project Specifications Project Specifications Unit 1, 2 & 3 / 1 Carmen Street, NEWPORT These specifications form part of the building contract. The owner shall therefore ensure that the project specifications are fully and accurately

More information

SOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS

SOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS Buyer s Guide HOMES 1300 985 110 LIVING SUPPORT SOLUTIONS 2 BCDS0868 Contents Just imagine the space you can create 4 More reasons to choose SmartSpace 8 SmartSpace Project Planner 9 Design your SmartSpace

More information

KOOKABURRA HOMES TWO STOREY HOMES. Standard Inclusions. kookaburrahomes.com.au

KOOKABURRA HOMES TWO STOREY HOMES. Standard Inclusions. kookaburrahomes.com.au KOOKABURRA HOMES Standard Inclusions TWO STOREY HOMES kookaburrahomes.com.au 2 CLASSIC TWO STOREY HOMES STANDARD INCLUSIONS PLANNING AND GENERAL WORKS Fixed price contract 3 month maintenance period Council

More information

Intermediate Mapping Grid: CPC30211 Certificate III in Carpentry

Intermediate Mapping Grid: CPC30211 Certificate III in Carpentry Intermediate Mapping Grid: CPC30211 Certificate III in Carpentry 30 units must be completed: 22 core units and 8 elective units Title: Basic Building and Construction Skills 5e Authors: South Western Sydney

More information

SOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS

SOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS Buyer s Guide Contents 1300 985 110 LIVING SUPPORT SOLUTIONS Just imagine the space you can create 5 More reasons to choose SmartSpace 9 SmartSpace Project Planner 10 Design your SmartSpace 13 SmartSpace

More information

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information

More information

HANDOVER INSPECTION PRE-PURCHASE BUILDING INSPECTION REPORT

HANDOVER INSPECTION PRE-PURCHASE BUILDING INSPECTION REPORT PPDoesn t Apply HANDOVER INSPECTION PRE-PURCHASE BUILDING INSPECTION REPORT This Report» Building Inspection Report» House ONLY» House AND Unit» All inspections are standard visual reports in accordance

More information

SAVE YOURSELF TIME AND MONEY! PLEASE READ THE FOLLOWING INFORMATION:

SAVE YOURSELF TIME AND MONEY! PLEASE READ THE FOLLOWING INFORMATION: TOWN OF SURFSIDE BEACH, SC SUBSTANTIAL IMPROVEMENT NOTICE TO PROPERTY OWNERS Rebuilding your Home or Non-residential structure after the storm? Adding on, renovating, or remodeling your home or business?

More information

CARPENTRY WORKPLACE TASKS - CHECK LIST (Note: for employer reference only)

CARPENTRY WORKPLACE TASKS - CHECK LIST (Note: for employer reference only) CARPENTRY WORKPLACE TASKS - CHECK LIST (Note: for employer reference only) CPCCOHS2001A OHS requirements in the construction industry This Unit of competency specifies the outcomes required to carry out

More information

FACT SHEET CPC CERTIFICATE III IN Formwork/Falsework

FACT SHEET CPC CERTIFICATE III IN Formwork/Falsework FACT SHEET CPC31511 - CERTIFICATE III IN Formwork/Falsework This qualification provides a trade outcome in construction of formwork and falsework. covering work in residential and commercial applications.

More information

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: S FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: Included Costs: Items that must be included in the costs of improvement or costs to repair are those that are directly associated with the

More information

CONSTRUCTION SMARTSCREEN

CONSTRUCTION SMARTSCREEN 6704 Level 1 Construction Trade Occupations - 325 + VAT (SS6704-LV1 ) Unit 102 - Construction Trade Occupations - Painting and Decorating Unit 103 - Construction Trade Occupations - Plastering Unit 104

More information

Our standard inclusions.

Our standard inclusions. Our standard inclusions. We pride ourselves on offering you certainty on a fixed price that includes everything you need in your new home. Before you make a final choice on your new home, check that all

More information

FIRE AND SOUND RESISTANCE OF BLOCK MASONRY

FIRE AND SOUND RESISTANCE OF BLOCK MASONRY FIRE AND SOUND RESISTANCE OF BLOCK MASONRY 1 INDEX 2. Introduction 3. Table 1 Properties 4. Design for fire 5. Table 2 FRL requirements (spans two pages) 7. Some other requirements 7. Some concessions

More information

Plant, Construction & Business NVQs

Plant, Construction & Business NVQs Plant, Construction & Business NVQs We offer a wide range of National Vocational Qualifications (NVQs). NVQs are qualifications that allow you to prove your competence in the workplace. You will have the

More information

KOOKABURRA HOMES BRICK HOMES. Standard Inclusions. kookaburrahomes.com.au

KOOKABURRA HOMES BRICK HOMES. Standard Inclusions. kookaburrahomes.com.au KOOKABURRA HOMES Standard Inclusions BRICK HOMES kookaburrahomes.com.au 1 KOOKABURRA HOMES STANDARD INCLUSIONS PLANNING AND GENERAL WORKS Fixed price contract 3 month maintenance period Council application

More information

COASTAL INCLUSIONS LIST

COASTAL INCLUSIONS LIST COASTAL INCLUSIONS LIST ALL PRICES INCLUDE: H.I.A. Fixed Price Contract. Site inspection and detailed feature & level survey. Bushfire Attack Level of 12.5 (if applicable). Provisional Sum allowance for

More information

Manx Accredited Construction Contractors Scheme 2018/19

Manx Accredited Construction Contractors Scheme 2018/19 Manx Accredited Construction Contractors Scheme 2018/19 Appendix 3 - Categories of Contractor The Manx Accredited Contractors Scheme is administered by the IOM Construction Federation and application may

More information

Construction Curriculum Framework (TVET)

Construction Curriculum Framework (TVET) Construction Curriculum Framework (TVET) Last updated April 2006 Extract from the Board of Studies Construction Curriculum Framework Stage 6 Syllabus Construction Curriculum Framework Construction (120

More information

proposed dwelling fjm homes lot 7 wrinklers drive scamander tasmania 7215 concept design jennifer binns Building Areas

proposed dwelling fjm homes lot 7 wrinklers drive scamander tasmania 7215 concept design jennifer binns Building Areas fjm homes scamander tasmania 7215 concept design Building Areas first floor 183.44 garage 39.58 ground floor 37.56 deck 37.45 porch 8.95 306.99 jennifer binns BUILDING DESIGN level 1 avery house, 48 cecilia

More information

cjd N02 Canon Hill Crescent - Scope Of Refurbishment Works September 2014 External

cjd N02 Canon Hill Crescent - Scope Of Refurbishment Works September 2014 External External 1 Driveway & Forecourt Entry Remove / replace existing iron gate (new modernised iron design). Remove / replace existing brick columns & up stands (new block with plaster finish). Remove / replace

More information

Owner Builder Inspection Report

Owner Builder Inspection Report www.sherspec.com Owner Builder Inspection Report PREPARED FOR USE IN ASSESSING A PROPOSAL FOR WARRANTY INSURANCE TO BE ISSUED UNDER SECTION 137B (2)(a) OF THE BUILDING ACT 1993 INSPECTION DETAILS Registered

More information

Home Inclusions $410, HOME & LAND PACKAGE MARCOOLA Land Content $ MARCOOLA. 4 Bedroom 2 Bathroom Multiple living zones Alfresco

Home Inclusions $410, HOME & LAND PACKAGE MARCOOLA Land Content $ MARCOOLA. 4 Bedroom 2 Bathroom Multiple living zones Alfresco HOME & LAND PACKAGE MARCOOLA Land Content $180000.00 $410,000.00 Please note: actual façade may vary slightly from picture. MARCOOLA 4 Bedroom 2 Bathroom Multiple living zones Alfresco Double Lockup Garage

More information

KOOKABURRA HOMES STANDARD INCLUSIONS CLASSIC HOMES

KOOKABURRA HOMES STANDARD INCLUSIONS CLASSIC HOMES KOOKABURRA HOMES STANDARD INCLUSIONS CLASSIC HOMES www.kookaburrahomes.com.au 2 KOOKABURRA HOMES STANDARD INCLUSIONS PLANNING AND GENERAL WORKS Fixed price contract 3 month maintenance period Council application

More information

Complying Development Checklist for Alterations (not Additions) to Dwellings & Ancillary Development. under the NSW Housing Alterations Code

Complying Development Checklist for Alterations (not Additions) to Dwellings & Ancillary Development. under the NSW Housing Alterations Code ABN 26 807 194 868 Suite 1 146 Oak Road KIRRAWEE NSW Phone 8880 4480 Email: info@mybuildingcertifier.com.au Complying Development Checklist for Alterations (not Additions) to Dwellings & Ancillary Development

More information

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW Parcel Number: Owner s Name: Co-Owner s Name: Owner s Mailing Address: Owner Phone Number: FIRM Panel: Lowest Floor Elevation (excluding garage):

More information

owner builders construction guide copyright - pdh estimating - june 2004

owner builders construction guide copyright - pdh estimating - june 2004 - residential costing services owner builders construction guide copyright - - june 2004 introduction this is a general guide for the owner builder to help in the construction of their own home. It must

More information

CITY OF TARPON SPRINGS, FLORIDA SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNERS

CITY OF TARPON SPRINGS, FLORIDA SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNERS NOTICE TO PROPERTY OWNERS Rebuilding your home after the storm? Adding on, renovating, or remodeling your home? Here s information you need to know about the 50% Rule. If your home or business is below

More information

Your Guide To Our Quality Range Of Exterior And Interior Finishes. Living Inclusions

Your Guide To Our Quality Range Of Exterior And Interior Finishes. Living Inclusions Your Guide To Our Quality Range Of Exterior And Interior Finishes Living Inclusions Hello! Welcome to Meridian Homes. Our standard inclusions have been designed with family in mind. Feel comfortable knowing

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE Information and Required Forms for Structures in Flood Zones AE & VE

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE Information and Required Forms for Structures in Flood Zones AE & VE County of Monroe The Florida Keys Floodplain Coordinator Upper Keys: 305-453-8729 Middle & Lower Keys: 305-289-2866 SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE Information and Required Forms for Structures

More information

BUILDING INFORMATION BAM /11/13

BUILDING INFORMATION BAM /11/13 Westport office: 788-9111 Reefton office: 732-8821 Exempt Building Work Section 41 Schedule 1 Building Act 2004 BUILDING INFORMATION BAM 458 28/11/13 1 General repair, maintenance, and replacement (1)

More information

The Pattison. At a Glance m Study m. 17.

The Pattison. At a Glance m Study m. 17. The Pattison At a Glance... 321.8m 2 4 + Study 2.0 2 21.566 m Please Note: The floor plan provided is for illustrative purposes only and is not drawn precisely to scale. However, the overall length and

More information

The Banksia. At a Glance m Study m. 18.

The Banksia. At a Glance m Study m. 18. The Banksia At a Glance... 350.1m 2 4 + Study 2.0 20.870 m Please Note: The floor plan provided is for illustrative purposes only and is not drawn precisely to scale. However, the overall length and width

More information

This document is a work in process, and is evolving.

This document is a work in process, and is evolving. 1 2 Please note the following: This document has been developed by the teachers in the Building, Design and Drafting section at Tonsley TafeSA, and is only a basic and simple guide to help you in your

More information

Standard Inclusions for

Standard Inclusions for Standard Inclusions for Preliminaries Soil test Contour Survey & Site Assessment Property Service Information Working Drawings Building permit and application fees Engineering Site & Connections Connections

More information

Taxable payments reporting - building and construction industry Overview

Taxable payments reporting - building and construction industry Overview Taxable payments reporting - building and construction industry Overview From 1 July 2012, businesses in the building and construction industry need to report the total payments they make to each contractor

More information

Schedule T5. Tender Documents. This tender is for: Tender Documents: The documents issued for this tender include the following: Tender Schedules

Schedule T5. Tender Documents. This tender is for: Tender Documents: The documents issued for this tender include the following: Tender Schedules Schedule T Tender Documents T This tender is for: Contract: Location: Tender Documents: Norrie Home 56 Hardinge Road The documents issued for this tender include the following: Tender Schedules Schedule

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

Executive Inclusions PRELIMINARIES:

Executive Inclusions PRELIMINARIES: Executive Inclusions PRELIMINARIES: Planning, Building Rules Consent & Development Approval Payment of CITB Levy Building Indemnity Insurance Public Liability Insurance during instruction Footings Inspection

More information

CostGuide Market Summary Overview

CostGuide Market Summary Overview CostGuide 2018 Market Summary Overview Year after year low interest rates and competitive construction pricing continues to make it a good time to renovate or construct a tailor designed dwelling. Interest

More information

f. Sign Installer/Hanger must submit the following to qualify for a license: i. Certificate of Insurance 1. $300,000 Minimum Liability Coverage

f. Sign Installer/Hanger must submit the following to qualify for a license: i. Certificate of Insurance 1. $300,000 Minimum Liability Coverage City of Arkansas City Contractor s License Application Information 1. Contractor must completely fill out the license application. 2. Decide what type of license to obtain. (Definitions on the back of

More information

Price List - All Qualifications

Price List - All Qualifications Price List - All Qualifications Qualifications Prices in VAT not included 601/1996/2 ProQual Level 1 Award in Health and Safety in a Construction Environment (QCF) 150 601/1858/1 ProQual Level 1 Certificate

More information

Home Inclusions or Domainehomes.com.au

Home Inclusions or Domainehomes.com.au Home Inclusions 13 64 69 or Domainehomes.com.au Home Inclusions Your new inclusions begin here Home Inclusions Box Hill Lux 18 Narrow Site Inclusions Costs & Basix Slab Up to "H1" Australian standard engineered

More information

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017 Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins

More information

Deluxe Inclusions for

Deluxe Inclusions for Deluxe Inclusions for Preliminaries Soil test Contour Survey & Site Assessment Property Service Information Working Drawings Building permit and application fees Engineering Site & Connections Connections

More information

Powder Coated Merino. Colorbond Dune. Concrete Tiles- Concrete Tiles Slate Grey Finish. Colorbond Paperbark. Concrete Tiles- Concrete Tile -

Powder Coated Merino. Colorbond Dune. Concrete Tiles- Concrete Tiles Slate Grey Finish. Colorbond Paperbark. Concrete Tiles- Concrete Tile - Colorbond Dune Powder Coated Merino Colorbond Paperbark Concrete Tiles- Concrete Tile - Concrete Tiles Slate Grey Finish Dulux Whisper White PCWF6 Concrete Tiles- Concrete Tile - Dulux Beige Royal Half

More information

THE BEST INCLUSIONS ALTI 202

THE BEST INCLUSIONS ALTI 202 THE BEST INCLUSIONS ALTI 202 WHITE LABEL RANGE WHITE LABEL INCLUSIONS PRELIMINARY WORKS Site Survey, soil test, site inspections as required Building Permit application including applicable fee Full set

More information

DESIGN GUIDELINES. (Stages 10, 11, 12 & 13)

DESIGN GUIDELINES. (Stages 10, 11, 12 & 13) DESIGN GUIDELINES (Stages 10, 11, 12 & 13) November 2014 Contents 1.0 Vision for Waterhaven Point Cook... 3 2.0 Purpose of these Guidelines... 3 3.0 Approval Process... 3 4.0 Site Layout and Building Setbacks...

More information

STANDARD SPECIFICATIONS. Page 1

STANDARD SPECIFICATIONS. Page 1 STANAR SPECIFICATIONS Page 1 Page 2 CERTIFICATION AN APPROVALS Complete soil test and engineer s report. Preparation and lodgement of evelopment including drafting of Architectural Plans and all applicable

More information

KOOKABURRA HOMES STANDARD INCLUSIONS TRANSPORTABLE HOMES. MURRAY BRIDGE STANDARD INCLUSIONS + PRICE LIST 1

KOOKABURRA HOMES STANDARD INCLUSIONS TRANSPORTABLE HOMES.   MURRAY BRIDGE STANDARD INCLUSIONS + PRICE LIST 1 KOOKABURRA HOMES STANDARD INCLUSIONS TRANSPORTABLE HOMES www.kookaburrahomes.com.au MURRAY BRIDGE STANDARD INCLUSIONS + PRICE LIST 1 2 MURRAY BRIDGE STANDARD INCLUSIONS + PRICE LIST KOOKABURRA HOMES STANDARD

More information

This guide only applies for sewer assets up to and including 225mm diameter.

This guide only applies for sewer assets up to and including 225mm diameter. INTRODUCTION This guide only applies for sewer assets up to and including 225mm diameter. These guidelines (subject to change) provide an outline of the requirements which need to be considered when planning

More information

City of Gary DEPARTMENT OF COMMERCE BUILDING DIVISION

City of Gary DEPARTMENT OF COMMERCE BUILDING DIVISION City of Gary DEPARTMENT OF COMMERCE BUILDING DIVISION KAREN FREEMAN-WILSON 401 Broadway Room 307 FLORZELL HAWKINS, JR. Mayor Gary, IN 46402 Building Commissioner (219) 881-1377 Fax: (219) 881-1425 SCOPE

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

CB04. Outback House. Case Study. Creative Spaces Australia. by Casey Brown Architecture

CB04. Outback House. Case Study. Creative Spaces Australia. by Casey Brown Architecture CB04 Case Study Outback House by Casey Brown Architecture Creative Spaces Australia E : info@creativespacesaustralia.com.au www.creativespacesaustralia.com.au Introduction Inspired by the big sheds of

More information

URBAN DESIGN GUIDELINES

URBAN DESIGN GUIDELINES URBAN DESIGN GUIDELINES Page C RIVERVIEW CONTENTS Introduction 02 The Process 03 Setbacks & Site Coverage 04 Building Materials 05 Vehicle Access to Allotments & Positioning of Crossovers 07 Design &

More information

2018 AUSTERE NSW TURN-KEY INCLUSION SPECIFICATIONS (PER DWELLING WHERE APPLICABLE):

2018 AUSTERE NSW TURN-KEY INCLUSION SPECIFICATIONS (PER DWELLING WHERE APPLICABLE): 2018 AUSTERE NSW TURN-KEY INCLUSION SPECIFICATIONS (PER DWELLING WHERE APPLICABLE): The following comprehensive list of Standard Turn-Key Inclusions for the new dwelling are to be read in conjunction with

More information

The Base, Dartford Business Park, Victoria Road, Dartford, Kent, DA1 5FS Office: Fax:

The Base, Dartford Business Park, Victoria Road, Dartford, Kent, DA1 5FS Office: Fax: The Base, Dartford Business Park, Victoria Road, Dartford, Kent, DA1 5FS Office: 01322 352330 Fax: 0845 46813374 Email:info@fabricsandmaintenance.com Web: www.ukbuildingcontractors.co.uk Was founded in

More information

KOOKABURRA HOMES TRANSPORTABLE HOMES. Standard Inclusions. kookaburrahomes.com.au

KOOKABURRA HOMES TRANSPORTABLE HOMES. Standard Inclusions. kookaburrahomes.com.au KOOKABURRA HOMES Standard Inclusions TRANSPORTABLE HOMES kookaburrahomes.com.au 2 MURRAY BRIDGE STANDARD INCLUSIONS + PRICE LIST KOOKABURRA HOMES STANDARD INCLUSIONS PLANNING AND GENERAL WORKS Fixed price

More information

Duplex_Cost Summary_ SAMPLE 43,465 SUM) 19 ELECTRICAL SERVICES (PROVISIONAL 24,820 SUM) 20 MECHANICAL SERVICES (PROVISIONAL

Duplex_Cost Summary_ SAMPLE 43,465 SUM) 19 ELECTRICAL SERVICES (PROVISIONAL 24,820 SUM) 20 MECHANICAL SERVICES (PROVISIONAL Duplex_Cost Summary_05.05.15 Job Name : Client's Name: BUILDER Builder sample Job Description Demolition of existing dwelling incl. Trd Trade Description Trade Cost/m2 Trade % Total 1 PRELIMINARIES 11.93

More information

INSPECT DIRECT. Web Page: THIS REPORT IS VALID FOR (6) MONTHS FROM THE DATE OF MOST RECENT INSPECTION.

INSPECT DIRECT. Web Page:  THIS REPORT IS VALID FOR (6) MONTHS FROM THE DATE OF MOST RECENT INSPECTION. INSPECT DIRECT Ph: 1300 133363 THIS REPORT IS VALID FOR (6) MONTHS FROM THE DATE OF MOST RECENT INSPECTION. REPORT ON DOMESTIC BUILDING WORK UNDER SECTION 137B OF THE BUILDING ACT 1993 (OWNER-BUILDER CONSTRUCTION)

More information

Freeling. reeling is located just 60km north f Adelaide it s an easy hour s drive o one of the most charming country owns in the state.

Freeling. reeling is located just 60km north f Adelaide it s an easy hour s drive o one of the most charming country owns in the state. reeling is located just 60km north f Adelaide it s an easy hour s drive o one of the most charming country owns in the state. Urban Design Guidelines March 2008 Freeling 00 Contents Welcome 3 Purpose of

More information

NAAHB Workgroup Index General Ledger Account

NAAHB Workgroup Index General Ledger Account NAAHB Workgroup Index General Ledger Account 1000 Series Preparation/Preliminaries 1000 Permits/Fees 1010 Building Permits 1020 HBA Assessments 1030 Warranty Fees 1100 Architectural/Engineering 1110 Blue

More information

Whether you re buying or investing, a Buy-Wise Building & Pest Inspection will tell you of everything you need to know about your new property.

Whether you re buying or investing, a Buy-Wise Building & Pest Inspection will tell you of everything you need to know about your new property. 1 Introducing. Whether you re buying or investing, a Buy-Wise Building & Pest Inspection will tell you of everything you need to know about your new property. Our Building Inspectors are all Registered

More information

Stage 10 Design & Building Guidelines

Stage 10 Design & Building Guidelines Stage 10 Design & Building Guidelines DESIRED CHARACTER/VISION The development of The Rivergums presents the opportunity to create a high quality and more sustainable living environment by providing an

More information

SAVANNAH HILLS. DOUBLE STOREY SPECIFICATIONS - TYPE D (N) 186m² & D (S) 191m²

SAVANNAH HILLS. DOUBLE STOREY SPECIFICATIONS - TYPE D (N) 186m² & D (S) 191m² SAVANNAH HILLS Updated 14/11/2016 DOUBLE STOREY SPECIFICATIONS - TYPE D (N) 186m² & D (S) 191m² 1. Preliminary and General Engineers certificates for all slabs N H B R C Registration Geological engineer

More information

Appendix 6: Mapping of 21844VIC to 22216VIC

Appendix 6: Mapping of 21844VIC to 22216VIC Appendix 6: Mapping of to 22216VIC Mapping table from Certificate II in Building and Construction (Bricklaying, Carpentry, Solid Plastering) to Construction (Bricklaying, Carpentry, Ceiling Lining, Wall

More information

LOT 25 Blueleaf Place. Brookfield $511,879 SUMMARY

LOT 25 Blueleaf Place. Brookfield $511,879 SUMMARY RENDERS ARE INDICATION ONLY Home size 27sq Land Size 512m2 LOT 25 Blueleaf Place Brookfield 5 2 2 $511,879 SUMMARY Land Price: $219,000 House Price: $292,879 (Fixed Price) Land Size: 512m2 House Size:

More information

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE TABLE OF CONTENTS SECTION TITLE DATE Division 00 Procurement and Contracting Requirements 000101... Project Title Page 000116... CAD Standards 001116... Invitation to Bid 002113... Instructions to Bidders

More information

SCHEDULE OF INCLUSIONS

SCHEDULE OF INCLUSIONS SCHEDULE OF INCLUSIONS GENERAL Builders and Home Warranty Insurance/Builders Indemnity Insurance covered. Public Liability and Workers Comm covered during the project. 6 years structural warranty on the

More information

Complying Development

Complying Development Complying Development Development Control Plan PART 1 - INTRODUCTION PREAMBLE This Development Control Plan (DCP) applies to complying development on lands zoned: For Residential Development: Residential

More information

FOREST PLACE 59 UNITS ERF 5586 PARKLANDS

FOREST PLACE 59 UNITS ERF 5586 PARKLANDS ANNEXURE "C" MATERIAL AND FINISHES SPECIFICATION FOREST PLACE 59 UNITS ERF 5586 PARKLANDS 1. FOUNDATIONS AND STRUCTURE Foundation walls are to be built in strict accordance with the municipal building

More information

Metriton Standard Inclusions

Metriton Standard Inclusions Metriton Standard Inclusions External Foundation Alfresco Roof Bricks Fascia & Gutters Downpipes Water Heater Recess Box Electrical Box Garage Door Eaves Waffle pod concrete slab to engineer specifications

More information

American Safety Insurance Company

American Safety Insurance Company American Safety Insurance Company General Liability Program A- Rated (Non-Admitted) Table of Contents Page 2 Page 3 Page 4 5 Underwriting Guidelines and Coverages Prohibited Classes Underwriting Classification

More information

contents 1 introduction general requirements building design guidelines... 2

contents 1 introduction general requirements building design guidelines... 2 138 rix road, building design guidelines hansen partnership pty ltd 1 contents 1 introduction... 2 2 general requirements... 2 3 building design guidelines... 2 building siting and site cover... 2 front

More information

SUBSTANTIAL IMPROVEMENT

SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT General Discussion The following discussion addresses several of the issues surrounding the NFIP regulations concerning substantial improvement and substantial damage. The attached

More information

Inspect Direct Pty Ltd

Inspect Direct Pty Ltd What do we inspect? Inspection includes a moisture check of the building for water leakage, dampness and missing insulation. We look at all areas of the building including the exterior and interior of

More information

Inspect Direct Pty Ltd

Inspect Direct Pty Ltd What do we inspect? Inspection includes a moisture check of the building for water leakage, dampness and missing insulation. We look at all areas of the building including the exterior and interior of

More information

Gain an NVQ qualification for your skills

Gain an NVQ qualification for your skills 1 Gain an NVQ qualification for your skills Health & Safety? DIY? Construction Trade Skills? We've got it covered. Find out more in our range of brochures shown below. DIY academy with CST 1 H ea lt h

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

Name: Address: Phone: Mobile: Project Address: Lot No. and DP No: Project Type: New Dwelling

Name: Address: Phone: Mobile:   Project Address: Lot No. and DP No: Project Type: New Dwelling GHA Design Brief Name: Address: Phone: Mobile: Email: Project Address: Lot No. and DP No: Project Type: New Dwelling Dual Occupancy Extension/Renovation Townhouse/Units Granny Flat 1.0 THE WHY (including

More information

The need-to-know stuff:

The need-to-know stuff: 22338VIC Certificate II in Building and Construction (Bricklaying) Pre-Apprenticeship Duration Training location basic skills and knowledge to enter the bricklaying or other building trades, and is designed

More information

Via Parque Alicante BUILDING SPECIFICATIONS

Via Parque Alicante BUILDING SPECIFICATIONS WE BUILD YOUR HOUSE, SO YOU CAN MAKE IT A HOME Via Parque Alicante BUILDING SPECIFICATIONS f\ acciona Inmobiliaria First impressions do count 01. FAÇADE Facing brick façade to feature two colours, depending

More information

ANNEX 9-F CONSTRUCTION SERVICES AND WORKS CONCESSIONS PART 1 SINGAPORE S COMMITMENTS

ANNEX 9-F CONSTRUCTION SERVICES AND WORKS CONCESSIONS PART 1 SINGAPORE S COMMITMENTS ANNEX 9-F CONSTRUCTION SERVICES AND WORKS CONCESSIONS PART 1 SINGAPORE S COMMITMENTS The following construction services in the sense of Division 51 of the Central Product Classification as contained in

More information

W i s d o m S m a r t C o l l e c t i o n. Aristotle series

W i s d o m S m a r t C o l l e c t i o n. Aristotle series W i s d o m S m a r t C o l l e c t i o n Aristotle series 8490mm Aristotle 16 Area Calculations ARIstotle 16 Itemised Floor Areas Ground Floor Garage Porch Outdoor Leisure Area 118.22 sqm 20.04 sqm 1.53

More information

FACT SHEET CPC CERTIFICATE III IN CARPENTRY

FACT SHEET CPC CERTIFICATE III IN CARPENTRY CPC30211 - CERTIFICATE III IN CARPENTRY This qualification provides a trade outcome in carpentry, covering work in residential and commercial applications. The qualification has core unit of competency

More information

SITE ANALYSIS, DESIGN BRIEF AND CASE STUDY

SITE ANALYSIS, DESIGN BRIEF AND CASE STUDY Page 1 of 13 UNIVERSITY OF NAIROBI SCHOOL OF THE BUILT ENVIRONMENT PORTFOLIO PROPOSED HOTEL IN WESTLANDS SITE ANALYSIS, DESIGN BRIEF AND CASE STUDY Prepared by: OGEGA DOUGLAS OKIOMA BACHELOR OF CONSTRUCTION

More information

Bella Rosa Design Guidelines

Bella Rosa Design Guidelines Bella Rosa Design Guidelines 1 P a g e Table of Contents Overview 3 Design Guidelines 4 Gaining Approval 4 Design Guidelines and Covenants 6 Identical Façade Assessment 6 Design Requirements 6 Building

More information

FACT SHEET CPC CERTIFICATE III IN CARPENTRY

FACT SHEET CPC CERTIFICATE III IN CARPENTRY FACT SHEET CPC30211 - CERTIFICATE III IN CARPENTRY This qualification provides a trade outcome in carpentry, covering work in residential and commercial applications. The qualification has core unit of

More information

Benefited Land means all the lots created when the Land is subdivided in accordance with the Deposited Plan;

Benefited Land means all the lots created when the Land is subdivided in accordance with the Deposited Plan; TAYLOR PRIVATE ESTATE STAGE 15B RESTRICTIVE COVENANT 1. Definitions 1.1 In this Deed: Benefited Land means all the lots created when the Land is subdivided in accordance with the Deposited Plan; Benefited

More information

S pecifications and I nclusions

S pecifications and I nclusions S pecifications and I nclusions STRUCTURAL / EXTERNAL / GARAGE FLOORING BUTLERS PANTRY (House Specific) A choice of feature front doors Brickwork over windows (house/facade specific) Aluminum stacker or

More information

CABONNE COUNCIL DEVELOPMENT CONTROL PLAN NO. 15 RELOCATABLE AND TRANSPORTABLE HOMES

CABONNE COUNCIL DEVELOPMENT CONTROL PLAN NO. 15 RELOCATABLE AND TRANSPORTABLE HOMES CABONNE COUNCIL DEVELOPMENT CONTROL PLAN NO. 15 RELOCATABLE AND TRANSPORTABLE HOMES As approved by Council at the meeting of 20 June 2005 Came into effect on 14 July 2005 I, G. L. P. Fleming, General Manager,

More information