LORONG K, TELUK KURAU 4 STOREY STRATA-TITLE APARTMENT WITH LIFT & SWIMMING POOL. At Lorong K, Teluk Kurau, Singapore
|
|
- Emery Goodwin
- 5 years ago
- Views:
Transcription
1 Design, Fabrication & Supply of Materials: LORONG K, TELUK KURAU 4 STOREY STRATA-TITLE APARTMENT WITH LIFT & SWIMMING POOL At Lorong K, Teluk Kurau, Singapore
2 CONTENT PROJECT INFORMATION 2 W&A BUILDING SYSTEM INTRODUCTION 3 W&A PRE-ENGINEERED STEEL Design and Specifications 4-6 Fabrication 7 Installation 8-10 W&A FLOORING SYSTEM 11 W&A ALC WALL SYSTEM Application Details and Connection 16 Panel Configuration COMPLETION PHOTOS External Façade Internal Finishing 23-24
3 PROJECT INFORMATION 1. Project location: Lor K Telok Kurau Singapore; 2. Building application: Apartment; 3. Build up area: 3157 M 2 ; 4. NO of storey: 4 storey + 1 Basement 5. Building system: - Steel structure - Metal decking floor - ALC wall - Metal roof 6. Estimated Schedule: 14 month
4 W&A BUILDING SYSTEM INTRODUCTION Pre-engineered Steel Structure, Q345B, HDG Double layer metal sheet roof system (M-Snap) ALC Wall Panel Besta Board Fins Metal Deck with RC Slab Aluminium Frame Curtain Wall
5 W&A PRE-ENGINEERED STEEL DESIGN & SPECIFICATIONS A.Building Regulation & Design Code Building Control Regulation (1989) BS 6399: Part 1: 1996 Design Loading for Buildings SS CP65: Part 1: 1999 Structural Use of Concrete BS 5950: Part 1: 2000 Structural Use of Steelwork in Buildings BC 1: 2012 Design Guide on Use of Alternative Steel Materials to BS5950 CP3 : 1972 Basic Data for the Design of Building B.Design Loading (Live Load) Second Storey 1.5KN/m2 Third Storey 1.5KN/m2 Attic Storey 1.5KN/m2 Roof Storey 0.5KN/m2 Roof ( equipment area ) 7.5KN/m2 (Dead Load) Second Storey Third Storey Attic Storey Roof Storey Wind Load 4.2KN/ m2 4.2KN/ m2 4.2KN/ m2 0.5KN/ m kn/ m2
6 W&A PRE-ENGINEERED STEEL DESIGN & SPECIFICATIONS Structure Design And Calculation By Midas Gen
7 W&A PRE-ENGINEERED STEEL DESIGN & SPECIFICATIONS Roof Structure & Lift Shaft Shop Drawing Design By Tekla Structure Column & Beam Connection
8 W&A PRE-ENGINEERED STEEL FABRICATION FABRICATION WORKS QA/QC CHECK BY SETSCO HOT DIPPED GALVANIZING PACKING & LOADING
9 W&A PRE-ENGINEERED STEEL INSTALLATION Bolt & Nut Connection No Welding on Structure Tapered Column to reduce steel weight 140mm wide column designed to requirement Column Connection to Ground Beam
10 W&A PRE-ENGINEERED STEEL INSTALLATION Pre-rolled Curve Roof Beam Pre-fab Steel Staircase Steel Lift Shaft
11 W&A METAL DECKING FLOOR SYSTEM W&A METAL DECK We provide layout for every piece of metal deck This is to illustrate on how decking is installed and integrated with our steel structure W&A design and supply decking, shear studs and end capping W&A also include design of the reinforced concrete slab thickness Metal deck designed as noncomposite to eliminate the requirement of fire proofing at slab soffit
12 ALC Panel Performance W&A ALC WALL PANEL SYSTEM Dry Density = Kg/m3 Compressive Strength > 4.0 Mpa Heat Conductivity Coefficient < 0.13 W/m.k Dry Shrinkage < 0.13mm/m Single Point Hanging Force = 1200N
13 W&A ALC WALL PANEL APPLICATION ALC Panel used at EXTERNAL WALL
14 W&A ALC WALL PANEL APPLICATION ALC Panel used at CURVE WALL - Easily cut and suit for curve walls - No special tools are needed ALC Panel used at CAVITY PARTITION WALL - 75mm ALC + 28mm air gap + 75mm ALC - Acoustic Property at 52dB - Ease of installation M&E Conduit
15 W&A ALC WALL PANEL APPLICATION Partition Wall 75mm ALC 2 layers External Wall 125mm ALC ALC FINISHING with Skim Coat Only NO PLASTERING Internal Wall 75mm & 100mm ALC
16 W&A ALC WALL PANEL TYPICAL DETAILS & CONNECTION
17 W&A ALC WALL PANEL CONFIGURATION W&A WALL PANEL LAYOUT We provide layout for every piece of ALC panel This is to illustrate on how ALC panel are installed and integrated with our steel structure In-house designer to communicate with client s representative to resolve queries and provide technical support Wall Panel layout designed using Tekla Software
18 W&A ALC WALL PANEL CONFIGURATION W&A WALL PANEL LAYOUT Length of individual panel provided for ease of installation Cut list provided for ease of cutting Layout drawings are provided for every wall Ease of identification of individual panel
19 PROJECT COMPLETION EXTERNAL FACADE
20 PROJECT COMPLETION EXTERNAL FACADE Glass Balustrade Laminated Tempered Glass ALC Parapet Wall M-Snap Metal Roof MS Railing ALC Wall Panel Double Glazed Laminated Aluminium Window
21 PROJECT COMPLETION EXTERNAL FACADE
22 PROJECT COMPLETION EXTERNAL FACADE DURING CONSTRUCTION DURING COMPLETION
23 PROJECT COMPLETION EXTERNAL FACADE INTERIOR FINISHING ALC Wall Panel Skim Coat and Paint Gypsum Board Ceiling WPC Extruded Door c/w Door Frame Steel Staircase with Stainless steel laminated glass balustrade Aluminium Window Frame with Double Laminated Glazing
24 PROJECT COMPLETION STAIRCASE FINISHING
25 Thank you for your time and attention - Well & Able Group of Companies Singapore HQ: No.23, Genting Road #03-01, Shanghai Office: Level 2&3, Building 12, 1818 Lianhang Road, Chevalier House Singapore Minhang District Shanghai T: Tel: Malaysia Office: Maldives Office: 23-1, Room 2, Jln Ros Merah 2/13, Taman Johor Jaya, Ameer Ahmed Magu, Male Johor Bahru, Johor
CATAMARAN TOWER - 1 Seef Area Plot 19, 20
STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details
More informationHalfen systems for the support and restraint of brickwork
Halfen Brickwork Support Systems Halfen systems for the support and restraint of brickwork Introduction Halfen is a leading supplier of channel fixing systems and building components, with manufacturing
More informationHEAVY STEEL CONSTRUCTION
HEAVY STEEL CONSTRUCTION PRE-ENGINEERED PRE ENGINEERED STEEL BUILDINGS Prismatic Constructions Work Shops, Storage Buildings etc. Figure 1 Figure 2 Prismatic steel constructions can be manufactured as
More informationPremier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017
Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins
More informationSECTION NON-STRUCTURAL METAL FRAMING
SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationFOLDING CONTAINER HOUSE: AMH-4000 SERIES GENERAL AMH-4120 DIMENSIONS AND WEIGHT PICTURES:
FOLDING CONTAINER HOUSE: AMH-4000 SERIES GENERAL 1. The standard container for various purposes is suitable for international container transport. It is of appropriate external dimensions and has connections
More informationSTEEL STRUCTURAL SYSTEMS
STEEL STRUCTURAL SYSTEMS Steel elements are of two basic types: Structural steel shapes are formed into their final shapes by hot-rolling. This method produces such common elements as wide flange sections,
More informationMetal Decking Specialists
Metal Decking Specialists Technical Design. Manual Manufacture. and Guidance Installation. Notes Contents Introduction 03 Introduction 04 SMD Product Selector Technical and Design Support 05 How can SMD
More informationBUILDING SPECIFICATIONS
BUILDING SPECIFICATIONS FOUNDATION AND STRUCTURE Foundations using reinforced concrete slabs, according to the data of the geotechnical study, complying with building standard CTE-DB-SE-C. Concrete walls
More information7. MATERIALS AND TECHNICAL INVESTIGATION
67 7. MATERIALS AND TECHNICAL INVESTIGATION Materials were chosen to provide minimal long-term maintenance. Hardwearing materials on ground floor levels were chosen to withstand the wear and tear of children
More information(Old examination format for reference only)
The Institution of Structural Engineers Associate-Membership Examination 11 APRIL 2003 INSTRUCTIONS TO CANDIDATE 1. The examination comprises two sessions separated by a lunch break of 1 2 hour, during
More informationTERRACE FACTORY - TYPE A1
TERRACE FACTORY - TYPE A1 Total Built-up Size: 3,401 sq ft No. of Units: 24 TERRACE FACTORY - TYPE A1 Total Built-up Size: 3,401 sq ft No. of Units: 24 SPECIFICATION FACTORY HEIGHT Approximately 6.6 meters
More informationCE410. CE 410 Guidelines to Structural Design Drawings
CE 410 Guidelines to Structural Design Drawings As an essential part of your structural design projects all groups in CE 410 are going to develop their designs in reference to simplified architectural
More informationTemecula Medical Center Temecula, CA
Temecula Medical Center Temecula, CA Technical Assignment #2 Sean F. Beville The Pennsylvania State University Architectural Engineering Structural Option Senior Thesis Project Student Advisor: Thomas
More informationCHAPTER FIVE 5.1 MODELING OF A TEN-STOREY BUILDING
CHAPTER FIVE 5.1 MODELING OF A TEN-STOREY BUILDING Three simple multi-storey buildings for a typical office complex of structural beam floors were analyzed using PROKON finite element model package to
More informationReliance House Investors Report. IR11 September 2018
Reliance House Investors Report IR11 September 2018 Extension & Conversion of Reliance House to Create 139 Luxury Apartments The 3 storey extension, refurbishment, adaptation and the sub-division works
More informationNortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1
16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationPRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Net Height of Typical Floors (Floor tiles to ceiling) = 290 cm 2 2 REV BY APP DESCRIPTION THIS DRAWING IS A COPYRIGHT. DO NOT FROM THE DRAWING. THE CONTRACTOR AND HIS SUBCONTRACTORS ARE TO VERIFY ALL P.O.Box:
More informationPart 6 Superstructure (excluding roofs) Chapter 6.5. Steelwork
Part 6 Superstructure (excluding roofs) hapter ONTENTS SOPE DESIGN lause Page Design standards D1 1 Structural design D 1 Padstones D3 1 This hapter gives guidance on meeting the Technical Requirements
More informationDICTATOR Lift Shaft System
DICTATOR Lift Shaft System The Modular Lift Shaft System, also for Retrofitting Certified According to EN 1090 A lift is becoming more and more important for daily life, not only in newly constructed buildings
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationglass interiors BALUSTRADES CATALOG
glass interiors BALUSTRADES CATALOG 2018 glass interiors The company Glasimo combines the family glassmaking traditions with modern processing technologies. The foundation of Glasimo is supported by 25
More informationSECTION NON-STRUCTURAL METAL FRAMING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable
More informationWORK PROCESSES SCHEDULE ACOUSTICAL CARPENTER SPECIALIST O*NET/SOC CODE: RAIS CODE: 0861
WORK PROCESSES SCHEDULE ACOUSTICAL CARPENTER SPECIALIST O*NET/SOC CODE: 47-2081.01 RAIS CODE: 0861 The following schedule is an example of work experience (OJT) and training considered necessary to develop
More informationThe HKIE Structural Examination Written Examination 2016
The HKIE Structural Examination Written Examination 2016 Section 2: Design Questions (80% of the Written Examination) Date: 2 December 2016 (Friday) Time: 12:00 nn - 06:00 pm Answer ONE question only Question
More informationArmatherm Structural Thermal Bridging Solutions
Armatherm Structural Thermal Bridging Solutions Minimising energy loss and improving building envelope performance www.armatherm.co.uk info@armatherm.com +44 (0) 1274 591 115 Armatherm is one of the leading
More informationNEW MNIR DESIGN INTERNATIONAL OPEN DESIGN COMPETITION COST PLAN ANALYSIS MNIR REDEVELOPMENT ELEMENTAL COST PLAN
NEW MNIR DESIGN INTERNATIONAL OPEN DESIGN COMPETITION COST PLAN ANALYSIS MNIR REDEVELOPMENT ELEMENTAL COST PLAN 1 SUBSTRUCTURE 4 278 780,63 Substructure 1 Item 2 SUPERSTRUCTURE 26 039 623,47 2A Frame 1
More informationFar more. glass. than just. This success has not come about by. From its early days over 50 years ago, as. a small local glazing contractor,
F A R M O R E T H A N J U S T G L A S S Far more than just glass Ducie House, Manchester From its early days over 50 years ago, as a small local glazing contractor, James Price Glazing has consistently
More informationCOPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31
Contents Preface to the Sixth Edition xi 1 Making Buildings 3 Learning to Build 4 Buildings and the Environment 5 The Work of the Design Professional 11 The Work of the Construction Professional 19 Trends
More informationArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette
ArcelorMittal Europe - Long Products Sections and Merchant Bars Office Building ArcelorMittal in Esch Alzette Location the country, at the heart of the iron and steel region. It has good access to the
More informationTHE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection gift from Faculty of Architecture The University of Hong Kong
Ml THE UNIVERSITY OF HONG KONG LIBRARIES Hong Kong Collection gift from Faculty of Architecture The University of Hong Kong CODE OF PRACTICE FOR FIRE RESISTING CONSTRUCTION 1989 BUILDING AUTHORITY HONGKONG
More informationHIDD HEIGHTS PROGRESS REPORT
HIDD HEIGHTS PROGRESS REPORT About the Project: Project Developer Title of Project Project Reference Design & Supervision Consultant Interior Design Consultant Main Contractor Bin Faqeeh Real Estate Investment
More informationProspective Construction Systems for Mass Housing
Prospective Construction Systems for Mass Housing TECHNOLOGY PROFILE Light Gauge Steel Framed Structures (LGSF) Building Materials & Technology Promotion Council Ministry of Housing & Urban Poverty Alleviation
More informationW ELCOME T O S ERI A MPANG H ILIR
Developed by Tan & Tan Property Showcase Suite 5.02, Level 5, The Gardens South Tower, Mid Valley City, Lingkaran Syed Putra, 59200 Kuala Lumpur, Malaysia Tel 603 2283 2266 Fax 603 2287 8868 www.tantan.com
More informationTOWER-1A: TERRACE FLOOR SLAB
TOWER-1A: TERRACE FLOOR SLAB TOWER NO: 1A (Overall completion 70.10%) Total Floors: - Stilt + 12 Upper floors Total Flats: - 24 (Duplex Type-A1) 1. Structural works up to terrace floor slab completed.
More informationCode Compliance and Product Selection
Code Compliance and Product Selection PT Blink Ltd are the owners of the intellectual property, patents, designs, concepts and know-how depicted in these drawings, images, plans and specifications. This
More informationROOF DETAIL RD-16 CONSTRUCTION DOCUMENTS - PHASE / PENNSYLVANIA HOUSING FINANCE AGENCY/ MAY 22, 2017 MURRAY ASSOCIATES ARCHITECTS, P.C.
3 4" ARRISCRAFT VENEER " NOMINAL AIR SPACE 2" RIGID INSULATION 8" CMU REINFORCED CONCRETE SLAB OVER METAL DECK - REFER TO STRUCTURAL DWGS 20 FIRST FLOOR 343' - 5" CONTINUOUS SEALANT TERMINATION BAR STAINLESS
More informationMOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS
MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS PARKERSBURG, WEST VIRGINIA DOMINIC MANNO STRUCTURAL OPTION FACULTY CONSULTANT: DR. ANDRES LEPAGE Technical Report 3 11-21-08 TABLE OF CONTENTS TABLE OF
More informationMistral Workspace redefined
The system from Optima, designed and supplied for many years under the Unilock brand, is ideal for those projects requiring a combination of high performance, elegant detailing yet low cost. offers unrivalled
More informationTalk to us, THE SMART DECKING PEOPLE Visit or Global Roofing Solutions Bond-Dek Composite Deck
Talk to us, THE SMART DECKING PEOPLE Visit www.globalroofs.co.za or email info@globalroofs.co.za Global Roofing Solutions Bond-Dek Composite Deck Bond-Dek composite deck Bond-Dek is a composite steel flooring
More informationIntroduction. Structures may be classified on the basis of materials used for construction, as follows: Steel structures. Aluminium structures
Steel Structures 1 Introduction Structures may be classified on the basis of materials used for construction, as follows: Steel structures Aluminium structures Concrete structures Composite structures
More informationmidas Gen Release Note
Gen 2014 Integrated Design System for Building and General Structures midas Gen Release Note Release Date : May. 28, 2014 Product Ver. : 2014(v2.1) Gen 2014 (v2.1) Release Note Gen 2014 (v2.1) Release
More informationHIDD HEIGHTS PROGRESS REPORT
HIDD HEIGHTS PROGRESS REPORT About the Project: Project Developer Title of Project Project Reference Design & Supervision Consultant Interior Design Consultant Main Contractor Bin Faqeeh Real Estate Investment
More informationCross Laminated Timber (CLT)
Cross Laminated Timber (CLT) Lesson Learning Objectives To provide an awareness of the use of cross laminated timber (CLT) in multistorey construction. To develop an awareness of how CLT panels are fixed
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationPRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION
PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION An overview of costing strategies for wood framed construction elements CREATING A PROJECT ENDLESS POSSIBILITIES COMPATORS LIST A FLOOR Cast in Place
More informationBuilding Design Data
Building Design Data.. 1. Building Design The KORE ICF System is designed to meet the requirements of the Building Regulations 1997-2006, in the case of two storeys, single occupancy dwellings. If the
More informationBuilding Your Visions
Ferguson C EAP Curtain Wall Systems Ferguson-EAP 130HP Series High Performance Curtain Wall System Ferguson s 130HP curtain wall system was developed for high performance double, triple, unique acoustical
More informationGMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014
GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh (23.968661, 90.296963) 22 March 2014 1 2 Observations 3 Highly stressed columns Cursory calculations indicate that the working stresses of columns
More informationModule 4D Field Review Declaration
Module 4D Field Review Declaration The Field Review Declaration is part of the Bulletin 19R Final Report and the Vendor/Builder must submit it to Tarion. Project Address: Common Element Enrolment No.:
More informationTender No Section St. James - Assiniboia Centennial Pool Fitness Facility Addition Page 1
Fitness Facility Addition Page 1 PART 1 GENERAL 1.1 SECTION INCLUDES.1 Extruded aluminum windows with fixed sash..2 Factory glazed..3 Perimeter sealant. 1.2 RELATED SECTIONS.1 Section 05500 - Metal Fabrications.2
More informationAirport Vicinity Acoustic Insulation
PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Airport Vicinity Acoustic Insulation By-law No. 6419/94 of the City of Winnipeg to establish minimum acoustic insulation requirements for buildings within
More informationSTRUT METAL FRAMING SYSTEMS
STRUT METAL FRAMING SYSTEMS CONTENTS STRUT CHANNELS 2 FLAT PLATE FITTINGS 4 ANGLE FITTINGS 6 Z & U FITTINGS 8 BEAM CLAMPS 9 BASE POSTS 11 CANTILEVERS 13 I-BEAM SUPPORTS 15 PROPERTIES OF SECTION PROFILES
More informationStructural Design of Pergola with Airfoil Louvers
International Journal of Advanced Structures and Geotechnical Engineering ISSN 2319-5347, Vol. 04, No. 03, July 2015 Structural Design of Pergola with Airfoil Louvers MUHAMMAD TAYYAB NAQASH Aluminium TechnologyAauxiliary
More informationBEARING METAL STUD FRAMING
L-1 Section 05410 Long Form Specification LOAD BEARING METAL STUD FRAMING This section includes axially loaded steel studs, with unique slotted top channels, usually of 0.91, 1.2 and 1.5 mm (16, 18, or
More informationLevel 6 Graduate Diploma in Engineering Structural analysis
9210-111 Level 6 Graduate Diploma in Engineering Structural analysis Sample Paper You should have the following for this examination one answer book non-programmable calculator pen, pencil, ruler, drawing
More informationThe Alcalá Residential Development combines the peace and quiet of a residential area with the convenience of living in the city.
Your new life starts here In Parque Almunia, one of the areas in Granada with the most growth, Inmobiliaria Osuna is building a development for you that is unique in its specifications, amenities, location
More informationSECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.
SECTION 10 5300 ALUMINUM WALKWAY COVERS Part 1 General 1.01 Related Documents A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.02 References A. International
More informationWilliam W. Wilkins Professional Building Columbus, Ohio
William W. Wilkins Professional Building Columbus, Ohio Technical Assignment 1 October 5, 2006 Michelle Structural Option AE 481W Senior Thesis Faculty Advisor: Dr. Boothby Table of Contents Executive
More informationPROGRESS JAIPUR PH-II AS ON 30 NOV 18
S MILESTONE DESCRIPTION STATUS No 1. MS 01 (D+120 Days) (a) Work commence for all Towers (b) Slab casting for 20 DU (c) Brick work for 25 DU (d) Internal electrical 15 DU (e) Internal Plumbing & Sewage
More informationStructural Inspection
General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized
More informationSECTION COLD-FORMED METAL FRAMING
SECTION 05 40 00 COLD-FORMED METAL FRAMING SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the
More informationExterior Wall Solutions Building Shell
A strong, water tight and thermally insulated building shell will ensure the buildings sustainability of usage over time. The Exterior Shell is the most important factor of protection to ensure that the
More informationDefinition of Wall. A continuous, vertical structure Thin relatively to its length and height
Walls & Partition Learning Objectives Briefly explain the functions & functional requirements of walls Differentiate and compare between load bearing and non-load bearing walls Briefly describe the characteristics,
More informationThe HKIE Structural Examination Written Examination
The HKIE Structural Examination Written Examination Section 2: Design Questions (80% of the Written Examination) Date: 28 November 2014 (Friday) Time: 12:00 nn - 06:00 pm Answer ONE question only Question
More informationST. CLOUD, MN. 316,000 Square Feet Situated on Acres. For additional information contact:
ST. CLOUD, MN 316,000 Square Feet Situated on 49.56 Acres For additional information contact: Gerald P. Norton Tel: 952.831.1993 E-mail: gnorton@binswanger.com B. Andrew Lubinski Tel: 952.831.1931 E-mail:
More informationHilton Baltimore Convention Center Hotel Western Podium
Hilton Baltimore Convention Center Hotel Western Podium CHRIS SIMMONS Structural Option Faculty Consultant: Dr. Ali M. Memari Technical Report 1 TABLE OF CONTENTS EXECUTIVE SUMMARY. Page 3 INTRODUCTION..
More informationget THE BRIGHTON VIBE. SUMMARY Specification.
get THE BRIGHTON VIBE. SUMMARY Specification. SUMMARY SPECIFICATION THE BRINELL BUILDING Occupancy General Occupancy: 1:8 sq m Means of escape: 1:6 sq m Internal climate: 1:8 sq m Lift provision: 1 person
More informationThe Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee
The Structural Redesign of Boyds Bear Country and its Related Systems Included in this Presentation: Background and Existing System Proposal Problem / Solution Structural System Redesigns Pre-cast Concrete
More informationConcepts. Products. Service. Rotunda Birmingham
Concepts Products Service Rotunda Birmingham 1 Project Report Rotunda Birmingham The Rotunda is the final part of the re-development of the land mark Bullring in central Birmingham. The iconic, 21 storey,
More informationAdjustable Suspension Hanger Technical Datasheet
Adjustable Suspension Hanger sheet The Adjustable Suspension Hangers Clip are a component of the Keylock Ceiling System. The upper vertical side of the hanger allows the Suspension Rod that goes through
More informationREEF RESIDENCE ON PLOT NO. JVC13JHRA002, JUMEIRAH VILLAGE CIRCLE, DUBAI, UAE.
REEF RESIDENCE ON PLOT NO. JVC13JHRA002,, UAE. Status 30 January 2017 1 P a g e INDEX 1. PROJECT DESCRIPTION 2. PROJECT ORGANOGRAM 3. PROGRESS PHOTOGRAPHS 2 P a g e 1.0 PROJECT DESCRIPTION Project Detail:
More informationStudying a multistory building with different types of bracing
International Journal of Current Engineering and Technology E-ISSN 2277 416, P-ISSN 2347 161 218 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijcet Research Article Ahmed Falah
More informationSection : 100 TRESHOLD STAIRS DEPARTMENT NGL HALLWAY TOWARDS MUSEUM FFL DISABLED WC FEMALE WC MALE WC FFL 95.
Section 3-3 1 : 100 TRESHOLD STAIRS DEPARTMENT NGL 100.000 FEMALE WC DISABLED WC MALE WC HALLWAY TOWARDS MUSEUM FFL 98.100 FFL 95.400 GROUND WATER COLLECTIONAND PUMP ROOM LOWER DOORS TO AUDITORIUM LOWER
More informationPRM/KA/RERA/1251/446/PR/171230/002141
PRM/KA/RERA/1251/446/PR/171230/002141 Strategically located near the Embassy Golf Links Business Park, Bangalore over looking the KGA Golf Course. Centrally located and easily accessible from all parts
More informationESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 7 High Rise Anatomy Revised
Truck Module Page 1 of 7 HIGH RISE BUILDING CONSTRUCTION The Truck Module 1000.00 sections are designed to be companion documents to EOM section 503.00 Objectives The objective of this section is to provide
More informationPASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Cavity & Smoke Barriers, Parapet & Spandrel Walls
PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Cavity & Smoke Barriers, Parapet & Spandrel Walls For Promat Asia Pacific Organisation February 0 PASSIVE FIRE PROTECTION SYSTEMS Application
More informationGypLyner IWL Independent wall lining system
Independent wall lining system Photograph courtesy of Philip Brier 0 Independent wall lining system independent wall lining is a lightweight, nonloadbearing drylining which is erected independently of
More informationDIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing
DIVISION 05 METALS 05 00 00 METALS 05 01 00 Maintenance of Metals 05 01 10 Maintenance of Structural Metal Framing 05 10 20 Maintenance of Metal Joists 05 10 30 Maintenance of Metal Decking 05 10 40 Maintenance
More informationDesign No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1
FIRESTOP JOINT SPRAY CFS-SP WB SILICONE JOINT SPRAY CFS-SP SIL F-RATING 2-HR. 2-HR. T-RATING -HR. -HR. APPLICATION THICKNESS PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table /8" WET FILM (/6"
More informationA-One Polar Ltd. Bhulta,Rupgonj,Narayangonj. ( , ) 27th April 2014
1 A-One Polar Ltd Bhulta,Rupgonj,Narayangonj. (23.754782,90545710) 27th April 2014 2 Observations Observations Knitting & Garments building Building 1 1 3 4 Observations Roof structure: no roof bracing
More informationSOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS
Buyer s Guide Contents 1300 985 110 LIVING SUPPORT SOLUTIONS Just imagine the space you can create 5 More reasons to choose SmartSpace 9 SmartSpace Project Planner 10 Design your SmartSpace 13 SmartSpace
More informationALSPEC ALUMINIUM SYSTEMS TECHNICAL MANUAL
ALSPEC ALUMINIUM SYSTEMS TECHNICAL MANUAL HR500 HIGH PERFORMANCE BALUSTRADE COPYRIGHT This Technical manual remains the property of Aluminium Specialties Group Pty Limited and contains privileged information
More informationA. Submit the following in addition to the standard requirements.
SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,
More information151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University
November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...
More informationGENERAL BUILDING CODE AND ZONING REQUIREMENTS: Post and spread footings shall be designed and constructed below the minimum frost depth of 42 inches
GENERAL BUILDING CODE AND ZONING REQUIREMENTS: Post and spread footings shall be designed and constructed below the minimum frost depth of 42 inches and shall be sized to carry the applicable roof and
More informationArchitectural Specification Manual
Architectural Specification Manual SteelBuilt Curtainwall INFINITY System The SteelBuilt Curtainwall Infinity System can use as a back mullion almost any type of custom steel member, such as stainless
More informationBlast Resistant Enhanced Curtain Wall. Reference Brand: Sapa Building System Elegance 85PF GENERAL DESCRIPTION PERFORMANCE
Blast Resistant Enhanced Curtain Wall Blast Resistant Enhanced Curtain Wall Reference Brand: Sapa Building System Elegance 85PF GENERAL DESCRIPTION Grid based thermally insulated curtain wall system with
More informationSECTION E INDEX CURTAINWALL FRAMING SYSTEMS
SECTION E INDEX CURTAINWALL FRAMING SYSTEMS E PAGE DESCRIPTION 0 CURTAINWALL FRAMING SPECIFICATION 0 SERIES /" () WIDE THERMALLY IMPROVED CURTAIN WALL FRAMING SYSTEM FOR SEALED UNIT GLAZING. 00 SERIES
More informationALFA. Pre Fab Multi Storey Steel Buildings Engineering - Design Manufacture, Erection TurnKey Solutions ALFA PEB LIMITED. Pre Engineered Building
ALFA PEB LIMITED. ALFA Pre Fab Multi Storey Steel Buildings Engineering - Design Manufacture, Erection TurnKey Solutions Shopping Malls, Indoor Stadiums & Theaters Commercial Buildings Institutional Buildings
More informationWisconsin Technical College System. Curriculum Standards & Program Design Summary CARPENTRY (CONSTRUCTION) APPRENTICE
Program Information Program Curriculum Standards & Program Design Summary 1 CARPENTRY (CONSTRUCTION) APPRENTICE Carpenters construct, erect, install or repair structures and fixtures made of wood; concrete
More informationArmatherm TM. Thermal Break Connections
Armatherm TM Thermal Break Connections Introduction Thermal break plates are used to prevent thermal / cold bridging between both vertical and horizontal connections of internal and external elements.
More informationMASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.
SECTION 05721 - ORNAMENTAL RAILINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Glass supported railings. B. See Division 5 Section "Metal Stairs" for steel tube railings associated
More informationGAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT STRUCTURAL FOR CUSTOMS HOUSE JULY 2014 i P a g e Table of Contents 1. INTRODUCTION 3 1.1 Design Criteria and Specifications..
More informationMILT-Pro. Built-in units and control centres for halls
MILT-Pro Built-in units and control centres for halls Space The MILT-Pro built-in units provide its design solution offer a large range of applications in commercial, manufacturing and warehouse spaces.
More informationST. CLOUD, MN 316,000 Square Feet Situated on Acres
ST. CLOUD, MN 316,000 Square Feet Situated on 49.56 Acres For additional information contact: Gerald P. Norton Tel: 952.831.1993 E mail: gnorton@binswanger.com B. Andrew Lubinski Tel: 952.831.1931 E mail:
More informationARCHITECTURAL TECHNOLOGY & DESIGN DESSIN ET TECHNOLOGIE ARCHITECTURALE POST-SECONDARY NIVEAU POSTSECONDAIRE
TEST PROJECT PROJET D ÉPREUVE ARCHITECTURAL TECHNOLOGY & DESIGN DESSIN ET TECHNOLOGIE ARCHITECTURALE POST-SECONDARY NIVEAU POSTSECONDAIRE Day 1 Competition Test & Appendix I Page 2 Day 1 (7 hours) REMEMBER
More informationADDITIONS BUILDING AND ZONING REQUIREMENTS (REVISED 4/22/2008)
ADDITIONS BUILDING AND ZONING REQUIREMENTS (REVISED 4/22/2008) PERMIT SUBMITTAL CHECKLIST: Signed completed Building Permit application form. Two (2) Copies of a Certificate of Survey. Draw to scale the
More informationLather (Interior Systems Mechanic) Level 3
Level 3 Lather/Interior Systems Mechanic (ISM) Unit: B3 Blueprint Reading and Specifications 3 Duration: 35 hours 20 hours 15 hours This unit is designed to provide the apprentice with the knowledge and
More informationFIRE PROTECTION AND PERFORMANCE DRY LINING BOARD THE ULTIMATE IN FIRE PROTECTION! 91 mins fire integrity and 86 mins fire insulation on 9mm board
THE ULTIMATE IN FIRE PROTECTION! 91 mins fire integrity and 86 mins fire insulation on 9mm board + Euroclass A1 Non-combustible FIRE PROTECTION AND PERFORMANCE DRY LINING BOARD Magply Fire PASSIVE FIRE
More information