TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL
|
|
- Buck Sparks
- 5 years ago
- Views:
Transcription
1 TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II El Paso, Texas EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL for the BUILDING CONCRETE GLASS AND GLAZING FIRE SPRINKLER MECHANICAL ELECTRICAL SCOPES OF WORK PREPARED BY: SUNDT CONSTRUCTION, INC. April 10, 2017
2 Concrete, Glass, Elevators, Fire Sprinkler, Mechanical, and Electrical INVITATION Sundt Construction, Inc., as the Construction Manager at Risk (CMAR), for the Medical Science Building II at Texas Tech University Health Sciences Center in El Paso, Texas (Owner) is seeking GMP Proposals for design phase assistance and construction services (pending mutual agreement on a GMP) from qualified subcontractors for the trades identified on the cover sheet of this invitation. The selected firm will work with Sundt Construction, Inc., Perkins + Will Architects and all of their Sub Consultants, and Broaddus and Associates as the Owner s Representative to develop pricing, schedules, constructability, and details as necessary for the construction of new 219,900 SF Medical Science Building II in El Paso, Texas. Proposal Submittal: Proposals will be received until 5:00 p.m. MST, April 20, Proposal Submission: Please submit one (1) electronic copy to Jon Schwab at jpschwab@sundt.com; except for Building Concrete GMP proposals which will need to be submitted to Steve Niskanen at sniskanen@broaddusassociates.com. Project Description: The project is a new, five-level concrete structure with a mezzanine totaling approximately 219,900 gross SF including an auditorium, classrooms, dining, library, laboratory space with support areas, president s office, and shell space at levels 2 and 3. There are seven (7) additive Alternates that could potentially increase the scopes of work. The successful firm will actively participate during preconstruction services and construction based on the Package 1 set of documents. (See enclosed schedule for durations.) Please refer all questions to me at Sundt Construction, Inc. (480) or via jpschwab@sundt.com. Please do not contact any of the Architects, Engineers, Consultants, or Owner directly. Thank you. Sincerely, SUNDT CONSTRUCTION, INC. Jon P. Schwab Preconstruction SUNDT CONSTRUCTION, INC. PAGE 1 OF 7 REQUEST FOR PROPOSAL
3 Submitted by: FIRM: SUBMITTAL FORM ADDRESS: CONTACT: TITLE: PHONE: FAX: The purpose of this RFP is to select the Building Concrete, Glass & Glazing, Fire Sprinkler, HVAC/Plumbing, and Electrical Subcontractors, which will assist in the preconstruction/design phase and perform construction phase services (based upon the successful execution of a GMP Subcontract) for the Texas Tech University Health Sciences Center Medical Sciences Building II () in El Paso, Texas. Sundt Construction, Inc. and (Team) reserve the right to waive any or all informalities or irregularities in any Proposal received. Sundt Construction, Inc. and Texas Tech University also reserve the right to reject any or all Proposals received, to accept a proposal other than the lowest priced proposal and to cancel this RFP as judged solely by the Team. The selection will be based upon the submittal package and a potential interview process, the review of the proposals will determine the list of subcontractors invited to interview. Subcontractors that make the short list will attend an interview, if conducted, to present their proposed staff, project approach, and answer a general range of questions as to their ability to perform the required functions for the project. Selection of the successful subcontractor may be based solely on review of the proposals, or interviews may be conducted with one or more firms. If conducted, subcontractor interviews will be held during the week of May 1, Representatives from selected subcontractors for interviews must include the Project Manager and Lead Estimator as a minimum. There may be other required attendees, but they will be identified if required. The successful proposer will be required to execute a standard Sundt Construction, Inc. Subcontractor Agreement. Any and all exceptions to this agreement must be submitted with your proposal. A sample Subcontract Agreement Exhibit B ; a list of standard and customary Reimbursable Costs Exhibit A, and a Project Schedule Exhibit C are enclosed for your review. All costs incurred by Proposer during the GMP will be included in the GMP, and will not be reimbursed. The successful Subcontractor will be issued a Contract for the preconstruction phase of the project; and a supplement to the Contract will be issued for the construction phase of the Contract. If the Subcontractor and Sundt Construction cannot reach an agreement as to the scope, schedule, and cost after the issuance of the Package 2 documents pricing has been submitted in accordance with the timeline stared in the Estimated Costs section below, the construction phase supplement will not be issued, and the project will be competitively bid. Please acknowledge receipt of Exhibits A to M on the Bid Form (Exhibit D). SUNDT CONSTRUCTION, INC. PAGE 2 OF 7 REQUEST FOR PROPOSAL
4 Scope of Work Description The basis for the Guaranteed Maximum Price for the respective scopes of work for each of the trades listed on the Cover Sheet, will be based on the Construction Documents Bid Package 1 provided by Perkins + Will, dated April 7, 2017, and Packages 2 & 3 that were issued as part of the 100% Design Development documents that were issued on March 3, Estimated Costs The Subcontractor shall work with Sundt Construction, Inc. and the Perkins + Will Architects design team to define systems, offer alternative systems and pricing, develop schedules, select materials and equipment, perform constructability reviews, maintain open and transparent communication via virtual or face to face meetings, and determine the most cost effective installation to control the cost to an established Interim GMP Estimate based on the Bid Package 1 documents. The intent of the GMP Documents is to include ALL of the work required to complete the project, whether or not it is shown on the GMP Documents. The GMP Documents are not complete at this time. The GMP shall include all costs as applicable for engineering, labor, material, delivery, freight, layout, supervision, equipment, hoisting, uncrating, setting, installation, parking, storage, insurance, taxes, detailing, shop drawings, submittals, samples, mock-ups, overhead, profit and other services necessary to complete the work as indicated of specified. All work shown on the Contract Documents and any work described therein which is inferable from or is the logical extension of the Contract Documents for completion of the project shall be considered as part of the work, and shall be included and executed by the Trade Contractors or Vendors in the same manner and with the same character of material as other portions of the work without an increase in the Contract Sum. This process will require the Subcontractor to submit and maintain throughout the preconstruction and construction phases an estimating system, which will be the basis for budget control. The Team expectations are that clarifications shall accompany the estimates at all milestones, including any variation from the design documents. All of the estimates will be subject to audit by the Team, until the execution of the GMP at which time the contracts will converted to a firm fixed price. The Subcontractor should plan on completing the following milestone estimates with enough detail to adequately analyze them including identification costs of work (quantities, unit prices, etc.), preconstruction costs and any contingencies starting with the interim GMP estimate based on Bid Package 1 (subject to change): I. Package 1: Interim GMP Documents to be issued on April 7, 2017 Interim GMP Estimate due on April 20, 2017 Anticipated GMP Subcontractors Award date: May 02, 2017 II. Package 2 100% CD Documents to be issued on June 9, % Confirming Estimate due on June 30, 2017 Estimate validation with GMP Subcontractors week of July 3, 2017 Decision to use GMP Subcontractors or bid those trades week of July 3, 2017 SUNDT CONSTRUCTION, INC. PAGE 3 OF 7 REQUEST FOR PROPOSAL
5 III. Package 3: 100% CD Documents to be issued on September 5, 2017 Estimates due on September 26, 2017 On site mobilization would take place on May 10, 2017 (subject to change). Responses to the following sections: I, II, III, IV, and V, should be in a separate document provided in the following format: I. EXPERIENCE List your company s experience on similar projects, including a narration pertaining to design assist and design build projects. Include two references with current phone numbers for each project. II. SAFETY List your company s Experience Modification Ratio (EMR) for the last three years, and describe your firm s in-house safety program. III. ESTIMATING, COST CONTROL, SCHEDULING Submit samples of your estimating systems; showing breakdown of systems and cost control, and scheduling systems. Explain how you intend to use them to control budget and cost. IV. PROJECT TEAM Submit resumes of the proposed key staff members; include at least three client references, including contact names and phone numbers; state their role, anticipated involvement, and individual qualifications pertinent to this project. The proposed Project Team must be committed for the duration of the project. You will be required to sign a key personnel clause, ensuring the proposed staff will be assigned to this project for its duration. Include an organizational chart of your team. Your Lead Estimator and Project Manager must be available for the interview as scheduled. V. BACKLOG Submit your company backlog, with manpower commitments, for the project duration shown on the Project Schedule Exhibit C. VI. WAGES A. Provide composite crew hourly rates for field and shop labor including all Burden, Fringes, Subsistence, etc. (Expand the list as required, include all personnel which will be assigned to the project and shop labor for work fabricated at your home facility.) These rates will be used throughout the project, include any anticipated rate increases and the date they will be expected to become effective. All project labor and supporting documentation will be submitted with each monthly pay application. SUNDT CONSTRUCTION, INC. PAGE 4 OF 7 REQUEST FOR PROPOSAL
6 B. Trade overtime rates below should be based on time and a half. Each Trade Composite Crew Rates: SHOP FIELD Trade Straight Time Overtime Straight Time Overtime 1. $ /HR $ /HR $ /HR $ /HR 2. $ /HR $ /HR $ /HR $ /HR 3. $ /HR $ /HR $ /HR $ /HR 4. $ /HR $ /HR $ /HR $ /HR 5. $ /HR $ /HR $ /HR $ /HR 6. Project Superintendent $ / HR 7. Project Manager $ / HR VII. COST OF THE WORK A. Material & Equipment Cost are as follows: Materials Actual Costs From Invoices Fixed Equipment Actual Costs From Invoices Freight, Unload, Delivery Actual Costs From Invoices Expediting Actual Costs From Invoices Insurance Actual Costs From Invoices Second Tier Subcontractors Actual Costs From Invoices/Subcontracts Inventory Wholesale Book Costs Small Tools Wholesale Book Costs Warranty Costs Lump Sum Within the GMP B. Construction Related Equipment (rates include maintenance, fuel, oil, and grease): 1. For equipment owned by the Subcontractor the rental rates shall not exceed an average of three (3) local rental company rates. 2. For Equipment from an Outside Rental Company shall be actual rental rate. VIII. OVERHEAD, PROFIT, and CONTINGENCY A. Overhead and Profit percentages (O & P) that will be used as the O & P multiplier for all job costs including change orders will be based on Section 11.8 of the Uniform General Conditions in Specification Section (Perkins + Will March 03, 2017 Documents). B. For a contract based on a Guaranteed Maximum Price (GMP) the Construction Manager-at-Risk (CMAR) shall not be entitled to a percentage mark-up on any change order work unless the Change Order increases the GMP. By inference this will include any Subcontractors who are contracted to a GMP contract. (Uniform General Conditions in Specification Section : Perkins + Will March 03, 2017 Documents) SUNDT CONSTRUCTION, INC. PAGE 5 OF 7 REQUEST FOR PROPOSAL
7 C. Identify on the GMP Bid Form (Exhibit D) the amount of contingency and associated risk description for applicable scopes of work. Three (3) line items have been included for contingencies (add others, if required). IX. Texas HUB Program A. All bidders shall include the applicable dollars and/or percentage of participation by Historically Underutilized Businesses (HUB) Program Subcontractors and Sub- Subcontractors on this Bid Form. 1. We are a Texas HUB Certified firm. YES NO 2. Amount of participation by Certified HUB Firms (if the answer is No to A.1 above): 1st Tier Subcontractor $ or % 2nd Tier Subcontractor $ or % B. All Texas HUB Enterprises must maintain their certification through final completion of the project. C. Information for current HUB certifications can be found on the following website: X. SUBCONTRACT AGREEMENT In submitting this Proposal as described herein, we have reviewed and agree to all terms stated in SUNDT CONSTRUCTION, INC. s Subcontract Agreement. (initials) If left blank this Proposal will be deemed non-responsive. XI. PERFORMANCE AND PAYMENT BOND PREMIUM Based on the GMP Estimate noted above in the Estimated Costs section above, what would the amount be for the Performance and Payment Bond premium in dollars? It is understood that this Proposal shall remain in effect, and may not be withdrawn, for a period of Ninety (90) days after the scheduled closing date for receipt of proposal. FIRM: SIGNED: TITLE: DATE: SUNDT CONSTRUCTION, INC. PAGE 6 OF 7 REQUEST FOR PROPOSAL
8 GMP DOCUMENTS: EXHIBIT A Standard and Customary Reimbursable Costs EXHIBIT B Sample Subcontract and Design-Build Subcontract EXHIBIT C Project Schedule, dated March 23, 2017 EXHIBIT D GMP Estimate Form (Including HUB Commitment) EXHIBIT D Concrete Only Supplemental Bid Form EXHIBIT E GMP Scoring Sheets EXHIBIT F Trade Specific Scopes (Building Concrete, Glass and Glazing, Plumbing, Fire Sprinkler, HVAC, and Electrical) EXHIBIT G List of Contract Documents (100% DD Package 2 & 3, dated March 3, 2017 & Construction Docs Bid Package 1, dated April 7, 2017) EXHIBIT H Prevailing Wages per Specification Section EXHIBIT I EXHIBIT J EXHIBIT K EXHIBIT L EXHIBIT M EXHIBIT N EXHIBIT O EXHIBIT P EXHIBIT Q EXHIBIT R * Available upon request Sample Trade Interface Agreement Site Logistics Plan Sample Code of Safe Practices Textura Overview Subcontractor s Liability Insurance Policy Quality Management Program Addenda *Sundt Construction Water Intrusion Prevention and Control Plan *Contract between Sundt Construction and the Owner *Guide to Loss Control SUNDT CONSTRUCTION, INC. PAGE 7 OF 7 REQUEST FOR PROPOSAL
Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION
Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION May 19, 2015 The Addison Public Library invites you to submit a reply to this Request for
More informationTOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR
February 5, 2018 SUMMARY OF CM/GC SELECTION PROCESS FOR DIMMIT II APARTMENT BUILDING The Town of Winter Park requests proposals from qualified Construction Manager / General Contractor (CM/GC) firms for
More informationDOCUMENT POST BID INTERVIEW
DOCUMENT 00 45 90 POST BID INTERVIEW PART 1 GENERAL 1.01 SUMMARY By request of the District, this Section requires the apparent low bidder to attend and participate in a Post Bid Interview with the Construction
More informationMARYLAND STADIUM AUTHORITY
MARYLAND STADIUM AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) GENERAL CONTRACTOR RENOVATIONS TO OPERATIONS OFFICE M&T BANK STADIUM MSA Project No. 19-013 ISSUE DATE: October 9, 2018 MARYLAND STADIUM AUTHORITY
More informationREQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September
More informationREQUEST FOR QUALIFICATIONS (RFQ-18084) CONSTRUCTION MANAGEMENT AT RISK (CMAR) SERVICES STATEMENT OF QUALIFICATIONS (SOQ)
REQUEST FOR QUALIFICATIONS (RFQ-18084) CONSTRUCTION MANAGEMENT AT RISK (CMAR) SERVICES STATEMENT OF QUALIFICATIONS (SOQ) Project: Ludden Library Renovation & Expansion By Laramie County Community College
More informationInvitation for Bid - Standard Office Furniture / Task Chair
Invitation for Bid - Bid#2016-09-001 Instructions to Bidders 1. General Information Rice University is issuing this Invitation for Bid (IFB) for the procurement of goods and/or trade services as described
More information6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents
Document (00 21 13) Rudolph/Libbe Inc. www.rlcos.com 6494 Latcha Rd. Walbridge, Ohio 43465 v: 419.241-5000 f: 419.837.9373 Table of Contents 1.0 General Instructions 1.1 Document Hierarchy 1.2 Safety 1.3
More informationScope of Work Bid Package C-8 - West Overhead Doors
Scope of Work Bid Package C-8 - West Overhead Doors CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,
More informationREQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services
REQUEST FOR PROPOSALS Construction Manager CM Services Pre-Construction and Construction Services Big Sky Fire Department Station 1 Project Big Sky Fire District OWNER Big Sky, Montana November 2016 Request
More informationREQUEST FOR PROPOSAL. Construction Management Services Not at Risk
REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk
More informationScope of Work Bid Package C-4 - West Polished Concrete
Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,
More informationREQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES
REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES Pueblo Urban Renewal Authority (PURA) Pueblo Convention Center Expansion &
More informationWEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES
1. Introduction WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES The Town of West Yellowstone (Town) is seeking a qualified
More informationADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW
January 31, 2018 To Whom It May Concern: I. INSTRUCTIONS ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project 18-0018PW A. The following additions, deletions, revisions, and/or
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER
More informationChapter 4 State Requirements for Educational Facilities Section 4.1
providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,
More informationREQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR CITY OF NANTICOKE
REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR CITY OF NANTICOKE Proposals Solicited by: City of Nanticoke 15 East Ridge Street Nanticoke, PA 18634 C:\Users\jim\Desktop\Nanticoke City\07222013professionalengservices\Engineer
More informationDepartment of Public Works Division of Engineering. Nassau County, New York
TOWN OF OYSTER BAY Department of Public Works Division of Engineering Nassau County, New York REQUEST FOR PROPOSALS FOR CONSULTANT SERVICES SOLICITATION NO. 2017-12 NOTES: 1. ISSUANCE DATE: Thursday, October
More informationLEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA
Project No. 4484/A4L-379/964840 LEVEL I PREQUALIFICATION DOCUMENTS for OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North
More informationREQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED MAXIMUM PRICE
CAYUCOS SANITARY DISTRICT 200 Ash Avenue P.O. Box 333, Cayucos, California 93430-0333 www.cayucossd.org 805-995-3290 REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED
More informationREQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN
REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN Introduction Becker County is issuing a RFQ for Construction Management at Risk Services
More informationDRAFT. Request for Proposal for Construction Manager at Risk Services ASHRAE. New Headquarters Building. Peachtree Corners, GA
DRAFT Request for Proposal for Construction Manager at Risk Services ASHRAE New Headquarters Building Peachtree Corners, GA 1. INTRODUCTION AND PROJECT DESCRIPTION A. Introduction On behalf of ASHRAE,
More informationREQUEST FOR QUALIFICATIONS AND PROPOSALS
REQUEST FOR QUALIFICATIONS AND PROPOSALS CONSTRUCTION MANAGER AT RISK SERVICES Preconstruction Phase Services and Construction Phase Services Sheridan Economic and Educational Development Authority Sheridan
More informationREQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK FOR THE NEW
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK FOR THE NEW Fire Station No. 1, Fire Administration, Training/Emergency Operations, and Public Works Service Center DUE April 17, 2017 BY 4:00
More informationLincoln City Visitor and Convention Bureau. City of Lincoln City REQUEST FOR QUALIFICATIONS
Lincoln City Visitor and Convention Bureau City of Lincoln City REQUEST FOR QUALIFICATIONS Visitor Center Concept Development and Designs Architectural Services Lincoln City, Oregon April 20, 2018 RFQ
More informationINVITATION FOR BID (IFB):
DATE: May 8, 2018 ADDENDUM NO. 1 INVITATION FOR BID (IFB): B180022132 RPD Furnish & Install Ballistic Glass Lobby Counters IFB #B180022132 WAS ISSUED: Wednesday April 25, 2018 RECEIPT DATE: May 23, 2018
More informationVILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information
VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES Part I: Proposal Information A General Information The Village of Vernon Hills is soliciting proposals for construction
More informationINSTRUCTIONS TO BIDDERS
INSTRUCTIONS TO BIDDERS CONTENTS I. Bid Documents II. Ethical Business Practices III. Contractor Qualifications IV. Performance and Quality Standards V. Bid Evaluation VI. Contract Award VII. Work Operations
More informationBidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue
Bidding Conditions March 22, 2018 (Project# 0192) at the Fresno Chaffee Zoo Project : Warthog Exhibit Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS Addendum - A document issued
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL DATE: February 24, 2015 Shimizu North America LLC 909 3rd Avenue, 28th Floor New York, NY 10022 RFP Queries (646) 205-4722 Fax (212) 223-1930 PROJECT: The Japan Foundation New York
More informationJanuary 22, Table of Contents
January 22, 2014 PROCEDURES SINGLE SELECTION PROCUREMENT OF DESIGN AND CONSTRUCTION MANAGEMENT SERVICES (Section 30 of Chapter 193 of the Acts of 2004) Table of Contents 1.0 Introduction...3 1.1 Purpose
More informationis to include all work necessary to complete the Bid Package Scope
May 17, 2012 RE: BID PACKAGE INSTRUCTIONS TO BIDDERS KPMG Denver Package Description: Interiorr Demolition Bid Package #: 01 Turner Construction Company invites your firm and team of subcontractors to
More informationAs a state agency, the College administration is required to develop procedures for Construction Manager selection.
COLLEGE of CENTRAL FLORIDA ADMINISTRATIVE PROCEDURE Title: Construction Management Selection Process Page 1 of 2 Implementing Procedure For F.S. 1013.45 Date Approved: 09/11/02 Division: Administration
More informationForsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101
Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Request for Qualifications Construction Manager at Risk (CMAR) INSTRUCTIONS
More informationBIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION. for the COUNTY OF ORANGEBURG. Project Number: FY
BIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION for the COUNTY OF ORANGEBURG Project Number: FY13-1206 October 18, 2012 1180 Columbia Avenue Suite 201 29063 (803) 781-1451
More informationRequest for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Harshman Demolition Response Deadline 3/28/18
More informationDAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower
DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate
More informationATTENTION CONTRACTORS
ATTENTION CONTRACTORS If you download this RFQ from the website, it is your responsibility to advise WOU's Planning Office that you have done so. This will allow us to add you to the Respondent's List,
More informationAppendix B - Minimum Qualification Form #96295 SaaS Training and Onboarding Tool GENERAL
Appendix B - Minimum Qualification Form #96295 SaaS Training and Onboarding Tool GENERAL THE MINIMUM QUALIFICATIONS SHALL BE SUBMITTED ON THIS FORM. IN ORDER TO BE CONSIDERED A QUALIFIED BIDDER BY JEA
More informationREQUEST FOR QUOTES (RFQ) Arbor E & T, LLC. Workforce Contractor for Workforce Solutions for South Texas
REQUEST FOR QUOTES (RFQ) for Arbor E & T, LLC. Workforce Contractor for Workforce Solutions for South Texas Description Personnel Services for Subsidized Employment for Workforce Customers Arbor E & T,
More informationADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION
ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build
More informationREQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES
REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES QUALIFICATION SUBMITTAL DATE: Monday, February 18, 2019 RFQ Number 2019-01 City of McLendon-Chisholm 1371 W. FM 550 McLendon-Chisolm, Texas 75032 972-524-2077
More informationEXHIBIT 6 Preconstruction Work
EXHIBIT 6 Preconstruction Work The following tasks shall be accomplished by the CM/GC as part of its obligations during the preconstruction phase. The work is to be coordinated with the services requirements
More informationWhat You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President
What You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President September 1, 2009 1 Part One Agenda Why the Session? Audit Themes Increasing Your Value Establishing Objectives
More informationPROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS
ADDENDUM #01 DATE: MAY 6, 2016 Page 1 of 2 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: CP151322 AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP160372 HULSTON HALL STAIR TOWER REPAIRS AT UNIVERSITY
More informationREQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES
SEDA-COUNCIL OF GOVERNMENTS REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES ENGINEERING, DESIGN, AND BIDDING 119 SOUTH LOCUST STREET DEMOLITION BOROUGH OF MOUNT CARMEL NORTHUMBERLAND COUNTY,
More informationPre-construction and Construction services for the construction of the Grand Street Settlement
Pre-construction and Construction services for the construction of the Grand Street Settlement Table of Contents Part A I. Introduction and Background II. Owner Goals and Objectives III. Key Dates, Contract
More informationOhio Public Employees Retirement System. Request for Proposal
Ohio Public Employees Retirement System For: Consulting Services for Development of the Business Intelligence & Analytics Office Date: 9/11/2017 Project Name: Business Intelligence & Analytics Program
More informationNAVAJO NATION OIL AND GAS COMPANY
Request for Proposals: Louis Denetsosie, Chief Executive Officer David Rubenking, Chief Financial Officer Board of Directors Lennard Eltsosie, Chairperson Diandra Benally, Vice-Chairperson Janna Blanter,
More informationREQUEST FOR PROPOSALS YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS
REQUEST FOR PROPOSALS GUTHRIE MEMORIAL LIBRARY ENVELOPE REHABILITATION YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS Table of Contents Section 1: Background...... 2 Section 2: Scope of Services... 2 Section
More informationPROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services
PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services SUBMISSION DEADLINE: October 23, 2009 11:00am FAIR AND OPEN PUBLIC SOLICITATION PROCESS FOR PROFESSIONAL SERVICES
More informationADDENDUM #2. Design/Build Contractor RFP Bid # for the. Joint-Use 21 st Century Post-Century Education Center.
ADDENDUM #2 Design/Build Contractor RFP Bid #0606-14 for the Joint-Use 21 st Century Post-Century Education Center SJECCD California July 7, 2014 SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT 4750 San
More informationEXHIBIT A - INSTRUCTIONS TO BIDDERS
1.01 GENERAL INFORMATION Neiman Marcus, Oak Brook, IL Oak Brook Center Remodel Project 2 EXHIBIT A - INSTRUCTIONS TO BIDDERS PROJECT: OWNER: CONSTRUCTION MANAGER: Neiman Marcus Oak Brook Remodel Project
More informationTerminal D South Expansion - Construction Manager-At-Risk (CMAR)
DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 3 FOR Terminal D South Expansion - Construction Manager-At-Risk (CMAR) CONTRACT NO. 9500647 August 30, 2018
More informationRequest for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Agency Project Name Stadium Project Response Deadline 1/9/14 12 pm local time
More informationREQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado
REQUEST FOR PROPOSAL HRIS Human Resources Information Software Fort Morgan, Colorado October 7, 2014 Michael Boyer Director, Human Resources and Risk Management CITY OF FORT MORGAN P.O. BOX 100 FORT MORGAN,
More informationREQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY
REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY June 1, 2018 The City of Rhome is now accepting sealed Request for Proposals and Statement of Qualifications (RFQ) for New Water &
More informationPROJECT DESCRIPTION. The project is the Spartan Complex Seismic Upgrade, San Jose, California.
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE SPARTAN COMPLEX SEISMIC UPGRADE PROJECT SAN JOSE STATE UNIVERSITY ONE WASHINGTON SQUARE, SAN JOSE, CA 95192-0010 The Trustees of
More informationREQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016
REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES For the renovation of existing apartment buildings August 15, 2016 INVITATION Bath Housing Development Corporation is soliciting proposals for
More informationADDENDUM #1. for the. Physical Security (Phase II), #31336 Bid #G San Jose City College
ADDENDUM #1 for the Physical Security (Phase II), #31336 Bid #G2010.0179 at San Jose City College San Jose Evergreen Community College District San Jose, California September 8, 2017 SAN JOSE EVERGREEN
More informationADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4
ADDENDUM #3 GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4 Please address inquiries to: Aaron R. Nickerson GRW, Inc. anickerson@grwinc.com TO ALL PROSPECTIVE BIDDERS:
More informationBidding Conditions Attachment C
Bidding Conditions Attachment C REV Date: November 9, 2018 Project Name (Permit Nos. xxx) at the Fresno Chaffee Zoo Project No. xxxx Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS
More informationPUBLICATION Commercial Refrigeration and Process Cooling and Heating R
TEXAS DEPARTMENT OF TRANSPORTATION SPECIFICATION NO. * COMMERCIAL HEATING, VENTILATION AND AIR CONDITIONING (HVAC) MAINTENANCE AND REPAIR SERVICES PUBLICATION This specification is a product of the Texas
More informationDocument B252TM 2007
Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation
More informationRequest for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County
Request for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County April 09, 2018 Responses Due Date/Time April 30, 2018 before 4:00 PM Pacific
More informationREQUEST FOR PROPOSALS AUDIT
REQUEST FOR PROPOSALS 2017-18 AUDIT PROFESSIONAL AUDIT SERVICES ANNUAL FINANCIAL STATEMENT PROPOSAL DEADLINE DATE Tuesday, February 6, 2018 at 3:00pm SUBMIT PROPOSAL TO: Ahmad Sheikholeslami Chief Business
More informationADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION
ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build
More informationAttachment 1 Architectural Services
A. Phase 1, Programming and Schematic Design: 1. Ascertain the requirements for each project through a meeting with the COUNTY, and a review of an existing schematic layout of each project, if such layout
More informationNorth American Development Bank. Engagement of Consultants
North American Development Bank Engagement of Consultants ENGAGEMENT OF CONSULTANTS This Note has been prepared by the North American Development Bank (the Bank) to assist staff and borrowers in the implementation
More informationSpecial Education Sexual Health Education Training Fall 2017
State of Vermont [phone] 802-479-1030 Agency of Education 219 North Main Street, Suite 402 [fax] 802-479-1835 Barre, VT 05641 education.vermont.gov Standard Bid Request for Proposals for: Special Education
More informationREQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE Memphis Cook Convention Center Renovation City of Memphis, Department of Housing and Community Development
More informationCITY OF MOORE Outdoor Fitness Equipment for Little River Park (Not to Exceed $65,000) RFP #
CITY OF MOORE Outdoor Fitness Equipment for Little River Park (Not to Exceed $65,000) RFP # 1900-04 The City of Moore Parks and Recreation Department is seeking written proposals for an Outdoor Fitness
More informationSOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY
I. Introduction SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY Request for Proposals on Rebate Program Automation Issuance Date: July 24, 2018 Response Deadline: August 23, 2018 The Southern California Public
More informationRefer to Section Proposal Form/All Trades (issued) a. Revised Alternate No. 2 b. Added Alternate No. 3
WAKELY ASSOCIATES, INC. ADDENDUM NO. ONE ARCHITECTS 30500 Van Dyke Avenue Suite 209 Warren, Michigan 48093 NEW LED LIGHTING Page 1 of 1 (write up only) January 23, 2018 ADDENDUM NO. ONE to the plans and
More informationHillsborough City School District Window Covering Projects At 6 District Sites. Bid #19-01 ADDENDUM NO. 1
Window Covering Projects At 6 District Sites Bid #19-01 ADDENDUM NO. 1 February 13, 2019 Owner: Project Manager: 300 El Cerrito Avenue Hillsborough, CA 94010 Capital Program Management, Inc. 1851 Heritage
More informationREQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS
REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS 1. REQUEST FOR PROPOSALS. Clearwater Public Schools, Ewing Public Schools,
More informationRequest for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Campus Wide HVAC Upgrades - Steam Lines Response
More informationAudio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program
Audio Sessions Session 4 PROCUREMENT Construction Contract Administration Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications
More informationSUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY
SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional
More informationREQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA
REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA GENERAL INFORMATION Greenwood School District 50 is
More informationPUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT)
PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT) The Greenville City School District (the "District") invites interested parties to submit
More informationRequest for Proposal for Annual Financial Audit Services
Request for Proposal for Annual Financial Audit Services RFP # 19_001 Jan 10, 2019 Page 1 I. RFP Timeline The following Timeline has been defined to efficiently solicit multiple competitive proposals,
More informationSPECIFICATIONS FOR TENDER # SUPPLY AND INSTALLATION OF LAUNDRY ROOM AIR SUPPLY FAN WESTERN HEALTH
SPECIFICATIONS FOR TENDER #0171-1807 SUPPLY AND INSTALLATION OF LAUNDRY ROOM AIR SUPPLY FAN WESTERN HEALTH CLOSING DATE: 20th of March, 2018 CLOSING TIME: 2:00 PM (Newfoundland Time) Invitation to Tender
More informationCONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS
CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS I. INTRODUCTION The East Rutherford School District is planning to hold a referendum on December 12, 2017 that incorporates facility
More informationUNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No
PART 1 GENERAL 1.1 RELATED DOCUMENTS REQUIREMENTS COMMON TO ALL WORK CATEGORIES 1. Drawings and general provisions of the Contract, including General Special Conditions and other Division 1 Specification
More informationProject Location: 2220 E. League City Parkway, League City, Texas 77573
DOCUMENT 00020 - INVITATION TO BIDDERS TO FROM ALL INVITED BIDDERS Houston Methodist Medical Office Buildings 6550 Fannin Street, Suite SM201 Houston, Texas 77030 The bidders list for this Project has
More informationREQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320
REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE 2015 2016 ROOF AND HVAC REPLACEMENT PROJECT PW1320 Issued by: City of Stockton Public Works Department 22 E. Weber Avenue, Room 301 Stockton, CA 95202
More informationMASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK
MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK DATE ISSUED: January 10, 2018 DEADLINE FOR WRITTEN
More informationBERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX
BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA 95132 408-923-1871 OFC 408-926-8329 FAX PREQUALIFICATION PACKAGE INSTRUCTIONS FOR PROSPECTIVE MEP SUBCONTRACTORS FEBRUARY
More informationPREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT
PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT JUNE 23, 2016 NOTICE TO CONTRACTORS TO PREQUALIFY FOR MECHANICAL,
More informationSOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY Request for Proposals for Smart Grid Implementation Services RFP Date: October 22, 2014 Response Deadline: November 21, 2014 I. Introduction The Southern California
More informationA D D E N D U M. REPLACE: Project Summary with attached revised Project Summary. 1 Specification Section Project Summary
A D D E N D U M 1 TO All Plan Holders ISSUE DATE 20 January 2017 PROJECT # 15-028 REGARDING Switchgear Replacement NARRATIVE PAGES 1 15-02812 KVa Switchgear Replacement Project SPECIFICATION PAGES 10 DRAWING
More informationADVERTISEMENT FOR SUBCONTRACTOR QUALIFICATION AND ADVERTISEMENT FOR PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS)
ADVERTISEMENT FOR SUBCONTRACTOR QUALIFICATION AND ADVERTISEMENT FOR PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) PROJECT NOTICE DPR Construction, hereinafter called DPR, intends to award
More informationAmity School District 4J
Amity School District 4J Code: DJCA-AR Adopted: 10/11/00 Revised/Readopted: 06/22/05 Personal Services Contracts I. Personal Services Contracts Defined A. Personal services contracts include, but are not
More informationCITY OF CHINO HILLS. Request for Proposals (RFP) for. On-call Electrical Repair Service. On-call Electrical Repair including Water and Wastewater
CITY OF CHINO HILLS Request for Proposals (RFP) for On-call Electrical Repair Service March 30, 2016 Department: Project Name: Public Works On-call Electrical Repair including Water and Wastewater Proposal
More informationREQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components
REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility RFP Components CLIENT: TradePort International Corporation, Operators of John C. Munro
More informationINVITATION FOR BIDS IFB NO FOR CDCA BATHROOMS/KITCHEN UPDATES. Dr. Julius R. Scruggs, Pastor
INVITATION FOR BIDS First Missionary Baptist Church The Church that is striving to become one of the most loving churches in all the world. 3509 Blue Spring Road, Huntsville, Alabama 35810 256-852-4318,
More informationOwner: Metropolitan Park District of Tacoma
Metropolitan Park District of Tacoma STAR Center HVAC Improvements SWR Bid# J2016-08 In TACOMA, WASHINGTON CONTRACT DOCUMENTS Owner: Metropolitan Park District of Tacoma Planning, Design and Development
More informationAPPENDIX D CONSTRUCTION PHASE CRITERIA
A. GENERAL REQUIREMENTS CONSTRUCTION PHASE CRITERIA For the Construction Phase of the Project, the Architect/Engineer (A/E) is responsible for providing project administration for the Owner in accordance
More information