Wetland Jurisdictional Size Comparisons Multiple Jurisdictions Jurisdiction Name (Year Jurisdictional Wetland Size Notes
|
|
- Blake Cox
- 6 years ago
- Views:
Transcription
1 1 Thurston County Planning Commission April 6, 2011 Meeting Wetland Jurisdictional Size Comparisons Multiple Jurisdictions Jurisdiction Name (Year Jurisdictional Wetland Size Notes Adopted/Amended) (SF = square feet) Thurston County (1994, as 22,000 SF Rural county 11,000 SF Urban growth area 2,500 SF Adjacent to stream or in 100-year floodplain Thurston County (proposed) 1,000 SF Smaller wetlands may be included if they are: located in riparian habitat or other critical area buffer; are a functional part of a mosaic wetland; or provide essential habitat for priority species Lewis County (2008) 1,000 SF Smaller wetlands may be included if they are: associated with riparian corridor; Mason County (2006) 1,000 SF Smaller wetlands may be included if they are: associated with riparian corridor; Grays Harbor County (2010) 1,000 SF Smaller wetlands may be included if they are: associated with riparian corridor;
2 2 Pierce County No exemption for Category I and II wetlands 2,500 SF for Category III 10,000 SF for Category IV No exemption for Category I or II wetlands; Smaller wetlands may be included if they are contiguous with freshwater or estuarine system, or part of mosaic wetland complex Smaller wetlands may be included if they are contiguous with freshwater or estuarine system, or part of mosaic wetland complex City of Olympia ( ) 1,000 SF Smaller wetlands may be included if they are: associated with riparian corridor; City of Lacey (~2007) Determined site by site, based on field visit City of Tumwater 1,000 SF Smaller wetlands may be included if they are: associated with riparian corridor; City of Yelm Delineation if presence is possible, no size threshold; wetlands usually associated with creek and protected by riparian buffers City of Rainier (2007) Does not appear to be a minimum size City of Tenino (2007) 1,000 SF Smaller wetlands may be included if they are: associated with riparian corridor;
3 3 Wetland Buffer Width Comparisons Multiple Jurisdictions WRS = Wetland Rating System (Ecology) LU = Land Use WQ = Water Quality WRS habitat type = Bogs, Natural Heritage wetlands, forested wetland Jurisdiction Name (Year Adopted/ Amended) Thurston County (1994, as Thurston County (proposed) Standard Buffer Range (Absolute; without reductions) Method of Determination Standard Buffer Width Reduction/Increase/ Reconfiguration/Averaging feet WRS; LU Intensity Reductions and averaging authorized feet Habitat Values/Water Quality requirements Wetland Rating System All authorized Lewis County (2008) Mason County (2006) Grays Harbor County (2010) feet WRS habitat score, then by LU intensity feet WRS habitat type and feet WRS habitat type and habitat quality requirements Reductions and averaging authorized Reduction, increase and averaging authorized Reduction and averaging allowed
4 4 Pierce County City of Olympia ( ) City of Lacey (~2007) City of Tumwater City of Yelm City of Rainier (2007) City of Tenino (2007) feet Sliding scale based on WRS habitat score, also recognizes WRS WQ score and special habitat types feet Sliding scale based on WRS habitat score, then by LU intensity feet WRS habitat type and Reduction, increase and averaging authorized Reduction, averaging authorized Increase, averaging authorized
5 5 Jurisdictional Comparison Impacts to Category III and IV Wetlands Jurisdiction Name (Year Replacement Criteria for Category III and IV Wetlands Adopted/Amended) Thurston County (1994, as None Thurston County (proposed) May impact Cat. III and IV wetlands between 1,000 and 4,000 SF, if: not in riparian area, functional part of wetland mosaic, have WRS habitat rating of less than 20 points, no habitat for priority wildlife species, mitigation Lewis County (2008) Mason County (2006) City of Olympia ( ) City of Tumwater City of Tenino (2007) Grays Harbor and Pierce Counties, Cities of Lacey, Yelm and Rainier May impact Cat. III and IV wetlands smaller than 2,500 SF, if: not associated with riparian corridor, part of May impact Cat. III and IV wetlands between 1,000 and 4,000 SF if: not associated with riparian corridor, part of a wetland mosaic, no essential habitat for priority species, mitigation These jurisdictions do not appear to allow replacement. However, Pierce County exempts smaller Category III (<2,500 SF) and Category IV (<10,000 SF) wetlands from review, subject to standards.
: Science to Local Policy Project Area Modeled Basins
Map 1 Project Area Mason County Science to Local Policy Project Area Modeled Basins Black Lake Woodard 5 Pierce County Jurisdiction McLane Creek Woodard Creek McLane LACEY Grays Harbor County Black Lake
More informationRevisions to the RI Freshwater Wetlands Act
Revisions to the RI Freshwater Wetlands Act 2016 Land & Water Summit Chuck Horbert, Supervising Environmental Scientist RI DEM March 19, 2016 1 A Short History 1971: RI Freshwater Wetlands Act passed (second
More informationHow Much Habitat Is Enough? How Much Disturbance is Too Much?
How Much Habitat Is Enough? How Much Disturbance is Too Much? Jocelyn Sherwood Canadian Wildlife Service - Ontario January 27 th, 2017 Page 2 April 19, 2017 Page 3 April 19, 2017 Grasslands Forest Wetlands
More informationAppendix D Inventory of Facilities
July 8, 2016 Appendix D Inventory of Facilities Appendix D identifies major transportation facilities in the Thurston region that function as an integrated system. This is a big-picture view of major roadways,
More informationCalifornia Rapid Assessment Method for Wetlands (CRAM) Buffer and Landscape Context Attribute
California Rapid Assessment Method for Wetlands (CRAM) Buffer and Landscape Context Attribute Buffer and Landscape Context Attribute Presence and/or continuity of wetlands and riparian areas adjacent to
More information1/16/2016. California Rapid Assessment Method for Wetlands (CRAM) Buffer and Landscape Context Attribute. Buffer and Landscape Context Attribute
California Rapid Assessment Method for Wetlands (CRAM) Buffer and Landscape Context Attribute Buffer and Landscape Context Attribute Presence and/or continuity of wetlands and riparian areas adjacent to
More information5.4 Alternative 2: Structural Flood Protection Without Flood Retention Facility
5.4 Alternative 2: Structural Flood Protection Without Flood Retention Facility Structural Flood Protection Without Flood Retention Facility (Alternative 2) would reduce flood damage during a major flood
More informationStormwater Management Tools: Real-Life Solutions for a Resilient Community Riparian Corridor Protection
Stormwater Management Tools: Real-Life Solutions for a Resilient Community Riparian Corridor Protection Montgomery County Planning Commission October 24, 2013 Eric Jarrell, Assistant Section Chief, Community
More informationVEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES
VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES The County will: GOALS AND OBJECTIVES 1.1 Conserve, Enhance, Protect, Maintain and Manage Vegetative, Water, Fish and Wildlife Resources Promote
More informationANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES
ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES Goal 1: Protect the health and safety of the Dane County population. a. Prevent development that may have an adverse effect
More informationSTAFF REPORT. Permit Number: Ryan. Kitsap County Board of Commissioners; Kitsap County Planning Commission
STAFF REPORT Permit Number: 15 00380 Ryan DATE: November 9, 2015 TO: FROM: Kitsap County Board of Commissioners; Kitsap County Planning Commission Katrina Knutson, AICP, Senior Planner, DCD and Jeff Arango,
More informationHow Much Habitat is Enough?
How Much Habitat is Enough? Canadian Wildlife Service 2017 Third Edition Page 2 April 19, 2017 Grasslands Forest Wetlands Riparian & Watershed Page 3 April 19, 2017 Significant impairment in stream At
More informationRiparian Corridors and Required Setbacks
Riparian Corridors and Required Setbacks This document is intended to explain where development and structures are allowed to be constructed adjacent to riparian corridors. Any proposed development (such
More informationCommunity LID Workgroup Issue Paper #3
Topic: Clearing, Grading & Healthy Soils Community LID Workgroup Issue Paper #3 Objectives: Limit clearing, grading, and soil disturbance outside of the building footprint on newly developed residential
More informationTHURSTON COUNTY SHORELINE MASTER PROGRAM UPDATE DRAFT SHORELINE ENVIRONMENT DESIGNATIONS
THURSTON COUNTY SHORELINE MASTER PROGRAM UPDATE DRAFT SHORELINE ENVIRONMENT DESIGNATIONS PREPARED BY THURSTON COUNTY PLANNING DEPARTMENT BUILDING # 1, 2ND FLOOR 2000 LAKERIDGE DRIVE SW OLYMPIA, WA 98502-6045
More informationIn 2008 a group of individuals came together to create Thurston Climate Action
January 13 th TESC Presentation In 2008 a group of individuals came together to create Thurston Climate Action Team or TCAT. We wanted to take on projects that would move Thurston County toward lower greenhouse
More informationMay 20, Buffer Program in Flux: Past, Present and Future
May 20, 2016 Buffer Program in Flux: Past, Present and Future Riparian Buffer Protections Our past Excess nutrients Massive fish kills Impacts to tourism The present Nutrient management strategies Riparian
More informationCritical Areas Ordinance
Public Review Draft //7 Public Review Draft //7 4 5 6 Kitsap County Code Title 9 Critical Areas Ordinance 7 8 9 0 Underline / Strike out Version 9.800 Appendices 4 5 6 7 8 9 0 4 5 Public Review Draft //7
More informationRiparian Setback- What is that and what should I be doing? October 25th, 2016 Presented by: Anil Tangirala, PE, CFM, ENV SP
Riparian Setback- What is that and what should I be doing? October 25th, 2016 Presented by: Anil Tangirala, PE, CFM, ENV SP Agenda Introduction Stream and Riparian Impacts Ohio EPA Stormwater General Permit
More informationGoose Creek Watershed Assessment Summary October 2003
Goose Creek Watershed Assessment Summary October 2003 The Goose Creek Watershed The Goose Creek watershed is 385 square miles, covering nearly half of Loudoun County and one-quarter of Fauquier County
More informationCOMMUNITY SUPPORT FOR ADOPTING WOODLAND CONSERVATION REGULATIONS EXAMPLE OF A WOODLAND CONSERVATION ORDINANCE STATEMENT OF PURPOSE:
EXAMPLE OF A WOODLAND CONSERVATION ORDINANCE STATEMENT OF PURPOSE: To preserve wooded corridors that connect large tracts of forests to act as wildlife corridors, encouraging species diversity by providing
More informationTrails Permitting Process
Appendix H: Trail Permitting Process A PPENDIX H: T RAIL P ERMITTING P ROCESS Trails Permitting Process The permitting process is a critical component in the successful development of a trail network.
More informationStormwater Discharge to Wetlands Item 3-21
Stormwater Discharge to Wetlands Item 3-21 Existing Regulation(s) 21A.50.300 (7) allows discharge from a surface water facility to wetlands or buffers if no increase in the rate of flow, change the plant
More informationMaryland s s Critical Area Program
Maryland s s Critical Area Program Overview of the Critical Area Program Highlights of 2008 Legislative Session Cecil County Land Use Alliance May 29, 2008 What Is the Critical Area Program? Based on Chesapeake
More informationMain Regulatory Agencies
Presentation Outline Regulated Activities Regulatory Agency Review Permit Requirements Road/Culvert Design Considerations Permitting Strategies Ecological Considerations Review & Questions Regulated Activities
More informationChapter 13: Wildlife and Vegetation
Chapter 13: Wildlife and Vegetation Introduction and Setting Nevada County contains an extremely wide range of plants, animals and habitat types. With topographic elevations ranging from 300 feet in the
More informationRIPARIAN PROTECTION Questions & Answers
RIPARIAN PROTECTION Questions & Answers 1. What is a riparian corridor and why is it important? Answer: A riparian corridor is a space on both sides of a stream or around a lake or wetland. The corridor
More informationNew Hampshire Regulation Stream & Wetland Buffers Making the Most of a Good Thing May 4, Mary Ann Tilton NH Wetlands Bureau
New Hampshire Regulation Stream & Wetland Buffers Making the Most of a Good Thing May 4, 2016 Mary Ann Tilton NH Wetlands Bureau NH Wetland Protection Wetland Protection Surface Water Quality Shoreland
More informationGrand Traverse Bay Watershed Protection Plan:
Grand Traverse Bay Watershed Protection Plan: An Overview Sarah U Ren Program Director The Watershed Center 231-935-1514, suren@gtbay.org What is a Watershed? A watershed is an area of land that captures
More informationInformation Request 37
Information Request 37 Information Request 37 37-1 Response to Information Request 37 Response to Information Requests 37a Response to Information Requests 37b 37-3 37-5 Federal Review Panel Information
More informationAppendix I Transportation Modeling Process
July 8, 2016 Appendix I. Transportation Modeling Process Appendix I Transportation Modeling Process All models are wrong, but some are useful. Introduction - George Box Regional transportation planning
More informationTAC CHARRETTE WORKBOOK Ecosystem Management and Sustainable Forestry Practices
For Discussion Purposes TAC CHARRETTE WORKBOOK Ecosystem Management and Sustainable Forestry Practices NEW JERSEY HIGHLANDS COUNCIL March 28, 2006 1 Overview of RMP Goals and Structure NEW JERSEY HIGHLANDS
More informationSTAFF REPORT. Permit Number: Tallman. Kitsap County Board of Commissioners; Kitsap County Planning Commission
STAFF REPORT Permit Number: 15 00742 Tallman DATE: November 9, 2015 TO: FROM: RE: Kitsap County Board of Commissioners; Kitsap County Planning Commission Katrina Knutson, AICP, Senior Planner, DCD and
More informationTumwater City Plan 2035 Utilities Element
2, Tumwater City Plan 2035 Utilities Element TABLE OF CONTENTS TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1 Introduction... 1 1.2 Utility Regulations... 2 1.2.1 State Regulation... 3 1.2.2 Federal Regulation...
More informationWhatcom County Public Review Draft Birch Bay Habitat Mitigation Fund: Watershed Based Management Plan November 2, 2011
ARTICLE 9 BIRCH BAY WATERSHED-BASED MANAGEMENT PLAN HABITAT MITIGATION FUND 16.16.910 Purpose The purpose of this article is to provide a watershed-based management plan, pursuant to the requirements of
More informationThurston County In-Lieu Prospectus. Thurston County Water Resources
Thurston County In-Lieu Prospectus Thurston County Water Resources March 2013 Acknowledgements Thurston County would like to express its sincere thanks to the Washington Department of Ecology for its funding
More informationClallam County Shoreline Master Program Update
Clallam County Shoreline Master Program Update Board of Commissioners Work Session November 13, 2017 Topics Buffers Channel Migrations Zones (CMZs) Mitigation and No Net Loss Importance of Buffers Provide
More informationCritical Areas Ordinance Update Best Available Science Review
Critical Areas Ordinance Update Best Available Science Review 19.200 Wetlands State Agency Guidance Documents In 2005, the Washington Department of Ecology (Ecology) provided a two volume guidance on wetland
More informationCWS Landscape Conservation Guidance and Planning. Graham Bryan CWS-ON September 16 th, 2016 Bracebridge
CWS Landscape Conservation Guidance and Planning Graham Bryan CWS-ON September 16 th, 2016 Bracebridge Canadian Wildlife Service Part of Environment & Climate Change Canada CWS is responsible for wildlife
More informationRIPARIAN AREAS REGULATION
Definitions and interpretation RIPARIAN AREAS REGULATION 1 (1) In this regulation: Act means the Fish Protection Act; active floodplain means an area of land that supports floodplain plant species and
More informationAppendix O Level of Service Standard and Measurements
July 8, 2016 Appendix O. Appendix O Standard and Measurements Definition Level of service (LOS) is a mechanism used to determine how well a transportation facility is operating from a traveler s perspective.
More informationAppendix A. Agricultural Resource Lands Designation: Selected Washington Counties Fully Planning Under the Growth Management Act
Appendix A Agricultural Resource Lands Designation: Selected Washington Counties Fully Planning Under the Growth Management Act Chelan County Comprehensive Plan, Land Use Element Chelan County is in the
More informationVegetative Buffer Regulations to Protect Water quality
Vegetative Buffer Regulations to Protect Water quality Robert Jontos, PWS, CPESC Land-Tech Consultants, Inc. Environmental Scientists and Engineers Connecticut Association of Conservation and Inland Wetland
More informationCarolina North Update Public Information Meeting January 19, 2012
Carolina North Update Public Information Meeting January 19, 2012 Agenda 1) General Overview 2) Project Phasing 3) Current Projects: Utilities Ductbank Landfill Gas Project Greenway Research Building and
More informationSite Condition Evaluation & Environmental Benefits Report
Site Evaluation & Environmental Benefits Report Background The New York State Conservation Reserve Enhancement Program is a collaborative effort between the USDA and the State of New York. The goal of
More informationCITY OF AUSTIN'S REGULATORY FRAMEWORK FOR CREEK PROTECTION
CITY OF AUSTIN'S REGULATORY FRAMEWORK FOR CREEK PROTECTION Liz Johnston, Watershed Protection Department Urban Riparian Symposium February 15 17, 2017 Houston, TX Valuable Resource Drinking Water Intake
More informationADDENDUM TO THE CITY OF LAKEPORT GENERAL PLAN EIR
ADDENDUM TO THE CITY OF LAKEPORT GENERAL PLAN EIR OCTOBER 24, 2014 Prepared for: City of Lakeport Community Development Department 225 Park Street Lakeport, CA 95453 Prepared by: De Novo Planning Group
More informationCity of Valdosta Land Development Regulations
Chapter 324 Section 324-1 Environmental Planning Criteria Protection of Groundwater Recharge Areas (A) Purpose and Intent. Pursuant to O.C.G.A. 12-2-8 and the Georgia Department of Natural Resources (DNR),
More informationSnohomish County Council
Snohomish County Council Committee: Planning & Community Development Analyst: Yorik Stevens-Wajda ECAF: 8361 (proposed motion 17-117) Date: June 11, 2017 Motion 17-117 would provide direction on which,
More informationTexas Riparian & Stream Ecosystem Training Program Update
Texas Riparian & Stream Ecosystem Training Program Update Clare Entwistle; Nikki Dictson; Dr. Fouad Jaber; Destiny Russell; Nathan Glavy Texas Water Resources Institute Threats to Riparian Areas Riparian
More informationIDEM Wetlands and Streams Regulatory Overview. An overview of IDEM permitting for work in Waters of the State
IDEM Wetlands and Streams Regulatory Overview An overview of IDEM permitting for work in Waters of the State Who Has Jurisdiction? Adjacent wetland: USACE & IDEM Stream > 1 sq. mile drainage: IDNR, USACE
More informationSENATE BILL 610 A BILL ENTITLED. Natural Resources Forest Conservation Act Standards and Requirements
M SENATE BILL lr CF lr By: Senators Young, Benson, Conway, Currie, Feldman, Ferguson, Guzzone, Kagan, Kelley, King, Lee, Madaleno, Nathan Pulliam, Pinsky, Ramirez, Robinson, and Zucker Introduced and read
More informationThe following changes are required to comply with the SMA (RCW 90.58) and the SMP guidelines (WAC , Part III);
ATTACHMENT B - DEPARTMENT OF ECOLOGY REQUIRED CHANGES TO THE CITY OF PUYALLUP, NOVEMBER 2014 SMP - ORDINANCE NO. 3076 The following changes are required to comply with the SMA (RCW 90.58) and the SMP guidelines
More informationChapter 4 Watershed Goals and Objectives
Chapter 4 Watershed Goals and Objectives Eight (8) long-term watershed goals have been developed by the NEW Watershed Advisory Group (WAG) after consideration of discussions held during monthly watershed
More informationCHAPTER FIVE -- TRANSPORTATION
CHAPTER FIVE -- I. INTRODUCTION This chapter of the Comprehensive Plan serves as the Transportation Element as defined by the Washington State Growth Management Act (GMA), RCW 36.70A. The contents of this
More informationSHORELINE MASTER PROGRAM
PRELIMINARY DRAFT GRAYS HARBOR COUNTY SHORELINE MASTER PROGRAM Please note that this draft is currently under review by the Shoreline Planning Committee and further changes should be expected. January
More informationA Tool for Rating Wetland Values in DE. Alison Rogerson, Andy Howard, Matt Jennette January 27, 2015
A Tool for Rating Wetland Values in DE Alison Rogerson, Andy Howard, Matt Jennette January 27, 2015 What s in place now? Delaware Rapid Assessment Procedure DERAP scores are based on multiple wetland functions
More informationFrequently Asked Questions
Frequently Asked Questions Chelan County Shoreline Master Program Update July 2009 What is an SMP? Shoreline Master Programs (SMP) are a combination of rules and comprehensive planning that are prepared
More informationThe role of riparian climate corridors in promoting ecological resilience
The role of riparian climate corridors in promoting ecological resilience DAVID PATRICK & MARK ANDERSON DAVID.PATRICK@TNC.ORG Acknowledgements Mark Anderson and his team 75 scientists, 8 years of work
More informationHow to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy
How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy for the Environmental Services Association of Nova Scotia By Krista Hilchey Wetland Specialist, Nova Scotia Environment To
More informationCompensatory Mitigation Regulation ( Mitigation( Rule )
Compensatory Mitigation Regulation ( Mitigation( Rule ) 33 CFR Part 332 (Corps) 40 CFR Part 230 (EPA) 3/20/09 Agenda Complete application Definitions What didn t t change? How does this rule affect existing
More informationWriting Performance Standards for Wetland Mitigation
Writing Performance Standards for Wetland Mitigation WSDOT Updated 08/23/17 Performance standards are critical components of any wetland mitigation report. These performance criteria describe measurable
More informationGROUNDWATER RECHARGE. Clear Creek Solutions, Inc., 2010
GROUNDWATER RECHARGE Clear Creek Solutions, Inc., 2010 Groundwater provides the base flow to streams and wetlands during dry periods. Groundwater also recharges aquifers and provides water for residential,
More informationUsing GIS for Prioritization in Subwatershed Restoration
Using GIS for Prioritization in Subwatershed Restoration Elena Horvath Advisor: Joseph Bishop, PhD November 10, 2011 The Pennsylvania State University Master in Geographic Information Systems www.gis.psu.edu
More informationNew Jersey Highlands Council RMP Update/Map Adjustment Review Municipal Petition for Plan Conformance SUMMARY OF FINDINGS RMP UPDATES/MAP ADJUSTMENTS
New Jersey Highlands Council RMP Update/Map Adjustment Review Municipal Petition for Plan Conformance SUMMARY OF FINDINGS RMP UPDATES/MAP ADJUSTMENTS Please be advised that RMP Updates pertain to factual
More informationWATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999
WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999 The following table indicates the draft goals and objectives for the Santa Clara Basin WMI process. The overall objectives
More information3.14 EAST STRAIT INDEPENDENT DRAINAGES RECOMMENDATIONS
Chapter 3.14 East Strait Independent Drainages Page 3.14-1 3.14 EAST STRAIT INDEPENDENT DRAINAGES RECOMMENDATIONS Section 3.4 contains recommendations for instream flows and Section 3.3 contains other
More informationDeleted Text: Strikethrough Proposed Changes: Underlined Staff Comments: Italics Unaffected Omitted Text: ( )
Thurston County Planning Department DRAFT IN PROGRESS AMENDMENTS TO THE CRITICAL AREAS REGULATIONS TCC 24.30 04/06/2011 Chapter 24.30 WETLANDS WETLANDS Sections: 24.30.005 Wetlands General purposes. 24.30.010
More informationSUMMARY OF MAJOR POLICY IMPLEMENTATION TOPICS From 2016 COUNTY Comprehensive Plan
SUMMARY OF MAJOR POLICY IMPLEMENTATION TOPICS From 2016 COUNTY Comprehensive Plan A checkmark means that implementing code amendments have been drafted or are in progress as of November 1, 2016. Evaluate
More informationCOUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND 2010 Legislative Session
DR- COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND 0 Legislative Session Bill No. CB--0 Chapter No. Proposed and Presented by The Chairman (by request Planning Board) Introduced by Council Members
More informationThe Gorst Creek Watershed White Paper
Prepared for City of Bremerton 345 6th Street, Suite 600 Bremerton, WA 98337 Prepared by October 2013 553-3622-009 CITATION. 2013. The Gorst Creek Watershed. Prepared by AECOM, Seattle, Washington and
More informationFunding Guidelines State Fiscal Year 2016
State Fiscal Year 2016 Water Quality Financial Assistance Centennial Clean Water Program Clean Water Act Section 319 Program Stormwater Financial Assistance Program Washington State Water Pollution Control
More information2. 7:06:43 PM APPROVAL OF AGENDA MOTION: Commissioner Cole moved to approve the July 26, 2006 agenda. Commissioner Musser seconded. Motion carried.
THURSTON COUNTY PLANNING COMMISSION Minutes July 26, 2006 1. 7:06:19 PM CALL TO ORDER Chair Roper called the July 26, 2006 regular meeting of the Thurston County Planning to order at 7:06 p.m. ers provided
More informationThe five regional level maps of natural and cultural resources are included below:
Environmental Mitigation CDTC s New Visions 2040 regional transportation plan encourages smart growth as well as investment and development in urban areas as a method to protect natural resources Smart
More informationRegional Master Plan Consistency Report 1/8/2010
of 47 11:31 AM Regional Master Plan Consistency Report Prepared by State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513), Chester, NJ 07930 Telephone: (908) 879-6737
More information16.1 Significant and Unavoidable Impacts
Chapter 16 NEPA requires an EIS and CEQA requires an EIR to evaluate a number of other types of environmental impacts in addition to those already addressed in the resource chapters. The analysis required
More informationTOPIC BILL FORMAT CHANGES (underline = additions; strikethrough = deletions) RATIONALE
Attachment B: Ecology Required Changes: Camas Shoreline Master Program, Ordinance No. 2643, adopted March 5, 2012. The following changes are required to comply with the SMA (RCW 90.58) and the SMP Guidelines
More informationPrime Wetlands: Study, Designation and Thereafter. Sandy Crystall, PWS Wetlands Bureau Nov 2009
Prime Wetlands: Study, Designation and Thereafter Sandy Crystall, PWS Wetlands Bureau Nov 2009 Introduction Wetlands and their protection in New Hampshire Why designate prime wetlands? Process and effect
More informationPublic Notice ISSUED: September 23, 2013 EXPIRES: October 22, 2013
APPLICANT: Edlen Cranberry Company Public Notice ISSUED: September 23, 2013 EXPIRES: October 22, 2013 REFER TO: MVP-2013-03340-NJC SECTION:404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge fill
More informationCity of Tacoma Planning and Development Services
City of Tacoma Planning and Development Services Agenda Item D-2 To: Planning Commission From: Elliott Barnett, Associate Planner Subject: Open Space Corridors Project Phase 1 Meeting Date: January 17,
More informationPullman Airport Expansion Permitting Process Overview, Wetlands and Mitigation. October 25, 2017
Pullman Airport Expansion Permitting Process Overview, Wetlands and Mitigation October 25, 2017 Overview of the Airport Project The Pullman Airport Expansion Project includes: Realignment of Runway 6/24
More information3D WETLAND MANAGEMENT
3D WETLAND MANAGEMENT 1. ISSUE Wetlands are one of the most productive ecosystems. They provide biological and chemical functions to the landscape that serve the watershed including the moderation of nutrient
More informationArticle 6 District Intensity Standards
Sec. 6.1 District Intensity in General 6.1.1 Purpose The district development standards of this Ordinance establish lot sizes and certain restrictions for all residential and nonresidential development.
More informationJoint Public Notice AGENT:
US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
More informationSilviculture Exemption Update
Silviculture Exemption Update US Army Corps of Engineers BUILDING STRONG Public Notice Issued December 8, 2010 Advertising 12-Month Implementation Period Guidelines for Silviculture Exemptions under the
More informationEcology Required Changes Revised July 6, Additional changes are underlined in bold.
ATTACHMENT B: Snohomish County SMP adopted October 13, 2010 Ecology Required Changes Revised July 6, 2012. Additional changes are underlined in bold. The following changes are required to comply with the
More informationBackground. Literature Review
Ms. Joanna Helms Economic Development Director Town of Apex 73 Hunter Street P.O. Box 250 Apex, North Carolina 27502 October 23, 2015 Reference: Report of Wetland Determination Cash Perkins Site ECS Project
More informationI-405 Congestion Relief and Bus Rapid Transit Projects: Renton Nickel Improvement Project (Renton Stage 1) Mitigation Site USACE NWP
I-405 Congestion Relief and Bus Rapid Transit Projects: Renton Nickel Improvement Project (Renton Stage 1) Mitigation Site USACE NWP 2006-00097 Northwest Region 2016 MONITORING REPORT Wetlands Program
More informationPublic Notice ISSUED: January 12, 2015 EXPIRES: February 12, 2015
SPONSOR: REFER TO: United States Forest Service Superior National Forest 2013-04745-LED Public Notice ISSUED: January 12, 2015 EXPIRES: February 12, 2015 SECTION:404 - Clean Water Act 1. WETLAND COMPENSATORY
More informationWater Quality Management Planning Rules. Readopted with Amendments July 7, 2008
Water Quality Management Planning Rules Readopted with Amendments July 7, 2008 Water Quality Planning Act N.J.S.A. 58:11A Counties as Water Quality Management Planning Agencies Integrate Federal, State,
More informationInformation for File # MVP SJW
Information for File # MVP-2018-02581-SJW Applicant: Robert Kiszka Fairview Cranberry Co., LLC Corps Contact: Sam Woboril Address: 2926 Post Road, Suite B, Stevens Point, Wisconsin 54481 E-Mail: samuel.j.woboril@usace.army.mil
More informationSeptember US Army Corps of Engineers Savannah District South Atlantic Division
ENVIRONMENTAL ASSESSMENT of Modifications to the RAW WATER STORAGE IMPOUNDMENT APPENDIX C: AGENCY COORDINATION SAVANNAH HARBOR EXPANSION PROJECT Chatham County, Georgia and Jasper County, South Carolina
More informationProject sponsors provided a brief presentation on their project(s), followed by comments from the Committee.
WRIA 14 Salmon Habitat Recovery Committee Meeting April 17, 2014 Summary notes Project sponsors provided a brief presentation on their project(s), followed by comments from the Committee. Allyn Shoreline
More informationSECONDARY WETLAND IMPACTS ANALYSIS
SECONDARY WETLAND IMPACTS ANALYSIS USACE File. SWG-2012-00153 During the development of the Grand Parkway (State Highway 99) Segments H and I-1 from United States Highway 59/Interstate Highway 69 N to
More informationCHAPTER SEVEN -- UTILITIES
CHAPTER SEVEN -- I. INTRODUCTION Growth Management Act: The Growth Management Act (GMA) requires that local comprehensive plans include a utilities element. According to the Act, the utilities element
More informationWater Quality Buffers for Waters and Wetlands
Water Quality Buffers for Waters and Wetlands 2008 Nor easter: Indian River Bay Progress Towards Pollution Reduction Goals for the Inland Bays Phosphorus (lbs. per day) Nitrogen (lbs. per day) 1,471
More informationS.R. 4007, Section 14B PADEP Environmental Assessment Form. Enclosure C Description of Aquatic Habitat
S.R. 4007, Section 14B PADEP Environmental Assessment Form Description of Aquatic Habitat Cresheim Creek is the only water resource that exists within the project area. No jurisdictional wetlands were
More informationRiparian Vegetation Protections. Heritage Tree Protection
PLACER Protections in place: Oak Tree Retention/ Replacement Requirements General Plan Language Specific Voluntary Rural Design require preservation of native trees and groves through replacement and dedication
More informationAdopted November 24, Ordinance No. 6089
Adopted November 24, 2014 Ordinance No. 6089 An Ordinance Of The Board Of Supervisors Of The County Of Sonoma, State Of California, Amending Chapter 26 Of The Sonoma County Code To Add Or Replace Miscellaneous
More information