1 Brief note on Perspective transmission Plan for 20 Year ( ) Annex I Overview : The perspective transmission plan is basically indicative in nature and covers the transmission systems at 400kV and above voltage levels. The Perspective transmission Plan for 20 Year ( ) has been formulated in two parts, Part I : Evolving Transmission System Additions for 13 th Plan i.e. up to and Part II: Evolving Transmission Corridors for period i.e. 14th, 15th Plans and beyond up to In respect of part one, i.e. up to 13 th Plan end, transmission system has been evolved based on State wise demand projections and generation plants under various stages of implementation. In regard to part two, as the generation has been de licensed and generation plants in this timeframe are yet to take off, it is not possible to identify the optimum generation plan for the period In such a scenario, broad transmission corridors have been identified. Load Growth : The electricity demand projections of each state/region has been considered as per 18th EPS (Electric Power Survey) of the country upto 15th Plan i.e. up to A forecast for 2034, by extrapolating the EPS figures has been made as the 18th EPS does not provide forecast for the year The total demand of the country including export to SAARC countries is expected to grow from 148 GW at present to 615 GW by as shown below. State wise details is enclosed at Annexure 1. State/UTs 11th Plan ( ) Region wise Demand Forecast (in MW) Existing as on th Plan ( ) 13 th Plan ( ) 14 th Plan ( ) 15 th Plan ( ) Estimates for Northern Region Western Region Southern Region Eastern Region North Eastern Region Andaman & Nicobar Lakshadweep All India Bangladesh Nepal SriLanka Pakistan SAARC Exports Total All India + SAARC Generation Growth : The present generation installed capacity in the country by end of July 2014 was about 250 GW including renewable generating resources of about 32 GW. For the purpose of this report, an assessment has been carried out to identify generation capacity

2 The projection of generation beyond has been made utilising the result of the Report of the Working Group on Integrated Strategy for Bulk Transport of Energy, [part of the Report of National Transport Development Policy Committee (NTDPC) setup by Cabinet Secretariat] supplemented with additional information as available with regard to nuclear, hydro projects in SAARC, gas resources. Two generation addition scenarios have been identified for 14th and 15th Plan Periods, Scenario I as per NTDPC report and Scenario II considering low availability of Gas and additional imported coal. A generation capacity scenario for has been considered by scaling up the coal based and gas based capacities of scenario I. The installed capacity including SAARC import grows from 250 GW at present upto 1029 GW by as shown below. The state wise details is given at Annexure 2. State/UTs 11th Plan ( ) Existing as on Region-wise Installed Capacity (in MW) 12 th Plan ( ) 13 th Plan ( ) 14 th Plan ( ) state wise and type wise that is likely to be commissioned up to end of 13 th Plan i.e Accordingly, the total Installed Capacity by the end of 13 th Plan is expected to be of the order of 469 GW which also includes 65 GW of renewable capacity. Scenario- I Scenario- II 15 th Plan ( ) Scenario- I Scenario- II Estimat es for NR WR SR ER NER All India Bhutan Nepal Total Import/Export Requirement : The transmission system is evolved to cater to the inter state and inter regional power transfer requirements. In order to find out the requirement of transmission system, the import / export requirement has been worked out on the basis of total power available within a Region/State considering the generation projects physically located in the Region/State irrespective of its classification as well as the projected demand. The base Load Generation scenario has been evolved for 3 seasons viz. winter, summer and monsoon and peak and off peak conditions for each of the seasons. The import/export of different regions as well as the SAARC countries is shown below :

3 Maximum Import/ Export of different Regions / SAARC Countries Region 13 th Plan ( ) 14 th Plan (Scenario I / Scenario II) 15 th Plan (Scenario I / Scenario II) NR (Import) / / WR (Export) / / SR (Import) / / ER (Export) / / NER (Export) / / Bhutan (Export) Nepal (Export) Sri Lanka (Import) Bangladesh (Import) Pakistan (Import) The total inter regional capacity addition during 13 th plan has been planned as 52,800 MW. The total inter regional capacity would grow from 40GW at present to about 198 GW by the end of as shown below : Interregional Installed Capacity (including SAARC) Corridor 11th Plan Existing as 12th Plan 13th Plan 14th Plan 15th Plan Estimates for ( ) on ( ) ( ) ( ) ( ) EAST/NER NORTH EAST WEST EAST SOUTH WEST NORTH WEST SOUTH EAST NER Total SAARC Interconnections transmission capacities Bhutan ER/NER Nepal ER Nepal NR NR Pakistan ER/NER Bangladesh SR Sri Lanka Evolving Transmission System upto 13 th plan : Transmission system upto 13 th plan has been evolved based on requirement of power transfer emerged from the load flow studies. Beyond 13 th plan, broad requirement of interregional transmission capacity has been estimated. A summary of the growth of 400kV and above transmission system from 11 th to 13 th Plans period is indicated below:

4 Transmission Lines (400kV and above system) (values in ckm) Existing as 12 th Plan 13 th Plan 11th Plan on HVDC Bipole lines kv kv Total HVDC Terminals: Substations (AC & HVDC) (400kV and above) (values in MVA / MW) 11th Plan Existing as on th Plan 13 th Plan HVDC back to back HVDC Bipole terminals Total HVDC Terminal Capacity, MW AC Substations 765 kv kv Total AC Substation capacity, MVA Fund requirement : It is estimated that during 13th Plan Period, about circuit kilometers (ckm) of transmission lines, MW of HVDC terminal capacity and MVA of transformation capacity of the 400 kv and above voltage level transmission systems would be required. Accordingly, it is estimated that total fund reqruiement for 13th Plan would be of the order of Rs. 2,60,000 crore as against Rs. 2,34,000 crore required in 12th plan period. This would comprise of Rs. 1,60,000 crore for 400kV and above transmission system and about 1,00,000 crores for 220 kv and below systems most of which would be as state transmission systems. Way Forward : The transmission system identified for the 13 th Plan would be firmed up through further detailed studies like transient stability, low frequency oscillations, reactive power compensation, short circuit and measures to limit fault levels etc. While implementing the Transmission Plan important factors like Issues related to ROW and forest clearance; mechanisms for secured operation of large Indian grid; developing adequate balancing facilities and mechanisms for handling variable nature of renewable Energy sources of generation etc need to be addressed. The details of various corridors would be worked out depending on the status of various future generation, load growth as well as transmission projects. The intra state transmission system is to be developed by the State Transmission Utilities. For a coordinated development process aiming at perspective optimization in meeting the growth targets, it would be appropriate that the State Transmission Utilities prepare their State Electricity Plans taking advantage of development plans for regional grid system and focusing on the specific requirements of the concerned State.

5 Annexure 1 ALL INDIA & STATE WISE / UT WISE DEMAND FORECAST (Figures in MW) Peak Electric Load at Power Station Bus Bars (Utilities Only) State/UTs 11th Plan ( ) Existing as on th Plan ( ) 13 th Plan ( ) 14 th Plan ( ) 15 th Plan ( ) Estimates for Delhi Haryana Himachal Pradesh Jammu & Kashmir Punjab Rajasthan Uttar Pradesh Uttarakhand Chandigarh Northern Region Goa Gujarat Chhattisgarh Madhya Pradesh Maharashtra D. & N. Haveli Daman & Diu Western Region Andhra Pradesh Karnataka Kerala Tamil Nadu Puducherry Southern Region Bihar Jharkhand Odisha West Bengal Sikkim Eastern Region Assam Manipur Meghalaya Nagaland Tripura Arunachal Pr Mizoram North Eastern Andaman & Nicobar Lakshadweep All India

6 Annexure 2 ALL INDIA & STATE WISE / UT WISE INSTALLED ENERATION CAPACITY (Figures in MW) State/UTs Existing as on th Plan ( ) 13 th Plan ( ) 14 th Plan ( ) 15 th Plan ( ) Estimates for Scenario I Scenario II Scenario I Scenario II Delhi Haryana Himachal J&K Punjab Rajasthan U.P Uttarkhand Northern Region Goa Gujarat Chhatisgarh M.P Maharashtra Western Region Andhra Pradesh Karnataka Kerala Tamilnadu Telangana Southern Region Bihar Jharkhand Odisha West Bengal Sikkim Eastern Region Assam Manipur Nagaland Tripura Arunachal Mizoram Meghalaya North Eastern Region Bhutan Nepal Total (MW) Detailed list is given below

7 Sl. No NAME OF THE PROJECT TYPE OF GEN. STATE STATUS OWNER INSTALLED CAPACITY PLAN NORTHERN REGION (STATE-WISE GENERATION LIST) 12th Plan BAWANA MODULE NR GAS DELHI EXISTING STATE NR-142 IP GAS GAS DELHI EXISTING STATE NR-143 PRAGATHI GAS GAS DELHI EXISTING STATE NR-144 RAJGHAT DELHI EXISTING STATE NR-145 CLP JHAJJAR HARYANA EXISTING STATE NR-146 FARIDABAD EXTN HARYANA STATE NR-147 JHAJJHAR HARYANA EXISTING CENTRAL NR-148 WY CANAL-I&II HYDRO HARYANA EXISTING STATE HIMACHAL NR-149 BUDHIL HEP HYDRO EXISTING IPP HIMACHAL NR-150 CHAMERA-III HYDRO EXISTING CENTRAL HIMACHAL NR-151 H.P SMALL HYDRO RENEWABLE STATE HIMACHAL NR-152 KASHANG HYDRO STATE HIMACHAL NR-153 KOLDAM HYDRO CENTRAL HIMACHAL NR-154 PARBATI-II HYDRO CENTRAL HIMACHAL NR-155 PARBATI-III HYDRO EXISTING CENTRAL HIMACHAL NR-156 RAMPUR HYDRO EXISTING CENTRAL HIMACHAL NR-157 RAMPUR HYDRO CENTRAL HIMACHAL NR-158 SAINJ HYDRO STATE HIMACHAL NR-159 SAWRA KUDDU HYDRO STATE HIMACHAL NR-160 SORANG HYDRO IPP HIMACHAL NR-161 TANGU ROMAI-I HYDRO IPP HIMACHAL NR-162 TIDONG HYDRO IPP HIMACHAL NR-163 UHL-III HYDRO STATE NR-164 BAGLIHAR HYDRO JK STATE NR-165 CHUTAK HYDRO JK EXISTING CENTRAL NR-166 J&K SMALL HYDRO RENEWABLE JK STATE NR-167 J&K SOLAR RENEWABLE JK STATE NR-168 J&K WIND RENEWABLE JK STATE NR-169 KISHENGANGA HYDRO JK CENTRAL

8 Sl. No NAME OF THE PROJECT TYPE OF GEN. STATE STATUS OWNER INSTALLED CAPACITY PLAN NR-170 NIMBOO BAZGO HYDRO JK EXISTING CENTRAL NR-171 URI-II HYDRO JK EXISTING CENTRAL NR-172 GOINDWAL PUNJAB STATE NR-173 RAJPURA PUNJAB EXISTING STATE NR-174 RAJPURA PUNJAB STATE NR-175 TALWANDI SABO PUNJAB EXISTING STATE NR-176 TALWANDI SABO PUNJAB STATE NR-177 CHABRA-U 3 & 4 RAJASTHAN STATE JALIPA(RAJ-WEST) NR-178 U 5 &6 RAJASTHAN EXISTING IPP JALIPA(RAJ-WEST) NR-179 U 7 &8 RAJASTHAN EXISTING IPP NR-180 KALSINDH** RAJASTHAN EXISTING STATE NR-181 KALSINDH** RAJASTHAN STATE NR-182 KAWAI TPS RAJASTHAN EXISTING IPP RAJASTHAN NR-183 SOLAR RENEWABLE RAJASTHAN STATE NR-184 RAJASTHAN WIND RENEWABLE RAJASTHAN STATE NR-185 RAMGARH GAS RAJASTHAN EXISTING STATE NR-186 RAMGARH GAS RAJASTHAN EXISTING STATE NR-187 RAPP-D NUCLEAR RAJASTHAN CENTRAL NR-188 VSLP RAJASTHAN EXISTING IPP UTTAR NR-189 ANPARA-D STATE UTTAR NR-190 BARA STATE UTTAR NR-191 HARDWAGANJ EXISTING STATE UTTAR NR-192 HARDWAGANJ EXISTING STATE UTTAR NR-193 HARDWAGANJ EXISTING STATE UTTAR NR-194 HARDWAGANJ EXISTING STATE UTTAR NR-195 LALITPUR STATE UTTAR NR-196 MEJA CENTRAL UTTAR NR-197 OBRA EXISTING STATE UTTAR NR-198 OBRA EXISTING STATE UTTAR NR-199 PANKI EXISTING STATE UTTAR NR-200 PARICHA EXISTING STATE NR-201 RIHAND III UP EXISTING CENTRAL

9 Sl. No NAME OF THE PROJECT TYPE OF GEN. STATE STATUS OWNER INSTALLED CAPACITY PLAN NR-202 PHATABYUNG HYDRO UTTARAKHAND SINGOLI NR-203 BHATWARI HYDRO UTTARAKHAND NR-204 SRINAGAR HYDRO UTTARAKHAND TAPOVAN NR-205 VISHNUGAD HYDRO UTTARAKHAND IPP IPP IPP CENTRAL th Plan NR-206 BADARPUR DELHI EXISTING CENTRAL GORAKHPUR NR-207 HARYANA NUCLEAR HARYANA CENTRAL NR-208 PTPS EXP U-9, 10 HARYANA STATE YAMUNA NAGAR U- NR HARYANA STATE HIMACHAL NR-210 BAJOLI HOLI HYDRO IPP CHANGO HIMACHAL NR-211 YANGTANG HYDRO IPP HIMACHAL NR-212 CHANJU-I HYDRO IPP HIMACHAL NR-213 KUTEHR HYDRO IPP HIMACHAL NR-214 MIYAR HYDRO IPP HIMACHAL NR-215 SHANGTONG HYDRO STATE NR-216 NEW GANDELWAL HYDRO JK STATE NR-217 PAKAL DUL HYDRO JK CENTRAL NR-218 RATLE HYDRO JK IPP NR-219 BHATINDA PUNJAB EXISTING STATE NR-220 MANSA PUNJAB STATE NR-221 SHAPUR KHANDI HYDRO PUNJAB STATE NR-222 CHABRA U 5 & 6 RAJASTHAN STATE NR-223 KALISINDH U 3 & 4 RAJASTHAN STATE NR-224 MAHI BANSWARA NUCLEAR RAJASTHAN CENTRAL NR-225 SURATGARH U-7&8 RAJASTHAN STATE UTTAR NR-226 BIRHAULI CENTRAL UTTAR NR-227 MEJA CENTRAL UTTAR NR-228 PANKI EXISTING STATE UTTAR NR-229 UNCHAHAR-IV CENTRAL

10 Sl. No NAME OF THE PROJECT TYPE OF GEN. STATE STATUS OWNER INSTALLED CAPACITY PLAN NR-230 ALAKNANDA HYDRO UTTARAKHAND NR-231 KASHIPUR BETA GAS UTTARAKHAND NR-232 KASHIPUR GAMMA GAS UTTARAKHAND KASHIPUR NR-233 SRAVANTI GAS UTTARAKHAND NR-234 KOTLIBEHAL HYDRO UTTARAKHAND NR-235 LATA TAPOVAN HYDRO UTTARAKHAND NR-236 TEHRI PSP HYDRO UTTARAKHAND VISHNUGARH NR-237 (PIPALKOTI) HYDRO UTTARAKHAND NR-238 VYASI HYDRO UTTARAKHAND IPP IPP IPP IPP CENTRAL CENTRAL CENTRAL CENTRAL STATE

11 Sl. No TYPE OF STATE STATUS OWNER IC NAME OF THE PROJECT GEN. EASTERN REGION (STATE-WISE GENERATION LIST) PL AN 12th Plan ER-57 BARH-2 UNIT#4 BIHAR EXISTING CENTRAL BIHAR ER-58 BARH-1 CENTRAL BIHAR ER-59 BARH-2 UNIT#5 CENTRAL BIHAR ER-60 MUZAFFARPUR TPP EXTN CENTRAL BIHAR ER-61 NABINAGAR-1 CENTRAL BIHAR ER-62 BARAUNI TPS EXTN STATE ADHUNIK POWER & NATURAL RESOURCES JHARKHAND EXISTING IPP ER-63 LIMITED JHARKHAND ER-64 BOKARO TPS-A EXP STATE CORPORATE POWER JHARKHAND ER-65 LIMITED PH-I IPP ER-66 KODERMA-2 JHARKHAND EXISTING STATE ER-67 BOKORA-A JHARKHAND EXISTING STATE ER-68 JOJOBERA JHARKHAND EXISTING IPP ER-69 PATRATU JHARKHAND EXISTING STATE GMR KAMALANGA ENERGY ER-70 LTD UNIT#1&2 ODISHA EXISTING IPP GMR KAMALANGA ENERGY ER-71 LTD UNIT#3 ODISHA EXISTING IPP GMR KAMALANGA ENERGY ODISHA ER-72 (PH-II) U-4 IPP IND BARATH ODISHA IPP ER-73 ER-74 ENERGY(UTKAL) LTD JINDAL INDIA POWER LTD JINDAL INDIA POWER LTD ODISHA IPP ER-75 ODISHA EXISTING IPP ODISHA ER-76 KVK NILANCHAL IPP LANCO BABANDH POWER ODISHA ER-77 PVT LTD IPP MONET POWER COMPANY ODISHA ER-78 LTD IPP ER-79 STERLITE ENERGY LTD ODISHA EXISTING IPP ER-80 TALCHER ODISHA EXISTING STATE DANS ENERGY PVT. LTD. HYDRO SIKKIM ER-81 (JORETHANG) IPP GATI INFRASTRUCTURE ER-82 LTD (CHUZACHEN) HYDRO SIKKIM EXISTING IPP GATI INFRASTRUCTURE BHASMEY POWER PVT. HYDRO SIKKIM ER-83 LTD. (BHASMEY) IPP 51 12

12 TYPE OF GEN. Sl. No NAME OF THE PROJECT STATE STATUS OWNER IC JAL POWER CORPORATION (RANGIT- HYDRO SIKKIM ER-84 IV) IPP LANCO ENERGY PVT. LTD. HYDRO SIKKIM ER-85 (TEESTA-VI) IPP TEESTA URJA LTD. / PTC HYDRO SIKKIM ER-86 (TEESTA-III) IPP WEST BENGAL ER-87 RAGHUNATHPUR-II STATE ER-88 TISTA CANAL HYDRO WEST BENGAL EXISTING STATE TEESTA LOWER DAM ER-89 (TLDP) HYDRO WEST BENGAL EXISTING CENTRAL ER-90 DURGAPUR TPS U#8 WEST BENGAL EXISTING STATE WEST BENGAL ER-91 HALDIA STATE WEST BENGAL ER-92 SAGARDIGHI TPS-2 STATE HYDRO WEST BENGAL ER-93 TEESTA LOWER DAM -4 CENTRAL ER-94 MULAJORE WEST BENGAL EXISTING STATE ER-95 TITAGARH WEST BENGAL EXISTING STATE ER-96 DPL WEST BENGAL EXISTING STATE ER-97 BANDEL WEST BENGAL EXISTING STATE th Plan BIHAR ER-98 JAS INFRA IPP BIHAR ER-99 NABINAGAR-2 CENTRAL CORPORATE POWER JHARKHAND ER-100 LIMITED PH-II IPP ESSAR POWER JHARKHAND ER-101 (JHARKHAND) LTD. IPP JHARKHAND ER-102 NORTH KARANPURA CENTRAL JHARKHAND ER-103 TILAIYYA CENTRAL JHARKHAND ER-104 PATRATU STATE ER-105 PATRATU JHARKHAND EXISTING STATE ODISHA ER-106 DARLIPALLI CENTRAL ODISHA ER-107 KVK NILANCHAL IPP LANCO BABANDH POWER ODISHA ER-108 PVT LTD IPP MONET POWER COMPANY ODISHA ER-109 LTD IPP NSL NAGPATNAM POWER & INFRATECH (EARLIER ODISHA ER-110 MAHANADI ABAN) IPP ODISHA ER-111 OPGC IPP PL AN

13 Sl. No ER-112 ER-113 ER-114 ER-115 ER-116 NAME OF THE PROJECT TALCHER TPS STAGE- III ODISHA UMPP OTPCL DICKCHU (SNEHA KINETIC POWER PROJECTS LTD.) BHARAT POWER CORPORATION LTD. (RONGNICHU) TASHIDING (SHIGA ENERGY PVT. LTD.) TYPE OF GEN. HYDRO HYDRO STATE STATUS OWNER IC ODISHA ODISHA ODISHA SIKKIM SIKKIM PL AN CENTRAL CENTRAL STATE IPP IPP HYDRO SIKKIM ER-117 IPP HYDRO SIKKIM ER-118 PANAN (HIMAGIRI) IPP HYDRO SIKKIM ER-119 RANGIT-II (SIKKIM HYDRO) IPP HYDRO SIKKIM ER-120 TEESTA IV CENTRAL WEST BENGAL ER-121 RAGHUNATHPUR-II STATE HYDRO WEST BENGAL ER-122 RAMAM-III CENTRAL WEST BENGAL ER-123 KATWA STATE HYDRO WEST BENGAL ER-124 TURGA PSS STATE ER-125 SOUTHERN REP WEST BENGAL EXISTING STATE ER-126 SANTHALDIH WEST BENGAL EXISTING STATE

14 Sl. No NAME OF THE PROJECT TYPE OF GEN. STATE STATUS OWNER IC PLAN NORTH EASTERN REGION (STATE-WISE GENERATION LIST) 12th Plan NER-33 L SUBHANSIRI HYDRO ARUNACHAL CENTRAL NER-34 KAMENG HYDRO ARUNACHAL CENTRAL NER-35 PARE HYDRO ARUNACHAL CENTRAL NER-36 BONGAIGAON TPP ASSAM CENTRAL NER-37 NAMRUP GAS ASSAM EXISTING STATE NER-38 NAMRUP GAS ASSAM STATE NER-39 MYNTDU LESHKA HYDRO MEGHALAYA EXISTING STATE NER-40 UMTRU HYDRO MEGHALAYA STATE NER-41 TURIAL HYDRO MIZORAM CENTRAL NER-42 LIKHIMROA HYDRO NAGALAND EXISTING STATE NER-43 MONARCHAK GAS TRIPURA CENTRAL NER-44 PALATANA U1 GAS TRIPURA EXISTING CENTRAL NER-45 PALATANA U2 GAS TRIPURA EXISTING CENTRAL NER-46 AGARTALA GAS GAS TRIPURA CENTRAL th Plan NER-47 L SUBHANSIRI HYDRO ARUNACHAL CENTRAL NER-48 SEW NAFRA HYDRO ARUNACHAL IPP NER-49 PATEL HYDRO HYDRO ARUNACHAL IPP ADISHANKAR NER-50 KHUITAM HYDRO ARUNACHAL IPP NER-51 KSK DIBBIN HYDRO ARUNACHAL IPP NER-52 TAWANG-I HYDRO ARUNACHAL CENTRAL NER-53 TAWANG-II HYDRO ARUNACHAL CENTRAL LOWER DEMWE NER-54 (ATHENA) HYDRO ARUNACHAL IPP NER-55 KALAI-II HYDRO ARUNACHAL IPP NER-56 NYAMJANGCHU HYDRO ARUNACHAL IPP NER-57 GMR LONDA HYDRO ARUNACHAL IPP NER-58 TATO-II HYDRO ARUNACHAL IPP NER-59 NAMRUP GAS ASSAM EXISTING STATE NER-60 LAKWA GAS ASSAM EXISTING STATE LOKTAK DOWN NER-61 STREAM HYDRO MANIPUR STATE NER-62 KOLODYNE ST-II HYDRO MIZORAM CENTRAL NER-63 DIKU HYDRO NAGALAND IPP

15 SI.NO Name of the Project Type of Gen. State Status Owner IC Plan SOUTHERN REGION (STATE-WISE GENERATION LIST) 12th Plan KRISHNAPATNAM JV SR-98 (APPDCL) ANDHRA STATE RAYALASEEMA TPS SR-99 ST-IV ANDHRA STATE SR-100 MEENAKSHI PH-I ANDHRA EXISTING IPP SR-101 SIMHAPURI PH-II ANDHRA EXISTING IPP SR-102 MEENAKSHI PH-II ANDHRA IPP SR-103 SIMHAPURI PH-II ANDHRA IPP SR-104 EAST COAST ENERGY ANDHRA IPP SR-105 POWERTECH. ANDHRA IPP SR-106 NCC KRISHNAPATNAM ANDHRA IPP HINDUJA STATE IPP, SR-107 VIZAG ANDHRA IPP SR-108 PULICHINTALA HYDRO ANDHRA STATE SR-109 A.P WIND RENEWABLE ANDHRA STATE SR-110 A.P SOALR RENEWABLE ANDHRA STATE SR-111 BELLARY TPS U-3 KARNATAKA STATE SR-112 YERAMARUS KARNATAKA STATE SR-113 EDLAPUR KARNATAKA STATE SR-114 KUDGI NTPC KARNATAKA CENTRAL SR-115 TORANGALU (JINDAL) KARNATAKA EXISTING IPP SR-116 KARNATAKA WIND RENEWABLE KARNATAKA STATE SR-117 KARNATKA SOLAR RENEWABLE KARNATAKA STATE KARNATKA SMALL SR-118 HYDRO RENEWABLE KARNATAKA STATE SR-119 PALLIVASAL EXTN HYDRO KERALA STATE SR-120 THOTTIAR HYDRO KERALA STATE SR-121 NORTH CHENNAI ST-II TAMIL NADU EXISTING STATE BHAWANI BARRAGE - SR-122 II & III HYDRO TAMIL NADU EXISTING STATE SR-123 METTUR TPS ST-III TAMIL NADU EXISTING STATE SR-124 NORTH CHENNAI ST-II TAMIL NADU EXISTING STATE SR-125 VALLUR TPS (NC JV) TAMIL NADU EXISTING CENTRAL SR-126 KUDANKULAM Nuclear TAMIL NADU CENTRAL SR-127 PFBR Nuclear TAMIL NADU CENTRAL NEVELI TS - II SR-128 EXPANSION TAMIL NADU CENTRAL SR-129 TUTICORIN JV TAMIL NADU CENTRAL SR-130 COASTAL ENERGEN TAMIL NADU IPP SR-131 IND-BARATH POWER TAMIL NADU IPP SR-132 IL&FS TAMIL NADU TAMIL NADU IPP SR-133 ENNORE TAMIL NADU EXISTING STATE SR-134 NEVELI ST-I TAMIL NADU EXISTING CENTRAL SR-135 TAMIL NADU SOLAR RENEWABLE TAMIL NADU STATE SR-136 TAMIL NADU WIND RENEWABLE TAMIL NADU STATE SR-137 KAKALIYA TPP ST-II TELANGANA STATE

16 SI.NO Name of the Project Type of Gen. State Status Owner IC Plan SR-138 N'SAGAR TR HYDRO TELANGANA STATE SR-139 LOWER JURALA HYDRO TELANGANA STATE SR-140 SINGARENI TELANGANA IPP SR-141 KOTHAGGUDEM TELANGANA EXISTING STATE TELANGANA EXISTING STATE SR-142 RAMAGUNDAM B th Plan INDIRA SR-143 SAGAR(POLAVARAM) HYDRO ANDHRA STATE SR-144 KAKATIYA ANDHRA STATE SR-145 VIJAYAWADA EXP ANDHRA STATE SR-146 KRISHNAPATNAM U-3 ANDHRA STATE SR-147 GMR VEMAGIRI CCGT GAS ANDHRA IPP SR-148 KONDAPALLI ST-3 GAS ANDHRA IPP PANDURANGA SR-149 VEMAGIRI CCGT GAS ANDHRA IPP SR-150 SAMALKOTE CCGT GAS ANDHRA IPP SR-151 KUDGI NTPC KARNATAKA CENTRAL NEYVELI TS-I SR-152 REPLACEMENT TAMIL NADU STATE SR-153 ENNORE TPS ANNEX TAMIL NADU STATE SR-154 REPLACEMENT OF EXISTING ENNORE TPS TAMIL NADU STATE NORTH CHENNAI ST-III SR-155 ( ) TAMIL NADU STATE NORTH CHENNAI ST- SR-156 IV ( ) TAMIL NADU STATE UDANGUDI TPS JV SR-157 (TNEB-BHEL) TAMIL NADU STATE UDANGUDI TPS JV ST- SR-158 II TAMIL NADU STATE TUTICORIN (IND SR-159 BARAT) TAMIL NADU EXISTING IPP SR-160 CHEYYUR UMPP TAMIL NADU CENTRAL SR-161 KUDANDKULAM U-3 Nuclear TAMIL NADU CENTRAL SR-162 NEVELI ST-I TAMIL NADU EXISTING CENTRAL SR-163 ENNORE TAMIL NADU EXISTING STATE SINGAREDDIPALLI SR-164 ( ) TELANGANA STATE SR-165 RAMAGUNDAM ST-IV TELANGANA CENTRAL SR-166 RAMAGUNDAM BPL TELANGANA STATE SR-167 KOTHAGUDEM TELANGANA EXISTING STATE SR-168 KOTHAGUDEM EXTN TELANGANA STATE

17 SI.NO Name of the Project Type of Gen State Status Owner IC Plan WESTERNN REGION (STATE-WISE GENERATION LIST) 12th Plan ATHENA CHHATTISGARH WR-101 POWER LTD CHHATTISGARH IPP WR-102 BALCO CHHATTISGARH IPP DB POWER WR-103 CHHATTISGARH LTD CHHATTISGARH EXISTING IPP DB POWER WR-104 CHHATTISGARH LTD CHHATTISGARH IPP GMR CHHATTISGARH WR-105 PVT LTD (2X685) CHHATTISGARH IPP JINDAL POWER LTD WR-106 (2X600 MW) (4UNITS) CHHATTISGARH EXISTING IPP KORBA WEST POWER WR-107 CO. LTD CHHATTISGARH EXISTING IPP WR-108 KSK MAHANADI (1UNITS) CHHATTISGARH IPP WR-109 LANCO AMARKANTAK POWER PVT LTD (2X660MW) CHHATTISGARH IPP MARUTI CLEAN COAL WR-110 LTD CHHATTISGARH IPP WR-111 MARWA TPP CHHATTISGARH STATE WR-112 MARWA TPP CHHATTISGARH EXISTING STATE RKM POWER GENT LTD WR-113 (3UNITS) CHHATTISGARH IPP SKS POWER LTD WR-114 (3UNITS) CHHATTISGARH IPP WR-115 ACBIL CHHATTISGARH EXISTING IPP JINDAL POWER LTD WR-116 (2X600 MW) CHHATTISGARH IPP SPECTRUM COAL & WR-117 POWER CHHATTISGARH IPP WR-118 TRN ENERGY LTD CHHATTISGARH IPP WR-119 KORBA (WEST U-5) CHHATTISGARH EXISTING STATE WR-120 KSK MAHANADI CHHATTISGARH EXISTING IPP SPECTRUM COAL & WR-121 POWER (1UNIT) CHHATTISGARH EXISTING IPP WR-122 SIPAT STPP STAGE - I CHHATTISGARH EXISTING CENTRAL WR-123 VANDANA VIDYUT CHHATTISGARH IPP ATHENA CHHATTISGARH WR-124 POWER LTD CHHATTISGARH IPP WR-125 VANDANA VIDYUT LTD CHHATTISGARH EXISTING IPP WR-126 KORBA CHHATTISGARH EXISTING STATE WR-127 SWASTIK KORBA CHHATTISGARH IPP WR-128 RATIJA - ACBIL CHHATTISGARH EXISTING IPP WR-129 CHAKABURA - ACBIL CHHATTISGARH IPP WR-130 ESSAR (SAILAIYA) - PH 1 GUJARAT EXISTING IPP WR-131 ESSAR (SAILAIYA) - PH 1 GUJARAT IPP WR-132 DHUVARAN GAS GUJARAT EXISTING STATE WR-133 KAKRAPAR APS PH II Nuclear GUJARAT CENTRAL WR-134 BHAVNAGAR ENERGY GUJARAT STATE

18 SI.NO Name of the Project Type of Gen State Status Owner IC Plan WR-135 SIKKA TPP EXTN GUJARAT STATE WR-136 SIKKA TPS EXTN GUJARAT STATE WR-137 PIPAVAV CCPP GAS GUJARAT EXISTING STATE WR-138 MUNDRA UMPP GUJARAT EXISTING CENTRAL TORRENT ENERGY LTD WR-139 (1MODULE) GAS GUJARAT EXISTING IPP TORRENT ENERGY LTD WR-140 (2MODULE) GAS GUJARAT EXISTING IPP TORRENT ENERGY LTD WR-141 (3MODULE) GAS GUJARAT EXISTING IPP TORRENT POWER LTD WR-142 (UNO SUGEN) GAS GUJARAT EXISTING IPP WR-143 UKAI TPP EXTN GUJARAT EXISTING STATE WR-144 GUJARAT WIND RENEWABLE GUJARAT STATE WR-145 GUJARAT SOLAR RENEWABLE GUJARAT STATE JAIPRAKASH POWER IPP WR-146 WR-147 WR-148 WR-149 WR-150 WR-151 WR-152 WR-153 WR-154 WR-155 WR-156 WR-157 WR-158 WR-159 WR-160 WR-161 VENTURES LTD BINA POWER SUPPLY CO. LTD (JAYPEE) ESSAR POWER MP LTD ESSAR POWER MP LTD (1X600) MB POWER MP LTD MALWA TPP (SHREE SINGAJI TPP) DB POWER MP LTD (1X660MW) MALWA TPP (SHREE SINGAJI TPP) NIWARI TPP (BLA POWER) NIWARI TPP (BLA POWER) SASAN UMPP SASAN UMPP SASAN UMPP SATPURA TPS EXTN JHABUA VINDHYACHAL STPP - IV HYDRO EXISTING IPP EXISTING IPP IPP IPP EXISTING STATE IPP STATE STATE EXISTING STATE EXISTING CENTRAL EXISTING CENTRAL EXISTING CENTRAL EXISTING STATE IPP EXISTING CENTRAL IPP WR-162 MAHESWAR IBL (INDIA BULLS LIMITED) (AMARAVATHI) MAHARASHTRA EXISTING IPP WR-163 PH-I WR-164 APML, TIRODA MAHARASHTRA EXISTING IPP WR-165 IEPL (IDEAL ENERGY MAHARASHTRA EXISTING IPP

19 SI.NO Name of the Project Type of Gen State Status Owner IC Plan WR-166 BUTIBORI TPP PH-II MAHARASHTRA EXISTING IPP DHARIWAL WR-167 INFRASTRUCTURE LTD MAHARASHTRA EXISTING IPP WR-168 EMCO ENERGY LTD MAHARASHTRA EXISTING IPP WR-169 GEPL MAHARASHTRA EXISTING IPP WR-170 MAUDA STPP MAHARASHTRA EXISTING CENTRAL NASIK TPP PH-I (INDIA WR-171 BULLS) MAHARASHTRA EXISTING IPP WR-172 PARAS MAHARASHTRA EXISTING STATE WR-173 APML, TIRODA MAHARASHTRA IPP CHANDRAPUR TPS EXTN WR-174 (U8) MAHARASHTRA STATE WR-175 CHNDRAPUR TPS (U9) MAHARASHTRA STATE WR-176 KORADI EXTN (9 & 10) MAHARASHTRA STATE WR-177 KORADI EXTN (9 & 10) MAHARASHTRA STATE WR-178 LANCO VIDHARBHA MAHARASHTRA IPP WR-179 MAUDA STPP II MAHARASHTRA CENTRAL WR-180 URAN-DPH GAS MAHARASHTRA EXISTING STATE VIDHARBHA INDUSTRY, WR-181 BUTIBORI MAHARASHTRA EXISTING IPP WR-182 PARLI TPS EXTN (U8) MAHARASHTRA STATE WR-183 SOLAPUR STPP MAHARASHTRA CENTRAL WR-184 PARLI MAHARASHTRA STATE WR-185 PARAS MAHARASHTRA EXISTING STATE WR-186 BHUSAWAL MAHARASHTRA EXISTING STATE WR-187 MAHARASHTRA WIND RENEWABLE MAHARASHTRA STATE WR-188 MAHARASHTRA SOLAR RENEWABLE MAHARASHTRA STATE th Plan WR-189 KSK MAHANADI (3UNITS) CHHATTISGARH IPP WR-190 LARA STPP I CHHATTISGARH CENTRAL RKM POWER GENT LTD WR-191 (1UNITS) CHHATTISGARH IPP SKS POWER LTD WR-192 (1UNITS) CHHATTISGARH IPP WR-193 VISA POWER LTD (1X600) CHHATTISGARH IPP KORBA WEST POWER WR-194 CO. LTD CHHATTISGARH IPP WR-195 INDIA BULLS (SARGUJA) CHHATTISGARH IPP WR-196 KORBA CHHATTISGARH EXISTING STATE WR-197 HAZARIRA EXT GAS GUJARAT STATE WR-198 OPG - GUJARAT GUJARAT STATE WR-199 WANAKBORI U-8 GUJARAT STATE WR-200 SURAT LIGNITE STAGE-III GUJARAT STATE WR-201 DHUVARAN GAS GUJARAT EXISTING STATE WR-202 UKAI GUJARAT EXISTING STATE WR-203 GANDHINAGAR TPS GUJARAT EXISTING STATE WR-204 GADARWARA STPP CENTRAL WR-205 VINDHYACHAL STPP-V CENTRAL WR-206 CHUTKA M.P Nuclear CENTRAL

20 SI.NO Name of the Project Type of Gen State Status Owner IC Plan MALWA TPP (SHREE WR-207 SINGAJI TPP) PH-II STATE WR-208 BARETHI PH-I CENTRAL AMRAVATI TPP PH-II ( WR-209 INDIA BULLS) MAHARASHTRA IPP WR-210 MAUDA STPP II MAHARASHTRA CENTRAL NASIK TPP PH-II INDIA WR-211 BULLS) MAHARASHTRA IPP WR-212 SOLAPUR STPP MAHARASHTRA CENTRAL WR-213 KOYNA LB HYDRO MAHARASHTRA STATE WR-214 DONDAICHA MAHARASHTRA STATE WR-215 TROMBAY GAS MAHARASHTRA EXISTING STATE WR-216 CHANDRAPURA MAHARASHTRA EXISTING STATE WR-217 KORADI MAHARASHTRA EXISTING STATE WR-218 URAN (G) GAS MAHARASHTRA EXISTING STATE WR-219 AMARKANTAK MAHARASHTRA EXISTING STATE WR-220 PIONEER CCGT GAS MAHARASHTRA STATE

21 SI.No Name of the Project Type of Gen State Status Owner Bhutan Generation List 12th Plan BH - 04 DAGACHU HYDRO BHUTAN CENTRAL BH - 05 MANGDECH HYDRO BHUTAN CENTRAL BH - 06 PUNATSANGCHU HYDRO BHUTAN CENTRAL PUNATSANGCHU- HYDRO CENTRAL BH - 07 II BHUTAN th Plan BH - 08 BUNAKHA HYDRO BHUTAN CENTRAL BH - 09 CHAMKARCHU-I HYDRO BHUTAN CENTRAL BH - 10 KHOLONCHU HYDRO BHUTAN CENTRAL BH - 11 WANGCHU HYDRO BHUTAN CENTRAL IC Plan

List of Indian Power Plants & Power Stations for SSC & Banking Exams - GK Notes in PDF!

List of Indian Power Plants & Power Stations for SSC & Banking Exams - GK Notes in PDF! List of Indian Power Plants & Power Stations for SSC & Banking Exams - GK Notes in PDF! India is a land of beautiful dams and power plants. A power plant is basically an industrial location that is utilized

More information

Potential Gains from Regional Cooperation and Trade of Electricity in South Asia

Potential Gains from Regional Cooperation and Trade of Electricity in South Asia Potential Gains from Regional Cooperation and Trade of Electricity in South Asia Govinda R. Timilsina and Mike Toman The World Bank, Washington, DC 5 th Asian Conference of IAEE University of Western Australia

More information

Forest Cover and Forest Area

Forest Cover and Forest Area Forest Cover and Forest Area Chapter 3 FOREST COVER AND FOREST AREA The term 'Forest Area' (or recorded forest area) generally refers to all the geographic areas recorded as forest in government records.

More information

Soil Health Management in India

Soil Health Management in India Soil Health Management in India Soil Health Management in India Soil Health Management In order to improve the soil health of the Indian soils, gov- The nature and extent of deficiencies of nutrients in

More information

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA UNSTARRED QUESTION NO.2282 TO BE ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA UNSTARRED QUESTION NO.2282 TO BE ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA UNSTARRED QUESTION NO.2282 TO BE ANSWERED ON 29.11.2016 Common Effluent Treatment Plants 2282. DR. C.GOPALAKRISHNAN: PROF.

More information

GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.186 ANSWERED ON ULTRA MEGA POWER PROJECTS

GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.186 ANSWERED ON ULTRA MEGA POWER PROJECTS *186. SHRI T. RATHINAVEL: Will the Minister of POWER be pleased to state: GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.186 ANSWERED ON 16.03.2015 ULTRA MEGA POWER PROJECTS (a)

More information

GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.76 TO BE ANSWERED ON PROJECTS UNDERTAKEN BY NTPC

GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.76 TO BE ANSWERED ON PROJECTS UNDERTAKEN BY NTPC *76. SHRI TAPAN KUMAR SEN: GOVERNMENT OF INDIA STARRED QUESTION NO.76 PROJECTS UNDERTAKEN BY NTPC (a) the details of projects undertaken by NTPC during the last five years; (b) whether certain projects

More information

State wise analysis of RPO Regulation for Captive users

State wise analysis of RPO Regulation for Captive users State Regulation for Captive Users Definition of renewable Energy as per the commission order Remarks Andhra Pradesh Every consumer owning a captive generating plant of installed capacity of one (1) MW

More information

Grid Connected Rooftop PV Systems

Grid Connected Rooftop PV Systems Grid Connected Rooftop PV Systems भ रत य स र ऊज नगम ल मट ड ल मटड (भ रत सरक र क उपबम) 1 st Floor, Religare Building D 3 District Centre, Saket, New Delhi 110017 Renewable Energy Targets :175 GW by 2022

More information

OWNER S ENGINEERING SERVICES

OWNER S ENGINEERING SERVICES OWNER S ENGINEERING SERVICES PROJECTS UNDER EXECUTION YOC Bhilosa Industries Pvt Ltd 66 /11 KV switchyard, Naroli plant, Silvassa Jindal Investimentos S.A., Mozambique Dubai Aluminium (DUBAL), UAE 1x150

More information

GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS

GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS Status report on implementation of the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 [for the period ending

More information

COMPENDIUM REGULATIONS & TARIFF ORDERS ISSUED BY REGULATORY COMMISSIONS FOR RENEWABLE ENERGY SOURCES IN INDIA

COMPENDIUM REGULATIONS & TARIFF ORDERS ISSUED BY REGULATORY COMMISSIONS FOR RENEWABLE ENERGY SOURCES IN INDIA COMPENDIUM OF REGULATIONS & TARIFF ORDERS ISSUED BY REGULATORY COMMISSIONS FOR RENEWABLE ENERGY SOURCES IN INDIA IREDA MINISTRY OF NEW AND RENEWABLE ENERGY INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY LTD.

More information

MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI LEGISLATIVE NOTE. No.47/LN/Ref./November/2017

MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI LEGISLATIVE NOTE. No.47/LN/Ref./November/2017 MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI LEGISLATIVE NOTE No.47/LN/Ref./November/2017 For the use of Members of Parliament NOT FOR PUBLICATION 1 THE ANCIENT MONUMENTS AND ARCHAEOLOGICAL

More information

OWNER S ENGINEERING SERVICES

OWNER S ENGINEERING SERVICES OWNER S ENGINEERING SERVICES PROJECTS UNDER EXECUTION YOC Nagai Power Private Limited, PMC & LE services for 1x150MW Nagai Coal based TPP, Tamil Nadu 2018 Bhilosa Industries Pvt Ltd 66 /11 KV switchyard,

More information

SUBJECT: MINUTES OF THE MEETING OF THE CROP WEATHER WATCH GROUP HELD ON

SUBJECT: MINUTES OF THE MEETING OF THE CROP WEATHER WATCH GROUP HELD ON F. No. 31/ 201819CFCCES GOVERNMENT OF INDIA MINISTRY OF AGRICULTURE AND FARMERS WELFARE DEPARTMENT OF AGRICULTURE, COOPERATION AND FARMERS WELFARE (CROP FORECAST COORDINATION CENTRE) Room No. 344A Krishi

More information

Manpower in Mining Some Reflections

Manpower in Mining Some Reflections Manpower in Mining Some Reflections Employment has been the biggest challenge for a country as diverse and as vast as India. The rural hinterland is a hub of diverse resources including variety of minerals.

More information

Matrix of importers and exporters of electricity, emission inventory and site selection

Matrix of importers and exporters of electricity, emission inventory and site selection 3 Matrix of importers and exporters of electricity, emission inventory and site selection The main objectives of this chapter are to analyse the impact of electricity transfer on the spatial distribution

More information

ENERGY STATISTICS (Twenty Fifth Issue)

ENERGY STATISTICS (Twenty Fifth Issue) Energy Statistics 2018 ENERGY STATISTICS 2018 (Twenty Fifth Issue) CENTRAL STATISTICS OFFICE MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION GOVERNMENT OF INDIA NEW DELHI CENTRAL STATISTICS OFFICE

More information

(i) GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS

(i) GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS Status report on implementation of the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 [for the period ending

More information

SUBJECT: MINUTES OF THE MEETING OF THE CROP WEATHER WATCH GROUP HELD ON

SUBJECT: MINUTES OF THE MEETING OF THE CROP WEATHER WATCH GROUP HELD ON F. No. 31/ 201718CFCCE&S GOVERNMENT OF INDIA MINISTRY OF AGRICULTURE AND FARMERS WELFARE DEPARTMENT OF AGRICULTURE, COOPERATION AND FARMERS WELFARE (CROP FORECAST COORDINATION CENTRE) Room No. 344A, Krishi

More information

Details of Retirement / Replacement of more than 25 years old Coal based Thermal Power Plants (as on )

Details of Retirement / Replacement of more than 25 years old Coal based Thermal Power Plants (as on ) Details of Retirement / Replacement of more than 25 years old Coal based Thermal Power Plants (as on 01.12.2017) In order to conserve scarce natural resources like land, water and coal, Ministry of Power

More information

SUBJECT: MINUTES OF THE MEETING OF THE CROP WEATHER WATCH GROUP HELD ON

SUBJECT: MINUTES OF THE MEETING OF THE CROP WEATHER WATCH GROUP HELD ON F. No. 31/ 201718CFCCE&S GOVERNMENT OF INDIA MINISTRY OF AGRICULTURE AND FARMERS WELFARE DEPARTMENT OF AGRICULTURE, COOPERATION AND FARMERS WELFARE (CROP FORECAST COORDINATION CENTRE) Room No. 344A, Krishi

More information

GUIDE FOR VAT, SALES TAX & OTHER LEVIES ( Updated On 31st -Jan-17)

GUIDE FOR VAT, SALES TAX & OTHER LEVIES ( Updated On 31st -Jan-17) NO. OF INVOICE TYPE OF FORM / PERMIT NO. REQUIRED ENTRY TAX OCTROI CODE SR. COPIES APPLICABLE APPLICABLE FOR TIN NO. INWARD OUTWARD 1 ANDHRA PRADESH 2 VAT FORM-X(600) VAT FORM-X(600) YES* NO 37 2 ANDAMAN

More information

Confederation of Indian Industry. Opportunities in. Ministry of Food Processing Industries. Government of India

Confederation of Indian Industry. Opportunities in. Ministry of Food Processing Industries. Government of India Confederation of Indian Industry Opportunities in DAIRY Sector in India Ministry of Food Processing Industries Government of India Advantage India One of the fastest growing economies in the world Largest

More information

Confederation of Indian Industry. Opportunities in. Fisheries. Sector in India. Ministry of Food Processing Industries. Government of India

Confederation of Indian Industry. Opportunities in. Fisheries. Sector in India. Ministry of Food Processing Industries. Government of India Confederation of Indian Industry Opportunities in Fisheries Sector in India Ministry of Food Processing Industries Government of India Advantage India One of the fastest growing economies in the world

More information

(as on ) CENTRAL POLLUTION CONTROL BOARD

(as on ) CENTRAL POLLUTION CONTROL BOARD Subject: (as on 13.6.2018) CENTRAL POLLUTION CONTROL BOARD (Waste Management Division-Bio-medical Waste) DELHI 110 032 ********* Status on Bio-medical Waste Management Scenario and recommendations for

More information

SCENARIO OF GOAT SECTOR: MAHARASHTRA STATE (INDIA)

SCENARIO OF GOAT SECTOR: MAHARASHTRA STATE (INDIA) SCENARIO OF GOAT SECTOR: MAHARASHTRA STATE (INDIA) Goat keeping is spread over all parts of the state. On goat rearing approximately 48 lakhs families are engaged. Goat rearing is highly preferred occupation

More information

Guidelines for Implementation of fisheries Scheme under the National Mission for Protein Supplements (NMPS) in States during

Guidelines for Implementation of fisheries Scheme under the National Mission for Protein Supplements (NMPS) in States during Annexure-III Guidelines for Implementation of fisheries Scheme under the National Mission for Protein Supplements (NMPS) in States during 2012-13 The Department of Animal Husbandry, Dairying & Fisheries,

More information

PROGRESS OF ON-GOING HYDRO ELECTRIC PROJECTS

PROGRESS OF ON-GOING HYDRO ELECTRIC PROJECTS CENTRAL ELECTRICITY AUTHORITY (HYDRO WING) PROGRESS OF ON-GOING HYDRO ELECTRIC PROJECTS (In fulfilment of CEA s obligation under Electricity Act, 003) QUARTERLY REVIEW NO. 85 Apr - June, 016 HYDRO PROJECT

More information

From Rooftops to Farmtops. Augmenting India s Distributed Solar Goals through net-metered solar pumps

From Rooftops to Farmtops. Augmenting India s Distributed Solar Goals through net-metered solar pumps From Rooftops to Farmtops Augmenting India s Distributed Solar Goals through net-metered solar pumps Introduction The Government of India has recently announced a scheme for solar water pumps known as

More information

+91-8079450188 Patel Material Handling Equipment http://www.patelequipmentindia.com/ We Are Leading Manufacturers & Exporters Of Hydraulic Handling Equipment, Drum Handling Equipment, Aluminium Ladder,

More information

Registered CDM Projects. (tco 2 )

Registered CDM Projects. (tco 2 ) Institute for Global Environmental Strategies Current Status of CDM in India Basic Information(as of 1 June 2010) Project Status N. of projects CDM projects registered at CDM executive board 506 CDM projects

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066. No. 51/4/SP&PA-2006/ 46-56 Date: 12-01-2007 To 1.The Member Secretary, Southern Regional

More information

Parliament of India for SSC & Bank Exams - GK Notes in PDF

Parliament of India for SSC & Bank Exams - GK Notes in PDF Parliament of India for SSC & Bank Exams - GK Notes in PDF We all know that India is a democratic country and the Parliament of India is the highest legislative body of India. By and large, the Indian

More information

Ministry of Environment, Forest and Climate Changeministry of. Government of India Environment & Forests Government of India

Ministry of Environment, Forest and Climate Changeministry of. Government of India Environment & Forests Government of India Ministry of Environment, Forest and Climate Changeministry of Government of India Environment & Forests Government of India Home > Printer-friendly > Pnnter-friendly Regional Offices Resolution No. 4-7/2012-ROHQ,

More information

GENERAL CROP ESTIMATION SURVEY (GCES)

GENERAL CROP ESTIMATION SURVEY (GCES) GENERAL CROP ESTIMATION SURVEY (GCES) R.P. Rathi NSSO (FOD) Agricultural Statistics Wing, CGO Complex, Block-II, NH-IV, Faridabad-121 001 1. INTRODUCTION In the context of primacy of Agriculture, timely

More information

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON 09.08.2016 Ecological Impact of Mining *334. SHRI JANARDAN SINGH SIGRIWAL state:

More information

HYDRO POWER IN INDIA 2017

HYDRO POWER IN INDIA 2017 Now Available HYDRO POWER IN INDIA 2017 Trends, Developments and Future Outlook Report (PDF) Data-set (Excel) India Infrastructure Research Hydro Power in India 2017 Table of Contents SECTION I: MARKET

More information

A. GUJARAT, GUJARAT STATE ELECTRICITY CORPORATION LIMITED (GSECL):

A. GUJARAT, GUJARAT STATE ELECTRICITY CORPORATION LIMITED (GSECL): RECORD NOTE OF DISCUSSIONS OF MEETING HELD IN CEA ON 18TH & 19TH APRIL, 2018 TO REVIEW THE STATUS OF UNDER CONSTRUCTION THERMAL POWER PROJECTS OF CENTRAL, STATE AND PRIVATE SECTORS TARGETED FOR COMMISSIONING

More information

GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.09 TO BE ANSWERED ON FOREIGN ASSISTANCE TO IMPROVE POWER SUPPLY

GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.09 TO BE ANSWERED ON FOREIGN ASSISTANCE TO IMPROVE POWER SUPPLY GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.09 TO BE ANSWERED ON 07.07.2014 FOREIGN ASSISTANCE TO IMPROVE POWER SUPPLY *9. SHRI RAMDAS ATHAWALE: Will the Minister of POWER be

More information

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.326 TO BE ANSWERED ON POWER SHORTAGES

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.326 TO BE ANSWERED ON POWER SHORTAGES GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.326 TO BE ANSWERED ON 09.08.2018 POWER SHORTAGES *326. SHRI D.K. SURESH: SHRI NALIN KUMAR KATEEL: Will the Minister of POWER be pleased

More information

WIND ENERGY FOR POWER GENERATION

WIND ENERGY FOR POWER GENERATION International Journal of Mechanical, Robotics and Production Engineering. Volume VI, Special Issue, 2016, ISSN 2349-3534, www.ijmpe.com, email editor@ijmpe.com WIND ENERGY: AN ATTEMPT TO ANALYZE AND REVIEW

More information

GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS

GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS MOST IMMEDIATE GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS Subject: Monthly update on status of implementation of the Scheduled Tribes and Other Traditional Forest Dweller (Recognition of Forest Rights)

More information

Agenda for 9 th Meeting of Northern Region Constituents regarding Connectivity/Long Term Access to Generation projects in NR

Agenda for 9 th Meeting of Northern Region Constituents regarding Connectivity/Long Term Access to Generation projects in NR Agenda for 9 th Meeting of Northern Region Constituents regarding Connectivity/Long Term Access to Generation projects in NR Following Connectivity and Long term Access (LTA) applications are proposed

More information

SMALL HYDRO PROGRAMME IN INDIA

SMALL HYDRO PROGRAMME IN INDIA SMALL HYDRO PROGRAMME IN INDIA Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy Hydropower represents use of water resources towards inflation free energy due to absence of fuel cost with mature

More information

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.164 ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.164 ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.164 ANSWERED ON 28.07.2016 ALLOCATION OF POWER *164. DR. BHOLA SINGH: Will the Minister of POWER be pleased to state: (a) whether a number

More information

MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI REFERENCE NOTE. No.56/RN/Ref./Nov/2017

MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI REFERENCE NOTE. No.56/RN/Ref./Nov/2017 MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI REFERENCE NOTE No.56/RN/Ref./Nov/2017 For the use of Members of Parliament NOT FOR PUBLICATION 1 DAIRY SECTOR: PRESENT SCENARIO AND NEW

More information

Capacity Building Scheme

Capacity Building Scheme Capacity Building Scheme NeGP Round Table Conference 29 th- 31 st July 2009 By Krishnan, Principal Consultant, PMU, DIT, GOI Contents 1 2 3 4 Background - Capacity Building Scheme Current Status of Activities

More information

Present Status of MSME Statistics

Present Status of MSME Statistics The Journal of Industrial Statistics (2012), 1 (2), 269-282 269 Present Status of MSME Statistics G. Sajeevan 1, Ministry of Micro Small and Medium Enterprise, New Delhi, India Abstract In this paper an

More information

First Source. Use First Source to. Expand markets. Search for new poten al customers. Explore/Discover new markets

First Source. Use First Source to. Expand markets. Search for new poten al customers. Explore/Discover new markets Use First Source to Expand markets Search for new poten al customers. Explore/Discover new markets Search for companies from new industries/loca ons. Mi gate business risks Research business associate,

More information

INDIAN TRADEMARK PRACTICES (CGPDTM) SUBASANI.P Examiner of Trademarks, Chennai

INDIAN TRADEMARK PRACTICES (CGPDTM) SUBASANI.P Examiner of Trademarks, Chennai INDIAN TRADEMARK PRACTICES (CGPDTM) By SUBASANI.P Examiner of Trademarks, Chennai Legal set up The Trade Marks Registry was established under the Trade Marks Act 1940. At present, it functions under the

More information

A. Forest (Conservation) Act related functions:

A. Forest (Conservation) Act related functions: (To be published in Part-I Section-I of Gazette of India) No. 4-7/2012-ROHQ Government of India Ministry of Environment and Forests... Dated: 08/01/2014 RESOLUTION Subject:- Strengthening and expansion

More information

Draft Document on Structure and Tasks of State Health Agency for Implementing PMRSSM in Trust Mode

Draft Document on Structure and Tasks of State Health Agency for Implementing PMRSSM in Trust Mode Draft Document on Structure and Tasks of State Health Agency for Implementing PMRSSM in Trust Mode In order to facilitate the effective implementation of the PMRSSM, the State Government shall set up the

More information

PRINCIPAL SECRETARIES (FOREST) OF ALL THE STATES ADDRESS AND TELEPHONE NUMBERS (As on Dec., 2017) Sl. No.

PRINCIPAL SECRETARIES (FOREST) OF ALL THE STATES ADDRESS AND TELEPHONE NUMBERS (As on Dec., 2017) Sl. No. PRINCIPAL SECRETARIES (FOREST) OF ALL THE STATES ADDRESS AND TELEPHONE NUMBERS (As on Dec., 2017) Sl. 1. ANDHRA PRADESH Shri G. Anantaha Ramu, IAS Principal Secretary (Forests), EFS & D Department, Government

More information

PRODUCTIVITY STATUS OF RICE DURING NINTH PLAN

PRODUCTIVITY STATUS OF RICE DURING NINTH PLAN 1 PRODUCTIVITY STATUS OF RICE DURING NINTH PLAN Prepared and Edited by Dr. M.C. Diwakar, Director DIRECTORATE OF RICE DEVELOPMENT GOVERNMENT OF INDIA MINISTRY OF AGRICULTURE (DEPTT. OF AGRI. & CO-OPERATION)

More information

Cellulosic Ethanol Emerging Opportunities in India Feb 2015

Cellulosic Ethanol Emerging Opportunities in India Feb 2015 Cellulosic Ethanol Emerging Opportunities in India Feb 2015 Safe Harbor Statement This presentation and its related comments contain forwardlooking statements, including financial expectations. Forward-looking

More information

GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF LAND RESOURCES LOK SABHA STARRED QUESTION NO. 70 TO BE ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF LAND RESOURCES LOK SABHA STARRED QUESTION NO. 70 TO BE ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF LAND RESOURCES LOK SABHA STARRED QUESTION NO. 70 TO BE ANSWERED ON 20.07.2017 Development of Wasteland *70. SHRI KUNWAR PUSHPENDRA SINGH

More information

Fastest Growing Electric Utility in Asia for 3 rd successive year. An S&P BSE SENSEX Company Q2 FY Press Meet New Delhi November 9, 2016

Fastest Growing Electric Utility in Asia for 3 rd successive year. An S&P BSE SENSEX Company Q2 FY Press Meet New Delhi November 9, 2016 Q2 FY 2016-17 Press Meet New Delhi November 9, 2016 Fastest Growing Electric Utility in Asia for 3 rd successive year An S&P BSE SENSEX Company Disclaimer By attending the meeting where this presentation

More information

NO:-32-20/2017-NDM-I Ministry of Home Affairs (Disaster Management Division)

NO:-32-20/2017-NDM-I Ministry of Home Affairs (Disaster Management Division) [ NO:-32-20/2017-NDM-I Ministry of Home Affairs (Disaster Management Division) SITREP NO. 56/2017 26/07/2017 (1515 Hours) Sub:- MONSOON-2017: DAILY MONSOON / FLOOD SITUATION REPORT 1. CENTRAL WATER COMMISSION

More information

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA UN-STARRED QUESTION N TO BE ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA UN-STARRED QUESTION N TO BE ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE OIH 532. SHRI NIHAL CHAND: SHRI B.V. NAIK LOK SABHA UN-STARRED QUESTION N0. 532 TO BE ANSWERED ON 20.07.2018 Pollution Emanated from

More information

Confederation of Indian Industry. Opportunities in ORGANIC. Food in India. Ministry of Food Processing Industries. Government of India

Confederation of Indian Industry. Opportunities in ORGANIC. Food in India. Ministry of Food Processing Industries. Government of India Confederation of Indian Industry Opportunities in ORGANIC Food in India Ministry of Food Processing Industries Government of India Advantage India One of the fastest growing economies in the world Largest

More information

VECTOR BORNE DISEASES AND CLIMATIC CHANGES

VECTOR BORNE DISEASES AND CLIMATIC CHANGES VECTOR BORNE DISEASES AND CLIMATIC CHANGES Dr. Neeraj Dhingra Additional Director National Vector Borne Disease Control Porgramme (NVBDCP Ministry of Health & Family Welfare Government of India PREVENTION

More information

PROGRAMMES AND SCHEMES Monsoon and Crop Sowing Situation during Kharif-2012

PROGRAMMES AND SCHEMES Monsoon and Crop Sowing Situation during Kharif-2012 PROGRAMMES AND SCHEMES Monsoon and Crop Sowing Situation during Kharif-2012 As per India Meteorological Department (IMD) data SW Monsoon rainfall for the country as a whole during June- September, 2012

More information

PROJECT TECHNICAL DESCRIPTION

PROJECT TECHNICAL DESCRIPTION Green Energy Corridor and Grid Strengthening Project (RRP IND 44426) PROJECT TECHNICAL DESCRIPTION A. Introduction 1. Power Grid Corporation of India Limited (POWERGRID) is India s national power transmission

More information

SWACHH BHARAT MISSION (GRAMIN)

SWACHH BHARAT MISSION (GRAMIN) SWACHH BHARAT MISSION (GRAMIN) Knowledge Exchange Seminar on Sanitation Facilities 10 th September, 2015 Ministry of Drinking Water & Sanitation 60% people globally that defecate in the open reside in

More information

HAZARDOUS SUBSTANCES MANAGEMENT DIVISION

HAZARDOUS SUBSTANCES MANAGEMENT DIVISION HAZARDOUS SUBSTANCES MANAGEMENT DIVISION ACCIDENT REPORTING PROCEDURE, CONTACT PERSONS WITH E-MAILS, PHONE NUMBERS, THE ACCIDENT REPORTING PROFORMA AND STATUS OF COMPLIANCE WITH RESPECT TO THE RULES ACCIDENT

More information

TCE ENVIS - Plastic Waste Management Thiagarajar College of Engineering, Environmental Information System

TCE ENVIS - Plastic Waste Management Thiagarajar College of Engineering, Environmental Information System TCE ENVIS - Plastic Waste Management Thiagarajar College of Engineering, Environmental Information System TCE ENVIS Web: www.tceenvis.in Mail ID: pwm@tceenvis.in Annexure State-wise summary of Implementation

More information

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.325 ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.325 ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.325 ANSWERED ON 08.12.2016 POWER PROJECTS *325. SHRI J.C. DIVAKAR REDDY: Will the Minister of POWER be pleased to state: (a) the number

More information

International Journal of Advance ISSN and Applied Research (IJAAR) Impact Factor 0.899

International Journal of Advance ISSN and Applied Research (IJAAR) Impact Factor 0.899 International Journal of Advance ISSN 2347-7075 and Applied Research (IJAAR) Impact Factor 0.899 Peer Reviewed Bi-Monthly Vol.2 No.1 Sept- Oct 2014 INSTALLATION OF OFF-GRID RENEWABLE ENERGY SYSTEMS IN

More information

% % % % % % % % % % %

% % % % % % % % % % % v vi vii ***** A. General viii Highlights of Mineral Production April 2014 to March 2015 During the financial year 2014-15, the total value of mineral production (excluding atomic minerals and minor minerals

More information

Status of Poverty in India A State wise Analysis

Status of Poverty in India A State wise Analysis Status of Poverty in India A State wise Analysis Dr Waheeda Sunny Thomas Faculty Economics, SEMCOM, Gujarat, India ABSTRACT First millennium development goal is to eradicate extreme poverty and hunger.

More information

Government of India Ministry of Tribal Affairs

Government of India Ministry of Tribal Affairs Government of India Ministry of Tribal Affairs Status report on implementation of the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 [for the period ending

More information

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.465 ANSWERED ON USE OF TRANSFERRED COAL

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.465 ANSWERED ON USE OF TRANSFERRED COAL GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.465 ANSWERED ON 06.04.2017 USE OF TRANSFERRED COAL *465. SHRI DHARMENDRA YADAV: SHRI SHRIRANG APPA BARNE: Will the Minister of POWER

More information

Loss of 7 Billion Units power generation due to raw water shortage at coal based thermal power stations in India from June 2016 to April 2017

Loss of 7 Billion Units power generation due to raw water shortage at coal based thermal power stations in India from June 2016 to April 2017 Loss of 7 Billion Units power generation due to raw water shortage at coal based thermal power stations in India from June 2016 to April 2017 Coal based thermal power generation needs huge amounts of water.

More information

Directions issued by Hon ble vide order dated PBMC submitted Action Plan and Bye laws, 2016 which covers the action points.

Directions issued by Hon ble vide order dated PBMC submitted Action Plan and Bye laws, 2016 which covers the action points. Sl. No. States/UTs 1 Andaman & Nicobar Island (Port Blair MC) Action Taken Report on Directions issued by Hon ble vide order dated 13.02. PBMC submitted Action Plan and Bye laws, 2016 which covers the

More information

PRE BID MEETING TWO FACTOR FINGER PRINT BIOMETRIC AUTHENTICATION. Wednesday, 20 th March, for

PRE BID MEETING TWO FACTOR FINGER PRINT BIOMETRIC AUTHENTICATION. Wednesday, 20 th March, for PRE BID MEETING Wednesday, 20 th March, 2019 TWO FACTOR FINGER PRINT BIOMETRIC AUTHENTICATION for [Ref: LIC/CO/IT-BPR/2FA/2018-19] Dated: 11/03/2019 AGENDA RFP Activity Schedule Bidding Process Eligibility

More information

FOOD PROCESSING REDUCES THE DISTANCE BETWEEN FARM AND FORK SHRI NARENDRA MODI HONOURABLE PRIME MINISTER OF INDIA

FOOD PROCESSING REDUCES THE DISTANCE BETWEEN FARM AND FORK SHRI NARENDRA MODI HONOURABLE PRIME MINISTER OF INDIA FOOD PROCESSING REDUCES THE DISTANCE BETWEEN FARM AND FORK SMT. HARSIMRAT KAUR BADAL Minister of Food Processing Industries SADHVI NIRANJAN JYOTI MOS for Food Processing Industries SHRI NARENDRA MODI HONOURABLE

More information

Feed-in-Tariff and Shortfall in RPO Compliance

Feed-in-Tariff and Shortfall in RPO Compliance Department of Industrial and Management Engineering Indian Institute of Technology Kanpur Training Programme on Power Procurement Strategy and Power Exchanges 20-2222 April 2015 Electricity Amendment Bill

More information

State Service Delivery Gateway (SSDG), e-forms, State Portal (SP): An Approach to Access the Services by Citizens under a Single Interface Mechanism

State Service Delivery Gateway (SSDG), e-forms, State Portal (SP): An Approach to Access the Services by Citizens under a Single Interface Mechanism State Service Delivery Gateway (SSDG), e-forms, State Portal (SP): An Approach to Access the Services by Citizens under a Single Interface Mechanism 1. Ms. Poonam Malik 2. Ms. Anisha Tandon Research scholar

More information

PROSPECTIVE OF NEW BUSINESS AVENUES FOR COMPANY SECRETARY PROFESSIONALS IN INDIA: A STUDY OF SOLAR ENERGY SECTOR

PROSPECTIVE OF NEW BUSINESS AVENUES FOR COMPANY SECRETARY PROFESSIONALS IN INDIA: A STUDY OF SOLAR ENERGY SECTOR PROSPECTIVE OF NEW BUSINESS AVENUES FOR COMPANY SECRETARY PROFESSIONALS IN INDIA: A STUDY OF SOLAR ENERGY SECTOR By Dr. Prasant Sarangi Director (Research) ICSI-CCGRT, Navi Mumbai 1 PROSPECTIVE OF NEW

More information

Flexibility Options in India

Flexibility Options in India Flexibility Options in India 1 Indian Grid Large Footprint Jammu Ludhiana Hydro Pipavav RAPP Gandhinagar Wind and Solar NR WR Tarapur Kozhikode Mangalore Jaipur Indore Mumbai Kaiga Kayamkulam Thiruvananthapuram

More information

Renewable Energy. These Slides Accompany the YouTube Video Tutorial: https://www.youtube.com/watch?v=u-h7eqmc9rq&t=41s

Renewable Energy. These Slides Accompany the YouTube Video Tutorial: https://www.youtube.com/watch?v=u-h7eqmc9rq&t=41s Renewable Energy Indian Scenario 11 th Largest Economy & 4 th Largest in Purchasing Power Potential Ahead Power Scenario in India (Installed 263.66 GW & Renewable Energy 34.35 GW) Ministry of Non-Conventional

More information

SECTION-3: AGRICULTURE AND ALLIED ACTIVITIES

SECTION-3: AGRICULTURE AND ALLIED ACTIVITIES Agriculture and Allied Activities 121 SECTION-3: AGRICULTURE AND ALLIED ACTIVITIES The agriculture situation in India has been presented with the help of a number of Tables highlighting India s share in

More information

Aajeevika - National Rural Livelihoods Mission, New Delhi

Aajeevika - National Rural Livelihoods Mission, New Delhi Aajeevika - National Rural Livelihoods Mission, New Delhi Terms of Reference for Technical Selection of Training Agencies for providing Training and Capacity Building support to SRLMs Note: The outcome

More information

GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.12 ANSWERED ON HIGH EFFICIENCY COAL-FIRED POWER GENERATION TECHNOLOGY

GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.12 ANSWERED ON HIGH EFFICIENCY COAL-FIRED POWER GENERATION TECHNOLOGY GOVERNMENT OF INDIA STARRED QUESTION NO.12 HIGH EFFICIENCY COAL-FIRED POWER GENERATION TECHNOLOGY *12. SHRI V.P. SINGH BADNORE: (a) the details of new high efficiency technology for coal-fired generation

More information

DATA Analytics of Agriculture Production, Wages and Income in Rural Areas of India using Big Data and Python Matplot Lib

DATA Analytics of Agriculture Production, Wages and Income in Rural Areas of India using Big Data and Python Matplot Lib DATA Analytics of Agriculture Production, Wages and Income in Rural Areas of India using Big Data and Python Matplot Lib K. Raghavendra Swamy Technical Trainer BDPS PVT LTD. VIJAYAWADA. swamy1712@gmail.com

More information

Integrating Renewable Energy

Integrating Renewable Energy Integrating Renewable Energy (Policy & Regulatory support) Ajit Pandit, Director Idam Infrastructure Advisory Pvt Ltd (February 01, 2016) 1 Agenda A. Background to RE Industry in India Growth so far Capacity

More information

CHAPTER 2 FOREST COVER

CHAPTER 2 FOREST COVER CHAPTER 2 FOREST COVER 2.1 Introduction Forest cover, as explained in the previous chapter, includes all lands more than 1 ha area having tree canopy density of 1 percent and above. The basic data for

More information

REGIONAL CONVERGENCE IN AGRICULTURE GROWTH IN INDIA: A STATE LEVEL ANALYSIS

REGIONAL CONVERGENCE IN AGRICULTURE GROWTH IN INDIA: A STATE LEVEL ANALYSIS REGIONAL CONVERGENCE IN AGRICULTURE GROWTH IN INDIA: A STATE LEVEL ANALYSIS Anju Rani Research Scholar, Dept. of economics, Central University of Haryana Dr. Ranjan Aneja Head, Assistant Professor, Dept.

More information

SADMS DROUGHT BULLETIN

SADMS DROUGHT BULLETIN SADMS DROUGHT BULLETIN Agriculture drought condition for South Asia 28 Sep 2018 ISSUE 10 Current Rainfall condition in reference to historical rainfall 14 Sep - 21 Sep, 2018 South Asia Drought Monitoring

More information

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.44 ANSWERED ON SUPPLY OF COAL AND GAS TO POWER PLANTS

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.44 ANSWERED ON SUPPLY OF COAL AND GAS TO POWER PLANTS GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.44 ANSWERED ON 23.07.2015 SUPPLY OF COAL AND GAS TO POWER PLANTS *44. SHRI KRUPAL BALAJI TUMANE: SHRIMATI BHAVANA PUNDALIKRAO GAWALI

More information

INDIRA PRIYADARSHINI VRIKSHA MITRA (IPVM) AWARDS 2012

INDIRA PRIYADARSHINI VRIKSHA MITRA (IPVM) AWARDS 2012 INDIRA PRIYADARSHINI VRIKSHA MITRA (IPVM) AWARDS 2012 Nominations are invited for Indira Priyadarshini Vriksha Mitra (IPVM) Awards for the year 2012 from individuals and institutions who have done pioneering

More information

GOVERNMENT OF INDIA MINISTRY OF DRINKING WATER & SANITATION LOK SABHA UNSTARRED QUESTION NO.450 TO BE ANSWERED ON Piped Water Supply

GOVERNMENT OF INDIA MINISTRY OF DRINKING WATER & SANITATION LOK SABHA UNSTARRED QUESTION NO.450 TO BE ANSWERED ON Piped Water Supply GOVERNMENT OF INDIA MINISTRY OF DRINKING WATER & SANITATION LOK SABHA UNSTARRED QUESTION NO.450 TO BE ANSWERED ON 19.07.2018 Piped Water Supply 450. SHRI BHAIRON PRASAD MISHRA: Will the Minister of DRINKING

More information

Responding to information needs of the citizens through e-government portals and online services in India

Responding to information needs of the citizens through e-government portals and online services in India The International Information & Library Review (2010) xx, 1e10 available at www.sciencedirect.com journal homepage: www.elsevier.com/locate/iilr Responding to information needs of the citizens through

More information

Instruction for filling the AIN application form

Instruction for filling the AIN application form Instruction for filling the AIN application form 1. Form is to be filled legibly in ENGLISH in BLOCK LETTERS. 2. While filling the form, each box, wherever provided, should contain only one character (alphabet/number/punctuation

More information

e-kranti: National e-governance Plan 2.0 Next Wave in e-governance

e-kranti: National e-governance Plan 2.0 Next Wave in e-governance e-kranti: National e-governance Plan 2.0 Next Wave in e-governance Transforming e-governance for Transforming Governance Vinay Thakur Director, NeGD Department of Electronics and Information Technology

More information

Operational Land Holdings in India: Trend and Inequality Analysis ( )

Operational Land Holdings in India: Trend and Inequality Analysis ( ) Learning Community: 6(1): April 2015: 87-100 2015 New Delhi Publishers. All rights reserved DOI Number: 10.5958/2231-458X.2015.00008.1 5 (New 9) (P) Operational Land Holdings in India: Trend and Inequality

More information

Section 86(1)(e): Specify Renewable Purchase Obligation. (RPO), grid connectivity. Section 61(h): Tariff regulations to be guided by promotion

Section 86(1)(e): Specify Renewable Purchase Obligation. (RPO), grid connectivity. Section 61(h): Tariff regulations to be guided by promotion Section 86(1)(e): Specify Renewable Purchase Obligation (RPO), grid connectivity Section 61(h): Tariff regulations to be guided by promotion of renewable energy sources Section 3: National Electricity

More information

Chapter: 4. Role of NTPC Ltd. in country s power sector and its activity profile.

Chapter: 4. Role of NTPC Ltd. in country s power sector and its activity profile. Chapter: 4 Role of NTPC Ltd. in country s power sector and its activity profile. 4.1 Origin of NTPC Ltd. In 1976 the amended Electricity Supply Act (1948) provided opportunity for the establishment of