1 CENTRAL ELECTRICITY AUTHORITY (HYDRO WING) PROGRESS OF ON-GOING HYDRO ELECTRIC PROJECTS (In fulfilment of CEA s obligation under Electricity Act, 003) QUARTERLY REVIEW NO. 85 Apr - June, 016 HYDRO PROJECT MONITORING DIVISION NEW DELHI August 016

2 I N D E X Chapter Contents Page Preface 1- Executive Summary Milestones achieved during the quarter Apr - June, Plan wise hydro capacity targets/ achievements from 4 th plan onwards. 6.1 Year/Plan wise hydro capacity in the country Hydro capacity addition during 1 th Plan- As Plan progress 9.a Hydro Capacity addition during b Hydro Capacity addition during c Hydro Capacity addition during d Hydro Capacity addition during Growth of installed capacity Growth of hydro capacity Trend of hydro capacity addition. (hydro and thermal mix ) List of sanctioned H.E.Projects for benefits during 1 th Plan & beyond Status of sanctioned H.E.Projects for benefits during 1 th Plan & beyond Financial status of sanctioned H.E.Projects for 1 th Plan & beyond Status of environment & forest clearance of sanctioned H.E.Projects for 1 th Plan & beyond. 9. Status of Award of civil package for under execution H.E.Projects for 1 th Plan & beyond. 9.1 Summary of ordering status of TG sets of under execution H.E. Projects for 1 th Plan & beyond. 9. Status of ordering status of TG sets of under execution H.E.Projects for 1 th Plan & beyond th Plan & beyond Projects- Ordering status of various packages Status of financial closure of Private Sector projects Details of Under Construction Projects having Time/Cost over-run 63-69

3 PREFACE Present Review Milestone Achieved During April, 016 to June, 016. Sanctioned Projects for 1 th Plan & Beyond Status of Sanctioned Projects for 1 th Plan & Beyond Financial Status of Projects for 1 th Plan & Beyond This quarterly review covers the period from Apr, 016 to June, 016 and is 85 th in the series. The objective of this review is to provide up to date information in respect of Hydro Electric (HE) Projects under construction/ implementation in the country. The review covers HE projects under construction likely to give benefits in 1 th Plan & beyond. This quarterly review has been brought out by CEA on the basis of data received from various project authorities, visit made to different HE projects and discussions held with the executing agencies and suppliers of equipments from time to time. Details of HE Projects Rolled/Commissioned during the Quarter is indicated in Chapter-1. A list of sanctioned HE projects for 1 th plan and beyond is indicated in Chapter 5. Broad present status of sanctioned HE projects for 1 th plan and beyond is given in Chapter 6. Financial status of HE projects supplied by project authorities (unaudited) 1 th plan and beyond is given in Chapter 7. Status of Environment & Forest Clearances of H.E. Projects for 1 th Plan & Beyond Dates of Award of First Package Ordering Status of TG set. The status of Environmental & Forest clearance of HE projects for 1 th plan and beyond is given in Chapters 8. The date of award of First Package for HE projects under execution is indicated in Chapter 9. Details of Ordering status of TG Set for HE projects under construction is given in Chapters 9.1 and 9.. 1

4 Details of Award of various packages Status of Financial closure of Private Sector Projects Time & Cost Over-run of Ongoing Hydro Projects Exclusions The details of package, and package of HE projects for benefits during 1 th plan and beyond has been given in Chapter 9.3. Details of financial closure of Private Sector HE projects for 1 th Plan and beyond is given in Chapter-10. The Status of Time & Cost Over-run of HE projects under execution for benefits during 1 th plan and beyond is given in Chapter 11 The review does not cover HE projects categorised as renewable, each with a total installed capacity of 5 MW and below, as these schemes come under the purview of Ministry of New & Renewable Energy (MNRE). Any suggestions/feedback for further improvement in the quarterly review shall be appreciated. The report is in fulfilment of CEA s obligation under Electricity Act, 003.

5 EXECUTIVE SUMMARY Trend of Hydro-Thermal Mix as on Hydro: 4, MW (16.46%) Thermal:,11,6. MW (81.3%) Nuclear: 5, MW (0.%) Total:,60,68.83 MW Hydro Capacity Under Execution (As on ): A hydro capacity of 13,437 MW is under execution to give benefits during remaining period of 1 th Plan & beyond. Sector wise summary is given as under:- Sector Central Private 3355 Total: 13,437 MW 1 th Plan Hydro Capacity Addition as Plan Progress:- Hydro Capacity Addition for the Year 01-13: Hydro Capacity Addition Monitorable Targets for the Year was 80 MW (645 MW in Central Sector, 87 MW in Sector, and 70 MW in Private Sector.). A Capacity of 501 MW (374 MW in Central Sector, 57 MW in Sector and 70 MW in Private Sector) has been achieved during Project-wise details are given in Chapter.a. Hydro Capacity Addition for the Year : Hydro Capacity Addition Monitorable Targets for the Year was 1198 MW (914 MW in Central Sector, 85 MW in Sector and 199 MW in Private Sector.). A Capacity of 1058 MW (914 MW in Central Sector, 45 MW in Sector and 99 MW in Private Sector) has been achieved during the year Project-wise details are given in Chapter.b. Hydro Capacity Addition for the Year : Hydro Capacity Addition Monitorable Targets for the Year was 84 MW (336 MW in Central Sector, 10 MW in Sector and 96 MW in Private Sector.). A Capacity of 736 MW in Central Sector has been achieved during the year Project-wise details are given in Chapter.c. Hydro Capacity Addition for the Year : Hydro Capacity Addition Monitorable Targets for the Year was 1691 MW (590 MW in Central Sector, 575 MW in Sector and 56 MW in Private Sector) A Capacity of 1516 MW (480 MW in Central Sector 610 MW in Sector and 46 MW in Private Sector) has been achieved during the year Project-wise details are given in Chapter.d. Hydro Capacity Addition for the Year : Hydro Capacity Addition Monitorable Targets for the Year is 1714 MW (490 MW in Central Sector, 995 MW in Sector and 9 MW in Private Sector). A Capacity of 65 MW in Sector has been achieved during the year up to Projectwise details are given as under:- Hydro Projects Monitorable Target for Sl. Particular A. Central Sector Unit Nos. Cap. (MW) Commissioning as programmed Actual(A)/ Anticipated Remarks 1 Teesta Low Dam IV NHPC, West Bengal 4x = 160 MW Unit # 3 Unit # 4 6/16 9/16 7/16 8/16 3

6 Kameng NEEPCO Arunachal Pradesh 4x150= 600 MW Unit # 1 Unit # /17 3/17 3/17 3/17 Critical 3 Pare NEEPCO, Arunachal Pradesh x55=110 MW Unit # 1 Unit # /16 1/17 3/17 3/17 Critical Sub- total (C.S.): 490 B. Sector 4 Nagarjuna Sagar TR APGENCO, AP x5=50 MW 5 Kashang I HPPCL, 1x65=65 MW 6 Sainj HPPCL, X50=100 MW 7 Lower Jurala TSGENCO, Telangana 6x= MW 8 Pulichintala TSGENCO,Telengana 4x30= 10 MW 9 New Umtru MePGCL; Meghalaya x0= MW 10 Teesta- III (*) Teesta Urja Ltd.; 6x00= 100 MW Unit # 1 Unit # 5 5 8/16 8/16 10/16 10/16 Unit # / (A) Commissioned Unit # 1 Unit # Unit # 5 Unit # 6 Unit # 1 Unit # Unit # 1 Unit # Unit # 1 Unit # Unit # Sub- total (S.S.): 995 C. Private Sector 11 Chanju-I (#) IA Energy ; 3x1= 36 MW 1 Dikchu (#) Sneha Kinetic Power Projects (P).Ltd., 3x3= 96 MW 13 Tashiding (#) Shiga Energy Pvt. Ltd. x48.5= 97 MW Unit # 1 Unit # Unit # 3 Unit # 1 Unit # Unit # 3 Unit # 1 Unit # Sub- total (P.S.): 9 Total C.S.+S.S.+P.S.) /16 1/17 9/16 11/16 8/16 1/16 11/16 1/16 1/16 1/17 /17 7/16 9/16 1/16 7/16 8/16 9/16 1/17 /17 1/16 01/17 08/16 09/16 10/16 1/16 0/17 03/17 1/16 01/17 0/17 08/16 09/16 1/16 01/17 0/17 03/17 01/17 0/17 Critical # Projects outside 1 th plan but likely to be commissioned in ; (*) w.e.f , Teesta Urja Ltd. is a Govt. of Enterprise, hence in Sector. 4

7 CHAPTER 1 Milestones achieved during the Quarter Apr - June, 016 Units Commissioned: Particulars Sector Unit Rating (MW) 1. Date Commissioned Kashang I (HPPCL) 1x65= 65 MW TOTAL 65 MW - 5 -

8 CHAPTER Plan wise Hydro capacity Target Vs Achievement since 4th Plan Plan Target (MW) Capacity % Achieved (Original) Addition (MW) 4th Plan ( ) 5th Plan ( ) Annual Plan ( ) 6th Plan ( ) 7th Plan ( ) Annual Plan ( ) Annual Plan (1991-9) 8th Plan (199-97) 9th Plan (1997-0) 10th Plan (00-07) 11th Plan (007-1) 1 th Plan (01-17) (up to ) (up to ) - 6 -

9 CHAPTER -.1 Year/Plan wise Hydro Capacity Addition in the Country S. Year Target Capacity % Achieved Remarks (Original) Addition (MW) 1st Five Year Plan ( to ) Total : nd Five Year Plan ( to ) Total : rd Five Year Plan ( to ) Total : Annual Plans ( , 67-68, 68-69) th Five Year Plan ( to ) Total : th Five Year Plan ( to ) Total : Annual Plan ( ) th Five Year Plan ( to ) Total :

10 S. Year Target Capacity % Achieved Remarks (Original) Addition (MW) 7th Five Year Plan ( to ) Total : Annual Plans ( , 91-9) th Five Year Plan (1.4.9 to ) Total : th Five Year Plan ( to ) Total : th Five Year Plan (1.4.0 to ) Highest till date Total : th Five Year Plan ( to ) nd Highest Total : th Five Year Plan (1.4.1 to ) (up to ) Note: Figures from 1951 to indicate uprated/derated capacities

11 Chapter. I. C. Year wise Cap. Addition S. Project Name Developer Slipping Total ( x MW) A. Commissioned Central Sector 1 Chamera-III HP NHPC 3x Chutak J&K NHPC 4x Teesta Low Dam- III WB NHPC 4x Uri-II J&K NHPC 4x60 5 Nimoo Bazgo J&K NHPC 3x Parabati- III HP NHPC 4x Rampur HEP SJVNL 6x Kol Dam HEP NTPC 4x a Teesta Low Dam- IV WB NHPC 4x Sub Total: Central Sector Sector 10 Bhawani Barrage-II Tamil Nadu TANGEDCO x Bhawani Barrage-III Tamil Nadu TANGEDCO x Myntdu-1 addl.unit Meghalaya MePGCL 1x Baglihar-II J&K JKPDC 3x a Lower Jurala Telengana TSGENCO 6x Kashang - I HPPCL 1x Sub Total: Sector Private Sector 16 Budhil HP LANCO x Chujachen SIKKIM GATI x Srinagar Uttarakhand AHPCo. Ltd. 4x Jorethang Loop DANS Pvt. Ltd x Sub Total: Private Sector Sub Total 'A': Commissioned B. Under Construction Central Sector 0 Pare HEP Ar. P NEEPCO x Kameng HEP (300 MW-BE) Ar. P NEEPCO 4x Subansiri Lower HEP Ar. P NHPC 8x Parbati-II HEP NHPC 4x Kishan Ganga (BE) J&K NHPC 3x Tuirial Mizoram NEEPCO x Tapovan Vishnugad Uttarakhand NTPC 4x b Teesta Low Dam- IV WB NHPC 4x Sub Total: Central Sector Sector 14b Lower Jurala Telengana TSGENCO 6x Pulichintala Telengana TSGENCO 4x Nagarjuna Sagar TR AP APGENCO x Uhl-III BVPC 3x Sawra Kuddu HPPCL 3x Kashang II & III HPPCL x Sainj HPPCL x Thottiar Kerala KSEB 1x30 + 1x10 34 Pallivasal Kerala KSEB x New Umtru Meghalaya MePGCL x0 36 Teesta-III (600 MW- BE) Teesta Urja (*) 6x Sub Total: Sector Private Sector 37 Tidong-I N S L Tidong Power Gen. Ltd x Sorang Himachal Sorang Power Pvt. Ltd x Tangnu Romai-I Tangnu Romai Power Gen. Ltd x Maheshwar MP SMHPCL 10x Bhasmey GATI x Rangit-IV Jal Power 3x Teesta-VI LANCO 4x Singoli Bhatwari Uttarakhand L & T 3x Phata Byung Uttarakhand LANCO x Sub Total: Private Sector Sub Total 'B': Under Construction Total- 1th Plan (A + B ) Likely in 1th Plan 656 (*) w.e.f , Teesta Urja Ltd. is a Govt. Of Enterprise Hydro Electric Projects for Benefits During 1th Plan- Plan Progress Note: (BE)- Best efforts projects totalling to 130 MW. 9 MW Capacity likely to advance (Out side the 1th Plan) Chanju - I (3x1= 36 MW) + Dikchu (3x3=96 MW) + Tashiding (x48.5=97 MW)=9 MW -9-

12 S l. N o. Particular A. Central Sector 1 Chamera-III NHPC, 3x77= 31 MW Uri-II NHPC, J&K 4x60= MW 3 Chutak NHPC, J&K 4x11 =44 MW 4 Parbati-III NHPC, HP 4x130= 50 MW Unit Nos Chapter-.a Hydro Capacity Addition during the Year Target (MW) Commissioning as programmed Jun-1 Aug-1 Oct -1 Aug -1 Sept -1 Nov-1 Dec-1 Sept-1 Sept-1 Nov -1 Dec-1 Actual (MW) Actual (A)/ Anticipated (A) (A) (A) Slipped Slipped Slipped Slipped.11.01(A) (A) (A) (A) Remarks - Local agitation from mid March, 1 to June, 1 end. - TRT was flooded on due to flash flood. - Filling of U/s Water conductor system delayed due to agitation by local people demanding employment in NHPC. - Commissioned in Mar-13 - Slipped - Non-availability of Transmission system. - Completion of Surge shaft gates. -Commissioned in Sub- total (A): B. Sector 5 Bhawani Kattalai -II TANGEDCO, T.N Tamil Nadu, x15 = 30 MW June-1 July Slipped 6 Bhawani Kattalai -III 1 15 Oct (A) TANGEDCO, T.N x15 = 30 MW 7 Myntdu, 3 4 Mar (A) MeECL, Meghalaya 3x4 = 16 MW Sub- total (B): C. Private Sector 8 Budhil Lanco H P x35=70 MW May-1 July-1 Sub- total (C): Total (A+B+C) 80 Out side the programme of Teesta Low Dam III NHPC, WB 4x33=13 MW Sub- total : Outside Total: (A) (A) (A) (A) (A) - Unit #1& synchronised at part load in July,11 & Sept,11 - Reservoir filling delayed on account of less release from Mettur dam. - Commissioned in

13 Chapter-.b Hydro Capacity Addition during the Year Sl. Particular A. Central Sector 1 Teesta Low Dam-III NHPC, WB. 4x33= 13 MW Uri-II NHPC, J&K 4x60= MW 3 Parbati-III NHPC, HP 4x130= 50 MW 4 Nimoo Bazgo NHPC, J&K 3x15 =45 MW 5 Rampur SJVN Limited, HP. 6x68.67 = 41 MW Unit Nos. Target Actual Commissioning as per program Actual (A)/ Anticipated Unit # April (A) Unit # 1 Unit # Unit # 3 Unit # 4 Unit # 1 Unit # Unit # 3 Unit # 1 Unit # Unit # 3 Unit # 1 Unit # Unit # Sub- total (A): B. Sector 6. Lower Jurala APGENCO, A.P. (6x= MW) 7 Bhawani Kattalai -II TANGEDCO, T.N Tamil Nadu, x15 = 30 MW 8 Bhawani Kattalai -III TANGEDCO, T.N Tamil Nadu, x15 = 30 MW May-13 June- 13 July- 13 July- 13 June-13 July -13 Feb- 14 Dec- 13 Nov -13 Nov-13 Jan- 14 Feb- 14 Mar (A) (A) (A) (A) (A) (A) (A) (A) (A) (A) (A) (A) (A) Unit # 1 - Dec (July-014) Unit # 1 Unit # Sub- total (B): C. Private Sector 9 Sorang Himachal Sorang Power Pvt. Ltd, H P. x50=100 MW 10 Chuzachen Gati Infra. Limited, x49.5= 99 MW July -13 Aug (A) (A) Unit # June (A) Unit # 1 Unit # Unit # 1 Unit # Sub- total (C): Nov-13 Dec-13 June -13 July (A) (A) Remarks -Unit was synchronized at part load on , but full load commissioning could not be achieved due to nonavailability of sufficient water. -Commissioned dur Commissioning delayed, cracks developed in penstock during filling of water conductor system in 1 st week of Nov Slipping from 1 th Plan. Total (A+B+C) Out side RFD achievements: Unit # ( MW) of Lower Jurala HEP was synchronized at part load on , but full load commissioning could not be achieved due to non-availability of sufficient water

14 Particular A. Central Sector 1 Parbati-III NHPC, HP 4x130= 50 MW Rampur SJVN Limited, HP. 6x68.67 = 41 MW Out side the Programme 3 Koldam NTPC, 4x00 = 800 MW Unit Nos. Chapter-.c Hydro Capacity Addition during the Year Target Actual Commissioning as per program Actual (A)/ Anticipated Unit # Aug (A) Unit # 3 Unit # 4 Unit # 6 Unit # 1 Unit # Sub- total (A): B. Sector 4 Lower Jurala TSGENCO, Telangana 6x= MW 5 Nagarjuna Sagar APGENCO, A.P. x5= 50 MW Unit # 1 Unit # Unit # 3 Unit # 4 Unit # 1 Unit # 5 5 Sub- total (B): 10 0 C. Private Sector 6 Jorethang Loop DANS Pvt. Ltd., x48= 96 MW 7 Teesta-III Teesta Urja, 6x00= 100 MW Unit # 1 Unit # Jun 14 May 14 Apr 14 Mar-15 Mar-15 Jul.-14 Jul.-14 Oct.-14 Mar.-15 Sep-14 Dec-14 Feb-15 Mar (A) (A) (A) (A) (A) Remarks - Slipped due to flooding of Power House on during synchronization process for Unit # 1 to Unit# 3. - Commissioned during Commissioning delayed due to non-availability of water Slipped due to noncompletion of HRT. - Commissioned during Unit # Slipped due to Financial crunch with the Developer. - Likely to be Commissioned during Sub- total (C): 96 0 Total (A+B+C) Out side RFD achievements: Unit #1 & # (0 MW) of Kol Dam HEP commissioned during March,

15 Chapter-.d Hydro Capacity Addition during the Year Particular Unit Nos. Target Actual Commissioning as programmed A. Central Sector 1 Koldam NTPC, HP 4x00= 800 MW Teesta Low Dam IV, NHPC, W.B 4x = 160 MW 3 Pare NEEPCO, Arunachal Pradesh x55=110 MW Unit # 3 Unit # 4 Unit # 1 Unit # Unit # 1 Unit # Actual(A)/ Anticipated Note: 1516 MW out of 1691MW is Commissioned. Out side RFD achievements: Unit #3 (0 MW) of Baglihar-II HEP commissioned ahead of Programme during Oct /15 5/15 /16 3/16 3/16 3/ (A) (A) Remarks Commissioned Commissioned Slipped to due to inundation of dam area with flood water after overtopping of Coffer Dam in June 15 and many times thereafter. Sub- total (A): Achieved:-480 MW B. Sector 4 Baglihar - II JKPDC, J&K 3x150= 450 MW 5 Kashang I HPPCL, 1x65=65 MW 6 Lower Jurala TSGENCO, Telangana 6x= MW 7 Nagarjuna Sagar TR APGENCO, AP x5=50 MW Unit # 1 Unit # Unit # /15 9/ (A) (A) (A) Commissioned Unit # /16 3/16 Slipped to due to non-completion of. Unit # 1 Unit # Unit # 3 Unit # 4 Unit # 1 Unit # 5 5 7/15 8/15 9/15 10/15 7/15 7/ (A) (A) (A) (A) Likely to slip to Commissioned Unit 1 & could not be commissioned due to nonavailability of rated discharge. Sub- total (B): Achieved:-610 MW C. Private Sector 8 Sorang HSPCL, x50 = 100 MW 9 Srinagar AHPCL, Uttarakhand 4x8.5= Jorethang Loop DANS Pvt. Ltd., x48= 96 MW Unit # 1 Unit # Unit # 1 Unit # Unit # 3 Unit # 4 Unit # 1 Unit # /15 6/15 4/15 4/15 5/15 6/15 9/15 10/ (A) (A) (A) (A) (A) (A) Unit # 1 synchronized, but could not be commissioned due to nonavailability of rated discharge. Penstock ruptured on Slipping to Commissioned Commissioned Sub- total (C): Achieved:-46 MW Total (A+B+C) Achieved:-1516 MW

16 - 14-1st nd rd Annual th 5th Annual 6th 7th Annual 8th 9th 10th th (Jun-16) HYDRO THERMAL NUCLEAR CHAPTER - 3 GROWTH OF INSTALLED CAPACITY (Excluding RES projects) PLAN/YEAR INSTALLED CAPACITY ( MW )

17 Chapter 3.1 Growth of Hydro Capacity in MW st nd rd Annual th th Annual 6th 7th Annual 8th 9th 10th 11th (Jun-16) PLAN/YEAR MW

18 - 16-1st nd rd Annuals th th Annual th 7th Annuals 91-8th (Jun-16) CHAPTER - 4 TREND OF CAPACITY ADDITION AS % OF TOTAL (Hydro Thermal mix) PLANS THERMAL HYDRO NUCLEAR PERCENTAGE

19 CHAPTER- 5 Sanctioned Hydro Projects for 1th Plan & Beyond (Excluding projects under Ministry of New & Renewable Energy) Sl. Name of Scheme I.C. Benefits Date of Likely ( x MW) (MW) Commng. A. Hydro Capacity as per Programme of 1th Plan i) Commissioned during 1th Plan Commissioned during Central Sector 1 Chamera-III (NHPC) 3x Chutak (NHPC) J&K 4x a Teesta Low Dam-III (NHPC) W.B. 4x Sub- total (Central Sector) : Sector 4a Bhawani Barrage III (TANGEDCO) T.N. x Myntdu (MeECL) Meghalaya x4+ 1x Sub- total ( Sector) : Private Sector 6 Budhil (LANCO Green Power) x Sub- total (Private Sector) : Total Commissioned Commissioned during Central Sector 3b Teesta Low Dam-III (NHPC) W.B. 4x Uri-II (NHPC) J&K 4x Nimoo Bazgo (NHPC) J&K 3x a Parabati-III (NHPC) 4x a Rampur (SJVNL) 6x Sub- total (Central Sector) : Sector 11 Bhawani Barrage II (TANGEDCO) T.N. x b Bhawani Barrage III (TANGEDCO) T.N. x Sub- total ( Sector) : Private Sector 1 Chujachen (Gati Infrastructure) x Sub- total (Private Sector) : Total Commissioned Commissioned during Central Sector 9b Parabati-III (NHPC) 4x b Rampur (SJVNL) 6x a Kol Dam (NTPC) 4x Sub- total (Central Sector) : Total Commissioned Commissioned during Central Sector 13b Kol Dam (NTPC) 4x Teesta Low Dam-IV (NHPC) W.B. 4x Sub- total (Central Sector) : Sector 15 Baglihar- II (JKPDC J&K 3x Lower Jurala (TSGENCO) Telangana 6x July, 007 Sub- total ( Sector) : Private Sector 17 Shrinagar (AHPC) Uttarakhand 4x Jorethang Loop (DANS Energy) x Sub- total (Private Sector) : Total Commissioned Commissioned during (Upto ) Sector 19 Kashang -I (HPPCL) 1x Nov, 01 Sub- total ( Sector) : Total (i) 1th Plan-Commissioned (up to ) ii) Under Execution Central Sector 1 Kishanganga (NHPC) J&K 3x *C Parbati St. II (NHPC) 4x Tapovan Vishnugad (NTPC) Uttarakhand 4x / Teesta Low Dam-IV (NHPC) W.B. 4x *P 5a Subansiri Lower (NHPC) Ar. Pr./Assam 8x *R 6 Kameng (NEEPCO) Ar. Pr. 4x *C 7 Pare (NEEPCO) Ar. Pr. x Tuirial (NEEPCO) Mizoram x Sub- total (Central Sector) :

20 Name of Scheme I.C. Benefits Date of Likely ( x MW) (MW) Commng. Sector 9 Uhl-III (BVPCL) 3x Kashang -II & III (HPPCL) x *R 11 Sainj (HPPCL) x Swara Kuddu (HPPCL) 3x Nagarujana Sagar TR (APGENCO) A.P. x *P *P Lower Jurala (TSGENCO) Telangana 6x July, *P 15 Pulichintala (TSGENCO) Telangana 4x Pallivasal (KSEB) Kerala x Jan., *R 17 Thottiyar (KSEB) Kerala 1x30+1x *R 18 New Umtru (MePGCL) Meghalaya x0.00 Dec., Teesta St. III (Teesta Urja) (*) 6x Sub- total ( Sector) : Private Sector 0 Sorang (Himachal Sorang Power) x Tidong-I (NSL Power) x Tangnu Romai- I (NSL Power) x *R 3 Phata Byung (LANCO) Uttarakhand x *A 4 Singoli Bhatwari (L&T) Uttarakhand 3x *A 5 Maheshwar (SMHPCL) M.P. 10x *R 6 Teesta St. VI (LANCO) 4x *R 7 Rangit-IV (JAL Power) 3x *R 8 Bhasmey (GATI Infrstructure) x Dec Sub- total (Private Sector) : Total ii: 1th Plan-Under execution Total'A': 1th Plan ( + Under Execution) SUMMARY- 1th Plan Central Private Total Commissioned Under Construction Total: (1th Plan) B. Hydro Capacity for benefits beyond 1th Plan- Under Execution Central Sector 9 Tehri PSS (THDC) Uttarakhand 4x Lata Tapovan (NTPC) Uttarakhand 3x *R 31 Vishnugad Pipalkoti (THDC) Uttarakhand 4x b Subansiri Lower (NHPC) Ar. Pr./Assam 8x *R 3 Ramam-III (NTPC) West Bengal 3x Sub- total (Central Sector) : Sector 33 Shongtom Karcham (HPPCL) 3x Shahpurkandi (PSPCL) Punjab 3x33+3x33+1x *R 35 Vyasi (UJVNL) Uttarakhand x Koyna Left Bank (WRDMah) Maharashtra x *A 37 Polavaram (PPA) Andhra Pradesh 1x *A Sub- total ( Sector) : Private Sector 38 Ratle (Ratle Hydro) J&K 4x05+1x *R 39 Bajoli Holi (GMR) 3x Chanju-I (IA Energy) 3x Tashiding (Shiga) x Dikchu (Dikchu) 3x Rangit-II ( Hydro Power) x *R 44 Rongnichu (Madhya Bharat Power) x Panan (Himagiri Hydro Energy) 4x *A 46 Gongri (Dirang Energy) Ar. Pradesh x *A Sub- total (Private Sector) : Total 'B': Beyond 1th Plan-Under execution Total: Under Execution Under Construction (1th plan & Beyond) Central Private Total Legends: *C-Critical; *P-Partialy Commissioned ; *R-Subject to Re-Start of. ; *A-Subject to Active Start of ; (*) w.e.f , Teesta Urja Ltd. is a Govt. of Enterprise

21 Chapter-6 Status of Under Execution Hydro Electric Projects for 1 th Plan & beyond Sl. Name of Project Executing Agency Date of CEA clearance / Broad Features Cost (original/latest) In Rs. Crores. Sch. (original/ Now Ant. A Hydro Capacity for benefits during 1 th Plan i) Projects Commissioned during 1 th Plan Commissioned during Chamera-III 3x77= 31 MW NHPC Broad Features : Dam 68m High, 78 m length, concrete gravity HRT- 6.5m x km P.House- underground 100mx 0.6mx m Turbine- V.Francis SWYD- 11/0 kv Cost: Original: Latest: Chutak 4x11 = 44 MW NHPC Barrage- 5 bays, 47.5 long HRT- D-5.9m, L- 4.37Km P.House- Underground 81mx 15.5 mx 34.5 m Turbine- V. Francis SWYD- 11/33 kv Cost: Original: 61.6 Latest: a. Teesta Low Dam-III 4x33 = 13 MW NHPC Broad Features : Barrage 1m L, 3.5m Height Penstock-4x 7m x 50m P.House- Surface 15mx mx56m Turbine- Kaplan Net head- 1.34m SWYD- 11/0 kv Cost: Original:768.9 Latest: Sector 4a. Bhawani Kattalai Barrage-III, x15 = 30 TANGEDCO Barrage gates P.House- Surface Turbine- Bulb Cost: Original: Latest: Cr. J&K West Bengal Tamil Nadu Broad Present Status / Critical Area Unit#3: Commissioned on Unit#: Commissioned on Unit#1: Commissioned on Unit#: Commissioned on Unit#3: Commissioned on Unit#1: Commissioned on Unit#4: Commissioned on Unit-1: Commissioned on Unit-: Commissioned on Unit-3: Commissioned on U #1: Commissioned on Remarks/ Critical issues

22 Name of Project Executing Agency Date of CEA clearance / Broad Features Cost (original/latest) In Rs. Crores. 5. Myntdu, MeECL / x4+1x4 = 16 MW Dam 63m High HRT mx3.4m dia Power House- Surface Turbine- V. Francis Cost: Original: Latest: Private Sector 6. Budhil Lanco Green Power Pvt Ltd / Jan, 06 (FC) x35=70 MW Dam-58m High HRT-4m x 608m. Power Houseunderground Turbine- V. Francis Cost: Original: Latest: b Sch. (original/ Now Ant. Megh Commissioned during Central Sector Teesta Low Dam-III West 4x33 = 13 MW Bengal NHPC Broad Features : Barrage 1m long, m high Penstock-4x 7m x 50m P.House- Surface 15mx mx56m Turbine- Kaplan Net head- 1.34m SWYD- 11/0 kv Cost: Original: (1/0) Latest: Uri-II NHPC x60 = MW Broad Features : Dam 5m High, 17m long, concrete gravity HRT- 8.4m x 4.7km P.House-Underground Turbine- V. Francis TRT- 8.4 m diax 3.78 km long SWYD- 11/0 kv Cost: Original: Latest: Nimoo Bazgo NHPC x15 = 45 MW J&K J&K Broad Present Status / Critical Area Unit #3: Commissioned on Unit#: Commissioned on Unit#1: Commissioned on Unit-4: Commissioned on Unit#1: Commissioned on Unit#3: Commissioned on Unit#: Commissioned on Unit#4: Commissioned on Unit#3: Commissioned on Unit#: Commissioned on Unit#1: Commissioned on Remarks/ Critical issues

23 Name of Project Executing Agency Date of CEA clearance / Broad Features Cost (original/latest) In Rs. Crores. Dam 57.5m High, concrete Spillway- 5 x 65m P.House- Surface Turbine- V. Francis SWYD- 11/33 kv Cost: Original: Latest: a. Parbati-III NHPC x130 = 50 MW Broad Features : Dam 43m High, 9 m long, Rockfill type HRT- 7.5m x 7.98km P. House -Underground Turbine- V. Francis SWYD- 13.8/0 kv Cost: Original: Latest: Sch. (original/ Now Ant Broad Present Status / Critical Area Unit#1: Commissioned on Unit#: Commissioned on Unit#3: Commissioned on Remarks/ Critical issues 10a Rampur SJVNL / x68.67= 41 MW HRT-10.5m x 15.08Km S.Shaft- 38m x 149m P.House- Surface Turbine- Francis Switchyard 0 kv Cost: Original: Latest: Sector 11. Bhawani Kattalai Barrage-II x15 = 30 MW TANGEDCO Barrage gates P.House- Surface Turbine- Bulb Cost: Original: Latest: b. Bhawani Kattalai Barrage-III, x15 = 30 TANGEDCO Barrage gates P.House- Surface Turbine- Bulb Cost: Original: Latest: Tamil Nadu Tamil Nadu Unit#1: Commissioned on Unit#: Commissioned on Unit#5: Commissioned on Unit#1: Commissioned on Unit#: Commissioned on U #: Commissioned on Private Sector 1. Chujachen Gati Infrastructure Ltd, Unit#: Commissioned on Unit#1: Commissioned on

24 Name of Project Executing Agency Date of CEA clearance / Broad Features Cost (original/latest) In Rs. Crores. Secunderabad ( Govt.) x49.5= 99 MW Dam Rangpo- 48.5m High Rongli- 41m High HRT- Rampo-3.3m x 578m Rongli-3.5m x 56m Common-5.m x 35m S. Shaft-1m x 104m P.House- Surface Turbine- V. Francis Cost: Original: Latest: Sch. (original/ Now Ant Commissioned during Central Sector 9b. Parbati-III NHPC x130 = 50 MW Broad Features : Dam 43m High, 9 m long, Rockfill type HRT- 7.5m x 7.98km P. House -Underground Turbine- V. Francis SWYD- 13.8/0 kv Cost: Original: Latest: b Ram Pur SJVNL / x68.67= 41 MW HRT-10.5m x 15.08Km S.Shaft- 38m x 149m P.House- Surface Turbine- Francis Switchyard 0 kv Cost: Original: Latest: a Kol Dam NTPC /Oct.00 4x00 = 800 MW Broad Features : Dam 163m High, Rock & Gravell fill Penstock Tunnel: 4nos. 6.45m dia, 1600m long P.House- Surface Turbine- V. Francis Cost: Original: Latest: Broad Present Status / Critical Area Unit#4: Commissioned on Unit#4: Commissioned on Unit#3: Commissioned on Unit#6: Commissioned on Unit#: Commissioned on Unit#1: Commissioned on Remarks/ Critical issues Commissioned during Central Sector 13b Kol Dam Unit # 3: Commissioned on

25 Name of Project Executing Agency Date of CEA clearance / Broad Features Cost (original/latest) In Rs. Crores. NTPC /Oct.00 4x00 = 800 MW Broad Features : Dam 163m High, Rock & Gravell fill Penstock Tunnel: 4nos. 6.45m dia, 1600m long P.House- Surface Turbine- V. Francis Cost: Original: Latest: Sch. (original/ Now Ant Broad Present Status / Critical Area Unit # 4: Commissioned on Remarks/ Critical issues 14. Teesta Low Dam-IV NHPC x = 160 MW Broad Features : Dam 45m High, 511m long, concrete gravity P. House- Surface 130mx 4mx 63m Turbine- Kaplan SWYD- 11/0 kv Cost: Original: Latest: West Bengal Unit #1: Commissioned on Unit #: Commissioned on Partially Commissioned. Sector 15. Baglihar-II JKPDC x150= 450 MW HRT m dia circular & m long Surge Shaft: 7.5 m dia & 97.5 m high restricted orifice type Power House: Underground TRT: D m L-34.6 m Cost: Original: Latest: J&K Unit # 1 : Commissioned on Unit # : Commissioned on Unit # 3 : Commissioned on Lower Jurala TSGENCO, x= MW (10 MW likely to slip) Intake: 18 vents (3 vents for each unit) 4.7m width, Power House- Surface, Turbine- Bulb Design Head- 0m SWYD- 0 kv Cost: Original: Latest: Telengana Unit # : Commissioned on Unit #1: Commissioned on Unit #3: Commissioned on Unit # 4: Commissioned on Partially Commissioned. Private Sector 17. Shrinagar AHPC Ltd.. Uttara khand Unit # 1: Commissioned on Unit # : Commissioned on

26 Name of Project Executing Agency Date of CEA clearance / Broad Features Cost (original/latest) In Rs. Crores. 14/06/000/ FC 4x8.5=330 Dam 66.5m High, concrete gravity HRT- 13m x 889m Penstock-4x 5.6m x 114m P.House- Surface Turbine- Francis Cost: Original: Latest: Jorethang Loop M/s DANS Energy x48 = 96 MW Barrage: Gravity Floor on Permeable Foundation 15 m High. HRT : D- 7m L-6.780km Surge Shaft :59m Height & 5m dia. Pressure Shaft : 17.60m length & 6m dia. Power House : Surface TR-Cut & Cover Conduit & 46.4m length. Switchyard: Outdoor, 0 KV/11KV Cost: Original: Latest : Sch. (original/ Now Ant Commissioned during Sector 19. Kashang-I Power Corpn. Ltd MW HRT-3.5m x 4.115, km long S.Shaft-.6m dia & 0.5 m backfill & 1346m long TRT: 335 m combined 6/4.5 m D. stream Cost: Original: Latest: A Central Sector 1 Kishanganga NHPC x110 = 330 MW Broad Features : Dam 77m High, concrete gravity HRT- 5.3m x 4 km long S.Shaft-15m dia x 17m Height P.House- Underground 103mx 1m x 45.5m Hydro Capacity for benefits during 1 th Plan J&K (With best efforts) Broad Present Status / Critical Area Unit # 3: Commissioned on Unit # 4: Commissioned on Unit # 1: Commissioned on Unit # : Commissioned on Commissioned on Dam & Intake :- Spillway concreting cum completed out of cum. CFRD Embankment- Completed. Construction of Cut off Wall completed. HRT:- Excavation completed by TBM/ DBM. Lining of TBM portion (14.7 km) completed and 5496m lining of DBM portion completed out of 8410m. Surge Shaft:- Concreting completed. Pressure Shaft liner:- 647 m liner completed out of 104 m. Power House:- Concreting completed. TRT : -Excavation Completed. 630m overt lining out of 849m completed Remarks/ Critical issues -Completion of Power evacuation arrangement. (PGCIL) -Completion of R&R

27 Name of Project Executing Agency Date of CEA clearance / Broad Features Cost (original/latest) In Rs. Crores. Turbine- Pelton wheel Swyd.- 0 kv Cost: Original: Latest: (09/15 PL) Sch. (original/ Now Ant. Broad Present Status / Critical Area Remarks/ Critical issues : - Unit # 1: Stator & rotor Lowered. Unit # : Stator lowered, Rotor building under progress. Unit # 3: Erection of Turbine housing & Distributor Completed. Critical Area: 1) Dam and associated HM. ) Filling of reservoir by 0 th Aug.016 3) Power evacuation system.. Parbati-II NHPC x00 = 800 MW Broad Features : Dam 85m High, 109. m long at top, concrete gravity type HRT- 6m x 31.3km P.House- Surface 3.5mx 39.7mx 13m. Turbine- Pelton Swyd /0 kv Cost: Original: Latest: Dam & Intake Structure- Concreting completed. Head Race Tunnel m Excavation out of 3155m completed Total Overt lining: 3143 m lining out of 3155 m completed. Power House: Concreting completed. Jiwa Nallah Feeder Tunnel: 4544 m Excavation out of 4560 m completed m Concreting out of 4560 m completed. Works: Unit # 1: Boxed up. Unit # : Boxing up in progress. Unit # 3: Stator lowered and assembly of rotor completed in service bay. Unit # 4: Erection of Stator frame completed. Stator Core & Rotor rim building in progress.. HM Works: Erection of ferrules in both Pressure Shafts completed and testing & commissioning of surge shafts gate completed. Erection of Radial Gates completed & welding in progress. Critical Area : HRT. Poor geology in HRT especially in Face-4 (TBM-Face). 3. Tapovan Vishnugad NTPC /Nov, 006 4x130 = 50 MW Broad Features : Barrage 5 bays of 1m HRT- 5.4m x 11.97km P.House- underground Turbine- V.Pelton Cost: Original: Latest: Uttara khand River diversion achieved on Barrage: Excavation completed and Concreting 9017 cum out of cum completed. HRT: m excavation completed out of m, TBM struck due to cavity (5.5km completed out of 8.8km) PH Cavern: Excavation completed and concreting cum out of 0000 cum completed. Desilting Chamber & Intake:.48 lakhs m 3 out of 4.73 lakh m 3 Excavation completed. TRT: Excavation completed. Unit #1 Stator Core building & Rotor poles erection is under progress. Surge shaft: Excavation & Lining completed. Penstock: Excavation completed and Lining of 794 m out of 137 m completed. : Pit liner erection on all 4 units completed. Turbine housing erection of all 4 units completed. Erection of EOT crane in BVC & service bay completed. Critical : HRT - HRT is critical. - Clearance of NBWL 4. Teesta Low Dam-IV NHPC x = 160 MW Broad Features : Dam 45m High, 511m long, concrete gravity P. House- Surface 130mx 4mx 63m Turbine- Kaplan West Bengal (Sept., 016) Unit #1: Commissioned on Unit #: Commissioned on Unit #3: Commissioning process underway and likely to be commissioned shortly. Unit #4: Unit Boxed up, commissioning by Sept,

28 Name of Project Executing Agency Date of CEA clearance / Broad Features Cost (original/latest) In Rs. Crores. SWYD- 11/0 kv Cost: Original: Latest: (1/15 PL) 5a. Subansiri Lower NHPC x50= 000 MW Broad Features : Dam 116m High, concrete gravity HRT- 8 x 9.5m x 1145m Power House- Surface Turbine- Francis SWYD- 16/0 kv Cost: Original: Latest: (0/16 PL) 6. Kameng NEEPCO Sch. (original/ Now Ant. Arunachal Pradesh Assam (Subject to re-start of ) Arunachal Pradesh Broad Present Status / Critical Area Dam: Excavation cum completed out of cum. Concreting: cum completed out of cum. Intake Structure: cum concreting completed out of cum. Head Race Tunnel (I-VIII): 7050 m heading excavation completed out of 714m. 479 m benching excavation completed out of 714 m m concrete overt lining completed out of 714 m. Surge Tunnels (8 nos.): 3109 m heading excavation completed out of 3545 m. Pressure Shaft- Vertical Pressure Shaft Slashing: 199 m excavation out of 384 m completed. Surface Power House: Concreting: cum out of cum completed. Works: Unit #1: Elbow erection (1 to 6) and Turbine stay ring and Spiral case erection completed. Unit #: Elbow erection ( to 6) and Turbine stay ring and Spiral case erection completed. HM Works: Erection of diversion tunnel gates 3% completed. Erection of Intake-5: % completed. Erection of Intake 7 & 8 0% completed each. 01 m pressure shaft steel liner erected out of total 1594 m. Work stopped since due to agitation launched by various activists against construction of Subansiri Lower HE Project. In this regard, as decided in the tripartite meeting dated , discussions between Expert Group formed at the request of AASU (All Assam Students Union) and Experts of Govt. of India & NHPC was held on Last meeting between Expert Group of Assam and Experts of Govt. of India was held on at Guwahati. Thereafter, meetings with Expert Group of Assam on and on & with various Stakeholders of Subansiri Lower Project on were held to discuss the issues. The meetings were Co-chaired by Hon ble MOS (I/C) for Power, Coal and New & Renewable Energy and Hon ble MOS (I/C) for Skill Development, Entrepreneurship, Youth Affairs & Sports. As decided in stakeholders meeting on , a Project oversight Committee (POC) was constituted vide MoP s OM dated Due to difference in opinion on some issues mainly seismic issues, the Expert Group of Assam has submitted the final report to MoP & members of POC from Government of India have also submitted a separate report to MoP. Matter related to Project is being heard by NGT. NGT allowed NHPC to undertake emergency maintenance for safety and protection of the public & property. Bichom Dam: Excavation / cum and Concreting 3550/4748 cum completed. Tenga Dam: Excavation / cum and Concreting Remarks/ Critical issues - Signing of MoU with Government of Assam. - Issue of Downstream Impact Assessment & demand for stoppage of by anti dam activists. -Since stopped due to agitation by various Assam. -Case in NGT. activists of -Dam and HRT is critical.

29 Name of Project Executing Agency Date of CEA clearance / Broad Features Cost (original/latest) In Rs. Crores. 4x150 = 600 MW Dam :Bichom-69m High, 47.3m long. Tenga 4.4 High, 103m long. HRT- 6.7m dia, km. High Pressure Tunnel (HPT)Total length 3.64 km Surge Shaft: 5m dia, 70m Height P.House- semi-u/g Turbine- Francis Cost: Original: Latest: Pare NEEPCO x55 = 110 MW Dam : 63m High, Con. Gravity Spillway 3 nos. gates Size of gate: 10.4m (w)x 1 m(h) Crest Level: 16 m HRT: Dia 7.5 M Length M Pressure Shaft: Dia: 6.4 M Length: 0M Bifucation Penstock Dia: 4.5 M Power House: Surface P.H. Size: 68 mx 5m Type of Turbine: VF TRC: Open channel 60.6 M wide 49M long Cost: Original: Latest: Tuirial NEEPCO Revised CCEA x30= 60 MW Dam: Earthfill, L 50 M H 75 M Sch. (original/ Now Ant (With best efforts- 300 MW) (Critical) Arunachal Pradesh (Critical) Mizoram Broad Present Status / Critical Area 9363 / cum completed. HRT: Excavation completed. Lining of out of 1438m completed. Surge Shaft: Orifice concrete Lining 6.8 Rm / Rm completed. HPT: Boring of vertical and horizontal portion completed & Open excavation of Surface Penstock including valve house /46504 cum completed. Power House & Tail Race: Excavation completed. Concreting 8494 / cum completed. HM Works: Fabrication of penstocks completed and 95% fabrication & erection of gates done. Unit erection: Unit # 1 & : Assembly of stator and Rotor is in progress. Assembly of Runner & Shaft for Unit #1 is in progress. Unit # 3 & 4: Hydro test of spiral case completed. Unit # 4: Trial Assembly of Guide Apparatus is in progress. Critical: 1. Dam construction & associated HM. HRT lining. Works: Dam: Excavation cum out of cum completed. Concreting cum out of cum completed. Head Race Tunnel: Boring and Lining completed. High Pressure Tunnel: Boring completed. Surge shaft: Open excavation, boring and lining completed. Power House: Excavation in pit completed. Concreting / 500 cum completed. Hydro Mechanical Works: Erection of steel liner 14 out of m completed. Erection of DT inlet gate completed. Unit erection: Unit-1: Rotor & Stator lowered. Erection of Spiral Casing & MIV completed. Unit-: Erection of Turbine Assembly is in progress. Concreting in generating barrel completed. Critical: 1. Dam construction & associated HM Dam: 5.06 lac cum excavation out of 5.19 lacs cum completed & filling 9.77 lacs cum out of lacs cum completed. Spillway: Excavation almost completed. Concreting 174 cum out of 174 cum completed. Power House & Switchyard: Excavation almost completed cum of Concreting in Power House out of 010 cum is completed. : DT Bend liner for unit#1 lowered and aligned. EOT crane has been erected and load test to be conducted. 1. Critical: Remarks/ Critical issues - Concreting of Dam & associated HM are critical. - Slope failure in Power house area. - Slope stabilization completed. - Poor approach roads. - Late mobilization of erection contractor for

30 Name of Project Executing Agency Date of CEA clearance / Broad Features Cost (original/latest) In Rs. Crores. Diversion Tunnel: Partly circular & partly modified horse shoe Diameter Diverted concrete portion 6 M steel liner portion 6M, 5.6 M & 3.6 M Power tunnel: Concrete Portion 00 M Steel Liner Portion 1M, 80M &.30 M Sch. (original/ Now Ant. Broad Present Status / Critical Area Remarks/ Critical issues Cost: Original:368.7 Latest: Sector 9. Uhl-III Beas Valley Power Corporation Ltd. (HPSEB) / (TEC -x50 MW) 3x33.3 =100 MW (Revised vide HPSEB letter dt HRT-4.15m x 8.47 km S.Shaft- 13m x 57m Penstock- 3.4m x 1860m P.House- Surface Turbine- V. Francis Cost: Original: Latest: Kashang-II & III Power Corpn. Ltd. 1x65 + 1x65= 130 MW Cost: Original: Latest: Sainj Power Corpn. Ltd. X50=100 MW Cost:Original Latest Swara Kuddu Power Corpn. Ltd. Clearance: x37= 111 MW Diversion Structure: 10.45m high Piano Key (Subject to re-start of ) Almost all civil completed except lining of HRT. 6063m ( done by earlier contractor) lining of HRT completed out of 8459m. :- All units boxed up. Critical : HRT Works of Kerang-Kashang link (KK Link) tunnel awarded to M/s Patel Engineering Ltd. Work on KK link tunnel is hampered due to two separate cases regarding Forest and Environmental issues are filed by Paryavaran Sangrakshan Smiti Lippa and Bhagat Singh Kinner respectively in NGT. Matter is being persuaded at higher level. Work on BR-III resumed on and excavation 49m out of 138m is balance & concreting 47m out of138 m is completed. - are in progress along with of Kashang I and are in advance stage of completion. Barrage: Concreting almost completed. HRT: Excavation & Lining completed. Surge Shaft: Excavation & lining completed. Pressure Shaft: Excavation completed. 67m out of 695 m lining completed. Power House: Excavation & lining almost completed. TRT: Excavation and Concreting completed. Unit Erection: Unit-1- Boxed up. Unit-- Boxing up in progress HRT lining critical. -Works on KK Link tunnel getting delayed due to continuous agitation by Lippa villagers. -The matter is subjudice. Barrage: Excavation completed & concreting is under - Works badly suffered advance stage of completion. due to encounter of HRT: 107m out of m from all faces of HRT poor geology in HRT. excavation completed and 4586 m out of 11364m overt lining - ual Issues. completed. - for HRT Surge Shaft: 76.6 m completed out of 77 m of shaft lining. package terminated on Power House: Excavation completed and concreting almost Re-awarded in

नम ण ध न जल व य त परय जन ओ क गत

नम ण ध न जल व य त परय जन ओ क गत क य व य त धकरण (जल व य त व ग) नम ण ध न जल व य त परय जन ओ क गत (वय त अ धनयम, 003 क तहत स ईए क द यव क प त म) म "सक सम # स %य. 94 QUARTERLY REVIEW 94 ज ल ई ~ "सत बर, 018 जल व य त परय जन भ धन भ ग नई $द&ल नव*बर

More information

WELCOME CHAMERA-I DAM

WELCOME CHAMERA-I DAM WELCOME CHAMERA-I DAM HYDRO POWER A CLEAN, GREEN & SUSTAINABLE POWER LEAST GENERATION OF GREEN HOUSE GASES WATER SECURITY SPINNING RESERVE DEVELOPMENT OF REMOTE AREA OF THE COUNTRY FLOOD MODERATION INCORPORATED

More information

DHUKWAN SHEP (24 MW) (UNDER CONSTRUCTION ON RIVER BETWA IN BABINA, DISTT. JHANSI, UP)

DHUKWAN SHEP (24 MW) (UNDER CONSTRUCTION ON RIVER BETWA IN BABINA, DISTT. JHANSI, UP) DHUKWAN SHEP (24 MW) (UNDER CONSTRUCTION ON RIVER BETWA IN BABINA, DISTT. JHANSI, UP) Dhukwan HEP is being constructed at the toe of existing Dhukwan masonry cum earthen dam across Betwa river. The 8.22

More information

HYDRO POWER IN INDIA 2017

HYDRO POWER IN INDIA 2017 Now Available HYDRO POWER IN INDIA 2017 Trends, Developments and Future Outlook Report (PDF) Data-set (Excel) India Infrastructure Research Hydro Power in India 2017 Table of Contents SECTION I: MARKET

More information

6) Penstocks 3.25m dia and 965m long to lead a design discharge of cumecs

6) Penstocks 3.25m dia and 965m long to lead a design discharge of cumecs Project: Sorang Hydro Electric Project - 100 MW Overview: M/s.Himachal Sorang Pvt.Ltd., Hyderabad, is developing the Run of the River Sorang Hydro Electric Project (100MW) in Kinnaur District of Himachal

More information

USE OF WHATSAPP MOBILE APPLICATION IN PROJECT MANAGEMENT OF LARGE INFRASTRUCTURE PROJECT

USE OF WHATSAPP MOBILE APPLICATION IN PROJECT MANAGEMENT OF LARGE INFRASTRUCTURE PROJECT USE OF WHATSAPP MOBILE APPLICATION IN PROJECT MANAGEMENT OF LARGE INFRASTRUCTURE PROJECT A CASE STUDY OF 1200 MW TEESTA-III HEP, SIKKIM Abstract - The Case study brings out the use of IT application in

More information

INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING)

INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING) INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING) Bid Title : EPC Bid for Planning, detailed design& engineering, construction/manufacturing of civil, electro-mechanical, hydro- mechanical and switch

More information

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.465 ANSWERED ON USE OF TRANSFERRED COAL

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.465 ANSWERED ON USE OF TRANSFERRED COAL GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.465 ANSWERED ON 06.04.2017 USE OF TRANSFERRED COAL *465. SHRI DHARMENDRA YADAV: SHRI SHRIRANG APPA BARNE: Will the Minister of POWER

More information

Chakachamna Hydro. AEA Geothermal Conference

Chakachamna Hydro. AEA Geothermal Conference Chakachamna Hydro AEA Geothermal Conference August 2007 Chakachamna Hydro 300+ MW hydro opportunity identified Preliminary FERC License application filed in May 2006 Initial scoping/informational meetings

More information

Tender Call No.: Likhu/GVN/Pkg-03/2012 OLUME III A 1 TABLE OF CONTENTS SALIENT FEATURES 1.0 SCOPE SALIENT FEATURES... 1

Tender Call No.: Likhu/GVN/Pkg-03/2012 OLUME III A 1 TABLE OF CONTENTS SALIENT FEATURES 1.0 SCOPE SALIENT FEATURES... 1 Table of contents OLUME III A 1 TABLE OF CONTENTS SALIENT FEATURES 1.0 SCOPE... 1 1.1 SALIENT FEATURES... 1 1.2 TRANSPORT LIMITATIONS... 8 1.3 DEVIATIONS FROM SPECIFICATIONS... 9 1.4 APPROVAL OF DRAWINGS...

More information

TEHRI PUMPED STORAGE PLANT (1000 MW) (UNDER CONSTRUCTION ON RIVER BHAGIRATHI IN TEHRI GARHWAL, UTTRAKHAND)

TEHRI PUMPED STORAGE PLANT (1000 MW) (UNDER CONSTRUCTION ON RIVER BHAGIRATHI IN TEHRI GARHWAL, UTTRAKHAND) TEHRI PUMPED STORAGE PLANT (1000 MW) (UNDER CONSTRUCTION ON RIVER BHAGIRATHI IN TEHRI GARHWAL, UTTRAKHAND) 1.0 Introduction: The Pumped Storage Plant (PSP) would involve construction of an underground

More information

b) Address of Project Incharge site office (With Pin code, Telephone/Fax)

b) Address of Project Incharge site office (With Pin code, Telephone/Fax) 97MW TASHIDING HYDRO ELECTRIC PROJECT DATA SHEET Sl.No. Particulars Details 1. Project Type Run- of- River Scheme 2. Name of the Project 97MW Tashiding Hydro Electric Project 3. Clearance Letter i) Environmental

More information

DORDI KHOLA HYDROPOWER PROJECT. Lamjung, Nepal. Monthly Progress Report. June 2018

DORDI KHOLA HYDROPOWER PROJECT. Lamjung, Nepal. Monthly Progress Report. June 2018 DORDI KHOLA HYDROPOWER PROJECT Lamjung, Nepal Monthly Progress Report June 2018 --------------------------------------------------- Himalayan Power Partner Limited Energy Sector Research, Development &

More information

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.326 TO BE ANSWERED ON POWER SHORTAGES

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.326 TO BE ANSWERED ON POWER SHORTAGES GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.326 TO BE ANSWERED ON 09.08.2018 POWER SHORTAGES *326. SHRI D.K. SURESH: SHRI NALIN KUMAR KATEEL: Will the Minister of POWER be pleased

More information

DORDI KHOLA HYDROPOWER PROJECT. Lamjung, Nepal. Progress Report. January 2018

DORDI KHOLA HYDROPOWER PROJECT. Lamjung, Nepal. Progress Report. January 2018 DORDI KHOLA HYDROPOWER PROJECT Lamjung, Nepal Progress Report January 2018 --------------------------------------------------- Himalayan Power Partner Limited Energy Sector Research, Development & Consulting

More information

No. Secy.CAO/USBRL/JAT/PCDO Dated: 10/08/2018

No. Secy.CAO/USBRL/JAT/PCDO Dated: 10/08/2018 व जय शर म vkbzvkj,lb Vijay Sharma IRSE No. Secy.CAO/USBRL/JAT/PCDO Dated: 10/08/2018 Sub: PCDO for the Month of July, 2018. 1. Highlights of the month of July, 2018. 1.1 During this month 2035 m of tunneling

More information

PCDO. May Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project

PCDO. May Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project PCDO May-2018 Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project Northern Railway vuqjkx dqekj lpku vkbzvkj,lb Anurag Kumar Sachan

More information

PCDO. April Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project

PCDO. April Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project PCDO April-2018 Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project Northern Railway vuqjkx dqekj lpku vkbzvkj,lb Anurag Kumar Sachan

More information

Systematic and Early Development of Hydro Projects in Nepal. Development of Projects in Bheri Basin A Case Study

Systematic and Early Development of Hydro Projects in Nepal. Development of Projects in Bheri Basin A Case Study Systematic and Early Development of Hydro Projects in Nepal Development of Projects in Bheri Basin A Case Study 1 RIVER MAP: ORIGIN AND ITS CONFLUENCES Tallo Bheri HEP Thuli Bheri-1HEP NEPAL Bheri-III

More information

INDICATIVE SUPROJECTS. New Projects

INDICATIVE SUPROJECTS. New Projects INDICATIVE SUPROJECTS New Projects Approval Date Applicant Name Sector Description Capacity (MW) Eligible ADB Loan Amount Financing (Rs. Lakhs) Loan Amount (USD) Project Cost (Rs. Lakhs) Project Site 26-Mar-14

More information

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION 1.1 General The Lower Erkhuwa hydropower Project is located in Kulung and Chauki Danda VDCs of Bhojpur District, in East Nepal. It is located

More information

DORDI KHOLA HYDROPOWER PROJECT. Lamjung, Nepal. Monthly Progress Report. February 2018

DORDI KHOLA HYDROPOWER PROJECT. Lamjung, Nepal. Monthly Progress Report. February 2018 DORDI KHOLA HYDROPOWER PROJECT Lamjung, Nepal Monthly Progress Report February 2018 --------------------------------------------------- Himalayan Power Partner Limited Energy Sector Research, Development

More information

11/10/2009. Lake Uist - BAKER PT. Distributor from bore to penstocks Lowest level in draft tube FSL Top of surge tank.

11/10/2009. Lake Uist - BAKER PT. Distributor from bore to penstocks Lowest level in draft tube FSL Top of surge tank. Parametric Analysis of Pump- Turbine Sites J. L. Gordon, P. Eng. Fellow CSCE 190.0 FSL 203.6 Top of surge tank. Lake Uist - BAKER PT 193.0 Deck El. 2120.6 Surge tank required? Yes 169.5 Bottom of surge

More information

HPGCL HPGCL was incorporated as a company 17th March, The business of Generation of Power of erstwhile HSEB was transferred HPGCL

HPGCL HPGCL was incorporated as a company 17th March, The business of Generation of Power of erstwhile HSEB was transferred HPGCL HPGCL was incorporated as a company on 17 th March, 1997. The business of Generation of Power of erstwhile HSEB was transferred to HPGCL on 14.08.98 pursuant to Power Reforms in Haryana. Objectives : -

More information

Vinnie Naidoo Technical Executive GIBB (Pty) Limited South Africa

Vinnie Naidoo Technical Executive GIBB (Pty) Limited South Africa Vinnie Naidoo Technical Executive GIBB (Pty) Limited South Africa Structure of Presentation Outline of the Project Development Phases Key Attributes of the Project Environmental Considerations Scheme Layout

More information

profile adversity glares, complexity dares, time lines daunt, conditions deter, but challenges beckon. no matter what, we ll build it.

profile adversity glares, complexity dares, time lines daunt, conditions deter, but challenges beckon. no matter what, we ll build it. profile adversity glares, complexity dares, time lines daunt, conditions deter, but challenges beckon. no matter what, we ll build it. ISO 9001 : 2008 CERTIFIED taking up bigger challenges since 15 years

More information

DORDI KHOLA HYDROPOWER PROJECT. Lamjung, Nepal. Progress Report. August 2018

DORDI KHOLA HYDROPOWER PROJECT. Lamjung, Nepal. Progress Report. August 2018 DORDI KHOLA HYDROPOWER PROJECT Lamjung, Nepal Progress Report August 2018 --------------------------------------------------- Himalayan Power Partner Limited Energy Sector Research, Development & Consulting

More information

No. Secy.CAO/USBRL/JAT/PCDO Dated: 10/10/2018

No. Secy.CAO/USBRL/JAT/PCDO Dated: 10/10/2018 व जय शर म vkbzvkj,lb Vijay Sharma IRSE No. Secy.CAO/USBRL/JAT/PCDO Dated: 10/10/2018 Sub: PCDO for the Month of Sep, 2018. 1. Highlights of the month of Sep, 2018. 1.1 Principal Executive Director/Bridges,

More information

ALEO HYDRO ELECTRIC PROJECT ALEO, MANALI (H.P.) (2X1500KW) A.K. Goel Manging Director M/s. Small Hydro Engineering Consultant Pvt. Ltd.

ALEO HYDRO ELECTRIC PROJECT ALEO, MANALI (H.P.) (2X1500KW) A.K. Goel Manging Director M/s. Small Hydro Engineering Consultant Pvt. Ltd. Himalayan Small Hydropower Summit (October 12-13, 2006), Dehradun ALEO HYDRO ELECTRIC PROJECT ALEO, MANALI (H.P.) (2X1500KW) A.K. Goel Manging Director M/s. Small Hydro Engineering Consultant Pvt. Ltd.

More information

State wise analysis of RPO Regulation for Captive users

State wise analysis of RPO Regulation for Captive users State Regulation for Captive Users Definition of renewable Energy as per the commission order Remarks Andhra Pradesh Every consumer owning a captive generating plant of installed capacity of one (1) MW

More information

GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.32 TO BE ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.32 TO BE ANSWERED ON *. SHRI D. RAJA: GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO. TO BE ANSWERED ON 7.0.015 CO EMISSIONS FROM THERMAL POWER PLANTS Will the Minister of POWER be pleased to state:

More information

HydroHelp 5 AN EXCEL PROGRAM DEVELOPED FOR PRE-FEASIBILITY ASSESSMENT PUMP-STORAGE HYDROELECTRIC SITES. J. L. GORDON P.Eng.

HydroHelp 5 AN EXCEL PROGRAM DEVELOPED FOR PRE-FEASIBILITY ASSESSMENT PUMP-STORAGE HYDROELECTRIC SITES. J. L. GORDON P.Eng. HydroHelp 5 AN EXCEL PROGRAM DEVELOPED FOR PRE-FEASIBILITY ASSESSMENT OF PUMP-STORAGE HYDROELECTRIC SITES BY J. L. GORDON P.Eng. January, 2009 HydroHelp 5 for pump-turbine sites. A continuation of the

More information

Potential Gains from Regional Cooperation and Trade of Electricity in South Asia

Potential Gains from Regional Cooperation and Trade of Electricity in South Asia Potential Gains from Regional Cooperation and Trade of Electricity in South Asia Govinda R. Timilsina and Mike Toman The World Bank, Washington, DC 5 th Asian Conference of IAEE University of Western Australia

More information

Research Compendium. Hydro power in North East India Under-Construction and Planned Projects

Research Compendium. Hydro power in North East India Under-Construction and Planned Projects Research Compendium Hydro power in North East India Release Date : August 2013 Research Background Total Hydro Power potential in India Untapped potential, 67.60% Source: Energyline India Tapped, 23. 88%

More information

PROJECT TITLE: 86 MW HYDRO PROJECT IN HIMACHAL PRADESH

PROJECT TITLE: 86 MW HYDRO PROJECT IN HIMACHAL PRADESH PROJECT TITLE: 86 MW HYDRO PROJECT IN HIMACHAL PRADESH Document Prepared By Malana Power Company Limited Contact Information Bhilwara Towers, A-12, Sector -1 Noida-201301 Uttar Pradesh India Contact Number

More information

Cost Analysis for High Head SHP Projects

Cost Analysis for High Head SHP Projects 2012 International Congress on Informatics, Environment, Energy and Applications-IEEA 2012 IPCSIT vol.38 (2012) (2012) IACSIT Press, Singapore Cost Analysis for High Head SHP Projects Sachin Mishra 1,

More information

RENEWABLE ENERGY INTEGRATION IN TAMILNADU

RENEWABLE ENERGY INTEGRATION IN TAMILNADU RENEWABLE ENERGY INTEGRATION IN TAMILNADU Generator Installed Capacity in MW CGS Nuclear 6% PURCHASE (LTOA, MTOA) 18% TN Hydro 2308 TN Thermal 4320 TN Gas 516 TN IPP 746 CGS Thermal 15% CPP 3% TN IPP 3%

More information

SMALL HYDRO PROGRAMME IN INDIA

SMALL HYDRO PROGRAMME IN INDIA SMALL HYDRO PROGRAMME IN INDIA Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy Hydropower represents use of water resources towards inflation free energy due to absence of fuel cost with mature

More information

DORDI KHOLA HYDROPOWER PROJECT. Lamjung, Nepal. Monthly Progress Report. April 2018

DORDI KHOLA HYDROPOWER PROJECT. Lamjung, Nepal. Monthly Progress Report. April 2018 DORDI KHOLA HYDROPOWER PROJECT Lamjung, Nepal Monthly Progress Report April 2018 --------------------------------------------------- Himalayan Power Partner Limited Energy Sector Research, Development

More information

Hydro & Small Hydro Outlook in India 2017

Hydro & Small Hydro Outlook in India 2017 Hydro & Small Hydro Outlook in India 217 Evaluating Business Case & Future Scenario of Large & Small Hydro Power Plants in India Report Summary enincon consulting llp, 217, New Delhi, India Enincon s Key

More information

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation Client: Budhi Gandaki Hydroelectric Project Development Committee General Presentation 1. Background and objectives 2. Project location 3. Project information/features 4. Project performances 5. Environmental

More information

Impact of Renewable Energy Certificate (REC) Mechanism in India

Impact of Renewable Energy Certificate (REC) Mechanism in India Impact of Renewable Energy Certificate (REC) Mechanism in India Authors: S. K. Soonee, K. V. S. Baba, U. K. Verma, Minaxi Garg, Shailendra Kr. Verma and K. C. Saini Power System Operation Corporation Ltd.

More information

World Renewable Energy Technology Congress

World Renewable Energy Technology Congress World Renewable Energy Technology Congress SMALL HYDRO POWER - POTENTIAL ASSESSMENT & ISSUES Dr. SUNIL K SINGAL Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee email : sunilfah@iitr.ernet.in,

More information

Guidelines for Implementation of fisheries Scheme under the National Mission for Protein Supplements (NMPS) in States during

Guidelines for Implementation of fisheries Scheme under the National Mission for Protein Supplements (NMPS) in States during Annexure-III Guidelines for Implementation of fisheries Scheme under the National Mission for Protein Supplements (NMPS) in States during 2012-13 The Department of Animal Husbandry, Dairying & Fisheries,

More information

Vishnugad Pipalkoti Hydropower Project Tehri Hydro Development Corporation Uttarakhand, India

Vishnugad Pipalkoti Hydropower Project Tehri Hydro Development Corporation Uttarakhand, India Vishnugad Pipalkoti Hydropower Project Tehri Hydro Development Corporation Uttarakhand, India World Bank Water Week February 17, 2009 Pyush Dogra (Environmental Specialists) & Daryl Fields (Senior Water

More information

PROJECT INFORMATION AND SHORTLISTING CRITERIA FOR SCREENING OF CONSULTING FIRM. Tamakoshi V Hydroelectric Project

PROJECT INFORMATION AND SHORTLISTING CRITERIA FOR SCREENING OF CONSULTING FIRM. Tamakoshi V Hydroelectric Project PROJECT INFORMATION AND SHORTLISTING CRITERIA FOR SCREENING OF CONSULTING FIRM 1. PROJECT INFORMATION Intoduction: Tamakoshi V Hydroelectric Project The Tamakoshi-V Hydropower Project is a cascade development

More information

ANNEXURE-III SALIENT FEATURES OF DUGAR HYDRO ELECTRIC PROJECT. Himachal Pradesh. Latitude. Longitude Nearest Railhead; Udhampur (J&K)

ANNEXURE-III SALIENT FEATURES OF DUGAR HYDRO ELECTRIC PROJECT. Himachal Pradesh. Latitude. Longitude Nearest Railhead; Udhampur (J&K) ANNEXURE-III SALIENT FEATURES OF DUGAR HYDRO ELECTRIC PROJECT Project Location State District River Vicinity Latitude Longitude Nearest Railhead; Udhapur (J&K) Hiachal Pradesh Chaba Chenab River Luj village

More information

Xayaburi Hydroelectric Power Project

Xayaburi Hydroelectric Power Project The MRC Regional Workshop on Discharge and Sediment Monitoring and Geomorphological Tool for the Lower- Mekong Basin, 21-22 22 October 2008 Xayaburi Hydroelectric Power Project TEAM Consulting Engineering

More information

1 Sawalkote HEP Kirthai Stage-II Baglihar Stage-II Kirthai Stage-I 390

1 Sawalkote HEP Kirthai Stage-II Baglihar Stage-II Kirthai Stage-I 390 POWER SCENARIO IN J&K The J & K State is endowed with huge and vast water resources in the form of permanent glaciers & ice bodies, inland water bodies viz. lakes & river systems. These are being utilized

More information

GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS

GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS Status report on implementation of the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 [for the period ending

More information

RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant

RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant The power plant is located in southern Tolima, in the municipality of Chaparral, approximately 150 km from Ibague. It has an installed capacity of 80

More information

WEST POINT PERTINENT DATA. GENERAL Location (damsite) Troup County GA, Chambers County AL, miles above mouth of Chattahoochee River

WEST POINT PERTINENT DATA. GENERAL Location (damsite) Troup County GA, Chambers County AL, miles above mouth of Chattahoochee River WEST POINT PERTINENT DATA GENERAL Location (damsite) Troup County GA, Chambers County AL, miles above mouth of Chattahoochee River 201.4 Drainage area, Buford Dam to West Point Dam, square miles 2,406

More information

INTRODUCTION & PROJECT DESCRIPTION

INTRODUCTION & PROJECT DESCRIPTION 1 INTRODUCTION & PROJECT DESCRIPTION 1.1 GENERAL Hirong Hydro Electrical Project is proposed to be developed as run-off the river scheme to harness the potential of river Siyom (a tributary of river Siang).

More information

GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF LAND RESOURCES LOK SABHA STARRED QUESTION NO. 70 TO BE ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF LAND RESOURCES LOK SABHA STARRED QUESTION NO. 70 TO BE ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF LAND RESOURCES LOK SABHA STARRED QUESTION NO. 70 TO BE ANSWERED ON 20.07.2017 Development of Wasteland *70. SHRI KUNWAR PUSHPENDRA SINGH

More information

Soil Health Management in India

Soil Health Management in India Soil Health Management in India Soil Health Management in India Soil Health Management In order to improve the soil health of the Indian soils, gov- The nature and extent of deficiencies of nutrients in

More information

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid Greening the Grid Andhra Pradesh Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid State-specific results from Volume II, which includes all of India. The full reports

More information

2 X 8 MW Patikari Hydroelectric Project, Himachal Pradesh Annual Report. Contents. 1 About the Project Generation Data Analysis 4

2 X 8 MW Patikari Hydroelectric Project, Himachal Pradesh Annual Report. Contents. 1 About the Project Generation Data Analysis 4 2 X 8 MW Patikari Hydro Power Project Annual Plant Performance Report For the year 2017-2018 S No. Contents Title Page No. 1 About the Project 3 2 Plant Performance 4 2.1 Generation Data Analysis 4 2.2

More information

(i) GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS

(i) GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS Status report on implementation of the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 [for the period ending

More information

BRILLIANT EXPANSION PROJECT

BRILLIANT EXPANSION PROJECT BRILLIANT EXPANSION PROJECT Utilizes power tunnel 120 MW Capacity 500 GWh Energy Transmission link to Brilliant Terminal Station Will reduce TGP downstream Intake Transmission Link Transmission Link Extent

More information

ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal.

ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal. ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal. Kutch (Gujarat) Date: 19/10/2016, Wednesday Duration: 1 Day A FEEDBACK REPORT ON VISIT

More information

Reference List of BOOM Systems Private Limited (Projects / Products / Services)

Reference List of BOOM Systems Private Limited (Projects / Products / Services) No. Name of Project Period Nature of Scope Name of Client 1 3 x 4 MW Maniyar HEP in Kerala State 1995 The scope involved, Design review fo generation optimization, Assistance in Field performance test

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : August,

More information

With the support of the PV Market Alliance. APVIA Q Market Report

With the support of the PV Market Alliance. APVIA Q Market Report With the support of the PV Market Alliance APVIA Q2 2017 Market Report Introduction Launched in 2017, this 2 nd edition of APVIA s quarterly PV market report focus on India, anticipated to witness the

More information

STATUS OF MAJOR PROJECTS UNDER VARIOUS STAGES OF APPRAISAL

STATUS OF MAJOR PROJECTS UNDER VARIOUS STAGES OF APPRAISAL STATUS OF MAJOR PROJECTS UNDER VARIOUS STAGES OF APPRAISAL As on 21.03.2016 ANDHRA PRADESH 1 B.R.R. Vamsadhara Phase-II of Stage- II 2 Thothapally Barrage New 06.08.2014 Hydrology, Inter-State, Ground

More information

MIEL I Hydroelectric Power Plant

MIEL I Hydroelectric Power Plant MIEL I Hydroelectric Power Plant The Miel I Power Plant, which is located in the municipality of Norcasia, forms part of the hydro potential in western Caldas. This region comprises the basins of the rivers

More information

Then the revolving speed of turbine is obtained as 300 r/min based on the specific speed of Ns 208 m-kw.

Then the revolving speed of turbine is obtained as 300 r/min based on the specific speed of Ns 208 m-kw. 11.4 Electromechanical Equipment Generally, a turbine-generator is said larger unit capacity has more economical merit of scale. However, the optimum unit size of turbine-generator is determined in consideration

More information

Renovation & Modernisation

Renovation & Modernisation Renovation & Modernisation of Kopili Hydro Electric Plant; NEEPCO The Back ground, Execution, hurdles and Performance A presentation by M S JYRWA ED(O&M) NEEPCO Ltd. SCOPE COMPLEX : New Delhi 16/12/2016

More information

Grid Connected Rooftop PV Systems

Grid Connected Rooftop PV Systems Grid Connected Rooftop PV Systems भ रत य स र ऊज नगम ल मट ड ल मटड (भ रत सरक र क उपबम) 1 st Floor, Religare Building D 3 District Centre, Saket, New Delhi 110017 Renewable Energy Targets :175 GW by 2022

More information

Breaking new grounds. Hydro-electric Power Irrigation Projects Tunnels & Underground Structures

Breaking new grounds. Hydro-electric Power Irrigation Projects Tunnels & Underground Structures L&T-HydroFolder Set 1 Tunnel for the Tata - Bhira hydro-electric power project in Maharashtra. CMYK Breaking new grounds Head race tunnel for Chilime Hydro-electric Project, Nepal A part of the Trishuli

More information

NHPC Limited. Background. Objects Of The Issue. Valuation. Aug 07, 2009

NHPC Limited. Background. Objects Of The Issue. Valuation. Aug 07, 2009 Aug 07, 2009 Issue Details Face Value INR. 10 Price Issue Size Issue Amount Minimum Lot INR 30-INR36 per share 1.68 bn equity shares INR50.32bn - INR60.39bn 175 shares Minimum Amount INR. 5250 INR. 6300

More information

John Hart Generating Station Replacement Project. January 2018 Community Construction Update Report #55

John Hart Generating Station Replacement Project. January 2018 Community Construction Update Report #55 John Hart Generating Station Replacement Project January 2018 Community Construction Update Report #55 Prepared by: Stephen Watson, BC Hydro (O) 250-755-4795 or (C) 250-616-9888 Twitter: @Puntledge Email:

More information

May 24, 2018 I Industry Research. Power: Yearly Update and Outlook. Graph 1 Electricity Generation Mix (FY18)

May 24, 2018 I Industry Research. Power: Yearly Update and Outlook. Graph 1 Electricity Generation Mix (FY18) Power: Yearly Update and Outlook Contact: Madan Sabnavis Chief Economist madan.sabnavis@careratings.com 91-22- 6754 3489 Ashish K Nainan Research Analyst ashish.nainan@careratings.com 91-22-6754 3443 Mradul

More information

Evolution of RPO and REC Mechanisms : Indian Experience

Evolution of RPO and REC Mechanisms : Indian Experience Session-5, Day 2 Evolution of RPO and REC Mechanisms : Indian Experience SAARC Knowledge Sharing Workshop on Modern Techniques including Renewable Energy Auctions for Economizing Renewable Energy Tariff

More information

SJVN Limited. Investor Meet Presentation JUNE 2015

SJVN Limited. Investor Meet Presentation JUNE 2015 SJVN Limited Investor Meet Presentation JUNE 2015 SJVN A Snapshot SJVN was incorporated as a JV between GoI and the GoHP with equity ratio 75:25. SJVN became a Schedule A PSU; designated as Mini- Ratna

More information

Department of Electrical Engineering. Industrial Visit Report. Sardar Sarovar Narmada Nigam Limited Hydro Electric Power Station

Department of Electrical Engineering. Industrial Visit Report. Sardar Sarovar Narmada Nigam Limited Hydro Electric Power Station Department of Electrical Engineering Industrial Visit Report Sardar Sarovar Narmada Nigam Limited Hydro Electric Power Station on 10 th March, 2017 Faculties Accompany: Prof. Anish Vora Prepared by: Prof.

More information

BRIHANMUMBAI MAHANAGARPALIKA

BRIHANMUMBAI MAHANAGARPALIKA BRIHANMUMBAI MAHANAGARPALIKA PROJECTS SANCTIONED UNDER JNNURM A] IV Mumbai - Middle Vaitarna Water Supply Project :- Municipal Corporation of Greater Mumbai (MCGM) has undertaken the Middle Vaitarana Water

More information

SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER)

SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER) SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER) PREPARED BY: ASSISTANT PROFESSOR NILESH PRAJAPATI CIVIL ENGG. DEPARTMENT DJMIT MOGAR River Bed Power House (RBPH) RIVER BED

More information

Blue Lake Hydroelectric Project (FERC No. 2230) Expansion Environmental Analysis

Blue Lake Hydroelectric Project (FERC No. 2230) Expansion Environmental Analysis United States Departme nt of Agriculture Forest Service Alaska Region Tongass National Forest (907) 747-6671 Blue Lake Hydroelectric Project (FERC No. 2230) Expansion Environmental Analysis Dear Planning

More information

John Hart Generating Station Replacement Project. December 2017 Community Construction Update Report #54

John Hart Generating Station Replacement Project. December 2017 Community Construction Update Report #54 John Hart Generating Station Replacement Project December 2017 Community Construction Update Report #54 Prepared by: Stephen Watson, BC Hydro (O) 250-755-4795 or (C) 250-616-9888 Twitter: @Puntledge Email:

More information

86 MW Hydro Project in Himachal Pradesh

86 MW Hydro Project in Himachal Pradesh 86 MW Hydro Project in Himachal Pradesh Monitoring Report- Fifth VER Verification (Total Emission Reductions- 45,737 tco2e) Monitoring Period: 01/10/2009 to 31/03/2010 (Inclusive of both days) Version:

More information

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid Greening the Grid Tamil Nadu Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid State-specific results from Volume II, which includes all of India. The full reports include

More information

SREI SAHAJ E-VILLAGE LTD: PLACEMENT LINKED SKILL DEVELOPMENT PROGRAMME: SGSY

SREI SAHAJ E-VILLAGE LTD: PLACEMENT LINKED SKILL DEVELOPMENT PROGRAMME: SGSY SREI SAHAJ E-VILLAGE LTD: PLACEMENT LINKED SKILL DEVELOPMENT PROGRAMME: SGSY The rural world is changing rapidly, and young people need to be prepared to rise to the new opportunities. Agriculture is also

More information

Annex 5 - Hydropower Model Vakhsh

Annex 5 - Hydropower Model Vakhsh Annex 5 - Hydropower Model Vakhsh 1. The Vakhsh Cascade The construction of dams on the Vakhsh River started in the late 1950s with the construction of the Perepadnaya diversion and power station. Until

More information

VECTOR BORNE DISEASES AND CLIMATIC CHANGES

VECTOR BORNE DISEASES AND CLIMATIC CHANGES VECTOR BORNE DISEASES AND CLIMATIC CHANGES Dr. Neeraj Dhingra Additional Director National Vector Borne Disease Control Porgramme (NVBDCP Ministry of Health & Family Welfare Government of India PREVENTION

More information

RATLE HYDRO ELECTRIC PROJECT (850 MW) BIDDING DOCUMENT FOR "APPOINTMENT OF OWNER S ENGINEER

RATLE HYDRO ELECTRIC PROJECT (850 MW) BIDDING DOCUMENT FOR APPOINTMENT OF OWNER S ENGINEER GVK RATLE HYDRO ELECTRIC PROJECT PRIVATE LIMITED RATLE HYDRO ELECTRIC PROJECT (850 MW) BIDDING DOCUMENT FOR "APPOINTMENT OF OWNER S ENGINEER (This document is meant for the exclusive purpose of bidding

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : January,

More information

We proudly present the first up to Six Jets Horizontal Pelton Turbine.

We proudly present the first up to Six Jets Horizontal Pelton Turbine. We proudly present the first up to Six Jets Horizontal Pelton Turbine. ESHA Congress E&E Contribution to the Hidroenergia Innovation Award 1 Erlach & Erlach GmbH offers: - Visibility studies of small hydro

More information

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA UNSTARRED QUESTION NO.2282 TO BE ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA UNSTARRED QUESTION NO.2282 TO BE ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA UNSTARRED QUESTION NO.2282 TO BE ANSWERED ON 29.11.2016 Common Effluent Treatment Plants 2282. DR. C.GOPALAKRISHNAN: PROF.

More information

Proposed Water Pipeline Route

Proposed Water Pipeline Route A Detail on Proposed Water Pipeline Route of 1600 (2 x 800) MW GODDA THERMAL POWER PROJECT GODDA, JHARKHAND ADANI POWER (JHARKHAND) LTD. Village - Motia, Tehsil Godda, District Godda, Jharkhand 1 Contents

More information

John Hart Generating Station Replacement Project. November 2017 Community Construction Update Report #53

John Hart Generating Station Replacement Project. November 2017 Community Construction Update Report #53 John Hart Generating Station Replacement Project November 2017 Community Construction Update Report #53 Prepared by: Stephen Watson, BC Hydro (O) 250-755-4795 or (C) 250-616-9888 Twitter: @Puntledge Email:

More information

Safe Water Network is recognized as a National Key Resource Center by the Ministry of Drinking Water and Sanitation KNOWLEDGE PARTNER GRANT PARTNER

Safe Water Network is recognized as a National Key Resource Center by the Ministry of Drinking Water and Sanitation KNOWLEDGE PARTNER GRANT PARTNER Safe Water Network is recognized as a National Key Resource Center by the Ministry of Drinking Water and Sanitation KNOWLEDGE PARTNER GRANT PARTNER 1 Dream of Har Ghar Jal will be realized by 2030:

More information

DORDI KHOLA HYDROPOWER PROJECT. Lamjung, Nepal. Annual (July) Progress Report. July 2018

DORDI KHOLA HYDROPOWER PROJECT. Lamjung, Nepal. Annual (July) Progress Report. July 2018 DORDI KHOLA HYDROPOWER PROJECT Lamjung, Nepal Annual (July) Progress Report July 2018 --------------------------------------------------- Himalayan Power Partner Limited Energy Sector Research, Development

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : August,

More information

Scenario of Small Hydro Power Projects in India and Its Environmental Aspect

Scenario of Small Hydro Power Projects in India and Its Environmental Aspect Generation Growth (%) International Research Journal of Engineering and Technology (IRJET) e-issn: 2395-0056 Scenario of Small Hydro Power Projects in India and Its Environmental Aspect Md. Mustafa Kamal

More information

TURBINE VENTING FOR DISSOLVED OXYGEN IMPROVEMENTS AT BULL SHOALS, NORFORK, AND TABLE ROCK DAMS

TURBINE VENTING FOR DISSOLVED OXYGEN IMPROVEMENTS AT BULL SHOALS, NORFORK, AND TABLE ROCK DAMS TURBINE VENTING FOR DISSOLVED OXYGEN IMPROVEMENTS AT BULL SHOALS, NORFORK, AND TABLE ROCK DAMS Introduction E. Dean 1, M. ASCE Bethel Herrold 2 George Robbins 3, M. ASCE James C. Carter 4 The Southwestern

More information

Enclosure-A:Calculation of Emission Reduction Units"

Enclosure-A:Calculation of Emission Reduction Units Enclosure-A:Calculation of Emission Reduction Units" Year 2003-04 Generation Mix Sector mu % Thermal Coal based(state) 13808,13 49,99 Thermal Coal based(central) 4054,82 14,68 Thermal Coal based(partneship

More information

PANCHET HYDEL STATION TILAIYA HYDEL STATION

PANCHET HYDEL STATION TILAIYA HYDEL STATION Workshop on Renovation, Modernization, Uprating & Life Extension of Hydro Power Plants-Diverse Issues & Handling strategies December 16, 2016, SCOPE Complex, New Delhi PANCHET HYDEL STATION TILAIYA HYDEL

More information

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA S. Masood Husain Nitya Nand Rai Director Assistant Director Foundation Engineering & Special Analysis Directorate Central

More information

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON 09.08.2016 Ecological Impact of Mining *334. SHRI JANARDAN SINGH SIGRIWAL state:

More information

GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS

GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS MOST IMMEDIATE GOVERNMENT OF INDIA MINISTRY OF TRIBAL AFFAIRS Subject: Monthly update on status of implementation of the Scheduled Tribes and Other Traditional Forest Dweller (Recognition of Forest Rights)

More information