3GPP2 C TSG-C
|
|
- Muriel Marsh
- 6 years ago
- Views:
Transcription
1 3GPP2 C TSG-C TITLE: Output metrics for UMB Performance Evaluation SOURCE: Yifei Yuan, Sudarshan Rao, Pichun Chen, Donghze Cui, Stan Vitebsky, Qi Bi, S. Vasudevan ABSTRACT: This contribution proposes a list of output metrics for comparing and calibrating the simulation results. The intention is to assist in discussion of output metric list for phase system evaluation. RECOMMENDATION: Discuss and adopt. Alcatel-Lucent Inc. grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any modifications thereof in the creation of 3GPP2 publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even though it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contribution or the resulting Organizational Partner's standards publication. Alcatel-Lucent Inc. is also willing to grant licenses under such contributor copyrights to third parties on reasonable, non-discriminatory terms and conditions for purpose of practicing an Organizational Partner s standard which incorporates this contribution. This document has been prepared by Alcatel-Lucent Inc. to assist the development of specifications by 3GPP2. It is proposed to the Committee as a basis for discussion and is not to be construed as a binding proposal on Alcatel-Lucent Inc.. Alcatel-Lucent Inc. specifically reserves the right to amend or modify the material contained herein and nothing herein shall be construed as conferring or offering licenses or rights with respect to any intellectual property of Alcatel- Lucent Inc. other than provided in the copyright statement above.
2 . Overview C This document provides a table of metrics that would assist in comparing results, across companies, obtained during simulation exercises. Table provides a summary. This list is not exhaustive and serves only as an aid for discussion. Additional metrics may be added if necessary. Figures through 3 is intended only to provide a visual indication of what the results may look like. Some generic example plots have been provided only for illustration purposes. The graphs and plots enclosed are not indicative of any actual or final simulation results at this point. 2. Output Metrics Summary Table Output metrics are summarized in Table. Item FL full buffer RL full buffer FL VoIP RL VoIP Aggregate sector throughput Yes Yes Optional Optional Edge (95%) user throughput Yes Yes No No PER after 6 HARQ trans. Yes Yes No No Normalized per user avg. throughput Yes Yes No No Short-term averaged sector throughput Optional Optional No No Transmission rate vs. C/I Yes No No No HARQ statistics (distribution) Yes Yes Yes Yes FLCS power overhead Yes No Yes No IoT of RL OFDM traffic No Yes No Yes RL packet format selection distribution No Yes No No Distribution of # of tiles assigned per request No Yes No No RL OFDM traffic Tx power distribution No Yes No No Average SINR per HARQ transmission No No Yes Yes 98% VoIP packet latency No No Yes Yes Tile occupancy No No Yes Yes Tx PSD per tile No No Yes No RoT of RL CDMA control No No No Yes Table : Summary of simulation output matrix. 2
3 C Illustrative Figures of Output Metrics User fairness curve, or of normalized per user average throughput as shown in Figure as a general example, should be provided for full-buffer data simulations. User throughput is normalized by the average user throughput which is average sector throughput divided by the average number of users per sector Example DV fairness criteria Normalized per user avg. throughput Figure : A general example of of normalized per user average throughput (fairness curve). Even with full-buffer traffic, sector throughput varies in time, due to fading channels, FLCS loading, scheduling etc. Figure 2 shows an example of of short-term averaged (3 PhyFrames = 28 ms) sector throughput Example Short-term averaged sector throughput (Mbps) 3
4 C Figure 2: A general example of short-term averaged sector throughput. Figure 3 shows an example of FL data transmission rate (excluding idle time) vs. longterm C/I (combined over Rx antennas) assuming single user scheduled each time. The curve reflects link level performance and link adaptation in various fading channels. 5 2 Example Mbps Long-term C/I (db) Figure 3: A general example of FL data transmission rate vs. C/I Figure 4 shows an example of HARQ statistics which reflect the link adaptation, PF selection and scheduler performance. HARQ statistics of both full-buffer and VoIP simulations should be provided..5.4 Mix chan. ChA ChB.3 PDF # HARQ transmissions Figure 4: A general example of HARQ statistics 4
5 C FL control power overhead should be provided as shown as an example in Figure FLCS power overhead (Watts) Figure 5: A general example of FL control power overhead. Interference-over-thermal (IoT) for RL OFDMA traffic should be provided as shown in Figure 6 for example Example IoT (db) Figure 6: A general example of IoT of RL OFDMA traffic. RL packet format selection distribution should be provided as shown in Figure 7 for example. It is especially useful when the received traffic PSD is set not the same across users. 5
6 C % 3% 25% 2% 5% % 5% % PF PF PF2 PF3 PF4 PF5 PF6 PF7 PF8 PF9 Packet Format Figure 7: A general example of RL packet format selection distribution. The distribution of number of tiles assigned per request should be provided as shown in Figure 8 for example. 2% 8% 5% 2% 9% 6% 3% % Number of tiles assigned per request Figure 8: A general example of distribution of number of tiles assigned per request. The distribution of RL OFDM traffic should be provided as shown in Figure 9 for example. 6
7 C % 4% 3% 2% % % RDCH Tx power (normalized to max Tx power) Figure 9: A general example of distribution of RL OFDM traffic Tx power. VoIP 98% packet delay for both FL and RL should be provided. Figure shows an example for certain number of Erlangs per sector xxx Erlang % packet delay (ms) Figure : A general example of of 98% packet delay for VoIP. Traffic tile occupancy for both FL and RL VoIP traffic should be provided as in the example of Figure. 7
8 C xxx Erlang # Occupied tiles Figure : A general example of of tile occupancy for VoIP. of transmit PSD per tile on FL for VoIP should be provided as in the example of Figure xxx Erlangs FL Tx PSD (dbw) per tile Figure 2: A general example of of transmit PSD per tile on FL for VoIP. of RoT for RL CDMA control in VoIP should be provided as in the example of Figure 3. 8
9 C xxx Erlangs RoT (db) Figure 3: A general example of RoT of RLCDMA control for VoIP. 9
Explore the Way with MulteFire Huawei elte-u Solution
Explore the Way with MulteFire Huawei elte-u Solution elte-u, a MulteFire Pathfinder LTE: high QoS, but expensive license Massively deployed all over the world 200+ countries 700+ operators High QoS benefit
More informationSAP SuccessFactors Succession and Development
SAP SuccessFactors Succession and Development Technical and Functional Specifications CUSTOMER TABLE OF CONTENTS KEY FEATURES AND FUNCTIONALITIES... 3 SUCCESSION MANAGEMENT... 3 CAREER AND DEVELOPMENT
More informationCall Center Shrinkage Due to Training
OpsDog KPI Reports Call Center Shrinkage Due to Training Benchmarks, Definition & Measurement Details SAMPLE CONTENT & DATA 2017 Edition www.opsdog.com info@opsdog.com 844.650.2888 Definition & Measurement
More informationGlobal Economic Indicators: China Railways Traffic
Global Economic Indicators: China Railways Traffic May 7, 218 Dr. Edward Yardeni 516-972-7683 eyardeni@ Debbie Johnson 48-664-1333 djohnson@ Mali Quintana 48-664-1333 aquintana@ Please visit our sites
More informationUltra high-speed switching Voltage clamping Protection circuits Mobile communication, digital (still) cameras, PDAs and PCMCIA cards.
3 September 208 Product data sheet. General description 2. Features and benefits 3. Applications 4. Quick reference data Planar encapsulated in a SOD882 leadless ultra small plastic package. Low forward
More informationCall Center Shrinkage
OpsDog KPI Reports Benchmarks, Definition & Measurement Details SAMPLE CONTENT & DATA 2017 Edition www.opsdog.com info@opsdog.com 844.650.2888 Definition & Measurement Details What is? The amount of time
More informationX12 Corporate Administrative Policy and Procedure. Intellectual Property (CAP05)
X12 Corporate Administrative Policy and Procedure Intellectual Property (CAP05) Intellectual Property 1 Introduction The X12 Board of Directors (Board) is responsible for this policy and associated procedures.
More informationHR Expense per Employee
OpsDog KPI Reports Benchmarks, Definition & Measurement Details SAMPLE CONTENT & DATA 2017 Edition www.opsdog.com info@opsdog.com 844.650.2888 Definition & Measurement Details What is? The total expense
More informationOccupancy Rate SAMPLE CONTENT & DATA. OpsDog KPI Reports. Benchmarks, Definition & Measurement Details Edition
OpsDog KPI Reports Benchmarks, Definition & Measurement Details SAMPLE CONTENT & DATA 2017 Edition www.opsdog.com info@opsdog.com 844.650.2888 Definition & Measurement Details What is? The amount of time
More informationHuman Resources (HR) Staffing Ratio
OpsDog KPI Reports Human Resources (HR) Staffing Ratio Benchmarks, Definition & Measurement Details SAMPLE CONTENT & DATA 2017 Edition www.opsdog.com info@opsdog.com 844.650.2888 Definition & Measurement
More informationAPPROVED SUMMARY OF ALL IP ADHOC MEETING for the period of August 2000 in San Francisco, CA. Clifton J. Barber
Page 1 Title: APPROVED SUMMARY OF ALL IP ADHOC MEETING for the period of 23-24 August 2000 in San Francisco, CA Source: Clifton J. Barber Oki Network Technologies 70 Crestridge Drive Suite 150 Suwanee,
More informationIBM Sterling Supply Chain Visibility Vendor Compliance
IBM Terms of Use IBM Sterling Supply Chain Visibility Vendor Compliance The terms of this IBM Terms of Use are in addition to those of the IBM International Passport Advantage Agreement, the IBM International
More informationIEEE C802.16h-06/009
Project Title Date Submitted Source(s) Re: Abstract Purpose Notice Release Patent Policy and Procedures IEEE 806 Broadband Wireless Access Working Group Discussion on inter working
More informationAbandonment Rate SAMPLE CONTENT & DATA. OpsDog KPI Reports. Benchmarks, Definition & Measurement Details Edition
OpsDog KPI Reports Benchmarks, Definition & Measurement Details SAMPLE CONTENT & DATA 2017 Edition www.opsdog.com info@opsdog.com 844.650.2888 Definition & Measurement Details What is? The number of callers
More informationIEEE C802.16h-06/002
sproject Title Date Submitted Source(s) Re: Abstract Purpose Notice Release Patent Policy and Procedures IEEE 806 Broadband Wireless Access Working Group Discussion on inter working
More informationUS Economic Indicators: Employment Cost Index
US Economic Indicators: September, Dr. Edward Yardeni -- eyardeni@ Debbie Johnson -- djohnson@ Mali Quintana -- aquintana@ Please visit our sites at blog. thinking outside the box Table Of Contents Table
More informationUS Economic Indicators: Employment Cost Index
US Economic Indicators: Employment Cost Index November, Dr. Edward Yardeni -- eyardeni@ Debbie Johnson -- djohnson@ Mali Quintana -- aquintana@ Please visit our sites at blog. thinking outside the box
More informationService Level (Speed of Answer)
OpsDog KPI Reports Benchmarks, Definition & Measurement Details SAMPLE CONTENT & DATA 2017 Edition www.opsdog.com info@opsdog.com 844.650.2888 Definition & Measurement Details What is? The number of calls
More informationRetail Sales Benchmarks, KPI Definitions & Measurement Details
The OpsDog Retail Sales Benchmarking Report Retail Sales Benchmarks, KPI Definitions & Measurement Details ABRIDGED CONTENT Purchase to View Full Benchmarking Report! 2017 Edition www.opsdog.com info@opsdog.com
More informationWINNER+ plans as IMT-Advanced evaluation group
IEEE L802.16-10/0013 WINNER+ plans as IMT-Advanced evaluation group Dr Werner Mohr, Nokia-Siemens Networks Coordinator of WINNER+ project Dr Johan Nyström, Ericsson Coordinator of WINNER+ ITU-R evaluation
More informationVoluntary Turnover Rate
OpsDog KPI Reports Benchmarks, Definition & Measurement Details SAMPLE CONTENT & DATA 2017 Edition www.opsdog.com info@opsdog.com 844.650.2888 Definition & Measurement Details What is? The number of employees
More informationUS Economic Indicators: West Coast Ports Container Traffic
US Economic Indicators: West Coast Ports Container Traffic April 5, 2018 Dr. Edward Yardeni 516-972-7683 eyardeni@ Debbie Johnson 480-664-1333 djohnson@ Mali Quintana 480-664-1333 aquintana@ Please visit
More informationRealistic Per-category Pricing Schemes for LTE users
Realistic Per-category Pricing Schemes for LTE users Aymen Belghith and Selem Trabelsi University of Sfax Road of Aeroport Km 0.5, 3029 Sfax, Tunisia Email: aymen.belghith@gmail.com selem.trabelsi@gmail.com
More informationSAP SuccessFactors Compensation
SAP SuccessFactors Compensation Technical and Functional Specifications CUSTOMER TABLE OF CONTENTS KEY FEATURES AND FUNCTIONALITIES... 3 BASE SALARY, SHORT TERM INCENTIVE, LONG TERM INCENTIVE... 3 CALIBRATION
More informationAutomotive suppliers. IFRS 15 Revenue Are you good to go? December kpmg.com/ifrs
Automotive suppliers IFRS 15 Revenue Are you good to go? December 2017 kpmg.com/ifrs Are you good to go? IFRS 15 may change the way many automotive suppliers account for different stages of their projects,
More informationIBM Sterling Data Synchronization Manager
IBM Terms of Use IBM Sterling Data Synchronization Manager The terms of this IBM Terms of Use are in addition to those of the IBM International Passport Advantage Agreement, the IBM International Passport
More informationGlobal Economic Indicators: German Factory Orders & Industrial Production
Global Economic Indicators: German Factory Orders & Industrial Production July 6, 2018 Dr. Edward Yardeni 516-972-7683 eyardeni@ Debbie Johnson 4-664-1333 djohnson@ Please visit our sites at www. blog.
More informationUS Economic Indicators: ADP Private Sector Payrolls Report
US Economic Indicators: ADP Private Sector Payrolls Report June 2, 218 Dr. Edward Yardeni 516-972-7683 eyardeni@ Debbie Johnson 48-664-1333 djohnson@ Mali Quintana 48-664-1333 aquintana@ Please visit our
More informationUS Economic Indicators: Durable Goods Orders & Shipments
US Economic Indicators: Durable Goods Orders & Shipments November 25, 16 Dr. Edward Yardeni 516-972-7683 eyardeni@ Debbie Johnson 48-664-1333 djohnson@ Mali Quintana 48-664-1333 aquintana@ Please visit
More informationAnalytical Modeling of
Analytical Modeling of Heterogeneous Cellular Networks Geometry, Coverage, and Capacity SAYANDEV MUKHERJEE DOCOMO Innovations Inc., Palo Alto, CA Cambridge UNIVERSITY PRESS Preface Acknowledgements List
More informationSmart Meters Programme Schedule 5.2. (Software) (CSP South version)
Smart Meters Programme Schedule 5.2 (Software) (CSP South version) Schedule 5.2 (Software) (CSP South version) Amendment History Version Date Status v.1 Signature Date Execution copy SCHEDULE 5.2 SOFTWARE
More informationSupplier Conflict of Interest Policy
Supplier Conflict of Interest Policy (External Document) COPYRIGHT EXPO DUBAI 2020 ALL RIGHTS RESERVED UNCONTROLLED IF PRINTED All texts, photographs, publications, designs, graphics, images, and all other
More informationHagerstown (WASH) to Pratt Broadband RFP
Hagerstown (WASH) to Pratt Broadband RFP Introduction The Enoch Pratt Free Library, Sailor Project, (hereinafter referred to as "EPFL/Sailor") requests proposals for these equipment and/or services as
More informationThings we can learn from simulating DC networks
Things we can learn from simulating DC networks Ariel Hendel/Infrastructure Technologist/Facebook Mark Griswold/Distinguished Engineer/Broadcom Chih-Yuan Chang/Master Engineer/Broadcom Cloud Operator Context
More informationManufacturing & Production
The OpsDog Manufacturing & Production Benchmarking Report Manufacturing & Production Benchmarks, KPI Definitions & Measurement Details ABRIDGED CONTENT Purchase to View Full Benchmarking Report! 2017 Edition
More informationFeature Scope Description for SAP S/4HANA Cloud for Data Enrichment
PUBLIC 2018-12-12 Feature Scope Description for SAP S/4HANA Cloud for Data Enrichment 2018 SAP SE or an SAP affiliate company. All rights reserved. THE BEST RUN Content 1 Feature Scope Description....3
More informationNOTICE. (Formulated under the cognizance of the CTA R7 Home Networks Committee.)
CTA Standard Test Procedure for Powerline Carrier Technology CTA-2002-A (Formerly CEA-2002-A) February 2009 NOTICE Consumer Technology Association (CTA) Standards, Bulletins and other technical publications
More informationLegal ABRIDGED CONTENT. Purchase to View Full Benchmarking Report! The OpsDog Legal Benchmarking Report
The OpsDog Legal Benchmarking Report Legal Benchmarks, KPI Definitions & Measurement Details ABRIDGED CONTENT Purchase to View Full Benchmarking Report! 2017 Edition www.opsdog.com info@opsdog.com 844.650.2888
More informationNet Neutrality in the Telecom Single Market Regulation. Thomas Lohninger
Net Neutrality in the Telecom Single Market Regulation Thomas Lohninger thomas.lohninger@edri.org +436801238611 commercial practices application specific data volumes 3 types 1. zero-rating for a fee 2.
More informationUS Economic Indicators: Business Sales & Inventories
US Economic Indicators: Business Sales & Inventories January 1, 218 Dr. Edward Yardeni 516-972-7683 eyardeni@ Debbie Johnson 48-664-1333 djohnson@ Mali Quintana 48-664-1333 aquintana@ Please visit our
More informationInvoice Upload Guide THE BEST RUN. ADMINISTRATION GUIDE PUBLIC Release a (incubation release, not globally available)
ADMINISTRATION GUIDE PUBLIC Release 1.0-2018.10a (incubation release, not globally available) 2018-10-24 2018 SAP SE or an SAP affiliate company. All rights reserved. THE BEST RUN Content 1 Introduction....3
More informationS4F20. Business Processes in Management Accounting in SAP S/4HANA COURSE OUTLINE. Course Version: 05 Course Duration: 5 Day(s)
S4F20 Business Processes in Management in SAP S/4HANA. COURSE OUTLINE Course Version: 05 Course Duration: 5 Day(s) SAP Copyrights and Trademarks 2016 SAP SE or an SAP affiliate company. All rights reserved.
More informationS4615. SAP S/4HANA Sales - Invoice Processing COURSE OUTLINE. Course Version: 08 Course Duration: Minutes
S4615 SAP S/4HANA Sales - Invoice Processing. COURSE OUTLINE Course Version: 08 Course Duration: Minutes SAP Copyrights and Trademarks 2018 SAP SE or an SAP affiliate company. All rights reserved. No part
More informationR12.x Oracle HRMS Work Structures Fundamentals Student Guide
R12.x Oracle HRMS Work Structures Fundamentals Student Guide D60565GC10 Edition 1.0 October 2010 D69202 Copyright 2007, 2010 Oracle. All rights reserved. Disclaimer This document contains proprietary information
More informationTitle Transmission Line Base Safety and Operating Standards. Reference Number POS 01 - (RIC Standard: EP SP)
Discipline Engineering Standard - NSW Category Electrical Title Transmission Line Base Safety and Operating Standards Reference Number POS 01 - (RIC Standard: EP 10 01 00 03 SP) Document Control Status
More informationTable 1. Quick reference data Symbol Parameter Conditions Min Typ Max Unit V RRM
5 January 217 Product data sheet 1. General description Silicon Carbide Schottky diode in a TO22F-2L plastic package, designed for high frequency switched-mode power supplies. 2. Features and benefits
More informationTurnover Rate SAMPLE CONTENT & DATA. OpsDog KPI Reports. Benchmarks, Definition & Measurement Details Edition
OpsDog KPI Reports Benchmarks, Definition & Measurement Details SAMPLE CONTENT & DATA 2017 Edition www.opsdog.com info@opsdog.com 844.650.2888 Definition & Measurement Details What is? The number of employees
More informationHealthcare without Bounds: Trends in Clinical Communications & Collaboration 2018
Trends in Clinical Communications & Collaboration 2018 1 of 3 Healthcare without Bounds: Trends in Clinical Communications & Collaboration 2018 TITLE: Trends in Clinical Communications & Collaboration
More informationAgile PLM UPK. Agile Help Menu Integration Guide. v9.3
Agile PLM UPK Agile Help Menu Integration Guide v9.3 Part No. E16112-01 July 2009 Oracle Copyright Copyright 1995, 2009, Oracle and/or its affiliates. All rights reserved. This software and related documentation
More informationTable 1. Quick reference data Symbol Parameter Conditions Min Typ Max Unit V RRM
6 January 217 Product data sheet 1. General description Silicon Carbide Schottky diode in a TO22F-2L plastic package, designed for high frequency switched-mode power supplies. 2. Features and benefits
More informationPlease read the Notes below before using the BIM Particular Conditions.
BIM Particular Conditions Version 1.0 The BIM Particular Conditions Version 1.0 on the following pages may be attached to the Principal Agreement when incorporating the use of BIM into the project, as
More informationUtilities Benchmarks, KPI Definitions & Measurement Details
Utilities Benchmarks, KPI Definitions & Measurement Details T N E T CON rt! o D p e E R g n i G rk RID Benchma AB ull iew F V o t e s a Purch 2017 Edition www.opsdog.com info@opsdog.com 844.650.2888 Benchmarking
More informationSAP SuccessFactors Performance and Goals
SAP SuccessFactors Performance and Goals Technical and Functional Specifications CUSTOMER TABLE OF CONTENTS KEY FEATURES AND FUNCTIONALITIES... 3 GOAL MANAGEMENT... 3 PERFORMANCE MANAGEMENT... 4 360 REVIEWS...
More informationISO INTERNATIONAL STANDARD. Soil quality Extraction of thallium and determination by electrothermal atomic absorption spectrometry
INTERNATIONAL STANDARD ISO 20279 First edition 2005-07-01 Soil quality Extraction of thallium and determination by electrothermal atomic absorption spectrometry Qualité du sol Extraction du thallium et
More informationTaleo Enterprise Performance Review Ratings Orientation Guide Release 17
Oracle Taleo Enterprise Performance Review Ratings Orientation Guide Release 17 Taleo Enterprise Review Ratings Guide Part Number: E89355-01 Copyright 2017, Oracle and/or its affiliates. All rights reserved
More informationOracle Fusion Transactional Business Intelligence
Oracle Fusion Transactional Business Intelligence 11.1.1.8.0 Sales - CRM Pipeline Subject Area August 2014 Contents Sales - CRM Pipeline... 3 Description... 3 This subject area can be used to answer business
More informationTable of Contents. Project Agreement Schedule 14
Table of Contents PART 1 DEFINITIONS... 3 PART 2 INTEGRATED MANAGEMENT SYSTEM REQUIREMENTS... 6 2.1. Introduction... 6 2.2. Overview... 6 2.2.1 Management System Requirements... 7 2.2.2 Certification...
More informationFEATURE SCOPE DESCRIPTION PUBLIC Feature Scope Description SAP SE or an SAP affiliate company. All rights reserved.
FEATURE SCOPE DESCRIPTION PUBLIC 2018-09-21 2018 SAP SE or an SAP affiliate company. All rights reserved. THE BEST RUN Content 1 About this Document....3 2....4 2 P U B L I C Content 1 About this Document
More informationMindSphere Marketing Guide
Introduction 1 Marketing 2 Making reference to MindSphere 3 Table of contents 1 Introduction...3 2 Marketing...4 3 Making reference to MindSphere...5 2 Introduction 1 This Guide is solely for use by MindAccess
More informationDecomposed versus integrated control of a one-stage production system Sierksma, Gerardus; Wijngaard, Jacob
University of Groningen Decomposed versus integrated control of a one-stage production system Sierksma, Gerardus; Wijngaard, Jacob IMPORTANT NOTE: You are advised to consult the publisher's version (publisher's
More informationA. Purpose. B. Background
A. Purpose This Memorandum of Understanding (MOU) is between Save the Children Federation, Inc. (SCUS) and X [insert collaborating entity] (collectively Parties ). The purpose of this MOU is to lay out
More informationMISO Module E Capacity Transaction Confirmation Version 1.0 October 20, 2008
MISO Module E Capacity Transaction Confirmation Version 1.0 October 20, 2008 NOTE: PARTIES SHOULD SEEK APPROPRIATE LEGAL AND ACCOUNTING ADVICE PRIOR TO USING THIS DOCUMENT. THIS DOCUMENT IS PROVIDED FOR
More informationBW465. SAP BW/4HANA - User Management and Authorizations COURSE OUTLINE. Course Version: 14 Course Duration:
BW465 SAP BW/4HANA - User Management and Authorizations. COURSE OUTLINE Course Version: 14 Course Duration: SAP Copyrights and Trademarks 2018 SAP SE or an SAP affiliate company. All rights reserved. No
More informationInfor ERP SyteLine. Planning Algorithm Flow Diagram
Infor ERP SyteLine Planning Algorithm Flow Diagram Copyright 2010 Infor All rights reserved. The word and design marks set forth herein are trademarks and/or registered trademarks of Infor and/or its affiliates
More informationAN1148: Johanson 868 MHz IPDs for EFR32 Wireless SOCs
AN1148: Johanson 868 MHz IPDs for EFR32 Wireless SOCs EFR32 devices supporting sub-ghz frequency bands utilize an external matching network. This network serves several purposes, including impedance transformation
More informationS4F29 Profitability Analysis in SAP S/4HANA
S4F29 Profitability Analysis in SAP S/4HANA. COURSE OUTLINE Course Version: 11 Course Duration: SAP Copyrights and Trademarks 2018 SAP SE or an SAP affiliate company. All rights reserved. No part of this
More informationGTS200. Configuring SAP Global Trade Services COURSE OUTLINE. Course Version: 15 Course Duration: 3 Day(s)
GTS200 Configuring SAP Global Trade Services. COURSE OUTLINE Course Version: 15 Course Duration: 3 Day(s) SAP Copyrights and Trademarks 2016 SAP SE or an SAP affiliate company. All rights reserved. No
More informationSmarter, Faster, Simpler IoT and the Digitization of Ports Value Chains
Smarter, Faster, Simpler IoT and the Digitization of Ports Value Chains Port of the Future meeting October 12 th, 2016 Melbourne, Australia Thierry Morin Value Engineering Expert for Travel & Transportation,
More informationAN1149: Murata 868 MHz IPDs for EFR32 Wireless SOCs
AN1149: Murata 868 MHz IPDs for EFR32 Wireless SOCs EFR32 devices supporting sub-ghz frequency bands utilize an external matching network. This network serves several purposes, including impedance transformation
More information2018 ASSET MANAGEMENT SYSTEM ADDENDUM # 1 TO REQUEST FOR PROPOSALS
2018 ASSET MANAGEMENT SYSTEM ADDENDUM # 1 TO REQUEST FOR PROPOSALS 1. How many Users will be using the system to process work as well as manage inventory and assets? These users would be utilizing the
More informationEnergy-efficiency analyses of heterogeneous macro and micro base station sites
Energy-efficiency analyses of heterogeneous macro and micro base station sites Josip Lorincz and Toncica Matijevic University of Split, FESB R. Boskovica 32, 21000 Split, Croatia [e-mail: josip.lerinc@fesb.hr]
More informationTraffic Shaping (Part 2)
Lab 2b Traffic Shaping (Part 2) Purpose of this lab: This lab uses the leaky bucket implementation (from Lab 2a) for experiments with traffic shaping. The traffic for testing the leaky bucket will be the
More informationAC245 SAP Convergent Invoicing
AC245 SAP Convergent Invoicing. COURSE OUTLINE Course Version: 15 Course Duration: 4 Day(s) SAP Copyrights and Trademarks 2017 SAP SE or an SAP affiliate company. All rights reserved. No part of this publication
More informationEWM130. Production Integration with SAP EWM COURSE OUTLINE. Course Version: 16 Course Duration: 2 Day(s)
EWM130 Production Integration with SAP EWM. COURSE OUTLINE Course Version: 16 Course Duration: 2 Day(s) SAP Copyrights and Trademarks 2016 SAP SE or an SAP affiliate company. All rights reserved. No part
More informationSelecting the Right Reporting Tool
Selecting the Right Reporting Tool Crystal Reports and Web Intelligence Michelle Ng Solution Engineer, OEM June 17 th, 2009 Introduction WHO AM I Michelle Ng Solution Engineer, OEM Working with Crystal
More informationNAPman: Network-Assisted Power Management for WiFi Devices
NAPman: Network-Assisted Power Management for WiFi Devices Eric Rozner Presented by University of Texas at Austin Andy Pyles November 10th, 2010 1 Introduction 2 WiFi-enabled mobile devices increasingly
More informationTRADESHOW SERVICES AGREEMENT
Appendix 5 TRADESHOW SERVICES AGREEMENT This TRADESHOW SERVICES AGREEMENT ( Agreement ), dated August ----, 2014. is by and between the Paris office of Japan External Trade Organization at 27, Rue de Berri
More informationITM203 Build Your Dashboards in SAP Solution Manager with Focused Insights. Public
ITM203 Build Your Dashboards in SAP Solution Manager with Focused Insights Public Speakers Las Vegas, Sept 19-23 Marc Thier Bangalore, October 5-7 Marc Thier Barcelona, Nov 8-10 Xavier Dupeyrat 2016 SAP
More informationPLM560. SAP Product Lifecycle Costing COURSE OUTLINE. Course Version: 02 Course Duration: 2 Day(s)
PLM560 SAP Product Lifecycle Costing. COURSE OUTLINE Course Version: 02 Course Duration: 2 Day(s) SAP Copyrights and Trademarks 2017 SAP SE or an SAP affiliate company. All rights reserved. No part of
More informationKick-Starting Your Move to the Cloud Starter Implementation Service for SAP Cloud for Customer with SAP ERP Integration
SAP Cloud for Customer Kick-Starting Your Move to the Cloud Starter Implementation Service for SAP Cloud for Customer with SAP ERP Integration Table of Contents 3 Serving your customers better starts here
More informationOracle Transactional Business Intelligence Enterprise for Human Capital Management Cloud Service
Oracle Transactional Business Intelligence Enterprise for Human Capital Management Cloud Service 11.1.1.8.1 Human Resources Workforce Frozen Snapshots July 2014 Contents Human Resources - Workforce Frozen
More informationENERGY PORTFOLIO MAN AGEMENT. Hydro and pump storage modelling in ABB Ability PROMOD Benchmark report
ENERGY PORTFOLIO MAN AGEMENT Hydro and pump storage modelling in ABB Ability PROMOD Benchmark report TABLE OF CONTENTS Table of Contents 1 ABSTRACT... 1 2 INTRODUCTION... 1 2.1 Hydro Modelling... 1 2.2
More informationDocument B105. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project
TM Document B105 2007 Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.)
More information2018 FIFA World Cup FIFA REGULATIONS FOR PUBLIC VIEWING EVENTS
2018 FIFA World Cup FIFA REGULATIONS FOR PUBLIC VIEWING EVENTS 1. Introduction All Exhibitors of Public Viewing Events (as defined below) in relation to any matches of the 2018 FIFA World Cup (the Competition
More informationHow To Set Up and Use the SAP ME Production Tracking Feature
SAP Manufacturing Execution How-To Guide How To Set Up and Use the SAP ME Production Tracking Feature Applicable Release: ME 6.0 Version 1.0 February 13, 2012 Copyright 2012 SAP AG. All rights reserved.
More informationPAII10 SAP Predictive Analytics
PAII10 SAP Predictive Analytics. COURSE OUTLINE Course Version: Course Duration: 5 Day(s) SAP Copyrights and Trademarks 2017 SAP SE or an SAP affiliate company. All rights reserved. No part of this publication
More informationMetro Optical Networking: Where's the Action?
Metro Optical Networking: Where's the Action? Ron Kline Sr. Analyst, North American Optical Transport May 1, 2002 w w w. r h k. c o m No, We re Not Talking About... Good bankruptcy lawyers Network liquidators
More informationIntroduction. What is a CO? » All Plan submittals must be signed, dated, and stamped by the responsible licensed professional.
Building Services Tenant Improvement-Submittal Requirements Introduction The City of Meridian requires a Tenant Improvement (TI) application when a interior remodel or alteration is going to occur in an
More informationS4F40 Cash Management in SAP S/4HANA
S4F40 Cash Management in SAP S/4HANA. COURSE OUTLINE Course Version: 06 Course Duration: 2 Day(s) SAP Copyrights and Trademarks 2016 SAP SE or an SAP affiliate company. All rights reserved. No part of
More informationArchitectural Services Consultant Exhibit A Scope of Services
Architectural Services Consultant Exhibit A Scope of Services I. Purpose The services to be provided under this Agreement will include a wide range of Architectural / Engineering services, including but
More informationSAP SuccessFactors Foundation
SAP SuccessFactors Foundation Technical and Functional Specifications CUSTOMER TABLE OF CONTENTS KEY FEATURES AND FUNCTIONALITIES... 3 INTELLIGENT SERVICES... 4 Activities... 4 Administration... 4 INTEGRATION
More informationPLM210. Master Data Configuration in SAP Project System COURSE OUTLINE. Course Version: 16 Course Duration: 2 Day(s)
PLM210 Master Data Configuration in SAP Project System. COURSE OUTLINE Course Version: 16 Course Duration: 2 Day(s) SAP Copyrights and Trademarks 2018 SAP SE or an SAP affiliate company. All rights reserved.
More information3.7GHz, Low Loss, 100MHz Bandwidth, Single Crystal, Aluminum Nitride on Silicon Carbide Substrate (AlN-on-SiC) BAW Filter
3.7GHz, Low Loss, 100MHz Bandwidth, Single Crystal, Aluminum Nitride on Silicon Carbide Substrate (AlN-on-SiC) BAW Filter Presented by Rama Vetury Akoustis Technologies, Inc. Outline of this Presentation
More informationOracle. Talent Management Cloud Using Talent Review and Succession Management. Release 13 (update 17D)
Oracle Talent Management Cloud Using Talent Review and Succession Management Release 13 (update 17D) Release 13 (update 17D) Part Number E89394-01 Copyright 2011-2017, Oracle and/or its affiliates. All
More informationEXHIBIT A SCOPE OF SERVICES: ROADWAY DESIGN SUPPORT CONSULTANT
EXHIBIT A SCOPE OF SERVICES: ROADWAY DESIGN SUPPORT CONSULTANT I. PURPOSE The Department requires professional engineering and data analysis Consultant services to support the Roadway Design Office with
More informationPackage LGA6x FixPitch- / FreePitch-Sensors
Package LG6x FixPitch- / FreePitch-Sensors LG6x.HIE.03 Page 1 of 6 1. Packaging Package LG6x The sensors are delivered in vacuum sealed, ESD-compliant dry bag. The series delivery form is tape & reel with
More informationSecurity for the Internet of Things: Strategy and Road Map
Security for the Internet of Things: Strategy and oad Map Dr. Laurent Gomez, SAP Product Security esearch José Márquez, IoT Central Architecture PUBLIC Security for the Internet of Things Business case
More informationFS253. Bank Analyzer Infrastructure in Banking Services from SAP 8.0 COURSE OUTLINE. Course Version: 10 Course Duration: 3 Day(s)
FS253 Bank Analyzer Infrastructure in Banking Services from SAP 8.0. COURSE OUTLINE Course Version: 10 Course Duration: 3 Day(s) SAP Copyrights and Trademarks 2017 SAP SE or an SAP affiliate company. All
More informationS4500. Business Processes in SAP S/4HANA Sourcing & Procurement COURSE OUTLINE. Course Version: 09 Course Duration:
S4500 Business Processes in SAP S/4HANA Sourcing & Procurement. COURSE OUTLINE Course Version: 09 Course Duration: SAP Copyrights and Trademarks 2018 SAP SE or an SAP affiliate company. All rights reserved.
More informationExhibit A - Scope of Services Connected and Automated Vehicle (CAV) General Engineering Consultant Contract
I. Purpose Exhibit A - Scope of Services The Florida Department of Transportation s (Department) Connected and Automated Vehicles (CAV) Program is aiming towards aggressive safety improvements with a focus
More information