1 Date ISDS PreparedNpdated: 08/06/07 I. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE A. Basic Project Data I Country: Indonesia I Project ID: PI04022 Project Name: Makassar Landfill Methane Collection and Flaring Project Task Team Leader: James Orehmie Monday Estimated Appraisal Date: November Estimated Board Date: NIA 19th I Managing Unit: EASRE 1 Lending Instrument: Carbon Finance Sector: Environment Theme: Climate Change Mitigation, Municipal Solid Waste Management IBRD Amount (US$m.): IDA Amount (US$m.): GEF Amount (US$m.): PCF Amount (US$m.): Other financing amounts by source: BORROWER Financing Gap B. Project Objectives [from section 2 of PCN] Report No.: The project development objective is to reduce methane emissions from solid waste disposed in the City of Makassar's landfill, Tempat Pembuangan Sampah Akhir (TPA) Tamangapa, through a carbon finance transaction. The key indicator for this objective will be the annual delivery of ERs. Another objective is to generate an income stream from the ERs that can be used to finance improvements in overall solid waste management, including improved collection services. C. Project Description [from section 3 of PCN] This CDM project consists of two distinct project activities: Component A: the construction and operation of landfill gas collection and flaring equipment that will result in ERs; and Component B: a carbon finance transaction that will facilitate the purchase of the ERs. Component A: The project will support the development and implementation of a landfill gas collection and flaring facility at TPA Tamangapa landfill. The construction of the landfill gas etraction and 41066

2 flaring facility will include the following components: (i) a collection system consisting of horizontal and vertical wells and collection pipes that will be installed in the area containing waste and epanded over time as additional areas are filled; (ii) landfill gas pumping equipment including a pipeline and blowers; (iii) landfill gas treatment and flare system which will remove moisture and combust the gas; and (iv) a monitoring and control system. Since 1993 it is estimated that approimately 1 million tonnes of organic waste has been deposited in the landfill. Based upon the forecast population growth and improvements in collection services in the City of Makassar it is epected that an additional 2 million tonnes of organic waste will be collected and disposed in the landfill during the 10-year period 2007 to Component B The World Bank-managed NCDMF will finance the purchase of ER credits resulting from the flaring of the gas. The purchase will be a performance-based contract under which payments are triggered by successful verification of the reduction of methane emissions by an independent, accredited international entity (Designated Operational Entity under the rules of the Kyoto Protocol). The quantity of ERs to be contracted, the length of time over which the purchase will be made, and the price paid will be agreed between the World Bank and the project sponsor. D. Project location (if known) The project site will be located approimately 15km from the city centre of Makassar. This landfill was established in 1993 and is epected to continue to provide the only municipal solid waste disposal location for the city until at least The City of Makassar is located on the Indonesian island of Sulawesi and like many other cities in Indonesia, suffers from an inability to cope with waste generation and disposal. Municipal solid waste generation is estimated at around 880 tonnesfday (0.70 kglca ita/day or 3, tonne/m3)l of which only 344 tonnes/day2 or 39% (1,500 m P /day) is collected and disposed in the landfill. This low level of collection service has major detrimental effects on the environment and health of the city. E. Borrower's Institutional Capacity for Safeguard Policies [from PCN] The City of Makassar plans to engage an eternal investor to share in the investment and risk of the landfill gas flaring project, as well as the ERs. The eternal investor will take responsibility for the financial investment, as well as the technical management and implementation of the flaring project either with its own resources or through a subcontractor. The City of Makassar will continue to own and operate the landfill. The eact details of the contract including distribution of the ER revenues that result from the flaring project will be addressed after selection of the eternal investor. The task team will eamine the eisting technical capacity and ' JICA (1996) Weighbridge Data, Dinas Keindahan, Kota Makassar

3 gapslconstraints of the eternal investor and, based on the eamination, review and advise on capacity building and training plans for the operation of the landfill gas capture system. F. Environmental and Social Safeguards Specialists Hiroshi Ono - Senior Environmental Engineer (EASRE) Sulistiowati Nainggolan - Social Development Specialist (EASIS) 11. SAFEGUARD POLICIES THAT MIGHT APPLY Safeguard Policies Triggered Yes No TBD Environmental Assessment (OPIBP 4.01) X The project will have significant local positive environmental outcomes through the implementation of an improved management of the landfill, which is a pre-requisite for the generation of adequate levels of methane. Because increased revenue will be generated proportionally to the amount of methane captured and flared, this will serve as a strong economic incentive fortimproved management of the landfill. However, this policy should be triggered because the construction and operation of the landfill gas etraction and flaring facility would cause some environmental impacts such as air pollution and noise. In addition, environmental concerns originated from the landfill site rembin, such as management of the leachate and other drainage issues affecting land, ground and sqrface water contamination, and public health and safety issues. The project boundary for safeguards compliance involves the landfill gas etraction and flaring facility such as (i) a collection system consisting of horizontal and vertical wells and collection pipes; (ii) landfill gas pumping equipment including a pipeline and blowers; (iii) landfill gas treatment and flare system; and (iv) a monitoring and control system. Notwithstanding, the task team plans to develop an environmental due diligence assessment report addressing the environmental impacts not only of the landfill gas etraction and flaring facility but also the eisting landfill itself. The TOR for the environment due diligence assessment work have been prepared and discussed with the project sponsor and the consulting firm performing the assignment. The task team received the first draft report on August 3,2007, and found that there were significant gaps between the agreed TOR and the contents of the draft. With the guidance of the Safeguards Meeting, the team will address the deficiencies of the draft, for instance, description of environmental risks and mitigation measures for the eisting landfill, and EMP for the landfill gas etraction and flaring facility, before appraisal. Natural Habitats (OP/BP 4.04) There are no protected areas, known natural habitats, or established or proposed critical natural habitats as defined under the policy in the project area. Forests (OP/BP 4.36) The project will not impact the health and quality of forests. Pest Management (OP 4.09) X The project will neither procure pesticides nor will result in an increased use of pesticides.

4 Safeguard Policies Triggered Cultural Property (OPN 11.03) Yes No TBD There are no physical cultural resources in the project area. Indigenous Peoples (OP/BP 4.10) The community near the landfill consists of two groups, namely, the employees working for the landfill operation, and scavengers. The estimated population of the scavengers is about 300. The majority of the scavengers (95%) are Makassar ethnic, and the rest are other ethnic groups such as Bugis and Java. The ongoing social due diligence practice will confirm before appraisal whether IP's as defined by the policy were or are present in the project area. Involuntary Resettlement (OP/BP 4.12) I I I The city confirmed that epansion of the landfill site is not required for the development of this project. The current land size available to the city and currently being used is adequate for the life of this project. Therefore, the project boundary is the current landfill site. The city however, will continue to acquire any surrounding land as it becomes available and as its owners are identified and confirmed, so as to meet the long term waste management planning needs of the city. This would be confirmed as part of the Bank's due diligence process. Safety of Dams (OPLBP 4.37) The project will not finance construction of any dams nor does it depend on the performance of an eisting dam. Projects on International Waterways (OPLBP 7.50) Projects in Disputed Areas (OP/BP 7.60) Environmental Category: [ ] A [ ] B [XI C [ ] F'I [ ] TBD (to be determined) 111. SAFEGUARD PREPARATION PLAN A. Target date for the Quality Enhancement Review (QER), at which time the PAD-stage ISDS would be prepared: NIA B. For simple projects that will not require a QER, the target date for preparing the PAD-stage ISDS: mid-october 2007, C. Time frame for launching and completing the safeguard-related studies that may be needed. The specific studies and their timing3 should be specified in the PAD-stage ISDS. The environmental and social due diligence report is planned to be completed by mid- October, Reminder: The Bank's Disclosure Policy requires that safeguard-related documents be disclosed before appraisal (i) at the InfoShop and (ii) in-country, at publicly accessible locations and in a form and language that are accessible to potentially affected persons.

5 IV. APPROVALS Approved by: Regional Safeguards Coordinator: Comments: Sector Manager: Comments: Rahul Raturi

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: 38582 Date ISDS Prepared/Updated: 16 January 2007 I. BASIC INFORMATION A.

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.:51272 Project Name CBF Sidi

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. I Estimated Board Date: July 27, 2017

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. I Estimated Board Date: July 27, 2017 Report No.: 111018 INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: Dec-12-2016 I. BASIC INFORMATION A. Basic Project Data Country: Morocco I Project ID : P161893 I Additional

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name CBF Sidi Daoud Wind Farm

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Mar-2015 Report No.: ISDSC 12226 Date ISDS Approved/Disclosed: 06-Apr-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 11/14/2009 Report.: AC4826 1. Basic Project Data Country: Sudan Project ID: P111061 Project Name: Southern Sudan

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/14/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/06/2011 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA14823 Project Name

More information

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Sep-2015 Report No.: ISDSC14538 Date ISDS Approved/Disclosed: 15-Oct-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 14-Apr-2014

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Geothermal Clean Energy

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/ Updated

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Date ISDS Prepared/Updated: 21 March 2005 I. BASIC INFORMATION

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 03/17/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name EGAT

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 01/19/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

The World Bank s Carbon Finance Business Options for Thailand. September 29, 2004

The World Bank s Carbon Finance Business Options for Thailand. September 29, 2004 The World Bank s Carbon Finance Business Options for Thailand September 29, 2004 Climate Change and the World Bank The Bank s mission: poverty alleviation, sustainable development The Bank accepts IPCC

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) te to Task Teams: The following sections are system generated and can only be edited online in the Portal. Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated:

More information

Large Marine Ecosystem Management Activities (US$5.62)

Large Marine Ecosystem Management Activities (US$5.62) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No: I048795

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFCAL USE ONLY PROJECT APPRASAL DOCUMENT OF THE NDONESA:

More information

DEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of

DEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2795 Regional

More information

Report No.: ISDSA13100

Report No.: ISDSA13100 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized o Date ISDS Prepared/Updated: 10-Sep-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

Appendix 1: Scoping Techniques

Appendix 1: Scoping Techniques Appendix 1: Scoping Techniques 1 Scoping Techniques Checklist technique Checklist technique is used for identifying the project impacts. Such lists usually cover all possible impacts of the project. In

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 04-Apr-2014

More information

The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc

The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc Dubrovnik, 07 October 2009 Structure of Presentation 1. A Bit

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC103763

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC103763 PROJECT INFORMA DOCUMENT (PID) IDENTIFICA/CONCEPT STAGE Report No: PIDC103763 Project Name Region Country Financing Instrument Project ID Borrower Name Implementing Agency Environmental Category Date PID

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

World Bank Group Recruitment Drive (TOR for Future Vacancies)

World Bank Group Recruitment Drive (TOR for Future Vacancies) World Bank Group Recruitment Drive (TOR for Future Vacancies) The World Bank Group is launching a recruitment drive aimed at attracting qualified candidates to fill positions in selected areas. Employment

More information

1 October. Public Information

1 October. Public Information ANZ S LAND ACQUISITION POSITION STATEMENT 1 October 2016 Public Information CONTENTS ANZ s land acquisition position statement 3 ANZ s commitment to sustainable development 3 Our human rights standards

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 05-Jan-2017 Report : PIDISDSC18566 Public Disclosure Authorized Public Disclosure Authorized

More information

Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary

Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary APPRAISAL REPORT CAO Appraisal for Audit of MIGA CAO Compliance October 3, 2011 PT Weda Bay Nickel Indonesia Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT

More information

I Fifth Power System Development Project SOUTH ASIA Power (100%) P POWERGRID CORPORATION OF INDIA LIMITED

I Fifth Power System Development Project SOUTH ASIA Power (100%) P POWERGRID CORPORATION OF INDIA LIMITED I Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Date PID Prepared Date of Appraisal Authorization Date of Board Approval PROJECT INFORMATION DOCUMENT (PID)

More information

SESA Terms of Reference FOREST CARBON PARTNERSHIP FACILITY (FCPF) INDONESIA: STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) 1

SESA Terms of Reference FOREST CARBON PARTNERSHIP FACILITY (FCPF) INDONESIA: STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) 1 SESA Terms of Reference Updated Draft subject to final consultation FOREST CARBON PARTNERSHIP FACILITY (FCPF) INDONESIA: STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) 1 May 25, 2011 These TORs are

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22361 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE TRANS-EUROPEAN NORTH-SOUTH MOTORWAY (TEM) 65th Steering Committee and EIA Workshop ENVIRONMENTAL IMPACT ASSESSMENT Best practices and challenges in Bosnia

More information

CHINA: LUOJING COREX PROJECT CARBON FINANCE ASSESSMENT MEMORANDUM FOR A SPANISH CARBON FUND EMISSION REDUCTION PURCHASE AGREEMENT

CHINA: LUOJING COREX PROJECT CARBON FINANCE ASSESSMENT MEMORANDUM FOR A SPANISH CARBON FUND EMISSION REDUCTION PURCHASE AGREEMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY CHINA: LUOJING COREX PROJECT CARBON

More information

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA

More information

INTEGRATED SAFEGUARDS DATASHEET RESTRUCTURING STAGE

INTEGRATED SAFEGUARDS DATASHEET RESTRUCTURING STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 08/31/2012 INTEGRATED SAFEGUARDS DATASHEET

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name Indonesia Power Transmission Development Project Region EAST ASIA AND PACIFIC Sector Power (100%) Project ID P117323 Borrower(s)

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 50,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 50,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020344 Public Disclosure Authorized Project ID P106702 Country Brazil Project Name BR Integr. Solid

More information

REPUBLIC OF THE UNION OF MYANMAR. Myanmar National ElectrificationProject Environmental and Social Management Framework

REPUBLIC OF THE UNION OF MYANMAR. Myanmar National ElectrificationProject Environmental and Social Management Framework REPUBLIC OF THE UNION OF MYANMAR Myanmar National ElectrificationProject Environmental and Social Management Framework DRAFT April 2015 1 TABLE OF CONTENTS 1. Executive Summary 6 2. Background 7 3. Project

More information

Overview of the CDM in the agriculture sector

Overview of the CDM in the agriculture sector Overview of the CDM in the agriculture sector Grant A. Kirkman Team Leader CDM Methodologies Methane to Markets 30 October 1 November 2007 Beijing China United Nations Framework Convention on Climate Change

More information

3. The benefits of waste-to-resource initiatives

3. The benefits of waste-to-resource initiatives 3. The benefits of Waste-to-resource initiatives produce a wide range of advantages to communities, municipalities and the environment. Some benefits are largely local, such as financial savings to municipal

More information

4 foshop ThtWd ILj^ ik

4 foshop ThtWd ILj^ ik Public Disclosure Authorized THE WORLD BANK GROUP 4 foshop ThtWd ILj^ ik Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 15-Jul-2016 Report No: PIDISDSC18355 Public Disclosure Authorized Public Disclosure Authorized

More information

Guangdong Provincial Green Freight Demonstration Project by Grant of GEF

Guangdong Provincial Green Freight Demonstration Project by Grant of GEF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Grant Project of Global Environment Facility (GEF) Guangdong Provincial Green Freight

More information

Global Overview of Policies Affecting Coal Mine Methane (CMM) Recovery and Utilization

Global Overview of Policies Affecting Coal Mine Methane (CMM) Recovery and Utilization Global Overview of Policies Affecting Coal Mine Methane (CMM) Recovery and Utilization Pamela M. Franklin U.S. Environmental Protection Agency August 30 31, 2010 Methane to Markets Partnership - Mongolia

More information

Peru, Guarantee Facility Project

Peru, Guarantee Facility Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Peru, Guarantee Facility Project Environmental and Social Management Framework (ESMF)

More information

Overview of Wastes Management in Mauritius

Overview of Wastes Management in Mauritius Overview of Wastes Management in Mauritius B.BEERACHEE DEPUTY DIRECTOR Solid Waste Management Division Ministry of Local Government and Outer Islands, Mauritius Seoul, KOREA, 05 September 2012 Contents

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. West Africa Agricultural Productivity Program APL (WAAPP-1B) Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. West Africa Agricultural Productivity Program APL (WAAPP-1B) Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE West Africa Agricultural

More information

Updated Project Information Document (PID) Climate change (P); Other urban development (S) Project

Updated Project Information Document (PID) Climate change (P); Other urban development (S) Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document () Project Name BRAZIL - Nova Gerar Landfill Rio

More information

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY Environmental and Social Management System for ADB Line of Credit CONTENTS I. INTRODUCTION 1 II. ENVIRONMENTAL AND SOCIAL MANAGEMENT POLICY AND APPLICABLE REQUIREMENTS

More information

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) CONCEPT STAGE. Parent Project ID (if any):

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) CONCEPT STAGE. Parent Project ID (if any): Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy COMBINED PROJECT INFORMATION DOCUMENTS

More information

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit Clean Energy Finance Investment Program (RRP IND 46268) INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY Environmental and Social Management System for ADB Line of Credit CONTENTS I. INTRODUCTION 1 II. ENVIRONMENTAL

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN IN THE AMOUNT OF US$ 100.

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN IN THE AMOUNT OF US$ 100. Document of The World Bank Report No: {ReportNo} INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN IN THE AMOUNT OF US$ 100.0 MILLION AND A PROPOSED GRANT

More information

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring Date ISDS Prepared/Updated:

More information

CASE STUDY THE PLANTAR PROJECT SUSTAINABLE FUELWOOD & CHARCOAL PRODUCTION FOR THE PIG IRON INDUSTRY SUSTAINABLE DEVELOPMENT ANALYSIS

CASE STUDY THE PLANTAR PROJECT SUSTAINABLE FUELWOOD & CHARCOAL PRODUCTION FOR THE PIG IRON INDUSTRY SUSTAINABLE DEVELOPMENT ANALYSIS CASE STUDY THE PLANTAR PROJECT SUSTAINABLE FUELWOOD & CHARCOAL PRODUCTION FOR THE PIG IRON INDUSTRY SUSTAINABLE DEVELOPMENT ANALYSIS Brody S. Sapnu klima-climate Change Center OUTLINE A. Background of

More information

7 Frame of Environmental Impact Assessment. 7.1 Outline of Project

7 Frame of Environmental Impact Assessment. 7.1 Outline of Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 7 Frame of Environmental Impact Assessment 7.1 Outline of Project The subprojects of

More information

BOSNIA AND HERZEGOVINA

BOSNIA AND HERZEGOVINA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Adriatic Sea Environmental Pollution Control Project (I) Croatia and Bosnia and Herzegovina

More information

International Bank for Reconstruction and Development International Development Association MANAGEMENT REPORT AND RECOMMENDATION IN RESPONSE TO THE

International Bank for Reconstruction and Development International Development Association MANAGEMENT REPORT AND RECOMMENDATION IN RESPONSE TO THE Report No. INSP/R2007-0006/2 International Bank for Reconstruction and Development International Development Association INSP/47713 GH MANAGEMENT REPORT AND RECOMMENDATION IN RESPONSE TO THE INSPECTION

More information

Monali Ranade. Financial & Technical solutions for Sustainable cities June 9, 2010

Monali Ranade. Financial & Technical solutions for Sustainable cities June 9, 2010 Monali Ranade Financial & Technical solutions for Sustainable cities June 9, 2010 Role of cities is evolving and responsibilities increasing Municipal government agenda expands as city grows Municipal

More information

The WWF Paper Scorecard Manual

The WWF Paper Scorecard Manual The WWF Paper Scorecard Manual The WWF Paper Scorecard is designed as a userfriendly tool for paper purchasers to evaluate their footprint on the environment and to channel paper consumption towards alternatives

More information

EXECUTIVE SUMMARY - Internal Control Review of Facilities Engineering and Project Management

EXECUTIVE SUMMARY - Internal Control Review of Facilities Engineering and Project Management EXECUTIVE SUMMARY - Internal Control Review of Facilities Engineering and Project We performed a limited scope audit of Engineering and Project (EPM) current and proposed processes of institutional managed

More information

Operational Policy (OP) 4.36 applies to all World

Operational Policy (OP) 4.36 applies to all World CHAPTER 9 Applying Forests Policy OP 4.36 Operational Policy (OP) 4.36 applies to all World Bank investment operations that potentially have an impact on forests, regardless of whether they are specific

More information

Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS)

Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS) Note to Task Teams: The following sections are system generated and can only be edited online in the Portal. Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS) Appraisal

More information

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL Fordham University School of Law February 22nd, 2010 A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL Agostino Re Rebaudengo President arr@asja.biz INDEX KYOTO PROTOCOL AND EMISSION

More information

UNISON Scotland response Scottish Government Consultation on the Creation of a Scottish National Investment Bank November 2017

UNISON Scotland response Scottish Government Consultation on the Creation of a Scottish National Investment Bank November 2017 UNISON Scotland response Scottish Government Consultation on the Creation of a Scottish National Investment Bank November 2017 Introduction UNISON is Scotland s largest trade union with members across

More information

Clean Development Mechanism

Clean Development Mechanism Climate Change Policy 4118 ENV Clean Development Mechanism Assignment 1 Karolina Szenczi 9/2/2013 s2798348 Table of Contents Table of Figures... 1 List of Abbreviations... 2 Introduction... 3 The CDM in

More information

GRI Airport Sector Supplement

GRI Airport Sector Supplement GRI Airport Sector Supplement September 24, 2010 2010 IATA Eagle Award winner A Note on Sustainability Global Reporting Guidelines are Guidelines for Reporting on Sustainability Overview of GRI organization

More information

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Energy and Mines Electricite Du Laos LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE

More information

FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN

FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: PAD1144 Public Disclosure Authorized INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL DOCUMENT

More information

Public Private Partnership PPP & The Egyptian Experience

Public Private Partnership PPP & The Egyptian Experience Public Private Partnership PPP & The Egyptian Experience Bassel Shoirah Project Manager / Utilities Sector - Egypt Good Governance for Development In Arab Countries initiatives of the OECD July 8, 2009

More information

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,

More information

Environmental and Social Management Framework (ESMF)

Environmental and Social Management Framework (ESMF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic Of Yemen Presidency of the Council of Ministers Social Fund for Development

More information

BPM with a KM Twist Using the APQC Model to Guide Process & Knowledge Management

BPM with a KM Twist Using the APQC Model to Guide Process & Knowledge Management BPM with a KM Twist Using the APQC Model to Guide Process & Knowledge Management Sondra Holt, Manager Business Processes Matt Foste, Sr. Business Process Analyst APQC 2010 Member Meeting November 4-5,

More information

Waste Management in Developing Countries: Present Conditions and Foreseen Paths - a Brazilian Overview

Waste Management in Developing Countries: Present Conditions and Foreseen Paths - a Brazilian Overview Waste Management in Developing Countries: Present Conditions and Foreseen Paths - a Brazilian Overview Alberto Bianchini & Carlos Silva Filho ABRELPE - Brazilian Association of Urban Cleansing and Waste

More information

As if you were not confused enough already?

As if you were not confused enough already? How to implement Ingebjørg Gravlien As if you were not confused enough already? Media Analysts Investors Regulators Shareholders Employees Customers Business Partners Community Non-Governmental Organisations

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS A. General description of project activity B. Application

More information

Hub and Spoke Recycling

Hub and Spoke Recycling Hub and Spoke Recycling Dispersed Collections Dispersed Collections Centralized Processing & Marketing Dispersed Collections Dispersed Collections Jessi Just New Mexico Recycling Coalition Rural New Mexico

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP)

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Executive Summary Sri Lanka Strategic Cities Development Project (SCDP) Executive Summary

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower(s) Implementing Agency

More information

Liberia Development Forestry Sector Management Project

Liberia Development Forestry Sector Management Project Questions & Answers Q1: What has been the World Bank s role in the Liberia forestry sector and what has been the impact of the Liberia Development Forestry Sector Management Project? Since 2004, the Bank

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING INDIA - CAPACITY BUILDING FOR INDUSTRIAL POLLUTION MANAGEMENT APPROVED ON JUNE 3, 2010

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING INDIA - CAPACITY BUILDING FOR INDUSTRIAL POLLUTION MANAGEMENT APPROVED ON JUNE 3, 2010 Public Disclosure Authorized The World Bank REPORT NO.: RES29424 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDIA - CAPACITY BUILDING

More information

cpf think big The Carbon Partnership Facility a s F l a r i n g

cpf think big The Carbon Partnership Facility a s F l a r i n g The Carbon Partnership Facility a s F l a r i n g cpf think big Larger scale, longer term, and bigger impact e m i s s i o n re d u c t i o n s e n e rg y e f f i c i e n c y l o n g - t e r m i m p a