ATTACHMENT BWSC-105 EVERETT STREET AT MASSACHUSETTS AVENUE CAMBRIDGE, MASSACHUSETTS RTN D. DESCRIPTION OF RESPONSE ACTIONS

Size: px
Start display at page:

Download "ATTACHMENT BWSC-105 EVERETT STREET AT MASSACHUSETTS AVENUE CAMBRIDGE, MASSACHUSETTS RTN D. DESCRIPTION OF RESPONSE ACTIONS"

Transcription

1 ATTACHMENT BWSC-105 EVERETT STREET AT MASSACHUSETTS AVENUE CAMBRIDGE, MASSACHUSETTS RTN D. DESCRIPTION OF RESPONSE ACTIONS 14. Removal of Drums, Tanks or Containers: a. Describe Quantity and Amount: Gallon Drums and 1 85-Gallon Drum of drill cuttings, drill wash water, and purge water (investigation derived wastes), one (1) approximately 20-Ton Roll-Off of excavated soil generated from the installation of the Retail Strip dewatering treatment system infiltration trench, one (1) approximately 3-Ton Roll-Off of excavated soil generated from the installation of soil vapor monitoring wells in Everett Street, Massachusetts Avenue and Chauncy Street, one (1) approximately 16.6-Ton Roll-off and one (1) approximately 18.2-Ton Roll-off of vacuum extracted soil generated from the utility clearance for bioremediation injection wells above the water table in Massachusetts Avenue, one (1) 1-cy box of hazardous soil generated from the installation of bioremediation injection wells in Massachusetts Avenue, and three (3) approximately 1-cy boxes of excavated soil generated from the modifications to the Zero Chauncy Street SVS. b. Receiving Facility Drums: Roll-Offs: Boxes: Ross Incineration Services, Grafton, OH Pollution Control Industries, East Chicago, IN Clean Harbors of Connecticut, Inc., Bristol, CT Clean Harbors Environmental Services, Cleveland, OH Clean Harbors Environmental Services, Kimball, NE Aggregate Recycling Corporation, Eliot, ME Taunton Landfill, Taunton, MA Clean Harbors Environmental Services, Kimball, NE Note: IRA activities, which have included SVS installation, operation, and monitoring at several buildings and sealing and patching of the basement slab at 3 to 5 Everett Street have not generated Remediation Waste. The IRA Status Reports previously submitted to MassDEP summarized management of Remediation Waste, Remedial Wastewater and/or Remedial Additives that were generated as part of site investigation, Phase IV and RAM activities. The management of these wastes was summarized in the IRA Status Reports for completeness but was

2 also documented in the associated Phase II, Phase IV and RAM Status and/or Completion Reports. The following is a summary of Phase IV, RAM, and investigatory remediation waste management previously summarized in IRA Status Reports: Observation well installation generated soil cuttings. Soil cuttings from above the water table were placed in cubic yard-sized packs and temporarily stored on-site until they were shipped off-site for disposal in two roll-off containers. Soil cuttings from below the water table were placed in one cubic yard-sized pack, and temporarily stored on-site until it was shipped off-site for disposal as hazardous waste. Observation well installation and sampling generated purge water. Purge water was treated and discharged using the treatment and infiltration system located at the Retail Strip. Excess Phase IV injection solution was either treated and discharged using the treatment and infiltration system located at the Retail Strip or drummed for disposal (two drums of excess injection solution were transported to Clean Harbors in Kimball, Nebraska on 20 October 2010). Excess water from the bioremediation performed in Massachusetts Avenue was discharged into horizontal wells below the Massachusetts Avenue sidewalk with no treatment because it did not contain concentrations of contaminants above RCGW-2 standards. Soil and asphalt excavated from the Retail Strip parking lot were temporarily stored in three roll-off containers and shipped off-site for disposal as hazardous waste. Drums of used carbon and bag filters from the GCTS were removed on 20 October and 14 December The drums were transported to Clean Harbors in Kimball, Nebraksa and Ross Incineration Services in Grafton, Ohio, respectively. Copies of the Uniform Hazardous Waste Manifests and Non-Hazardous Waste Manifests for waste removal were previously submitted to MassDEP as attachments to previous IRA, Phase IV, and RAM Status or Completion Reports. Following submission of this IRA Completion Report, Remediation Waste will be managed as a Phase IV activity.remediation waste generated from future assessment activities will be containerized for future offsite disposition or in the case of purge water, treated and discharged using the treatment and infiltration system located at the Retail Strip. Additionally, future granular activated carbon from the treatment of water and vapors will be transported off-site for disposal or regeneration, as necessary. 16. Other Response Actions: Installation of subslab ventilation/depressurization systems and air exchange units.

3 F. PERSON UNDERTAKING IRA 2. Complete Name of Organization: President and Fellows of Harvard College Acting by and through Harvard Law School and University Operations Services H. REQUIRED ATTACHMENT AND SUBMITTALS: 2. The Response Actions on which this opinion is based were subject to approval by the Massachusetts Department of Environmental Protection and the terms of a Tier IC Permit. Approval has been granted by MassDEP for the installation and operation of six (6) subslab ventilation/depressurization systems (SVS), which are located at Story Hall, Dane Hall, and Wyeth Hall (now demolished) on the Harvard campus, at the Retail Strip building at Massachusetts Avenue, at Zero Chauncy Street, and at 1600 Massachusetts Avenue. MassDEP has also granted approval for various configurations of indoor air exchange units at various times and places. Remedial monitoring reports for the systems at Story Hall, Dane Hall, and the Retail Strip are prepared every six months concurrent with IRA Status Reports, pursuant to the MCP (310 CMR ). The system at Wyeth Hall was shut down in May 2007, and is therefore no longer a subject of ongoing remedial monitoring reports. The systems at Zero Chauncy Street and 1600 Massachusetts Avenue have been reported on monthly. a. Harvard Campus: Oral approval was granted on 30 November 2006 to conduct an Imminent Hazard Evaluation; 1 and 2 December 2006 for assessment only IRA activities; 15 December 2006 for the installation of two subslab ventilation/depressurization systems at buildings located on the Harvard campus; 28 August 2007 for installation of a subslab ventilation/depressurization system (SVS) and extraction points for two possible systems at buildings located on the Harvard campus; for the shutdown of SVS at Story Hall on 8 May 2009; and for the shutdown of SVS at Dane Hall on 30 June b. Retail Strip: Oral approval was granted on 19 November 2007 for the installation of the subslab ventilation/depressurization system (SVS) in the basement of the Retail Strip where Crimson Cleaners formerly operated a dry cleaning business. MassDEP approval for startup was granted on 8 January After the system began operation, it was determined that expanding to include a dewatering component would increase the system s effectiveness. Approval was granted on 12 February 2008 for the installation and operation of a treatment and re-infiltration system to manage groundwater associated with the IRA activities at the former Crimson Cleaners. Two indoor air exchange units were also installed on 21 May 2008 in the portion of the Retail Strip occupied by the former clothing store. The units were shut down on 2 September 2008 when the former tenant vacated the clothing store space. On 23 September 2008, the indoor air exchange units were repositioned and turned back on so that two units were operating in the basement below the former clothing store, and three units were operating in the basement of the former dry cleaner. These units were temporarily shut down from 15 May to 21 May 2009 during

4 mechanical systems repair activities. Additionally, on 16 June 2009, one indoor air exchange unit was removed from the basement below the former clothing store and one indoor air exchange unit was removed from the basement of the former dry cleaner for use at other areas of the Site. Currently, one indoor air exchange unit in the basement below the former clothing store and two indoor air exchange units in the basement of the former dry cleaner continue to be in use. Following soil vapor sampling from horizontal soil vapor wells installed on 31 December 2008 through the eastern and western foundation walls of the Retail Strip, three of the wells (H1, H2, and H3) were connected to the Retail Strip SVS on 7 April 2009, and two of the wells (H4 and H5) were connected to the Retail Strip SVS on 13 April Geosyntec monitored total VOC concentrations at these extraction wells between 11 March and 12 May 2009 with a MiniRAE photoionization detector (PID). Haley & Aldrich continues to monitor influent, mid-carbon, and effluent discharges from the SVS with a GC-FID on a quarterly basis. The Retail Strip SVS was temporarily shut down for rebound testing on 20 July 2009 following oral approval from Kathy Cahill of MassDEP on 16 July Indoor air sampling was performed on 3 August 2009, two weeks following the shutdown, to evaluate impacts to indoor air. Indoor air results showed that no Imminent Hazard was present, but based on the rebound concentrations the system was restarted on 12 August RAM activities associated with the 10 February 2010 RAM Plan Retail Strip Sewer Lateral Remediation were initiated in February Concurrent with these activities, certain extraction wells were temporarily turned off and on, as noted on the OM&M logs. On 2 March 2010, the dewatering component of the SVS and all vertical extraction wells were shutdown, per oral approval by MassDEP on 2 March Select horizontal extraction wells currently remain open. c. Zero Chauncy Street: Per discussions with MassDEP on 4 March 2008, Haley and Aldrich installed indoor air exchange units at two garden level apartments at Zero Chauncy Street. An SVS was installed at Zero Chauncy Street following verbal MassDEP approval of the 26 June 2008 Addendum/IRA Plan Summary of Work and Request for Approval of SVS Design and Further Work at Zero Chauncy Street. The SVS began operation on 17 July The air exchange units in Apartments B-2 and B- 3 at Zero Chauncy Street were shut down on 7 August In order to enhance the SVS performance, the 2-hp blower in the existing SVS was replaced with a 3-hp blower on 24 September Two indoor air exchange units were reinstalled in Apartment B-3 on 16 June IRA Plan Addendum #2 - Zero Chauncy Street was submitted to MassDEP on 22 June MassDEP granted conditional approval of the plan in its letter dated 2 July In response, a letter was submitted to MassDEP on 15 July 2009 to request an extension to applicable deadlines. The request was approved by MassDEP in a letter dated 23 July The IRA activities outlined in the Addendum were performed during July and August 2009 after the approval, and included the expansion of the SVS with perforated vacuum piping connected to two new extraction lines and sealing cracks in the floors and walls with concrete

5 sealant. The two indoor air exchange units were shut down on 30 July 2009 after connection of the SVS modifications (a few days prior to the end of construction) to allow for sampling on 5 August In addition, RAM activities relating to the 7 July 2009 RAM Plan for a bioremediation pilot test have been completed at Zero Chauncy Street. A RAM Completion Report, dated 4 November 2009, was submitted to MassDEP on 6 November d Massachusetts Avenue: Haley & Aldrich installed an indoor air exchange unit for the ground floor apartment (Unit 101) at 1600 Massachusetts Avenue on 21 March An SVS was installed at 1600 Massachusetts Avenue following verbal MassDEP approval of the 30 April 2008 Addendum/IRA Plan Summary of Work and Request for Approval of SVS Design and Further Work at 1600 Massachusetts Avenue. The SVS began operation on 21 May The air exchange unit in Unit 101 at 1600 Massachusetts Avenue was shut down on 4 June LSP Opinion: Deborah H. Gevalt is the LSP for the project. The LSP seal and signature are provided on the attached Transmittal Form BWSC-105. The attached Remedial Monitoring Report (RMR) contains material facts, data, and other information that support the LSP Opinion that, to the best of the LSP s knowledge, information and belief, the response actions that are the subject of this submittal (i) are being implemented in accordance with the applicable provisions of M.G.L.c.21E and 310 CMR , (ii) are appropriate and reasonable to accomplish the purposes of such response action as set forth in the applicable provisions of M.G.L.c.21E and 310 CMR , and (iii) comply with the identified provisions of all orders, permits, and approvals identified in this submittal. G:\30118\211 DLA Piper\MCP\RMRs\ RMRs\ BWSC105 Attachment-D2.docx

MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION

MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION 273 West Main Street, Norton, MA 02766 Tel: (508) 226-1800 Fax: (508) 226-1811 MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION CITGO BULK STORAGE TERMINAL 385 QUINCY AVENUE BRAINTREE, MASSACHUSETTS

More information

Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup

Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup A. THIS FORM IS BEING USED TO: (check one) 1. Log Date: 10/24/2017 Log Time: 11:18 AM PM 2. Assign a (RTN) to a Release or TOR Report. a. Reportable Release or TOR. b. Release that is Less Than the Reporting

More information

Immediate Response Action (IRA) Status Report

Immediate Response Action (IRA) Status Report Immediate Response Action (IRA) Status Report Site: The Wakefield Corporation, Wakefield, MA RTN 3-31274 Prepared For: The Wakefield Corporation, Wakefield, MA 01880 Prepared by: 51 Portsmouth Avenue,

More information

40 Shattuck Road Suite 110 Andover, Massachusetts

40 Shattuck Road Suite 110 Andover, Massachusetts COMMITMENT & INTEGRITY DRIVE RESULTS 40 Shattuck Road Suite 110 Andover, Massachusetts 01810 www.woodardcurran.com T 866.702.6371 T 978.557.8150 F 978.557.7948 August 13, 2014 John Cole Boston Environmental

More information

PERMANENT SOLUTION STATEMENT. Hydraulic Oil Release 68 Hopkinton Road Westborough, Massachusetts

PERMANENT SOLUTION STATEMENT. Hydraulic Oil Release 68 Hopkinton Road Westborough, Massachusetts PERMANENT SOLUTION STATEMENT Hydraulic Oil Release 68 Hopkinton Road Westborough, Massachusetts Release Tracking Number: 2-19324 CHES Job No.: 1402479917 TABLE OF CONTENTS INTRODUCTION... 1 SITE SETTING...

More information

Vapor Intrusion in Massachusetts Gerard Martin

Vapor Intrusion in Massachusetts Gerard Martin Vapor Intrusion in Massachusetts Gerard Martin Chief Compliance, Enforcement and Brownfields Redevelopment Section Bureau of Waste Site Cleanup, MassDEP Proposed MCP Amendments Relative to Vapor Intrusion

More information

STANTEC CONSULTING SERVICES INC.

STANTEC CONSULTING SERVICES INC. Transmittal Stantec Consulting Services Inc. 61 Commercial Street, Suite 100 Rochester NY 14614-1009 Tel: (585) 475-1440 Fax: (585) 272-1814 To: Ms. Sarah Saucier From: Robert Mahoney Company: NYSDEC X

More information

Appendix C Site Specific Soil Management Plan prepared by Millennium Environmental

Appendix C Site Specific Soil Management Plan prepared by Millennium Environmental Appendix C Site Specific Soil Management Plan prepared by Millennium Environmental PLYMOUTH, MA WAKEFIELD, MA WORCESTER, MA RINDGE, NH Site Specific Soil Management Plan Lynn, Massachusetts Submitted By:

More information

Proposed MCP Amendments

Proposed MCP Amendments Gerard Martin, Chief Compliance, Enforcement and Brownfields Redevelopment Section MassDEP, Bureau of Waste Site Cleanup Southeast Regional Office September 27, 2013 Proposed MCP Amendments Process Improvements:

More information

Remediation Approach. W-3839 July 6, 2009

Remediation Approach. W-3839 July 6, 2009 W-3839 July 6, 2009 Scott Alfonse City of New Bedford Department of Environmental Stewardship 133 William Street, Room 304 New Bedford, MA 02740 Re: Opinion of Probable Remediation Costs Former Polymerine

More information

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA)

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA) DRAFT Analysis of Brownfields Cleanup Alternatives (ABCA) Preliminary Evaluation Ball Square Station Site Boston Avenue and Broadway Somerville and Medford, Massachusetts Massachusetts DEP Release Tracking

More information

Rhode Island Department of Environmental Mgmt. Office of Waste Management. NEWMOA TCE Vapor Intrusion Workshop Providence, Rhode Island April 13, 2015

Rhode Island Department of Environmental Mgmt. Office of Waste Management. NEWMOA TCE Vapor Intrusion Workshop Providence, Rhode Island April 13, 2015 Rhode Island Department of Environmental Mgmt. Office of Waste Management NEWMOA TCE Vapor Intrusion Workshop Providence, Rhode Island April 13, 2015 Current Groundwater Standards GA MCLs GB Developed

More information

The State of Greener Cleanups in Massachusetts

The State of Greener Cleanups in Massachusetts The State Greener Cleanups in Massachusetts Air & Waste Management Association New England Section FALL 2016 CONFERENCE Thursday, October 27, 2016 Sheraton Framingham Hotel & Conference Center, Framingham

More information

Release Abatement Measure Plan Former General Electric Facility 50 Fordham Road, Wilmington, MA RTN

Release Abatement Measure Plan Former General Electric Facility 50 Fordham Road, Wilmington, MA RTN Release Abatement Measure Plan Former General Electric Facility 50 Fordham Road, Wilmington, MA RTN 3-0518 Prepared for: Lockheed Martin Corporation/Wilmington Realty Trust Prepared by: AECOM July 3, 2017

More information

D2 Project Environmental Remediation Briefing August 21, 2018

D2 Project Environmental Remediation Briefing August 21, 2018 D2 Project Environmental Remediation Briefing August 21, 2018 The Union Square Revitalization Project (USQ) is a 2.4 million square foot transit-oriented, mixed use project that is transforming Union Square,

More information

REMOVAL AND DISPOSAL OF STORAGE TANKS

REMOVAL AND DISPOSAL OF STORAGE TANKS 026500 REMOVAL AND DISPOSAL OF STORAGE TANKS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION I GENERAL REQUIREMENTS

More information

Parcel E (Site 03) Treatability Study and Parcel C Remedial Action

Parcel E (Site 03) Treatability Study and Parcel C Remedial Action Parcel E (Site 03) Treatability Study and Parcel C Remedial Action Hunters Point Naval Shipyard ACTIVITY NAME Community Meeting Parcel C Cleanup Actions Hunters Point Naval Shipyard in 1941 34 BRAC Program

More information

Removal of Perchloroethylene within a Silt Confining Layer Using Hydrogen Release Compound

Removal of Perchloroethylene within a Silt Confining Layer Using Hydrogen Release Compound Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 15 Article 20 June 2010 Removal of Perchloroethylene within a Silt Confining Layer Using Hydrogen Release

More information

LIGHTSHIP ENGINEERING

LIGHTSHIP ENGINEERING LIGHTSHIP ENGINEERING ASSESSMENT AND REMEDIATION CIVIL ENGINEERING ENERGY MANAGEMENT WATER AND WASTEWATER MANAGEMENT PERMITTING RELEASE ABATEMENT MEASURE STATUS REPORT Former Fisherville Mill 60 Main Street

More information

Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts

Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts SPCC PLAN Raytheon Company Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts 6 November 2002 143.65 Environmental Resources Management

More information

Presented to the Norwalk Tank Farm Restoration Advisory Board. On behalf of KMEP. February 10, 2011

Presented to the Norwalk Tank Farm Restoration Advisory Board. On behalf of KMEP. February 10, 2011 Presented to the Norwalk Tank Farm Restoration Advisory Board On behalf of KMEP February 10, 2011 Presentation Overview KMEP Update - Remediation Operations Update - Generator Fuel Spill Update - Selenium

More information

The total estimated project costs and funding sources are summarized in the table below. Description Total Project Expenditures 20

The total estimated project costs and funding sources are summarized in the table below. Description Total Project Expenditures 20 The total estimated project costs and funding sources are summarized in the table below. Description 2005-2008 2009-2012 Total Project Expenditures 2005-2006 Environmental Site Assessment, Remediation

More information

IMMEDIATE RESPONSE ACTIONS MASSDEP RTN

IMMEDIATE RESPONSE ACTIONS MASSDEP RTN Former Revere Copper Products, Inc. New Bedford, Massachusetts Request for Determination of Applicability May 2017 IMMEDIATE RESPONSE ACTIONS MASSDEP RTN 4-26614 Request for Determination of Applicability

More information

ROUX ASSOCIATES, INC. Environmental Consulting & Management

ROUX ASSOCIATES, INC. Environmental Consulting & Management February 28, 2012 PARTIAL RESPONSE ACTION OUTCOME STATEMENT (RAO) 17 Central Street Property Peabody Essex Museum RTN 3-23396 Prepared for PEABODY ESSEX MUSEUM East India Square Salem, Massachusetts 01907

More information

2018 SECDEF Environmental Awards Environmental Restoration Installation: DLA San Joaquin

2018 SECDEF Environmental Awards Environmental Restoration Installation: DLA San Joaquin Introduction DLA Distribution Depot San Joaquin is an active distribution center operated by the Defense Logistics Agency (DLA) to supply military services with the equipment needed to fulfill their missions.

More information

CITY OF TACOMA Department of Neighborhood and Community Services

CITY OF TACOMA Department of Neighborhood and Community Services CITY OF TACOMA Department of Neighborhood and Community Services ADDENDUM NO. 3 DATE: January 31, 2017 REVISIONS TO: Request for Bids Specification No. NC16-0353F On-Call Building Demolition NOTICE TO

More information

Risk and Required Mitigation

Risk and Required Mitigation 1 2.3 Critical Exposure Pathways 2.3.1 Identification of a Critical Exposure Pathway (CEP) 2.3.1.1. The CEP Concept The CEP requirements in the MCP are focused on human receptors in homes, schools and

More information

Pease AFB RAB Meeting

Pease AFB RAB Meeting Air Force Civil Engineer Center Pease AFB RAB Meeting 26 July 2017 Battle Ready Built Right! 1 Agenda Welcome and Introduction RAB Member Administrative Items March 22 2017 minutes approval Intro to the

More information

3.7 GROUNDWATER AND SOILS Introduction Environmental Setting Applicable Regulations Impacts and Mitigation Measures

3.7 GROUNDWATER AND SOILS Introduction Environmental Setting Applicable Regulations Impacts and Mitigation Measures . GROUNDWATER AND SOILS 0.. Introduction.. Environmental Setting.. Applicable Regulations.. Impacts and Mitigation Measures... Project Impacts and Mitigation... Proposed Project... Construction Impacts

More information

Remediation of a Hexavalent Chromium Release To Groundwater Using Ion-Specific Resins

Remediation of a Hexavalent Chromium Release To Groundwater Using Ion-Specific Resins Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 15 Article 7 June 2010 Remediation of a Hexavalent Chromium Release To Groundwater Using Ion-Specific Resins

More information

2014 Capital Improvement Project Contract Concrete Paving & Utilities Oshkosh, Wisconsin

2014 Capital Improvement Project Contract Concrete Paving & Utilities Oshkosh, Wisconsin Environment Submitted to City of Oshkosh Dept. of PW 215 Church Ave. Oshkosh, WI 54903 Submitted by AECOM 558 N. Main St. Oshkosh, WI 54901 February 14, 2014 Soil and Groundwater Management Plan 2014 Capital

More information

ACTIVITY AND USE LIMITATION OPINION Portion of W.R. Grace & Co.-Conn. Disposal Site Cambridge, Massachusetts RTN

ACTIVITY AND USE LIMITATION OPINION Portion of W.R. Grace & Co.-Conn. Disposal Site Cambridge, Massachusetts RTN DRAFT Revised 19 January 2005 EXHIBIT C ACTIVITY AND USE LIMITATION OPINION Portion of W.R. Grace & Co.-Conn. Disposal Site Cambridge, Massachusetts In accordance with the requirements of 310 CMR 40.1074,

More information

Modern Electroplating Site Update. Dudley Vision Advisory Task Force September 2008 Meeting

Modern Electroplating Site Update. Dudley Vision Advisory Task Force September 2008 Meeting Modern Electroplating Site Update Dudley Vision Advisory Task Force September 2008 Meeting 1 Modern Electroplating Uncontrolled Waste Site Key elements that define a site relative to MA DEP and US EPA

More information

COMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS

COMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS DIVISION 02 EXISTING CONDITIONS 02 01 00 MAINTENANCE OF EXISTING CONDITIONS 1. Maintenance of site remediation, underground storage tank removal, facility remediation, and hazardous waste drum handling

More information

IMMEDIATE RESPONSE ACTION STATUS REPORT LEDERLE GRADUATE RESEARCH CENTER UNIVERSITY OF MASSACHUSETTS AMHERST, MASSACHUSETTS RTN:

IMMEDIATE RESPONSE ACTION STATUS REPORT LEDERLE GRADUATE RESEARCH CENTER UNIVERSITY OF MASSACHUSETTS AMHERST, MASSACHUSETTS RTN: IMMEDIATE RESPONSE ACTION STATUS REPORT LEDERLE GRADUATE RESEARCH CENTER UNIVERSITY OF MASSACHUSETTS AMHERST, MASSACHUSETTS RTN: 1-16269 Prepared For: Brian Fitzpatrick, CHMM Environmental Management Services

More information

https://edep.dep.mass.gov/pages/printreceipt.aspx

https://edep.dep.mass.gov/pages/printreceipt.aspx edep - MassDEP's OnlineFiling System https://edep.dep.mass.gov/pages/printreceipt.aspx Page 1 of 1 8/14/2014 Type your Windows password to log on: OK x MassDEP Home Contact Privacy Policy MassDEP's Online

More information

Indoor Air Quality Testing at the Middle River Complex

Indoor Air Quality Testing at the Middle River Complex Indoor Air Quality Testing at the Middle River Complex September 2016 Lockheed Martin has been investigating, and more recently, cleaning up contaminants in soil and groundwater at the Middle River Complex.

More information

US Ecology Nevada Compliance History

US Ecology Nevada Compliance History US Ecology Nevada Compliance History May 2017, OAM Summary: the Nevada Division of Environmental Protection (NDEP) conducted a RCRA quarterly Operations and Maintenance (OAM) inspection of the facility

More information

PM STRAUSS & ASSOCIATES Energy and Environmental Consulting MEMORANDUM

PM STRAUSS & ASSOCIATES Energy and Environmental Consulting MEMORANDUM PM STRAUSS & ASSOCIATES Energy and Environmental Consulting MEMORANDUM TO: FROM: Lenny Siegel Peter Strauss DATE: September, 2016 SUBJ: Site 28: Review of Draft Air Sampling and Vapor Intrusion Plan Tier

More information

THE MASSACHUSETTS CONTINGENCY PLAN (MCP) 310 CMR Phase V Status Report 310 CMR And Monitoring Report

THE MASSACHUSETTS CONTINGENCY PLAN (MCP) 310 CMR Phase V Status Report 310 CMR And Monitoring Report THE MASSACHUSETTS CONTINGENCY PLAN (MCP) 310 CMR 40.0000 Phase V Status Report 310 CMR 40.0892 And Monitoring Report Disposal Site Location: 110 Burrage Street Lunenburg, MA 01462 RTN 2-0015139 ACOP-CE-12-3A005

More information

1. Provide the following information on the location where the waste was generated: City/Town State Zip code

1. Provide the following information on the location where the waste was generated: City/Town State Zip code A. Location Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. Provide the following information on the location where

More information

Memorandum. Rian Amiton; City of Brockton Planning Department. John McRobbie and Thomas Biolsi; TRC Environmental Corporation

Memorandum. Rian Amiton; City of Brockton Planning Department. John McRobbie and Thomas Biolsi; TRC Environmental Corporation TRC Wannalancit Mills 650 Suffolk Street Lowell, Massachusetts 01854 Main 978.970.5600 Fax 978.453.1995 Memorandum To: From: Subject: Rian Amiton; City of Brockton Planning Department John McRobbie and

More information

Monthly Status Report W. R. Grace Superfund Site Acton, Massachusetts June 29, 2009

Monthly Status Report W. R. Grace Superfund Site Acton, Massachusetts June 29, 2009 Monthly Status Report W. R. Grace Superfund Site Acton, Massachusetts June 29, 2009 W. R. Grace (Grace) is conducting the Remedial Design/Remedial Action (RD/RA) for Operable Unit Three (OU-3) at the above

More information

Silver Line Phase III Hazardous Materials Technical Appendix

Silver Line Phase III Hazardous Materials Technical Appendix Silver Line Phase III Hazardous Materials Technical Appendix Introduction This Technical Appendix contains a description of hazardous materials release locations occurring within the limits of construction

More information

W.R. Grace (Acton Plant) Superfund Site Community Update

W.R. Grace (Acton Plant) Superfund Site Community Update U.S. Environmental Protection Agency (EPA) W.R. Grace (Acton Plant) Superfund Site Community Update EPA Superfund Community Involvement July 2009 This community update provides you with information on

More information

Theresa Wolejko, University of Massachusetts

Theresa Wolejko, University of Massachusetts COMMITMENT & INTEGRITY DRIVE RESULTS 40 Shattuck Road Suite 110 Andover, Massachusetts 01810 www.woodardcurran.com T 866.702.6371 T 978.557.8150 F 978.557.7948 January 8, 2013 Ms. Kimberly Tisa PCB Coordinator

More information

Permanent Solution Statement. and Immediate Response Action Completion Report Release Tracking Number

Permanent Solution Statement. and Immediate Response Action Completion Report Release Tracking Number Permanent Solution Statement and Immediate Response Action Completion Report Release Tracking Number 4-25035 Site Location Name: Easton Mobile Home Park 305 Turnpike Street Unit 173 Easton, MA 02375 Prepared

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL MAXYMILLIAN TECHNOLGIES, INC. 1801 East Street PITTSFIELD, MASSACHUSETTS 01201 TEL (413) 499-3050 FAX (413) 443-0511 LETTER OF TRANSMITTAL Transmittal No. 020G TO: Commonwealth of Massachusetts Department

More information

ACTIVITY: Dewatering Operations AM 12

ACTIVITY: Dewatering Operations AM 12 Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria &

More information

Creamer Environmental. Containment, Caps & Liners. 12 Old Bridge Road C ed ar Grov e, N e w Jer s e y

Creamer Environmental. Containment, Caps & Liners. 12 Old Bridge Road C ed ar Grov e, N e w Jer s e y Containment, Caps & Liners While excavation and treatment are common solutions for many soil and groundwater remediation projects, containment can sometimes be a more appropriate and more economical alternative.,

More information

Release Abatement. Completion Report and Class A-2 Response. University of. Massachusetts. Southwest Concourse Amherst, Massachusetts

Release Abatement. Completion Report and Class A-2 Response. University of. Massachusetts. Southwest Concourse Amherst, Massachusetts Release Abatement Measure Completion Report and Class A-2 Response Action Outcome University of Massachusetts Southwest Concourse Amherst, Massachusetts 1.866.702.6371 35 New England Business Center Andover,

More information

May 30, 2012 Project

May 30, 2012 Project Geotechnical Environmental Water Resources Ecological May 30, 2012 Project 98461-5 Bureau of Waste Site Cleanup Department of Environmental Protection Northeastern Regional Office 205B Lowell Street Wilmington,

More information

HISTORY AND COMMITMENT

HISTORY AND COMMITMENT COMPANY PROFILE HISTORY AND COMMITMENT Since 1989, National Environmental Systems has served the Remediation Professionals responsible for cleaning up our nation s hazardous waste sites. As we approach

More information

MARINA COAST WATER DISTRICT PROPOSITION 218 NOTICE OF PROPOSED WATER AND WASTEWATER RATE CHANGES FOR CENTRAL MARINA AND THE ORD COMMUNITY

MARINA COAST WATER DISTRICT PROPOSITION 218 NOTICE OF PROPOSED WATER AND WASTEWATER RATE CHANGES FOR CENTRAL MARINA AND THE ORD COMMUNITY MARINA COAST WATER DISTRICT PROPOSITION 218 NOTICE OF WATER AND WASTEWATER RATE CHANGES FOR CENTRAL MARINA AND THE ORD COMMUNITY NOTICE OF PUBLIC HEARING A public hearing for the proposed rate changes

More information

Former Raritan Arsenal Fact Sheet

Former Raritan Arsenal Fact Sheet New York District Former Raritan Arsenal Fact Sheet Edison, New Jersey November 2011 The USACE s Sponsors Public Information Meeting to Discuss Project The U.S. Army Corps of Engineers (USACE) invites

More information

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENTS CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

I. Introduction and Background

I. Introduction and Background M-0817 February 18, 2014 Kathy Castagna EPA New England - Region 1 5 Post Office Square, Suite 100 Mail Code (OSRR07-3) Boston, MA 02109-3912 Re: Analysis of Brownfield Cleanup Alternatives 116 Cook Avenue,

More information

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA)

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) #47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) by Michael J. Carey Michael J. Fisher Steven R. Day Presented at: International Containment Technology

More information

EBC Solid Waste Management Program: Update from the MassDEP Regional Solid Waste Section Chiefs

EBC Solid Waste Management Program: Update from the MassDEP Regional Solid Waste Section Chiefs EBC Solid Waste Management Program: Update from the MassDEP Regional Solid Waste Section Chiefs Welcome David Murphy Chair, EBC Solid Waste Management Committee Vice President, Tighe & Bond Environmental

More information

HAZARDOUS MATERIAL SPILLS INFORMATION REQUEST

HAZARDOUS MATERIAL SPILLS INFORMATION REQUEST Page 1 HAZARDOUS MATERIAL SPILLS INFORMATION REQUEST QAZI TOWING 41-01 23RD STREET LONG ISLAND CITY, NY 11101 Spill Number: 0412186 Close Date: ADDRESS CHANGE INFORMATION Revised street: 4101 23RD STREET

More information

COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION

COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION ONE WINTER STREET, BOSTON, MA 02108 617-292-5500 MITT ROMNEY Governor KERRY HEALEY Lieutenant

More information

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location Maryland Department of the Environment Site Location FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) This 2.4581-acres site (Site) consists of four parcels of

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1993 Specifications CSJ 8015-24-003 SPECIAL SPECIFICATION TO ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1. DESCRIPTION. This item shall govern all work required to remove groundwater encountered

More information

1. Provide the following information on the location where the waste was generated: City/Town State Zip code

1. Provide the following information on the location where the waste was generated: City/Town State Zip code A. Location Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. Provide the following information on the location where

More information

Ex-situ Treatment & CAMU Implications at the Springvilla Site

Ex-situ Treatment & CAMU Implications at the Springvilla Site Ex-situ Treatment & CAMU Implications at the Springvilla Site David Anderson, Oregon DEQ State Coalition for Remediation of Drycleaners Kansas City, September 2004 Introduction Q Cleanup of former dry

More information

TOWN OF PLAINFIELD REQUEST FOR PROPOSAL BROWNFIELDS HAZARDOUS SUBSTANCES ASSESSMENT PROGRAM

TOWN OF PLAINFIELD REQUEST FOR PROPOSAL BROWNFIELDS HAZARDOUS SUBSTANCES ASSESSMENT PROGRAM TOWN OF PLAINFIELD REQUEST FOR PROPOSAL BROWNFIELDS HAZARDOUS SUBSTANCES ASSESSMENT PROGRAM 1. Description of Project The Town of Plainfield ( Town ) has been awarded a $200,000 site-specific brownfields

More information

NYSDEC Brownfield Cleanup Program #C Community Meeting # 11 May 24, 2017

NYSDEC Brownfield Cleanup Program #C Community Meeting # 11 May 24, 2017 Former Marble Quarry Landfill 109 Marbledale Road Tuckahoe, New York NYSDEC Brownfield Cleanup Program #C360143 Community Meeting # 11 May 24, 2017 Source Area Soil Stockpile Removal CAMP monitoring was

More information

MINNESOTA DECISION DOCUMENT

MINNESOTA DECISION DOCUMENT MINNESOTA DECISION DOCUMENT 3M Cottage Grove Disposal Site City of Cottage Grove, Washington County, Minnesota SITE DESCRIPTION Background The 3M Cottage Grove Site (Site) encompasses a large industrial

More information

(B) "Facility," for the purposes of this rule, means:

(B) Facility, for the purposes of this rule, means: 3745-27-13 Procedure to engage in filling, grading, excavating, building, drilling, or mining on land where a hazardous waste facility or solid waste facility was operated. (A) No person shall, without

More information

Department of Toxic Substances Control

Department of Toxic Substances Control Matthew Rodriguez Secretary for Environmental Protection Department of Toxic Substances Control Deborah O. Raphael, Director 9211 Oakdale Avenue Chatsworth, CA 91311 Edmund G. Brown Jr. Governor STATEMENT

More information

Nevada Environmental Response Trust Site Fact Sheet

Nevada Environmental Response Trust Site Fact Sheet Nevada Environmental Response Trust Site Fact Sheet The Nevada Environmental Response Trust (the NERT ) Site, which was previously known as the Tronox LLC ( Tronox ), formerly Kerr-McGee Chemical LLC,

More information

SECTION MONITORING WELL ABANDONMENT

SECTION MONITORING WELL ABANDONMENT SECTION 027300 MONITORING WELL ABANDONMENT PART I GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 1 - GENERAL REQUIREMENTS,

More information

January 13, Mr. Mike Zamiarski New York State Department of Environmental Conservation, Region East Avon Lima Road Avon, New York 14454

January 13, Mr. Mike Zamiarski New York State Department of Environmental Conservation, Region East Avon Lima Road Avon, New York 14454 January 13, 2017 Mr. Mike Zamiarski New York State Department of Environmental Conservation, Region 8 6724 East Avon Lima Road Avon, New York 14454 Re: Quarterly Monitoring Report Third Quarter 2016 Buckeye

More information

Public Notice: Wetland/Waterway/Water Quality Regulations

Public Notice: Wetland/Waterway/Water Quality Regulations Public Notice: Wetland/Waterway/Water Quality Regulations Pursuant to M.G.L. c.30a, the MA Department of Environmental Protection (DEP) gives notice of its intent to revise the following regulations under

More information

This Fourth Quarter 2013 Progress Report (No. 10) covers the period of October 1, 2013 through December 31, 2013.

This Fourth Quarter 2013 Progress Report (No. 10) covers the period of October 1, 2013 through December 31, 2013. Transmitted via Electronic Mail ARCADIS G&M of Michigan, LLC 28550 Cabot Drive Suite 500 Novi Michigan 48377 Tel 248 994 2240 Fax 248 994 2241 www.arcadis-us.com Mr. Chris Black U.S. Environmental Protection

More information

December 2008 Informational Meeting Regarding the Status of Ground Water Cleanup Activities Undertaken by Nor-Lake, Inc.

December 2008 Informational Meeting Regarding the Status of Ground Water Cleanup Activities Undertaken by Nor-Lake, Inc. December 2008 Informational Meeting Regarding the Status of Ground Water Cleanup Activities Undertaken by Nor-Lake, Inc. Welcome! Site Investigation and Remediation Activities Update Chuck Dullea, President,

More information

Tyree 26 Town Forest Road, Webster, MA Fax: Phone:

Tyree 26 Town Forest Road, Webster, MA Fax: Phone: Tyree 26 Town Forest Road, Webster, MA 01570 Fax: 508-640-0370 Phone: 508-640-0300 April 9, 2012 Massachusetts Department of Environmental Protection Northeast Regional Office 205B Lowell Street Wilmington,

More information

STATE CLEANUP PROGRAM INDEPENDENT CLOSURE PROCESS SITE CLOSURE State Form (11-09)

STATE CLEANUP PROGRAM INDEPENDENT CLOSURE PROCESS SITE CLOSURE State Form (11-09) STATE CLEANUP PROGRAM INDEPENDENT CLOSURE PROCESS SITE CLOSURE State Form 54166 (11-09) Indiana Department of Environmental Management Office of Land Quality 100 North Senate Avenue Mail Code 66-30 Room

More information

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY File No. 0506-013-07 Contaminated Media Management Plan Midland

More information

TRANSPORT PATHWAY EVIDENCE OF A SEWER VAPOR. Findings from Work Performed at the Indianapolis USEPA Research Duplex

TRANSPORT PATHWAY EVIDENCE OF A SEWER VAPOR. Findings from Work Performed at the Indianapolis USEPA Research Duplex EVIDENCE OF A SEWER VAPOR TRANSPORT PATHWAY Findings from Work Performed at the Indianapolis USEPA Research Duplex Midwestern States Environmental Consultants Association Spring Seminar Rob Uppencamp May

More information

Indoor Air Quality Testing at the Middle River Complex. Indoor Air Quality Testing at the Middle River Complex. For More Information

Indoor Air Quality Testing at the Middle River Complex. Indoor Air Quality Testing at the Middle River Complex. For More Information Indoor Air Quality Testing at the Middle River Complex September 2017 Indoor Air Quality Testing at the Middle River Complex Lockheed Martin has been investigating and, more recently, cleaning up soil

More information

Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial Heating Oil Systems. National Oilheat Research Alliance (NORA)

Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial Heating Oil Systems. National Oilheat Research Alliance (NORA) Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial National Oilheat Research Alliance (NORA) Forward Heating oil is used to heat many private homes as well as small commercial

More information

Remediation Services

Remediation Services Remediation Services www.hcr-llc.com We provide customized one-stop solutions by also performing remediation services with expert field service for all remediation types from excavation, system installation,

More information

FINAL COMPLETION REPORT

FINAL COMPLETION REPORT FINAL COMPLETION REPORT SOUTHWEST RESIDENTIAL AREA CONCOURSE PCB CLEANUP CRAMPTON & MACKIMMIE DORMITORIES PREPARED FOR: UNIVERSITY OF MASSACHUSETTS ENVIRONMENTAL HEALTH & SAFETY 118 DRAPER HALL 40 CAMPUS

More information

MCP Regulatory Reform. Waste Site Cleanup Advisory Committee March 22, 2012

MCP Regulatory Reform. Waste Site Cleanup Advisory Committee March 22, 2012 MCP Regulatory Reform Waste Site Cleanup Advisory Committee March 22, 2012 1 Since our last advisory committee meeting BWSC held meetings in February on MCP Standards Permit/Tier/NRS AUL Streamlining Vapor

More information

MUNICIPAL STORMWATER REGULATION PROGRAM TIER A MUNICIPALITIES 2018 PERMIT UPDATE

MUNICIPAL STORMWATER REGULATION PROGRAM TIER A MUNICIPALITIES 2018 PERMIT UPDATE MUNICIPAL STORMWATER REGULATION PROGRAM TIER A MUNICIPALITIES 2018 PERMIT UPDATE Stormwater Compliance Program s Implementation Schedule for Statewide Basic s MUNICIPAL STORMWATER COMPLIANCE PROGRAM FOR

More information

the former Honeywell plant building (3 Hamilton Avenue) a single-storey brick industrial/commercial building (233 Armstrong Street)

the former Honeywell plant building (3 Hamilton Avenue) a single-storey brick industrial/commercial building (233 Armstrong Street) consulting engineers memorandum to: Tega Developments - Mr. Spyro Dimitrakopoulos - spyro@tegadevelopments.com re: Environmental Remedial Action Plan Proposed Residential Building 233 Armstrong Street

More information

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES Preliminary Evaluation for Wells & Son Metal Recycling aka Cardinal Grain Property 607 South Chauncey Street Columbia City, Indiana 46725 1.0 INTRODUCTION This

More information

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program www.pca.state.mn.us Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program This document describes the requirements for excavating petroleum-contaminated soil

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

FACTS ABOUT: Kop-Flex. Site Location. Site History. Environmental Investigations

FACTS ABOUT: Kop-Flex. Site Location. Site History. Environmental Investigations FACTS ABOUT: Kop-Flex Maryland Department of the Environment Site Location The 25-acre property is located at 7565 Harmans Road in Hanover, Anne Arundel County, Maryland. The property is owned by Emerson

More information

Assessment of Changes to Title 5

Assessment of Changes to Title 5 Assessment of Changes to Title 5 This document is being provided as a courtesy to regulatory officials and others to share our review of the changes which MassDEP instituted to Title 5 in January 2014.

More information

REMEDY OPERATION STATUS REPORT October March 2003 FORMER VARIAN FACILITY SITE 150 SOHIER ROAD BEVERLY, MASSACHUSETTS 01915

REMEDY OPERATION STATUS REPORT October March 2003 FORMER VARIAN FACILITY SITE 150 SOHIER ROAD BEVERLY, MASSACHUSETTS 01915 REMEDY OPERATION STATUS REPORT October 2002 - March 2003 FORMER VARIAN FACILITY SITE 150 SOHIER ROAD BEVERLY, MASSACHUSETTS 01915 MA DEP SITE NO. 3-0485 Tier 1B Permit No. P23730 April 29, 2003 Shaw Environmental,

More information

STORMWATER MANAGEMENT PROGRAM. Table of Contents

STORMWATER MANAGEMENT PROGRAM. Table of Contents STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public

More information

Transferring Effective Technologies From the. IPEC Conference San Antonio, TX November 13, 2013 Mike Sequino

Transferring Effective Technologies From the. IPEC Conference San Antonio, TX November 13, 2013 Mike Sequino Horizontal Remediation Wells (HRW): Transferring Effective Technologies From the Oil Industry to Environmental Remediation IPEC Conference San Antonio, TX November 13, 2013 Mike Sequino Directional Drilling

More information

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements RFP 2019-01 Reeta s Building Demolition City of Morgantown REQUEST FOR PROPOSALS Demolition Contractors INTRODUCTION A. Overview This Request for Proposals ( RFP ) is being issued by the City of Morgantown

More information

Groundwater Treatment Facility Operations Martin State Airport August 2018 Chuck Trione, Project Lead

Groundwater Treatment Facility Operations Martin State Airport August 2018 Chuck Trione, Project Lead Groundwater Treatment Facility Operations Martin State Airport August 2018 Chuck Trione, Project Lead 1 Martin State Airport Groundwater Treatment Plant The recently completed 10,200 square foot building

More information

SOIL SUBMITTAL PACKAGE CHECKLIST DUDLEY RECLAMATION PROJECT 123 OXFORD AVENUE DUDLEY, MASSACHUSETTS

SOIL SUBMITTAL PACKAGE CHECKLIST DUDLEY RECLAMATION PROJECT 123 OXFORD AVENUE DUDLEY, MASSACHUSETTS SOIL SUBMITTAL PACKAGE CHECKLIST DUDLEY RECLAMATION PROJECT 123 OXFORD AVENUE DUDLEY, MASSACHUSETTS ~ Please RETURN this check list with all supporting information~ Facility Name: Dudley Reclamation Project

More information

Corrective action design and implementation Petroleum Remediation Program

Corrective action design and implementation Petroleum Remediation Program www.pca.state.mn.us Corrective action design and implementation Petroleum Remediation Program This document describes the process for obtaining Minnesota Pollution Control Agency (MPCA) corrective action

More information

Is this the maturation Phase of Vapor Intrusion Investigations?

Is this the maturation Phase of Vapor Intrusion Investigations? Is this the maturation Phase of Vapor Intrusion Investigations? Presenter: Will Elcoate June 27 th, 2012 EPA Moves forward with Vapor Intrusion EPA plans to tear down three city businesses Columbus Telegram

More information