1 Geotechnical Environmental Water Resources Ecological May 30, 2012 Project Bureau of Waste Site Cleanup Department of Environmental Protection Northeastern Regional Office 205B Lowell Street Wilmington, MA Dear Sir or Madam: Re: Release Abatement Measure Plan Beach Debris Removal Activities Planned for 2012 to 2022 MEC Transmission Line Property Beach Pierce Avenue and Waite Street Salem, Massachusetts MassDEP RTN On behalf of Massachusetts Electric Company d/b/a National Grid (MEC), GEI Consultants, Inc. is submitting this Release Abatement Measure (RAM) Plan for the management of miscellaneous debris that will be removed from the beach along Collins Cove in Salem, Massachusetts (Fig. 1). The beach is located within the boundary of the Salem former manufactured gas plant (MGP) site, identified by Massachusetts Department of Environmental Protection (MassDEP) Release Tracking Number (RTN) (the Site). This RAM Plan was prepared in accordance with the requirements of the Massachusetts Contingency Plan (MCP; 310 CMR ), specifically, RAM provisions contained in 310 CMR ). The original MassDEP RAM Transmittal Form (BWSC106) was submitted electronically via edep, and a copy is in Appendix A. Notification, including the purpose, nature, and expected duration of the RAM, has been provided to the City of Salem Chief Municipal Officer and Board of Health in accordance with the public notice requirements of 310 CMR (3)(d). Copies of the notification letters are in Appendix B. 1. Contact Information (310 CMR [1][a]) Responsibility for the RAM Jason Naiden Project Manager Massachusetts Electric Company d/b/a National Grid 40 Sylvan Road Waltham, MA Licensed Site Professional (LSP) for the RAM Mark C. Ensign, C.G., P.G., LSP LSP No GEI Consultants, Inc. 400 Unicorn Park Drive Woburn, MA GEI Consultants, Inc. 400 Unicorn Park Drive, Woburn, MA fax:

2 MassDEP, BWSC -2- May 30, Description of Release, Site Conditions, and Surrounding Receptors (310 CMR [1][b]) 2.1 Release Description The former Salem MGP historically operated along Pierce Avenue and Waite Street in Salem, Massachusetts. The Site is comprised of two properties currently owned by MEC and Boston Gas Company d/b/a National Grid (BGC), the abutting 15 Bridge Street property, and portions of the intertidal zone of Beverly Harbor and Collins Cove. The BGC property currently houses a liquefied natural gas (LNG) operation used for LNG storage and distribution. The MEC property is a transmission line property occupied by high tension electrical power lines. Investigations at the properties that comprise the Site have identified compounds typically associated with MGPs (i.e., polycyclic aromatic hydrocarbons [PAHs], volatile organic compounds [VOCs], petroleum hydrocarbons, and complex cyanide compounds) in site soil primarily situated on the eastern portions of the two properties, and in sediment and groundwater. The Site is currently in Remedy Operation Status (ROS). Phase IV remediation activities on the upland portion of the Site consisted of removing some hotspot soil, capping the more heavily used portions of the BGC LNG property, and installing a drainage system. The Phase IV construction in the upland portion was completed in May The Phase IV construction in the intertidal zone included removal of non-aqueous phase liquid (NAPL)-impacted sediment and the capping of the Collins Cove beach portion adjacent to the BGC LNG property and MEC transmission line property. The Phase IV intertidal zone construction on the beach and in the intertidal zone was completed in April Site Description The Site is divided into two portions: Area 1 and Area 2 (Fig. 2). Work presented with this RAM plan is strictly associated with Area 2. Area 1: Area 1 refers to the upland areas of the Site and includes the BGC LNG property (approximately 16 acres) that is currently used as a LNG storage and distribution facility. The perimeter of the LNG property is fenced to control access. Area 1 also includes the portion of the MEC transmission line property above mean high water (approximately 6.8 acres). The perimeter of the MEC transmission line property above the intertidal region is also fenced to control access to the property. The MEC transmission line property is occupied by five electrical power transmission line support towers. One additional support tower for an air break switch is located between the westernmost towers. There are currently no other structures on the MEC transmission line property. Area 2: Area 2 encompasses the majority of Collins Cove and a portion of Beverly Harbor s intertidal regions adjacent to the BGC LNG facility. Area 2 includes the remaining approximately 12.8 acres of the MEC transmission line property that are comprised of intertidal flats above mean low water. Area 2 natural resources include coastal wetland, coastal beach, coastal dune, salt marsh, rocky intertidal shore, land under the ocean (including tidal flats and submerged areas) and land subject to coastal storm flowage. The proposed RAM activities will be conducted on a portion of the MEC transmission line property (Fig. 2).

3 MassDEP, BWSC -3- May 30, Surrounding Receptors According to the Massachusetts Geographic Information Systems National Resources Map for the Salem area, the Site is not located within a Potentially-Productive Aquifer, Sole Source Aquifer, or Interim Wellhead Protection Area (Zone II). No Areas of Critical Environmental Concern, Habitats of Threatened or Endangered Species, protected open space, or Institutions were identified within 500 feet of the Property. Collins Cove and Beverly Harbor, presumed to be fish habitats, abut the Site to the east and the north, respectively. Private residences and commercial properties abut the Site to the west and south. 3. RAM Objectives, Plan, and Schedule (310 CMR [1][c]) 3.1 Objective The objective of the RAM is to manage debris to be removed from the beach along Collins Cove that is situated on the MEC transmission line property in Salem, Massachusetts (Fig. 2). 3.2 Project Description The entire project is located within the Site boundary and the debris removal is limited to MEC owned property. Debris consisting of bricks, clinkers, and solid tar has been observed on the beach along Collins Cove on the MEC transmission line property. A significant portion of the debris is likely associated with the historic MGP at the Site. Activities described in this RAM Plan are similar to activities performed at the same location along Collins Cove in May GEI submitted a RAM Completion Report to MassDEP on June 17, 2010 documenting RAM activities conducted in May RAM activities in May 2010 successfully removed exposed debris from the beach. However, ongoing natural coastal processes such as erosion, storm events, littoral drift and transport have exposed or re-deposited additional debris on the beach since May MEC plans to conduct up to two scheduled removal events each year for 10 years to manage debris that is regularly exposed or deposited within the RAM area (Fig. 3). In addition, periodic unscheduled removal events in response to significant storm events may be performed. During each debris removal event, MEC plans to remove debris larger than approximately ½ to ¾ inches in diameter from the upper four to six inches of the beach surface within the RAM area. Collected debris will be transported from the beach to lined containers located on the MEC transmission line property within Area 1. Debris removal will be performed by TFord Company Inc. (TFord) of Georgetown, Massachusetts. MEC will permit, characterize, transport, and appropriately dispose of the collected debris at a permitted disposal facility. The debris will be shipped to the disposal facility under a MassDEP Bill of Lading. GEI and its subconsultant, Anchor QEA of Beverly, Massachusetts, will document activities associated with debris removal and management in a RAM Status Report within 120 days of the submission of this RAM Plan to MassDEP. Subsequent RAM activities will be documented in semiannual RAM Status Reports and in a RAM Completion Report after RAM activities are completed. 3.3 Site Activities Site activities during each debris removal event include the following:

4 MassDEP, BWSC -4- May 30, 2012 A topographic survey will be performed before and after each debris removal event to evaluate whether any significant change to the existing coastal beach profile occurs as a result of RAM activities. In the event that RAM activities directly cause a substantial change to the existing beach profile, mitigating measures (e.g. importing clean sand to restore grades) will be proposed and coordinated in advance with regulatory agencies. The surficial debris will be removed using a combination of a skid steer with a RockHound attachment and hand raking. A skid steer will be used to remove miscellaneous debris from the beach area. In areas where the skid steer cannot operate or where disturbance of vegetation would occur, hand raking will be used to remove the larger pieces of miscellaneous fill. The miscellaneous debris will be transported to the upland portion of the transmission line property and stored within lined roll-off containers in preparation for offsite disposal. A daily report will be created to document site activities, record the area of the beach where debris was removed and the approximate volume of miscellaneous debris removed. Precautions will be taken to limit the potential for damaging existing vegetation on the beach. Timber mats will be used to access the beach from the upland portion of the transmission line property. Debris removal activities will occur during periods of low tide when the beach is exposed. No activities will occur within submerged portions of the beach. No stockpiles of materials will remain on the beach after working hours. 3.4 Schedule MEC plans to conduct up to two scheduled debris removal events each year for 10 years. In addition, periodic unscheduled removal events in response to significant storm events may be performed. Each debris removal event is expected to take approximately five days to complete. The first debris removal event is expected to be conducted in June Remediation Waste Management (310 CMR [1][d]) 4.1 Debris Removal and Management The estimated volume of debris that may be generated and managed during each debris removal event is approximately 30 cubic yards (yds 3 ). Debris removal activities conducted during the next 10 years are expected to generate approximately 600 yds 3 of debris. However, for the purposes of this RAM Plan, we estimate that up to1,200 yds 3 of debris may be generated. Collected debris will be disposed of at an off-site facility. The debris will be transported under a Bill of Lading and handled in accordance with the MCP (310 CMR ). Debris removed from the beach may be temporarily placed in stockpiles on the beach and then placed in lined, covered roll-off containers located within the fenced upland Area 1 portion of the MEC transmission line property. No debris stockpiles will be left on the beach at the end of each shift. No remedial wastewater or remedial additives will be generated, excavated, stored, treated, discharged, applied, reused, or otherwise managed at the Site as a part of this RAM. 5. Environmental Monitoring (310 CMR [1][e]) The contractor (TFord) performing the debris removal will prepare a health and safety plan (HASP) for the protection of its employees. GEI and/or Anchor will be on site during debris removal activities to observe conditions encountered. No significant excavation will occur because the debris to be removed is located at or near the surface. Previous investigations in this

5 MassDEP, BWSC -5- May 30, 2012 area indicate OHM is not present in a form that would generate vapors and the material to be handled will be damp or wet; therefore, air monitoring is not necessary. 6. Permits (310 CMR [1][f]) The following permits or certifications were obtained by MEC to perform the proposed RAM activities: The Salem Conservation Commission issued an Order of Conditions (OOC) on December 12, It is identified as MassDEP File number The OOC issued is valid for five years. Prior to expiration MEC plans to submit an application to extend the OOC for an additional five years. The U.S. Army Corps of Engineers (USACE) authorized the work as a Category 2 activity under the Massachusetts General Permit (GP) on February 24, The GP expires on January 21, 2015 and allows under contract activities to occur until January 21, Prior to January 21, 2016, MEC plans to submit an application to continue work for an additional five years. The USACE Permit number for this project is NAE MassDEP issued a 401 Water Quality Certification on May 21, 2012, under WQC Transmittal number X This permit allows the work to be conducted for 10 years. MassDEP issued a Chapter 91 Waterways Permit on May 24, 2012, under Permit number This permit was issued for a 5 year term, and MEC plans to submit an application to extend the Chapter 91 permit for another 5 years. 7. Certifications (310 CMR [1][g,h]) We estimate that less than 1,200 yds 3 of remediation waste will be generated during the performance of the RAM. Therefore, the certification that sufficient financial resources to manage excavated materials in the manner and timeframes specified at 310 CMR (5) is not required. The seal and signature of Mark C. Ensign, C.G., P.G., LSP, are provided on the BWSC106 transmittal form (copy in Appendix A). 8. Limitations This RAM Plan was prepared for the use of MEC, exclusively; however, a copy of the RAM Plan may be provided to the City of Salem as a reference. The conclusions presented in this report are based solely on the information reported in this document. Additional information regarding the Site that was not available to GEI at the time this report was prepared, may result in a modification of the findings above. The report has been prepared in accordance with generally accepted hydrogeological practices. No warranty, expressed or implied, is made.

6 MassDEP, BWSC -6- May 30, 2012 Please contact me at or if you have any questions. Very truly yours, GEI CONSULTANTS, INC. Saskia E. Oosting, P.G. Project Manager CHA/MCE/SEO:mrb Enclosures c: Jason Naiden, MEC Mark Mahoney, Anchor QEA Mark Ensign, GEI M:\PROJECT\1998\98461.dar\ \Reports\12\RAM Plan Beach Cleaning 2012\RAM Plan_Area2 beach debris.docx

7

8

9

10 Appendix A MassDEP Transmittal Form

11 Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup RELEASE ABATEMENT MEASURE (RAM) TRANSMITTAL FORM Pursuant to 310 CMR (Subpart D) BWSC106 Release Tracking Number A. SITE LOCATION: 1. Site Name/Location Aid: NEPCO PROPERTY FMR GAS PLANT 2. Street Address: PIERCE AVE AND WAITE ST 3. City/ SALEM 4. ZIP Code: UTM Coordinates: a. UTM N: b. UTM E: 6. Check here if a Tier Classification Submittal has been provided to DEP for this disposal site. a. Tier IA b. Tier IB c. Tier IC d. Tier II 7. If a Tier I Permit has been issued, provide Permit Number: B. THIS FORM IS BEING USED TO: (check all that apply) 1. List Submittal Date of Initial RAM Plan (if previously submitted): 2. Submit an Initial Release Abatement Measure (RAM) Plan. (mm/dd/yyyy) a. Check here if the RAM is being conducted as part of the construction of a permanent structure. If checked, you must specify what type of permanent structure is to be erected in or in the immediate vicinity of the area where the RAM is to be conducted. b. Specify type of permanent structure: (check all that apply) i. School ii. Residential iii. Commercial iv. Industrial v. Other Specify: 3. Submit a Modified RAM Plan of a previously submitted RAM Plan. 4. Submit a RAM Status Report. 5. Submit a Remedial Monitoring Report. (This report can only be submitted through edep, concurrent with a RAM Status Report.) a. Type of Report: (check one) i. Initial Report ii. Interim Report iii. Final Report b. Number of Remedial Systems and/or Monitoring Programs: A separate BWSC106A, RAM Remedial Monitoring Report, must be filled out for each Remedial System and/or Monitoring Program addressed by this transmittal form. 6. Submit a RAM Completion Statement. 7. Submit a Revised RAM Completion Statement. 8. Provide Additional RTNs: a. Check here if this RAM Submittal covers additional Release Tracking Numbers (RTNs). RTNs that have been previously linked to a Primary Tier Classified RTN do not need to be listed here. This section is intended to allow a RAM to cover more than one unclassified RTN and not show permanent linkage to a Primary Tier Classified RTN. b. Provide the additional Release Tracking Number(s) covered by this RAM Submittal. - - (All sections of this transmittal form must be filled out unless otherwise noted above) Revised: 2/16/2005 Page 1 of 6

12 Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup RELEASE ABATEMENT MEASURE (RAM) TRANSMITTAL FORM Pursuant to 310 CMR (Subpart D) C. RELEASE OR THREAT OF RELEASE CONDITIONS THAT WARRANT RAM: BWSC106 Release Tracking Number Identify Media Impacted and Receptors Affected: (check all that apply) a. Air b. Basement c. Critical Exposure Pathway d. Groundwater e. Residence f. Paved Surface g. Private Well h. Public Water Supply i. School j. Sediments k. Soil l. Storm Drain m. Surface Water n. Unknown o. Wetland p. Zone 2 q. Others Specify: DEBRIS CONSISTING OF BRICKS, CLINKERS, AND SOLID TAR 2. Identify all sources of the Release or Threat of Release, if known: (check all that apply) a. Above-ground Storage Tank (AST) b. Boat/Vessel c. Drums d. Fuel Tank e. Pipe/Hose/Line f. Tanker Truck g. Transformer h. Under-ground Storage Tank (UST) i. Vehicle j. Others Specify: 3. Identify Oils and Hazardous Materials Released: (check all that apply) a. Oils b. Chlorinated Solvents c. Heavy Metals d. Others Specify: BRICKS, CLINKERS, AND SOLID TAR D. DESCRIPTION OF RESPONSE ACTIONS: (check all that apply, for volumes list cumulative amounts) 1. Assessment and/or Monitoring Only 3. Deployment of Absorbent or Containment Materials 5. Structure Venting System 7. Product or NAPL Recovery 9. Groundwater Treatment Systems 11. Bioremediation 2. Temporary Covers or Caps 4. Temporary Water Supplies 6. Temporary Evacuation or Relocation of Residents 8. Fencing and Sign Posting 10. Soil Vapor Extraction 12. Air Sparging Revised: 2/16/2005 Page 2 of 6

13 Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup RELEASE ABATEMENT MEASURE (RAM) TRANSMITTAL FORM Pursuant to 310 CMR (Subpart D) BWSC106 Release Tracking Number D. DESCRIPTION OF RESPONSE ACTIONS (cont.): (check all that apply, for volumes list cumulative amounts) 13. Excavation of Contaminated Soils a. Re-use, Recycling or Treatment i. On Site Estimated volume in cubic yards ii. Off Site Estimated volume in cubic yards iia. Receiving Facility: iib. Receiving Facility: iii. Describe: b. Store iia. Receiving Facility: iib. Receiving Facility: c. Landfill Receiving Facility: i. On Site ii. Off Site i. Cover Estimated volume in cubic yards Estimated volume in cubic yards Estimated volume in cubic yards Receiving Facility: ii. Disposal Estimated volume in cubic yards 14. Removal of Drums, Tanks or Containers: a. Describe Quantity and Amount: b. Receiving Facility: c. Receiving Facility: 15. Removal of Other Contaminated Media: a. Specify Type and Volume: b. Receiving Facility: c. Receiving Facility: 16. Other Response Actions: Describe: REMOVAL OF DEBRIS FROM BARRIER BEACH (UP TO 1200 CUBIC YARDS) 17. Use of Innovative Technologies: Describe: Revised: 2/16/2005 Page 3 of 6

14 Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup RELEASE ABATEMENT MEASURE (RAM) TRANSMITTAL FORM Pursuant to 310 CMR (Subpart D) BWSC106 Release Tracking Number E. LSP SIGNATURE AND STAMP : I attest under the pains and penalties of perjury that I have personally examined and am familiar with this transmittal form, including any and all documents accompanying this submittal. In my professional opinion and judgment based upon application of (i) the standard of care in 309 CMR 4.02(1), (ii) the applicable provisions of 309 CMR 4.02(2) and (3), and 309 CMR 4.03(2), and (iii) the provisions of 309 CMR 4.03(3), to the best of my knowledge, information and belief, > if Section B of this form indicates that a Release Abatement Measure Plan is being submitted, the response action(s) that is (are) the subject of this submittal (i) has (have) been developed in accordance with the applicable provisions of M.G.L. c. 21E and 310 CMR , (ii) is (are) appropriate and reasonable to accomplish the purposes of such response action(s) as set forth in the applicable provisions of M.G.L. c. 21E and 310 CMR and (iii) comply(ies) with the identified provisions of all orders, permits, and approvals identified in this submittal; > if Section B of this form indicates that a Release Abatement Measure Status Report and/or Remedial Monitoring Report is being submitted, the response action(s) that is (are) the subject of this submittal (i) is (are) being implemented in accordance with the applicable provisions of M.G.L. c. 21E and 310 CMR , (ii) is (are) appropriate and reasonable to accomplish the purposes of such response action(s) as set forth in the applicable provisions of M.G.L. c. 21E and 310 CMR and (iii) comply(ies) with the identified provisions of all orders, permits, and approvals identified in this submittal; > if Section B of this form indicates that a Release Abatement Measure Completion Statement is being submitted, the response action(s) that is (are) the subject of this submittal (i) has (have) been developed and implemented in accordance with the applicable provisions of M.G.L. c. 21E and 310 CMR , (ii) is (are) appropriate and reasonable to accomplish the purposes of such response action(s) as set forth in the applicable provisions of M.G.L. c. 21E and 310 CMR and (iii) comply(ies) with the identified provisions of all orders, permits, and approvals identified in this submittal: I am aware that significant penalties may result, including, but not limited to, possible fines and imprisonment, if I submit information which I know to be false, inaccurate or materially incomplete. 1. LSP #: First Name: MARK C 3. Last Name: ENSIGN 4. Telephone: Ext.: 6. FAX: 7. Signature: 8. Date: (mm/dd/yyyy) 9. LSP Stamp: Revised: 2/16/2005 Page 4 of 6

15 F. PERSON UNDERTAKING RAM: 2. Name of Organization: Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup RELEASE ABATEMENT MEASURE (RAM) TRANSMITTAL FORM Pursuant to 310 CMR (Subpart D) 1. Check all that apply: a. change in contact name MASS ELECTRIC CO DBA NATIONAL GRID b. change of address BWSC106 Release Tracking Number c. change in the person undertaking response actions 3. Contact First Name: JASON C 4. Last Name: NAIDEN 5. Street: 40 SYLVAN RD 6. Title: PROJECT MANAGER 7. City/ WALTHAM 8. MA 9. ZIP Code: Telephone: Ext.: 12. FAX: G. RELATIONSHIP TO RELEASE OR THREAT OF RELEASE OF PERSON UNDERTAKING RAM: 1. RP or PRP a. Owner b. Operator c. Generator d. Transporter e. Other RP or PRP Specify: 2. Fiduciary, Secured Lender or Municipality with Exempt Status (as defined by M.G.L. c. 21E, s. 2) 3. Agency or Public Utility on a Right of Way (as defined by M.G.L. c. 21E, s. 5(j)) 4. Any Other Person Undertaking RAM Specify Relationship: H. REQUIRED ATTACHMENT AND SUBMITTALS: 1. Check here if any Remediation Waste, generated as a result of this RAM, will be stored, treated, managed, recycled or reused at the site following submission of the RAM Completion Statement. You must submit a Phase IV Remedy Implementation Plan along with the appropriate transmittal form (BWSC108). 2. Check here if the Response Action(s) on which this opinion is based, if any, are (were) subject to any order(s), permit(s) and/or approval(s) issued by DEP or EPA. If the box is checked, you MUST attach a statement identifying the applicable provisions thereof. 3. Check here to certify that the Chief Municipal Officer and the Local Board of Health have been notified of the implementation of a Release Abatement Measure. 4. Check here if any non-updatable information provided on this form is incorrect, e.g. Release Address/Location Aid. Send corrections to the DEP Regional Office. 5. If a RAM Compliance Fee is required for this RAM, check here to certify that a RAM Compliance Fee was submitted to DEP, P. O. Box 4062, Boston, MA Check here to certify that the LSP Opinion containing the material facts, data, and other information is attached. Revised: 2/16/2005 Page 5 of 6

16 Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup RELEASE ABATEMENT MEASURE (RAM) TRANSMITTAL FORM BWSC106 Release Tracking Number Pursuant to 310 CMR (Subpart D) I. CERTIFICATION OF PERSON UNDERTAKING RAM: 1. I,, attest under the pains and penalties of perjury (i) that I have personally examined and am familiar with the information contained in this submittal, including any and all documents accompanying this transmittal form, (ii) that, based on my inquiry of those individuals immediately responsible for obtaining the information, the material information contained in this submittal is, to the best of my knowledge and belief, true, accurate and complete, and (iii) that I am fully authorized to make this attestation on behalf of the entity legally responsible for this submittal. I/the person or entity on whose behalf this submittal is made am/is aware that there are significant penalties, including, but not limited to, possible fines and imprisonment, for willfully submitting false, inaccurate, or incomplete information. 2. By: 3. Title: PROJECT MANAGER Signature 4. For: MASS ELECTRIC CO DBA NATIONAL GRID (Name of person or entity recorded in Section F) 5. Date: (mm/dd/yyyy) 6. Check here if the address of the person providing certification is different from address recorded in Section F. 7. Street: 8. City/ ZIP Code: 11. Telephone: 12. Ext.: 13. FAX: YOU ARE SUBJECT TO AN ANNUAL COMPLIANCE ASSURANCE FEE OF UP TO $10,000 PER BILLABLE YEAR FOR THIS DISPOSAL SITE. YOU MUST LEGIBLY COMPLETE ALL RELEVANT SECTIONS OF THIS FORM OR DEP MAY RETURN THE DOCUMENT AS INCOMPLETE. IF YOU SUBMIT AN INCOMPLETE FORM, YOU MAY BE PENALIZED FOR MISSING A REQUIRED DEADLINE. Date Stamp (DEP USE ONLY:) Revised: 2/16/2005 Page 6 of 6

17 Appendix B Public Notice Letters

18 Geotechnical Environmental Water Resources Ecological May 30, 2012 Project Mayor Kimberley Driscoll Salem City Hall 93 Washington Street Salem, MA Dear Mayor Driscoll: Re: Release Abatement Measure Plan Notification Beach Debris Removal Activities MEC Transmission Line Property Beach Pierce Avenue and Waite Street Salem, Massachusetts MassDEP RTN GEI Consultants, Inc. is hereby notifying your office that Massachusetts Electric Company d/b/a National Grid (MEC) intends to perform Release Abatement Measure (RAM) activities at the above-referenced location. A RAM Plan has been submitted to the Massachusetts Department of Environmental Protection (MassDEP). GEI prepared this notification and RAM Plan on behalf of MEC. The purpose of the RAM is to collect and dispose of surficial debris on the beach along the western side of Collins Cove on the MEC transmission line property. The debris consists of bricks, clinkers, and solid tar and is likely associated with the historic manufactured gas plant (MGP) activities at the property. Activities proposed will be similar to those performed at the same location along Collins Cove in May RAM activities in May 2010 successfully removed exposed debris from the beach, however, ongoing natural coastal processes have exposed or re-deposited additional debris on the beach since May MEC plans to conduct up to two scheduled removal events each year for 10 years to manage debris that is regularly exposed or deposited on the beach along the western side of Collins Cove. GEI estimates that up to 1,200 cubic yards of debris may be managed as part of this RAM. Work will be performed by contractors engaged by MEC. The RAM is anticipated to begin in June 2012 and each debris removal event is anticipated to take less than one week. This notification is being made in fulfillment of the public notice requirements of the Massachusetts Contingency Plan (MCP; 310 CMR ). Please contact me at or soosting@geiconsultants.com if you have any questions. Sincerely, GEI CONSULTANTS, INC. Saskia E. Oosting, P.G. Project Manager SEO:mrb Enclosures c: MassDEP, Northeast Region, Wilmington, MA M:\PROJECT\1998\98461.dar\ \Reports\12\RAM Plan Beach Cleaning 2012\RAM Plan_Area2 beach debris-jcn.docx GEI Consultants, Inc. 400 Unicorn Park Drive, Woburn, MA fax:

19 Geotechnical Environmental Water Resources Ecological May 30, 2012 Project Mr. Larry Ramdin Health Agent 120 Washington Street, 4 th Floor Salem, MA Dear Mr. Ramdin: Re: Release Abatement Measure Plan Notification Beach Debris Removal Activities MEC Transmission Line Property Beach Pierce Avenue and Waite Street Salem, Massachusetts MassDEP RTN GEI Consultants, Inc. is hereby notifying your office that Massachusetts Electric Company d/b/a National Grid (MEC) intends to perform Release Abatement Measure (RAM) activities at the above-referenced location. A RAM Plan has been submitted to the Massachusetts Department of Environmental Protection (MassDEP). GEI prepared this notification and RAM Plan on behalf of MEC. The purpose of the RAM is to collect and dispose of surficial debris on the beach along the western side of Collins Cove on the MEC transmission line property. The debris consists of bricks, clinkers, and solid tar and is likely associated with the historic manufactured gas plant (MGP) activities at the property. Activities proposed will be similar to those performed at the same location along Collins Cove in May RAM activities in May 2010 successfully removed exposed debris from the beach, however, ongoing natural coastal processes have exposed or re-deposited additional debris on the beach since May MEC plans to conduct up to two scheduled removal events each year for 10 years to manage debris that is regularly exposed or deposited on the beach along the western side of Collins Cove. GEI estimates that up to 1,200 cubic yards of debris may be managed as part of this RAM. Work will be performed by contractors engaged by MEC. The RAM is anticipated to begin in June 2012 and each debris removal event is anticipated to take less than one week. This notification is being made in fulfillment of the public notice requirements of the Massachusetts Contingency Plan (MCP; 310 CMR ). Please contact me at or soosting@geiconsultants.com if you have any questions. Sincerely, GEI CONSULTANTS, INC. Saskia E. Oosting, P.G. Project Manager SEO:lek Enclosures c: MassDEP, Northeast Region, Wilmington, MA M:\PROJECT\1998\98461.dar\ \Reports\12\RAM Plan Beach Cleaning 2012\RAM Plan_Area2 beach debris-jcn.docx GEI Consultants, Inc. 400 Unicorn Park Drive, Woburn, MA fax:

40 Shattuck Road Suite 110 Andover, Massachusetts

40 Shattuck Road Suite 110 Andover, Massachusetts COMMITMENT & INTEGRITY DRIVE RESULTS 40 Shattuck Road Suite 110 Andover, Massachusetts 01810 www.woodardcurran.com T 866.702.6371 T 978.557.8150 F 978.557.7948 August 13, 2014 John Cole Boston Environmental

More information

Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup

Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup A. THIS FORM IS BEING USED TO: (check one) 1. Log Date: 10/24/2017 Log Time: 11:18 AM PM 2. Assign a (RTN) to a Release or TOR Report. a. Reportable Release or TOR. b. Release that is Less Than the Reporting

More information

Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts

Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts SPCC PLAN Raytheon Company Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts 6 November 2002 143.65 Environmental Resources Management

More information

D2 Project Environmental Remediation Briefing August 21, 2018

D2 Project Environmental Remediation Briefing August 21, 2018 D2 Project Environmental Remediation Briefing August 21, 2018 The Union Square Revitalization Project (USQ) is a 2.4 million square foot transit-oriented, mixed use project that is transforming Union Square,

More information

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA)

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA) DRAFT Analysis of Brownfields Cleanup Alternatives (ABCA) Preliminary Evaluation Ball Square Station Site Boston Avenue and Broadway Somerville and Medford, Massachusetts Massachusetts DEP Release Tracking

More information

ATTACHMENT BWSC-105 EVERETT STREET AT MASSACHUSETTS AVENUE CAMBRIDGE, MASSACHUSETTS RTN D. DESCRIPTION OF RESPONSE ACTIONS

ATTACHMENT BWSC-105 EVERETT STREET AT MASSACHUSETTS AVENUE CAMBRIDGE, MASSACHUSETTS RTN D. DESCRIPTION OF RESPONSE ACTIONS ATTACHMENT BWSC-105 EVERETT STREET AT MASSACHUSETTS AVENUE CAMBRIDGE, MASSACHUSETTS RTN 3-26434 D. DESCRIPTION OF RESPONSE ACTIONS 14. Removal of Drums, Tanks or Containers: a. Describe Quantity and Amount:

More information

Successful Sediment Remediation Strategies at Contaminated Sites Across the Commonwealth. Mille Garcia-Serrano

Successful Sediment Remediation Strategies at Contaminated Sites Across the Commonwealth. Mille Garcia-Serrano Successful Sediment Remediation Strategies at Contaminated Sites Across the Commonwealth Mille Garcia-Serrano Deputy Regional Director MassDEP Environmental Business Council New England Energy Environment

More information

Immediate Response Action (IRA) Status Report

Immediate Response Action (IRA) Status Report Immediate Response Action (IRA) Status Report Site: The Wakefield Corporation, Wakefield, MA RTN 3-31274 Prepared For: The Wakefield Corporation, Wakefield, MA 01880 Prepared by: 51 Portsmouth Avenue,

More information

PERMANENT SOLUTION STATEMENT. Hydraulic Oil Release 68 Hopkinton Road Westborough, Massachusetts

PERMANENT SOLUTION STATEMENT. Hydraulic Oil Release 68 Hopkinton Road Westborough, Massachusetts PERMANENT SOLUTION STATEMENT Hydraulic Oil Release 68 Hopkinton Road Westborough, Massachusetts Release Tracking Number: 2-19324 CHES Job No.: 1402479917 TABLE OF CONTENTS INTRODUCTION... 1 SITE SETTING...

More information

Appendix C Site Specific Soil Management Plan prepared by Millennium Environmental

Appendix C Site Specific Soil Management Plan prepared by Millennium Environmental Appendix C Site Specific Soil Management Plan prepared by Millennium Environmental PLYMOUTH, MA WAKEFIELD, MA WORCESTER, MA RINDGE, NH Site Specific Soil Management Plan Lynn, Massachusetts Submitted By:

More information

Public Notice: Wetland/Waterway/Water Quality Regulations

Public Notice: Wetland/Waterway/Water Quality Regulations Public Notice: Wetland/Waterway/Water Quality Regulations Pursuant to M.G.L. c.30a, the MA Department of Environmental Protection (DEP) gives notice of its intent to revise the following regulations under

More information

MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION

MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION 273 West Main Street, Norton, MA 02766 Tel: (508) 226-1800 Fax: (508) 226-1811 MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION CITGO BULK STORAGE TERMINAL 385 QUINCY AVENUE BRAINTREE, MASSACHUSETTS

More information

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 DECISION DOCUMENT Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 Prepared by Division of Environmental Remediation New York State Department of Environmental

More information

https://edep.dep.mass.gov/pages/printreceipt.aspx

https://edep.dep.mass.gov/pages/printreceipt.aspx edep - MassDEP's OnlineFiling System https://edep.dep.mass.gov/pages/printreceipt.aspx Page 1 of 1 8/14/2014 Type your Windows password to log on: OK x MassDEP Home Contact Privacy Policy MassDEP's Online

More information

1. Provide the following information on the location where the waste was generated: City/Town State Zip code

1. Provide the following information on the location where the waste was generated: City/Town State Zip code A. Location Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. Provide the following information on the location where

More information

Tyree 26 Town Forest Road, Webster, MA Fax: Phone:

Tyree 26 Town Forest Road, Webster, MA Fax: Phone: Tyree 26 Town Forest Road, Webster, MA 01570 Fax: 508-640-0370 Phone: 508-640-0300 April 9, 2012 Massachusetts Department of Environmental Protection Northeast Regional Office 205B Lowell Street Wilmington,

More information

Fill out all sections or mark with N/A (not applicable)

Fill out all sections or mark with N/A (not applicable) TOWN of PLAINVILLE 142 South St Plainville, MA. 02762 508-695-3010 ext#12 / fax # 508-695-1857 Commercial Building Permit BUILDING PERMIT INSTRUCTIONS and APPLICATION Please be advised that any incomplete

More information

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY File No. 0506-013-07 Contaminated Media Management Plan Midland

More information

Fill out all sections or mark with N/A (not applicable)

Fill out all sections or mark with N/A (not applicable) TOWN of PLAINVILLE 142 South St Plainville, MA. 02762 508-695-3010 ext#12 / fax # 508-695-1857 Commercial Building Permit BUILDING PERMIT INSTRUCTIONS and APPLICATION Please be advised that any incomplete

More information

Executive Summary. 2. Property Investigations Groundwater Sampling Soil Sampling Soil Vapor Sampling 5

Executive Summary. 2. Property Investigations Groundwater Sampling Soil Sampling Soil Vapor Sampling 5 Table of Contents Executive Summary iv 1. Introduction 1 1.1 Purpose 1 1.2 Scope 2 1.3 Submittals 2 1.4 Public Record 2 1.5 Contact Information 2 1.6 Conceptual Site Model 3 1.6.1 Property Location and

More information

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STATE OF COLORADO GENERAL PERMIT APPLICATION Updated 11/04 STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY This application is for use by all stormwater dischargers engaged in construction

More information

Release Abatement Measure Plan Former General Electric Facility 50 Fordham Road, Wilmington, MA RTN

Release Abatement Measure Plan Former General Electric Facility 50 Fordham Road, Wilmington, MA RTN Release Abatement Measure Plan Former General Electric Facility 50 Fordham Road, Wilmington, MA RTN 3-0518 Prepared for: Lockheed Martin Corporation/Wilmington Realty Trust Prepared by: AECOM July 3, 2017

More information

IMMEDIATE RESPONSE ACTIONS MASSDEP RTN

IMMEDIATE RESPONSE ACTIONS MASSDEP RTN Former Revere Copper Products, Inc. New Bedford, Massachusetts Request for Determination of Applicability May 2017 IMMEDIATE RESPONSE ACTIONS MASSDEP RTN 4-26614 Request for Determination of Applicability

More information

1. Please type or print. A separate Transmittal Form must be completed for each permit application. 2. Make your check payable to the Commonwealth of

1. Please type or print. A separate Transmittal Form must be completed for each permit application. 2. Make your check payable to the Commonwealth of 1. Please type or print. A separate Transmittal Form must be completed for each permit application. 2. Make your check payable to the Commonwealth of Massachusetts and mail it with a copy of this form

More information

Mill Street Corridor Assessment/Cleanup Overview

Mill Street Corridor Assessment/Cleanup Overview Mill Street Corridor Assessment/Cleanup Overview Former S. Bent Mill Site Site History Overview Circa 1867 to 1992 - S. Bent Mill Company (furniture manufacturing) Circa early 1900s - expansion of the

More information

APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL

APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL DIVISION OF SOIL AND WATER CONSERVATION SHORELINE AND WATERWAY MANAGEMENT SECTION Office of the

More information

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering) Compliance Assistance Program Checklist 1 Start of Construction Stormwater Self-Certification Checklist Note: This checklist must be completed and submitted to the DEM no later than 30 days after initiating

More information

A. General Information

A. General Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Note: Before completing this form consult your local Conservation Commission regarding

More information

CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, Prepared By:

CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, Prepared By: CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, 2016 Prepared By: SHANNON & WILSON, INC. 5430 Fairbanks Street, Suite 3 Anchorage, Alaska 99507 (907)

More information

SECTION RISK-BASED ASSESSMENT AND CORRECTIVE ACTION FOR NON-UST PETROLEUM RELEASES

SECTION RISK-BASED ASSESSMENT AND CORRECTIVE ACTION FOR NON-UST PETROLEUM RELEASES SECTION.0500 - RISK-BASED ASSESSMENT AND CORRECTIVE ACTION FOR NON-UST PETROLEUM RELEASES 15A NCAC 02L.0501 PURPOSE AND SCOPE (a) The purpose of this Section is to establish procedures for risk-based assessment

More information

Interim Policy # COMM

Interim Policy # COMM COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION 20 RIVERSIDE DRIVE, LAKEVILLE, MA 02347 508-946-2700 ARGEO PAUL CELLUCCI Governor JANE SWIFT

More information

EBC Site Remediation and Redevelopment Program: The 2018 MCP Amendments

EBC Site Remediation and Redevelopment Program: The 2018 MCP Amendments EBC Site Remediation and Redevelopment Program: The 2018 MCP Amendments Welcome Jonathan Kitchen Chair, EBC Site Remediation & Redevelopment Committee Principal, Civil & Environmental Consultants, Inc.

More information

PROPOSED DECISION DOCUMENT. CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017

PROPOSED DECISION DOCUMENT. CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017 PROPOSED DECISION DOCUMENT CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017 Prepared by Division of Environmental Remediation New York State Department

More information

OVERVIEW SCOPE OF WORK (SOW)

OVERVIEW SCOPE OF WORK (SOW) Site Description The subject property is occupied by the former Parker Service Station, which contained a former Service Garage (now called Former Garage) and Filling Station Store (now called Storage

More information

1. Provide the following information on the location where the waste was generated: City/Town State Zip code

1. Provide the following information on the location where the waste was generated: City/Town State Zip code A. Location Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. Provide the following information on the location where

More information

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location Maryland Department of the Environment Site Location FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) This 2.4581-acres site (Site) consists of four parcels of

More information

THE MASSACHUSETTS CONTINGENCY PLAN (MCP) 310 CMR Phase V Status Report 310 CMR And Monitoring Report

THE MASSACHUSETTS CONTINGENCY PLAN (MCP) 310 CMR Phase V Status Report 310 CMR And Monitoring Report THE MASSACHUSETTS CONTINGENCY PLAN (MCP) 310 CMR 40.0000 Phase V Status Report 310 CMR 40.0892 And Monitoring Report Disposal Site Location: 110 Burrage Street Lunenburg, MA 01462 RTN 2-0015139 ACOP-CE-12-3A005

More information

Chapter 34 Index. Article V Violations And Penalties Misdemeanor Injunction Civil Damages...

Chapter 34 Index. Article V Violations And Penalties Misdemeanor Injunction Civil Damages... Chapter 34 Index Article I Definitions; General Provisions 34-1 Definitions... 34-1 34-2 Purpose... 34-2 34-3 Application; Variances; Minimum Requirements... 34-3 34-4 Reserved... 34-3 34-5 Reserved...

More information

Huntington Building Inspection

Huntington Building Inspection Huntington Building Inspection George W. Peterson Building Inspector PHONE 4136675763 APPLICATION Other Than One and Two Family Dwelling For ALL other projects use One and Two Family Dwelling (Residence)

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District KENAI FIELD OFFICE Regulatory Division (1145) CEPOA-RD 44669 Sterling Highway, Suite B Soldotna, Alaska 99669-7915 Public Notice of Application for Permit PUBLIC

More information

EROSION CONTROL AND GRADING PERMIT APPLICATION

EROSION CONTROL AND GRADING PERMIT APPLICATION EROSION CONTROL AND GRADING PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT 1735 MONTGOMERY STREET OROVILLE, CA 95965 530-538-2420 FAX (530) 5382426 www.cityoforoville.org APPLICATION DATE PERMIT FEE

More information

Silver Line Phase III Hazardous Materials Technical Appendix

Silver Line Phase III Hazardous Materials Technical Appendix Silver Line Phase III Hazardous Materials Technical Appendix Introduction This Technical Appendix contains a description of hazardous materials release locations occurring within the limits of construction

More information

Remediation Approach. W-3839 July 6, 2009

Remediation Approach. W-3839 July 6, 2009 W-3839 July 6, 2009 Scott Alfonse City of New Bedford Department of Environmental Stewardship 133 William Street, Room 304 New Bedford, MA 02740 Re: Opinion of Probable Remediation Costs Former Polymerine

More information

Memorandum. Rian Amiton; City of Brockton Planning Department. John McRobbie and Thomas Biolsi; TRC Environmental Corporation

Memorandum. Rian Amiton; City of Brockton Planning Department. John McRobbie and Thomas Biolsi; TRC Environmental Corporation TRC Wannalancit Mills 650 Suffolk Street Lowell, Massachusetts 01854 Main 978.970.5600 Fax 978.453.1995 Memorandum To: From: Subject: Rian Amiton; City of Brockton Planning Department John McRobbie and

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

SOIL MANAGEMENT PLAN

SOIL MANAGEMENT PLAN SOIL MANAGEMENT PLAN BELFAST BOATYARD 39 & 41 FRONT STREET BELFAST, MAINE Prepared by: Ransom Consulting, Inc. 400 Commercial Street, Suite 404 Portland, Maine 04101 (207) 772-2891 March 22, 2013 1.0 INTRODUCTION

More information

Programmatic General Permit Army Corps of Engineers Connecticut Addendum

Programmatic General Permit Army Corps of Engineers Connecticut Addendum Programmatic General Permit Army Corps of Engineers Connecticut Addendum DEP USE ONLY NAE#: DEP #: PGP Screening Date: Determinations: Eligible Category 2 Eligible Category 1 Individual Permit Print or

More information

MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No ) Van Nuys Fire Station 39

MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No ) Van Nuys Fire Station 39 MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No. 2015031067) Van Nuys Fire Station 39 W.O. E170094B ENGINEERING mtm CITY OF LOS ANGELES Transmittal

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

Modern Electroplating Site Update. Dudley Vision Advisory Task Force September 2008 Meeting

Modern Electroplating Site Update. Dudley Vision Advisory Task Force September 2008 Meeting Modern Electroplating Site Update Dudley Vision Advisory Task Force September 2008 Meeting 1 Modern Electroplating Uncontrolled Waste Site Key elements that define a site relative to MA DEP and US EPA

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District ANCHORAGE Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: July 31,

More information

The State of Greener Cleanups in Massachusetts

The State of Greener Cleanups in Massachusetts The State Greener Cleanups in Massachusetts Air & Waste Management Association New England Section FALL 2016 CONFERENCE Thursday, October 27, 2016 Sheraton Framingham Hotel & Conference Center, Framingham

More information

Anacostia Watershed Tidal River Toxic Remediation Update 4/30/14. polychlorinated biphenyls (PCBs), polycyclic aromatic hydrocarbons (PAHs), lead,

Anacostia Watershed Tidal River Toxic Remediation Update 4/30/14. polychlorinated biphenyls (PCBs), polycyclic aromatic hydrocarbons (PAHs), lead, 1. Kenilworth Park Landfill Anacostia Watershed Tidal River Toxic Remediation Update 4/30/14 Contaminants: and methane gas polychlorinated biphenyls (PCBs), polycyclic aromatic hydrocarbons (PAHs), lead,

More information

25 July Mr. Glenn Griffith Brownfields Coordinator Escambia County Community & Environment Bureau 221 Palafox Place Pensacola, FL 32502

25 July Mr. Glenn Griffith Brownfields Coordinator Escambia County Community & Environment Bureau 221 Palafox Place Pensacola, FL 32502 316 South Baylen Street, Suite 201 Pensacola, Florida 32502 PH 850.477.6547 FAX 850.477.6707 www.geosyntec.com Brownfields Coordinator Escambia County Community & Environment Bureau 221 Palafox Place Pensacola,

More information

ATTACHMENT C MEASURES TO MINIMIZE HARM

ATTACHMENT C MEASURES TO MINIMIZE HARM ATTACHMENT C MEASURES TO MINIMIZE HARM ATTACHMENT C MEASURES TO MINIMIZE HARM The mitigation measures and other features of the Project that reduce adverse impacts, to which Federal Transit Administration

More information

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS ARTICLE 6 EXCAVATION OF MINERAL MATERIALS SECTION 1. PURPOSE All excavations, extraction of materials and minerals, open pits and impounding of waters hereafter established or enlarged shall conform to

More information

The information provided in this form is for: Initial Release Notification Supplemental Notification

The information provided in this form is for: Initial Release Notification Supplemental Notification HAZARDOUS SUBSTANCE RELEASE NOTIFICATION FORM Mail to: Maryland Department of the Environment Land Restoration Program 1800 Washington Blvd, Suite #625 Baltimore, MD 21230-1719 PART I -- PROPERTY INFORMATION

More information

GRADING PERMIT APPLICATION

GRADING PERMIT APPLICATION Butte County Department of Public Works Butte County Department of Development Services/Planning Division 7 County Center Drive, Oroville, CA 95965 (530) 538-7266 / (530) 538-7601 GRADING PERMIT APPLICATION

More information

Three copies (one original and two copies) of your completed NOI should be submitted to:

Three copies (one original and two copies) of your completed NOI should be submitted to: To: Prospective Applicants for a Stormwater General Permit Associated with Construction Activity Greater than 5 Acres Attached is a Stormwater General Permit Associated with Construction Activity Greater

More information

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework THIS PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS C3.1 Purpose... C3-1 C3.2 Responsibility of Implementation... C3-2 C3.3

More information

Chapter 11: Hazardous Materials A. INTRODUCTION

Chapter 11: Hazardous Materials A. INTRODUCTION Chapter 11: Hazardous Materials A. INTRODUCTION This chapter relies on the analysis from the Fresh Kills Park Final Generic Environmental Impact Statement (FGEIS) and summarizes the conclusions drawn from

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, SC 29403-5107 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Ocean and Coastal

More information

CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist

CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist Con Appendix FINAL US Army Garrison, Hawaii October 2015 CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist Storm Water Management Plan CON Appendix C U.S. Army Garrison-Hawaii

More information

Stormwater Pollution Prevention Plan Engineering Department Requirements

Stormwater Pollution Prevention Plan Engineering Department Requirements Stormwater Pollution Prevention Plan Engineering Department Requirements The following are the stormwater pollution prevention plan requirements for the above referenced project. If you have any questions

More information

Permanent Solution Statement. and Immediate Response Action Completion Report Release Tracking Number

Permanent Solution Statement. and Immediate Response Action Completion Report Release Tracking Number Permanent Solution Statement and Immediate Response Action Completion Report Release Tracking Number 4-25035 Site Location Name: Easton Mobile Home Park 305 Turnpike Street Unit 173 Easton, MA 02375 Prepared

More information

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706) Memo To: From: cc: Local Issuing Authorities, Design Professionals, Plan Reviewers and Other Interested Parties The Georgia Soil and Water Conservation Commission and the Georgia Environmental Protection

More information

SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE. ADEM Form

SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE. ADEM Form SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE ADEM Form 305 8-02 1 July 10, 2002 M E M O R A N D U M TO: FROM: RE: Applicants Seeking a Permit for Solid Waste

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

April 16, Dear Mr. Beedie:

April 16, Dear Mr. Beedie: April 16, 2012 Mr. Michael Beedie, P.E. City of Ft. Walton Beach Engineering Services Department 105 Miracle Strip Parkway SW Ft. Walton Beach, FL 32548 Re: Proposal for a Supplemental Site Assessment

More information

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO:

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO: PERMIT NUMBER: GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD 57701 ID NO: (605) 394-4157 PIN NO: APPLICATION DATE: DATE ISSUED: PROPERTY INFORMATION CONTRACTOR INFORMATION LOT ADDRESS

More information

PROPOSED DECISION DOCUMENT. CE - E. 17th St. Station Voluntary Cleanup Program New York, New York County Site No. V00541 October 2017

PROPOSED DECISION DOCUMENT. CE - E. 17th St. Station Voluntary Cleanup Program New York, New York County Site No. V00541 October 2017 PROPOSED DECISION DOCUMENT CE - E. 17th St. Station Voluntary Cleanup Program New York, New York County Site No. V00541 October 2017 Prepared by Division of Environmental Remediation New York State Department

More information

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET Permit. ARR150000 SITE WITH AUTOMATIC COVERAGE (LESS THAN 5 ACRES) CONSTRUCTION SITE NOTICE FOR THE Arkansas Department of Environmental Quality (ADEQ) Storm Water Program NPDES GENERAL PERMIT NO. ARR150000

More information

PUBLIC NOTICE APPLICATION FOR PERMIT

PUBLIC NOTICE APPLICATION FOR PERMIT PUBLIC NOTICE APPLICATION FOR PERMIT U.S. ARMY CORPS OF ENGINEERS CHICAGO DISTRICT PUBLIC NOTICE/APPLICATION NUMBER: LRC-2018-00968 COMMENT PERIOD BEGINS: February 11, 2019 COMMENT PERIOD EXPIRES: March

More information

Storm Water Pollution Prevention Plan (SWP3) Checklist

Storm Water Pollution Prevention Plan (SWP3) Checklist . Summit Soil and Water Conservation District Storm Water Pollution Prevention Plan (SWP3) Checklist Modified from the Ohio EPA SWP3 Checklist (Revised January 2017) SITE NAME: REVIEWER: DATE RECEIVED:

More information

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY Environmental Health Department 950 MAIDU AVENUE, SUITE 170 NEVADA CITY, CA 95959-8617 (530) 265-1222 FAX (530) 265-9853 http://mynevadacounty.com Amy Irani,

More information

APPLICANT: Decatur Head Beach Association 1327 Decatur Head Drive Decatur Island Anacortes, WA Telephone: (425)

APPLICANT: Decatur Head Beach Association 1327 Decatur Head Drive Decatur Island Anacortes, WA Telephone: (425) US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET Permit. ARR150000 SITE WITH AUTOMATIC COVERAGE (LESS THAN 5 ACRES) CONSTRUCTION SITE NOTICE FOR THE Arkansas Department of Environmental Quality (ADEQ) Storm Water Program NPDES GENERAL PERMIT NO. ARR150000

More information

PROCEDURES FOR CHANGES TO ELKO CITY BUSINESS LICENSES

PROCEDURES FOR CHANGES TO ELKO CITY BUSINESS LICENSES PROCEDURES FOR CHANGES TO ELKO CITY BUSINESS LICENSES In accordance with Elko City Code 4-1-6, any changes made to an Elko City Business must be reported to the City of Elko Business License Department.

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District ANCHORAGE Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: February

More information

John Kubiczki, LSP, PG Senior Project Manager

John Kubiczki, LSP, PG Senior Project Manager John Kubiczki, LSP, PG Senior Project Manager 155 West Street, Suite 6, Wilmington, MA 01887 800-659-1202 john_kubiczki@efiglobal.com Years Experience: 40 Professional Summary: Mr. Kubiczki is a New Hampshire

More information

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS I. Site Information A. Location (Include site map of harvest area)

More information

IMMEDIATE RESPONSE ACTION STATUS REPORT LEDERLE GRADUATE RESEARCH CENTER UNIVERSITY OF MASSACHUSETTS AMHERST, MASSACHUSETTS RTN:

IMMEDIATE RESPONSE ACTION STATUS REPORT LEDERLE GRADUATE RESEARCH CENTER UNIVERSITY OF MASSACHUSETTS AMHERST, MASSACHUSETTS RTN: IMMEDIATE RESPONSE ACTION STATUS REPORT LEDERLE GRADUATE RESEARCH CENTER UNIVERSITY OF MASSACHUSETTS AMHERST, MASSACHUSETTS RTN: 1-16269 Prepared For: Brian Fitzpatrick, CHMM Environmental Management Services

More information

.. / '\1 r.;... ~ -.. ~ /\ c~v TEXAS COMMISSION ON ENVIRONMENTAL QUALITY. Protecting Texas by Reducing and Preventing Pollution.

.. / '\1 r.;... ~ -.. ~ /\ c~v TEXAS COMMISSION ON ENVIRONMENTAL QUALITY. Protecting Texas by Reducing and Preventing Pollution. B1yan W. Shaw, Ph.D., P.E., Chairman Toby Baker, Commissioner Zak Covar, Commissioner Richard A. Hyde, P.E., Executive Director.. / ~ '\1 r.;... ~ -.. ~ /\ c~v TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

More information

Minnesota Pollution Control Agency 520 Lafayette Road North, St. Paul, Minnesota (612) Toll Free

Minnesota Pollution Control Agency 520 Lafayette Road North, St. Paul, Minnesota (612) Toll Free Minnesota Pollution Control Agency 520 Lafayette Road North, St. Paul, Minnesota 55155 (612) 296-6300 Toll Free 1-800-657-3864 DEMOLITION DEBRIS LAND DISPOSAL SITE or FACILITY PERMIT-BY-RULE NOTIFICATION

More information

Department of the Army Permit Application

Department of the Army Permit Application Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers

More information

Weldcraft Boatyard Clean-up and Redevelopment Project

Weldcraft Boatyard Clean-up and Redevelopment Project Weldcraft Boatyard Clean-up and Redevelopment Project Habitat Mitigation Mike Stoner Environmental Director Port of Bellingham 1801 Roeder Avenue Bellingham, WA 98227 mikes@portofbellingham.com June 10,

More information

SUBMITTAL REQUIREMENTS:

SUBMITTAL REQUIREMENTS: 9611 SE 36 th Street Mercer Island, WA 98040-3732 PHONE (206) 275-7605 FAX (206) 275-7726 Wet Season Grading Restriction (October 1 through April 1) Seasonal Development Limitation Waiver CHECKLIST FOR

More information

PUBLIC NOTICE. Dredge, with 10-years maintenance, and placement of sand on an adjacent beach

PUBLIC NOTICE. Dredge, with 10-years maintenance, and placement of sand on an adjacent beach PUBLIC NOTICE US Army Corps of Engineers New York District Jacob K. Javits Federal Building New York, N.Y. 10278-0090 ATTN: Regulatory Branch In replying refer to: Public Notice Number: NAN-2017-00816-EKN

More information

REMOVAL AND DISPOSAL OF STORAGE TANKS

REMOVAL AND DISPOSAL OF STORAGE TANKS 026500 REMOVAL AND DISPOSAL OF STORAGE TANKS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION I GENERAL REQUIREMENTS

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE PLYMOUTH HARBOR FEDERAL NAVIGATION PROJECT PLYMOUTH, MASSACHUSETTS

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE PLYMOUTH HARBOR FEDERAL NAVIGATION PROJECT PLYMOUTH, MASSACHUSETTS 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Michael Walsh nae-pn-nav@usace.army.mil Programs & Project Management Division Date: June 14, 2018 Comment Period Closes: July

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

SECTION.0500 RISK-BASED ASSESSMENT AND CORRECTIVE ACTION FOR PETROLEUM RELEASES FROM ABOVEGROUND STORAGE TANKS AND OTHER SOURCES

SECTION.0500 RISK-BASED ASSESSMENT AND CORRECTIVE ACTION FOR PETROLEUM RELEASES FROM ABOVEGROUND STORAGE TANKS AND OTHER SOURCES B- 0 0 A NCAC 0L.00 is adopted with changes as published in 0:0 NCR - as follows: SECTION.000 RISK-BASED ASSESSMENT AND CORRECTIVE ACTION FOR PETROLEUM RELEASES FROM ABOVEGROUND STORAGE TANKS AND OTHER

More information

SIOUX ENERGY CENTER SCPB CCR IMPOUNDMENT CLOSURE PLAN

SIOUX ENERGY CENTER SCPB CCR IMPOUNDMENT CLOSURE PLAN SIOUX ENERGY CENTER SCPB CCR IMPOUNDMENT CLOSURE PLAN i Table of Contents 1.0 INTRODUCTION... 1 2.0 SITE DESCRIPTION... 1 3.0 CLOSURE PLAN... 1 3.1 Overview of Closure Approach... 1 3.2 Estimated Maximum

More information

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION Michael J. Van Mill, AICP Planning Director 189 East Court Street Kankakee, IL 60901

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information. MARTIN COUNTY EXCAVATION AND FILL PERMIT APPLICATION This application to be used only for excavating or filling activities not associated with a building permit or development review and for projects requiring

More information

beginning with the end of the quarter following the issue date of the Operating Permit.

beginning with the end of the quarter following the issue date of the Operating Permit. *** IMPORTANT INFORMATION *** Please note that upon issuance of an Operating Permit, quarterly inspection fees are due to the Planning and Growth Management Department in the amount of $.02 per cubic yard