Offshore wind power in Norway. Strategic environmental assessment English summary

Size: px
Start display at page:

Download "Offshore wind power in Norway. Strategic environmental assessment English summary"

Transcription

1 Offshore wind power in Norway Strategic environmental assessment English summary 2

2 This is an english summary of NVE-rapport Havvind strategisk konsekvensutredning Norwegian water resources and energy directorate (NVE) Middelthunsgate 29, P.O.Box 5091 Majorstua, N-0301 Oslo, Norway Phone Web:

3 1 Introduction Offshore renewable energy production in Norway is governed by the Offshore Energy Act. Under this act, the construction of offshore wind power and other renewable energy production units/facilities at sea can only take place after the Norwegian Government has opened specific geographical zones for licence applications. The opening of zones requires that a strategic environmental assessment (SEA) is carried out. The work with the SEA has been carried out by the Norwegian Water Resources and Energy Directorate (NVE) and was presented to the Ministry of Oil and Energy (OED) on January 4, The Ministry will decide which zones are to be opened for licence applications. Several other directorates and government bodies apart from the NVE have contributed with their expertise in the SEA, and NVE wishes to thank the Norwegian Directorate of Nature Management, The Norwegian Directorate for Fisheries, The Norwegian Coastal Administration, and the Norwegian Petroleum Directorate for their involvement. This document summarises the main findings in the SEA and NVE s recommendations to the OED. The SEA is carried out on an overall level, and is not a substitute for project-specific impact assessments. The goal of the SEA is to provide the best possible basis for deciding which of the zones should be opened for licence applications. The 15 zones considered in the SEA include zones considered for bottom-fixed installations and floating turbines. In total, the 15 zones have a capacity from MW, with an estimated normal production of TWh. On average, wind speeds are considerably more favourable offshore than onshore, and the capacity factor of turbines is estimated to be in the range of 36 50%. The areas differ in size. The two southernmost zones, Sørlige Nordsjø I and Sørlige Nordsjø II, cover areas of 1300 km 2 and 2500 km 2 respectively. The areas of the zones considered for floating turbines range from km 2, and the zones considered for bottom-fixed installations range from km 2. In total, the areas considered cover a total area of 9000 km 2, approximately 1% of the Norwegian Exclusive Economic Zone. Offshore turbines are increasing in size, with larger turbine blades and increased installed capacity. In the SEA, turbines with an installed capacity of 10 MW per unit are considered1. It is estimated that the levelised cost of energy in the considered zones will be øre/kwh in 2020, with investment costs in the range of MNOK/MW. Developing wind power projects in the Norwegian zones poses technical challenges. Deep waters, excessive wave heights, and non-homogeneous seabed conditions make the Norwegian zones less likely to be developed in the near future. However, European trends show a clear tendency towards wind power projects being consented and planned in deeper waters. The wind resources off the Norwegian coast are generally more favourable than in other European zones. As technology matures and costs are reduced, it is therefore likely that development of the Norwegian zones will be cost-competitive with other European offshore wind projects post However, developing offshore projects in the Norwegian zones are likely to remain more expensive than developing onshore wind projects on the Norwegian mainland in the conceivable future. Norwegian industries are world-leading in offshore and subsea construction, and many companies are exporting technology and know-how to offshore wind developers all over Europe. A development of offshore wind in Norway would strengthen Norwegian know-how, allowing the industry to specialise in developing offshore wind in deeper waters. 1 For production and cost estimates, turbines with known effect curves in the 6 7 MW range were used. 3

4 2 Environmental impacts 2.1 Birds Impacts on seabirds and migrating birds are found to be small to moderate in all zones. Assessments have been carried out for breeding populations in, and close to, the 15 zones. The zones where wind farms are considered to have the least impact on birds are Sørlige Nordsjø I and Sørlige Nordsjø II, and Sandskallen - Sørøya nord. These zones are located far away from established bird colonies and the zones have low bird densities. For all the other zones, negative impacts on birds are found to be moderate, with differences in impact levels within the zones. presence of wind farms in the zones Sandskallen - Sørøya nord, Stadthavet, and Utsira nord would generate the highest pollution potential. In total, wind farm development in Utsira nord and Stadthavet are associated with the highest environmental risk. It is, however, important to note that the actual risk of accidents is considered as low in all zones. 2.2 Fish, marine mammals and benthic organisms Negative impacts of wind farms on fish are found to be small or even non-detectable. The exceptions are in the zones Stadthavet, Frøyabanken and Sørlige Nordsjø II, where construction can have impacts on blue lings, haddocks and sandeels respectively. Impacts can be reduced by not allowing construction work during spawning-periods. Killer whales are sensitive to sound. Noise from the construction phase can have an impact on their behaviour, possibly preventing them from hunting close to construction sites. It is found that behavioural impacts can be expected in an area of 8 km around the construction site. Behavioural impacts for killer whales can be expected in the northern zones, and measures should be taken to prevent noise-generating construction activities in periods when presence of killer whales can be expected. Impacts on benthic organisms depend on the size and form of the wind turbine foundations. In general, impacts are found to be small to moderate within the 15 assessed zones. However, both the seabed geology and ecology are poorly mapped in many of the zones, and specific impacts on benthos will need to be studied closer in later project-specific assessments. 2.3 Environmental risk In the SEA, environmental risk is measured as the potential for a given type of accident to occur, and the severity of the pollution potential of said accident. The relative potential for accidents is highest in the zones Utsira nord, Stadthavet, Frøyabanken, Frøyagrunnene and Olderveggen, while the 4

5 3 Impact on business and public interests There is a potential for value-creation by developing offshore wind power. The value-creation related to developing the proposed zones is estimated to MNOK/MW over the lifetime of the projects. Labour demand is estimated to be in the region of man-labour years/mw over the lifetime of the project, most of which (80%) will be associated with the construction phase. 3.1 Petroleum interests Potential impacts for the petroleum industry are related to the petroleum resource potential within each zone. The highest petroleum resource potential is found within Sørlige Nordsjø I and II, and the conflict of interests is therefore considered to be highest here. Within the zones Stadthavet and Frøyabanken, the resource potential is also considerable. The Norwegian Petroleum Directorate nevertheless assumes that the coexistence of wind power and petroleum installations is possible within all zones. 3.2 Shipping Wind farm development in the zones Frøyabanken and Træna vest is expected to cause the highest impact on shipping. Also, development in the zones Olderveggen and Trænafjorden can adversely affect shipping due to their location in relation to established shipping lanes and leads. The Norwegian Coastal Administration has proposed new boundaries for some of the zones due to conflicts with existing leads. Co-existence between wind power and shipping is possible in most of the areas, but may require alterations of existing leads and rearranging of beacons/lighthouses. 3.3 Fisheries The Norwegian Directorate for Fisheries has made a general conclusion that co-existence between wind farms and fishery activities will not be possible within a zone. The Directorate recommends that 7 of the 15 areas are not opened for licence applications. These zones are Sandskallen - Sørøya nord, Nordmela, Olderveggen, Frøyagrunnene, Trænafjorden - Selvær, Træna vest and Nordøyan - Ytre Vikna. 3.4 Landscape Visual impacts from offshore wind turbines on the landscape generally increase the closer the turbines are situated to shore. Development of the zones Gimsøy nord and Nordmela will yield the highest negative impacts on landscape as the zones are close to shore and the landscape is considered vulnerable to the visual intrusion represented by the wind turbines. Wind farm development in the zones Trænafjorden - Selvær, Nordøyan - Ytre Vikna, Utsira nord and Frøyagrunnene will also impact the surrounding landscape. Nevertheless, the visual impact from wind turbines is not considered to be unacceptable in any of the 15 zones. 3.5 Outdoor recreation and tourism The presence of offshore wind turbines can have an impact on leisure yachting and fishing activities in the developed areas through restricted access and complicating navigation. However, it is generally the visual intrusion of the turbines that is considered to represent the most important impact for outdoor activities. Visual intrusion is expected to be strongest in the zones Gimsøy nord and Nordøyan - Ytre Vikna. Nevertheless, the visual impact from wind turbines on outdoor activities is not considered to be unacceptable in any of the 15 zones. Offshore wind power is also found to have a potential negative impact on tourism in some zones. This is particularly the case in the zone Nordmela. Impact is also expected to be negative in the zones Gimsøy nord and Frøyagrunnene. In the zone Utsira nord, however, a slight positive impact on tourism is expected. 3.6 Historical monuments and cultural heritage sites Wind power development in the zones will not directly impact any known historical monuments or cultural heritage sites. However, development in the zones Trænafjorden, Selvær and Gimsøy nord may result in some visual impact on cultural heritage sites. 3.7 Other interests The zones Gimsøy nord and Utsira nord overlap with areas used by the Norwegian Air Force and the Norwegian Navy for practice purposes, and development of wind power will be in direct conflict with today s use of the areas. In Gimsøy nord, 5

6 development of wind power is not recommended as long as the area is in use by the Norwegian Navy. When it comes to Utsira nord, however, only a small part of the proposed development area overlaps with the military training area. Subsequently, the potential conflict of interest in this area can be easily avoided by not developing in the overlapping areas. Wind power development in the proposed zones will not impact meteorological or civil aviation radars. The Norwegian Meteorological Institute and Avinor recommend that wind turbines are not sited closer than 5 and 10 km from meteorological and aviation radars respectively. Utsira nord is the only zone where there are pipelines on the seabed. The pipelines are located in the south-eastern corner of the zone. There are no subsea power cables in any of the zones. 6

7 4 Findings in the SEA and NVE s recommendations to OED Figure 4.1: Zones considered for offshore wind power in Norway. Category indicates NVE s recommendations for the further process based on the degree of possibilities and challenges regarding wind power development. See the text for description of the categories. 7

8 The 15 zones considered in the SEA are located along the Norwegian coast from the Barents Sea in the north to the southern parts of the North Sea. In the following the main results from the SEA in each zone will be presented along with NVE s recommendations to the OED. Based on the results from the SEA, NVE has divided the considered zones into three categories: > > Category A: Wind power development within the zone is technically and economically feasible, and will have relatively few negative impacts. Grid connection is possible before > > Category B: Wind power development within the zone will have challenges related to either technical aspects or conflict of interests/negative impacts. The challenges might be resolved in the future through technology development, grid measures and/or mitigation measures. NVE considers that zones in this category can be opened when technology matures, or when existing use of the areas changes. > > Category C: Wind power development within the zone represents greater challenges than in the other two categories. Conflicts of interest in the areas are not easily resolved. Foreseen negative impacts are still considered acceptable. Zones in this category should not be opened at the expense of zones in the two other categories. 8

9 4.1 Sandskallen - Sørøya nord Figure 4.2: The most important interests in and around Sandskallen - Sørøya nord. This zone is located in the Barents Sea, approximately 14 km outside Sørøya in Finnmark County. Average wind speed is estimated to 9.4 m/s, and the zone covers an area of 260 km 2. There is moderate shipping activity in the area, mainly consisting of fishing vessels and freighters. Traffic patterns must be adjusted to ensure safe passage for ships if the area is developed for wind power. The fishing activity in the area is high, with fishing mainly from larger vessels. A low density of seabirds in the area suggests that the area can be developed with little or no impact for seabirds. Care must be taken to minimize impacts for puffins, black-backed gulls and blacklegged kittiwakes. There are also harbour seals in the area. With water depths varying between 40 and 80 meters, this zone can be suitable for both floating and bottom-fixed technology. Relative to the other zones, wind conditions are not among the best, but the wind resources in the zone are considered as superior to onshore wind resources in Finnmark, and also superior to those of many existing European offshore projects. It is expected that electricity demands will rise in the region due to an increase in mining and petroleum activity. Development of wind power in the zone might impact local fishery activities, and the Norwegian Directorate of Fisheries recommends that this zone is not opened for development of wind power. NVE still considers that parts of the zone can be opened with limited impacts on fisheries. However, care must be taken to ensure that fishing interests are appropriately included in the planning process. Category: A 9

10 4.2 Vannøya nordøst Figure 4.3: The most important interests in and around Vannøya nordøst. This zone is located in the Barents Sea close to Vannøya in the municipality of Karlsøy, Troms County. Average wind speed is estimated to 9.2 m/s, and the zone covers an area of 154 km 2. Grid access will require significant investments, and is not likely to be available until Shipping activity in the area is low, and consists mostly of smaller fishing vessels. There is limited existing knowledge of seabird activity in the area. It is known, however, that there are herring gulls and black-backed gulls in the area, and that kittiwakes and razorbills are using the area for foraging. There are established populations of harbour seals in the area, and killer whales can be present during winter. With water depths between 20 and 80 m, the zone can be suitable for both floating and bottom-fixed technology. However, investment costs are considered to be higher than average if compared to the other zones. This is mainly related to varying wind resources across the zone and high costs associated with gaining grid access. If wind power development is carried out within this zone, care must be taken to minimize potential negative impacts on marine mammals during the construction phase. Category: B 10

11 4.3 Auvær Figure 4.4: The most important interests in and around Auvær. This zone is located in the Barents Sea, approximately 15 km outside Kvaløya in Troms County. The zone covers an area of 105 km 2, and the average wind speed is estimated to 9.3 m/s. Grid access will require significant investments. There is relatively high fishing activity in the area. The zone overlaps partially with Auvær Nature Reserve, and includes a wintering area for marine ducks and an important area for common eider ducks and terns. The zone also overlaps with a foraging area for guillemots and auks. Killer whales can be present during parts of the year. With water depths between 20 and 40 m, this zone is suitable for bottom-fixed installations. Although depths alone suggest low investment costs, distance to existing infrastructure and varying wind conditions within the zone suggest high levelised cost of energy (LCOE) compared to the other zones. Developing of wind power in the zone can have impacts on seabirds and fisheries, and parts of the zone overlaps with Auvær nature reserve. NVE recommends that the part of the zone which overlaps with the nature reserve should be excluded from future development considerations. Category: B 11

12 4.4 nordmela Figure 4.5: The most important interests in and around Nordmela. Nordmela is located close to the island Andøya in the municipality of Andøy, Nordland County. Average wind speed in this zone is estimated to 9.2 m/s, and the zone covers an area of 332 km2. Grid access will require significant investments, and might not be possible until after The island of Andøya is an important area for many seabirds, and two nesting cliffs are located adjacent to the zone. Within the zone there are breeding sites for razorbills, puffins, guillemots and kittiwakes. On Andøya, there are also important areas for barnacle geese and pink-footed geese. Within the influence area, there are also important areas for harbour seals. Killer whales are known to be present during winter. Parts of the zone overlap with Skogvoll Nature Reserve. Shipping activity in the area consists of freighters and fishing vessels, and wind farm development within the area will trigger a need for changes in existing routes in the area. Any wind turbines erected within the zone will be visible from Andøya. With water depths varying between 20 and 80 m, this zone can be suitable for both bottom-fixed and floating installations. The wind resources are varying within the zone, though the best wind resources are found in the areas furthest from the shore. Grid access is difficult and will require significant investments. There are important fishing activities in the area. The potential for conflict of interests between wind farm development and local fisheries is considered as high. Category: C 12

13 4.5 Gimsøy nord Figure 4.6: The most important interests in and around Gimsøy Gimsøy nord is located northwest of Gimsøy in the municipality of Vågan, Nordland County. Average wind speed in the area is estimated to 8.9 m/s, and the zone covers an area of 245 km2. Grid access is unproblematic in the area. A large part of the zone coincides with a training area used by the Norwegian Navy. It is assumed that development of the area cannot commence while the Navy are actively using the area for training purposes. The zone is also located within an area important for seabirds, with many species overwintering in the area or using the zone for foraging. In addition, a bird migration route from Svalbard crosses the zone. Within the influence area of the zone there are locations with high densities of harbour seal, and killer whales might be present during winter. Parts of the zone overlap with Hovsflesa Nature Reserve. There is dense traffic in the area, mostly consisting of freighters and fishing vessels. Fishing activity within the area is high, mostly involving smaller fishing vessels. The zone is located close to shore, and a wind farm development in the area will be visible from areas where landscape values are of national importance. With water depths between 20 and 40 m, this zone is considered to be suitable for bottom-fixed installations only. The area is considered to be suitable both technically and economically, but NVE recommends that this area is not given priority due to the high possible impacts for birdlife, and high visual impact on the surrounding landscape. Moreover, development of offshore wind power within this zone is not consistent with the Navy s current use of the area. Category: C 13

14 4.6 Trænafjorden Selvær Figure 4.7: The most important interests in and around Trænafjorden - Selvær. Trænafjorden - Selvær is located in the Norwegian Sea, approximately 26 km from the Nordland County coast. The zone is divided in two sub-areas where Trænafjorden is the southernmost and Selvær the northernmost area. The latter sub-area is an area with many smaller islands and access to this part of the zone might be challenging. This zone covers an area of 197 km2, and average wind speed is measured to 10 m/s. The zone, and especially the Selvær sub-area, is used as a foraging area for migrating barnacle geese, and there are known areas of coral reefs within the zone. Traffic is dense in the zone, and the Trænafjorden sub-area is the most heavily trafficked of all the zones considered. The traffic consists mainly of fishing vessels and passenger ferries. There is also high fishing activity within the zone. A wind farm development within the zone will be visible from populated areas like Husøya, and from cultural heritage sites on the islands. With water depths in the zone varying between 0 and 60 meters, the area can be suitable for both bottom-fixed and floating installations. The wind resources are good across the zone, but wind farm development within the Selvær sub-area will offer challenges regarding access. The zone is located far from existing grid infrastructure, and grid access will require significant investments. Development of wind power in the area can have impact on fisheries and on birdlife, and will be visible from the islands of Træna. Category: B 14

15 4.7 Træna vest Figure 4.8: The most important interests in and around Træna vest. Træna west is located in the Norwegian Sea, approximately 45 km off the Nordland County coastline. This zone covers an area of 773 km2, and average wind speed in the area is estimated to 9.8 m/s. Occurrences of horse mussels and sponges have been registered in the area, and these nature types are categorized as threatened by OSPAR. Very little is currently known about seabird activity in the area. There are shipping routes through the zone. The traffic in the area is largely consisting of offshore supply ships and freighters. However, chemical freighters and fishing vessels also use the area. Fishing activity in the zone is high. The zone is located far away from shore, and wind power development will not cause any visual impacts. With water depths between 181 and 352 meters, this zone is suitable for floating installations. Grid connection is considered to be impossible before 2030 and will require significant investments. The wind resources in the area are considered as lower than in the other zones considered for floating installations. Based on existing knowledge, a development in the area will not have significant impact on environmental interests. Impacts from wind power developments on birdlife are not considered, however, due to lack of existing data. Category: B 15

16 4.8 Nordøyan - Ytre Vikna Figure 4.9: The most important interests in and around Nordøyan Ytre Vikna. Nordøyan - Ytre Vikna is located in the Norwegian Sea, more than 10 km off the island Ytre Vikna in the municipality of Vikna. Average wind speed in the area is estimated to 9.7 m/s, and the zone is covering an area of 140 km2. Traffic density in the area is low, and traffic consists mainly of smaller fishing vessels. The zone is located in an area considered as important to seabirds and there are colonies of kittiwakes, puffins, razorbills and guillemots close to the zone. Fruflesa and Nordøyan Nature Reserves are located adjacent to the zone. Parts of the zone are located close to shore, and a wind power development in these parts of the zone will consequently have visual impacts on the landscape. With water depths of less than 60 meters in most of the zone, this zone is considered for bottom-fixed installations. The depths, however, are varying greatly within the zone, and development of wind power is considered to be challenging. Grid connection will require upgrading of onshore grid, but is considered possible. Development of wind power might impact bird life in the area, and might also have impacts on local fishing activities, as the smaller vessels using the area have few alternative sites. Category: B 16

17 4.9 Frøyabanken Figure 4.10: The most important interests in and around Frøyabanken. Frøyabanken is located approximately 34 km off the coast, and covers an area of 819 km2. Average wind speed is estimated to 9.8 m/s. There is a spawning area for haddock within the zone, but impacts for this species are considered to be few. The zone also overlaps with spawning areas for cod and redfish. Traffic density in this zone is relatively low, with traffic consisting of larger ships and towing vessels. Towing and other activity in the area is mostly related to petroleum installations, and it must be noted that towing vessels have lower manoeuvrability than other vessels. There is also fishing activity in the area. With water depths between 160 and 310 meters, the area is suitable for floating installations. The wind resources are considered as low compared to the other areas suited for floating installations. Grid connection will require significant investments, and might not be possible until after Developing wind power in the zone will have the highest impact on shipping activities compared to the other zones. Also, the zone overlaps with spawning areas for haddock, which is considered to be an important commercial species. Impacts from wind power development on bird life in this zone are unknown due to lack of existing data. Category: B 17

18 4.10 Stadthavet Figure 4.11: The most important interests in and around Stadthavet. Stadthavet is located in the Northern Sea, approximately 58 km from the coast of Nordfjord in Sogn and Fjordane County. The zone covers an area of 520 km2. Average wind speed within the zone is estimated to 11 m/s, and this zone is considered to have the overall roughest weather conditions of the 15 zones considered. The zone overlaps with around 20% of Norway s sole spawning area for blue ling, a Red List-classified fish species. Construction noise may impact the behaviour of this species, and construction and other noise-generating activities should be avoided during the spawning periods. Coral reefs are registered close to the zone, but not within the zone. Fishing activity in the area is high. With water depths between 170 and 210 meters, this zone is suitable for floating installations. The wind resources in the area are excellent, but rough weather condition might limit accessibility of the zone. Grid connection will require significant investments, and might not be possible until after Development in the zone might have impact on blue ling, a species which is on the Norwegian Red List. In a case of wind power development in the area, care needs to be taken to minimize impacts on blue ling. Due to rough climate, and moderate shipping activity, wind power development of the zone also carries higher environmental risks than the other considered zones. Category: B 18

19 4.11 Olderveggen Figure 4.12: The most important interests in and around Olderveggen. Olderveggen covers an area of 76 km2, and is located in the North Sea outside Måløy, in Sogn and Fjordane County. This zone is located close to the zone Frøyagrunnene. Average wind speed is estimated to 10.8 m/s. With water depths between 5 and 60 meters, the zone is considered for bottom-fixed structures. Both Olderveggen and Frøyagrunnene are located close to shore, and in close proximity to existing infrastructure. Either one of the two zones, but not both, can be connected to the existing grid before Olderveggen is located close to the main shipping lane to Måløy, Sandane and Olden, all of which are cruise destinations. There is also high fishing activity within the zone Olderveggen is also close to several bird colonies and many important nesting areas for seabirds in the Sogn and Fjordane region. Parts of the area that is covered by the zone is considered to be an important area for several Red List-classified species, and parts of the nature reserve Veststeinen is located within the area. Olderveggen is located close to the zone Frøyagrunnene. The two zones are mutually excluding, and NVE recommends that Frøyagrunnene is opened before Olderveggen. For more info see NVE comments Frøyagrunnene Category: B 19

20 4.12 Frøyagrunnene Figure 4.13: The most important interests in and around Frøyagrunnene. Frøyagrunnene covers an area of 58 km2, and is located 10 km southwest of Bremangerlandet in Sogn and Fjordane County. Average wind speed in this zone is estimated to 10 m/s. With water depths between 5-60 meters, the zone is considered for bottom-fixed structures. The zone is located close to the zone Olderveggen. Both zones are located close to existing infrastructure and there is grid capacity in the existing grid, allowing one of the two zones to be connected before Traffic in the area consists mostly of freighters and fishing vessels, and the area is used extensively for fishing. If the zone is developed for wind power the traffic patterns must be adjusted. The zone is located relatively close to shore, and any wind farm development will be visible from parts of the coast, including the tourist destination Kalvåg. Developments will also be visible from Hurtigruten, a popular ferry/cruise liner, which sailing route passes the zone. considered to be lower in Frøyagrunnene than in Olderveggen. The Directorate for Fisheries has considered both zones as one, and recommends that neither of the zones is opened. Category: A The zones Frøyagrunnene and Oldeveggen are in close proximity to each other and are technically similar zones. Both zones have water depths between 5 and 60 meters and wind conditions are excellent. Of the zones close to shore in shallow water, Frøyagrunnen and Olderveggen are considered to be those with the highest technical feasibilities. Both zones are also close to existing infrastructure, and there is currently grid capacity for one of the two zones. NVE recommends that Frøyagrunnene is opened for development before Olderveggen due to possible impacts for shipping and seabirds, which are 20

21 4.13 Utsira nord Figure 4.14: The most important interests in and around Utsira nord. Utsira nord is located west of Haugesund, approximately 22 km off the coast. The closest populated area is Utsira. The zone covers an area of 1010 km2, and average wind speed in the area is 10.2 m/s. The area is heavily trafficked, mainly by larger freighters and fishing vessels. Many of the freighters are carrying potentially polluting cargo. Parts of the zone coincide with a training area used by the Norwegian Air Force. Development in the zone will be visible from parts of the island of Utsira. With water depths between 185 and 280 meters, this zone is considered for floating structures. The wind conditions in this zone are among the best of the 15 considered zones, and the foreseen negative impacts of a wind power development in the area are relatively few. The area is, however, heavily trafficked. This, coupled with its proximity to shore, means a development in this zone may be associated with a relatively high environmental risk. NVE recommends that this zone is opened for wind power development, but stresses that such a development will require close co-ordination with the Norwegian Coastal Administration to ensure navigational interests are maintained. Category: A 21

22 4.14 Sørlige Nordsjø I Figure 4.15: The most important interests in and around Sørlige Nordsjø I. Sørlige Nordsjø I is located in the southern parts of the North Sea, some 150 km off the Norwegian coast. Average wind speed in the area is estimated to 10.5 m/s, and the zone covers an area of 1375 km2. The distance to the nearest grid connection point is approximately 200km. Petroleum sectoractivity is high in the southern North Sea, and this zone is located between the petroleum fields Yme and Ula. The zones Sørlige Nordsjø I and Sørlige Nordsjø II are located relatively close to each other and are technically similar zones. These two zones have therefore been evaluated together. See Sørlige Nordsjø II (4.15) for more information. Category: A 22

23 4.15 Sørlige Nordsjø II Figure 4.16: The most important interests in and around Sørlige Nordsjø II. Sørlige Nordsjø II is located some 140 km off the southern coast of Norway. This zone is the largest of all the considered zones, covering an area of 2591 km2. Wind speed in the zone is estimated to 10.5 m/s. The distance to the nearest grid connection point is approximately 200km. Petroleum sector-activity is high in the southern North Sea, and this zone is located between the petroleum fields Ekofisk and Tor. The area is heavily trafficked, with most of the traffic relating to the petroleum industry. Parts of the zone overlap with around 20% of Norway s spawning grounds for sandeel, an ecologically important species. NVE recommends that both Sørlige Nordsjø I and Sørlige Nordsjø II are opened for development. This is due to excellent wind conditions, and due to the relatively low impact of developing the zones. The areas both have water depths between 40 and 70 meters, and NVE has considered that both floating and bottom-fixed structures could be feasible in the zones. There is, however, only grid capacity to handle electricity production from one of the two zones in the foreseeable future. NVE does not want to prioritise one of the zones over the other as they are both very similar in regard to both technical feasibility and possible negative impacts. There are some small differences, however, such as a slightly lower traffic density in Sørlige Nordsjø II. Both areas overlap with spawning areas for sandeel, and if wind power development is carried out in one or both areas, NVE recommends that appropriate measures are taken to prevent disturbances during the sandeel spawning periods. Category: A 23

24

Planning for offshore windpower in Norway

Planning for offshore windpower in Norway Planning for offshore windpower in Norway Strategic impact assessment (SIA) - Strategic impact study of offshore wind in Norway. Gudmund Synnevåg Sydness Content Stages of the planning process SIA the

More information

Assessing impacts of human use

Assessing impacts of human use Norway Japan marine seminar 2012 Assessing impacts of human use Fisheries, aquaculture, shipping and energy exploitation in an integrated and ecosystem-based perspective By: Dr. Erik Olsen Head of research

More information

THE NORTH SEA AND SKAGERRAK

THE NORTH SEA AND SKAGERRAK Scientific basis for an integrated management plan for THE NORTH SEA AND SKAGERRAK SUMMARY CUMULATIVE ENVIRONMENTAL EFFECTS Summary Work on the management plan for the Norwegian sector of the North Sea

More information

Emerging long term effects:

Emerging long term effects: Emerging long term effects: 14 years of Exxon Valdez oil spill studies documents delayed, chronic and indirect effects of marine oil pollution (Peterson et. al. 2003. SCIENCE 302, p. 2084) Seabirds Thick-billed

More information

Scoping Document for the Environmental Assessment. BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey

Scoping Document for the Environmental Assessment. BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey Scoping Document for the Environmental Assessment BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey Exploration Licenses 2431, 2432, 2433, and 2434 August 2013 Contents 1.0 Purpose... 2 2.0 Regulatory

More information

New York State Offshore Wind Master Plan. October 20, 2017

New York State Offshore Wind Master Plan. October 20, 2017 New York State Offshore Wind Master Plan October 20, 2017 2 Offshore Wind Master Plan A comprehensive State roadmap for advancing development of offshore wind in a cost-effective and responsible manner

More information

Kentish Flats Offshore Wind Farm

Kentish Flats Offshore Wind Farm Kentish Flats Offshore Wind Farm A pure spot on the Map of the World Kentish Flats Offshore Wind Farm features 30 wind-powered turbines each with a nominal rated capacity of 3 MW making a net capacity

More information

Framework Ecology and Cumulation

Framework Ecology and Cumulation Framework Ecology and Cumulation, Ministry of Infrastructure and Environment, Commissioned by: Ministry of Economic Affairs Why assessing cumulative effects of offshore wind farm development? Plans for

More information

Legal aspects to renewable energy production in marine areas and coastal zone. Prof. Sigrid Eskeland Schütz Faculty of Law University of Bergen

Legal aspects to renewable energy production in marine areas and coastal zone. Prof. Sigrid Eskeland Schütz Faculty of Law University of Bergen Legal aspects to renewable energy production in marine areas and coastal zone. Prof. Sigrid Eskeland Schütz Faculty of Law University of Bergen Photo: Sónia Arrepia Photography/www.visitnorway.com More

More information

Scoping Document for the Environmental Assessment Statoil Waverley 3D Seismic Survey Exploration Licenses 2435 and 2436

Scoping Document for the Environmental Assessment Statoil Waverley 3D Seismic Survey Exploration Licenses 2435 and 2436 Scoping Document for the Environmental Assessment Statoil Waverley 3D Seismic Survey Exploration Licenses 2435 and 2436 September 1, 2017 Page 1 This page is intentionally left blank Table of Contents

More information

Environmental Impact of Marine Renewable Energy

Environmental Impact of Marine Renewable Energy Environmental Impact of Marine Renewable Energy Prof. Martin J Attrill Director Plymouth University Marine Institute, UK mattrill@plymouth.ac.uk @mjattrill Plan of Presentation Environmental Impact of

More information

First update of the Integrated Management Plan for the Marine Environment of the Barents Sea Lofoten Area

First update of the Integrated Management Plan for the Marine Environment of the Barents Sea Lofoten Area Meld. St. 10 (2010 2011) Report to the Storting (white paper) First update of the Integrated Management Plan for the Marine Environment of the Barents Sea Lofoten Area Ørnulf Opdahl: Hav (Ocean) (watercolour)

More information

Walney Extension Offshore Wind Farm

Walney Extension Offshore Wind Farm WALNEY EXTENSION OFFSHORE WIND FARM Walney Extension Offshore Wind Farm Statement of Common Ground Between: 1. DONG Energy Walney Extension (UK) Limited 2. Whale and Dolphin Conservation In relation to

More information

LID6 Environmental Statement On behalf of Lincs Wind Farm Limited. Non-Technical Summary May Produced in association with

LID6 Environmental Statement On behalf of Lincs Wind Farm Limited. Non-Technical Summary May Produced in association with On behalf of Lincs Wind Farm Limited Non-Technical Summary May 2010 Produced in association with Non-Technical Summary Introduction This document provides a Non-Technical Summary (NTS) of the Environmental

More information

Rampion Offshore Wind Farm Frequently Asked Questions (FAQs)

Rampion Offshore Wind Farm Frequently Asked Questions (FAQs) Rampion Offshore Wind Farm Frequently Asked Questions (FAQs) February 2012 Q: Why renewable energy? A: Renewable energy involves generating electricity from natural sustainable energy sources, which do

More information

3. The maximum generating capacity of the Development shall not exceed 560MW at any time.

3. The maximum generating capacity of the Development shall not exceed 560MW at any time. Our ref: 12.04.09.04/227C DEPARTMENT OF ENERGY AND CLIMATE CHANGE ELECTRICITY ACT 1989 (Section 36) CONSTRUCTION AND OPERATION OF A WIND FARM GENERATING STATION KNOWN AS DUDGEON OFF THE COAST OF NORFOLK

More information

Beatrice Offshore Wind Farm Environmental Statement Addendum

Beatrice Offshore Wind Farm Environmental Statement Addendum Beatrice Offshore Wind Farm Environmental Statement Addendum Non Technical Summary May 2013 Beatrice Offshore Wind Farm Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 ENVIRONMENTAL IMPACT ASSESSMENT

More information

Offshore wind farms in the Belgian part of the North Sea: Understanding environmental impacts

Offshore wind farms in the Belgian part of the North Sea: Understanding environmental impacts Offshore wind farms in the Belgian part of the North Sea: Understanding environmental impacts Royal Belgian Institute for Natural Sciences Robin Brabant Setting the scene Belgian coast line is only 60

More information

CHAPTER 1 OFFSHORE RENEWABLE ENERGY DEVELOPMENT IN THE BELGIAN PART OF THE NORTH SEA

CHAPTER 1 OFFSHORE RENEWABLE ENERGY DEVELOPMENT IN THE BELGIAN PART OF THE NORTH SEA CHAPTER 1 OFFSHORE RENEWABLE ENERGY DEVELOPMENT IN THE BELGIAN PART OF THE NORTH SEA RUMES Bob 1 & BRABANT Robin 2 Royal Belgian Institute of Natural Sciences (RBINS), Operational Directorate Natural Environment

More information

Ecosystem based fisheries management:

Ecosystem based fisheries management: Ecosystem based fisheries management: A NE Atlantic view. Chris Frid University of Newcastle Dove Marine Laboratory Traditional fisheries management How many fish are in the sea? How big is the sustainable

More information

Integrated Actions to Mitigate Environmental Risks in the Mediterranean Sea

Integrated Actions to Mitigate Environmental Risks in the Mediterranean Sea Integrated Actions to Mitigate Environmental Risks in the Mediterranean Sea Coastal Tourism Maritime Transport Socio-economic drivers Contribution to Gross Value Added (GVA) Fisheries and aquaculture Oil

More information

APPENDIX 1 SUMMARY OF DFO S HADD COMPENSATION PROCESS

APPENDIX 1 SUMMARY OF DFO S HADD COMPENSATION PROCESS APPENDIX 1 SUMMARY OF DFO S HADD COMPENSATION PROCESS Any project that is referred to DFO is reviewed to determine if there is likely to be a HADD to productive fish habitat as defined under Section 35

More information

From close to the coast to farshore E.ON s Experience with Offshore Wind Energy Projects

From close to the coast to farshore E.ON s Experience with Offshore Wind Energy Projects From close to the coast to farshore E.ON s Experience with Offshore Wind Energy Projects Dr. Frank Mastiaux, CEO Eufores-Conference, 16th of September 2010 Offshore wind energy: more than wind onshore

More information

Organisation of the Norwegian preparedness against acute pollution. Norwegian Coastal Administration department for emergency response

Organisation of the Norwegian preparedness against acute pollution. Norwegian Coastal Administration department for emergency response NORWEGIAN COASTAL ADMINISTRATION Organisation of the Norwegian preparedness against acute pollution. Norwegian Coastal Administration department for emergency response ORWEGIAN COASTAL ADMINISTRATION Norwegian

More information

Dealing with cumulative effects of offshore windfarms on marine ecology

Dealing with cumulative effects of offshore windfarms on marine ecology Dealing with cumulative effects of offshore windfarms on marine ecology Applying first results in consenting process for offshore wind in Dutch North Sea Maarten Platteeuw, Ministry of Infrastructure and

More information

RENEWABLE ENERGY - Interreg IVB presentation. Iain Todd Renewables Champion. 23 September 2008

RENEWABLE ENERGY - Interreg IVB presentation. Iain Todd Renewables Champion. 23 September 2008 RENEWABLE ENERGY - Interreg IVB presentation Iain Todd Renewables Champion 23 September 2008 NORTH SEA PIONEERING NORTH SEA NORTH SEA OIL AND GAS CARTA MARINA 1539 CARTA MARINA - DETAIL Europe 2100 (unchanged)

More information

Strategic Environmental Assessment of the Marine Spatial Plan proposal for Skagerrak and Kattegat. Consultation document

Strategic Environmental Assessment of the Marine Spatial Plan proposal for Skagerrak and Kattegat. Consultation document Strategic Environmental Assessment of the Marine Spatial Plan proposal for Skagerrak and Kattegat Consultation document Swedish Agency for Marine and Water Management 2018 Swedish Agency for Marine and

More information

Contents. Non-Technical Summary. 1. Introduction. 2. Policy, Regulatory and Administrative Framework. 3. Impact Assessment Methodology

Contents. Non-Technical Summary. 1. Introduction. 2. Policy, Regulatory and Administrative Framework. 3. Impact Assessment Methodology Contents Non-Technical Summary Units and Abbreviations 1. Introduction 1.1 Introduction... 1-2 1.1.1 Overview of 3D Seismic Survey... 1-2 1.1.2 Other BP Exploration and Production Activities in the SWAP

More information

Offshore wind energy effect on maritime resources and environment

Offshore wind energy effect on maritime resources and environment Offshore wind energy effect on maritime resources and environment Solfrid Sætre Hjøllo NORCOWE DAYS 2010 1 1 Content IMR field activities Wind power and the marine environment - interactions and possible

More information

CASE STU DY: CAPE W IND

CASE STU DY: CAPE W IND Your web browser (Safari 7) is out of date. For more security, comfort and the best experience on this site: Update your browser Ignore CASE STU DY: CAPE W IND PRO JECT America s First Offshore Wind Farm

More information

Policy Research Corporation

Policy Research Corporation Policy Research Corporation SOUND SOLUTIONS BASED ON SCIENTIFIC RESEARCH The role of Maritime Clusters to enhance the strength and development of maritime sectors Country report Lithuania INTRODUCTION

More information

BALANCE. Kick-off Meeting, Copenhagen, Denmark. 31st of August - 1st of September 2005

BALANCE. Kick-off Meeting, Copenhagen, Denmark. 31st of August - 1st of September 2005 BALANCE Baltic Sea Management - Nature Conservation and Sustainable Development of the Ecosystem through Spatial Planning Kick-off Meeting, Copenhagen, Denmark 31st of August - 1st of September 2005 Johnny

More information

Mediterranean Sea Community of Common Interest

Mediterranean Sea Community of Common Interest Mediterranean Sea Community of Common Interest 1. Maritime Spatial Planning (MSP) Overview In general terms the issue was extensively debated in Palma at the GA1, with the outcome that all CCI members

More information

Consenting, EIA and HRA Guidance for Marine Renewable Energy Developments in Scotland

Consenting, EIA and HRA Guidance for Marine Renewable Energy Developments in Scotland Consenting, EIA and HRA Guidance for Marine Renewable Energy Developments in Scotland Scottish Environment LINK is the forum for Scotland's voluntary environment organisations, with over 30 member bodies

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

Experience from the UK: Monitoring, Modelling and Uncertainty

Experience from the UK: Monitoring, Modelling and Uncertainty Experience from the UK: Monitoring, Modelling and Uncertainty Lucy Greenhill Offshore Industries Advisor Joint Nature Conservation Committee (JNCC) Symposium: Towards an Environmentally Sound Offshore

More information

The Future of the Ocean Economy - Offshore Wind

The Future of the Ocean Economy - Offshore Wind The Future of the Ocean Economy - Offshore Wind Workshop on Shipping and the Offshore Industry Monday 24 th November, 2014 OECD, Paris Key data sources EWEA Background Projections Technology Finance IEA

More information

Potential of offshore wind energy in Poland

Potential of offshore wind energy in Poland Potential of offshore wind energy in Poland based on Programme for the development of offshore energy and maritime industry in Poland update 2018 Warszawa, 1 March 2018 1 Offshore wind energy in the world

More information

THE FUTURE OF THE OCEAN ECONOMY: WHAT IMPLICATIONS FOR SHIPPING AND SHIPBUILDING?

THE FUTURE OF THE OCEAN ECONOMY: WHAT IMPLICATIONS FOR SHIPPING AND SHIPBUILDING? THE FUTURE OF THE OCEAN ECONOMY: WHAT IMPLICATIONS FOR SHIPPING AND SHIPBUILDING? WORKSHOP ON THE FUTURE OF SHIPBUILDING 29 TH NOVEMBER 2012 OECD International Futures Programme STI/IFP 1 The International

More information

Central Baltic Case. Topic Paper on Energy. Final Version June Authors:

Central Baltic Case. Topic Paper on Energy. Final Version June Authors: Central Baltic Case Topic Paper on Energy Final Version June 2016 Authors: Reinis Āboltiņš - consultant on energy, environment and climate, European Affairs Committee of the Parliament, Latvia Susanne

More information

Floating Wind Power in Deep Water Competitive with Shallow-water Wind Farms?

Floating Wind Power in Deep Water Competitive with Shallow-water Wind Farms? Floating Wind Power in Deep Water Competitive with Shallow-water Wind Farms? a report by Eystein Borgen Sway AS Pioneering projects with a few bottom-mounted wind turbines in shallow water were first installed

More information

Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT

Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT HIBERNIAN WIND POWER LIMITED Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT NON-TECHNICAL SUMMARY September 2003 Report P04E311A-R2 Stephen Court, 18/21 St. Stephen's Green,

More information

Offshore Wind: Ecological risks and opportunities

Offshore Wind: Ecological risks and opportunities Offshore Wind: Ecological risks and opportunities Guido Schild Nathalie Strookman Offshore wind: Ecological risks and opportunities 1. Status of offshore wind in the Netherlands 2. Ecological risks 3.

More information

Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring.

Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring. Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring. Ad Stolk and Chris Dijkshoorn Ministry of Transport, Public Works and Water Management Rijkswaterstaat North

More information

Effects of offshore windfarms on marine wildlife a synthesis for Swedish waters

Effects of offshore windfarms on marine wildlife a synthesis for Swedish waters Effects of offshore windfarms on marine wildlife a synthesis for Swedish waters L. Bergström, L. Kautsky, T. Malm, H. Ohlsson, M. Wahlberg, R. Rosenberg, N. Åstrand Capetillo CWE, Stockholm 5-7 Feb 2013

More information

Project 5a Team 8. Motivation Technology Economic Feasibility Environmental Impact

Project 5a Team 8. Motivation Technology Economic Feasibility Environmental Impact Project 5a Team 8 Motivation Technology Economic Feasibility Environmental Impact 1 CO 2 Emissions Renewable Energy Source Larger Wind Turbines More Energy Reduced Noise and Sight Line Obstruction Sustainable

More information

Wind Energy: Opportunities and Challenges for Offshore Applications. Presentation Outline

Wind Energy: Opportunities and Challenges for Offshore Applications. Presentation Outline Wind Energy: Opportunities and Challenges for Offshore Applications Presentation to IEEE Richmond Section 07 September 2006 Saifur Rahman George Hagerman Manisa Pipattanasomporn VT Advanced Research Institute

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

OSPAR Guidance on Environmental Considerations for Offshore Wind Farm Development

OSPAR Guidance on Environmental Considerations for Offshore Wind Farm Development OSPAR CONVENTION FOR THE PROTECTION OF THE MARINE ENVIRONMENT OF THE NORTH-EAST ATLANTIC OSPAR Guidance on Environmental Considerations for Offshore Wind Farm Development (Reference number: 2008-3) 1 Table

More information

Garden State Offshore Energy, LLC

Garden State Offshore Energy, LLC Garden State Offshore Energy, LLC 2011 1 Contents Brief Background of the NJ Offshore Wind Industry Developer s perspective on maritime risks Public / Private Co-operation Questions? 2 Background of NJ

More information

New Grids for Renewables and the Wadden Sea?

New Grids for Renewables and the Wadden Sea? New Grids for Renewables and the Wadden Sea? Presentation at the Conference New Grids for Renewables! Berlin 10-11 Nov 2011 Dr. Hans-Ulrich Rösner WWF Germany Wadden Sea Office www.wwf.de/watt Oil drilling,

More information

Offshore Renewable Energy in Scottish Waters Policy, Planning and Licensing for the Present and Future

Offshore Renewable Energy in Scottish Waters Policy, Planning and Licensing for the Present and Future Offshore Renewable Energy in Scottish Waters Policy, Planning and Licensing for the Present and Future Licensing context: Development applications for wind farms in the Moray Firth and the requirement

More information

The Potential for Offshore Wind Power in the Southeast A Regional Approach

The Potential for Offshore Wind Power in the Southeast A Regional Approach The Potential for Offshore Wind Power in the Southeast A Regional Approach ASERTTI 2007 State & Local Clean Energy Forum 13 February 2007 Robert Leitner Associate Director South Carolina Institute for

More information

SENSE - Self Erecting Nacelle and Service System Estimated Cost Savings

SENSE - Self Erecting Nacelle and Service System Estimated Cost Savings - Self Erecting Nacelle and Service System Estimated Cost Savings 1. Modelling Work This document sets out the preliminary final results from the combined cost and marine operations modelling undertaken

More information

Draft Structure of the Environmental Report for the Spatial Offshore Grid Plan of the German Exclusive Economic Zone (EEZ) in the Baltic Sea 2013

Draft Structure of the Environmental Report for the Spatial Offshore Grid Plan of the German Exclusive Economic Zone (EEZ) in the Baltic Sea 2013 Draft Structure of the Environmental Report for the Spatial Offshore Grid Plan of the German Exclusive Economic Zone (EEZ) in the Baltic Sea 2013 1 Introduction 1.1 Legal Basis and Function of Environmental

More information

Pilot Project Licensing Justification Statement

Pilot Project Licensing Justification Statement Pilot Project Licensing Justification Statement The following demonstrates that the Snohomish County Public Utility District No. 1 (Snohomish) Admiralty Inlet Pilot Tidal Project (the Project ) meets the

More information

Wind Power in Denmark. Steffen Nielsen Head of Section Danish Energy Authority Ministry of Climate and Energy

Wind Power in Denmark. Steffen Nielsen Head of Section Danish Energy Authority Ministry of Climate and Energy Wind Power in Denmark Steffen Nielsen Head of Section Danish Energy Authority Ministry of Climate and Energy Outline Status on wind power deployment and large scale integration Support system and consent

More information

Strategic Environmental Assessment of the Marine Spatial Plan proposal for the Gulf of Bothnia

Strategic Environmental Assessment of the Marine Spatial Plan proposal for the Gulf of Bothnia Strategic Environmental Assessment of the Marine Spatial Plan proposal for the Gulf of Bothnia Swedish Agency for Marine and Water Management 2018 Swedish Agency for Marine and Water Management Date: 10/04/2018

More information

Garvagh Glebe Wind Energy Project County Leitrim

Garvagh Glebe Wind Energy Project County Leitrim HIBERNIAN WIND POWER LIMITED & COILLTE Garvagh Glebe Wind Energy Project County Leitrim ENVIRONMENTAL IMPACT STATEMENT NON-TECHNICAL SUMMARY March 2003 Report P04J004 R3 Stephen Court, 18/21 St. Stephen's

More information

LSI Toolbox. Heidi Roberts.

LSI Toolbox. Heidi Roberts. LSI Toolbox Heidi Roberts hroberts@abpmer.co.uk Name of presentation Integration of LSI into MSP and associated SEA Practical Toolbox for Practitioners on LSI Easily applied within any admin. or governance

More information

Scoping Document. for the. Strategic Environmental Assessment. for Exploration Activities. on the Southwestern Scotian Slope

Scoping Document. for the. Strategic Environmental Assessment. for Exploration Activities. on the Southwestern Scotian Slope Scoping Document for the Strategic Environmental Assessment for Exploration Activities on the Southwestern Scotian Slope Canada-Nova Scotia Offshore Petroleum Board July 2011 Table of Contents 1.0 Introduction...

More information

Development of Wind Energy in Lithuania. Vitalijus Auglys Ministry of Environment of Lithuania

Development of Wind Energy in Lithuania. Vitalijus Auglys Ministry of Environment of Lithuania Development of Wind Energy in Lithuania Vitalijus Auglys Ministry of Environment of Lithuania Demand of Renewable Energy Following the commitments to the EU, LT has to increase the total amount of energy

More information

SET Plan Declaration of Intent on Strategic Targets in the context of an Initiative for Global Leadership in Ocean Energy

SET Plan Declaration of Intent on Strategic Targets in the context of an Initiative for Global Leadership in Ocean Energy EUROPEAN COMMISSION RTD - Energy ENER - Renewables, R&I, Energy Efficiency JRC Energy, Transport and Climate SET Plan Secretariat Purpose of this document SET Plan Declaration of Intent on Strategic Targets

More information

E-Island. (Energy, Economy, Environment)

E-Island. (Energy, Economy, Environment) E-Island (Energy, Economy, Environment) Introduction to the project The electrical output of wind turbines is intermittent. Sometimes there is little to no wind and wind turbines only start to deliver

More information

Action and responses regarding the ESPOOconvention notification for the Nearshore Windfarm projects at Vesterhav Syd, Sæby, and Bornholm

Action and responses regarding the ESPOOconvention notification for the Nearshore Windfarm projects at Vesterhav Syd, Sæby, and Bornholm Action and responses regarding the ESPOOconvention notification for the Nearshore Windfarm projects at Vesterhav Syd, Sæby, and Bornholm 05-05-2014 SRN/BES 1. Introduction In accordance with Article 3

More information

Prepared by: Dana Morin and Greg Trowse (Fundy Tidal Inc.)

Prepared by: Dana Morin and Greg Trowse (Fundy Tidal Inc.) Southwest Nova Scotia Tidal Energy Resource Assessment Volume 5: Community Engagement Prepared by: Dana Morin and Greg Trowse (Fundy Tidal Inc.) Introduction The Southwest Nova Scotia Tidal Energy Resource

More information

Development of Human Activities in the North Sea

Development of Human Activities in the North Sea BE-AWARE Risk Assessment Seminar, Tønsberg, Norway Development of Human Activities in the North Sea David Johnson, Bonn Secretariat EWEA Members Across entire supply chain EWEA Wind Energy scenario to

More information

Windfarms and biodiversity

Windfarms and biodiversity Windfarms and biodiversity Evidence to date indicates that appropriately sited and well designed wind energy developments are generally not a threat to biodiversity. However, there may be occasions where

More information

The Greenland part of the Labrador Sea (south of 60 N, west of 42,5 W)

The Greenland part of the Labrador Sea (south of 60 N, west of 42,5 W) National Environmental Research Institute University of Aarhus Department of Arctic Environment David Boertmann 15 October 2007 The Greenland part of the Labrador Sea (south of 60 N, west of 42,5 W) A

More information

Proposed Natura 2000 designation

Proposed Natura 2000 designation Proposed Natura 2000 designation Impact Assessment Document - draft for consultation Proposed site: Liverpool Bay / Bae Lerpwl potential Special Protected Area (pspa) November 2016 Mae'r ddogfen hon yn

More information

Ministry of Natural Resources and Environment Responses to Relevant Comments in the Statement from Finland on the Espoo Report

Ministry of Natural Resources and Environment Responses to Relevant Comments in the Statement from Finland on the Espoo Report Ministry of Natural Resources and Environment Responses to Relevant Comments in the from Finland on the Espoo Report Table of Contents 1 Introduction... 3 2 Construction schedule (Ministry of Environment

More information

Updated oil spill risk assessment for the Gulf of Suez

Updated oil spill risk assessment for the Gulf of Suez Updated oil spill risk assessment for the Gulf of Suez G. Ghalwash & M. Elkawam Arab Academy for Science, Technology & Maritime Transport Abstract The Gulf of Suez (GOS) is an important and sensitive area

More information

Renewable energy prospects - wind

Renewable energy prospects - wind Policy Briefing June 2010 Renewable energy prospects - wind CIC recently had a briefing from RenewableUK, a trade and professional association covering wind energy (both on and off shore) as well as wave

More information

ENERGY ON THE HORIZON: OFFSHORE WIND TURBINES SCHEDULED FOR CLEVELAND

ENERGY ON THE HORIZON: OFFSHORE WIND TURBINES SCHEDULED FOR CLEVELAND ENERGY ON THE HORIZON: OFFSHORE WIND TURBINES SCHEDULED FOR CLEVELAND GE 4.0 MW Offshore Wind Turbine. Image from LEEDCo project website, see: http://www.nortechenergy.org/projects/offshore-wind-energy/

More information

MAERSK OIL ESIA-16 NON-TECHNICAL SUMMARY ESIS GORM

MAERSK OIL ESIA-16 NON-TECHNICAL SUMMARY ESIS GORM Intended for Maersk Oil Document type Non-Technical Summary (NTS) Date August, 2015 MAERSK OIL ESIA-16 NON-TECHNICAL SUMMARY ESIS GORM Non-Technical Summary ESIS Gorm 1 of 11 PREFACE This document is the

More information

Developing the second holistic assessment of ecosystem health in the Baltic Sea (HOLAS II) and HELCOM Data management plans

Developing the second holistic assessment of ecosystem health in the Baltic Sea (HOLAS II) and HELCOM Data management plans Developing the second holistic assessment of ecosystem health in the Baltic Sea (HOLAS II) and HELCOM Data management plans Joni Kaitaranta, Data Coordinator joni.kaitaranta@helcom.fi 12.4.2016 First HELCOM

More information

HORNS REV 1 OFFSHORE WIND FARM

HORNS REV 1 OFFSHORE WIND FARM HORNS REV 1 OFFSHORE WIND FARM Mankind has been making use of wind power for thousands of years. The current trend is moving away from small groups of land-based wind turbines to larger offshore wind farms.

More information

Norwegian financial contributions to the objectives of the Convention on Biological Diversity Content

Norwegian financial contributions to the objectives of the Convention on Biological Diversity Content Norwegian financial contributions to the objectives of the Convention on Biological Diversity Content 1. Background...2 2. General notes on methodology and scope...2 3. Environmental budgets...4 4. National

More information

THE CURRENT CLIMATE FOR A SUSTAINABLE BLUE ECONOMY

THE CURRENT CLIMATE FOR A SUSTAINABLE BLUE ECONOMY THE CURRENT CLIMATE FOR A SUSTAINABLE BLUE ECONOMY BLUE ECONOMY CONFERENCE: SOUTHAMPTON, UNITED KINGDOM, APRIL 14, 2015 Surv. Mrs. Angela K. Etuonovbe Chair, Commission 4 (Hydrography) International Federation

More information

Non-Technical Summary (NTS)

Non-Technical Summary (NTS) OFFSHORE WIND AND MARINE RENEWABLE ENERGY IN NORTHERN IRELAND STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) Non-Technical Summary (NTS) AECOM and Metoc December 2009 CONTENTS 1. Introduction 2. Overview of

More information

Section 36C Variation Environmental Statement Non Technical Summary

Section 36C Variation Environmental Statement Non Technical Summary Rev.: 07 Page 1 of 19 Section 36C Variation Environmental Statement Non KINCARDINE OFFSHORE Document Category X Prepared Checked Reviewed Approved 23-11-2017 24-11-2017 24-11-2017 24-11-2017 Organisation:

More information

Swedish Institute for the Marine Environment

Swedish Institute for the Marine Environment Swedish Institute for the Marine Environment National Centre for Analysis of the Marine Environment CONSULTATION RESPONSE 27.08.2010 Ref. No 121-3663-10 Rv registrator@naturvardsverket.se The comments

More information

MSP in Norway: Lessons learned from the Norwegian and Barents seas plans. Erik Olsen

MSP in Norway: Lessons learned from the Norwegian and Barents seas plans. Erik Olsen MSP in Norway: Lessons learned from the Norwegian and Barents seas plans Erik Olsen Background Norway is developing integrated area based management plans for Norwegian EEZs in: Barents Sea. Established

More information

ATLANTIC ARRAY OFFSHORE WINDFARM INITIAL CONSULTATION AVIATION INTERESTS

ATLANTIC ARRAY OFFSHORE WINDFARM INITIAL CONSULTATION AVIATION INTERESTS ATLANTIC ARRAY OFFSHORE WINDFARM AVIATION INTERESTS Document Information Document title Author Produced by Atlantic Array Offshore Windfarm Initial Consultation Andrew Radforth, Cyrrus Limited Cyrrus Ltd

More information

Breakwater Construction Mary s Harbour, NL Environmental Registration Document

Breakwater Construction Mary s Harbour, NL Environmental Registration Document Breakwater Construction Mary s Harbour, NL Environmental Registration Document Submitted to the Government of Newfoundland and Labrador Department of Municipal Affairs and Environment Environmental Assessment

More information

Governance analysis of maritime spatial planning: Belgian case study

Governance analysis of maritime spatial planning: Belgian case study Governance analysis of maritime spatial planning: Belgian case study MSP Governance Ocean governance : rules, principles, institutions, processes, arrangements and activities carried out to manage the

More information

Environmental Impact of Marine Renewable Energy

Environmental Impact of Marine Renewable Energy Environmental Impact of Marine Renewable Energy Prof. Martin J Attrill Director Plymouth University Marine Institute, UK Peninsula Research Institute for Marine Renewable Energy Plan of Presentation Environmental

More information

Wind Energy 101: The Power in Wind

Wind Energy 101: The Power in Wind Wind Energy 101: The Power in Wind Wind Basics Wind is actually solar energy! Wind is the flow of gases on a large scale resulting from the heating and cooling of Earth and its atmosphere as well as the

More information

A positive experience from Great Britain and Northern Europe: Best Practice in Offshore Wind Farm environmental impact assessment

A positive experience from Great Britain and Northern Europe: Best Practice in Offshore Wind Farm environmental impact assessment A positive experience from Great Britain and Northern Europe: Best Practice in Offshore Wind Farm environmental impact assessment Adrian Judd Cefas POWERED IPA Adriatic Project Seminar 11 th October 2013,

More information

MARCS A Computer System For Assessment and Management of Ship Accident Risks

MARCS A Computer System For Assessment and Management of Ship Accident Risks MARCS A Computer System For Assessment and Management of Ship Risks The safety of ships at sea and the environmental risks of marine accidents involving hazardous cargo receive much attention in the world's

More information

Scoping Document. for the. Strategic Environmental Assessment. for Exploration Activities. on the Southwestern Scotian Slope

Scoping Document. for the. Strategic Environmental Assessment. for Exploration Activities. on the Southwestern Scotian Slope Scoping Document for the Strategic Environmental Assessment for Exploration Activities on the Southwestern Scotian Slope Canada-Nova Scotia Offshore Petroleum Board August 2011 Table of Contents 1.0 Introduction...

More information

Offshore Windpark Egmond aan Zee

Offshore Windpark Egmond aan Zee Offshore Windpark Egmond aan Zee Monitoring program and international collaboration Henk Kouwenhoven Monitoring and WTG package manager www.noordzeewind.nl 22 February 2007 EU Policy Workshop on offshore

More information

PES ESSENTIAL. PES: Europe

PES ESSENTIAL. PES: Europe PES ESSENTIAL 96 PES: Europe The cost of wind Like other renewable energy technologies, wind is capital intensive, but has no fuel costs. The key parameters governing wind power economics are the investment

More information

The Malaspina Okeover

The Malaspina Okeover Unit 3 Trevenen Bay Marine Area Substrate Exposure Current Roughness Shoreline Slope Depth Benthic Summer Temp 1.0 sq km Mud 7.3 km Flat Shallow-Mid-depth Warm DESCRIPTION Trevenen Bay is a long narrow

More information

Feasibility Study of Songao s Low Carbon Town Planning, China

Feasibility Study of Songao s Low Carbon Town Planning, China Available online at www.sciencedirect.com ScienceDirect Energy Procedia 88 (2016 ) 313 320 CUE2015-Applied Energy Symposium and Summit 2015: Low carbon cities and urban energy systems Feasibility Study

More information

Policy Research Corporation

Policy Research Corporation Policy Research Corporation SOUND SOLUTIONS BASED ON SCIENTIFIC RESEARCH The role of Maritime Clusters to enhance the strength and development of maritime sectors Country report Belgium INTRODUCTION TO

More information

A British perspective on the design of an offshore wind farm: balancing constraint Pre- and post- monitoring at an of offshore wind farm

A British perspective on the design of an offshore wind farm: balancing constraint Pre- and post- monitoring at an of offshore wind farm A British perspective on the design of an offshore wind farm: balancing constraint Pre- and post- monitoring at an of offshore wind farm Dr Marcus Cross 8 th November 2017 Contents Introduction Full Scope

More information

Belize Cable Feasibility Study Stakeholder Briefing Note

Belize Cable Feasibility Study Stakeholder Briefing Note Project brief background. Belize Cable Feasibility Study project was firstly conceived to provide a reliable service to the current and future electricity supplies for Caye Caulker. Current supply is from

More information

Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities

Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities Content Introduction... 2 Procedural Guidelines... 2 1. Scope of recommended procedural guidelines... 3 2.

More information

Offshore Wind: Consideration for CMANC Stakeholders

Offshore Wind: Consideration for CMANC Stakeholders Offshore Wind: Consideration for CMANC Stakeholders January 10, 2019 Todd Mitchell Source: www.equinor.com 2 Typical Offshore Wind Farm Life Cycle Planning and Analysis Leasing Site Assessment Construction

More information