No /47/2008 CA I(Pt.) Government of India Ministry of Coal NOTICE

Size: px
Start display at page:

Download "No /47/2008 CA I(Pt.) Government of India Ministry of Coal NOTICE"

Transcription

1 No /47/2008 CA I(Pt.) Government of India Ministry of Coal New Delhi the 30 TH May, 2012 NOTICE Sub: Identification of coal blocks for allocation and earmarking for various sectors reg. The list of the coal blocks identified for allocation and earmarked for various sectors is Annexed herewith. Further action would be taken as indicated in the note attached. This is for your information. Encls: A.A. Sd/ (Sandeep Gupta) Under Secretary to Govt. of India To i) Secretary, Ministry of Power ii) Secretary, Ministry of iii) Secretary, Deptt. of Industrial Policy and Promotion iv) Secretary, Deptt. of Fertilizers v) NIC with a request to upload on the website of the Ministry for information.

2 ANNEXURE S.No. Coalfield Block Area LIST OF COAL BLOCKS IDENTIFIED FOR ALLOCATION 1 East Bokaro Jhirki &Jhirki west 8 Incrop S-I-UG Detailed OC Integrated 2 Raniganj Surajnagar SC I to A-F Semi 3 Jharia Aluara SI-UG Regional (Govt) 4 Jharia Parbatpur North SI-UG Semi (Govt) 5 North Karanpura Badam Dip Side WI-UG Semi (Govt) 6 West Bokaro Duni 2 Incrop SII- WIV Semi 7 Pench Kanhan Tambia 13 Incrop WI- WIV Regional 8 Sohagpur Patasi SI-WIV C-F Regional 9 Raniganj Dharma SII-W IV Regional 10 Raniganj Kabirtirtha SII-UG Regional (Govt) 11 East Bokaro North Kathara Ph-I 12 East Bokaro North Kathara Ph-II WIV UG 0.50 Integrated WIV UG 0.50 Integrated

3 S.No. Coalfield Block Area 1 Kamptee Bokhara 3.5 Incrop Kamptee Tonda Incrop- Khairi Khandala 26 A-G Detailed OC Cement C-F Semi Detailed UG Cement 3 Sohagpur Bicharpur B-D Regional UG Cement East 4 Raniganj Andal B-E 0.50 Cement Babuisole 5 Pench- Rawanwara B-F UG 0.50 Cement Kanahan East 6 Pench- Dhau North B-E UG 0.30 Cement Kanhan 7 Kamptee Dahegaon Dhapewada A-F Not UG 1.00 Cement 1 Korba Karkoma A-G Regionally UG Sponge Iron explored 2 Sohagpur Bicharpur A-F Regional UG Sponge Iron North 3 Bander Mohan B-G Regional UG Sponge Iron 4 Kamptee Kalambi A-F Not UG 0.60 Sponge iron Kameshwar 5 Sohagpur Shahdol C-E Not UG 1.00 Sponge iron

4 S.No. Coalfield Block Area 1 Tatapani- Ramkola 2 Tatapani- Ramkola Meguli B-D Not Sursa B-D Not UG 0.50 Surface Gasification UG 1.50 Surface Gasification S.No. Coalfield Block Area 1 Mand Jilga-Barpali Regionally explored UG Power 2 Brahmani Kalyanpur- 6 Incrop Regional OC Power Badalpara South Tokisud-II 2 Incrop- 160 B-G Semi Power Karanpura Singrauli Gand Bahera Ujheni NA Regional - Power 5 Talcher Kudanali A-G Regional OC Power Laburi 6 Talcher Sarapal C-G Regional UG Power Nuapara 7 Talcher Tentuloi D-G Regional UG Power 8 Barjora Barjora 5.5 Incrop F-G Semi UG Power South Rajmahal Pachwara 6.5 Incrop- 280 B-G Regional OC Power South Raniganj Tamla North B-D Not UG 4.00 Power 11 Raniganj Bistupur Dandeshwar E-G Not UG 1.00 Power

5 12 Raniganj Domra D-E Not UG 2.00 Power Panagarh 13 Hasdeo- Saidu North 7.25 Upto A-G Regional OC Power Arand Sector 14 Hasdeo- Arand Saidu South Sector 2.75 Upto A-G Regional OC Power 15 Kamptee Mahajanvadi C-F Not UG 1.00 Power 16 Talcher Chandrabila D-F Not Power S.No. Coalfield Block Area 1 Talcher Brahmani 13.2 Incrop B-G Semi Government Godavari Cherla OC 0.66 Semi Government 3 Godavari Cherla UG 1.99 A-E Semi Government 4 Godavari Tadicherla Regional - Government II 5 Mand- Baisi 6 Incrop- 150 Semi UG Government Auranga Gava Regional - Government 7 Korba Kerwa 11 Incrop C-UG Promotional exploration UG Government 8 Bhirbhum Deocha- Pachami C-G Regional Government Dewanganj- Harinsinha Incrop C-G 9 Raniganj Raniganj B-E UG 1.00 Government

6 10 Mand 11 Mand 12 Hasdeo- Arand Banai 17.2 Upto A-G Promotional Government Bhalumuda 16.4 Upto A-G Promotional Government Kente Extn 17 Upto B-G Part Regional OC Government Notes: (i) (ii) The coal blocks earmarked for power sector are meant both for tariff based bidding and Central Government companies engaged in production of power. The further earmarking would be done in consultation with the Ministry of Power and CMPDIL and the same would be notified separately before the applications are invited. The blocks meant for Government companies shall be allocated for commercial mining only and they shall be circulated inviting applications after terms and conditions are finalised. (iii) Applications for the blocks reserved for integrated steel for Government companies shall be separately circulated after finalisation of terms & conditions. The remaining blocks meant for allocation through auction by competitive bidding would be advertised once the bidding documents are ready. (iv) The coal blocks earmarked for allocation through tariff based bidding and for allocation through auction by competitive bidding shall be allotted only after exploration and preparation of Geological Report. *******

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update Research Compendium Coal Sector in India 2013 A comprehensive data and information update Release Date : August 2013 Background About the report Coal is the only major conventional source of energy that

More information

OUTLOOK OF COAL DEMAND/SUPPLY AND POLICY IN INDIA 2009 APEC CLEAN FOSSIL ENERGY TECHNICAL AND POLICY SEMINAR 12 TH - 14 TH OCTOBER 2009 INCHEON, KOREA

OUTLOOK OF COAL DEMAND/SUPPLY AND POLICY IN INDIA 2009 APEC CLEAN FOSSIL ENERGY TECHNICAL AND POLICY SEMINAR 12 TH - 14 TH OCTOBER 2009 INCHEON, KOREA OUTLOOK OF COAL DEMAND/SUPPLY AND POLICY IN INDIA 2009 APEC CLEAN FOSSIL ENERGY TECHNICAL AND POLICY SEMINAR 12 TH - 14 TH OCTOBER 2009 INCHEON, KOREA 1 Presentation Sturcture Coal Sector Overview Demand

More information

A-60011/01/2016-Coord. Ministry of Coal Coordination Section Shastri Bhawan, New Delhi Dated 29th July, 2016 ORDER Consequent upon transfer of Shri S.K.Shahi, Joint Secretary as DDG(C&A) in the Department

More information

Coal Sub committee meeting at Cagliari, Italy April Strategies for promoting CMM project development in India

Coal Sub committee meeting at Cagliari, Italy April Strategies for promoting CMM project development in India Coal Sub committee meeting at Cagliari, Italy 29-30 April 2008 Strategies for promoting CMM project development in India 1. Broad National Initiative: India is vigorously pursuing clean coal technologies

More information

Award Scheme for Secondary Steel Producers

Award Scheme for Secondary Steel Producers Award Scheme for Secondary Steel Producers 1.0 Background: 1.1 Secondary Steel sector (mini steel plants and steel processing units) in India comprises of composite and stand-alone steel production & processing

More information

No /15/2016-CPD/CLD Government of India Ministry of Coal

No /15/2016-CPD/CLD Government of India Ministry of Coal 1 No. 23011/15/2016-CPD/CLD Government of India Ministry of Coal IMMEDIATE Shastri Bhawan, New Delhi, the 22nd May, 2017 To Chairman-cum-Managing Director, Coal India Limited, Coal Bhawan, New Town, Rajarhat,

More information

IP,9 (A.K. Das) Under Secretary to the Government of India Tel No

IP,9 (A.K. Das) Under Secretary to the Government of India Tel No Guard folder No.23No1.81 Ministry of Coal (IF Division) New Delhi the 13th May, 2016 Subject: (i) Amendment to the Rule of 126 General Financial Rule,2005 regarding. (ii) Insertion of Rule 141 A after

More information

Unconventional Gas E&P : Essar Approach

Unconventional Gas E&P : Essar Approach Unconventional Gas E&P : Essar Approach 26-27 th November, 2015 Essar Exploration & Production Peninsula Techno-park, Tower II, LBS Marg, Mumbai 400070, India. www.essar.com About Essar Essar is a multinational

More information

Mining and mineral based industries: BIG NUMBERS. Centre for Science and Environment New Delhi

Mining and mineral based industries: BIG NUMBERS. Centre for Science and Environment New Delhi Mining and mineral based industries: BIG NUMBERS Centre for Science and Environment New Delhi The Study o Data on forests and environment clearances granted by the MoEF in the last five years - 11 th FYP

More information

Optimal exploitation of coal resources

Optimal exploitation of coal resources Optimal exploitation of coal resources through Coal to Chemicals Industry February 2015 New Delhi Coverage Indian context Global context Adani Proposal Support from Govt. 2 India has significant shortfall

More information

COAL PRODUCTION, MARKETING & DISTRIBUTION

COAL PRODUCTION, MARKETING & DISTRIBUTION Chapter-7 COAL PRODUCTION, MARKETING & DISTRIBUTION 7.1 COAL PRODUCTION 7.1.1 Coal India Ltd. and its subsidiaries are the major producer of coal. 291.24 Million Tonnes of coal was produced by Coal India

More information

4x150 MW Surguja Thermal Power Project Near Parsa Village, Udaypur Tehsil, Surguja Dist. Chhattisgarh By Surguja Power Private Limited.

4x150 MW Surguja Thermal Power Project Near Parsa Village, Udaypur Tehsil, Surguja Dist. Chhattisgarh By Surguja Power Private Limited. 4x150 MW Surguja Thermal Power Project Near Parsa Village, Udaypur Tehsil, Surguja Dist. Chhattisgarh By Surguja Power Private Limited. Project Category Project Proponent Location Proposed 600 (4x150)

More information

No. J-11015/308/2010-IA.II (M) Government of India Ministry of Environment & Forests

No. J-11015/308/2010-IA.II (M) Government of India Ministry of Environment & Forests No. J-11015/308/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi-110003 Dated: 16 th July, 2013 To, The General Manager M/s Madhya

More information

Green Rating Project What, why, How?

Green Rating Project What, why, How? Green Rating Project What, why, How? CSE s Green Rating Project - what and why? Started in 1997; Rated 6 sectors: 1. Pulp and Paper 1999, revisited it 2004, 2013 2. Automobile, 2001 3. Chlor-alkali, 2002

More information

Rosa Phase I Location Capacity Fuel Source Status. : Uttar Pradesh : 600 MW. : Coal. : Operational. Rosa Phase II Location Capacity Fuel Source Status

Rosa Phase I Location Capacity Fuel Source Status. : Uttar Pradesh : 600 MW. : Coal. : Operational. Rosa Phase II Location Capacity Fuel Source Status Coal Based Projects Rosa Phase I Rosa Phase II : Uttar Pradesh : 600 MW : Operational : Uttar Pradesh : 600 MW : Operational Butibori Power Project : Maharashtra : 600 MW : Operational Sasan Ultra Mega

More information

Petroleum Planning & Analysis Cell

Petroleum Planning & Analysis Cell Petroleum Planning & Analysis Cell Monthly Report on Natural gas production, availability and consumption - July 2017 1. Highlights of the report for the month of July 2017 are as follows: Gross production

More information

TENDER NOTICE. (ii) Last Date & Time and place for : In the Tender Box kept at acceptance of Tender

TENDER NOTICE. (ii) Last Date & Time and place for : In the Tender Box kept at acceptance of Tender F.No.22-30/2015-INC Dated: 22 nd December, 2017 TENDER NOTICE Sub. : Tender for disposal of Obsolete/Unserviceable Store items. 1. Sealed tenders are invited for disposal of Obsolete/Unserviceable Store

More information

Possible source-sink matching for CO 2 sequestration in Eastern India

Possible source-sink matching for CO 2 sequestration in Eastern India Available online at www.sciencedirect.com Energy Procedia 37 (2013 ) 3233 3241 Abstract GHGT-11 Possible source-sink matching for CO 2 sequestration in Eastern India Priyank Jain 1 *, Khanindra Pathak

More information

Report of the Working Group on Integrated Strategy for Bulk Transport of Energy and Related Commodities in India

Report of the Working Group on Integrated Strategy for Bulk Transport of Energy and Related Commodities in India 2013 Report of the Working Group on Integrated Strategy for Bulk Transport of Energy and Related Commodities in India National Transport Development Policy Committee (NTDPC) Report of the Working Group

More information

Subject : Selection for the post of Director (Power), BHEL, a schedule `A' CPSE.

Subject : Selection for the post of Director (Power), BHEL, a schedule `A' CPSE. F. No. 5-01/1/2017-PE-11 SECTION Ministry Of Heavy Industries And Public Enterprises Department Of Heavy Industry PE XI Section Room No. 387-A, Udyog Bhawan, ew Delhi Dated : June, 2018 To The Chairman

More information

INDIAN SCHOOL MUSCAT DEPT OF SOCIAL SCIENCE GEOGRAPHY QUESTION BANK CLASS X- ( ) CHAPTER-1- RESOURCES AND DEVELOPMENT

INDIAN SCHOOL MUSCAT DEPT OF SOCIAL SCIENCE GEOGRAPHY QUESTION BANK CLASS X- ( ) CHAPTER-1- RESOURCES AND DEVELOPMENT INDIAN SCHOOL MUSCAT DEPT OF SOCIAL SCIENCE GEOGRAPHY QUESTION BANK CLASS X- (2017-2018) CHAPTER-1- RESOURCES AND DEVELOPMENT 1 Which is the most important soil of India? 1 2 What is another name of black

More information

Website: persmin.nic.in/pesb No.7/76/2009-PESB Government of India Public Enterprises Selection Board Department of Personnel & Training

Website: persmin.nic.in/pesb No.7/76/2009-PESB Government of India Public Enterprises Selection Board Department of Personnel & Training Website: persmin.nic.in/pesb No.7/76/2009-PESB Government of India Public Enterprises Selection Board Department of Personnel & Training Block 14, P E Bhavan, CGO Complex, Lodhi Road, New Delhi-110 003

More information

Subject: Selection for the post of Director (Marketing), Heavy Engineering Corporation Limited(HEC), a schedule A CPSE.

Subject: Selection for the post of Director (Marketing), Heavy Engineering Corporation Limited(HEC), a schedule A CPSE. No. 7/72/2014-PESB भ रत सरक र / Government of India क र म क एव प रश क षण शवभ ग / Department of Personnel & Training ल क उद यम चयन ब र / Public Enterprises Selection Board *** ब ल क स ख य 14, स ज ओ क म

More information

STRATEGIC PLAN MINISTRY OF COAL

STRATEGIC PLAN MINISTRY OF COAL STRATEGIC PLAN MINISTRY OF COAL Issued : 10 th February,2011 1 I N D E X Section Subject Page 1 Core Purpose, Aspiration 1 2 Assess the Situation 2 3 Strategies 6 4 Implementation Plan 13 5 Linkage between

More information

Subject: Tender for Manufacturing and Supply of Self Adhesive Stickers under two bid system (technical bid and financial bid) -reg

Subject: Tender for Manufacturing and Supply of Self Adhesive Stickers under two bid system (technical bid and financial bid) -reg F 43-141/2013/NIOS/Admn./Pur 13 th May, 2013 To Subject: Tender for Manufacturing and Supply of Self Adhesive Stickers under two bid system (technical bid and financial bid) -reg Dear Sir/Madam, National

More information

ब ल क स ख य 14, स ज ओ क म प ल क स, ल द र र Block No.14, C.G.O. Complex, Lodhi Road नई ददल ल / New Delhi , ददन दकत/ Dated: 30 th January, 2018

ब ल क स ख य 14, स ज ओ क म प ल क स, ल द र र Block No.14, C.G.O. Complex, Lodhi Road नई ददल ल / New Delhi , ददन दकत/ Dated: 30 th January, 2018 No. 7/89/2017-PESB भ रत सरक र / Government of India क र म क एव प रर क षण ववभ ग / Department of Personnel & Training ल क उद यम चयन ब र / Public Enterprises Selection Board *** Subject: Selection for the

More information

ब ल क स ख य 14, स ज ओ क म प ल क स, ल द र र Block No.14, C.G.O. Complex, Lodhi Road नई र दल ल / New Delhi , र दन र कत/ Dated: 18 th October, 2017

ब ल क स ख य 14, स ज ओ क म प ल क स, ल द र र Block No.14, C.G.O. Complex, Lodhi Road नई र दल ल / New Delhi , र दन र कत/ Dated: 18 th October, 2017 No. 7/74/2017-PESB भ रत सरक र / Government of India क र म क एव प रर क षण र वभ ग / Department of Personnel & Training ल क उद यम चयन ब र / Public Enterprises Selection Board *** ब ल क स ख य 14, स ज ओ क म

More information

SUPREME COURT OF INDIA

SUPREME COURT OF INDIA SUPREME COURT OF INDIA ADMN. MATERIALS (P&S) By Speed Post No. 33/Comp/dis/17/SCI(AM) Dated : 20 th December, 2017 Last date of Tender : 8 th January, 2018 NOTICE INVITING TENDER FOR SELLING/DISPOSAL OF

More information

India Coal Sector Update to the 25 th Session of Global Methane Initiative (GMI) Coal Subcommittee

India Coal Sector Update to the 25 th Session of Global Methane Initiative (GMI) Coal Subcommittee India Coal Sector Update to the 25 th Session of Global Methane Initiative (GMI) Coal Subcommittee Shekhar Saran Chairman cum Managing Director Central Mine Planning & Design Institute 24 th 25 th October

More information

Subject: Tender for supply of Antivirus and Application Software under two bid system (technical bid and financial bid) -reg

Subject: Tender for supply of Antivirus and Application Software under two bid system (technical bid and financial bid) -reg F-43-95/2011/NIOS/Admn./Pur 16.7. 2012 M/s....... Subject: Tender for supply of Antivirus and Application Software under two bid system (technical bid and financial bid) -reg Dear Sir/Madam, National Institute

More information

IChina and the US. The total coal production in India was

IChina and the US. The total coal production in India was ndia is the third largest coal producer in the world after IChina and the US. The total coal production in India was around 612 million tonnes (MT) in FY 2015, which has increased to 626 MT in FY 2016.

More information

BHAVAN, 4/2ASHOK NAGAR,.P.B NO: 227 GUNTUR PH.NO: /943,FAX:

BHAVAN, 4/2ASHOK NAGAR,.P.B NO: 227 GUNTUR PH.NO: /943,FAX: (A Govt of India Undertaking) KAPAS BHAVAN, 4/2ASHOK NAGAR,.P.B NO: 227 GUNTUR-522002 PH.NO:0863-2233472/943,FAX:0863-2357472 EMAIL: guntur@cotcorp.com, CCI Website:www.cotcorp.org.in Ministry website:www.texmin.nic.in

More information

CENTRAL BOARD OF SECONDARY EDUCATION SHIKSHA KENDRA, 2, COMMUNITY CENTRE PREET VIHAR, DELHI

CENTRAL BOARD OF SECONDARY EDUCATION SHIKSHA KENDRA, 2, COMMUNITY CENTRE PREET VIHAR, DELHI CENTRAL BOARD OF SECONDARY EDUCATION SHIKSHA KENDRA, 2, COMMUNITY CENTRE PREET VIHAR, DELHI-1100092 TENDER NOTICE Sealed tenders are invited under Two-Bid System from reputed contractors registered with

More information

RASHTRIYA ISPAT NIGAM LIMITED VISAKHAPATNAM STEEL PLANT, VISAKHAPATNAM

RASHTRIYA ISPAT NIGAM LIMITED VISAKHAPATNAM STEEL PLANT, VISAKHAPATNAM RASHTRIYA ISPAT NIGAM LIMITED VISAKHAPATNAM STEEL PLANT, VISAKHAPATNAM 530 031 MATERIALS MANAGEMENT DEPARTMENT (Purchase Wing) BLOCK-A, ADMINISTRATIVE BUILDING VISAKHAPATNAM STEEL PLANT VISAKHAPATNAM 530

More information

COAL EXPLORATION XI PLAN PERIOD ( )

COAL EXPLORATION XI PLAN PERIOD ( ) COAL EXPLORATION The exploration for coal is by nature an investigation and developmental activity, undertaken in anticipation of future demand of coal, to enable mine projection and mine development.

More information

CENTRAL COALFIELDS LIMITED SALES & MARKETING DIVISION DARBHANGA HOUSE : RANCHI

CENTRAL COALFIELDS LIMITED SALES & MARKETING DIVISION DARBHANGA HOUSE : RANCHI CENTRAL COALFIELDS LIMITED SALES & MARKETING DIVISION DARBHANGA HOUSE : RANCHI No. CCL/HQ/C-4/E-AUCTION/DECEMBER 18/12798 Dated: 18.12.2018 SALE OF COAL THROUGH SPOT E-AUCTION It is for information of

More information

Software requirement of Payroll Module

Software requirement of Payroll Module PF Trust & Payroll Software Tender Document Annexure-A Software requirement of Payroll Module (a) Software of Payroll should generate present requirement of payroll. (b) The system should be developed

More information

Steel scenario in India. Mr V R Sharma Dy MD & CEO

Steel scenario in India. Mr V R Sharma Dy MD & CEO Steel scenario in India Mr V R Sharma Dy MD & CEO Inadequate Survey & Exploration Lack of Private Participation in Survey & Exploration Actual Explored Reserves and Total Investment too small Exploration

More information

ORDER. (Date of Hearing: 1 st October, 2013) (Date of Order : 8 th October, 2013) M.P. Power Transmission Co. Ltd., Jabalpur - Petitioner.

ORDER. (Date of Hearing: 1 st October, 2013) (Date of Order : 8 th October, 2013) M.P. Power Transmission Co. Ltd., Jabalpur - Petitioner. Petition No.45 of 2013 Sub: In the matter of MPPTCL s application for adoption of tariff under section 63 of ORDER (Date of Hearing: 1 st October, 2013) (Date of Order : 8 th October, 2013) M.P. Power

More information

Energy is essential for meeting basic human needs, for

Energy is essential for meeting basic human needs, for 16 Using energy efficiently 4 Energy is essential for meeting basic human needs, for economic growth, and for social development. India is well aware of the challenge of providing access to modern energy

More information

Suggestions of Cement Sector on Procedure & Methodology of auction/ allocation of coal blocks : A Presentation before the Nominated Authority

Suggestions of Cement Sector on Procedure & Methodology of auction/ allocation of coal blocks : A Presentation before the Nominated Authority Presentation made to the Nominated Authority on the suggestions of Cement Sector regarding Allocation of Coal Blocks Suggestions of Cement Sector on Procedure & Methodology of auction/ allocation of coal

More information

LIMITED E-TENDER NO: REC/LAW/PARIWARTAN/ /5/43 (ONLY THROUGH E-TENDERING MODE) Invitation for Bid. For

LIMITED E-TENDER NO: REC/LAW/PARIWARTAN/ /5/43 (ONLY THROUGH E-TENDERING MODE) Invitation for Bid. For REC Limited (Formerly RURAL ELECTRIFICATION CORPORATION LIMITED) (A Government of India Enterprise) Regd Office:Core-4, SCOPE Complex, 7, Lodi Road, New Delhi - 110003 Tele. 43091567 Fax 24360644 Email

More information

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB)

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB) Brief Note Prakash Industries Limited (PIL) is existing Integrated Steel Plant located at Hathneora, Champa Villages, Janjgir-Champa District, Chhattisgarh. Existing plant has obtained Environment Clearance

More information

Interested eligible bidders for the captioned project can submit the EoI along with the project concept and mentioned documents.

Interested eligible bidders for the captioned project can submit the EoI along with the project concept and mentioned documents. EXPRESSION OF INTEREST (EoI) Design, Installation, Operation and Maintenance of Smart Parking System at Multi-Level Car Park (MLCP) at Sector 38A, Near Botanical Garden Metro Station, Noida, Uttar Pradesh

More information

Subject: Selection for the post of Director (Personnel), Steel Authority of India Ltd. (SAIL), a schedule A CPSE.

Subject: Selection for the post of Director (Personnel), Steel Authority of India Ltd. (SAIL), a schedule A CPSE. No. 7/28/2016-PESB भ रत सरक र / Government of India क र म क एव प रश क षण शवभ ग / Department of Personnel & Training ल क उद यम चयन ब र / Public Enterprises Selection Board *** ब ल क स ख य 14, स ज ओ क म

More information

Sub: Filling up the posts of Finance & Administrative Officer, Sr. Accountant, Marketing Assistant and Consultant (Administration).

Sub: Filling up the posts of Finance & Administrative Officer, Sr. Accountant, Marketing Assistant and Consultant (Administration). Government of India National Medicinal Plants Board Ministry of AYUSH Room No. 309, 3 rd Floor, AYUSH Bhawan, B Block, GPO Complex, INA, New Delhi-110023 Sub: Filling up the posts of Finance & Administrative

More information

EXPRESSION OF INTEREST (EoI) Supply, Installation, Operation and Maintenance of Water Treatment Technology for Ranney Wells Noida, Uttar Pradesh

EXPRESSION OF INTEREST (EoI) Supply, Installation, Operation and Maintenance of Water Treatment Technology for Ranney Wells Noida, Uttar Pradesh EXPRESSION OF INTEREST (EoI) Supply, Installation, Operation and Maintenance of Water Treatment Technology for Ranney Wells Noida, Uttar Pradesh Noida Authority invites Expression of Interest (EoI) to

More information

CHAIRMAN S STATEMENT

CHAIRMAN S STATEMENT 1 CHAIRMAN S STATEMENT My Dear Friends, I am really delighted to welcome you all to the 43 rd Annual General Meeting of Coal India Limited. The Directors Report, the Financial Statement for the year 2016-17

More information

MINING REGULATIONS IN FOREST AND ECO-FRAGILE AREAS A PRESENTATION BY RAJEEVA, IFS, ADDITIONAL PRINCIPAL CHIEF CONSERVATOR OF FORESTS.

MINING REGULATIONS IN FOREST AND ECO-FRAGILE AREAS A PRESENTATION BY RAJEEVA, IFS, ADDITIONAL PRINCIPAL CHIEF CONSERVATOR OF FORESTS. MINING REGULATIONS IN FOREST AND ECO-FRAGILE AREAS A PRESENTATION BY RAJEEVA, IFS, ADDITIONAL PRINCIPAL CHIEF CONSERVATOR OF FORESTS. MINERAL RESOURCES IN INDIA The mineral resources in India consist of

More information

MINING IN INDIA 2016

MINING IN INDIA 2016 Now Available MINING IN INDIA 2016 Sector Analysis and Market Outlook Research Report Data-set (Excel) India Infrastructure Research www.indiainfrastructure.com 1. Executive Summary SECTION I: SECTOR OVERVIEW

More information

STANDING COMMITTEE ON COAL AND STEEL ( ) FIFTEENTH LOK SABHA

STANDING COMMITTEE ON COAL AND STEEL ( ) FIFTEENTH LOK SABHA 31 STANDING COMMITTEE ON COAL AND STEEL (2012-2013) FIFTEENTH LOK SABHA MINISTRY OF COAL REVIEW OF ALLOTMENT, DEVELOPMENT AND PERFORMANCE OF COAL/LIGNITE BLOCKS THIRTY-FIRST REPORT LOK SABHA SECRETARIAT

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR-34 A, CHANDIGARH

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR-34 A, CHANDIGARH PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-21, SECTOR-34 A, CHANDIGARH Petition No. 31 of 2016 Date of Order: 10.06.2016 Present: Shri D.S. Bains, Chairman Shri S.S. Sarna, Member In the

More information

Coal Sector Reforms in India Analysing from the Lens of Competition & Regulatory Architecture

Coal Sector Reforms in India Analysing from the Lens of Competition & Regulatory Architecture Coal Sector Reforms in India Analysing from the Lens of Competition & Regulatory Architecture 9th India Coal Summit, New Delhi Arpit Tiwari CUTS International 29 June 2017 1 Contents Introduction Coal

More information

Examining the Technology of CBM Multiple-lateral Horizontal Well

Examining the Technology of CBM Multiple-lateral Horizontal Well Examining the Technology of CBM Multiple-lateral Horizontal Well Dr. S. K. Singh VP & Head-Technical-Unconventional Unconventional Gas Asia Summit (UGAS 2013) New Delhi, 18-19 April 2013 Agenda Essar CBM

More information

THE INTERNATIONAL JOURNAL OF SCIENCE & TECHNOLEDGE

THE INTERNATIONAL JOURNAL OF SCIENCE & TECHNOLEDGE THE INTERNATIONAL JOURNAL OF SCIENCE & TECHNOLEDGE Integrated Development Of Both Conventional And Unconventional Coal Fuels In India Annapurna Boruah Ph. D. Student, The Maharaja Sayajirao University

More information

TENDER NOTICE. Printers/Fax 122* 100* 28* 18* 75* 1 *Likely to increase or decrease

TENDER NOTICE. Printers/Fax 122* 100* 28* 18* 75* 1 *Likely to increase or decrease F.No.D.19015/1/2017-Admn.II(LD) Government of India Ministry of Law and Justice Legislative Department Shastri Bhawan, New Delhi Dated the 15 th March, 2017 TENDER NOTICE Subject:- Awarding Comprehensive

More information

Delhi Metro Rail Corporation Limited (A JV of Govt. of India and Govt. of Delhi) Metro Bhawan,Barakhamba Road, Delhi (India)

Delhi Metro Rail Corporation Limited (A JV of Govt. of India and Govt. of Delhi) Metro Bhawan,Barakhamba Road, Delhi (India) Delhi Metro Rail Corporation Limited (A JV of Govt. of India and Govt. of Delhi) Metro Bhawan,Barakhamba Road, Delhi-110001 (India) Request for Proposal (RFP) for Setting up a Wi-Fi Hotspot at Delhi Metro

More information

IMPLEMENTING CLEAN COAL TECHNOLOGY THROUGH GASIFICATION AND LIQUEFACTION THE INDIAN PERSPECTIVE

IMPLEMENTING CLEAN COAL TECHNOLOGY THROUGH GASIFICATION AND LIQUEFACTION THE INDIAN PERSPECTIVE IMPLEMENTING CLEAN COAL TECHNOLOGY THROUGH GASIFICATION AND LIQUEFACTION THE INDIAN PERSPECTIVE (Presented at the International Conference on Global Scenario in Environment and Energy held at MANIT, Bhopal

More information

PUBLIC WATCH 02 COAL MINING A. ENVIRONMENT CLEARANCE B. FOREST CLEARANCE

PUBLIC WATCH 02 COAL MINING A. ENVIRONMENT CLEARANCE B. FOREST CLEARANCE COAL MINING A. ENVIRONMENT CLEARANCE Presently, there are 581 coal mines in India with about 2.1 lakh hectare (ha) mine lease area and the present coal production is of the order of 554 million tonnes

More information

No /4/2016-Genl. Government of India Ministry of Textiles

No /4/2016-Genl. Government of India Ministry of Textiles No. 15011/4/2016-Genl. Government of India Ministry of Textiles. Udyog Bhawan, New Delhi July, 2016 To, (As per List enclosed) Subject: Limited Tender Enquiry for procurement of HP make toner/ink cartridges

More information

L/3412/Add.1 GENERAL AGREEMENT ON TARIFFS AND TRADE. (b) securing the efficient development of the coal mining industry; and

L/3412/Add.1 GENERAL AGREEMENT ON TARIFFS AND TRADE. (b) securing the efficient development of the coal mining industry; and GENERAL AGREEMENT ON TARIFFS AND TRADE RESTRICTED L/3412/Add.1 17 September 1970 Limited Distribution STATE TRADING Notifications Pursuant to Article XVII:4(a) Addendum UNITED KINGDOM Original: English

More information

No. C2/Rect./Sr. Dy. CAO/2016 Dt To The Chairmen, All Major Ports.

No. C2/Rect./Sr. Dy. CAO/2016 Dt To The Chairmen, All Major Ports. VISAKHAPATNAM PORT TRUST GENERAL ADMINISTRATION DEPARTMENT (PERSONNEL DIVISION) ISO-9001 ISO-14001 OHSAS-18001 No. C2/Rect./Sr. Dy. CAO/2016 Dt. 10.05.2016 To The Chairmen, All Major Ports. Sir, Sub: Filling

More information

APPLICATION OF UNFC FOR MANAGEMENT OF CBM/CMM/AMM/VAM RESOURCES IN INDIA

APPLICATION OF UNFC FOR MANAGEMENT OF CBM/CMM/AMM/VAM RESOURCES IN INDIA WORKSHOP ON COAL MINE METHANE & ABANDONED MINE METHANE IN THE CONTEXT OF SUSTAINABLE ENERGY 23 OCTOBER 2017 APPLICATION OF UNFC FOR MANAGEMENT OF CBM/CMM/AMM/VAM RESOURCES IN INDIA Shekhar Saran Chairman-cum-Managing

More information

Video recording of whole public hearing was done, which is attached as C.D.

Video recording of whole public hearing was done, which is attached as C.D. Details of public hearing held on 16.05.2015 at Kathara Officers Club, C.C.L, Kathara, Bokaro for Environmental clearance for Sand Mining for Govindpur M/s Central Coalfields Limited. As per Environment

More information

HPGCL HPGCL was incorporated as a company 17th March, The business of Generation of Power of erstwhile HSEB was transferred HPGCL

HPGCL HPGCL was incorporated as a company 17th March, The business of Generation of Power of erstwhile HSEB was transferred HPGCL HPGCL was incorporated as a company on 17 th March, 1997. The business of Generation of Power of erstwhile HSEB was transferred to HPGCL on 14.08.98 pursuant to Power Reforms in Haryana. Objectives : -

More information

EOI No.: TSSPDCL/IPC/01/MT/2014 Dated:

EOI No.: TSSPDCL/IPC/01/MT/2014 Dated: EXPRESSION OF INTEREST (EOI) FROM POWER GENERATION COMPANIES /INDEPENDENT POWER PRODUCERS (IPPS) /POWER PLANT DEVELOPERS/CAPTIVE POWER PRODUCERS (CPP s)/ VARIOUS TRADING LICENSEES FOR OFFERING TO SUPPLY

More information

CDM in India, Challenges and Success. by Pamposh Bhat Head, CDM-India, New Delhi Dec 23,06 EPCO, Bhopal,M.P

CDM in India, Challenges and Success. by Pamposh Bhat Head, CDM-India, New Delhi Dec 23,06 EPCO, Bhopal,M.P CDM in India, Challenges and Success by Pamposh Bhat Head, CDM-India, New Delhi Dec 23,06 EPCO, Bhopal,M.P India s Position in The Global Carbon Market India has consolidated its leadership position in

More information

% T P T '3 ^ T S IF T CENTRAL COUNCIL FOR RESEARCH IN AYURVEDIC SCIENCES

% T P T '3 ^ T S IF T CENTRAL COUNCIL FOR RESEARCH IN AYURVEDIC SCIENCES 'HKd A'a w - ' n w H ^ n r^hr fahbrui ^ % T P T '3 ^ T S IF T s t ^ t s t r 61-65, «5T, T ^ R, ^ rtwfj-110058 CENTRAL COUNCIL FOR RESEARCH IN AYURVEDIC SCIENCES Ministry of AYUSH, Govt, of India Jawahar

More information

Model Residential School

Model Residential School Expression of Interest Model Residential School at SIDHAW Bagaha II Block West Champaran SC & ST Welfare Department Govt. of Bihar Patna 2 1. The SC & ST Welfare Department, Govt. of Bihar invites this

More information

F.No. I-11012/2/2018-ADMIN Indian Institute of Corporate Affairs (An Autonomous body under Ministry of Corporate Affairs)

F.No. I-11012/2/2018-ADMIN Indian Institute of Corporate Affairs (An Autonomous body under Ministry of Corporate Affairs) F.No. I-11012/2/2018-ADMIN Indian Institute of Corporate Affairs (An Autonomous body under Ministry of Corporate Affairs) Subject: - Filling up of the posts of Faculty on contractual basis Plot no. P-6,7,8,

More information

F. No. 8/42/2600-DONER (NLCPR) GOVERNMENT OF INDIA MINISTRY OF DEVELOPMENT OF NORTH EASTERN REGION

F. No. 8/42/2600-DONER (NLCPR) GOVERNMENT OF INDIA MINISTRY OF DEVELOPMENT OF NORTH EASTERN REGION F. No. 8/42/2600-DONER (NLCPR) GOVERNMENT OF INDIA MINISTRY OF DEVELOPMENT OF NORTH EASTERN REGION Vigyan Bhawan Annexe, Maulana Azad Road New Delhi 110 011, the 24 th September, 2007 Subject: Meeting

More information

No.13-20/2015-CAMPA Dated the 29 th January 2015.

No.13-20/2015-CAMPA Dated the 29 th January 2015. Ad-hoc Compensatory Afforestation Fund Management and Planning Authority Constituted by the Hon ble Supreme Court of India, by Order dated 5 th May 2006 in IA No.1337 with IA Nos.827, 1122, 1216, 1473

More information

Date: 24 th August 2016

Date: 24 th August 2016 Corrigendum 1 to Responses to Bidders Queries ( 1) on Model Tender Document and Mine Specific Tender Documents for Auctions of Category C Iron Ore Mines, Date: 24 th August 2016 Pursuant to the order of

More information

EXPRESSION OF INTEREST (EoI) Design, Installation, Operation and Maintenance of Bus Queue Shelters Noida, Uttar Pradesh

EXPRESSION OF INTEREST (EoI) Design, Installation, Operation and Maintenance of Bus Queue Shelters Noida, Uttar Pradesh EXPRESSION OF INTEREST (EoI) Design, Installation, Operation and Maintenance of Bus Queue Shelters Noida, Uttar Pradesh Noida Authority invites Expression of Interest (EoI) to undertake the Design, Installation,

More information

ENVIRONMENT DIVISION COAL INDIA LTD HEADQUARTERS

ENVIRONMENT DIVISION COAL INDIA LTD HEADQUARTERS ENVIRONMENT DIVISION COAL INDIA LTD HEADQUARTERS LAND RECLAMATION Opencast mining method necessitates excavation of land. This initially leads to degradation of land. Coal India, tries to bring back the

More information

CIRCULAR. 6. This may kindly be given wide publicity. (Guljari Lal) Under Secretary to the Govt. of India

CIRCULAR. 6. This may kindly be given wide publicity. (Guljari Lal) Under Secretary to the Govt. of India No. K-14015/12/2013-PC Ministry of Rural Development, Govt. of India C-21, 4th Floor, Baba Kharag Singh Marg, State Emporia Building, New Delhi-110001 Dated 11.07.2013 CIRCULAR Sub:- Filling up of the

More information

Subject: Selection for the post of Director(Mines), NLC India Limited, a schedule 'A' CPSE.

Subject: Selection for the post of Director(Mines), NLC India Limited, a schedule 'A' CPSE. No. 7/65/2017-PESB भ रत सरक र / Government of India क र म क एव प रर क षण र वभ ग / Department of Personnel & Training ल क उद यम चयन ब र / Public Enterprises Selection Board *** ब ल क स ख य 14, स ज ओ क म

More information

CONSULTING ENGINEERS ASSOCIATION OF INDIA APPLICATION FOR MEMBER (INDIVIDUAL)

CONSULTING ENGINEERS ASSOCIATION OF INDIA APPLICATION FOR MEMBER (INDIVIDUAL) CONSULTING ENGINEERS ASSOCIATION OF INDIA OCF Plot No.2, Pocket 9, Sector - B Vasant Kunj, New Delhi 110070 Tel: 91-11- 26134644, Telefax: 91-11- 26139658 Email: ceai.ceai@gmail.com; Website: www.ceaindia.com

More information

*** ~~ 14, "fit ~ 3-lT 41ICFc(>lCf=8, ~ Us Block No.14, C.G.O. Complex, Lodhi Road ~~/NewDelhi ,

*** ~~ 14, fit ~ 3-lT 41ICFc(>lCf=8, ~ Us Block No.14, C.G.O. Complex, Lodhi Road ~~/NewDelhi , No.7/59/2016-PESB ih'rc1 fficfir' 1 Government of India ~1JCi qfuajut fu31tdt / Department of Personnel & Training ~ 3"U'R ~ ~ 1 Public Enterprises Selection Board *** ~~ 14, "fit ~ 3-lT 41ICFc(>lCf=8,

More information

Domestic and International Coal Market in India 2013 Understanding Demand Segmentation and Evolving Dynamics of Coal in India

Domestic and International Coal Market in India 2013 Understanding Demand Segmentation and Evolving Dynamics of Coal in India Domestic and International Coal Market in India 2013 Understanding Demand Segmentation and Evolving Dynamics of Coal in India October 2013 October 2013 Business Report Series Copyright 2013, All Rights

More information

ब ल क स ख य 14, स ज ओ क म प ल क स, ल द र र Block No.14, C.G.O. Complex, Lodhi Road नई र दल ल / New Delhi , र दन र कत/ Dated: 09 th October, 2017

ब ल क स ख य 14, स ज ओ क म प ल क स, ल द र र Block No.14, C.G.O. Complex, Lodhi Road नई र दल ल / New Delhi , र दन र कत/ Dated: 09 th October, 2017 No. 7/73/2017-PESB भ रत सरक र / Government of India क र म क एव प रर क षण र वभ ग / Department of Personnel & Training ल क उद यम चयन ब र / Public Enterprises Selection Board *** ब ल क स ख य 14, स ज ओ क म

More information

F.No. IICA/ 2-17 /2013 Indian Institute of Corporate Affairs (An Autonomous body under Ministry of Corporate Affairs)

F.No. IICA/ 2-17 /2013 Indian Institute of Corporate Affairs (An Autonomous body under Ministry of Corporate Affairs) F.No. IICA/ 2-17 /2013 Indian Institute of Corporate Affairs (An Autonomous body under Ministry of Corporate Affairs) Plot no. P-6,7,8, Sec-5, IMT Manesar, District Gurugram-122050 Date : 02.06.2018 Subject:

More information

CENTRAL COALFIELDS LIMITED RAJRAPPA AREA. PO: Rajrappa Project, Distt.: Ramgarh (Jharkhand)

CENTRAL COALFIELDS LIMITED RAJRAPPA AREA. PO: Rajrappa Project, Distt.: Ramgarh (Jharkhand) CENTRAL COALFIELDS LIMITED RAJRAPPA AREA. PO: Rajrappa Project, Distt.: Ramgarh (Jharkhand) No.GM(R)/SO(P&P)/Tender/Socio-econ. Survey/14/578 Dated: 26.03.2014 NOTICE INVITING TENDER 1. Sealed tenders

More information

SECTOR COVERAGE Date: - 18 th September 2017 SECTOR-MINING AND MINERALS

SECTOR COVERAGE Date: - 18 th September 2017 SECTOR-MINING AND MINERALS Introduction SECTOR-MINING AND MINERALS The Mining and Minerals sector is one of the core sectors that drive economic growth of the country. India has been eminently and enormously endowed with minerals

More information

Filling up of the Post of Director (Admn/Finance) on transfer on deputation failing which by Direct Recruitment

Filling up of the Post of Director (Admn/Finance) on transfer on deputation failing which by Direct Recruitment INDIAN COUNCIL OF PHILOSOPHICAL RESEARCH Darshan Bhawan, 36, Tuglakabad Institutional Area, M.B. Road, Near Batra Hospital, New Delhi-110062 Tele: 011 2990 1516 Filling up of the Post of Director (Admn/Finance)

More information

Route map to the venue of the meeting

Route map to the venue of the meeting Route map to the venue of the meeting New Delhi Agra Kosi Kalan National Hihgway-2 99 Kms. Approx 4Km Resort Country INN Link road Shalimar 15kms Nandgaon Road A-1, UPSIDC Industrial Area, Nandgaon Road,

More information

GOVERNMENT OF INDIA MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION CENTRAL STATISTICS OFFICE New Delhi Dated: September 12, 2018 PRESS RELEASE

GOVERNMENT OF INDIA MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION CENTRAL STATISTICS OFFICE New Delhi Dated: September 12, 2018 PRESS RELEASE This Press Release is embargoed against publication, telecast or circulation on internet till 5.30 PM 12 th September, 2018. GOVERNMENT OF INDIA MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION CENTRAL

More information

Underground Mining for Meeting Environmental Concerns A Strategic Approach for Sustainable Mining in Future

Underground Mining for Meeting Environmental Concerns A Strategic Approach for Sustainable Mining in Future Available online at www.sciencedirect.com ScienceDirect Procedia Earth and Planetary Science 11 ( 2015 ) 232 241 Global Challenges, Policy Framework & Sustainable Development for Mining of Mineral and

More information

Phone: ; No. RCB/NIQ/Freezer/02/14-15 Date : 11 Sep 2014 SUBJECT: NOTICE INVITING QUOTATIONS

Phone: ;   No. RCB/NIQ/Freezer/02/14-15 Date : 11 Sep 2014 SUBJECT: NOTICE INVITING QUOTATIONS Regional Centre for Biotechnology an institution of education, training & research (Established by the Dept of Biotechnology, Govt of India under the auspices of UNESCO) 180, Udyog Vihar Phase I, Gurgaon

More information

F. No / SP II (NSDF) Government of India Ministry of Youth Affairs and Sports Department of Sports (National Sports Development Fund)

F. No / SP II (NSDF) Government of India Ministry of Youth Affairs and Sports Department of Sports (National Sports Development Fund) F. No. 20-105/2014 - SP II (NSDF) Government of India Ministry of Youth Affairs and Sports Department of Sports (National Sports Development Fund) Shastri Bhavan, New Delhi 110001 Dated 19 th February

More information

SUPREME COURT OF INDIA ADMN. MATERIALS (P&S) F. No.23/Roti Maker/15/SCI(AM) Dated:

SUPREME COURT OF INDIA ADMN. MATERIALS (P&S) F. No.23/Roti Maker/15/SCI(AM) Dated: SUPREME COURT OF INDIA ADMN. MATERIALS (P&S) BY SPEED POST LAST DATE OF TENDER : 12.06.2015 PRE-BID MEETING : 08.06.2015 F. No.23/Roti Maker/15/SCI(AM) Dated: 27.05.2015 NOTICE INVITING TENDER FOR SUPPLY

More information

To 9(.2 ' 7 Mr. P.K.Handa, M/s. Trade International, C-8, 2 nd Floor, East of Kailash, New Delhi

To 9(.2 ' 7 Mr. P.K.Handa, M/s. Trade International, C-8, 2 nd Floor, East of Kailash, New Delhi REGISTERED-POST F.No. B-31011 (BMW) /30/93/HWMD/ To 9(.2 ' 7 Mr. P.K.Handa, M/s. Trade International, C-8, 2 nd Floor, East of Kailash, New Delhi - 110 065. October 16, 2012 Sub: Provisional approval for

More information

Petition No 730 of 2011 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order :

Petition No 730 of 2011 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order : Petition No 730 of 2011 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 22.07.2011 IN THE MATTER OF: BETWEEN Approval for Quantum of 3 x 660 MW Power to be procured under

More information

Module 1: Production, present scenario and consumption pattern of fuels. Lecture 3: Production, present scenario and consumption pattern of fuels

Module 1: Production, present scenario and consumption pattern of fuels. Lecture 3: Production, present scenario and consumption pattern of fuels 1 P age Module 1: Production, present scenario and consumption pattern of fuels Lecture 3: Production, present scenario and consumption pattern of fuels 2 P age Keywords: mining of coal; exploration of

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No , SECTOR 34-A, CHANDIGARH

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No , SECTOR 34-A, CHANDIGARH PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No. 220-221, SECTOR 34-A, CHANDIGARH Petition No. 23 of 2018 (Suo-Motu) Date of Order: 09.08.2018 In the matter of: Determination/ fixation of levellised

More information

TENDER NOTICE. Comprehensive Annual Maintenance Contract for Konica Minolta Photocopiers.

TENDER NOTICE. Comprehensive Annual Maintenance Contract for Konica Minolta Photocopiers. No. 1701 1/02/20 14-Admr Government of India Ministry of Chemicals & Fertilizers Department of Fertilizers * ** Room No.203-D, Shastri Bhawan, New De0-110 001 Dated:t311ay, 2014. TENDER NOTICE Subject:

More information

HeidelbergCement India Ltd. Welcome To Threshold Value of Minerals Workshop

HeidelbergCement India Ltd. Welcome To Threshold Value of Minerals Workshop HeidelbergCement India Ltd. Welcome To Threshold Value of Minerals Workshop Word wide Presence of Heidelberg and Zuari Cement HCIL Limestone Mines of Damoh: At a glance Bougainvillea at Slope Green Belt

More information

NOTICE INVITING EXPRESSION OF INTEREST

NOTICE INVITING EXPRESSION OF INTEREST CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD. (A subsidiary of Coal India Ltd.) Gondwana Place, Kanke Road, Ranchi-834 031 (Jharkhand), India Email: hodcbm.cmpdi@coalindia.in, Tel. (+91)-651-2230011 Fax:

More information

(APGCL) AM

(APGCL) AM Record Notes of 1st Meeting of Monitoring Committee for reviewing the performance of the Assam Power Generation Corporation Limited (APGCL) held on 26.06.2012 at 11.30 AM in the Conference Hall of AERC.

More information