Site Source & Uncontaminated Soil Certifications: Assessment Strategies to Minimize Costs ENVIRONMENT : INFRASTRUCTURE : DEVELOPMENT
|
|
- Paul Cannon
- 6 years ago
- Views:
Transcription
1 Site Source & Uncontaminated Soil Certifications: Assessment Strategies to Minimize Costs ENVIRONMENT : INFRASTRUCTURE : DEVELOPMENT
2 CCDD & Uncontaminated Soil CCDD: UNCONTAMINATED broken concrete without protruding metal bars, bricks, rock, stone, reclaimed or other asphalt pavement, or soil generated from construction/demolition activities. NOT CCDD NOT CCDD NOT CCDD
3 CCDD & Uncontaminated Soil CCDD Fill or Uncontaminated Soil Fill Operations: Permitted or registered operation that can accept fill material in a current or former quarry, mine or other excavation.
4 Soil Management Options in Illinois Private or Public Property Permitted Subtitle D Landfill Reuse Onsite Permitted CCDD or Registered Clean Fill Sites
5 Soil Management Options in Illinois Reuse Onsite Applies to site of origin No testing requirements Least expensive option Ensure property owner/contract specifications allow for this approach If test results available: Although not required, consider potential exposure pathways
6 Private or Public Property No certification requirements Less expensive option CCDD is not waste when used as fill below grade when: Fill is placed no higher than the highest point of elevation existing prior to the fill and if covered by sufficient uncontaminated soil to support vegetation within 30 days. Fill not placed in Setback Zone. Used as required fill as part of a project. Soil Management Options in Illinois
7 Permitted CCDD or Registered Clean Fill Sites Disposal costs $35 to $105/truckload Lower hauling costs Requires certification Source Site Certification by Owner or Operators (LPC-662) Uncontaminated Soil Certification by Licensed PEs & PGs (LPC-663) Painted CCDD Certifications (LPC-667) Soil Management Options in Illinois
8 Owner & Operators LPC-662 Form Owner or Operator Certify: Soil is not from a site that is potentially impacted property (PIP) Soils within a soil ph range of 6.25 to 9.0 Owner or Operator required to sign the certification form certifying soil is PRESUMED to be uncontaminated
9 Potentially Impacted Properties LPC-662 Form Properties on which a historical or current use, or contaminant from a proximate site, increases the presence or potential presence of contamination at the source site ASTM Methods (E & E ) IDOT & Toll Highway Authority Environmental Procedures (Environmental Surveys, PESAs & PSIs) Six documents incorporated by reference at 35 IAC
10 Potentially Impacted Properties LPC-662 Form Environmental Regulatory Database Reports Sanborn Fire Insurance Maps Historic City Directories Historic Aerial Photographs
11 Soil ph LPC-662 Form Measure of soil acidity or alkalinity Certify soil ph is within range of 6.25 to 9.0 units Laboratory (Method 9045C) versus field methods (reproducible)
12 PE/PG Certification LPC-663 Form Required for all sites that are potentially impacted properties (PIPs) Professional Engineer or Professional Geologist certifying soil is uncontaminated and within a ph range of Supporting documentation required to be submitted with LPC-663 Form PE or PG required to sign and seal the certification form
13 Site Investigation LPC-663 Form Historical review of area Review of regulatory environmental databases Soil screening and sampling Laboratory results Certification evaluation
14 Screening Process LPC-663 Form Process of identifying and defining areas, contaminants, and conditions at the property that warrant further attention Visual/Olfactory PID Screening
15 Sampling Process LPC-663 Form Composite: A sample comprised of soils from an entire depth profile or several locations within prescribed area Discrete: A sample from a distinct or prescribed soil depth interval or location
16 Constituents of Concern LPC-663 Form Based on subject and surrounding property historical and current uses (or requirements of CCDD Facility) Typical analyte groups: Volatile Organic Compounds (Fuel & solvents) Semi-Volatile Organic Compounds (Combustion/fuel components) Polynuclear Aromatic Hydrocarbons (Combustion By-products) RCRA Metals (Naturally Occurring & Everywhere) Pesticides/Herbicides (Agricultural/food applications) Polychlorinated Biphenyls (Cooling/hydraulic oils)
17 MACs are the lowest Tier 1 chemical-specific soil value of the exposure routes for residential and construction worker receptors set forth in 35 Ill. Adm. Code 742.Appendix B, Tables A and B Soil ingestion, outdoor inhalation, soil component of the groundwater ingestion and construction worker exposure routes Maximum Allowable Concentrations (MACs) LPC-663 Form
18 Different types of analytical methods Maximum Allowable Concentrations (MACs) LPC-663 Form Total Concentrations (e.g. total chromium) Toxic Characteristic Leaching Procedure (TCLP) or Synthetic Precipitate Leaching Procedure (SPLP) Uncontaminated Soil = Below MACs
19 Load Rejections Load rejection form Discuss option with CCDD facility contact, PE/PG and owner PID rejection possible air out Retest or delineate bad area Landfill waste characterization necessary? Load may be taken back to site until further handling requirements are determined
20 Soil Management Options in Illinois Permitted Subtitle D Landfills Most expensive disposal costs $350 to $500/truckload Limited disposal options results in higher hauling costs Different type of analytical testing (waste characterization) Soil managed as landfill cover, non-hazardous, special or nonspecial waste
21 Uncontaminated Soil vs. Landfill Analysis Landfill waste characterization NOT the same as uncontaminated soil characterization Landfill Waste Characterization used to verify wastes do not exhibit hazardous waste characteristics (ignitability, corrosivity, reactivity and toxicity) Uncontaminated Soil Characterization used to verify soils do not contain constituents of concern above MACs
22 Application Utility Improvement Project: PIP Evaluation LPC #662 versus LPC #663 Former Drycleaner Contaminants of Concern Soil Analytical Results Polk 1 Polk 2 Polk 6 Soil Management (Re-use, CCDD or landfill) Polk 3 Polk 4 Polk Non CCDD Dirt Former Gas Station Approx. 30 Truckloads of Non- Haz, Non-Spec Waste Soil Approx. $24,000 Additional Disposal Cost
23 Application Utility Improvement Project: Delineate Impacted Soils 20 Non CCDD Dirt Former Drycleaner Approx. 2 Truckloads of Non-Haz, Non-Spec Waste Soil Approx. $1600 Additional Disposal Cost Polk 1 Polk 2 Polk 2a Polk 2b Polk 3 Polk 4 Polk 5 Polk 6 Delineation Sampling Cost Approx. $2,000 Former Gas Station Project Savings $20,400
24 Application Ravenswood Station Redevelopment: A 240,000-square-foot retail center also anchored by Mariano s with a LA Fitness and Sears Auto Center Former Site Occupants: Sears Auto, Gas Station and Coal Yard Previous Phase II ESAs Identified Soil Impacts Soil from Column Pads, Footings, Utility Trenches, Stormwater Detention Budgeted for Non-Haz, Non-Spec Waste Disposal Est. 1,200 $800/load
25 Application Ravenswood Station Redevelopment: Developed Soil Management Plan to Delineate Impacts Prepared LPC #663 Defining Areas/Established Waste Profile Performed On-Site Soil PID screening During All Soil Excavation Activities Act. 240 $800/load and 960 $200/load Additional Sampling/Oversight Costs Approx. $60,000 Project Savings $566,000
26 Some Good Advice Internal screening process for project PIPs Work with an environmental professional Select potential CCDD facilities & landfills and confirm sampling requirements prior to initiating project Owner control of LPC-662 & LPC-663 evaluation process Perform sampling for landfill and uncontaminated soils at same time Delineate contaminated soils on projects
27 Brian Mihelich, CHMM Iroquois Avenue, Ste. 206 Naperville, Illinois p f ENVIRONMENT : INFRASTRUCTURE : DEVELOPMENT
Johanna Heywood, PE, PG
Johanna Heywood, PE, PG MEMPHIS BROWNFIELD WORKSHOP, SEPTEMBER 10, 2014 Past use of the site Chemicals used on-site Surrounding property usage Does not generally confirm or delineate contaminated areas
More informationMARTIN N. FALLON, P.G.
CCDD Presentation 1 MARTIN N. FALLON, P.G. Hydrogeologist and Project Manager APTIM BS Geology and BBA Business St. Norbert College, De Pere, WI Licensed Professional Geologist Illinois and Indiana 18
More informationFINAL PLAN OF REMEDIAL ACTION
FINAL PLAN OF REMEDIAL ACTION DRAVO SHIPYARD Operable Unit II RDC/Harbor Associates Properties Wilmington, Delaware DNREC Projects No. DE-1092 & DE-1096 February 2001 Department of Natural Resources and
More informationALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION- INDUSTRIAL SECTION
ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION- INDUSTRIAL SECTION CLOSURE GUIDELINES FOR INDUSTRIAL WASTEWATER IMPOUNDMENTS (Revised: 03/00) I. Applicability and Certification Requirements:
More informationSection 34 Brieser Construction SH&E Manual
Brieser Construction SH&E Manual April 23 2010 This written program documents the steps has taken to minimize General Refuse and Construction & Demolition debris resulting from various construction activities
More informationFACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location
Maryland Department of the Environment Site Location FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) This 2.4581-acres site (Site) consists of four parcels of
More informationRevisions to DEP s Management of Fill Policy. Solid Waste Advisory Committee March 8, 2018
Revisions to DEP s Management of Fill Policy Solid Waste Advisory Committee March 8, 2018 1 Previously Proposed Changes PA DEP proposed changes to the Management of Fill Policy (MoFP) on December 20, 2014.
More informationMITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No ) Van Nuys Fire Station 39
MITIGATION MDNITDRING PROGRAM (Accompanies the Van Nuys Fire Station 39 Environmental Impact Report SCH No. 2015031067) Van Nuys Fire Station 39 W.O. E170094B ENGINEERING mtm CITY OF LOS ANGELES Transmittal
More informationLEAD IN SOIL. Commercial/Industrial Site Assessment & Remediation
Benjamin M. LaPointe, CHMM Assessment/Remediation Manager Metric Environmental, LLC. benjaminl@metricenv.com Commercial/Industrial Site Assessment & Remediation LEAD IN SOIL I. WHY? PURPOSE OF LEAD SOIL
More informationCOMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS
DIVISION 02 EXISTING CONDITIONS 02 01 00 MAINTENANCE OF EXISTING CONDITIONS 1. Maintenance of site remediation, underground storage tank removal, facility remediation, and hazardous waste drum handling
More informationTABLE NO. 2 Industrial-Commercial
Phase II Environmental Site Assessments (ESAs) What is a Phase II? An intrusive investigation of a site to collect samples of environmental media (i.e. soil, groundwater, surface water, and soil gas) for
More informationANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES
ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES Preliminary Evaluation for Wells & Son Metal Recycling aka Cardinal Grain Property 607 South Chauncey Street Columbia City, Indiana 46725 1.0 INTRODUCTION This
More informationFebruary 8, Mr. Jeff Vanderdasson, P.E. PACLAND 6400 SE Lake Road, Suite 300 Portland, Oregon 97222
Mr. Jeff Vanderdasson, P.E. PACLAND 6400 SE Lake Road, Suite 300 Portland, Oregon 97222 Re: Phase I Environmental Site Assessment Recommendations Letter NW 9th Street and NW Spruce Avenue Corvallis, Benton
More informationDECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013
DECISION DOCUMENT Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 Prepared by Division of Environmental Remediation New York State Department of Environmental
More informationChapter 11: Hazardous Materials A. INTRODUCTION
Chapter 11: Hazardous Materials A. INTRODUCTION This chapter relies on the analysis from the Fresh Kills Park Final Generic Environmental Impact Statement (FGEIS) and summarizes the conclusions drawn from
More informationPhase I Environmental Site Assessment
Phase I Environmental Site Assessment 97204 Prepared for: Multnomah County 401 NE Dixon Avenue, Suite 274 97227 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 1 2.0 PROPERTY AND REPORT INFORMATION... 3 2.1
More information87th Air Base Wing Joint Base McGuire-Dix-Lakehurst Public Meeting December 13, 2017 Proposed Plan McGuire Operable Unit-3
87th Air Base Wing Joint Base McGuire-Dix-Lakehurst Public Meeting December 13, 2017 Proposed Plan McGuire Operable Unit-3 87th Air Base Wing Mr. Curtis Frye, PE Chief, Environmental Restoration Program,
More informationFill Material and Soil Management
Fill Material and Soil Management What You Need to Know The purpose of this fact sheet is to describe how fill material and excess soil can be reused properly during the cleanup and redevelopment of properties
More informationEnvironmental Overview: 39 th Avenue Greenway. What We ll Cover: Denver s Environmental Investigation Process Environmental Concerns Identified
What We ll Cover: Denver s Environmental Investigation Process Environmental Concerns Identified Recognized Environmental Conditions VB/I-70 Superfund Site (OU-1, OU-2) Planned Investigations Next Steps
More informationAPPENDIX M: Hazardous Waste Technical Report
APPENDIX M: Hazardous Waste Technical Report M.1 Existing Conditions A hazardous waste review was conducted to provide preliminary information regarding the potential presence of any hazardous substances
More informationFacts About. LMA Fill Material and Soil Management Guidance. Introduction. What Soils and Fill Material are Subject to the Policy?
Facts About LMA Fill Material and Soil Management Guidance The purpose of this guidance is to describe how fill material and excess soil can be reused properly during the cleanup and redevelopment of properties
More informationDRAFT. Phase II Environmental Site Assessment 929 Main Street City of Buffalo, Erie County, New York
DRAFT Phase II Environmental Site Assessment 929 Main Street City of Buffalo, Erie County, New York Prepared For: State University Construction Fund 353 Broadway Albany, New York 12246 April 2013 Prepared
More informationCUMBERLAND COUNTY IMPROVEMENT AUTHORITY CUMBERLAND COUNTY SOLID WASTE COMPLEX SOIL ACCEPTANCE PROTOCOL
CUMBERLAND COUNTY IMPROVEMENT AUTHORITY CUMBERLAND COUNTY SOLID WASTE COMPLEX SOIL ACCEPTANCE PROTOCOL This protocol establishes procedures to be followed by waste generators petitioning the Cumberland
More informationPhase II Environmental Site Assessment Review/Reuse Recommendations Pagnotti Property, Maffett and South Main Streets, Plains Township, PA
January 8, 2018 Dr. Brian Costello WBASD Superintendent 730 S. Main Street Wilkes-Barre, PA 18711 Subject: Phase II Environmental Site Assessment Review/Reuse Recommendations Pagnotti Property, Maffett
More informationDelineation, Remediation and Redevelopment of a Heavy Metal Hazardous Waste Disposal Site
Delineation, Remediation and Redevelopment of a Heavy Metal Hazardous Waste Disposal Site Octavius V Catto School Redevelopment Project Camden, New Jersey J. Stuart Wiswall, P.G., LSRP Keating Environmental
More informationD2 Project Environmental Remediation Briefing August 21, 2018
D2 Project Environmental Remediation Briefing August 21, 2018 The Union Square Revitalization Project (USQ) is a 2.4 million square foot transit-oriented, mixed use project that is transforming Union Square,
More informationDesign and Construction Considerations on Brownfield Sites
Design and Construction Considerations on Brownfield Sites Presented to: City of St Petersburg, Florida September 26, 2012 David, Goldman, P.G. Kimley-Horn and Associates, Inc. 904-828-3912 David.goldman@kimley-horn.com
More informationRock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon
Rock Fill Layer Management and Maintenance Plan 13 Highway 99 Prepared for: Half Moon LLC P.O. Box 25112 97402 PBS Project No. 51833.000 Rock Fill Layer Management and Maintenance Plan TABLE OF CONTENTS
More informationREMEDIAL ACTION COMPLETION REPORT
REMEDIAL ACTION COMPLETION REPORT PROJECT SITE: CIVIC CENTER REDEVELOPMENT SITE # 1 (FORMER MUSSELMAN LUMBER / PACKER ENGINEERING SITE) 28W 751 MOUNT STREET WARRENVILLE, DUPAGE COUNTY, ILLINOIS IEPA BOL
More informationProject Background. Project Purpose
August 21, 2015 Ms. Suzanne Wynn Project Manager Gainesville Community Redevelopment Agency 802 NW 5th Avenue, Suite 200 Gainesville, Florida 32601 Re: Order of Magnitude Estimates for Environmental Assessment/Remediation
More informationGENERATOR INFORMATION
Page 1 Office Use Only Waste Permit No. Date: GENERATOR INFORMATION One West Main Suite 401 Medford, OR 97501 Jenifer Stuber 541-494-5455 jstuber@drycreeklandfill.com Steve DeBerry 541-494-5460 sdeberry@drycreeklandfill.com
More informationPaul M. Becks, CPG, LRS President & Environmental Geologist P.O. Box 426 Tallmadge, Ohio
President & Environmental Geologist P.O. Box 426 Tallmadge, Ohio 44278 330.472.2137 Education and Professional Affiliations M.S., Geology with Emphasis in Geochemistry, 1997 University of Toledo, Toledo,
More informationREQUEST FOR QUALIFICATIONS
REQUEST FOR QUALIFICATIONS Village of La Grange Phase II Design Engineering Services for Submission Deadline: No later than 10:00 am on October 19, 2018 Published on: October 5, 2018 on the Village of
More informationMETHODOLOGY FOR THE ENVIRONMENTAL RISK ASSESSMENT OF FLY ASH USE IN HIGHWAY EMBANKMENTS
METHODOLOGY FOR THE ENVIRONMENTAL RISK ASSESSMENT OF FLY ASH USE IN HIGHWAY EMBANKMENTS Pardeep Kumar Gupta Civil Engineering, Department, PEC University of Technology, Chandigarh Abstract: Fly ash can
More informationSOIL INVESTIGATION McLAREN BIKE SKILLS PARK SAN FRANCISCO, CALIFORNIA
FUGRO CONSULTANTS, INC. SOIL INVESTIGATION McLAREN BIKE SKILLS PARK SAN FRANCISCO, CALIFORNIA Prepared for: CITY OF SAN FRANCISCO RECREATION AND PARKS DEPARTMENT JUNE 2013 Fugro Project No. 04.72130038
More informationEnvironmental Remediation Cement Solidification/Stabilization
Environmental Remediation Cement Solidification/Stabilization After decades of improper waste management, an industrial location in Sydney Harbor became severely contaminated Throughout the 20 th century,
More informationModule 2: Hazardous Waste Determination
Module 2: Hazardous Waste Determination 15 th Annual OSC Readiness Training Program www.oscreadiness.org Hazardous Waste Determination Basics An issue that almost always must be addressed during CERCLA
More informationApril 16, Dear Mr. Beedie:
April 16, 2012 Mr. Michael Beedie, P.E. City of Ft. Walton Beach Engineering Services Department 105 Miracle Strip Parkway SW Ft. Walton Beach, FL 32548 Re: Proposal for a Supplemental Site Assessment
More informationThursby, Kim. Received. Thanks, Kurt. Good Morning Kurt, Please confirm receipt of the attached document as described below.
Thursby, Kim From: Kurt Fogleman Sent: Monday, August 6, 2018 10:52 AM To: Buselli, Bradley; kfogleman@perma-fix.com Cc: ronie.rukab@aecom.com; Thursby, Kim Subject: RE: Perma-Fix
More informationTechnical Memorandum. Blum Junk Yard Properties. Assessment of Environmental Risk Related to Demolition of Properties at 411 and 501 E.
Technical Memorandum Blum Junk Yard Properties Assessment of Environmental Risk Related to Demolition of Properties at 411 and 501 E. 15 th Street 9/16/15 40140060.13 Prepared For: Steven Sampson Brown
More informationM:\acad\120591\PublicLandCrossings.mxd NAD 1983 StatePlane Florida East FIPS 0901 FeetTransverse Mercator Conservation Lands
0 300 North/Walk-in-Water Creek North/Walk-in-Water Creek North/Walk-in-Water Creek 38.3 38.4 38.5 38.6 38.7 38.8 FIGURE 8.4.1. SHEET (9 of 21) North Walk-In-Water Creek 0 500 39.6 39.7 39.8 39.9 40 40.1
More informationASH MANAGEMENT PLAN. U.S. Environmental Protection Agency Region 4, Atlanta, GA. Mr. Joe Alfano, Remedial Project Manager
ASH MANAGEMENT PLAN U.S. Environmental Protection Agency Region 4, Atlanta, GA Mr. Joe Alfano, Remedial Project Manager 404-562-8933 City of Jacksonville Environmental and Compliance Department Site Investigation
More informationRisk-Based Decision Making for Site Cleanup
Risk-Based Decision Making for Site Cleanup The Oklahoma Department of Environmental Quality (DEQ) has adopted a risk-based decision-making process to provide a framework for determining cleanup requirements
More informationGeorge s Used Equipment Removal Action Report Laboratory analytical results were compared to the cleanup objectives outlined in the previously approve
July 10, 2015 Ed Olson MPCA 520 Lafayette Avenue North St. Paul, MN 55115 RE: George s Used Equipment Response Action Report UMore Park OU2 and OU3 Rosemount, MN Bay West Proposal J140651 Dear Mr. Olson:
More informationMaterial Characterization Report
SSI-Metro12 Facility Carteret, NJ Page 1 of 3 Please complete all sections of the form, sign where indicated and return completed form to: Soil Safe, Inc. 6700 Alexander Bell Dr., Suite 300, Columbia MD
More informationPhase I and Phase II Environmental Site Assessments
Phase I and Phase II Environmental Site Assessments Society of Women Environmental Professionals Capital Chapter Ira Walton Environmental Director United Environmental Services, Inc. May 1, 2018 Who Needs
More informationEnvironmental Site Assessment for Limited Remediation Protocol
Environmental Site Assessment for Limited Remediation Protocol Adopted by the Minister of Environment Pursuant to the Contaminated Sites Regulations Adopted by the Minister of Environment, Hon. Sterling
More informationIntroduction. Remedial Action Objectives. In This Guide
Addendum to Citizens Guide Proposed soil cleanup plans for additional Tax Blocks for Lockheed Martin s Middle River Complex Winter 2013-2014 Lockheed Martin Would Like to Invite the Community to a Public
More informationBULK UNLOAD AREA INVESTIGATION WORK PLAN
BULK UNLOAD AREA INVESTIGATION WORK PLAN GENERAL MOTORS CORPORATION GRAND RAPIDS METAL PLANT WYOMING, MICHIGAN FEBRUARY 2007 REF. NO. 17360 (14) TABLE OF CONTENTS 1.0 INTRODUCTION...1 1.1 BACKGROUND...1
More informationContained-in Determination Nonrule Policy Document & Uncontaminated Soil Nonrule Policy Document
Contained-in Determination Nonrule Policy Document & Uncontaminated Soil Nonrule Policy Document Contained-in Policy Established to clarify hazardous waste regulations To facilitate site cleanup activities
More informationCalifornia Regional Water Quality Control Board San Francisco Bay Region
California Regional Water Quality Control Board San Francisco Bay Region Linda S. Adams Secretary for Environmental Protection 1515 Clay Street, Suite 1400, Oakland, California 94612 (510) 622-2300 Fax
More information520 Lafayette Road 520 Lafayette Road St. Paul, Minnesota St. Paul, Minnesota
February 4, 2015 Ms. Shanna Schmitt, Project Manager Ms. Amy Hadiaris, Technical Analyst Minnesota Pollution Control Agency Minnesota Pollution Control Agency VIC Program VIC Program 520 Lafayette Road
More information316 Flynn Avenue Mixed-Use Redevelopment CCRPC Brownfield Grant Narrative
316 Flynn Avenue Mixed-Use Redevelopment CCRPC Brownfield Grant Narrative Amount of Request: $6,330 for Phase 2 ESA (amt based on proposal from LE Environmental) Required Characteristics 1) The property
More informationReal Estate Due Diligence Services
Real Estate Due Diligence Services timely delivery, clear communication Cameron-Cole provides property due diligence and development support services for all sizes of projects from normal, single property
More informationRemediation Program Landfills and Open Dumps Guidance
Remediation Program Landfills and Open Dumps Guidance Solid Waste Regulations Lori Freeman Senior Environmental Manager Industrial Waste Compliance Office of Land Quality Solid Waste Statutes - History
More informationIC Chapter 3. Powers and Duties Concerning Solid Waste and Hazardous Waste Management
IC 13-19-3 Chapter 3. Powers and Duties Concerning Solid Waste and Hazardous Waste Management IC 13-19-3-1 Regulation of solid and hazardous waste and atomic radiation; review orders; development of operating
More informationManagement of Contaminated Soil. Click to edit Master subtitle style Peter Langtry, P.G., C.E.G Senior Principal Geologist
Management of Contaminated Soil Peter Langtry, P.G., C.E.G Senior Principal Geologist Objectives Describe common soil contamination issues that can be encountered during construction/infrastructure projects
More informationOVERVIEW SCOPE OF WORK (SOW)
Site Description The subject property is occupied by the former Parker Service Station, which contained a former Service Garage (now called Former Garage) and Filling Station Store (now called Storage
More informationFill Material Classification and Use
1 Fill Material Classification and Use 6 NYCRR Part 360.13 David Gibb, P.E., Deputy Regional Materials Management Engineer November 8, 2018 2 Discussion Topics Background Qualified environmental professionals
More informationWARTBURG COLLEGE ENVIRONMENTAL AND OCCUPATIONAL SAFETY PROGRAM HAZARDOUS WASTE PLAN
July 15, 2015 WARTBURG COLLEGE ENVIRONMENTAL AND OCCUPATIONAL SAFETY PROGRAM HAZARDOUS WASTE PLAN Table of Contents General.. 1 Responsibilities. 1 Program Development... 2 References... 2 Management Procedures
More informationReceive Site Fact Sheets by . See "For More Information" to Learn How.
June 2015 FACT SHEET Brownfield Cleanup Program Receive Site Fact Sheets by Email. See "For More Information" to Learn How. Site Name: 291 Homer Street DEC Site #: C905042 Address: 291 Homer Street; Olean,
More informationDiamond Grinding Use in NC. Ken Pace, P.E.
Diamond Grinding Use in NC Ken Pace, P.E. October 29, 2014 Overview Regulations and Permits Hydrodemolition and Diamond Grinding Evolution Current Process for Disposal Lessons Learned Expectations 2 Rules
More informationDRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA)
DRAFT Analysis of Brownfields Cleanup Alternatives (ABCA) Preliminary Evaluation Ball Square Station Site Boston Avenue and Broadway Somerville and Medford, Massachusetts Massachusetts DEP Release Tracking
More informationSOIL MANAGEMENT PLAN
SOIL MANAGEMENT PLAN BELFAST BOATYARD 39 & 41 FRONT STREET BELFAST, MAINE Prepared by: Ransom Consulting, Inc. 400 Commercial Street, Suite 404 Portland, Maine 04101 (207) 772-2891 March 22, 2013 1.0 INTRODUCTION
More informationContaminated Site ESAs and HBMAs: Requirements and Terminology
Contaminated Site ESAs and HBMAs: Requirements and Terminology OMREB - Commercial Zone Luncheon Rebekka Lindskoog, B.Sc., R.P.Bio. Regional Manager, Northwest Territories November 22, 2017 Outline 3 questions
More informationOn March 6, 2014, 17 shallow soil samples were collected along the proposed trail alignment according to
LAKE EWAUNA TRAIL LEVEL 2 FIELD SAMPLING ASSESSMENT the proposed alignment (Figure 1). The trail will also include the installation of a geothermal snow melt system, allowing for year round use of the
More informationANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES
ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK 119TH STREET & VINCENNES AVENUE BLUE ISLAND, COOK COUNTY, ILLINOIS LPC #0310245119 WEST PARCELS PARCEL D (TPH
More informationGuidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial Heating Oil Systems. National Oilheat Research Alliance (NORA)
Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial National Oilheat Research Alliance (NORA) Forward Heating oil is used to heat many private homes as well as small commercial
More informationSECURE Energy Services Inc. Proposed Conklin Class II Landfill Portions of: NE W4, SE W4 and NW W4
26 February 2016 RE: SECURE Energy Services Inc. Proposed Conklin Class II Landfill Portions of: NE 23-76-8W4, SE 26-76-8W4 and NW-24-76-8W4 Dear Sir or Madam, SECURE Energy Services Inc. ( SECURE ) is
More informationConstruction Dewatering General Permit (GP) & Groundwater Remediation GP. Navigating the Permitting Process
Construction Dewatering General Permit (GP) & Groundwater Remediation GP Navigating the Permitting Process IECA Conference November 18, 2014 Margo Griffin Permits Section Water Quality Control Division
More informationStormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide
Stormwater Standards Clackamas County Service District No. 1 APPENDIX E Infiltration Testing Guide Table of Contents Appendix E - Infiltration Testing Guide... Page E.1 General... 1 E.2 Basic Method -
More informationSanta Susana Field Laboratory RCRA Facility Investigation Report Review Group 2 NASA Area I and Northern Portion of NASA Area II
Santa Susana Field Laboratory RCRA Facility Investigation Report Review Group 2 NASA Area I and Northern Portion of NASA Area II May 18, 2009 Thomas M. Skaug, C.E.G. Engineering Geologist California Environmental
More informationPage 1 of 6 Permit No: MN R J. Mineral Mining and Dressing
Page 1 of 6 J. Mineral Mining and Dressing 1. Authorized Stormwater Discharges The requirements in Sector J apply to stormwater discharges associated with industrial activity from active, temporarily inactive
More informationMarch 16, Dear Mr. Chapman:
March 16, 2011 Mr. Al Chapman State of North Carolina Department of Environment and Natural Resources Division of Waste Management, Superfund Section 401 Oberlin Road, Suite 150 Raleigh, North Carolina
More informationNew Jersey Department of Environmental Protection. Technical Guidance for the Attainment of Remediation Standards and Site-Specific Criteria
New Jersey Department of Environmental Protection Site Remediation Program Technical Guidance for the Attainment of Remediation Standards and Site-Specific Criteria September 24, 2012 Version 1.0 TABLE
More informationIf you have any questions regarding the report, please contact me at (510) , ext. 109.
March 16, 2006 Mr. Nick Thom City Of San Leandro Engineering and Transportation Department 835 East 14th Street, Suite 101 San Leandro, California 94577 RE: Soil Characterization Report 2660 Eden Road,
More informationSolid & Hazardous Wastes. Lesson 12: Solid Waste February 10, ENVSC 296: Health & Environment 1. Lesson Overview. Lesson 12.
Lesson 12. Solid Waste Solid & Hazardous Wastes February 10, 2005 Chuck Treser University of Washington Dept. of Environmental and Occupational Health Sciences ENV H 311: Lesson 12 1 Lesson Overview Definition
More informationA. Project will be constructed under a general construction contract.
SECTION 01100 SUMMARY AND PAYMENT ITEMS 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections,
More informationInformation Sheet Questions & Answers New Edinburgh Park, 193 Stanley Avenue
Information Sheet Questions & Answers New Edinburgh Park, 193 Stanley Avenue Environmental Risk Management Program Q1 What was the historical use of this site? A1 A portion of New Edinburgh Park was historically
More informationSOIL AND GROUNDWATER MANAGEMENT PLAN ADDENDUM COOLEY LANDING 2100 BAY ROAD EAST PALO ALTO, CALIFORNIA
SOIL AND GROUNDWATER MANAGEMENT PLAN ADDENDUM COOLEY LANDING 2100 BAY ROAD EAST PALO ALTO, CALIFORNIA PREPARED FOR: Ms. Sharon Jones City of East Palo Alto 1960 Tate Street East Palo Alto, California 94303
More informationATTACHMENT N LEED PROJECT PROCEDURES
ATTACHMENT N LEED PROJECT PROCEDURES 1. All subcontractors, sub-subcontractors and suppliers at all tiers are to include the following items in their trade scope of work: a. Submit data and documentation
More informationLand Reclamation Site Siting and Application Guidelines
Department of Environment and Local Government Land Reclamation Site Siting and Application Guidelines Rationale In an effort to reduce the cost associated with the transportation of demolition wastes,
More informationADVANCE NOTICE OF FINAL RULEMAKING DEPARTMENT OF ENVIRONMENTAL PROTECTION. (25 PA Code Chapter 271 and 287)
ADVANCE NOTICE OF FINAL RULEMAKING DEPARTMENT OF ENVIRONMENTAL PROTECTION (25 PA Code Chapter 271 and 287) Draft Final Regulations for the Management of Safe Fill Executive Summary The Department of Environmental
More informationSECTION GRAVITY WASTEWATER LINES
SECTION GRAVITY WASTEWATER LINES 1. DESCRIPTION This specification shall govern all work required for furnishing, handling and installing gravity wastewater lines required to complete the project. 2. MATERIALS
More informationWARTBURG COLLEGE ENVIRONMENTAL AND OCCUPATIONAL SAFETY PROGRAM HAZARDOUS WASTE PLAN
3 February, 2001 WARTBURG COLLEGE ENVIRONMENTAL AND OCCUPATIONAL SAFETY PROGRAM TABLE OF CONTENTS HAZARDOUS WASTE PLAN 1. General 2. Responsibilities 3. Program Development 4. References 5. Management
More informationleft over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or
14. Waste Management 14.1. Waste Management Regulations The regulatory requirements governing waste management are provided within the EP Act, the EPR and associated Environmental Protection (Waste Management)
More informationHolly Piza, P.E., Urban Drainage & Flood Control District Eliot Wong, P.E., Wright Water Engineers
Potential for Hazardous Sediments in Stormwater Quality Treatment Facilities Holly Piza, P.E., Urban Drainage & Flood Control District Eliot Wong, P.E., Wright Water Engineers 0 Agenda Project Importance
More informationGround Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging
Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging James J. Serpico (&) Geotechnical Services, Maser Consulting P.A.,
More informationGRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO:
PERMIT NUMBER: GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD 57701 ID NO: (605) 394-4157 PIN NO: APPLICATION DATE: DATE ISSUED: PROPERTY INFORMATION CONTRACTOR INFORMATION LOT ADDRESS
More informationA Clean, Green Remediation
A Clean, Green Remediation How Green Remediation can make hazardous waste cleanup more eco-friendly, from beginning to end and at the same time help the bottom line By Robert J. Young, PG Vice President,
More informationExpect the Unexpected Contamination at Public Infrastructure Projects January 26, City Engineers Association of Minnesota Annual Conference
Expect the Unexpected Contamination at Public Infrastructure Projects January 26, 2017 City Engineers Association of Minnesota Annual Conference Introductions Dan Fetter, Barr Engineering Jackie Dylla,
More informationGuidance for Soil Stockpile Characterization and Evaluation of Imported and Exported Fill Material. October 2017
Guidance for Soil Stockpile Characterization and Evaluation of Imported and Exported Fill Material October 2017 State of Hawai i Department of Health, Hazard Evaluation and Emergency Response Office Honolulu,
More informationCCR Landfill Information. D.B. Wilson CCR Landfill D.B. Wilson Generating Station 5663 State Route 85 West Centertown, KY 42328
Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill Groundwater Monitoring System and Statistical Method Assessment and Certification
More informationKANE COUNTY DIVISION of TRANSPORTATION
Carl Schoedel, P.E. irector of Transportation County Engineer KANE COUNTY IVISION of TRANSPORTATION 41W011 Burlington Road St. Charles, IL 60175 Phone: (630) 584-1170 Fax: (630) 584-5265 Section 17-00485-00-RS
More informationSection 3.11: Hazardous Materials
Section 3.11: Hazardous Materials Section 3.11 Hazardous Materials 3.11 HAZARDOUS MATERIALS 3.11.1 Introduction to Analysis This section provides information regarding known contaminated sites and general
More informationSTATE OF DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL- SITE INVESTIGATION AND RESTORATION BRANCH
STATE OF DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL- SITE INVESTIGATION AND RESTORATION BRANCH PROPOSED PLAN OF REMEDIAL ACTION May 2006 Ion Power Formally South Parcel of Metachem
More informationCONSTRUCTION SITE REPROCESSING FACILITY APPLICATION
CONSTRUCTION SITE REPROCESSING FACILITY APPLICATION CITY OF CHICAGO DEPARTMENT OF PUBLIC HEALTH AS REQUIRED UNDER THE PROVISIONS OF THE ENVIRONMENTAL PROTECTION AND CONTROL ORDINANCE (CHAPTER 11-4 OF THE
More informationWaste Matters. Scott Hunter Head Waste Compliance Unit Coffs Harbour
Waste Matters Scott Hunter Head Waste Compliance Unit Coffs Harbour 1 Who is the NSW EPA? The NSW Environment Protection Authority protects our environment and community We do this by being a leader, a
More informationSECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING
SECTION 334701 - WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. The Contractor shall provide all labor, materials, tools, and equipment required
More informationSeptember 19, Mr. James W. Thorpe A&A Construction and Development Chester Avenue Newark, NJ 07104
September 19, 2014 Mr. James W. Thorpe A&A Construction and Development 14-16 Chester Avenue Newark, NJ 07104 RE: SUMMARY REPORT OF FINDINGS SOIL INVESTIGATION 81-89 WEST ALPINE STREET BLOCK 2678, LOTS
More information