1 Sarbari II hydro power project by DSL Hydrowatt Limited in Kullu, Himachal Pradesh Document Prepared By (DSL Hydrowatt Limited) Project Title Sarbari II hydro power project by DSL Hydrowatt Limited in Kullu, Himachal Pradesh Version 02 Date of Issue 18 th July 2012 Prepared By Contact DSL Hydrowatt Limited Contact Information of Central GHG Monitoring Entity: Mr. M N Ramachandra DSL Hydrowatt Limited Empire House, 214, Dr. D. N. Road Fort, Mumbai , Maharashtra, India Telephone: / 79 id: mnramachandra@gmail.com 1

2 Table of Contents Insert table of contents 1. Project Details 3 2. Application of Methodology 7 3. Quantification of GHG Emission Reductions and Removals 8 4. Monitoring 9 5. Environmental Impact Stakeholders Comments 10 2

3 1 PROJECT DETAILS 1.1 Summary Description of the Project The project activity is a new (2 x 2.7) 5.4 MW Sarbari II hydro power plant in the Kullu district, Himachal Pradesh, India with 25% continuous over load installed capacity. It is a run-of-the-river power project which is utilizing water from the tail race of Sarbari I SHP, The water from tail race of Sarbari I SHP is taken to an intake and is diverted through the power house to generate renewable power. The project has been constructed in the existing water bodies i.e. no water reservoir has been created for the project activity and has no negative environmental impacts. (2 x 2.7) 5.4 MW of entire renewable power is exported to Himachal Pradesh State Electricity Board (HPSEB) as per the PPA (Power Purchase Agreement) signed between PP & HPSEB on 23rd August PP has successfully commissioned two hydro projects and it is already registered as a CDM project under UNFCCC. The Hydro power project is Sarbari-I small hydro project of DSL Hydrowatt Limited (DSLHL), Himachal Pradesh, India in Kullu district of Himachal Pradesh & the other is Sarbari II hydro power plant in the Kullu district, Himachal Pradeshs 1.2 Sectoral Scope and Project Type The project activity falls under the following Sectoral scope and Type: Sectoral Scope: 1 Energy industries (renewable / non renewable sources) Type I: Renewable Energy Projects and Category D: Grid connected renewable electricity generation (version 16, EB 54, valid from 11 th June, ). 1.3 Project Proponent Contact information of the person & entity responsible for completing the monitoring report form is as below. Organization: Street/P.O.Box: Building: City: State/Region: DSL Hydrowatt Limited 214, Dr. D. N. Road, Fort Empire House Mumbai Maharashtra Postcode/ZIP: Country: India Telephone: / 79 FAX: URL: mnramachandra@gmail.com 1 ( 3

4 1.4 Other Entities Involved in the Project Not applicable PROJECT DESCRIPTION: VCS Version Project Start Date The project start date is 25 th August 2010 that is the date of commercial operation of the Hydro Power Plant. 1.6 Project Crediting Period This is the first monitoring report and covers the activity from 25/08/2010 to 27/07/2011. As per registered PDD of this project (UNFCCC Project ID: ) the start date of the project activity was 25/ 07/2007 (The earliest date of the placement of the purchase order has been considered as the start date for the project activity i.e. Order for Civil works were placed for Sai Engg Foundation) and of the crediting period is from 25/08/2010 to 24/08/ th August 2010 is the date of commercial operation of the Sarbari - II Hydro Power Plant. 1.7 Project Scale and Estimated GHG Emission Reductions or Removals Project Mega-project Years , , , , , , ,626 Total estimated ERs Total number of crediting years Estimated GHG emission reductions or removals (tco 2 e) 7 years Average annual ERs 27,

5 1.8 Description of the Project Activity Project Location The project activity is located in the Shalang village of Kullu district in Himachal Pradesh, India. The project site is connected by road and is located at a distance of 207 km from Shimla. The nearest air-port is Bhuntar, located at 30 km and the closest railway station is at Jogindar Nagar. The exact project location is as under: Latitude: N Longitude: E 1.10 Conditions Prior to Project Initiation The project activity is a Greenfield activity that is the installation of new (2 x 2.7) 5.4 MW Sarbari II hydro power plant for generating electricity. In the absence of the project activity taken up by the Project Proponent, the renewable energy source from the hydro power would not have been generated. This would have resulted in equivalent power generation from the fossil fuel based NEWNE Region Gird. Therefore the energy base line is the electrical energy displaced by the hydro power plant installed by the project proponent in the NEWNE Grid that would have continued without implementation of project activity. 5

6 1.11 Compliance with Laws, Statutes and Other Regulatory Frameworks 1.12 Ownership and Other Programs Proof of Title The evidence of proof of title is substantiated through power purchase agreement (PPA) and Host Country Approval (HCA) for this project activity and is provided to the DOE Emissions Trading Programs and Other Binding Limits This project activity is voluntary initiative of DSL Hydrowatt Limited and it is not to meet any local laws or regulatory compliances. DSL Hydrowatt Limited has submitted an undertaking that they shall not claim for GHG emission reduction credits for the given period under any other emission trading program Participation under Other GHG Programs Title: Sarbari II Hydro Power Project by DSL Hydrowatt Limited in Kullu, Himachal Pradesh. Date of CDM Registration: 28/07/2011 CDM Reference Number: Other Forms of Environmental Credit Emission reduction generated from the project activity will not be double counted (i.e. issuance of other form of environmental credit/certificate) for a particular crediting period. DSL Hydrowatt Limited has submitted an undertaking that they shall not claim for GHG emission reduction credits for the given period under any other emission trading program Projects Rejected by Other GHG Programs 1.13 Additional Information Relevant to the Project Eligibility Criteria This project is not a grouped project. Leakage Management There are no leakages from the project and hence not applicable. Commercially Sensitive Information There is no commercially sensitive information that has been excluded from the public version of the project description. 6

7 Project Baseline PROJECT DESCRIPTION: VCS Version 3 Further Information There is no additional relevant legislative, technical, economic, sectoral, social, environmental, geographic, site-specific and/or temporal information that may have a bearing on the eligibility of the project, the net GHG emission reductions or removals, or the quantification of the project s net GHG emission reductions or removals. 2 APPLICATION OF METHODOLOGY 2.1 Title and Reference of Methodology 2.2 Applicability of Methodology 2.3 Project Boundary Source Gas Included? Justification/Explanation CO 2 Source 1 Source 2 Source 1 Source 2 CH 4 N 2 O Other CO 2 CH 4 N 2 O Other CO 2 CH 4 N 2 O Other CO 2 CH 4 N 2 O Other 7

8 2.4 Baseline Scenario 2.5 Additionality 2.6 Methodology Deviations 3 QUANTIFICATION OF GHG EMISSION REDUCTIONS AND REMOVALS 3.1 Baseline Emissions 3.2 Project Emissions 3.3 Leakage 3.4 Summary of GHG Emission Reductions and Removals Years Estimated baseline emissions or removals (tco2e) Estimated project emissions or removals (tco2e) Estimated leakage emissions (tco2e) Estimated net GHG emission reductions or removals (tco2e) Year A Year B Year C Year... Total 4 MONITORING 4.1 Data and Parameters Available at Validation Data Unit / Parameter: Data unit: Description: Source of data: Value applied: Justification of choice of data or description of measurement methods and procedures applied: Any comment: 8

9 4.2 Data and Parameters Monitored PROJECT DESCRIPTION: VCS Version 3 Data Unit / Parameter: Data unit: Description: Source of data: Description of measurement methods and procedures to be applied: Frequency of monitoring/recording: EU trans kwh Transmission line loss from the project activity Joint meter reading sheet authorized by HPSEB Monitoring: There is a main meter and a check meter of accuracy class 0.2s located at the HPSEB substation. The electricity generated by Sarbari I plant and the VCS project activity Sarbari II project plant (belonging to the same PP) are connected to the same Main & Check meter at HPSEB substation. A monthly recording of the electricity exported and electricity imported takes place at the HPSEB substation in the presence of the representatives of the PP and the HPSEB. Based on the monthly recorded data from the VCS project activity Sarbari II, the other hydro power project of the PP(Sarbari-I) and at the HPSEB substation, the HPSEB authority conducts an apportioning to deduce the transmission line losses for the project activity plant(sarbari-ii) & Sarbari-I hydro project plant. The entire procedure of apportioning for transmission line loss is conducted and controlled by the HPSEB authorities and the PP has no role in the same. Finally the JMR sheet, authorized and issued by HPSEB, indicates the transmission losses and net electricity supplied by the project activity plant (Sarbari-II) and also of the other hydro plant of the same PP (Sarbari-I) to the grid. Data type: Calculated Archiving procedure: Paper and Electronic Responsibility: All the meters are owned by HPSEB. The calibration of meters is under the purview HPSEB officials. Electricity export values are also recorded by representatives of PP on a daily basis in a log book maintained at the plant site. Monthly joint readings of the main and check meters at HPSEB substation in presence of PP and HPSEB officials. 9

10 Value applied: 1,170,919 Monitoring equipment: - QA/QC procedures to be applied: Calculation method: - Any comment: PROJECT DESCRIPTION: VCS Version 3 Calibration Frequency: All main and check meters at HPSEB substation will be calibrated annually. This value can be cross checked from the invoice raised by the PP. Data shall be archived for Crediting period + 2 yrs in paper & electronic form. 4.3 Description of the Monitoring Plan 5 ENVIRONMENTAL IMPACT 6 STAKEHOLDER COMMENTS 10

PROJECT TITLE: 86 MW HYDRO PROJECT IN HIMACHAL PRADESH

PROJECT TITLE: 86 MW HYDRO PROJECT IN HIMACHAL PRADESH PROJECT TITLE: 86 MW HYDRO PROJECT IN HIMACHAL PRADESH Document Prepared By Malana Power Company Limited Contact Information Bhilwara Towers, A-12, Sector -1 Noida-201301 Uttar Pradesh India Contact Number

More information

PROJECT DESCRIPTION: VCS Version 3

PROJECT DESCRIPTION: VCS Version 3 VCS Project Description Template This template is for the development of VCS projects. Instructions for completing the project description: TITLE PAGE: All items in the box at the bottom of the title page

More information

86 MW Hydro Project in Himachal Pradesh

86 MW Hydro Project in Himachal Pradesh 86 MW Hydro Project in Himachal Pradesh Monitoring Report- Fifth VER Verification (Total Emission Reductions- 45,737 tco2e) Monitoring Period: 01/10/2009 to 31/03/2010 (Inclusive of both days) Version:

More information

TOTORAL WIND FARM PROJECT

TOTORAL WIND FARM PROJECT TOTORAL WIND FARM PROJECT Document Prepared By Knut Vrålstad Project Title Totoral Wind Farm Project Version 2.0 Date of Issue 29-03-2012 Prepared By Knut Vrålstad, SN Power Invest AS Contact Lilleakervn.

More information

DAK PSI 3 AND 4 HYDROPOWER PROJECT

DAK PSI 3 AND 4 HYDROPOWER PROJECT DAK PSI 3 AND 4 HYDROPOWER PROJECT Document Prepared By Kyoto Energy Pte. Ltd. Project Title Dak Psi 3 and 4 Hydropower Project Version 2.3 Date of Issue Prepared By Contact 27-February-2013 Kyoto Energy

More information

LA FERME BAMBOUS SOLAR PHOTOVOLTAIC POWER PLANT

LA FERME BAMBOUS SOLAR PHOTOVOLTAIC POWER PLANT LA FERME BAMBOUS SOLAR PHOTOVOLTAIC POWER PLANT Document Prepared By on behalf of Project Title La Ferme Bambous solar photovoltaic power plant Version Version 1.1 Report ID Date of Issue Project ID Bambous_VCS_MR2

More information

Version 05.1 Page 1 of 16

Version 05.1 Page 1 of 16 CDM-MR-FORM Monitoring report form (Version 05.1) MONITORING REPORT Title of the project activity 15 MW Solar Photovoltaic Power Project at Gujarat UNFCCC reference number of the project activity 8671

More information

500kW Photovoltaic Plant on Vava u Island in the Kingdom of Tonga

500kW Photovoltaic Plant on Vava u Island in the Kingdom of Tonga 500kW Photovoltaic Plant on Vava u Island in the Kingdom of Tonga Document Prepared By Easy Carbon Consultancy Co., Ltd. Project Title 500kW Photovoltaic Plant on Vava u Island in the Kingdom of Tonga

More information

INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT

INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT Document Prepared By Inner Mongolia Xinjin Wind Power Co., Ltd. Project Title Inner Mongolia Hangjin Yihewusu Wind Power Project Version 2.0 Report ID

More information

VALIDATION AND VERIFICATION REPORT FOR SOLAR GROUPED PROJECT BY ACME GROUP (EKIESL-VCS-AUG-16-01)

VALIDATION AND VERIFICATION REPORT FOR SOLAR GROUPED PROJECT BY ACME GROUP (EKIESL-VCS-AUG-16-01) VALIDATION AND VERIFICATION REPORT FOR SOLAR GROUPED PROJECT BY ACME GROUP (EKIESL-VCS-AUG-16-01) Document Prepared by: Carbon Check (India) Private Ltd. Project Title Report Title Solar Grouped project

More information

Santangou First and Second Grade Hydropower Stations Project MONITORING REPORT

Santangou First and Second Grade Hydropower Stations Project MONITORING REPORT Santangou First and Second Grade Hydropower Stations Project MONITORING REPORT Document Prepared By (Zhijie Duan, South Pole Carbon Asset Management Ltd.) Contact Information (j.duan@southpolecarbon.com)

More information

Monitoring report form (Version 05.1)

Monitoring report form (Version 05.1) Monitoring report form (Version 05.1) MONITORING REPORT Title of the project activity CECIC Zhangbei Dayangzhuang Wind Farm Project UNFCCC reference number of the project activity 1855 Version number of

More information

REPORT OF THE SEVENTH MEETING OF THE EXECUTIVE BOARD Annex 5

REPORT OF THE SEVENTH MEETING OF THE EXECUTIVE BOARD Annex 5 - 1 - Annex 5 Appendix A 1 to the simplified modalities and procedures for small-scale CDM project activities CLEAN DEVELOPMENT MECHANISM SIMPLIFIED PROJECT DESIGN DOCUMENT FOR SMALL SCALE PROJECT ACTIVITIES

More information

WIND POWER PROJECT OF CLP WIND FARMS (INDIA) PRIVATE LIMITED

WIND POWER PROJECT OF CLP WIND FARMS (INDIA) PRIVATE LIMITED WIND POWER PROJECT OF CLP WIND FARMS (INDIA) PRIVATE LIMITED Document Prepared By: EKI Energy Services Limited Project Title Wind Power Project of CLP Wind Farms (India) Private Limited Version 03 Report

More information

(Version 05.1) Salkhit Wind Farm. Clean Energy LLC Swedish Energy Agency. Mongolia

(Version 05.1) Salkhit Wind Farm. Clean Energy LLC Swedish Energy Agency. Mongolia CDM-MR-FORM Monitoring report form (Version 05.1) Complete this form in accordance with the Attachment Instructions for filling out the monitoring report form at the end of this form. MONITORING REPORT

More information

VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT

VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT Document Prepared By: Bureau Veritas Certification Holding SAS Report No.BVC/China-VR/7066/2012 Project Title Version Report ID Yunnan Mangli Hydropower

More information

PART I. Programme of activities (PoA)

PART I. Programme of activities (PoA) F-CDM-PoA-DD Programme design document form for CDM programmes of activities (Version 03.0) PART I. Programme of activities (PoA) SECTION A. General description of PoA A.1. Title of the PoA A.2. Purpose

More information

INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT

INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT Document Prepared By Inner Mongolia Xinjin Wind Power Co., Ltd. Project Title Inner Mongolia Hangjin Yihewusu Wind Power Project Version 2.0 Date of Issue

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS A. General description of project activity B. Application

More information

Post Registration Changes How to Address? Sustainable Development Mechanisms, UNFCCC secretariat

Post Registration Changes How to Address? Sustainable Development Mechanisms, UNFCCC secretariat Post Registration Changes How to Address? Sustainable Development Mechanisms, UNFCCC secretariat Procedures available for Post registration changes Four (4) procedures have been developed to facilitate

More information

VGS Monitoring Report Longhe 1.03MW Hydro Power Project (GS 482)

VGS Monitoring Report Longhe 1.03MW Hydro Power Project (GS 482) VGS Monitoring Report Longhe 1.03MW Hydro Power Project (GS 482) 5 th Monitoring Period: 28/07/2014~09/02/2016 Version: 3.0 Date: 06/05/2016 Climate Bridge Ltd. Contents 1. Introduction... - 1-1.1 Monitoring

More information

COMPONENT PROJECT ACTIVITIES DESIGN DOCUMENT (CPA-DD)

COMPONENT PROJECT ACTIVITIES DESIGN DOCUMENT (CPA-DD) CDM Executive Board Page 1 COMPONENT PROJECT ACTIVITY DESIGN DOCUMENT FORM FOR AFFORESTATION AND REFORESTATION COMPONENT PROJECT ACTIVITIES (F-CDM-AR-CPA-DD) Version 02.1 COMPONENT PROJECT ACTIVITIES DESIGN

More information

YAPRAK WEIR AND HEPP

YAPRAK WEIR AND HEPP YAPRAK WEIR AND HEPP Document Prepared By: KBS Certification Services Pvt. Ltd. Project Title Yaprak Weir and HEPP Version 01.1 Report ID VCS.15.VER.005 Report Title Client Pages 19 Date of Issue Prepared

More information

Post Registration Changes How to Address? Nitin Arora Sustainable Development Mechanisms, UNFCCC secretariat

Post Registration Changes How to Address? Nitin Arora Sustainable Development Mechanisms, UNFCCC secretariat Post Registration Changes How to Address? Nitin Arora Sustainable Development Mechanisms, UNFCCC secretariat Procedures available for Post registration changes. Four (4) procedures have been developed

More information

CLEAN DEVELOPMENT MECHANISM PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-CPA-DD) Version 01 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-CPA-DD) Version 01 CONTENTS CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-CPA-DD) Version 01 CONTENTS A. General description of CDM programme activity (CPA) B. Eligibility of CPA

More information

Concepts of Clean Development Mechanism. Confederation of Indian Industry

Concepts of Clean Development Mechanism. Confederation of Indian Industry Concepts of Clean Development Mechanism Kyoto Protocol UNFCCC & Kyoto Protocol Kyoto Treaty was drawn up in Kyoto, Japan, on 11 th December, 1997 to implement United Nations Framework Convention for Climate

More information

VER MONITORING REPORT

VER MONITORING REPORT VER MONITORING REPORT RIALMA COMPANHIA ENERGÉTICA S/A. SANTA EDWIGES II SMALL HYDRO POWER PLANT SMALL SCALE CDM PROJECT Monitoring Period: From 3 December, 2005 to 31 March, 2007 Version 2 April 14th,

More information

VERIFICATION REPORT FOR SATARA WIND POWER PROJECT IN MAHARASHTRA, INDIA

VERIFICATION REPORT FOR SATARA WIND POWER PROJECT IN MAHARASHTRA, INDIA VERIFICATION REPORT FOR SATARA WIND POWER PROJECT IN MAHARASHTRA, INDIA Document Prepared By: LGAI Technological Center, S.A. (Applus) Project Title Satara Wind Power Project in Maharashtra, India Version

More information

Approved baseline methodology AM0019

Approved baseline methodology AM0019 Approved baseline methodology AM0019 Renewable energy s replacing part of the electricity production of one single fossil fuel fired power plant that stands alone or supplies to a grid, excluding biomass

More information

44.40 MW Wind Energy Project by Ruchi Soya Industries Limited, India

44.40 MW Wind Energy Project by Ruchi Soya Industries Limited, India 44.40 MW Wind Energy Project by Ruchi Soya Industries Limited, India Document Prepared By EKI Energy Services Limited Contact Information: Office No. 201, EnKing Embassy Plot No. 48, Scheme No. 78 Part

More information

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) CDM Executive Board Page 1 PROGRAMME DESIGN DOCUMENT FORM FOR SMALL-SCALE CDM PROGRAMMES OF ACTIVITIES (F-CDM-SSC-PoA-DD) Version 02.0 PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) PART I. Programme

More information

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) CDM Executive Board Page 1 PROGRAMME DESIGN DOCUMENT FORM FOR SMALL-SCALE CDM PROGRAMMES OF ACTIVITIES (F-CDM-SSC-PoA-DD) Version 02.0 PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) PART I. Programme

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS A. General description of the small scale project activity B. Application

More information

3 MW HYDRO POWER PROJECT BY DARJEELING POWER PVT. LTD.

3 MW HYDRO POWER PROJECT BY DARJEELING POWER PVT. LTD. 3 MW HYDRO POWER PROJECT BY DARJEELING POWER PVT. LTD. Document Prepared By (Darjeeling Power Pvt. Ltd.) Project Title 3 MW Hydro Power Project by Darjeeling Power Pvt. Ltd. Version 1 Date of Issue Monitoring

More information

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) CDM Executive Board Page 1 PROGRAMME DESIGN DOCUMENT FORM FOR CDM PROGRAMMES OF ACTIVITIES (F-CDM-PoA-DD) Version 02.0 PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) PART I. Programme of activities (PoA)

More information

Description of the Bundle and the subbundles:

Description of the Bundle and the subbundles: CDM Executive Board Version 2, page 1 CLEAN DEVELOPMENT MECHANISM FORM FOR SUBMISSION OF BUNDLED SMALL SCALE PROJECT ACTIVITIES (SSC-CDM-BUNDLE) SECTION A. General description of the Bundle A.1. Title

More information

VALIDATION REPORT. KKK Hydro Power Limited Baragran Hydro Electric Project, 3.0 MW (being expanded to 4.9 MW)

VALIDATION REPORT. KKK Hydro Power Limited Baragran Hydro Electric Project, 3.0 MW (being expanded to 4.9 MW) VALIDATION REPORT KKK Hydro Power Limited Baragran Hydro Electric Project, 3.0 MW (being expanded to 4.9 MW) SGS Climate Change Programme SGS United Kingdom Ltd SGS House 217-221 London Road Camberley

More information

PROJECT DESIGN DOCUMENT (PDD)

PROJECT DESIGN DOCUMENT (PDD) CDM Executive Board Page 1 PROJECT DESIGN DOCUMENT FORM FOR CDM PROJECT ACTIVITIES (F-CDM-PDD) Version 04.1 PROJECT DESIGN DOCUMENT (PDD) Title of the project activity Renewable Wind Energy by Fortune

More information

BUNDLED SOLAR POWER PROJECT BY VECTOR GREEN SUNSHINE PRIVATE LIMITED AND POLEPALLY SOLAR PARKS PRIVATE LIMITED

BUNDLED SOLAR POWER PROJECT BY VECTOR GREEN SUNSHINE PRIVATE LIMITED AND POLEPALLY SOLAR PARKS PRIVATE LIMITED BUNDLED SOLAR POWER PROJECT BY VECTOR GREEN SUNSHINE PRIVATE LIMITED AND POLEPALLY SOLAR PARKS PRIVATE LIMITED Document Prepared By Vector Green Sunshine Private Limited Project Title Bundled Solar Power

More information

CER Monitoring Report

CER Monitoring Report CER Monitoring Report Waste gases utilisation for Combined Cycle Power Plant in Handan Iron & Steel Group Co., Ltd (Registration Reference No. 1262) Monitoring period 15/10/2007 ~ 29/02/2008 (first periodic

More information

JOINT IMPLEMENTATION PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM Version 01 - in effect as of: 01 November CONTENTS

JOINT IMPLEMENTATION PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM Version 01 - in effect as of: 01 November CONTENTS Joint Implementation Supervisory Committee page 1 JOINT IMPLEMENTATION PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM Version 01 - in effect as of: 01 November 2009 1 CONTENTS A. General description of the

More information

SOLAR POWER PROJECT BY MYTRAH ENERGY INDIA PRIVATE LIMITED

SOLAR POWER PROJECT BY MYTRAH ENERGY INDIA PRIVATE LIMITED SOLAR POWER PROJECT BY MYTRAH ENERGY INDIA PRIVATE LIMITED Document Prepared by Mytrah Energy India Private Limited Project Title Solar Power Project by Mytrah Energy India Private Limited Version 01 Date

More information

The Gold Standard Suppressed Demand Small- scale Methodology for Energy Use for the Processing of Agricultural Products

The Gold Standard Suppressed Demand Small- scale Methodology for Energy Use for the Processing of Agricultural Products The Gold Standard Suppressed Demand Small- scale Methodology for Energy Use for the Processing of Agricultural Products February 2013 This methodology was prepared by Perspectives GmbH with input from

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS A. General description of the small scale project activity B. Application

More information

VERIFICATION REPORT OF THE LUGOUHE HYDROPOWER PROJECT IN SICHUAN PROVINCE, CHINA

VERIFICATION REPORT OF THE LUGOUHE HYDROPOWER PROJECT IN SICHUAN PROVINCE, CHINA VCS Verification Report VERIFICATION REPORT OF THE LUGOUHE HYDROPOWER PROJECT IN SICHUAN PROVINCE, CHINA Voluntary Carbon Standard 2007.1 Report No: VCS 009-06, rev. 03 Germanischer Lloyd Certification

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS.

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS. CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS A. General description of the small scale project

More information

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SSC A/R (CDM-PoA-DD-SSC-AR) - Version 01. CDM Executive Board Page 1

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SSC A/R (CDM-PoA-DD-SSC-AR) - Version 01. CDM Executive Board Page 1 Page 1 CLEAN DEVELOPMENT MECHANISM PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SMALL-SCALE AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-PoA-DD-SSC-AR) (Version 01) CONTENTS A. General description

More information

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) page1 PROGRAMME DESIGN DOCUMENT FORM FOR SMALL-SCALE CDM PROGRAMMES OF ACTIVITIES (F-CDM-SSC-PoA-DD) Version 02.0 PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) PART I. Programme of activities (PoA)

More information

Methodological tool Baseline, project and/or leakage emissions from electricity consumption and monitoring of electricity generation

Methodological tool Baseline, project and/or leakage emissions from electricity consumption and monitoring of electricity generation CLEAN DEVELOPMENT MECHANISM TOOL05 Methodological tool Baseline, project and/or leakage emissions from electricity consumption and monitoring of electricity generation TABLE OF CONTENTS Page 1. INTRODUCTION...

More information

BATAAN MW POWER RICE HULL COGENERATION PROJECT

BATAAN MW POWER RICE HULL COGENERATION PROJECT BATAAN 2020 12.5 MW POWER RICE HULL COGENERATION PROJECT Document Prepared By Bataan 2020, Inc. 226 Quirino Highway, Baesa Queson City, Metro Manila, Phillippines. Tel: +632 334 2960 to 67 Email: ayh@bataan2020.net

More information

PROJECT DESIGN DOCUMENT (PDD)

PROJECT DESIGN DOCUMENT (PDD) CDM Executive Board Page 1 PROJECT DESIGN DOCUMENT FORM FOR CDM PROJECT ACTIVITIES (F-CDM-PDD) Version 04.0 PROJECT DESIGN DOCUMENT (PDD) Title of the project activity Wind Farm Kladovo 1 Version number

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS A. General description of the small scale project activity B. Application

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS Annexes CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 A. General description of the small scale project activity B. Application

More information

CLEAN DEVELOPMENT MECHANISM SIMPLIFIED PROJECT DESIGN DOCUMENT FOR SMALL-SCALE PROJECT ACTIVITIES (SSC-CDM-PDD) Version 02 CONTENTS

CLEAN DEVELOPMENT MECHANISM SIMPLIFIED PROJECT DESIGN DOCUMENT FOR SMALL-SCALE PROJECT ACTIVITIES (SSC-CDM-PDD) Version 02 CONTENTS CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM SIMPLIFIED PROJECT DESIGN DOCUMENT FOR SMALL-SCALE PROJECT ACTIVITIES (SSC-CDM-PDD) Version 02 CONTENTS A. General description of the small-scale

More information

CAKIT HYDROPOWER PLANT, TURKEY

CAKIT HYDROPOWER PLANT, TURKEY VOLUNTARY EMISSION REDUCTION PROJECT MONITORING REPORT CAKIT HYDROPOWER PLANT, TURKEY Preparation Date: 08/08/2011 Monitoring Period: 01/06/2010-30/06/2011 Number: 1 Document ID: CakitVCS-MR1-2010_2011-v03

More information

Small-Scale CDM & Bundling: Criteria, Advantages & Status

Small-Scale CDM & Bundling: Criteria, Advantages & Status Small-Scale CDM & Bundling: Criteria, Advantages & Status Need for Small-Scale CDM introduced by CDM EB to encourage the development of smaller CDM projects typically would have been less attractive in

More information

MONITORING REPORT. Ver. 02, 2009/03/04. [The Monitoring period is chosen from 2006/04/01 to 2008/05/26 both days included]

MONITORING REPORT. Ver. 02, 2009/03/04. [The Monitoring period is chosen from 2006/04/01 to 2008/05/26 both days included] Someshwara small hydropower project (24.75 MW) in Karnataka, India (UNFCCC Project Activity Reference No.1273) MONITORING REPORT Ver. 02, 2009/03/04 [The Monitoring period is chosen from 2006/04/01 to

More information

Validation and Verification: VCS

Validation and Verification: VCS Validation and Verification: VCS Mr N.VASASMITH GHG Assessor Scope 13.1 Meeting room 3, Zone B, Queen Sirikit National Convention Center 2012 January 24 Prepare by Ms S.THONGSONG 1 Introduction VCS is

More information

Approved consolidated baseline and monitoring methodology ACM0013

Approved consolidated baseline and monitoring methodology ACM0013 Approved consolidated baseline and monitoring methodology ACM0013 Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS A. General description of the small scale project activity B. Application

More information

VERIFICATION AND CERTIFICATION REPORT

VERIFICATION AND CERTIFICATION REPORT VERIFICATION AND CERTIFICATION REPORT Datang Zhangzhou Wind Power Co., Ltd Fujian Zhangpu Liuao 45MW Wind Power Project SGS Climate Change Programme SGS United Kingdom Ltd SGS House 217-221 London Road

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS.

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS. CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS A. General description of the small scale project activity B. Application

More information

AMAYO PHASE II WIND POWER PROJECT

AMAYO PHASE II WIND POWER PROJECT AMAYO PHASE II WIND POWER PROJECT Report No: 8000402033-11/558 Date: 2012-03-21 TÜV NORD CERT GmbH JI/CDM Certification Program Langemarckstraße, 20 45141 Essen, Germany Phone: +49-201-825-3335 Fax: +49-201-825-3290

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS A. General description of the small scale project activity B. Application

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS A. General description of the small scale project activity B. Application

More information

MONITORING REPORT FORM CONTENTS

MONITORING REPORT FORM CONTENTS MONITORING REPORT FORM CONTENTS A. General description of the project activity A.1. Brief description of the project activity A.2. Project participants A.3. Location of the project activity A.4. Technical

More information

Monitoring report form (Version 04.0)

Monitoring report form (Version 04.0) CDM-MR-FORM Monitoring report form (Version 04.0) MONITORING REPORT Title of the project activity Çanakkale WPP Reference number of the project activity GS 906 Version number of the monitoring report v3

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS page 1 CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS A. General description of project activity B. Application of a baseline and

More information

Bethlehem Hydroelectric Project South Africa

Bethlehem Hydroelectric Project South Africa Appendix A 1 to the simplified modalities and procedures for small-scale CDM project activities CLEAN DEVELOPMENT MECHANISM SIMPLIFIED PROJECT DESIGN DOCUMENT FOR SMALL SCALE PROJECT ACTIVITIES (SSC-PDD)

More information

Verification and certification report form for GS project activities. (Version 01.0)

Verification and certification report form for GS project activities. (Version 01.0) Verification and certification report form for GS project activities (Version 01.0) VERICATION AND CERTIFICATION REPORT Title of the project activity Reference number of the project activity 15 MW Solar

More information

Voluntary Carbon Standard VALIDATION REPORT BUNDLED WIND POWER PROJECT

Voluntary Carbon Standard VALIDATION REPORT BUNDLED WIND POWER PROJECT VALIDATION REPORT BUNDLED WIND POWER PROJECT Positive Climate Care 9.75 MW Bundled Wind Power Project Activity by Savita Oil Technologies Ltd. & its group companies in the state of Maharashtra, India.

More information

18 MW Kemphole Mini Hydel Scheme (KMHS) by International Power Corporation Limited. CDM Project Number 0312

18 MW Kemphole Mini Hydel Scheme (KMHS) by International Power Corporation Limited. CDM Project Number 0312 Revised Monitoring Plan 18 MW Kemphole Mini Hdel Scheme (KMHS) b International Power Corporation Limited CDM Project Number 0312 Version: 1.1 Implemented b International Power Corporation Limited Defense

More information

Voluntary Carbon Standard Project Description

Voluntary Carbon Standard Project Description Voluntary Carbon Standard Project Description Date of VCS PD: 11 September 2009 Version: 3 Table of Contents 1 Description of Project:... 2 2 VCS Methodology:... 8 3 Monitoring:... 12 4 GHG Emission Reductions:...

More information

Criteria Catalogue: VER+

Criteria Catalogue: VER+ Criteria Catalogue: VER+ Prepared / changed: IS-CMS-MUC approved: IS-CMS-MUC page 1 of 10 CONTENTS Acronyms...3 Definitions...3 A. CRITERIA CATALOGUE... 4 1. Eligibility Criteria...4 2. Additionality...4

More information

WIND POWER PROJECT OF CLP WIND FARMS (INDIA) PRIVATE LIMITED

WIND POWER PROJECT OF CLP WIND FARMS (INDIA) PRIVATE LIMITED WIND POWER PROJECT OF CLP WIND FARMS (INDIA) PRIVATE LIMITED Document Prepared By: CLP Wind Farms (India) Private Limited Project Title Wind Power Project of CLP Wind Farms (India) Private Limited Version

More information

5 MW Wind Energy Project at Villages Mada and Kotari, Tehsil Fatahgarh, District Jaisalmer, State Rajasthan, India

5 MW Wind Energy Project at Villages Mada and Kotari, Tehsil Fatahgarh, District Jaisalmer, State Rajasthan, India 5 MW Wind Energy Project at Villages Mada and Kotari, Tehsil Fatahgarh, District Jaisalmer, State Rajasthan, India Project Owner: M/S Sangam (India) Ltd PO Box 126 Biliya Kalan Chittorgarh Road Bhilwara,

More information

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN Rio Taquesi Hydroelectric Power Project UNFCCC Ref. No. 1031 SGS Climate Change Programme SGS United Kingdom Ltd SGS House 217-221 London Road

More information

YUNNAN TENGZHONG NEW ENERGY TECHNOLOGY Co. Ltd. BIOMASS HEATING SYSTEM RETROFITTING AND BIOMASS COLLECTION STATION PROJECT

YUNNAN TENGZHONG NEW ENERGY TECHNOLOGY Co. Ltd. BIOMASS HEATING SYSTEM RETROFITTING AND BIOMASS COLLECTION STATION PROJECT YUNNAN TENGZHONG NEW ENERGY TECHNOLOGY Co. Ltd. BIOMASS HEATING SYSTEM RETROFITTING AND BIOMASS COLLECTION STATION PROJECT Document Prepared By Beijing Karbon Energy Consulting Co., Ltd. Project Title

More information

GRID CONNECTED 25 MW PV SOLAR POWER PROJECT AT CHARANKA IN GUJARAT

GRID CONNECTED 25 MW PV SOLAR POWER PROJECT AT CHARANKA IN GUJARAT GRID CONNECTED 25 MW PV SOLAR POWER PROJECT AT CHARANKA IN GUJARAT Document Prepared By Vivek Sadevra Contact Information (optional) Project Title Grid connected 25 MW PV solar power project at Charanka

More information

VERIFICATION REPORT OF INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT

VERIFICATION REPORT OF INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT VERIFICATION REPORT OF INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT Document Prepared By China Environmental United Certification Centre Co., Ltd. Project Title Inner Mongolia Hangjin Yihewusu Wind

More information

HYDROELECTRIC PROJECT IN KINNAUR DISTRICT IN HIMACHAL PRADESH

HYDROELECTRIC PROJECT IN KINNAUR DISTRICT IN HIMACHAL PRADESH HYDROELECTRIC PROJECT IN KINNAUR DISTRICT IN HIMACHAL PRADESH Document Prepared By EKI Energy Services Limited Project Title Hydroelectric Project in Kinnaur District in Himachal Pradesh Version 02 Report

More information

Waste management - Hydro, Wind, Solar Energy. - Capturing of landfill methane emission - Biomass power. to generate power - Geothermal, Tidel Energy

Waste management - Hydro, Wind, Solar Energy. - Capturing of landfill methane emission - Biomass power. to generate power - Geothermal, Tidel Energy Workshop on Improving the Regional Distribution of CDM s in Asia and the Pacific Technical Session 1 : Overview of CDM Key Elements of CDM Cycle Hemant Nandanpawar International CDM Specialist Technical

More information

Small-scale Methodology AMS-III.AE.: Energy efficiency and renewable energy measures in new residential buildings

Small-scale Methodology AMS-III.AE.: Energy efficiency and renewable energy measures in new residential buildings CLEAN DEVELOPMENT MECHANISM CDM-EB101-A14 Small-scale Methodology AMS-III.AE.: Energy efficiency and renewable energy measures in new TABLE OF CONTENTS Page 1. INTRODUCTION... 3 2. SCOPE, APPLICABILITY,

More information

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03- in effect as of: 22 December 2006 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03- in effect as of: 22 December 2006 CONTENTS CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03- in effect as of: 22 December 2006 CONTENTS A. General description of the small scale project activity B. Application of

More information

VERIFICATION / CERTIFICATION REPORT

VERIFICATION / CERTIFICATION REPORT VERIFICATION / CERTIFICATION REPORT 4.5 MW BIOMASS (LOW DENSITY CROP RESIDUES) BASED POWER GENERATION UNIT OF MALAVALLI POWER PLANT PVT LTD. IN INDIA (UNFCCC Ref.No. 0298) VERIFICATION PERIOD: 01 AUGUST

More information

GS VALIDATION & VERIFICATION REPORT

GS VALIDATION & VERIFICATION REPORT GS VALIDATION & VERIFICATION REPORT 4.5 MW BIOMASS (LOW DENSITY CROP RESIDUES) BASED POWER GENERATION UNIT OF MALAVALLI POWER PLANT PVT LTD, INDIA REPORT NO. 2007-4003 REVISION NO. 01 DET NORSKE VERITAS

More information

VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E) REVISION NO. 03 GHG CERTIFICATION OFFICE

VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E) REVISION NO. 03 GHG CERTIFICATION OFFICE VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E)12-004 REVISION NO. 03 GHG CERTIFICATION OFFICE KOREA ENERGY MANAGEMENT CORPORATION Date of first issue: Project No.: 19/06/2012 GHGCC(E)12-004

More information

VERIFICATION REPORT for the CDM Project Activity

VERIFICATION REPORT for the CDM Project Activity VERIFICATION REPORT for the CDM Project Activity Abohar Power Generation Private Limited Abohar Branch Canal Based Small Hydro Power Project in Punjab, India In India Report No: CCL257/CDM/VER/PHG/20140303/A01

More information

GUIDELINES FOR COMPLETING THE FORM FOR SUBMISSION OF BUNDLED SMALL-SCALE CDM PROJECT ACTIVITIES (F-CDM-SSC-BUNDLE) (Version 01) CONTENTS

GUIDELINES FOR COMPLETING THE FORM FOR SUBMISSION OF BUNDLED SMALL-SCALE CDM PROJECT ACTIVITIES (F-CDM-SSC-BUNDLE) (Version 01) CONTENTS GUIDELINES FOR COMPLETING THE FORM FOR SUBMISSION OF BUNDLED SMALL-SCALE CDM PROJECT ACTIVITIES (F-CDM-SSC-BUNDLE) (Version 01) CONTENTS I. Information note on bundling of Small-Scale project activities

More information

VCS MONITORING REPORT. Generation of electricity from Bundled 25 MW wind energy project aggregated by Resurge Energy Private Limited.

VCS MONITORING REPORT. Generation of electricity from Bundled 25 MW wind energy project aggregated by Resurge Energy Private Limited. VCS MONITORING REPORT Generation of electricity from Bundled 25 MW wind energy project aggregated by Resurge Energy Private Limited. VCS Monitoring Period 1 April 2006 to 31 October 2008 (Both day inclusive),

More information

Draft revision to the approved consolidated baseline methodology ACM0007

Draft revision to the approved consolidated baseline methodology ACM0007 Draft revision to the approved consolidated baseline methodology ACM0007 Baseline methodology for conversion from single cycle to combined cycle power generation Sources This baseline methodology is based

More information

CDM AND VER VALIDATION PROTOCOL

CDM AND VER VALIDATION PROTOCOL APPENDIX A CDM AND VER VALIDATION PROTOCOL SAYALAR 30.4 MW WIND FARM PROJECT TURKEY FINAL REPORT NO. 2007-44003 REVISION NO. 01 Table 1 Mandatory Requirements for High Standard Voluntary Emission Reduction

More information

FIRST ASSESSMENT REPORT FOR THE REVISIONS TO AMS-III.BC TO INCLUDE MOBILE MACHINERY

FIRST ASSESSMENT REPORT FOR THE REVISIONS TO AMS-III.BC TO INCLUDE MOBILE MACHINERY FIRST ASSESSMENT REPORT FOR THE REVISIONS TO AMS-III.BC TO INCLUDE MOBILE MACHINERY Document Prepared By Stantec Consulting Ltd. Methodology Element Title Revisions to AMS-III.BC to Include Mobile Machinery

More information

Version 05.1 Page 1 of 24

Version 05.1 Page 1 of 24 Monitoring report form (Version 05.1) MONITORING REPORT Title of the project activity UNFCCC reference number of the project activity Zhongshan County Micro Hydro Project Bundle No.2 GS1100 Version number

More information

MONITORING REPORT. Grid connected electricity generation from renewable sources: Uzuncayir 82.0 MW Hydroelectric Power Plant Project, Turkey

MONITORING REPORT. Grid connected electricity generation from renewable sources: Uzuncayir 82.0 MW Hydroelectric Power Plant Project, Turkey MONITORING REPORT Project Title Version 2.0 Grid connected electricity generation from renewable sources: Uzuncayir 82.0 MW Hydroelectric Power Plant Project, Turkey Date of Issue 22 December 2011 Project

More information

CLEAN DEVELOPMENT MECHANISM SIMPLIFIED PROJECT DESIGN DOCUMENT FOR SMALL-SCALE PROJECT ACTIVITIES (SSC-CDM-PDD) Version 02 CONTENTS

CLEAN DEVELOPMENT MECHANISM SIMPLIFIED PROJECT DESIGN DOCUMENT FOR SMALL-SCALE PROJECT ACTIVITIES (SSC-CDM-PDD) Version 02 CONTENTS CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM SIMPLIFIED PROJECT DESIGN DOCUMENT FOR SMALL-SCALE PROJECT ACTIVITIES (SSC-CDM-PDD) Version 02 CONTENTS A. General description of the small-scale

More information

Afforestation/Reforestation Afforestation/Reforestation Clean Development Mechanism Projects in Uttar Pradesh State August

Afforestation/Reforestation Afforestation/Reforestation Clean Development Mechanism Projects in Uttar Pradesh State August Afforestation/Reforestation Clean Development Mechanism Projects in Uttar Pradesh State August 9, 2014 Suresh Chauhan TERI, New Delhi Presentation outlines 1. Guidelines for preparing Project Design Document

More information

82 MW LAU RENUN HYDRO POWER PLANT, NORTH SUMATRA

82 MW LAU RENUN HYDRO POWER PLANT, NORTH SUMATRA 82 MW LAU RENUN HYDRO POWER PLANT, NORTH SUMATRA Document Prepared By: KBS Certification Services Pvt. Ltd. Project Title 82 MW Lau Renun Hydro Power Plant, North Sumatra Version 01.2 Report ID VCS.17.VER.009_Crediting

More information

CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM (CDM-SSC-PoA-DD) Version 01 CONTENTS

CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM (CDM-SSC-PoA-DD) Version 01 CONTENTS CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM (CDM-SSC-PoA-DD) Version 01 CONTENTS A. General description of small-scale programme of activities

More information

MONITORING REPORT. Bundled wind power project in Tamil Nadu, India. Voluntary Carbon Units (VCUs):

MONITORING REPORT. Bundled wind power project in Tamil Nadu, India. Voluntary Carbon Units (VCUs): MONITORING REPORT Bundled wind power project in Tamil Nadu, India Voluntary Carbon Units (VCUs): 10 th April 2006 15 th November 2008 (Both days included) Monitoring Report Version: Version 1.2 Date: 11

More information