1 Decision Aquatera Utilities Inc MW Power Plant June 26, 2014

2 The Alberta Utilities Commission Decision : Aquatera Utilities Inc MW Power Plant Application No Proceeding No June 26, 2014 Published by The Alberta Utilities Commission Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta T2P 3L8 Telephone: Fax: Website:

3 The Alberta Utilities Commission Calgary, Alberta Decision Aquatera Utilities Inc. Application No MW Power Plant Proceeding No Introduction and background 1. Aquatera Utilities Inc. (Aquatera) filed an application with the Alberta Utilities Commission (AUC or the Commission) for approval to construct and operate a 2.85-megawatt (MW) power plant at its water and wastewater treatment plant, located in the city of Grande Prairie, as well as for the issuance of a connection order, pursuant to sections 11 and 18 of the Hydro and Electric Energy Act. The application was registered on February 28, 2014 as Application No and assigned Proceeding No The Commission requested additional information from Aquatera regarding potential environmental impacts on April 1, 2014, and received responses on April 17, The Commission issued a second round of information requests pertaining to Aquatera s compliance with Section 95 of the Electric Utilities Act on June 3, 2014, and received responses on June 9, The Commission issued a notice of application on May 20, The notice was also published in the Grande Prairie Daily Herald on Friday, May 23, No submissions were received by the deadline date of June 13, Discussion 4. Aquatera stated that the bioreactor landfill gas-to-energy project would consist of two MW GE Jenbacher JMS 420 dual fuel (landfill gas/natural gas) generators. The generators would be capable of operating by themselves, in parallel, or in cogeneration with the power grid. Aquatera stated that the primary fuel supply for the power plant would be landfill gas collected and transmitted by pipeline from the adjacent facilities at the landfill. Natural gas, supplied from the local ATCO Gas distribution system would be used as a backup fuel supply in the event that the supply of landfill gas is unavailable at the power plant. 5. Aquatera stated that the proposed power plant would be housed in a building constructed on previously disturbed land within the water and wastewater treatment plant site, located at the southeast quarter of Section 11, Township 71, Range 6, west of the Sixth Meridian and partly on Plan , Lot 1, Block 1, within the city of Grande Prairie. 6. Aquatera submitted a noise impact assessment respecting the proposed power plant and stated that the anticipated noise levels would be within the permissible sound levels specified in AUC Rule 012: Noise Control (AUC Rule 012). 7. The proposed power plant would be connected to the Alberta Interconnected Electric System via ATCO Electric Ltd. s distribution system. Aquatera provided both a proposal to AUC Decision (June 26, 2014) 1

4 2.85 MW Power Plant Aquatera Utilities Inc. connect the proposed power plant from ATCO Electric Ltd. and ATCO Electric Ltd. s acceptance of the connection proposal. 8. Aquatera completed an air quality assessment for sulphur dioxide, carbon monoxide and particulate matter for the proposed and existing sources of air emissions and predicted the maximum concentrations would be less than the applicable Alberta Ambient Air Quality Objectives. 9. Aquatera stated that the Alberta Air Emission Standards for Electric Generation are applicable to natural gas-fired power plants, but would not apply to the proposed power plant because the primary fuel source for the power plant is intended to be landfill gas. Aquatera submitted that they had consulted with Alberta Environment and Sustainable Resource Development (AESRD) with respect to NO x emission limits and the applicability of the Alberta Air Emission Standards for Electric Generation. Aquatera also submitted that the AESRD is currently in the process of reviewing its Environmental Protection and Enhancement Act application and will make a decision on the NO x emission limit after reviewing the application and the air quality assessment. 10. Aquatera stated that it is wholly owned by the City of Grande Prairie, County of Grande Prairie No. 1 and the Town of Sexsmith. The City of Grande Prairie holds an absolute majority of both the issued common shares and the preferred shares; therefore, Aquatera is a subsidiary of the City of Grande Prairie. Aquatera submitted that it is in compliance with Section 95 of the Electric Utilities Act in that the generating units would be located on Aquatera s property and the electric energy to be produced by these units is incidental to the main purpose of the landfill site. Aquatera also submitted that it would use all the electrical energy produced within the landfill site and the water treatment plant at other Aquatera sites and in the city of Grand Prairie. 11. Aquatera provided an approval of generation facility, issued by the Market Surveillance Administrator (MSA), confirming the MSA s acceptance on Aquatera s compliance plan under Section 2 of the Municipal Own-use Generation Regulation. 12. Aquatera submitted that it conducted a participant involvement program for the power plant in February Personal consultations were conducted with landowners within 800 metres of the project and information packages were sent to 49 businesses within the County of Grande Prairie Industrial Park, Minhas Industrial Park, and Highway 40 Industrial Park. Unaddressed mail was also sent to 3,917 residents and landowners within a 2,100-metre radius. Aquatera stated that no concerns about the proposed power plant were raised. 3 Findings 13. The Commission has considered the application and finds that the application meets the information requirements stipulated in AUC Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments. 14. The Commission finds that the noise impact assessment submitted by Aquatera fulfills the requirements of AUC Rule 012 and the proposed power plant will not exceed the permissible sound level. 2 AUC Decision (June 26, 2014)

5 2.85 MW Power Plant Aquatera Utilities Inc. 15. The Commission considers that Aquatera s participant involvement program is satisfactory. No public, industry or agency objections were received by Aquatera. Further, no objections or concerns were received in response to the notice of application issued by the Commission. As a result, the Commission considers that a hearing is not required for this application. 16. The Commission finds that Aquatera is in compliance with Section 95 of the Electric Utilities Act because it is a subsidiary of the City of Grande Prairie and the power plant is located on land owned by the City of Grande Prairie. Also, Aquatera has complied with sections 2 and 3 of the Municipal Own-use Generation Regulation because all of the electrical energy produced by the proposed power plant will be used by Aquatera and the City of Grande Prairie and Aquatera has received approval of its compliance plan from the MSA. 17. Furthermore, the Commission is satisfied that the environmental impacts of the proposed power plant are minimal since the power plant will be located within the water and wastewater treatment plant, and will use landfill gas that currently is being emitted into the environment. 18. As a result of the above findings, the Commission considers that the approval of the proposed power plant is in the public interest, pursuant to Section 17 of the Alberta Utilities Commission Act. 19. The Commission also considers that the requirements for the issuance of a connection order have been met for the proposed power plant. 4 Decision 20. Pursuant to Section 11 of the Hydro and Electric Energy Act, the Commission approves the application and grants Aquatera the approval set out in Appendix 1 Power Plant Approval No. U June 26, 2014 (Appendix 1 will be distributed separately). 21. Pursuant to Section 18 of the Hydro and Electric Energy Act, the Commission approves the application for a connection order and grants Aquatera the approval set out in Appendix 2 Connection Order No. U June 26, 2014 (Appendix 2 will be distributed separately). Dated on June 26, The Alberta Utilities Commission (original signed by) Henry van Egteren Commission Member AUC Decision (June 26, 2014) 3

Harvest Operations Corp.

Harvest Operations Corp. Decision 2014-214 Six-MW Power Plant Exemption July 21, 2014 The Alberta Utilities Commission Decision 2014-214: Six-MW Power Plant Exemption Application No. 1610444 Proceeding No. 3153 July 21, 2014 Published

More information

Seven Generations Energy Ltd.

Seven Generations Energy Ltd. Decision 22976-D01-2018 Power Plant Exemption at Gold Creek Gas Plant January 17, 2018 Alberta Utilities Commission Decision 22976-D01-2018 Power Plant Exemption at Gold Creek Gas Plant Proceeding 22976

More information

Grande Prairie Generation, Inc.

Grande Prairie Generation, Inc. Decision 20292-D01-2015 Northern Prairie Power Plant November 27, 2015 Alberta Utilities Commission Decision 20292-D01-2015 Northern Prairie Power Plant Proceeding 20292 Application 20292-A001 November

More information

Suncor Energy Inc. Errata to Decision Firebag Substations and Power Plant Expansion and Industrial System Designation Amendment

Suncor Energy Inc. Errata to Decision Firebag Substations and Power Plant Expansion and Industrial System Designation Amendment Decision 2011-523 (Errata) Errata to Decision 2011-523 Firebag Substations and Power Plant Expansion and Industrial System Designation Amendment January 10, 2012 The Alberta Utilities Commission Decision

More information

Pembina NGL Corporation

Pembina NGL Corporation Decision 22928-D01-2018 45-Megawatt Cogeneration Power Plant, Alteration to Scoria 318S Substation and Amendment to the Redwater Industrial System Designation January 9, 2018 Alberta Utilities Commission

More information

Decision GTE Solar Inc. Brooks Solar Power Plant. January 31, 2013

Decision GTE Solar Inc. Brooks Solar Power Plant. January 31, 2013 Decision 2013-027 Brooks Solar Power Plant January 31, 2013 The Alberta Utilities Commission Decision 2013-027: Brooks Solar Power Plant Application No. 1608532 Proceeding ID No. 1938 January 31, 2013

More information

Alberta Power (2000) Ltd.

Alberta Power (2000) Ltd. Decision 23558-D01-2018 Battle River Power Plant Alterations August 27, 2018 Alberta Utilities Commission Decision 23558-D01-2018 Battle River Power Plant Alterations Proceeding 23558 Application 23558-A001

More information

ENMAX Power Corporation

ENMAX Power Corporation Decision 22562-D01-2017 ENMAX No. 31 Substation Alteration May 25, 2017 Alberta Utilities Commission Decision 22562-D01-2017 ENMAX No. 31 Substation Alteration Proceeding 22562 Application 22562-A001 May

More information

Signalta Resources Limited

Signalta Resources Limited Decision 22388-D01-2017 Coaldale 6.4-Megawatt Cogeneration Station June 1, 2017 Alberta Utilities Commission Decision 22388-D01-2017 Coaldale 6.4-Megawatt Cogeneration Station Proceeding 22388 Application

More information

NaturEner Wild Rose 1 Energy Inc.

NaturEner Wild Rose 1 Energy Inc. Decision 2013-348 Amendment to Wild Rose 1 Wind Power Plant September 13, 2013 The Alberta Utilities Commission Decision 2013-348: Amendment to Wild Rose 1 Wind Power Plant Application No. 1609685 Proceeding

More information

Alberta Electric System Operator Needs Identification Document Application

Alberta Electric System Operator Needs Identification Document Application Decision 22618-D01-2017 Alberta Electric System Operator Needs Identification Document Application Facility Applications June 22, 2017 Alberta Utilities Commission Decision 22618-D01-2017: Alberta Electric

More information

EPCOR Distribution & Transmission Inc.

EPCOR Distribution & Transmission Inc. Decision 22229-D01-2016 Victoria E511S Substation Breaker Additions December 19, 2016 Alberta Utilities Commission Decision 22229-D01-2016 Victoria E511S Substation Breaker Additions Proceeding 22229 Application

More information

NOVA Chemicals Corporation

NOVA Chemicals Corporation Decision 2013-426 NOVA Chemicals Corporation Industrial System Designation Amendment November 29, 2013 The Alberta Utilities Commission Decision 2013-426: NOVA Chemicals Corporation Industrial System Designation

More information

Pengrowth Energy Corporation

Pengrowth Energy Corporation Decision 2013-308 Lindberg SAGD Industrial System Designation August 20, 2013 The Alberta Utilities Commission Decision 2013-308: Lindberg SAGD Industrial System Designation Application No. 1609200 Proceeding

More information

SunEEarth Alberta Solar Development Inc.

SunEEarth Alberta Solar Development Inc. Decision 22422-D01-2017 Yellow Lake Solar Project September 26, 2017 Alberta Utilities Commission Decision 22422-D01-2017 Yellow Lake Solar Project Proceeding 22422 Application 22422-A001 September 26,

More information

Canadian Natural Resources Limited

Canadian Natural Resources Limited Decision 23468-D01-2018 Margie 1034S Substation May 28, 2018 Alberta Utilities Commission Decision 23468-D01-2018 Margie 1034S Substation Proceeding 23468 Application 23468-A001 May 28, 2018 Published

More information

The City of Red Deer

The City of Red Deer Decision 2010-148 The City of Red Deer 15-kW Solar Power Plant for City of Red Deer Civic Yards Building April 5, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-148: The City of Red Deer 15-kW Solar Power

More information

Connacher Oil and Gas Limited

Connacher Oil and Gas Limited Decision 2010-094 Cogeneration Plant and Industrial System Designation March 2, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-094: Cogeneration Plant and Industrial System Designation Application No.

More information

Decision B. St. Pierre kW Photovoltaic Micro-Generation System. May 15, 2013

Decision B. St. Pierre kW Photovoltaic Micro-Generation System. May 15, 2013 Decision 2013-180 13.05-kW Photovoltaic Micro-Generation System May 15, 2013 The Alberta Utilities Commission Decision 2013-180: 13.05-kW Photovoltaic Micro-Generation System Application No. 1609500 Proceeding

More information

Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document

Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document Decision 3476-D01-2015 Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document ATCO Electric Ltd. Yeo Substation Project Facility Application February 18, 2015 Alberta Utilities

More information

Decision MEG Energy Corp. Amend Christina Lake Industrial System Designation. December 15, 2011

Decision MEG Energy Corp. Amend Christina Lake Industrial System Designation. December 15, 2011 Decision 2011-496 December 15, 2011 The Alberta Utilities Commission Decision 2011-496: Application No. 1607774 Proceeding ID No. 1505 December 15, 2011 Published by The Alberta Utilities Commission Fifth

More information

TransAlta Corporation

TransAlta Corporation Decision 23808-D01-2018 Coal-to-Gas Conversion of Keephills Power Plant Units 1 and 2 December 21, 2018 Alberta Utilities Commission Decision 23808-D01-2018 Coal-to-Gas Conversion of Keephills Power Plant

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22781-D01-2017 Newell Solar Power Plant November 15, 2017 Alberta Utilities Commission Decision 22781-D01-2017 Newell Solar Power Plant Proceeding 22781 Application 22781-A001 November 15, 2017

More information

Decision D The City of Calgary. Bonnybrook Cogeneration Expansion Project. May 17, 2018

Decision D The City of Calgary. Bonnybrook Cogeneration Expansion Project. May 17, 2018 Decision 22711-D01-2018 Bonnybrook Cogeneration Expansion Project May 17, 2018 Alberta Utilities Commission Decision 22711-D01-2018 Bonnybrook Cogeneration Expansion Project Proceeding 22711 Application

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22499-D01-2017 June 7, 2017 Decision 22499-D01-2017 Proceeding 22499 Application 22499-A001 June 7, 2017 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta

More information

Decision Cenovus FCCL Ltd.

Decision Cenovus FCCL Ltd. Decision 2012-196 Construct and Operate a 95-MW Cogeneration Power Plant, Construct and Operate Sunday Creek 539S Substation, Industrial System Designation and Interconnection of the Christina Lake Industrial

More information

Nexen Inc. OPTI Canada Inc.

Nexen Inc. OPTI Canada Inc. Decision 2010-006 Nexen Inc. OPTI Canada Inc. Long Lake South Phase 1 Cogeneration Power Plant January 15, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-006: Nexen Inc. and OPTI Canada Inc. Long Lake

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22296-D01-2017 Hays Solar Power Plant June 7, 2017 Alberta Utilities Commission Decision 22296-D01-2017 Hays Solar Power Plant Proceeding 22296 Application 22296-A001 June 7, 2017 Published by

More information

Nexen Inc. and CNOOC Canada Inc.

Nexen Inc. and CNOOC Canada Inc. Decision 2012-330 Long Lake Project December 6, 2012 The Alberta Utilities Commission Decision 2012-330: Long Lake Project Application No. 1608729 Proceeding ID No. 2074 December 6, 2012 Published by The

More information

Grizzly Oil Sands ULC

Grizzly Oil Sands ULC Decision 2013-124 Algar Lake Project Distribution System Exemption March 28, 2013 The Alberta Utilities Commission Decision 2013-124: Algar Lake Project Distribution System Exemption Application No. 1609370

More information

Pteragen Canada Inc.

Pteragen Canada Inc. Decision 2013-171 May 7, 2013 The Alberta Utilities Commission Decision 2013-171: Application No. 1608907 Proceeding ID No. 2181 May 7, 2013 Published by The Alberta Utilities Commission Fifth Avenue Place,

More information

Oldman 2 Wind Farm Limited

Oldman 2 Wind Farm Limited Decision 2010-461 Oldman 2 Wind Farm Project September 24, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-461: Oldman 2 Wind Farm Project Application No. 1605398 Proceeding ID. 293 September 24, 2010

More information

Burdett Solar GP Corp.

Burdett Solar GP Corp. Decision 23364-D01-2018 Burdett Solar Project Time Extension October 3, 2018 Alberta Utilities Commission Decision 23364-D01-2018 Burdett Solar Project Time Extension Proceeding 23364 Application 23364-A001

More information

Greengate Power Corporation

Greengate Power Corporation Decision 2011-085 Blackspring Ridge Wind Project March 9, 2011 The Alberta Utilities Commission Decision 2011-085: Blackspring Ridge Wind Project Application No. 1604777 Proceeding ID No. 190 March 9,

More information

AltaGas Utilities Inc.

AltaGas Utilities Inc. Decision 23918-D01-2018 Paddle Prairie Compressor Station Installation Mackenzie County October 11, 2018 Alberta Utilities Commission Decision 23918-D01-2018 Paddle Prairie Compressor Station Installation

More information

Decision D ATCO Electric Ltd. Swan Hills F.P.L. 744S Substation Decommission and Salvage. November 8, 2018

Decision D ATCO Electric Ltd. Swan Hills F.P.L. 744S Substation Decommission and Salvage. November 8, 2018 Decision 23890-D01-2018 Swan Hills F.P.L. 744S Substation Decommission and Salvage November 8, 2018 Alberta Utilities Commission Decision 23890-D01-2018 Swan Hills F.P.L. 744S Substation Decommission and

More information

Solar Krafte Utilities Inc.

Solar Krafte Utilities Inc. Decision 23323-D01-2018 August 21, 2018 Alberta Utilities Commission Decision 23323-D01-2018 Proceeding 23323 Application 23323-A001 August 21, 2018 Published by the: Alberta Utilities Commission Eau Claire

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22447-D01-2017 Vauxhall Solar Power Plant July 4, 2017 Alberta Utilities Commission Decision 22447-D01-2017 Vauxhall Solar Power Plant Proceeding 22447 Application 22447-A001 July 4, 2017 Published

More information

Decision Syncrude Canada Ltd. Mildred Lake Power Plant. July 17, 2014

Decision Syncrude Canada Ltd. Mildred Lake Power Plant. July 17, 2014 Decision 2014-212 Syncrude Canada Ltd. Mildred Lake Power Plant July 17, 2014 Decision 2014-212: Syncrude Canada Ltd. Mildred Lake Power Plant Application No. 1610311 Proceeding No. 3068 July 17, 2014

More information

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on June

More information

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on March

More information

AltaGas Utilities Inc.

AltaGas Utilities Inc. Decision 23713-D01-2018 August 28, 2018 Alberta Utilities Commission Decision 23713-D01-2018 Proceeding 23713 Application 23713-A001 August 28, 2018 Published by the: Alberta Utilities Commission Eau Claire

More information

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on December

More information

EDF EN Canada Development Inc.

EDF EN Canada Development Inc. Decision 21203-D01-2016 Blackspring Ridge Wind Power Plant March 2, 2016 Alberta Utilities Commission Decision 21203-D01-2016 Blackspring Ridge Wind Power Plant Proceeding 21203 Application 21203-A001

More information

Decision FortisAlberta Inc. Micro-Generation Determination. December 16, 2008

Decision FortisAlberta Inc. Micro-Generation Determination. December 16, 2008 Decision 2008-132 FortisAlberta Inc. Micro-Generation Determination December 16, 2008 ALBERTA UTILITIES COMMISSION Decision 2008-132: FortisAlberta Inc. Micro-Generation Determination Application No. 1594619

More information

SUNDANCE 7 January 2014

SUNDANCE 7 January 2014 Artist rendering of a combined-cycle natural gas power plant. SUNDANCE 7 January 2014 Project Information Booklet Table of Contents Introduction to Sundance 7 1 TransAlta and MidAmerican 1 Project location

More information

ATCO Electric Ltd. ATCO Gas (a division of ATCO Gas and Pipelines Ltd.) ENMAX Power Corp. EPCOR Distribution and Transmission Inc. FortisAlberta Inc.

ATCO Electric Ltd. ATCO Gas (a division of ATCO Gas and Pipelines Ltd.) ENMAX Power Corp. EPCOR Distribution and Transmission Inc. FortisAlberta Inc. Regulatory Audit Report #2008-001 ATCO Electric Ltd. ATCO Gas (a division of ATCO Gas and Pipelines Ltd.) ENMAX Power Corp. EPCOR Distribution and Transmission Inc. FortisAlberta Inc. Inter-Affiliate Code

More information

Renewable Energy Services Ltd.

Renewable Energy Services Ltd. Decision 1976-D01-2018 McLaughlin Wind Power Plant and Substation February 23, 2018 Alberta Utilities Commission Decision 1976-D01-2018 McLaughlin Wind Power Plant and Substation Proceeding 1976 Applications

More information

Notice of Technical Meeting

Notice of Technical Meeting Notice of Technical Meeting Amendments to three wind energy projects in the Pincher Creek area proposed by Welsch Wind Power Inc., Windy Point Wind Park Ltd. and NextEra Canada Development & Acquisitions,

More information

Decision D Alberta Ltd. (BluEarth) Bull Creek Wind Power Project Noise Complaints

Decision D Alberta Ltd. (BluEarth) Bull Creek Wind Power Project Noise Complaints Decision 22493-D01-2018 1646658 Alberta Ltd. (BluEarth) Bull Creek Wind Power Project Noise Complaints January 17, 2018 Alberta Utilities Commission Decision 22493-D01-2018 1646658 Alberta Ltd. (BluEarth)

More information

Oldman 2 Wind Farm Limited

Oldman 2 Wind Farm Limited Decision 22706-D01-2017 Spring 2017 Comprehensive Sound Survey at Receptors R and S August 25, 2017 Alberta Utilities Commission Decision 22706-D01-2017 Proceeding 22706 Application 22706-A001 August 25,

More information

COMMUNITY FUND AND INVOLVEMENT

COMMUNITY FUND AND INVOLVEMENT ENNER WIND POWER ANUARY 2018 NEWSLETTER INTRODUCTION enner Wind Limited Partnership (WLP), a subsidiary of Potentia Renewables Inc. (PRI), would like to thank you for your continued support and interest

More information

Welcome to our Open House!

Welcome to our Open House! Welcome to our Open House! Please sign in at the front desk and provide your contact information if you would like to receive project updates. We invite you to walk around and look at the displays. If

More information

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017 FALL 2017 PROJECT OVERVIEW EDF EN Canada is proposing to develop, construct, and operate the Cypress Wind Power Project with 243.6 megawatts (MW) of generating capacity. The Project is south of Dunmore,

More information

October 30, 2012 Our File:

October 30, 2012 Our File: October 30, 2012 Our File: 5000-510-5120 Minister of Environment and Sustainable Resource Development 204 Legislature Building 10800 97 Avenue Edmonton, AB T5K 2B6 Attention: Honourable Diana McQueen at

More information

ATCO Gas and Pipelines Ltd.

ATCO Gas and Pipelines Ltd. Decision 22889-D01-2017 ATCO Gas and Pipelines Ltd. 2017-2018 Unaccounted-For Gas Rider D October 13, 2017 Alberta Utilities Commission Decision 22889-D01-2017 ATCO Gas and Pipelines Ltd. 2017-2018 Unaccounted-For

More information

ATCO HEARTLAND GENERATING STATION PHASE 2

ATCO HEARTLAND GENERATING STATION PHASE 2 ATCO HARTLAND GNRATING STATION PHAS 2 Project Information Package August 2015 Conceptual drawing of ATCO Heartland Generating Station with Phase 2 on the upper left Project Overview ATCO Power is proposing

More information

ALBERTA ENVIRONMENT ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT APPLICATIONS NO AND ENVIRONMENTAL IMPACT ASSESSMENT

ALBERTA ENVIRONMENT ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT APPLICATIONS NO AND ENVIRONMENTAL IMPACT ASSESSMENT Notice NOTICE OF APPLICATIONS SHELL CANADA LIMITED QUEST CARBON CAPTURE AND STORAGE RADWAY FIELD ENERGY RESOURCES CONSERVATION BOARD APPLICATIONS NO. 1689376, 1670112, AND 1671615 ALBERTA ENVIRONMENT ENVIRONMENTAL

More information

AREA STRUCTURE PLAN PROCESS

AREA STRUCTURE PLAN PROCESS AREA STRUCTURE PLAN PROCESS Planning & Development Guide County of Grande Prairie No. 1 10001 84 Avenue Clairmont, Alberta, T0H 0W0 Tel: (780) 513-3950 Fax: (780) 539-7686 www.countygp.ab.ca Page 1 TABLE

More information

AMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT. Appendix C. Project Notices

AMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT. Appendix C. Project Notices AMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT Appendix C Project Notices AMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT Appendix C1 Notice of Proposal to Engage in a Renewable Energy Project

More information

May 1, To: Parties currently registered on Proceeding Distributed Generation Review Proceeding Application A001

May 1, To: Parties currently registered on Proceeding Distributed Generation Review Proceeding Application A001 May 1, 2017 To: Parties currently registered on Proceeding 22534 Distributed Generation Review Proceeding 22534 Application 22534-A001 Process for Proceeding 22534 1. On March 31, 2017, the Alberta Utilities

More information

APPLICATION To The Minister of the Ministry of Highways and Infrastructure

APPLICATION To The Minister of the Ministry of Highways and Infrastructure Ministry of Highways and Infrastructure Regional Services APPLICATION To The Minister of the Ministry of Highways and Infrastructure (a) (b) Pursuant to: Section 14 of The Pipeline Act for consent for

More information

6. INFRASTRUCTURE CHARGES

6. INFRASTRUCTURE CHARGES 6.1 Overview 6. INFRASTRUCTURE CHARGES Aquatera currently uses infrastructure charges to recover the capital cost of construction related to Water and Wastewater services. The Infrastructure Charge is

More information

Wind Power Regulatory Process Review

Wind Power Regulatory Process Review Wind Power Regulatory Process Review Stakeholder Consultation Summary of Discussion September 28, 2012 The Alberta Utilities Commission Wind Power Regulatory Process Review Stakeholder Consultation Summary

More information

Canadian Natural Resources Limited

Canadian Natural Resources Limited Decision 2008-012 Application for a Pipeline Licence Taber Field February 12, 2008 ALBERTA ENERGY AND UTILITIES BOARD Decision 2008-012:, Application for a Pipeline Licence, Taber Field February 12, 2008

More information

SemCAMS Area Project Description

SemCAMS Area Project Description REGULATORY The Redwillow Pipeline Project involves crossing a provincial boundary, and therefore, approval for it will require the preparation of an application to the NEB. plans to proceed with the regulatory

More information

Ellerslie Substation Expansion

Ellerslie Substation Expansion Ellerslie Substation Expansion Volume 2 UV 2 North Saskatchewan River EDMONTON UV 216 UV 14 ") ELLERSLIE 89S Bretona!! Trevithick March 2010 Why are you receiving this newsletter? You are receiving this

More information

Up to 9.5MW AC solar project located near Burdett, Alberta

Up to 9.5MW AC solar project located near Burdett, Alberta PROJECT OVERVIEW Up to 9.5MW AC solar project located near Burdett, Alberta Located on agricultural land within the quarter section NE-21-010-12-W4M near the intersection of Range Road 123 and Township

More information

Decision D Town of Grande Cache. Appeal of Water Utility Charges by the Grande Cache Hotel

Decision D Town of Grande Cache. Appeal of Water Utility Charges by the Grande Cache Hotel Decision 22465-D01-2018 Appeal of Water Utility Charges by the Grande Cache Hotel June 14, 2018 Alberta Utilities Commission Decision 22465-D01-2018 Appeal of Water Utility Charges by the Grande Cache

More information

September 16, EQB Board Members. George Edwin Johnson EQB Staff

September 16, EQB Board Members. George Edwin Johnson EQB Staff September 16, 2004 TO: FROM: SUBJECT: EQB Board Members George Edwin Johnson EQB Staff 651 296-2888 Two Permits for Mankato Energy Center (MEC) Site Permit (655 megawatt Large Electric Power Generating

More information

Proposed Enhance CO 2

Proposed Enhance CO 2 Proposed Enhance CO 2 Pipeline Project Enhance Pipeline: Project Overview 1 Project Design 2 Regulatory Considerations 4 Public Consultation Process 5 Health, Safety, and Environmental Programs 6 Project

More information

Welcome to Capital Power s Halkirk 2 Project Open House #2

Welcome to Capital Power s Halkirk 2 Project Open House #2 Welcome to Capital Power s Halkirk 2 Project Open House #2 ABOUT US BC AB RESPECTED, RELIABLE, COMPETITIVE ON Capital Power is a growth-oriented North American power producer headquartered in Edmonton,

More information

Grand Valley Wind Farms Phase 3 Wind Project Wind Turbine Specification Report

Grand Valley Wind Farms Phase 3 Wind Project Wind Turbine Specification Report Grand Valley Wind Farms Phase 3 Wind Project Wind Turbine Specification Report Prepared for: Grand Valley 2 Limited Partnership 222 3rd Avenue Southwest, Suite 900 Livingston Place, South Tower Calgary

More information

CITY OF EDMONTON ANNEXATION APPLICATION APPENDIX 1.0 SE NOTICE OF INTENT TO ANNEX (MARCH 2018)

CITY OF EDMONTON ANNEXATION APPLICATION APPENDIX 1.0 SE NOTICE OF INTENT TO ANNEX (MARCH 2018) CITY OF EDMONTON ANNEXATION APPLICATION APPENDIX 1.0 SE NOTICE OF INTENT TO ANNEX (MARCH 2018) MARCH 2018 Office of the City Manager City of Edmonton 3rd Floor, City Hall 1 Sir Winston Churchill Square

More information

Alberta Electric System Operator AltaLink Management Ltd. Alberta-Pacific Forest Industries Inc.

Alberta Electric System Operator AltaLink Management Ltd. Alberta-Pacific Forest Industries Inc. Decision 2010-612 Alberta Electric System Operator AltaLink Management Ltd. Alberta-Pacific Forest Industries Inc. Needs Identification Document, Transmission Line, Substation and Power Plant Al-Pac Pulp

More information

Accompanying this letter are three documents with further information about the project and BowArk s public involvement:

Accompanying this letter are three documents with further information about the project and BowArk s public involvement: BowArk Energy Ltd. Suite 0 Devon Tower 00 Ave SW Calgary, Alberta, TP H (0 - www.bowark.com March 0, 0 RE: Lanfine Wind Power Project Dear neighbour, My name is Keith Knudsen, and I am the lead developer

More information

CIBC WHISTLER INSTITUTIONAL INVESTOR CONFERENCE JANUARY 2019

CIBC WHISTLER INSTITUTIONAL INVESTOR CONFERENCE JANUARY 2019 CIBC WHISTLER INSTITUTIONAL INVESTOR CONFERENCE JANUARY 2019 LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and Canadian Utilities Limited and information provided in this presentation

More information

Investor Presentation September 2016

Investor Presentation September 2016 Investor Presentation September 2016 1 LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and information provided in this presentation may be considered forward-looking statements. By their

More information

Your guide to the. SOUTHERN ALBERTA Transmission Reinforcement

Your guide to the. SOUTHERN ALBERTA Transmission Reinforcement Your guide to the SOUTHERN ALBERTA Transmission Reinforcement OUR TRANSMISSION LINES TRANSPORT THE POWER YOU USE EVERY DAY. Edmonton Red Deer Calgary Lethbridge 85% AltaLink s transmission system efficiently

More information

Jackfish 2 Project. Public Disclosure Document. August 2005

Jackfish 2 Project. Public Disclosure Document. August 2005 Jackfish 2 Project Public Disclosure Document August 2005 Table of Contents Introduction...1 Company Profile...2 Preliminary Project Description...2 The Plan...2 The Process...3 Facilities...3 Physical

More information

EDP Renewables SH Project GP Ltd.

EDP Renewables SH Project GP Ltd. Decision 22665-D01-2018 September 21, 2018 Alberta Utilities Commission Decision 22665-D01-2018 Proceeding 22665 Applications 22665-A001 to 22665-A004 September 21, 2018 Published by the: Alberta Utilities

More information

Before the Public Utilities Commission of the State of South Dakota. In the Matter of the Application of Black Hills Power, Inc.

Before the Public Utilities Commission of the State of South Dakota. In the Matter of the Application of Black Hills Power, Inc. Direct Testimony Mark Lux Before the Public Utilities Commission of the State of South Dakota In the Matter of the Application of Black Hills Power, Inc. For the Phase In of Rates Regarding Construction

More information

GENERAL ORDER Amendment 1 Section 49 Oil and Gas Activities Act. Attention: Cory Beliveau, Manager, Health, Safety, Environment& Regulatory

GENERAL ORDER Amendment 1 Section 49 Oil and Gas Activities Act. Attention: Cory Beliveau, Manager, Health, Safety, Environment& Regulatory GENERAL ORDER 2017-108 Amendment 1 Section 49 Oil and Gas Activities Act Issued to: ARC Resources Ltd. 1200, 308-4th Avenue, SW Calgary, AB T2P 0H70 Attention: Cory Beliveau, Manager, Health, Safety, Environment&

More information

Controlled Corporations

Controlled Corporations Controlled Corporations This technical document is part of a series of draft discussion papers created by Municipal Affairs staff and stakeholders to prepare for the Municipal Government Act Review. It

More information

Wednesday, February 15, :00 9:00 p.m. Sedalia Hall 1st Avenue, Sedalia, Special Area 3, Alberta

Wednesday, February 15, :00 9:00 p.m. Sedalia Hall 1st Avenue, Sedalia, Special Area 3, Alberta EDP Renewables Canada Ltd. 0B- th Avenue SW Calgary, Alberta TR 0C5 Toll Free: ---0 www.sharphillswindfarm.com www.edpr.com January, 0 Dear Stakeholder, My name is Ryan O Connor, and I am the project manager

More information

Proposed Heartland Cavern Lateral Pipeline and Meter Station. Public Information Document

Proposed Heartland Cavern Lateral Pipeline and Meter Station. Public Information Document Proposed Heartland Cavern Lateral Pipeline and Meter Station Public Information Document April 16, 2015 Proposed Heartland Cavern Lateral Pipeline and Meter Station Project 2 Contents Project Necessity...

More information

AltaLink Management Ltd. and ATCO Electric Ltd.

AltaLink Management Ltd. and ATCO Electric Ltd. Decision 2012-120 AltaLink Management Ltd. and ATCO Electric Ltd. Hanna Region Transmission Development May 8, 2012 The Alberta Utilities Commission Decision 2012-120: Hanna Region Transmission Development

More information

ATCO Gas and Pipelines Ltd. (South)

ATCO Gas and Pipelines Ltd. (South) Decision 2014-313 Sarcee Trail S.W. Pipeline Replacement Southwest Calgary November 14, 2014 The Alberta Utilities Commission Decision 2014-313: Sarcee Trail S.W. Pipeline Replacement Southwest Calgary

More information

Project Location. The CEC is a 320 MW combined-cycle power generation

Project Location. The CEC is a 320 MW combined-cycle power generation ENMAX Corporation ENMAX, through its subsidiaries, makes, moves and sells electricity to residential, small business and large commercial customers and is headquartered in Calgary, Alberta, with offices

More information

Land Use Amendment in East Shepard Industrial (Ward 12) at multiple addresses, LOC

Land Use Amendment in East Shepard Industrial (Ward 12) at multiple addresses, LOC Page 1 of 7 EXECUTIVE SUMMARY This application was submitted by Gibbs Gage Architects on 2018 October 30 on behalf of the landowner Sun Life Assurance Company of Canada. The application proposes to redesignate

More information

November 5, 2018 Council Meeting

November 5, 2018 Council Meeting November 5, 2018 Council Meeting Meeting Type : Regular Council Meeting Date : Monday, November 05, 2018 Start time : 10:00 AM Location : County of Grande Prairie No. 1 Administration Building Minutes

More information

Welcome. to the Community Meeting for the Niagara Region Wind Project. Thank you for coming!

Welcome. to the Community Meeting for the Niagara Region Wind Project. Thank you for coming! Welcome to the Community Meeting for the Niagara Region Wind Project Thank you for coming! In early September we will host the first Public Open House under We are happy to share information about this

More information

SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT DESIGN AND OPERATIONS REPORT. Attachment D. Property Line Setback Assessment

SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT DESIGN AND OPERATIONS REPORT. Attachment D. Property Line Setback Assessment SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT DESIGN AND OPERATIONS REPORT Attachment D Property Line Setback Assessment SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT PROPERTY LINE SETBACK ASSESSMENT REPORT

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Tractebel Management Inc. 4375 Sandwich Street Windsor,

More information

SHELL CANADA LIMITED COGENERATION PLANT AND HYDROGEN PIPELINE Addendum to Decision FORT SASKATCHEWAN AREA Applications No.

SHELL CANADA LIMITED COGENERATION PLANT AND HYDROGEN PIPELINE Addendum to Decision FORT SASKATCHEWAN AREA Applications No. ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta SHELL CANADA LIMITED COGENERATION PLANT AND HYDROGEN PIPELINE Addendum to Decision 2000-30 FORT SASKATCHEWAN AREA Applications No.990464 and 1051618 DECISION

More information

Alberta Regulation 258/95. Alberta Heritage Scholarship Act ALBERTA HERITAGE SCHOLARSHIP AMENDMENT REGULATION

Alberta Regulation 258/95. Alberta Heritage Scholarship Act ALBERTA HERITAGE SCHOLARSHIP AMENDMENT REGULATION Alberta Regulation 258/95 Alberta Heritage Scholarship Act ALBERTA HERITAGE SCHOLARSHIP AMENDMENT REGULATION Filed: October 25, 1995 Made by the Lieutenant Governor in Council (O.C. 672/95) pursuant to

More information

EOG Resources Canada Inc.

EOG Resources Canada Inc. Decision 2008-061 Application for a Pipeline Licence Provost Field July 15, 2008 ENERGY RESOURCES CONSERVATION BOARD Decision 2008-061:, Application for a Pipeline Licence, Provost Field July 15, 2008

More information

Decision (Errata) Alberta Ltd. Errata to Decision Bull Creek Wind Project. March 10, 2014

Decision (Errata) Alberta Ltd. Errata to Decision Bull Creek Wind Project. March 10, 2014 Decision 2014-040 (Errata) Errata to Decision 2014-040 Bull Creek Wind Project March 10, 2014 The Alberta Utilities Commission Decision 2014-040 (Errata): Bull Creek Wind Project Application No. 1608556

More information

E.L. Smith Solar Farm Project Open House. Lower Level

E.L. Smith Solar Farm Project Open House. Lower Level E.L. Smith Solar Farm Project Open House Lower Level We are consulting you to share feedback and perspectives that we will consider in the planning and execution of this project. Who is epcor? Powering

More information

Project siting. Lanfine. Wind resource assessment. Wind Power Project

Project siting. Lanfine. Wind resource assessment. Wind Power Project Project siting Wind resource assessment This assessment determines how much electrical energy can be extracted from the wind Meteorological towers are installed on site to measure wind speed and direction

More information