1 Decision Aquatera Utilities Inc MW Power Plant June 26, 2014
2 The Alberta Utilities Commission Decision : Aquatera Utilities Inc MW Power Plant Application No Proceeding No June 26, 2014 Published by The Alberta Utilities Commission Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta T2P 3L8 Telephone: Fax: Website:
3 The Alberta Utilities Commission Calgary, Alberta Decision Aquatera Utilities Inc. Application No MW Power Plant Proceeding No Introduction and background 1. Aquatera Utilities Inc. (Aquatera) filed an application with the Alberta Utilities Commission (AUC or the Commission) for approval to construct and operate a 2.85-megawatt (MW) power plant at its water and wastewater treatment plant, located in the city of Grande Prairie, as well as for the issuance of a connection order, pursuant to sections 11 and 18 of the Hydro and Electric Energy Act. The application was registered on February 28, 2014 as Application No and assigned Proceeding No The Commission requested additional information from Aquatera regarding potential environmental impacts on April 1, 2014, and received responses on April 17, The Commission issued a second round of information requests pertaining to Aquatera s compliance with Section 95 of the Electric Utilities Act on June 3, 2014, and received responses on June 9, The Commission issued a notice of application on May 20, The notice was also published in the Grande Prairie Daily Herald on Friday, May 23, No submissions were received by the deadline date of June 13, Discussion 4. Aquatera stated that the bioreactor landfill gas-to-energy project would consist of two MW GE Jenbacher JMS 420 dual fuel (landfill gas/natural gas) generators. The generators would be capable of operating by themselves, in parallel, or in cogeneration with the power grid. Aquatera stated that the primary fuel supply for the power plant would be landfill gas collected and transmitted by pipeline from the adjacent facilities at the landfill. Natural gas, supplied from the local ATCO Gas distribution system would be used as a backup fuel supply in the event that the supply of landfill gas is unavailable at the power plant. 5. Aquatera stated that the proposed power plant would be housed in a building constructed on previously disturbed land within the water and wastewater treatment plant site, located at the southeast quarter of Section 11, Township 71, Range 6, west of the Sixth Meridian and partly on Plan , Lot 1, Block 1, within the city of Grande Prairie. 6. Aquatera submitted a noise impact assessment respecting the proposed power plant and stated that the anticipated noise levels would be within the permissible sound levels specified in AUC Rule 012: Noise Control (AUC Rule 012). 7. The proposed power plant would be connected to the Alberta Interconnected Electric System via ATCO Electric Ltd. s distribution system. Aquatera provided both a proposal to AUC Decision (June 26, 2014) 1
4 2.85 MW Power Plant Aquatera Utilities Inc. connect the proposed power plant from ATCO Electric Ltd. and ATCO Electric Ltd. s acceptance of the connection proposal. 8. Aquatera completed an air quality assessment for sulphur dioxide, carbon monoxide and particulate matter for the proposed and existing sources of air emissions and predicted the maximum concentrations would be less than the applicable Alberta Ambient Air Quality Objectives. 9. Aquatera stated that the Alberta Air Emission Standards for Electric Generation are applicable to natural gas-fired power plants, but would not apply to the proposed power plant because the primary fuel source for the power plant is intended to be landfill gas. Aquatera submitted that they had consulted with Alberta Environment and Sustainable Resource Development (AESRD) with respect to NO x emission limits and the applicability of the Alberta Air Emission Standards for Electric Generation. Aquatera also submitted that the AESRD is currently in the process of reviewing its Environmental Protection and Enhancement Act application and will make a decision on the NO x emission limit after reviewing the application and the air quality assessment. 10. Aquatera stated that it is wholly owned by the City of Grande Prairie, County of Grande Prairie No. 1 and the Town of Sexsmith. The City of Grande Prairie holds an absolute majority of both the issued common shares and the preferred shares; therefore, Aquatera is a subsidiary of the City of Grande Prairie. Aquatera submitted that it is in compliance with Section 95 of the Electric Utilities Act in that the generating units would be located on Aquatera s property and the electric energy to be produced by these units is incidental to the main purpose of the landfill site. Aquatera also submitted that it would use all the electrical energy produced within the landfill site and the water treatment plant at other Aquatera sites and in the city of Grand Prairie. 11. Aquatera provided an approval of generation facility, issued by the Market Surveillance Administrator (MSA), confirming the MSA s acceptance on Aquatera s compliance plan under Section 2 of the Municipal Own-use Generation Regulation. 12. Aquatera submitted that it conducted a participant involvement program for the power plant in February Personal consultations were conducted with landowners within 800 metres of the project and information packages were sent to 49 businesses within the County of Grande Prairie Industrial Park, Minhas Industrial Park, and Highway 40 Industrial Park. Unaddressed mail was also sent to 3,917 residents and landowners within a 2,100-metre radius. Aquatera stated that no concerns about the proposed power plant were raised. 3 Findings 13. The Commission has considered the application and finds that the application meets the information requirements stipulated in AUC Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments. 14. The Commission finds that the noise impact assessment submitted by Aquatera fulfills the requirements of AUC Rule 012 and the proposed power plant will not exceed the permissible sound level. 2 AUC Decision (June 26, 2014)
5 2.85 MW Power Plant Aquatera Utilities Inc. 15. The Commission considers that Aquatera s participant involvement program is satisfactory. No public, industry or agency objections were received by Aquatera. Further, no objections or concerns were received in response to the notice of application issued by the Commission. As a result, the Commission considers that a hearing is not required for this application. 16. The Commission finds that Aquatera is in compliance with Section 95 of the Electric Utilities Act because it is a subsidiary of the City of Grande Prairie and the power plant is located on land owned by the City of Grande Prairie. Also, Aquatera has complied with sections 2 and 3 of the Municipal Own-use Generation Regulation because all of the electrical energy produced by the proposed power plant will be used by Aquatera and the City of Grande Prairie and Aquatera has received approval of its compliance plan from the MSA. 17. Furthermore, the Commission is satisfied that the environmental impacts of the proposed power plant are minimal since the power plant will be located within the water and wastewater treatment plant, and will use landfill gas that currently is being emitted into the environment. 18. As a result of the above findings, the Commission considers that the approval of the proposed power plant is in the public interest, pursuant to Section 17 of the Alberta Utilities Commission Act. 19. The Commission also considers that the requirements for the issuance of a connection order have been met for the proposed power plant. 4 Decision 20. Pursuant to Section 11 of the Hydro and Electric Energy Act, the Commission approves the application and grants Aquatera the approval set out in Appendix 1 Power Plant Approval No. U June 26, 2014 (Appendix 1 will be distributed separately). 21. Pursuant to Section 18 of the Hydro and Electric Energy Act, the Commission approves the application for a connection order and grants Aquatera the approval set out in Appendix 2 Connection Order No. U June 26, 2014 (Appendix 2 will be distributed separately). Dated on June 26, The Alberta Utilities Commission (original signed by) Henry van Egteren Commission Member AUC Decision (June 26, 2014) 3
Harvest Operations Corp.
Decision 2014-214 Six-MW Power Plant Exemption July 21, 2014 The Alberta Utilities Commission Decision 2014-214: Six-MW Power Plant Exemption Application No. 1610444 Proceeding No. 3153 July 21, 2014 Published
More informationSeven Generations Energy Ltd.
Decision 22976-D01-2018 Power Plant Exemption at Gold Creek Gas Plant January 17, 2018 Alberta Utilities Commission Decision 22976-D01-2018 Power Plant Exemption at Gold Creek Gas Plant Proceeding 22976
More informationGrande Prairie Generation, Inc.
Decision 20292-D01-2015 Northern Prairie Power Plant November 27, 2015 Alberta Utilities Commission Decision 20292-D01-2015 Northern Prairie Power Plant Proceeding 20292 Application 20292-A001 November
More informationSuncor Energy Inc. Errata to Decision Firebag Substations and Power Plant Expansion and Industrial System Designation Amendment
Decision 2011-523 (Errata) Errata to Decision 2011-523 Firebag Substations and Power Plant Expansion and Industrial System Designation Amendment January 10, 2012 The Alberta Utilities Commission Decision
More informationPembina NGL Corporation
Decision 22928-D01-2018 45-Megawatt Cogeneration Power Plant, Alteration to Scoria 318S Substation and Amendment to the Redwater Industrial System Designation January 9, 2018 Alberta Utilities Commission
More informationDecision GTE Solar Inc. Brooks Solar Power Plant. January 31, 2013
Decision 2013-027 Brooks Solar Power Plant January 31, 2013 The Alberta Utilities Commission Decision 2013-027: Brooks Solar Power Plant Application No. 1608532 Proceeding ID No. 1938 January 31, 2013
More informationAlberta Power (2000) Ltd.
Decision 23558-D01-2018 Battle River Power Plant Alterations August 27, 2018 Alberta Utilities Commission Decision 23558-D01-2018 Battle River Power Plant Alterations Proceeding 23558 Application 23558-A001
More informationENMAX Power Corporation
Decision 22562-D01-2017 ENMAX No. 31 Substation Alteration May 25, 2017 Alberta Utilities Commission Decision 22562-D01-2017 ENMAX No. 31 Substation Alteration Proceeding 22562 Application 22562-A001 May
More informationSignalta Resources Limited
Decision 22388-D01-2017 Coaldale 6.4-Megawatt Cogeneration Station June 1, 2017 Alberta Utilities Commission Decision 22388-D01-2017 Coaldale 6.4-Megawatt Cogeneration Station Proceeding 22388 Application
More informationNaturEner Wild Rose 1 Energy Inc.
Decision 2013-348 Amendment to Wild Rose 1 Wind Power Plant September 13, 2013 The Alberta Utilities Commission Decision 2013-348: Amendment to Wild Rose 1 Wind Power Plant Application No. 1609685 Proceeding
More informationAlberta Electric System Operator Needs Identification Document Application
Decision 22618-D01-2017 Alberta Electric System Operator Needs Identification Document Application Facility Applications June 22, 2017 Alberta Utilities Commission Decision 22618-D01-2017: Alberta Electric
More informationEPCOR Distribution & Transmission Inc.
Decision 22229-D01-2016 Victoria E511S Substation Breaker Additions December 19, 2016 Alberta Utilities Commission Decision 22229-D01-2016 Victoria E511S Substation Breaker Additions Proceeding 22229 Application
More informationNOVA Chemicals Corporation
Decision 2013-426 NOVA Chemicals Corporation Industrial System Designation Amendment November 29, 2013 The Alberta Utilities Commission Decision 2013-426: NOVA Chemicals Corporation Industrial System Designation
More informationPengrowth Energy Corporation
Decision 2013-308 Lindberg SAGD Industrial System Designation August 20, 2013 The Alberta Utilities Commission Decision 2013-308: Lindberg SAGD Industrial System Designation Application No. 1609200 Proceeding
More informationSunEEarth Alberta Solar Development Inc.
Decision 22422-D01-2017 Yellow Lake Solar Project September 26, 2017 Alberta Utilities Commission Decision 22422-D01-2017 Yellow Lake Solar Project Proceeding 22422 Application 22422-A001 September 26,
More informationCanadian Natural Resources Limited
Decision 23468-D01-2018 Margie 1034S Substation May 28, 2018 Alberta Utilities Commission Decision 23468-D01-2018 Margie 1034S Substation Proceeding 23468 Application 23468-A001 May 28, 2018 Published
More informationThe City of Red Deer
Decision 2010-148 The City of Red Deer 15-kW Solar Power Plant for City of Red Deer Civic Yards Building April 5, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-148: The City of Red Deer 15-kW Solar Power
More informationConnacher Oil and Gas Limited
Decision 2010-094 Cogeneration Plant and Industrial System Designation March 2, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-094: Cogeneration Plant and Industrial System Designation Application No.
More informationDecision B. St. Pierre kW Photovoltaic Micro-Generation System. May 15, 2013
Decision 2013-180 13.05-kW Photovoltaic Micro-Generation System May 15, 2013 The Alberta Utilities Commission Decision 2013-180: 13.05-kW Photovoltaic Micro-Generation System Application No. 1609500 Proceeding
More informationAlberta Electric System Operator Yeo 2015S Substation Needs Identification Document
Decision 3476-D01-2015 Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document ATCO Electric Ltd. Yeo Substation Project Facility Application February 18, 2015 Alberta Utilities
More informationDecision MEG Energy Corp. Amend Christina Lake Industrial System Designation. December 15, 2011
Decision 2011-496 December 15, 2011 The Alberta Utilities Commission Decision 2011-496: Application No. 1607774 Proceeding ID No. 1505 December 15, 2011 Published by The Alberta Utilities Commission Fifth
More informationTransAlta Corporation
Decision 23808-D01-2018 Coal-to-Gas Conversion of Keephills Power Plant Units 1 and 2 December 21, 2018 Alberta Utilities Commission Decision 23808-D01-2018 Coal-to-Gas Conversion of Keephills Power Plant
More informationC&B Alberta Solar Development ULC
Decision 22781-D01-2017 Newell Solar Power Plant November 15, 2017 Alberta Utilities Commission Decision 22781-D01-2017 Newell Solar Power Plant Proceeding 22781 Application 22781-A001 November 15, 2017
More informationDecision D The City of Calgary. Bonnybrook Cogeneration Expansion Project. May 17, 2018
Decision 22711-D01-2018 Bonnybrook Cogeneration Expansion Project May 17, 2018 Alberta Utilities Commission Decision 22711-D01-2018 Bonnybrook Cogeneration Expansion Project Proceeding 22711 Application
More informationC&B Alberta Solar Development ULC
Decision 22499-D01-2017 June 7, 2017 Decision 22499-D01-2017 Proceeding 22499 Application 22499-A001 June 7, 2017 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta
More informationDecision Cenovus FCCL Ltd.
Decision 2012-196 Construct and Operate a 95-MW Cogeneration Power Plant, Construct and Operate Sunday Creek 539S Substation, Industrial System Designation and Interconnection of the Christina Lake Industrial
More informationNexen Inc. OPTI Canada Inc.
Decision 2010-006 Nexen Inc. OPTI Canada Inc. Long Lake South Phase 1 Cogeneration Power Plant January 15, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-006: Nexen Inc. and OPTI Canada Inc. Long Lake
More informationC&B Alberta Solar Development ULC
Decision 22296-D01-2017 Hays Solar Power Plant June 7, 2017 Alberta Utilities Commission Decision 22296-D01-2017 Hays Solar Power Plant Proceeding 22296 Application 22296-A001 June 7, 2017 Published by
More informationNexen Inc. and CNOOC Canada Inc.
Decision 2012-330 Long Lake Project December 6, 2012 The Alberta Utilities Commission Decision 2012-330: Long Lake Project Application No. 1608729 Proceeding ID No. 2074 December 6, 2012 Published by The
More informationGrizzly Oil Sands ULC
Decision 2013-124 Algar Lake Project Distribution System Exemption March 28, 2013 The Alberta Utilities Commission Decision 2013-124: Algar Lake Project Distribution System Exemption Application No. 1609370
More informationPteragen Canada Inc.
Decision 2013-171 May 7, 2013 The Alberta Utilities Commission Decision 2013-171: Application No. 1608907 Proceeding ID No. 2181 May 7, 2013 Published by The Alberta Utilities Commission Fifth Avenue Place,
More informationOldman 2 Wind Farm Limited
Decision 2010-461 Oldman 2 Wind Farm Project September 24, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-461: Oldman 2 Wind Farm Project Application No. 1605398 Proceeding ID. 293 September 24, 2010
More informationBurdett Solar GP Corp.
Decision 23364-D01-2018 Burdett Solar Project Time Extension October 3, 2018 Alberta Utilities Commission Decision 23364-D01-2018 Burdett Solar Project Time Extension Proceeding 23364 Application 23364-A001
More informationGreengate Power Corporation
Decision 2011-085 Blackspring Ridge Wind Project March 9, 2011 The Alberta Utilities Commission Decision 2011-085: Blackspring Ridge Wind Project Application No. 1604777 Proceeding ID No. 190 March 9,
More informationAltaGas Utilities Inc.
Decision 23918-D01-2018 Paddle Prairie Compressor Station Installation Mackenzie County October 11, 2018 Alberta Utilities Commission Decision 23918-D01-2018 Paddle Prairie Compressor Station Installation
More informationDecision D ATCO Electric Ltd. Swan Hills F.P.L. 744S Substation Decommission and Salvage. November 8, 2018
Decision 23890-D01-2018 Swan Hills F.P.L. 744S Substation Decommission and Salvage November 8, 2018 Alberta Utilities Commission Decision 23890-D01-2018 Swan Hills F.P.L. 744S Substation Decommission and
More informationSolar Krafte Utilities Inc.
Decision 23323-D01-2018 August 21, 2018 Alberta Utilities Commission Decision 23323-D01-2018 Proceeding 23323 Application 23323-A001 August 21, 2018 Published by the: Alberta Utilities Commission Eau Claire
More informationC&B Alberta Solar Development ULC
Decision 22447-D01-2017 Vauxhall Solar Power Plant July 4, 2017 Alberta Utilities Commission Decision 22447-D01-2017 Vauxhall Solar Power Plant Proceeding 22447 Application 22447-A001 July 4, 2017 Published
More informationDecision Syncrude Canada Ltd. Mildred Lake Power Plant. July 17, 2014
Decision 2014-212 Syncrude Canada Ltd. Mildred Lake Power Plant July 17, 2014 Decision 2014-212: Syncrude Canada Ltd. Mildred Lake Power Plant Application No. 1610311 Proceeding No. 3068 July 17, 2014
More informationApplications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments
Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on June
More informationApplications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments
Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on March
More informationAltaGas Utilities Inc.
Decision 23713-D01-2018 August 28, 2018 Alberta Utilities Commission Decision 23713-D01-2018 Proceeding 23713 Application 23713-A001 August 28, 2018 Published by the: Alberta Utilities Commission Eau Claire
More informationApplications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments
Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on December
More informationEDF EN Canada Development Inc.
Decision 21203-D01-2016 Blackspring Ridge Wind Power Plant March 2, 2016 Alberta Utilities Commission Decision 21203-D01-2016 Blackspring Ridge Wind Power Plant Proceeding 21203 Application 21203-A001
More informationDecision FortisAlberta Inc. Micro-Generation Determination. December 16, 2008
Decision 2008-132 FortisAlberta Inc. Micro-Generation Determination December 16, 2008 ALBERTA UTILITIES COMMISSION Decision 2008-132: FortisAlberta Inc. Micro-Generation Determination Application No. 1594619
More informationSUNDANCE 7 January 2014
Artist rendering of a combined-cycle natural gas power plant. SUNDANCE 7 January 2014 Project Information Booklet Table of Contents Introduction to Sundance 7 1 TransAlta and MidAmerican 1 Project location
More informationATCO Electric Ltd. ATCO Gas (a division of ATCO Gas and Pipelines Ltd.) ENMAX Power Corp. EPCOR Distribution and Transmission Inc. FortisAlberta Inc.
Regulatory Audit Report #2008-001 ATCO Electric Ltd. ATCO Gas (a division of ATCO Gas and Pipelines Ltd.) ENMAX Power Corp. EPCOR Distribution and Transmission Inc. FortisAlberta Inc. Inter-Affiliate Code
More informationRenewable Energy Services Ltd.
Decision 1976-D01-2018 McLaughlin Wind Power Plant and Substation February 23, 2018 Alberta Utilities Commission Decision 1976-D01-2018 McLaughlin Wind Power Plant and Substation Proceeding 1976 Applications
More informationNotice of Technical Meeting
Notice of Technical Meeting Amendments to three wind energy projects in the Pincher Creek area proposed by Welsch Wind Power Inc., Windy Point Wind Park Ltd. and NextEra Canada Development & Acquisitions,
More informationDecision D Alberta Ltd. (BluEarth) Bull Creek Wind Power Project Noise Complaints
Decision 22493-D01-2018 1646658 Alberta Ltd. (BluEarth) Bull Creek Wind Power Project Noise Complaints January 17, 2018 Alberta Utilities Commission Decision 22493-D01-2018 1646658 Alberta Ltd. (BluEarth)
More informationOldman 2 Wind Farm Limited
Decision 22706-D01-2017 Spring 2017 Comprehensive Sound Survey at Receptors R and S August 25, 2017 Alberta Utilities Commission Decision 22706-D01-2017 Proceeding 22706 Application 22706-A001 August 25,
More informationCOMMUNITY FUND AND INVOLVEMENT
ENNER WIND POWER ANUARY 2018 NEWSLETTER INTRODUCTION enner Wind Limited Partnership (WLP), a subsidiary of Potentia Renewables Inc. (PRI), would like to thank you for your continued support and interest
More informationWelcome to our Open House!
Welcome to our Open House! Please sign in at the front desk and provide your contact information if you would like to receive project updates. We invite you to walk around and look at the displays. If
More informationOPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017
FALL 2017 PROJECT OVERVIEW EDF EN Canada is proposing to develop, construct, and operate the Cypress Wind Power Project with 243.6 megawatts (MW) of generating capacity. The Project is south of Dunmore,
More informationOctober 30, 2012 Our File:
October 30, 2012 Our File: 5000-510-5120 Minister of Environment and Sustainable Resource Development 204 Legislature Building 10800 97 Avenue Edmonton, AB T5K 2B6 Attention: Honourable Diana McQueen at
More informationATCO Gas and Pipelines Ltd.
Decision 22889-D01-2017 ATCO Gas and Pipelines Ltd. 2017-2018 Unaccounted-For Gas Rider D October 13, 2017 Alberta Utilities Commission Decision 22889-D01-2017 ATCO Gas and Pipelines Ltd. 2017-2018 Unaccounted-For
More informationATCO HEARTLAND GENERATING STATION PHASE 2
ATCO HARTLAND GNRATING STATION PHAS 2 Project Information Package August 2015 Conceptual drawing of ATCO Heartland Generating Station with Phase 2 on the upper left Project Overview ATCO Power is proposing
More informationALBERTA ENVIRONMENT ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT APPLICATIONS NO AND ENVIRONMENTAL IMPACT ASSESSMENT
Notice NOTICE OF APPLICATIONS SHELL CANADA LIMITED QUEST CARBON CAPTURE AND STORAGE RADWAY FIELD ENERGY RESOURCES CONSERVATION BOARD APPLICATIONS NO. 1689376, 1670112, AND 1671615 ALBERTA ENVIRONMENT ENVIRONMENTAL
More informationAREA STRUCTURE PLAN PROCESS
AREA STRUCTURE PLAN PROCESS Planning & Development Guide County of Grande Prairie No. 1 10001 84 Avenue Clairmont, Alberta, T0H 0W0 Tel: (780) 513-3950 Fax: (780) 539-7686 www.countygp.ab.ca Page 1 TABLE
More informationAMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT. Appendix C. Project Notices
AMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT Appendix C Project Notices AMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT Appendix C1 Notice of Proposal to Engage in a Renewable Energy Project
More informationMay 1, To: Parties currently registered on Proceeding Distributed Generation Review Proceeding Application A001
May 1, 2017 To: Parties currently registered on Proceeding 22534 Distributed Generation Review Proceeding 22534 Application 22534-A001 Process for Proceeding 22534 1. On March 31, 2017, the Alberta Utilities
More informationAPPLICATION To The Minister of the Ministry of Highways and Infrastructure
Ministry of Highways and Infrastructure Regional Services APPLICATION To The Minister of the Ministry of Highways and Infrastructure (a) (b) Pursuant to: Section 14 of The Pipeline Act for consent for
More information6. INFRASTRUCTURE CHARGES
6.1 Overview 6. INFRASTRUCTURE CHARGES Aquatera currently uses infrastructure charges to recover the capital cost of construction related to Water and Wastewater services. The Infrastructure Charge is
More informationWind Power Regulatory Process Review
Wind Power Regulatory Process Review Stakeholder Consultation Summary of Discussion September 28, 2012 The Alberta Utilities Commission Wind Power Regulatory Process Review Stakeholder Consultation Summary
More informationCanadian Natural Resources Limited
Decision 2008-012 Application for a Pipeline Licence Taber Field February 12, 2008 ALBERTA ENERGY AND UTILITIES BOARD Decision 2008-012:, Application for a Pipeline Licence, Taber Field February 12, 2008
More informationSemCAMS Area Project Description
REGULATORY The Redwillow Pipeline Project involves crossing a provincial boundary, and therefore, approval for it will require the preparation of an application to the NEB. plans to proceed with the regulatory
More informationEllerslie Substation Expansion
Ellerslie Substation Expansion Volume 2 UV 2 North Saskatchewan River EDMONTON UV 216 UV 14 ") ELLERSLIE 89S Bretona!! Trevithick March 2010 Why are you receiving this newsletter? You are receiving this
More informationUp to 9.5MW AC solar project located near Burdett, Alberta
PROJECT OVERVIEW Up to 9.5MW AC solar project located near Burdett, Alberta Located on agricultural land within the quarter section NE-21-010-12-W4M near the intersection of Range Road 123 and Township
More informationDecision D Town of Grande Cache. Appeal of Water Utility Charges by the Grande Cache Hotel
Decision 22465-D01-2018 Appeal of Water Utility Charges by the Grande Cache Hotel June 14, 2018 Alberta Utilities Commission Decision 22465-D01-2018 Appeal of Water Utility Charges by the Grande Cache
More informationSeptember 16, EQB Board Members. George Edwin Johnson EQB Staff
September 16, 2004 TO: FROM: SUBJECT: EQB Board Members George Edwin Johnson EQB Staff 651 296-2888 Two Permits for Mankato Energy Center (MEC) Site Permit (655 megawatt Large Electric Power Generating
More informationProposed Enhance CO 2
Proposed Enhance CO 2 Pipeline Project Enhance Pipeline: Project Overview 1 Project Design 2 Regulatory Considerations 4 Public Consultation Process 5 Health, Safety, and Environmental Programs 6 Project
More informationWelcome to Capital Power s Halkirk 2 Project Open House #2
Welcome to Capital Power s Halkirk 2 Project Open House #2 ABOUT US BC AB RESPECTED, RELIABLE, COMPETITIVE ON Capital Power is a growth-oriented North American power producer headquartered in Edmonton,
More informationGrand Valley Wind Farms Phase 3 Wind Project Wind Turbine Specification Report
Grand Valley Wind Farms Phase 3 Wind Project Wind Turbine Specification Report Prepared for: Grand Valley 2 Limited Partnership 222 3rd Avenue Southwest, Suite 900 Livingston Place, South Tower Calgary
More informationCITY OF EDMONTON ANNEXATION APPLICATION APPENDIX 1.0 SE NOTICE OF INTENT TO ANNEX (MARCH 2018)
CITY OF EDMONTON ANNEXATION APPLICATION APPENDIX 1.0 SE NOTICE OF INTENT TO ANNEX (MARCH 2018) MARCH 2018 Office of the City Manager City of Edmonton 3rd Floor, City Hall 1 Sir Winston Churchill Square
More informationAlberta Electric System Operator AltaLink Management Ltd. Alberta-Pacific Forest Industries Inc.
Decision 2010-612 Alberta Electric System Operator AltaLink Management Ltd. Alberta-Pacific Forest Industries Inc. Needs Identification Document, Transmission Line, Substation and Power Plant Al-Pac Pulp
More informationAccompanying this letter are three documents with further information about the project and BowArk s public involvement:
BowArk Energy Ltd. Suite 0 Devon Tower 00 Ave SW Calgary, Alberta, TP H (0 - www.bowark.com March 0, 0 RE: Lanfine Wind Power Project Dear neighbour, My name is Keith Knudsen, and I am the lead developer
More informationCIBC WHISTLER INSTITUTIONAL INVESTOR CONFERENCE JANUARY 2019
CIBC WHISTLER INSTITUTIONAL INVESTOR CONFERENCE JANUARY 2019 LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and Canadian Utilities Limited and information provided in this presentation
More informationInvestor Presentation September 2016
Investor Presentation September 2016 1 LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and information provided in this presentation may be considered forward-looking statements. By their
More informationYour guide to the. SOUTHERN ALBERTA Transmission Reinforcement
Your guide to the SOUTHERN ALBERTA Transmission Reinforcement OUR TRANSMISSION LINES TRANSPORT THE POWER YOU USE EVERY DAY. Edmonton Red Deer Calgary Lethbridge 85% AltaLink s transmission system efficiently
More informationJackfish 2 Project. Public Disclosure Document. August 2005
Jackfish 2 Project Public Disclosure Document August 2005 Table of Contents Introduction...1 Company Profile...2 Preliminary Project Description...2 The Plan...2 The Process...3 Facilities...3 Physical
More informationEDP Renewables SH Project GP Ltd.
Decision 22665-D01-2018 September 21, 2018 Alberta Utilities Commission Decision 22665-D01-2018 Proceeding 22665 Applications 22665-A001 to 22665-A004 September 21, 2018 Published by the: Alberta Utilities
More informationBefore the Public Utilities Commission of the State of South Dakota. In the Matter of the Application of Black Hills Power, Inc.
Direct Testimony Mark Lux Before the Public Utilities Commission of the State of South Dakota In the Matter of the Application of Black Hills Power, Inc. For the Phase In of Rates Regarding Construction
More informationGENERAL ORDER Amendment 1 Section 49 Oil and Gas Activities Act. Attention: Cory Beliveau, Manager, Health, Safety, Environment& Regulatory
GENERAL ORDER 2017-108 Amendment 1 Section 49 Oil and Gas Activities Act Issued to: ARC Resources Ltd. 1200, 308-4th Avenue, SW Calgary, AB T2P 0H70 Attention: Cory Beliveau, Manager, Health, Safety, Environment&
More informationControlled Corporations
Controlled Corporations This technical document is part of a series of draft discussion papers created by Municipal Affairs staff and stakeholders to prepare for the Municipal Government Act Review. It
More informationWednesday, February 15, :00 9:00 p.m. Sedalia Hall 1st Avenue, Sedalia, Special Area 3, Alberta
EDP Renewables Canada Ltd. 0B- th Avenue SW Calgary, Alberta TR 0C5 Toll Free: ---0 www.sharphillswindfarm.com www.edpr.com January, 0 Dear Stakeholder, My name is Ryan O Connor, and I am the project manager
More informationProposed Heartland Cavern Lateral Pipeline and Meter Station. Public Information Document
Proposed Heartland Cavern Lateral Pipeline and Meter Station Public Information Document April 16, 2015 Proposed Heartland Cavern Lateral Pipeline and Meter Station Project 2 Contents Project Necessity...
More informationAltaLink Management Ltd. and ATCO Electric Ltd.
Decision 2012-120 AltaLink Management Ltd. and ATCO Electric Ltd. Hanna Region Transmission Development May 8, 2012 The Alberta Utilities Commission Decision 2012-120: Hanna Region Transmission Development
More informationATCO Gas and Pipelines Ltd. (South)
Decision 2014-313 Sarcee Trail S.W. Pipeline Replacement Southwest Calgary November 14, 2014 The Alberta Utilities Commission Decision 2014-313: Sarcee Trail S.W. Pipeline Replacement Southwest Calgary
More informationProject Location. The CEC is a 320 MW combined-cycle power generation
ENMAX Corporation ENMAX, through its subsidiaries, makes, moves and sells electricity to residential, small business and large commercial customers and is headquartered in Calgary, Alberta, with offices
More informationLand Use Amendment in East Shepard Industrial (Ward 12) at multiple addresses, LOC
Page 1 of 7 EXECUTIVE SUMMARY This application was submitted by Gibbs Gage Architects on 2018 October 30 on behalf of the landowner Sun Life Assurance Company of Canada. The application proposes to redesignate
More informationNovember 5, 2018 Council Meeting
November 5, 2018 Council Meeting Meeting Type : Regular Council Meeting Date : Monday, November 05, 2018 Start time : 10:00 AM Location : County of Grande Prairie No. 1 Administration Building Minutes
More informationWelcome. to the Community Meeting for the Niagara Region Wind Project. Thank you for coming!
Welcome to the Community Meeting for the Niagara Region Wind Project Thank you for coming! In early September we will host the first Public Open House under We are happy to share information about this
More informationSUNCOR ENERGY CEDAR POINT WIND POWER PROJECT DESIGN AND OPERATIONS REPORT. Attachment D. Property Line Setback Assessment
SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT DESIGN AND OPERATIONS REPORT Attachment D Property Line Setback Assessment SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT PROPERTY LINE SETBACK ASSESSMENT REPORT
More informationContent Copy Of Original
Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Tractebel Management Inc. 4375 Sandwich Street Windsor,
More informationSHELL CANADA LIMITED COGENERATION PLANT AND HYDROGEN PIPELINE Addendum to Decision FORT SASKATCHEWAN AREA Applications No.
ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta SHELL CANADA LIMITED COGENERATION PLANT AND HYDROGEN PIPELINE Addendum to Decision 2000-30 FORT SASKATCHEWAN AREA Applications No.990464 and 1051618 DECISION
More informationAlberta Regulation 258/95. Alberta Heritage Scholarship Act ALBERTA HERITAGE SCHOLARSHIP AMENDMENT REGULATION
Alberta Regulation 258/95 Alberta Heritage Scholarship Act ALBERTA HERITAGE SCHOLARSHIP AMENDMENT REGULATION Filed: October 25, 1995 Made by the Lieutenant Governor in Council (O.C. 672/95) pursuant to
More informationEOG Resources Canada Inc.
Decision 2008-061 Application for a Pipeline Licence Provost Field July 15, 2008 ENERGY RESOURCES CONSERVATION BOARD Decision 2008-061:, Application for a Pipeline Licence, Provost Field July 15, 2008
More informationDecision (Errata) Alberta Ltd. Errata to Decision Bull Creek Wind Project. March 10, 2014
Decision 2014-040 (Errata) Errata to Decision 2014-040 Bull Creek Wind Project March 10, 2014 The Alberta Utilities Commission Decision 2014-040 (Errata): Bull Creek Wind Project Application No. 1608556
More informationE.L. Smith Solar Farm Project Open House. Lower Level
E.L. Smith Solar Farm Project Open House Lower Level We are consulting you to share feedback and perspectives that we will consider in the planning and execution of this project. Who is epcor? Powering
More informationProject siting. Lanfine. Wind resource assessment. Wind Power Project
Project siting Wind resource assessment This assessment determines how much electrical energy can be extracted from the wind Meteorological towers are installed on site to measure wind speed and direction
More information