September 9, Corzo Castella Carballo Thompson Salman, P.A. 901 Ponce de Leon Boulevard Suite 900 Coral Gables, Florida 33134
|
|
- Ernest Fletcher
- 5 years ago
- Views:
Transcription
1 September 9, 2009 Corzo Castella Carballo Thompson Salman, P.A. 90 Ponce de Leon Boulevard Suite 900 Coral Gables, Florida 3334 Attn: Mr. Ian John, E.I. Re: Exfiltration Test Results Glenroyal East Phase Roadway and Drainage Improvements NW 7 th Avenue and NW 7 th Street Miami, Miami-Dade County, Florida Terracon Job No Dear Mr. John: As proposed we have completed 9 exfiltration tests for the above referenced project. The following is a brief description of the test procedures and an overview of the results. Also included in the attachments are Exfiltration Sheets containing the test data and an Exfiltration Test Location Diagram showing the approximate location of the tests. Nine exfiltration tests (E- through E-9) were performed at the site in general accordance with the South Florida Water Management District (SFWMD) procedures for the "Usual Open-Hole Constant Head Condition" Percolation Tests. The test was performed in a 0- inch diameter borehole advanced by means of a PVC casing to a depth of 5 feet below the existing ground surface. A 6-inch diameter perforated PVC pipe was placed in the borehole prior to retrieving the casing. Water was then pumped into the borehole in order to raise the water level in the borehole to near the ground surface. Once the inflow stabilized with the outflow rate, the average pumping rate and the elevation of the water obtained with this stabilized flow rate were recorded. Material encountered at the exfiltration test site was identified in the field from cuttings brought to the surface by the augering process. Upon completion of the drilling and following groundwater stabilization, the distance from the existing ground surface to the water table was recorded. The rate of water flow required to maintain a constant hydraulic head was then recorded. The hydraulic conductivity value was determined from the test results and is presented in the Exfiltration Test Sheets attachment in this memo. The hydraulic conductivity value is reported in units of cubic feet per second per square foot of seepage area per foot of head (cfs/ft 2 -ft head). Terracon Consultants, Inc NW 53 rd Street Sunrise, FL 3335 P [954] F [954] terracon.com
2 Glenroyal East Phase Drainage and Roadway Improvements Terracon Job No September 9, 2009 The soil profile at the exfiltration test locations generally consisted of fill material consisting of sand and limerock to depths of approximately 2 to feet below grade. Sand with limestone fragments was encountered below the fill material to a depth of approximately 3 feet at E-. Miami limestone was encountered below the sand with limestone fragments at E- and extended to the exfiltration test depth of 5 feet below grade. Limestone was typically encountered at the remaining test locations at depths ranging between 2 and 5 feet below grade and extended to the exfiltration test termination depths of 5 feet. The groundwater level was recorded at the exfiltration test locations during the augering process. During the subsurface exploration, groundwater (measured in August) was typically observed at the test locations at depths ranging from 3 to 6 feet below existing grade. Exceptions exist at test locations E-2 and E-3 where groundwater levels were encountered at approximately 0½ feet and 3 feet, respectively. These water level observations provide an approximate indication of the groundwater conditions existing on the site at the time the borings were drilled. Fluctuations in the groundwater table can occur due to seasonal variations, recent rainfall conditions and other site specific conditions. Therefore, at the time of the year different from the time of drilling, there is a possibility of a change in the recorded level. We estimate that during the peak of the wet hydroperiod, with rainfall and recharge at a maximum, groundwater level at the site could be one to five feet higher than those measured in the borings. This possibility should be considered when developing design and construction plans and specifications for the project. Long term monitoring in cased holes or piezometers would be necessary to accurately evaluate the potential range of groundwater conditions at the site. Asphalt core samples were recovered from the roadway at the exfiltration test locations by J&R Precision Drilling, Inc. A total of nine (9) 4-inch diameter cores were taken. Once the cores were extracted, they were transported to our laboratory in Sunrise, Florida. A summary of the test results and asphalt core thicknesses are presented in the following table. More detailed test information can be found in the attachments included with this letter. Test Location Hydraulic Conductivity (cfs/ft 2 ft.head) TABLE : Exfiltration Test Results Asphalt Thickness (in.) Test Location Hydraulic Conductivity (cfs/ft 2 ft.head) Asphalt Thickness (in.) E- 5.5 x E x E-2.09 x E x E x E x 0-5.7
3
4
5 EFILTRATION TEST LOG - E- Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/9/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min INCH ASPHALT SAND, fine, brown SAND, with limestone fragments, fine, brown LIMESTONE, with sand, light brown Q = Average Stabilized Rate: 0.3 Gal/Min H = to Groundwater Level: 6.5 Ft Ds = Saturated : 8.5 Ft D = of Hole: 5 Ft Hydraulic Conductivity 5.5E-06 cfs/ft 2 ft.head
6 EFILTRATION TEST LOG - E-2 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 2 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/9/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min /4-INCH ASPHALT FILL-SAND, with limerock, fine, brown LIMESTONE, with sand, light brown to gray Q = Average Stabilized Rate: 0.8 Gal/Min H = to Groundwater Level: 0.5 Ft Ds = Saturated : 4.5 Ft D = of Hole: 5 Ft Hydraulic Conductivity.09E-05 cfs/ft 2 ft.head
7 EFILTRATION TEST LOG - E-3 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 3 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/20/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min /4-INCH ASPHALT FILL-LIMEROCK, with sand, light brown LIMESTONE, with sand, tan Q = Average Stabilized Rate: 35.0 Gal/Min H = to Groundwater Level: 3 Ft Ds = Saturated : 2 Ft D = of Hole: 5 Ft Hydraulic Conductivity 4.56E-03 cfs/ft 2 ft.head Values adjusted since groundwater was not able to be raised to the surface.
8 EFILTRATION TEST LOG - E-4 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 4 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/2/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min /2-INCH ASPHALT FILL-LIMEROCK, with sand, fine, light brown LIMESTONE, with sand, brown Q = Average Stabilized Rate: 8.9 Gal/Min H = to Groundwater Level: 4.33 Ft Ds = Saturated : 0.7 Ft D = of Hole: 5 Ft Hydraulic Conductivity 2.25E-04 cfs/ft 2 ft.head
9 EFILTRATION TEST LOG - E-5 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 5 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/20/ Auger Diameter: 0 inches Tube : 5 Ft Sample Location: Increment Gal/Min As shown on Exfiltration Test Location Diagram /4-INCH ASPHALT SAND, trace limerock, fine, brown LIMESTONE, with sand, light gray to brown Q = Average Stabilized Rate: 28. Gal/Min H = to Groundwater Level: 3.5 Ft Ds = Saturated :.5 Ft D = of Hole: 5 Ft Hydraulic Conductivity 8.5E-04 cfs/ft 2 ft.head
10 EFILTRATION TEST LOG - E-6 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 6 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/20/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min /4-INCH ASPHALT FILL-SAND, with limerock, fine, light brown LIMESTONE, with sand, light gray to brown Q = Average Stabilized Rate: 2.7 Gal/Min H = to Groundwater Level: 5.5 Ft Ds = Saturated : 9.5 Ft D = of Hole: 5 Ft Hydraulic Conductivity 5.63E-05 cfs/ft 2 ft.head
11 EFILTRATION TEST LOG - E-7 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 7 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/2/ Auger Diameter: 0 inches Tube : 5 Ft Sample Location: Increment Gal/Min As shown on Exfiltration Test Location Diagram /4-INCH ASPHALT FILL-SAND, with limerock, fine, brown LIMESTONE, with sand, tan Q = Average Stabilized Rate: 9. Gal/Min H = to Groundwater Level: 4 Ft Ds = Saturated : Ft D = of Hole: 5 Ft Hydraulic Conductivity 2.46E-04 cfs/ft 2 ft.head
12 EFILTRATION TEST LOG - E-8 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 8 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/20/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min INCH ASPHALT FILL-SAND, fine, brown FILL-LIMEROCK, with sand, brown LIMESTONE, with sand, tan Q = Average Stabilized Rate: 7. Gal/Min H = to Groundwater Level: 3.5 Ft Ds = Saturated :.5 Ft D = of Hole: 5 Ft Hydraulic Conductivity 2.5E-04 cfs/ft 2 ft.head
13 EFILTRATION TEST LOG - E-9 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 9 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/2/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min /2-INCH ASPHALT FILL-SAND, with limerock, fine, brown LIMESTONE, with sand, tan Q = Average Stabilized Rate: 6. Gal/Min H = to Groundwater Level: 4 Ft Ds = Saturated : Ft D = of Hole: 5 Ft Hydraulic Conductivity.65E-04 cfs/ft 2 ft.head
This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description
September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:
More informationMay 1, THE CORRADINO GROUP 4055 N.W. 97 th Avenue Miami, Florida Mr. Carlos E. Verson, P.E. Project Manager
May 1, 213 THE CORRADINO GROUP 455 N.W. 97 th Avenue Miami, Florida 33178 Attention: Mr. Carlos E. Verson, P.E. Project Manager Re: Report of Geotechnical Engineering Services - Roadway Soil Survey Bird
More informationAugust 15, 2006 (Revised) July 3, 2006 Project No A
August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway
More informationCONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133
GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project
More informationTypical Subsurface Profile. November 28, 2016
November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530
More informationREPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA
REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida
More informationSubsurface Environmental Investigation
Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants,
More information1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017
October 31, 2017 City of Oelwein c/o Fox Engineering 414 South 17 th Street, Suite 107 Ames, IA 50010 Attn: Re: Ms. Jessica M.B. Fisher, P.E. Project Manager P: (515) 233-0000 E: jmf@foxeng.com Proposal
More informationArdaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants
SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS CREEKSIDE BOULEVARD FORCE MAIN EXTENSION AND INTERCONNECT NAPLES, COLLIER COUNTY, FLORIDA COLLIER COUNTY PROJECT NO. 700.2. P.O. #0003, CN #3-66
More informationArdaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants
SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS PROPOSED WEIRS AT STATIONS 130+00 AND 16+00 DRAINAGE IMPROVEMENTS TO THE FOUR CORNERS MSBU HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical,
More informationApril 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1
PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes
More informationPROJECT INFORMATION. 1.1 Site Location. October 4, Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203
October 4, 2017 Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203 P: 888.900.3823 E: jscwab@schwabeng.com Re: Geotechnical Engineering Letter Report VAMC Bldg 202 Domiciliary C-D Entryway
More informationRe: Geotechnical Consultation for Storm Infiltration Robert Louis Stevenson ES Modernization th Avenue San Francisco, California
Date: August 4, 2015 Project No.: 608-4-2 Prepared For: Mr. Sajeev Madhaven, AIA SAN FRANCISCO UNIFIED SCHOOL DISTRICT 135 Van Ness Avenue - Room 207a San Francisco, California 94102 Re: Geotechnical Consultation
More informationReport of Preliminary Geotechnical Engineering Investigation for Ponds
Report of Preliminary Geotechnical Engineering Investigation for Ponds Segment 3: State Road 400 (SR 400)/Interstate 4 (I-4) from One Mile East of SR 434 to East of SR 15-600/US 17-92 Seminole County (77160),
More informationJune 28, Test Well Flow Rate Report MSD Underground Injection Control Wells City of Richlawn Louisville, Kentucky 40207
June 28, 2018 Mr. Chad McCormick, P.E. 503 Washburn Avenue, Suite 101 Louisville, Kentucky 40222 ECS Project No. 61:1132 GEM Project No. G-5155 Reference: Test Well Flow Rate Report MSD Underground Injection
More informationPROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No.
Central Florida Testing Laboratories, Inc. Testing, Development and Research 12625-40th Street North Clearwater, Florida 33762 ENGINEERING BUSINESS NO. 1066 GEOLOGY BUSINESS NO. 224 TAMPA BAY AREA (727)
More informationCONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146
GEOTECHNICAL EXPLORATION SERVICES REPORT CONDUCTED FOR: Collier Boulevard PREPARED FOR: Mr. Christopher L. Johnson Director of Land Development Stock Development, LLC Professional Circle, Suite 01 Naples,
More informationmtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida
mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,
More informationApplied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois
AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West
More informationSubsurface Study. Faulk Assisted Living Facility Boca Raton, Florida. George E. Mueller West Palm Beach, Florida
Subsurface Study Faulk Assisted Living Facility Boca Raton, Florida April 24, 2014 Terracon Project No.: HD145025 Prepared for: George E. Mueller West Palm Beach, Florida Prepared by: Dunkelberger Engineering
More informationSepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL
Bay County Solid Waste 11411 Landfill Rd. Panama City Beach, Florida 32413 Telephone: (850) 236-2212 Fax: (850) 233-5053 Board of County Commissioners www.baycountyfl.gov Sepetember 27, 2018 Florida Department
More informationEstimating the Seasonal High Water Table: A Mix of Art & Science
Estimating the Seasonal High Water Table: A Mix of Art & Science PONDS WORKSHOP - SJRWMD Devo Seereeram, Ph.D., P.E. This paper was originally written over 4 years ago & generated a lot of interest. The
More informationFor. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida
Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,
More informationREPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS
FIGURE 3 Geotechnical Report (2) REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS RIVER TOWER RESTORATION RIVER TOWER PARK TAMPA, FLORIDA AREHNA PROJECT NO. B-13-002 February 22, 2013 Prepared
More informationSUMMARY REPORT OF A GEOTECHNICAL SITE EXPLORATION LACROSSE CITRUS REPOSITORY LACROSSE, ALACHUA COUNTY, FLORIDA. GSE PROJECT No.
SUMMARY REPORT OF A GEOTECHNICAL SITE EXPLORATION LACROSSE CITRUS REPOSITORY LACROSSE, ALACHUA COUNTY, FLORIDA GSE PROJECT No. 1128 Prepared For: BURE OF CITRUS BUDWOOD REGISTRATION SEPTEMBER 2011 Certificate
More informationSubsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois
AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,
More informationFor. Report of Geotechnical Exploration. University of North Florida Parking Lot 11 Jacksonville, Florida
Report of Geotechnical Exploration For University of North Florida Parking Lot 11 Jacksonville, Florida MAE Project No. 0019-0008 January 13, 2017 Prepared for: GAI Consultants 1301 Riverplace Boulevard,
More informationABSTRACT & POWERPOINT PRESENTATION
ABSTRACT & POWERPOINT PRESENTATION Design, Construction, and Use of Instrumented Boreholes and DC Resistivity Surveys to Measure Artificial Recharge in Thick Unsaturated Zones, Antelope Valley, California
More informationApplied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois
AGI Project No. 13-109B Subsurface Investigation Report For the Proposed Roosevelt Middle School Site Improvements 7560 Oak Avenue River Forest, Illinois Prepared for Mr. Jerry Pilipowicz Terra Engineering,
More informationReport of Preliminary Geotechnical Engineering Investigation for Ponds
Report of Preliminary Geotechnical Engineering Investigation for Ponds Segment 2: State Road 400 (SR 400)/Interstate 4 (I-4) from West of SR 528 (Beachline Expressway) to West of SR 435 (Kirkman Road)
More informationVOCs, including fuel oxygenates, via EPA Analytical Method The second soil sample from MW-24 (MW ) was analyzed for Total Organic Carbon.
December 5, 2012 Mrs. Jenny Herman Maryland Department of the Environment Oil Control Program 1800 Washington Boulevard Baltimore, Maryland 212301719 Re: Additional Monitoring Well Installation Report
More informationKeys Edge Community Development District. Engineer s Report Infrastructure Improvements
Keys Edge Community Development District Engineer s Report Infrastructure Improvements Prepared for Keys Edge Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by
More informationAddendum # 1 Public Safety Complex Wetland Date of Addendum: 2/23/17
Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Public Safety Complex Wetland Date of Addendum:
More informationREPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784
REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows
More informationPROJECT NO A. ISSUED: February 29, 2016
INTERPRETIVE REPORT FOR INFILTRATION SYSTEM DESIGN, PROPOSED VILLA VERONA APARTMENT COMMUNITY, ASSESSOR S PARCEL NUMBERS 311-040-015, 311-040-021, 311-040-024, 311-040-026 AND 311-040-013, LOCATED ON THE
More informationSouth Sound Geotechnical Consulting P.O. Box Lakewood, WA (253) Figure 1 Site Plan. SERA Playground Tacoma, WA.
N TP -3, E3RA TP -4, E3RA TP -2, E3RA B -6, Terracon HA -2 HA -3 HA -1 TP -1, E3RA Legend HA-1 Approximate Hand Excavation Location by SSGC Approximate Exploration Location by others Scale: NTS South Sound
More information3. FIELD INVESTIGATION PROGRAM
Department of Public Works U.S. Army Corps of Engineers Phase 1B Geotechnical Investigation Geotechnical Data Report 3.3 FIELD METHODS AND PROCEDURES 3. FIELD INVESTIGATION PROGRAM The borings were advanced
More informationReport of Exploratory Test Pits
Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001
More informationThis Page Intentionally Left Blank
GEOTECHNICAL REPORT This Page Intentionally Left Blank July 30, 2014-Revised December 11, 2013 South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33406 Attn: Mr. Jesse
More informationAppendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New
More informationNovember 9, Tredyffrin Township Stephen Burgo, PE Township Engineer 1100 Duportail Road Berwyn, PA
November 9, 2017 Tredyffrin Township Attn: Stephen Burgo, PE Township Engineer 1100 Duportail Road Berwyn, PA 19312-1079 Scientists, Engineers & Environmental Planners Designing Innovative Solutions for
More informationGeotechnical Exploration and Evaluation Report
Geotechnical Exploration and Evaluation Report Pavement Coring and Evaluation UNF Parking Lot 3 Jacksonville, Florida CSI Geo Project No.: 71-18-135-23 Prepared by CSI Geo, Inc. 2394 St. Johns Bluff Road
More informationMay 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC
Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions
More informationNovember 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112
November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Hopeland Road Valve Site Sunoco Pennsylvania Pipeline
More informationHSA ENGINEERS & SCIENTISTS. A member of the CRA family of companies
HSA ENGINEERS & SCIENTISTS A member of the CRA family of companies Report of Pavement Coring and Services Town of Belleair Rosery Road Seawall, Roadway and Drainage Improvements Atkins 4030 West Boy Scout
More informationPAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA
PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTETATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA Terracon Project No. 3105079, Revision 3 1.0 INTRODUCTION This report presents the results of
More informationGeotechnical Engineering Report
BIG CYPRESS SEMINOLE INDIAN RESERVATION WATER TREATMENT FACILITY October 29, 2015 Terracon Project No. HD155065 Prepared for: REISS ENGINEERING, INC. 1016 Spring Villas Pt. Winter Springs, FL 32708 Prepared
More informationGEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO
GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST
More informationADDENDUM NO. 1. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB#
ADDENDUM NO. 1 DATE: January 22, 214 TO: Prospective Bidders via individual e-mails FROM: Alan Wise, P.E. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: 23.15 ---- Wakulla Co
More informationPreliminary Soil Survey Report
Florida Department of TRANSPORTATION Preliminary Soil Survey Report Malabar Road (SR 514) PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID: 430136 1 22 01 ETDM: 13026
More informationGEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E
GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA
More informationAttachment B: Field Forms and Notes
Attachment B: Field Forms and Notes Field forms Dalton, Olmsted & Fuglevand, Inc. Environmental Consultants T117 Early Action Area, Port
More informationGeotechnical Exploration and Evaluation Report
Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01
More informationLICENSED ENGINEERING, ASBESTOS & GEOLOGICAL BUSINESS
TIERRA CONSULTING GROUP, INC. ENVIRONMENTAL ENGINEERING & CONSULTING 5815 N. ANDREWS WAY, SUITE B, FT. LAUDERDALE, FL 33309 TELEPHONE (954) 202-9226 FAX (954) 202-9227 LICENSED ENGINEERING, ASBESTOS &
More informationReport of Geotechnical Exploration For Baymeadows Road/Old Still PUD 6 inch Reclaimed Water Main Jacksonville, FL
Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD inch Reclaimed Water Main Jacksonville, FL MAE Project No. 0 000 June, 0 Prepared for: CPH, Inc. 00 Belfort Road, Suite 0 Jacksonville,
More informationResults of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California
Lansing Companies 12671 High Bluff Drive, Suite 150 San Diego, California 92130 April 18, 2017 Project No. 11607.001 Attention: Subject: References: Mr. Casey Malone Results of Onsite Percolation Testing
More informationFor. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St.
Report of Geotechnical Exploration For St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St. Johns County, FL MAE Project No. 0106-0005 June 14, 2017 Prepared for: CPH, Inc.
More informationNovember 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112
November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Gates Road Valve Site Sunoco Pennsylvania Pipeline
More informationJuly 23, Mr. Richard Miller, Vice President Lake Arrowhead Property Owners Association 7065 Arrowroot Trail Gaylord, Michigan 49735
Mr. Richard Miller, Vice President Lake Arrowhead Property Owners Association 7065 Arrowroot Trail Gaylord, Michigan 49735 Re: Task No. 3 Report of Findings Section 32, Township 30 North, Range 4 West
More informationEXHIBIT G GEOTECHNICAL REPORT (DRAFT)
EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION
More informationReport of Geotechnical Exploration For. University of North Florida Kernan Shuttle Stop Jacksonville, Florida
Report of Geotechnical Exploration For University of North Florida Kernan Shuttle Stop Jacksonville, Florida MAE Project No. 0016-0023 March 18, 2015 Prepared for: Prepared by: Jacksonville, Florida 32256
More informationCherry Estates APPENDIX A
Cherry Estates APPENDIX A Ardaman & Associates Inc. Geotechnical Environmental and Materials Consultants... LEE COUNTY MSTBU SERVICES 1500 Monroe Street 4th Floor Fort Myers FL 33901 19-APR-2016 Project
More informationOctober 11, 2011 Re-Issued November 15, 2011
Shadow Wood Investors LLC 425 W New England Avenue, Suite 425 Winter Park, FL 32789 October 11, 2011 Re-Issued November 15, 2011 LOCATIONS: Atlanta Daytona Beach Fort Myers Fort Pierce Gainesville Jacksonville
More informationENGINEERING SERVICES REPORT FOREST LAKES BOULEVARD PAVEMENT EVALUATION TAMPA ROAD TO COUNTY LINE FOR PINELLAS COUNTY, FL. May 21, 2010 URS CORPORATION
ENGINEERING SERVICES REPORT FOREST LAKES BOULEVARD PAVEMENT EVALUATION TAMPA ROAD TO COUNTY LINE FOR PINELLAS COUNTY, FL May 21, 2010 URS CORPORATION May 21, 2010 Mr. Brent D. Hall Senior Department Administrative
More informationWater Management Under Severe Storm Conditions in Central and South Florida
Water Management Under Severe Storm Conditions in Central and South Florida Chandra S. S. Pathak, Ph.D., P.E. Severe Storm Prediction and Global Climate Impact in the Gulf Coast Conference October 29 to
More informationREPORT OF GEOTECHNICAL CONSULTING SERVICES
REPORT OF GEOTECHNICAL CONSULTING SERVICES Escambia County Public Works Department Thompson, Crary and McNeal Roadway Project Escambia County, Century,FL Thompson Engineering Project No.: 15-1101-0297
More informationSOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands
SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced
More informationSubsurface Investigation Report
AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland
More informationGEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax
GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 May 10, 2016 Banner Associates, Inc. 2307 W. 57 th Street, Suite
More informationSeptember 3, 2013 Via
September 3, 2013 Via email: sadler@adeq.state.ar.us Mr. Bill Sadler, PG Geology Supervisor Solid Waste Management Division Arkansas Department of Environmental Quality 5301 Northshore Drive North Little
More informationDEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E.
LD-40 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Soil Survey Report March 29, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia Insert
More informationReport of CCR Rule Stability Analyses AEP Clifty Creek Power Plant Boiler Slag Pond Dam and Landfill Runoff Collection Pond
Report of CCR Rule Stability Analyses AEP Clifty Creek Power Plant Boiler Slag Pond Dam and Landfill Runoff Collection Pond Madison, Jefferson County, Indiana Prepared for: American Electric Power Columbus,
More informationEarth Mechanics, Inc. Geotechnical & Earthquake Engineering
DATE: August 31, 2000 Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM EMI PROJECT NO: 99-136 PREPARED FOR: COPIES: PREPARED BY: Tayfun Saglam / Parsons Brinckerhoff Juan
More informationREPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY
REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY HERITAGE BAY MASTER PUMP STATION ISSUED FOR BID REPORT OF GEOTECHNICAL EXPLORATION PROPOSED INLINE WASTEWATER BOOSTER STATION Collier
More informationGeotechnical Investigation Report
MC Squared, Inc Geotechnical Investigation Report S. Edison Avenue Roadway Improvements City Of Tampa Florida Prepared for: Ms. Barbara Graves City of Tampa DPW Stormwater Engineering 306 E. Jackson St.,6N
More informationLAKE LABELLE ENGINEERING REPORT
154 N. Bridge Street, LaBelle, Florida 33935 -Tel: (863) 612-0011 Fax: (863) 612-0014 - email: rock@rockhendry.com LAKE LABELLE ENGINEERING REPORT PREPARED FOR Lake LaBelle, LLC March 2014 PREPARED BY:
More informationORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA
PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland
More informationpaterson -MEMO consulting engineers
paterson consulting engineers EMAIL-MEMO to: Minto Communities Inc. - Mr. Barry Gray bgray@minto.com cc: Minto Communities Inc. - Mr. Julio Da Silva julio_dasilva@minto.com re: Grade Raise Recommendations
More informationStormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide
Stormwater Standards Clackamas County Service District No. 1 APPENDIX E Infiltration Testing Guide Table of Contents Appendix E - Infiltration Testing Guide... Page E.1 General... 1 E.2 Basic Method -
More information100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light
100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light Maintenance Facility (VSLMF) Osceola County, Florida
More informationTHIS INFORMATION IS PROVIDED BY PLUMAS COUNTY ENVIRONMENTAL HEALTH
PLUMAS COUNTY Guidelines for GeoThermal Heat Exchange Wells THIS INFORMATION IS PROVIDED BY PLUMAS COUNTY ENVIRONMENTAL HEALTH FOR MORE INFORMATION ENVIRONMENTAL PLEASE CONTACT HEALTH CHESTER OFFICE: PHONE:
More informationORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA
PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland
More informationFlorida s Leading Engineering Source
Since 1988 Florida s Leading Engineering Source Environmental Geotechnical Construction Materials Testing Threshold and Special Inspections Plan Review & Code Compliance Mr. Ron Ridenour Hanson Professional
More informationSTORMWATER MANAGEMENT. 158 Attachment 2. Borough of Perkasie
158 Attachment 2 Borough of Perkasie Appendix B Site Soil Evaluation and Soil Infiltration Testing Source: Pennsylvania Stormwater Best Management Practice Manual, December 2006. SITE SOIL EVALUATION AND
More informationSTORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017
STORMWATER MANAGEMENT REPORT FOR Chick-Fil-A 3000 S Ferdon Blvd, Crestview FL February 10 th, 2017 PROJECT #010014-01-047 954.712.7482 www.bowmanconsulting.com Table of Contents Introduction.1 Project
More informationSoil Improvement by Compaction Grouting
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction
More informationBioreactor Landfill Design
Bioreactor Landfill Design Timothy Townsend, PhD, PE Department of Environmental Engineering Sciences University of Florida ttown@ufl.edu Bioreactor Landfill Design Modern landfill design entails many
More informationSubject: Aquifer Test Observation Well Installation Work Plan Hilmar Cheese Company, Hilmar, Merced County, CA
October 1, 2009 Mr. Jan Alfson California Regional Water Quality Control Board Fresno Branch Office 1685 E Street Fresno, CA 93706 Subject: Aquifer Test Observation Well Installation Work Plan Hilmar Cheese
More informationBROWARD COUNTY ENVIRONMENTAL PROTECTION DEPARTMENT (EPD) MINIMUM CRITERIA FOR MONITORING WELL INSTALLATION AND SAMPLING
Failure to follow these criteria, or to obtain approval for variation to these criteria, is a citationable offense and bears an associated civil penalty, as provided in Section 27-38(h) (9), of the Broward
More informationAPPENDIX A GEOTECHNICAL REPORT
The City of Winnipeg Bid Opportunity No. 5-06 Template Version: C40606 - RW APPENDIX A GEOTECHNICAL REPORT AECOM 99 Commerce Drive 04 477 538 tel Winnipeg, MB, Canada R3P 0Y7 04 84 040 fax www.aecom.com
More informationDetermination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities
Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission
More informationFENCE INSTALLATION PERMIT APPLICATION INSTALLATION REQUIREMENTS FOR WOOD FENCES AS PER THE FLORIDA BUILDING CODE
FENCE INSTALLATION PERMIT APPLICATION INSTALLATION REQUIREMENTS FOR WOOD FENCES AS PER THE FLORIDA BUILDING CODE FINAL INSPECTION: To be made after installation and completion of all elements of construction.
More informationReport of Geotechnical Exploration PROPOSED SANITARY SEWER AND FORCE MAIN REPLACEMENT
Report of Geotechnical Exploration PROPOSED SANITARY SEWER AND FORCE MAIN REPLACEMENT Collier County Project Number 70043.14.1 Vanderbilt Drive and Finger Streets From Vanderbilt Beach Road to 111th Avenue
More informationINVESTIGATION RESULTS
September 13, 2011 Burt Fleischer, R.E.A., R.E.P. Director, Environmental Affairs Hilmar Cheese Company 9001 N. Lander Avenue Hilmar, CA 95324 Subject: Revised Work Plan for Supply Well IN 1 Destruction
More informationSUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464
SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA
More informationHighway 12 SP , Willmar Wye Soils Borings, Soils Tests, and Reporting
Highway 12 SP 3403-74, Willmar Wye Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003246 General Project Overview This work is located along Trunk Highway (TH) 12, on the west side of Willmar.
More informationMarch 10, 2017 SITE AND PROJECT INFORMATION
March 10, 2017 Derek Hawkes, PE NASH COUNTY 120 W. Washington Street - Suite 2004 Nashville, NC 27856 Re: Report of Subsurface Investigation Middlesex Corporate Park, Lot 3 Middlesex, North Carolina GeoTechnologies
More informationFile No Supplemental November Geotechnical and Environmental Consulting Engineers
Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction
More informationApplicant s Handbook, Volume II (including Appendices A through F`) is Incorporated by Reference in Rule , F.A.C.
REFERENCES AND DESIGN AIDS FOR THE ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II FOR USE WITHIN THE GEOGRAPHIC LIMITS OF THE NORTHWEST FLORIDA WATER MANAGEMENT DISTRICT Applicant s Handbook,
More informationMay 3, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE, Room 1A Washington, D.C
1250 West Century Avenue Mailing Address: P.O. Box 5601 Bismarck, ND 58506-5601 (701) 530-1600 May 3, 2018 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE, Room 1A
More information