September 9, Corzo Castella Carballo Thompson Salman, P.A. 901 Ponce de Leon Boulevard Suite 900 Coral Gables, Florida 33134

Size: px
Start display at page:

Download "September 9, Corzo Castella Carballo Thompson Salman, P.A. 901 Ponce de Leon Boulevard Suite 900 Coral Gables, Florida 33134"

Transcription

1 September 9, 2009 Corzo Castella Carballo Thompson Salman, P.A. 90 Ponce de Leon Boulevard Suite 900 Coral Gables, Florida 3334 Attn: Mr. Ian John, E.I. Re: Exfiltration Test Results Glenroyal East Phase Roadway and Drainage Improvements NW 7 th Avenue and NW 7 th Street Miami, Miami-Dade County, Florida Terracon Job No Dear Mr. John: As proposed we have completed 9 exfiltration tests for the above referenced project. The following is a brief description of the test procedures and an overview of the results. Also included in the attachments are Exfiltration Sheets containing the test data and an Exfiltration Test Location Diagram showing the approximate location of the tests. Nine exfiltration tests (E- through E-9) were performed at the site in general accordance with the South Florida Water Management District (SFWMD) procedures for the "Usual Open-Hole Constant Head Condition" Percolation Tests. The test was performed in a 0- inch diameter borehole advanced by means of a PVC casing to a depth of 5 feet below the existing ground surface. A 6-inch diameter perforated PVC pipe was placed in the borehole prior to retrieving the casing. Water was then pumped into the borehole in order to raise the water level in the borehole to near the ground surface. Once the inflow stabilized with the outflow rate, the average pumping rate and the elevation of the water obtained with this stabilized flow rate were recorded. Material encountered at the exfiltration test site was identified in the field from cuttings brought to the surface by the augering process. Upon completion of the drilling and following groundwater stabilization, the distance from the existing ground surface to the water table was recorded. The rate of water flow required to maintain a constant hydraulic head was then recorded. The hydraulic conductivity value was determined from the test results and is presented in the Exfiltration Test Sheets attachment in this memo. The hydraulic conductivity value is reported in units of cubic feet per second per square foot of seepage area per foot of head (cfs/ft 2 -ft head). Terracon Consultants, Inc NW 53 rd Street Sunrise, FL 3335 P [954] F [954] terracon.com

2 Glenroyal East Phase Drainage and Roadway Improvements Terracon Job No September 9, 2009 The soil profile at the exfiltration test locations generally consisted of fill material consisting of sand and limerock to depths of approximately 2 to feet below grade. Sand with limestone fragments was encountered below the fill material to a depth of approximately 3 feet at E-. Miami limestone was encountered below the sand with limestone fragments at E- and extended to the exfiltration test depth of 5 feet below grade. Limestone was typically encountered at the remaining test locations at depths ranging between 2 and 5 feet below grade and extended to the exfiltration test termination depths of 5 feet. The groundwater level was recorded at the exfiltration test locations during the augering process. During the subsurface exploration, groundwater (measured in August) was typically observed at the test locations at depths ranging from 3 to 6 feet below existing grade. Exceptions exist at test locations E-2 and E-3 where groundwater levels were encountered at approximately 0½ feet and 3 feet, respectively. These water level observations provide an approximate indication of the groundwater conditions existing on the site at the time the borings were drilled. Fluctuations in the groundwater table can occur due to seasonal variations, recent rainfall conditions and other site specific conditions. Therefore, at the time of the year different from the time of drilling, there is a possibility of a change in the recorded level. We estimate that during the peak of the wet hydroperiod, with rainfall and recharge at a maximum, groundwater level at the site could be one to five feet higher than those measured in the borings. This possibility should be considered when developing design and construction plans and specifications for the project. Long term monitoring in cased holes or piezometers would be necessary to accurately evaluate the potential range of groundwater conditions at the site. Asphalt core samples were recovered from the roadway at the exfiltration test locations by J&R Precision Drilling, Inc. A total of nine (9) 4-inch diameter cores were taken. Once the cores were extracted, they were transported to our laboratory in Sunrise, Florida. A summary of the test results and asphalt core thicknesses are presented in the following table. More detailed test information can be found in the attachments included with this letter. Test Location Hydraulic Conductivity (cfs/ft 2 ft.head) TABLE : Exfiltration Test Results Asphalt Thickness (in.) Test Location Hydraulic Conductivity (cfs/ft 2 ft.head) Asphalt Thickness (in.) E- 5.5 x E x E-2.09 x E x E x E x 0-5.7

3

4

5 EFILTRATION TEST LOG - E- Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/9/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min INCH ASPHALT SAND, fine, brown SAND, with limestone fragments, fine, brown LIMESTONE, with sand, light brown Q = Average Stabilized Rate: 0.3 Gal/Min H = to Groundwater Level: 6.5 Ft Ds = Saturated : 8.5 Ft D = of Hole: 5 Ft Hydraulic Conductivity 5.5E-06 cfs/ft 2 ft.head

6 EFILTRATION TEST LOG - E-2 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 2 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/9/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min /4-INCH ASPHALT FILL-SAND, with limerock, fine, brown LIMESTONE, with sand, light brown to gray Q = Average Stabilized Rate: 0.8 Gal/Min H = to Groundwater Level: 0.5 Ft Ds = Saturated : 4.5 Ft D = of Hole: 5 Ft Hydraulic Conductivity.09E-05 cfs/ft 2 ft.head

7 EFILTRATION TEST LOG - E-3 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 3 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/20/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min /4-INCH ASPHALT FILL-LIMEROCK, with sand, light brown LIMESTONE, with sand, tan Q = Average Stabilized Rate: 35.0 Gal/Min H = to Groundwater Level: 3 Ft Ds = Saturated : 2 Ft D = of Hole: 5 Ft Hydraulic Conductivity 4.56E-03 cfs/ft 2 ft.head Values adjusted since groundwater was not able to be raised to the surface.

8 EFILTRATION TEST LOG - E-4 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 4 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/2/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min /2-INCH ASPHALT FILL-LIMEROCK, with sand, fine, light brown LIMESTONE, with sand, brown Q = Average Stabilized Rate: 8.9 Gal/Min H = to Groundwater Level: 4.33 Ft Ds = Saturated : 0.7 Ft D = of Hole: 5 Ft Hydraulic Conductivity 2.25E-04 cfs/ft 2 ft.head

9 EFILTRATION TEST LOG - E-5 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 5 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/20/ Auger Diameter: 0 inches Tube : 5 Ft Sample Location: Increment Gal/Min As shown on Exfiltration Test Location Diagram /4-INCH ASPHALT SAND, trace limerock, fine, brown LIMESTONE, with sand, light gray to brown Q = Average Stabilized Rate: 28. Gal/Min H = to Groundwater Level: 3.5 Ft Ds = Saturated :.5 Ft D = of Hole: 5 Ft Hydraulic Conductivity 8.5E-04 cfs/ft 2 ft.head

10 EFILTRATION TEST LOG - E-6 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 6 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/20/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min /4-INCH ASPHALT FILL-SAND, with limerock, fine, light brown LIMESTONE, with sand, light gray to brown Q = Average Stabilized Rate: 2.7 Gal/Min H = to Groundwater Level: 5.5 Ft Ds = Saturated : 9.5 Ft D = of Hole: 5 Ft Hydraulic Conductivity 5.63E-05 cfs/ft 2 ft.head

11 EFILTRATION TEST LOG - E-7 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 7 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/2/ Auger Diameter: 0 inches Tube : 5 Ft Sample Location: Increment Gal/Min As shown on Exfiltration Test Location Diagram /4-INCH ASPHALT FILL-SAND, with limerock, fine, brown LIMESTONE, with sand, tan Q = Average Stabilized Rate: 9. Gal/Min H = to Groundwater Level: 4 Ft Ds = Saturated : Ft D = of Hole: 5 Ft Hydraulic Conductivity 2.46E-04 cfs/ft 2 ft.head

12 EFILTRATION TEST LOG - E-8 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 8 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/20/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min INCH ASPHALT FILL-SAND, fine, brown FILL-LIMEROCK, with sand, brown LIMESTONE, with sand, tan Q = Average Stabilized Rate: 7. Gal/Min H = to Groundwater Level: 3.5 Ft Ds = Saturated :.5 Ft D = of Hole: 5 Ft Hydraulic Conductivity 2.5E-04 cfs/ft 2 ft.head

13 EFILTRATION TEST LOG - E-9 Client: C3TS Job # Site: NW 7th Avenue and NW 7th Street Test # 9 Project: Glenroyal East Phase Roadway and Drainage Improvements Date: 8/2/ Auger Diameter: 0 inches Tube : 5 Ft Increment Gal/Min /2-INCH ASPHALT FILL-SAND, with limerock, fine, brown LIMESTONE, with sand, tan Q = Average Stabilized Rate: 6. Gal/Min H = to Groundwater Level: 4 Ft Ds = Saturated : Ft D = of Hole: 5 Ft Hydraulic Conductivity.65E-04 cfs/ft 2 ft.head

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

May 1, THE CORRADINO GROUP 4055 N.W. 97 th Avenue Miami, Florida Mr. Carlos E. Verson, P.E. Project Manager

May 1, THE CORRADINO GROUP 4055 N.W. 97 th Avenue Miami, Florida Mr. Carlos E. Verson, P.E. Project Manager May 1, 213 THE CORRADINO GROUP 455 N.W. 97 th Avenue Miami, Florida 33178 Attention: Mr. Carlos E. Verson, P.E. Project Manager Re: Report of Geotechnical Engineering Services - Roadway Soil Survey Bird

More information

August 15, 2006 (Revised) July 3, 2006 Project No A

August 15, 2006 (Revised) July 3, 2006 Project No A August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway

More information

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133 GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project

More information

Typical Subsurface Profile. November 28, 2016

Typical Subsurface Profile. November 28, 2016 November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

Subsurface Environmental Investigation

Subsurface Environmental Investigation Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants,

More information

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017 October 31, 2017 City of Oelwein c/o Fox Engineering 414 South 17 th Street, Suite 107 Ames, IA 50010 Attn: Re: Ms. Jessica M.B. Fisher, P.E. Project Manager P: (515) 233-0000 E: jmf@foxeng.com Proposal

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS CREEKSIDE BOULEVARD FORCE MAIN EXTENSION AND INTERCONNECT NAPLES, COLLIER COUNTY, FLORIDA COLLIER COUNTY PROJECT NO. 700.2. P.O. #0003, CN #3-66

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS PROPOSED WEIRS AT STATIONS 130+00 AND 16+00 DRAINAGE IMPROVEMENTS TO THE FOUR CORNERS MSBU HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical,

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

PROJECT INFORMATION. 1.1 Site Location. October 4, Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203

PROJECT INFORMATION. 1.1 Site Location. October 4, Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203 October 4, 2017 Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203 P: 888.900.3823 E: jscwab@schwabeng.com Re: Geotechnical Engineering Letter Report VAMC Bldg 202 Domiciliary C-D Entryway

More information

Re: Geotechnical Consultation for Storm Infiltration Robert Louis Stevenson ES Modernization th Avenue San Francisco, California

Re: Geotechnical Consultation for Storm Infiltration Robert Louis Stevenson ES Modernization th Avenue San Francisco, California Date: August 4, 2015 Project No.: 608-4-2 Prepared For: Mr. Sajeev Madhaven, AIA SAN FRANCISCO UNIFIED SCHOOL DISTRICT 135 Van Ness Avenue - Room 207a San Francisco, California 94102 Re: Geotechnical Consultation

More information

Report of Preliminary Geotechnical Engineering Investigation for Ponds

Report of Preliminary Geotechnical Engineering Investigation for Ponds Report of Preliminary Geotechnical Engineering Investigation for Ponds Segment 3: State Road 400 (SR 400)/Interstate 4 (I-4) from One Mile East of SR 434 to East of SR 15-600/US 17-92 Seminole County (77160),

More information

June 28, Test Well Flow Rate Report MSD Underground Injection Control Wells City of Richlawn Louisville, Kentucky 40207

June 28, Test Well Flow Rate Report MSD Underground Injection Control Wells City of Richlawn Louisville, Kentucky 40207 June 28, 2018 Mr. Chad McCormick, P.E. 503 Washburn Avenue, Suite 101 Louisville, Kentucky 40222 ECS Project No. 61:1132 GEM Project No. G-5155 Reference: Test Well Flow Rate Report MSD Underground Injection

More information

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No.

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No. Central Florida Testing Laboratories, Inc. Testing, Development and Research 12625-40th Street North Clearwater, Florida 33762 ENGINEERING BUSINESS NO. 1066 GEOLOGY BUSINESS NO. 224 TAMPA BAY AREA (727)

More information

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146 GEOTECHNICAL EXPLORATION SERVICES REPORT CONDUCTED FOR: Collier Boulevard PREPARED FOR: Mr. Christopher L. Johnson Director of Land Development Stock Development, LLC Professional Circle, Suite 01 Naples,

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

Subsurface Study. Faulk Assisted Living Facility Boca Raton, Florida. George E. Mueller West Palm Beach, Florida

Subsurface Study. Faulk Assisted Living Facility Boca Raton, Florida. George E. Mueller West Palm Beach, Florida Subsurface Study Faulk Assisted Living Facility Boca Raton, Florida April 24, 2014 Terracon Project No.: HD145025 Prepared for: George E. Mueller West Palm Beach, Florida Prepared by: Dunkelberger Engineering

More information

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL Bay County Solid Waste 11411 Landfill Rd. Panama City Beach, Florida 32413 Telephone: (850) 236-2212 Fax: (850) 233-5053 Board of County Commissioners www.baycountyfl.gov Sepetember 27, 2018 Florida Department

More information

Estimating the Seasonal High Water Table: A Mix of Art & Science

Estimating the Seasonal High Water Table: A Mix of Art & Science Estimating the Seasonal High Water Table: A Mix of Art & Science PONDS WORKSHOP - SJRWMD Devo Seereeram, Ph.D., P.E. This paper was originally written over 4 years ago & generated a lot of interest. The

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS FIGURE 3 Geotechnical Report (2) REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS RIVER TOWER RESTORATION RIVER TOWER PARK TAMPA, FLORIDA AREHNA PROJECT NO. B-13-002 February 22, 2013 Prepared

More information

SUMMARY REPORT OF A GEOTECHNICAL SITE EXPLORATION LACROSSE CITRUS REPOSITORY LACROSSE, ALACHUA COUNTY, FLORIDA. GSE PROJECT No.

SUMMARY REPORT OF A GEOTECHNICAL SITE EXPLORATION LACROSSE CITRUS REPOSITORY LACROSSE, ALACHUA COUNTY, FLORIDA. GSE PROJECT No. SUMMARY REPORT OF A GEOTECHNICAL SITE EXPLORATION LACROSSE CITRUS REPOSITORY LACROSSE, ALACHUA COUNTY, FLORIDA GSE PROJECT No. 1128 Prepared For: BURE OF CITRUS BUDWOOD REGISTRATION SEPTEMBER 2011 Certificate

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 11 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 11 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 11 Jacksonville, Florida MAE Project No. 0019-0008 January 13, 2017 Prepared for: GAI Consultants 1301 Riverplace Boulevard,

More information

ABSTRACT & POWERPOINT PRESENTATION

ABSTRACT & POWERPOINT PRESENTATION ABSTRACT & POWERPOINT PRESENTATION Design, Construction, and Use of Instrumented Boreholes and DC Resistivity Surveys to Measure Artificial Recharge in Thick Unsaturated Zones, Antelope Valley, California

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-109B Subsurface Investigation Report For the Proposed Roosevelt Middle School Site Improvements 7560 Oak Avenue River Forest, Illinois Prepared for Mr. Jerry Pilipowicz Terra Engineering,

More information

Report of Preliminary Geotechnical Engineering Investigation for Ponds

Report of Preliminary Geotechnical Engineering Investigation for Ponds Report of Preliminary Geotechnical Engineering Investigation for Ponds Segment 2: State Road 400 (SR 400)/Interstate 4 (I-4) from West of SR 528 (Beachline Expressway) to West of SR 435 (Kirkman Road)

More information

VOCs, including fuel oxygenates, via EPA Analytical Method The second soil sample from MW-24 (MW ) was analyzed for Total Organic Carbon.

VOCs, including fuel oxygenates, via EPA Analytical Method The second soil sample from MW-24 (MW ) was analyzed for Total Organic Carbon. December 5, 2012 Mrs. Jenny Herman Maryland Department of the Environment Oil Control Program 1800 Washington Boulevard Baltimore, Maryland 212301719 Re: Additional Monitoring Well Installation Report

More information

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements Keys Edge Community Development District Engineer s Report Infrastructure Improvements Prepared for Keys Edge Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

Addendum # 1 Public Safety Complex Wetland Date of Addendum: 2/23/17

Addendum # 1 Public Safety Complex Wetland Date of Addendum: 2/23/17 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Public Safety Complex Wetland Date of Addendum:

More information

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784 REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows

More information

PROJECT NO A. ISSUED: February 29, 2016

PROJECT NO A. ISSUED: February 29, 2016 INTERPRETIVE REPORT FOR INFILTRATION SYSTEM DESIGN, PROPOSED VILLA VERONA APARTMENT COMMUNITY, ASSESSOR S PARCEL NUMBERS 311-040-015, 311-040-021, 311-040-024, 311-040-026 AND 311-040-013, LOCATED ON THE

More information

South Sound Geotechnical Consulting P.O. Box Lakewood, WA (253) Figure 1 Site Plan. SERA Playground Tacoma, WA.

South Sound Geotechnical Consulting P.O. Box Lakewood, WA (253) Figure 1 Site Plan. SERA Playground Tacoma, WA. N TP -3, E3RA TP -4, E3RA TP -2, E3RA B -6, Terracon HA -2 HA -3 HA -1 TP -1, E3RA Legend HA-1 Approximate Hand Excavation Location by SSGC Approximate Exploration Location by others Scale: NTS South Sound

More information

3. FIELD INVESTIGATION PROGRAM

3. FIELD INVESTIGATION PROGRAM Department of Public Works U.S. Army Corps of Engineers Phase 1B Geotechnical Investigation Geotechnical Data Report 3.3 FIELD METHODS AND PROCEDURES 3. FIELD INVESTIGATION PROGRAM The borings were advanced

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

This Page Intentionally Left Blank

This Page Intentionally Left Blank GEOTECHNICAL REPORT This Page Intentionally Left Blank July 30, 2014-Revised December 11, 2013 South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33406 Attn: Mr. Jesse

More information

Appendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New

More information

November 9, Tredyffrin Township Stephen Burgo, PE Township Engineer 1100 Duportail Road Berwyn, PA

November 9, Tredyffrin Township Stephen Burgo, PE Township Engineer 1100 Duportail Road Berwyn, PA November 9, 2017 Tredyffrin Township Attn: Stephen Burgo, PE Township Engineer 1100 Duportail Road Berwyn, PA 19312-1079 Scientists, Engineers & Environmental Planners Designing Innovative Solutions for

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Pavement Coring and Evaluation UNF Parking Lot 3 Jacksonville, Florida CSI Geo Project No.: 71-18-135-23 Prepared by CSI Geo, Inc. 2394 St. Johns Bluff Road

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Hopeland Road Valve Site Sunoco Pennsylvania Pipeline

More information

HSA ENGINEERS & SCIENTISTS. A member of the CRA family of companies

HSA ENGINEERS & SCIENTISTS. A member of the CRA family of companies HSA ENGINEERS & SCIENTISTS A member of the CRA family of companies Report of Pavement Coring and Services Town of Belleair Rosery Road Seawall, Roadway and Drainage Improvements Atkins 4030 West Boy Scout

More information

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTETATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA Terracon Project No. 3105079, Revision 3 1.0 INTRODUCTION This report presents the results of

More information

Geotechnical Engineering Report

Geotechnical Engineering Report BIG CYPRESS SEMINOLE INDIAN RESERVATION WATER TREATMENT FACILITY October 29, 2015 Terracon Project No. HD155065 Prepared for: REISS ENGINEERING, INC. 1016 Spring Villas Pt. Winter Springs, FL 32708 Prepared

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

ADDENDUM NO. 1. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB#

ADDENDUM NO. 1. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB# ADDENDUM NO. 1 DATE: January 22, 214 TO: Prospective Bidders via individual e-mails FROM: Alan Wise, P.E. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: 23.15 ---- Wakulla Co

More information

Preliminary Soil Survey Report

Preliminary Soil Survey Report Florida Department of TRANSPORTATION Preliminary Soil Survey Report Malabar Road (SR 514) PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID: 430136 1 22 01 ETDM: 13026

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

Attachment B: Field Forms and Notes

Attachment B: Field Forms and Notes Attachment B: Field Forms and Notes Field forms Dalton, Olmsted & Fuglevand, Inc. Environmental Consultants T117 Early Action Area, Port

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

LICENSED ENGINEERING, ASBESTOS & GEOLOGICAL BUSINESS

LICENSED ENGINEERING, ASBESTOS & GEOLOGICAL BUSINESS TIERRA CONSULTING GROUP, INC. ENVIRONMENTAL ENGINEERING & CONSULTING 5815 N. ANDREWS WAY, SUITE B, FT. LAUDERDALE, FL 33309 TELEPHONE (954) 202-9226 FAX (954) 202-9227 LICENSED ENGINEERING, ASBESTOS &

More information

Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD 6 inch Reclaimed Water Main Jacksonville, FL

Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD 6 inch Reclaimed Water Main Jacksonville, FL Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD inch Reclaimed Water Main Jacksonville, FL MAE Project No. 0 000 June, 0 Prepared for: CPH, Inc. 00 Belfort Road, Suite 0 Jacksonville,

More information

Results of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California

Results of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California Lansing Companies 12671 High Bluff Drive, Suite 150 San Diego, California 92130 April 18, 2017 Project No. 11607.001 Attention: Subject: References: Mr. Casey Malone Results of Onsite Percolation Testing

More information

For. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St.

For. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St. Report of Geotechnical Exploration For St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St. Johns County, FL MAE Project No. 0106-0005 June 14, 2017 Prepared for: CPH, Inc.

More information

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Gates Road Valve Site Sunoco Pennsylvania Pipeline

More information

July 23, Mr. Richard Miller, Vice President Lake Arrowhead Property Owners Association 7065 Arrowroot Trail Gaylord, Michigan 49735

July 23, Mr. Richard Miller, Vice President Lake Arrowhead Property Owners Association 7065 Arrowroot Trail Gaylord, Michigan 49735 Mr. Richard Miller, Vice President Lake Arrowhead Property Owners Association 7065 Arrowroot Trail Gaylord, Michigan 49735 Re: Task No. 3 Report of Findings Section 32, Township 30 North, Range 4 West

More information

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

EXHIBIT G GEOTECHNICAL REPORT (DRAFT) EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION

More information

Report of Geotechnical Exploration For. University of North Florida Kernan Shuttle Stop Jacksonville, Florida

Report of Geotechnical Exploration For. University of North Florida Kernan Shuttle Stop Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Kernan Shuttle Stop Jacksonville, Florida MAE Project No. 0016-0023 March 18, 2015 Prepared for: Prepared by: Jacksonville, Florida 32256

More information

Cherry Estates APPENDIX A

Cherry Estates APPENDIX A Cherry Estates APPENDIX A Ardaman & Associates Inc. Geotechnical Environmental and Materials Consultants... LEE COUNTY MSTBU SERVICES 1500 Monroe Street 4th Floor Fort Myers FL 33901 19-APR-2016 Project

More information

October 11, 2011 Re-Issued November 15, 2011

October 11, 2011 Re-Issued November 15, 2011 Shadow Wood Investors LLC 425 W New England Avenue, Suite 425 Winter Park, FL 32789 October 11, 2011 Re-Issued November 15, 2011 LOCATIONS: Atlanta Daytona Beach Fort Myers Fort Pierce Gainesville Jacksonville

More information

ENGINEERING SERVICES REPORT FOREST LAKES BOULEVARD PAVEMENT EVALUATION TAMPA ROAD TO COUNTY LINE FOR PINELLAS COUNTY, FL. May 21, 2010 URS CORPORATION

ENGINEERING SERVICES REPORT FOREST LAKES BOULEVARD PAVEMENT EVALUATION TAMPA ROAD TO COUNTY LINE FOR PINELLAS COUNTY, FL. May 21, 2010 URS CORPORATION ENGINEERING SERVICES REPORT FOREST LAKES BOULEVARD PAVEMENT EVALUATION TAMPA ROAD TO COUNTY LINE FOR PINELLAS COUNTY, FL May 21, 2010 URS CORPORATION May 21, 2010 Mr. Brent D. Hall Senior Department Administrative

More information

Water Management Under Severe Storm Conditions in Central and South Florida

Water Management Under Severe Storm Conditions in Central and South Florida Water Management Under Severe Storm Conditions in Central and South Florida Chandra S. S. Pathak, Ph.D., P.E. Severe Storm Prediction and Global Climate Impact in the Gulf Coast Conference October 29 to

More information

REPORT OF GEOTECHNICAL CONSULTING SERVICES

REPORT OF GEOTECHNICAL CONSULTING SERVICES REPORT OF GEOTECHNICAL CONSULTING SERVICES Escambia County Public Works Department Thompson, Crary and McNeal Roadway Project Escambia County, Century,FL Thompson Engineering Project No.: 15-1101-0297

More information

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced

More information

Subsurface Investigation Report

Subsurface Investigation Report AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 May 10, 2016 Banner Associates, Inc. 2307 W. 57 th Street, Suite

More information

September 3, 2013 Via

September 3, 2013 Via September 3, 2013 Via email: sadler@adeq.state.ar.us Mr. Bill Sadler, PG Geology Supervisor Solid Waste Management Division Arkansas Department of Environmental Quality 5301 Northshore Drive North Little

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E. LD-40 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Soil Survey Report March 29, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia Insert

More information

Report of CCR Rule Stability Analyses AEP Clifty Creek Power Plant Boiler Slag Pond Dam and Landfill Runoff Collection Pond

Report of CCR Rule Stability Analyses AEP Clifty Creek Power Plant Boiler Slag Pond Dam and Landfill Runoff Collection Pond Report of CCR Rule Stability Analyses AEP Clifty Creek Power Plant Boiler Slag Pond Dam and Landfill Runoff Collection Pond Madison, Jefferson County, Indiana Prepared for: American Electric Power Columbus,

More information

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering DATE: August 31, 2000 Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM EMI PROJECT NO: 99-136 PREPARED FOR: COPIES: PREPARED BY: Tayfun Saglam / Parsons Brinckerhoff Juan

More information

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY HERITAGE BAY MASTER PUMP STATION ISSUED FOR BID REPORT OF GEOTECHNICAL EXPLORATION PROPOSED INLINE WASTEWATER BOOSTER STATION Collier

More information

Geotechnical Investigation Report

Geotechnical Investigation Report MC Squared, Inc Geotechnical Investigation Report S. Edison Avenue Roadway Improvements City Of Tampa Florida Prepared for: Ms. Barbara Graves City of Tampa DPW Stormwater Engineering 306 E. Jackson St.,6N

More information

LAKE LABELLE ENGINEERING REPORT

LAKE LABELLE ENGINEERING REPORT 154 N. Bridge Street, LaBelle, Florida 33935 -Tel: (863) 612-0011 Fax: (863) 612-0014 - email: rock@rockhendry.com LAKE LABELLE ENGINEERING REPORT PREPARED FOR Lake LaBelle, LLC March 2014 PREPARED BY:

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

paterson -MEMO consulting engineers

paterson  -MEMO consulting engineers paterson consulting engineers EMAIL-MEMO to: Minto Communities Inc. - Mr. Barry Gray bgray@minto.com cc: Minto Communities Inc. - Mr. Julio Da Silva julio_dasilva@minto.com re: Grade Raise Recommendations

More information

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide Stormwater Standards Clackamas County Service District No. 1 APPENDIX E Infiltration Testing Guide Table of Contents Appendix E - Infiltration Testing Guide... Page E.1 General... 1 E.2 Basic Method -

More information

100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light

100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light 100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light Maintenance Facility (VSLMF) Osceola County, Florida

More information

THIS INFORMATION IS PROVIDED BY PLUMAS COUNTY ENVIRONMENTAL HEALTH

THIS INFORMATION IS PROVIDED BY PLUMAS COUNTY ENVIRONMENTAL HEALTH PLUMAS COUNTY Guidelines for GeoThermal Heat Exchange Wells THIS INFORMATION IS PROVIDED BY PLUMAS COUNTY ENVIRONMENTAL HEALTH FOR MORE INFORMATION ENVIRONMENTAL PLEASE CONTACT HEALTH CHESTER OFFICE: PHONE:

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

Florida s Leading Engineering Source

Florida s Leading Engineering Source Since 1988 Florida s Leading Engineering Source Environmental Geotechnical Construction Materials Testing Threshold and Special Inspections Plan Review & Code Compliance Mr. Ron Ridenour Hanson Professional

More information

STORMWATER MANAGEMENT. 158 Attachment 2. Borough of Perkasie

STORMWATER MANAGEMENT. 158 Attachment 2. Borough of Perkasie 158 Attachment 2 Borough of Perkasie Appendix B Site Soil Evaluation and Soil Infiltration Testing Source: Pennsylvania Stormwater Best Management Practice Manual, December 2006. SITE SOIL EVALUATION AND

More information

STORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017

STORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017 STORMWATER MANAGEMENT REPORT FOR Chick-Fil-A 3000 S Ferdon Blvd, Crestview FL February 10 th, 2017 PROJECT #010014-01-047 954.712.7482 www.bowmanconsulting.com Table of Contents Introduction.1 Project

More information

Soil Improvement by Compaction Grouting

Soil Improvement by Compaction Grouting CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction

More information

Bioreactor Landfill Design

Bioreactor Landfill Design Bioreactor Landfill Design Timothy Townsend, PhD, PE Department of Environmental Engineering Sciences University of Florida ttown@ufl.edu Bioreactor Landfill Design Modern landfill design entails many

More information

Subject: Aquifer Test Observation Well Installation Work Plan Hilmar Cheese Company, Hilmar, Merced County, CA

Subject: Aquifer Test Observation Well Installation Work Plan Hilmar Cheese Company, Hilmar, Merced County, CA October 1, 2009 Mr. Jan Alfson California Regional Water Quality Control Board Fresno Branch Office 1685 E Street Fresno, CA 93706 Subject: Aquifer Test Observation Well Installation Work Plan Hilmar Cheese

More information

BROWARD COUNTY ENVIRONMENTAL PROTECTION DEPARTMENT (EPD) MINIMUM CRITERIA FOR MONITORING WELL INSTALLATION AND SAMPLING

BROWARD COUNTY ENVIRONMENTAL PROTECTION DEPARTMENT (EPD) MINIMUM CRITERIA FOR MONITORING WELL INSTALLATION AND SAMPLING Failure to follow these criteria, or to obtain approval for variation to these criteria, is a citationable offense and bears an associated civil penalty, as provided in Section 27-38(h) (9), of the Broward

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 5-06 Template Version: C40606 - RW APPENDIX A GEOTECHNICAL REPORT AECOM 99 Commerce Drive 04 477 538 tel Winnipeg, MB, Canada R3P 0Y7 04 84 040 fax www.aecom.com

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

FENCE INSTALLATION PERMIT APPLICATION INSTALLATION REQUIREMENTS FOR WOOD FENCES AS PER THE FLORIDA BUILDING CODE

FENCE INSTALLATION PERMIT APPLICATION INSTALLATION REQUIREMENTS FOR WOOD FENCES AS PER THE FLORIDA BUILDING CODE FENCE INSTALLATION PERMIT APPLICATION INSTALLATION REQUIREMENTS FOR WOOD FENCES AS PER THE FLORIDA BUILDING CODE FINAL INSPECTION: To be made after installation and completion of all elements of construction.

More information

Report of Geotechnical Exploration PROPOSED SANITARY SEWER AND FORCE MAIN REPLACEMENT

Report of Geotechnical Exploration PROPOSED SANITARY SEWER AND FORCE MAIN REPLACEMENT Report of Geotechnical Exploration PROPOSED SANITARY SEWER AND FORCE MAIN REPLACEMENT Collier County Project Number 70043.14.1 Vanderbilt Drive and Finger Streets From Vanderbilt Beach Road to 111th Avenue

More information

INVESTIGATION RESULTS

INVESTIGATION RESULTS September 13, 2011 Burt Fleischer, R.E.A., R.E.P. Director, Environmental Affairs Hilmar Cheese Company 9001 N. Lander Avenue Hilmar, CA 95324 Subject: Revised Work Plan for Supply Well IN 1 Destruction

More information

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA

More information

Highway 12 SP , Willmar Wye Soils Borings, Soils Tests, and Reporting

Highway 12 SP , Willmar Wye Soils Borings, Soils Tests, and Reporting Highway 12 SP 3403-74, Willmar Wye Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003246 General Project Overview This work is located along Trunk Highway (TH) 12, on the west side of Willmar.

More information

March 10, 2017 SITE AND PROJECT INFORMATION

March 10, 2017 SITE AND PROJECT INFORMATION March 10, 2017 Derek Hawkes, PE NASH COUNTY 120 W. Washington Street - Suite 2004 Nashville, NC 27856 Re: Report of Subsurface Investigation Middlesex Corporate Park, Lot 3 Middlesex, North Carolina GeoTechnologies

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

Applicant s Handbook, Volume II (including Appendices A through F`) is Incorporated by Reference in Rule , F.A.C.

Applicant s Handbook, Volume II (including Appendices A through F`) is Incorporated by Reference in Rule , F.A.C. REFERENCES AND DESIGN AIDS FOR THE ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II FOR USE WITHIN THE GEOGRAPHIC LIMITS OF THE NORTHWEST FLORIDA WATER MANAGEMENT DISTRICT Applicant s Handbook,

More information

May 3, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE, Room 1A Washington, D.C

May 3, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE, Room 1A Washington, D.C 1250 West Century Avenue Mailing Address: P.O. Box 5601 Bismarck, ND 58506-5601 (701) 530-1600 May 3, 2018 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE, Room 1A

More information