CASE STUDIES EPC NTPC LIMITED. Mandsaur, Madhya Pradesh CASE STUDY

Size: px
Start display at page:

Download "CASE STUDIES EPC NTPC LIMITED. Mandsaur, Madhya Pradesh CASE STUDY"

Transcription

1 CASE STUDIES NTPC LIMITED Mandsaur, Madhya Pradesh CASE STUDY

2 NTPC LIMITED Mandsaur, Madhya Pradesh PROJECT OVERVIEW R Site Co-ordinates 24.1N, 75.8E R Plant capacity 50 MW R Connection Type & Connected to Grid connected- 220/33KV Grid substation, R Connected to NTPC, Gujjerkhedi, Mandsaur R Rated System Power 50 MW R Total Site Span 5.05 km R Number of Modules About 1,60,000 nos. R Inverter Solar Grid Connected Inverter (40 nos.) R Power Evacuation 50 MW power are being evacuated with 33KV line from individual projects and the same are connected with 220KV GSS R Total Land Area 250 acres

3 be installed in an optimum manner. Mitigation: Variable pitch design methodology was implemented to mitigate shading losses in the undulated land. Weather: The temperature in the region was at C whereas during winters the temperature would drop down to 100 C. Mitigation: To keep up with the deadline, the project team at site used to wear winter jackets during the cold season and they braved the summer with potable water which was adequately provided by us. CASE STUDIES NTPC Limited Mandsaur, MP CHALLENGES & SOLUTION Land Undulation: The land is undulated with an inclination of 11 degrees. Mitigation: A special drilling machine (Crawler) was used on the undulated land. This also allowed us to achieve excellence without a single incident. Soil and Land Strata: Soil in the area is essentially weathered rock soil and the land is quite undulated which posed a serious challenge for the project team to start the basic drilling work. Furthermore, the project engineering team had to make the site layout in such a way that the Module Mounting Structure & the PV modules could Local Manpower: Predominantly, local manpower was used. The team faced lots of hurdles during the initial days to get the necessary permissions from the local bodies and government authorities. Mitigation: Understanding the situation, Team Vikram Solar acted efficiently and initiated a dialogue with all the local bodies & government authorities and subsequently, the persisting issue was mutually resolved. Construction Power & Water: There was dearth of electricity at the construction site and there was no water storage facility in the vicinity. What aggravated the matter was that there was no permission from the Government of Madhya Pradesh for the bore well too. Mitigation: The Team had to use Diesel Generator set for power and water from neighbouring villages to carry on uninterrupted construction work.

4

5 PROJECT USP Three special types of MMS were established, ranging from 00 to 110, for handling the undulating land slope. To tackle the hurdle of land inclination, up to a measure of 110, and the foundation of Module Mounting Structure, a special type of drilling machine (Crawler) was used, which is a first-of-its-kind usage at solar projects in India. The execution and installation time got reduced substantially by using readymade STP (Sewage Treatment Plant) in place of a traditional brick septic tank. Solar PV Modules with binning of 2.5Wp were used, which reduced the mismatch loss. Solar PV Module with 4 bus bars in the DCR category was introduced by Vikram Solar. High quality MMS manufacturing was done by Vikram India, which helped the team maintain the timeline without compromising on quality. In-house PEB design was done which helped the project team adhere to the strict quality guidelines that we follow. CASE STUDIES NTPC Limited Mandsaur, MP 19

6 STEP BY STEP DEVELOPMENT Site preparation Site preparation Structure mounting Array junction box Control room

7 CASE STUDIES NTPC Limited Mandsaur, MP Fencing Control room 21

8 STEP BY STEP DEVELOPMENT Weather monitoring station Switch yard

9 ENVIRONMENTAL BENEFITS Expected Annual Energy Yield million unit. The plant is also expected to reduce CO 2 emissions to the tune of metric tonnes annually. CASE STUDIES NTPC Limited Mandsaur, MP 23

NTPC LIMITED. Bhadla, Rajasthan CASE STUDY

NTPC LIMITED. Bhadla, Rajasthan CASE STUDY NTPC LIMITED Bhadla, CASE STUDY NTPC LIMITED Bhadla, PROJECT OVERVIEW R Site Co-ordinates 27.5N, 72.0E R Plant capacity 130 MW (2 blocks of 65 MW each) R Connection Type & Connected to Grid connected -

More information

BE PART OF A SUNNY FUTURE WITH INDIA S LEADING SOLAR SOLUTIONS PROVIDER

BE PART OF A SUNNY FUTURE WITH INDIA S LEADING SOLAR SOLUTIONS PROVIDER BE PART OF A SUNNY FUTURE WITH INDIA S LEADING SOLAR SOLUTIONS PROVIDER VIKRAM SOLAR WHO WE ARE Vikram Solar Limited is a globally recognized reliable solar energy solutions provider, specializing in high

More information

We are pleased to quote our best price for 5 M W Solar Plant as appended. Annexure I : Price Schedule for 5 M W Solar Plant

We are pleased to quote our best price for 5 M W Solar Plant as appended. Annexure I : Price Schedule for 5 M W Solar Plant Dear Sir Greetings to you Subject: Offer for Supply of 5 M W Solar Plant Ref: Add posted on site Dear Sir, Greetings to you We are pleased to quote our best price for 5 M W Solar Plant as appended. Annexure

More information

Solar PV Nominated Technical Persons Criteria

Solar PV Nominated Technical Persons Criteria MCS Company Scheme Criteria for: Solar PV Nominated Technical Persons Criteria Current Criteria This document shows the Competence Criteria required to be met by a company undertaking the type of work

More information

BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE

BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE JUNE 2017 ENVIRONMENTAL IMPACT ASSESSMENT PROCESS CONSTRUCTION OF THE PROPOSED BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE NORTHERN CAPE BACKGROUND INFORMATION DOCUMENT A commercial

More information

HARTEK POWER PVT LTD SOLAR BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd)

HARTEK POWER PVT LTD SOLAR BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd) (Formerly known as Amtek Energy & Power Pvt Ltd) SOLAR BUSINESS CATALOGUE 2015-16 2 P a g e Contents 1. Introduction 2. Mission SOLAR 3. Why us? 4. Engineering Procurement Construction Services 4.1 Process

More information

THE DISTRIBUTION SYSTEM SECURITY AND PLANNING STANDARDS. Asset Management & Regulation, ESB Networks

THE DISTRIBUTION SYSTEM SECURITY AND PLANNING STANDARDS. Asset Management & Regulation, ESB Networks THE DISTRIBUTION SYSTEM SECURITY AND PLANNING STANDARDS. Issued by: Review Cycle: Asset Management & Regulation, ESB Networks Three years Contents 1.0 Introduction....3 1.1 Definitions...3 1.2 Aim of Planning...5

More information

5.5 KW DC PV SYSTEM Optimal Location W Solar PV Panels 60 Cell 250W PV Module

5.5 KW DC PV SYSTEM Optimal Location W Solar PV Panels 60 Cell 250W PV Module 13.5' 36' YOUR LOGO HERE 21.5' 5.5 KW DC PV SYSTEM Optimal Location 22 250W Solar PV Panels Driveway 23' 36" 19' 9" ➋ 13' 2" 36" 36" 36" 6' 6" Array Modules Azimuth Tilt Yield kwh/kw/yr 9.5' 36" ➊ 12 169

More information

Contents QUALIFICATIONS PACK - OCCUPATIONAL STANDARDS FOR GREEN JOBS. Introduction Qualifications Pack- Solar PV Site Surveyor

Contents QUALIFICATIONS PACK - OCCUPATIONAL STANDARDS FOR GREEN JOBS. Introduction Qualifications Pack- Solar PV Site Surveyor QUALIFICATIONS PACK - OCCUPATIONAL STANDARDS FOR GREEN JOBS Contents 1. Introduction and Contacts....[1] 2. Qualifications Pack....[2] 3. Glossary of Key Terms.[3] 4. OS Units.....[5] OS describe what

More information

An inverter is the heart of a solar PV installation and it plays a critical role in maximizing energy harvest.

An inverter is the heart of a solar PV installation and it plays a critical role in maximizing energy harvest. Conext RL PV Inverters: Superior energy harvest and return on PV system investment By Prasad Rao and Ranjeet Kuberkar Abstract An inverter is the heart of a solar PV installation and it plays a critical

More information

BANKABILITY OF SOLAR PROJECTS HOW TO MAKE YOUR PV PROJECT BANKABLE? HOW TO SELECT EPC CONTRATCOR? ROLE OF TECHNLOGY SELECTION

BANKABILITY OF SOLAR PROJECTS  HOW TO MAKE YOUR PV PROJECT BANKABLE? HOW TO SELECT EPC CONTRATCOR? ROLE OF TECHNLOGY SELECTION 0 HOW TO MAKE YOUR PV PROJECT BANKABLE? HOW TO SELECT EPC CONTRATCOR? ROLE OF TECHNLOGY SELECTION BANKABILITY OF SOLAR PROJECTS www.firstgreen.co IMPACT OF O&M ON BANKABILITY SOLAR RESOURCE ASSESSMENT

More information

Center for Study of Science, Technology & Policy. ENERGISING DATA-DRIVEN POLICY MAKING AND INVESTMENT IN RENEWABLE POWER: Lessons from India

Center for Study of Science, Technology & Policy. ENERGISING DATA-DRIVEN POLICY MAKING AND INVESTMENT IN RENEWABLE POWER: Lessons from India Center for Study of Science, Technology & Policy ENERGISING DATA-DRIVEN POLICY MAKING AND INVESTMENT IN RENEWABLE POWER: Lessons from India CSTEP: Key Research Areas Energy Renewables, Nuclear Smart Grid,

More information

EXPRESSION OF INTENT FOR 100 MW SOLAR PV PROJECT ON EPC BASIS AT KHARAGHODA

EXPRESSION OF INTENT FOR 100 MW SOLAR PV PROJECT ON EPC BASIS AT KHARAGHODA EXPRESSION OF INTENT FOR 100 MW SOLAR PV PROJECT ON EPC BASIS AT KHARAGHODA EOI No. 38(Com)Purchase/2016-17 EOI Issue date 28.12.2016 Last date and time of 19.01.2017 upto 15.00 Hrs at office of Submission

More information

SOLAR. Ground, Rooftop, Water, Space. Think Solar Think BHEL

SOLAR. Ground, Rooftop, Water, Space. Think Solar Think BHEL SOLAR Ground, Rooftop, Water, Space Think Solar Think BHEL About BHEL Established in 1964, Bharat Heavy Electricals Limited is an integrated power plant equipment manufacturer and one of the largest engineering

More information

SURINDER RAINA GM-I/C(RE & Nuclear)

SURINDER RAINA GM-I/C(RE & Nuclear) 13.02.17 SURINDER RAINA GM-I/C(RE & Nuclear) 1 1 Outline Renewable Energy in India Solar Projects in NTPC -EPC Mode -Developer Mode Wind Projects in NTPC New Initiatives 2 Renewable Energy in India Installed

More information

Investigating the Shading Impact of Rail on the Energy Output of a PV System in Hong Kong

Investigating the Shading Impact of Rail on the Energy Output of a PV System in Hong Kong Investigating the Shading Impact of Rail on the Energy Output of a PV System in Hong Kong Jinqing Peng a, b, Lin Lu b,*, Hongxing Yang b, Tao Ma b, KM HO c, Peter Law c a College of Civil Engineering,

More information

7 Project Description

7 Project Description 7 Project Description 7.1 Project Promoter The CEB (Green energy) Co. Ltd. is a private company fully owned by the Central Electricity Board incorporated on 11 October 2016 to promote the generation of

More information

Fact sheet. Photovoltaic systems. Why consider photovoltaics?

Fact sheet. Photovoltaic systems. Why consider photovoltaics? Fact sheet Photovoltaic systems In this Fact sheet: What is a photovoltaic system? Choosing the right system Choosing solar modules Orientation and pitch Maintenance Why consider photovoltaics? Photovoltaic

More information

Global Top 10 Trackers for 2016 GTM Research

Global Top 10 Trackers for 2016 GTM Research Global Top 10 Trackers for 2016 GTM Research #1Indian Tracker Technology installed FY 2016-2017 ONLY GLOBAL Tracker Technology Organization with Multiple Solutions WHY TRACK THE SUN? Punjab Pavagada *

More information

Home PV System Design

Home PV System Design Home PV System Design Step #1 Evaluate Home Energy Needs (based on 2007 & 2008 PG&E bill) Averaged annual electricity usage is around 4,500kWh Step #2 Determine System Requirements (Grid-tied, Fixed tilt)

More information

SOLAR ENERGY ASSESSMENT REPORT. For 80.5 kwp. Meteorological Data Source NASA-SSE. Date 18 October, Name of Place Uttar Pradesh.

SOLAR ENERGY ASSESSMENT REPORT. For 80.5 kwp. Meteorological Data Source NASA-SSE. Date 18 October, Name of Place Uttar Pradesh. SOLAR ENERGY ASSESSMENT REPORT For 80.5 kwp Name of Place Uttar Pradesh Client abc Capacity 80 kw Meteorological Data Source NASA-SSE Email ezysolare@gmail.com Order No. #1410180006 Date 18 October, 2014

More information

NABCEP PV Technical Sales Job Task Analysis

NABCEP PV Technical Sales Job Task Analysis NABCEP PV Technical Sales Job Task Analysis Introduction This document presents an in-depth Job Task Analysis for solar electric professionals who gather site specific information and analyze customer

More information

Department of Electrical Engineering. Industrial Visit Report. Sardar Sarovar Narmada Nigam Limited Hydro Electric Power Station

Department of Electrical Engineering. Industrial Visit Report. Sardar Sarovar Narmada Nigam Limited Hydro Electric Power Station Department of Electrical Engineering Industrial Visit Report Sardar Sarovar Narmada Nigam Limited Hydro Electric Power Station on 10 th March, 2017 Faculties Accompany: Prof. Anish Vora Prepared by: Prof.

More information

PHOTOVOLTAIC SYSTEMS. Syllabus. 1 Photovoltaic systems

PHOTOVOLTAIC SYSTEMS. Syllabus. 1 Photovoltaic systems PHOTOVOLTAIC SYSTEMS Syllabus 1 Photovoltaic systems 1 Identify typical photovoltaic (PV) installations a) grid connected b) building integrated c) non-integrated 2 State typical expected outputs of a

More information

Additional Information on Project Components

Additional Information on Project Components Additional Information on Project Components A. Part A: Ashuganj 450 MW Combine Cycle Power Plant 1. Description 1. The proposed project involves retirement of the existing combined cycle power plant (CCPP)

More information

Sri: Sustainable Power Sector Support Project

Sri: Sustainable Power Sector Support Project Environmental Monitoring Report June 2015 Sri: Sustainable Power Sector Support Project Prepared by Ceylon Electricity Board for the Asian Development Bank. This environmental monitoring report is a document

More information

M/s.NEERAJ KUMAR JAIN

M/s.NEERAJ KUMAR JAIN EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND

More information

AN EFFECTIVE STUDY ON PERFORMANCE ANALYSIS OF GRID CONNECTED PV SYSTEM

AN EFFECTIVE STUDY ON PERFORMANCE ANALYSIS OF GRID CONNECTED PV SYSTEM AN EFFECTIVE STUDY ON PERFORMANCE ANALYSIS OF GRID CONNECTED PV SYSTEM Jignesh L. Rohit 1, Prof. K.D. Panchal 2 1 P.G. Student, M. E. (Energy Engineering), Government Engineering College, Valsad, Gujarat

More information

From Rooftops to Farmtops. Augmenting India s Distributed Solar Goals through net-metered solar pumps

From Rooftops to Farmtops. Augmenting India s Distributed Solar Goals through net-metered solar pumps From Rooftops to Farmtops Augmenting India s Distributed Solar Goals through net-metered solar pumps Introduction The Government of India has recently announced a scheme for solar water pumps known as

More information

TRAINING PROGRAM ON SOLAR POWER PROJECT DEVELOPMENT

TRAINING PROGRAM ON SOLAR POWER PROJECT DEVELOPMENT Duration : 5th Oct 2015 to 10th Oct 2015 TRAINING PROGRAM ON SOLAR POWER PROJECT DEVELOPMENT DAY 1 / 05.10.2015 (MONDAY): Welcome speech- and introduction of the training program FIRSTGREEN + MNIT + NISE

More information

Model Curriculum. Solar PV Maintenance Technician - Civil (Ground Mount) GREEN JOBS RENEWABLE ENERGY Operation & Maintenance SGJ/Q0116, V1.

Model Curriculum. Solar PV Maintenance Technician - Civil (Ground Mount) GREEN JOBS RENEWABLE ENERGY Operation & Maintenance SGJ/Q0116, V1. Model Curriculum Solar PV Maintenance Technician - Civil (Ground Mount) SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: GREEN JOBS RENEWABLE ENERGY Operation & Maintenance SGJ/Q0116, V1.0 4 1 TABLE

More information

INDIAN INSTITUTE OF TROPICAL METEOROLOGY

INDIAN INSTITUTE OF TROPICAL METEOROLOGY INDIAN INSTITUTE OF TROPICAL METEOROLOGY (An Autonomous Body under the Ministry of Earth Sciences,Govt. of india) Dr. Homi Bhabha Road, Pashan, Pune-411008 IITM/EM/ SOLAR NOTICE FOR EXPRESSION OF INTEREST

More information

LECTURE 15 PHOTOVOLTAIC MATERIALS. ECE 371 Sustainable Energy Systems

LECTURE 15 PHOTOVOLTAIC MATERIALS. ECE 371 Sustainable Energy Systems LECTURE 15 PHOTOVOLTAIC MATERIALS ECE 371 Sustainable Energy Systems 1 SHADING IMPACTS ON I-V CURVE The output of the PV cell is reduced significantly when even a small portion of it is shaded Even a single

More information

Financial Benefits of Integrating East West Fixed, Single and Dual Axes Tracking PV Systems in the Supply Mix of a South African Research Campus

Financial Benefits of Integrating East West Fixed, Single and Dual Axes Tracking PV Systems in the Supply Mix of a South African Research Campus Financial Benefits of Integrating East West Fixed, Single and Dual Axes Tracking PV Systems in the Supply Mix of a South African Research Campus (Conference ID: CFP/871/2018) Henerica Tazvinga*, Enose

More information

1 Project description

1 Project description 1 Project description Akfen Renewables (the "Company") is currently developing a portfolio of (PV) power plants located in the provinces of Konya, Amasya, Tokat, Van and Malatya provinces in Turkey. This

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

Shed Nos: 38 & 39, Plot Nos: 26 & 27, Phase: II, Industrial Development Area, Cherlapally, Hyderabad Telangana

Shed Nos: 38 & 39, Plot Nos: 26 & 27, Phase: II, Industrial Development Area, Cherlapally, Hyderabad Telangana COMPANY PROFILE An ISO 9001 : 2008 Company Shed Nos: 38 & 39, Plot Nos: 26 & 27, Phase: II, Industrial Development Area, Cherlapally, Hyderabad - 500 051. Telangana Tele : +91 40 2970 7726 Mail ID : srtind.2008@gmail.com

More information

Megawatt Solutions Private Limited

Megawatt Solutions Private Limited Megawatt Solutions Private Limited Contact us T-93, 4 th Floor, Gautam Nagar, Yousuf Sarai Commercial Complex, New Delhi-110049 smalik@megawattsolutions.in, Tel: 011-40536349 Indigenous High-Efficiency

More information

Monroe County s Path to Solar Energy: Western New York s Largest Municipal Solar Installation

Monroe County s Path to Solar Energy: Western New York s Largest Municipal Solar Installation Monroe County s Path to Solar Energy: Western New York s Largest Municipal Solar Installation April 24, 2018 Michelle Virts, MCDES Nathan Rizzo, Solar Liberty Monroe County 13 MW 13 MW 45,000 Solar Modules

More information

Annex B2.3. Background Information Document

Annex B2.3. Background Information Document Annex B2.3 Background Information Document Background Goldfields South Deep Mine, in partnership with Enel Green Power, proposes to design, construct, and operate 2x20MW Solar PV plants on Mine owned property

More information

FEASIBILITY REPORT FOR ROUTE SELECTION OF 132 KV DOUBLE CIRCUIT TRANSMISSION LINE

FEASIBILITY REPORT FOR ROUTE SELECTION OF 132 KV DOUBLE CIRCUIT TRANSMISSION LINE FEASIBILITY REPORT FOR ROUTE SELECTION OF 132 KV DOUBLE CIRCUIT TRANSMISSION LINE FOR PROPOSED 126 MW WIND POWER PROJECT OF WELSPUN RENEWABLES ENERGY PVT.LTD IN DISTRICT PRATAPGARH, RAJASTHAN TABLE OF

More information

RESULTS A)Without any area B) Within restricted

RESULTS A)Without any area B) Within restricted SL. No. Vineeti Technologies Customer Name Project report version V-00 Hourly power demand (Watt.hr) Value 1 Date 04-04-2017 Peak demand (W) 200000 Average demand/hr in _morning 2 Site Location Mysore

More information

Guidelines for Solar Photovoltaic Installation

Guidelines for Solar Photovoltaic Installation WEST COVINA FIRE DEPARTMENT Fire Prevention Bureau 1435 W. Puente Ave. West Covina, CA 91790 (626) 338-8800 Guidelines for Solar Photovoltaic Installation PURPOSE SCOPE TABLE OF CONTENTS..2..2 REQUIREMENTS..2

More information

MAXIMIZING. Making Use of Existing Roofs

MAXIMIZING. Making Use of Existing Roofs MESSAGE MAXIMIZING Solar Power Generation Making Use of Existing Roofs In this article, Satish N Diwakar outlines various aspects of solar photovoltaic (SPV) systems on rooftops, including evaluation of

More information

Building Solar Friendly Roofs

Building Solar Friendly Roofs Building Solar Friendly Roofs Presented by John Maissan Leading Edge Projects Inc. Yukon Housing Corporation Contractor Breakfast April 15, 2015 Presentation Outline Why solar Sun angles by time of day

More information

Guideline for Fire Safety. Elements of Solar. Photovoltaic Systems

Guideline for Fire Safety. Elements of Solar. Photovoltaic Systems Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 This document was developed by the Orange County Fire Chiefs Association, Orange County Fire Marshal Committee. It is based

More information

Available online at ScienceDirect. Procedia Technology 24 (2016 ) Tahira Bano a,*, K.V.S. Rao a

Available online at   ScienceDirect. Procedia Technology 24 (2016 ) Tahira Bano a,*, K.V.S. Rao a Available online at www.sciencedirect.com ScienceDirect Procedia Technology 24 (2016 ) 505 512 International Conference on Emerging Trends in Engineering, Science and Technology (ICETEST - 2015) Levelized

More information

BURBANK FIRE DEPARTMENT 311 East Orange Grove Avenue, Burbank CA Fax

BURBANK FIRE DEPARTMENT 311 East Orange Grove Avenue, Burbank CA Fax BURBANK FIRE DEPARTMENT 311 East Orange Grove Avenue, Burbank CA 91502 818 238 3473 Fax 818 238 3479 SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINES BASED ON THE CSFM PV GUIDELINES (REVISED APRIL 2017) The

More information

Outline Construction and Environmental Management Plan

Outline Construction and Environmental Management Plan 1.1.1 Gwent Farmers Community Solar Scheme January 2018 Outline Construction and Environmental Management Plan www.savills.co.uk Project: Client: Gwent Levels Community Solar Scheme Partnership Ltd Job

More information

MOUNTING SYSTEMS PRODUCT CATALOG

MOUNTING SYSTEMS PRODUCT CATALOG MOUNTING SYSTEMS PRODUCT CATALOG MOUNTING SYSTEMS Reliable solar modules support Mounting systems, as solar modules supporting equipment, represent an important part of the final solar solution. Integrated,

More information

NEONERGY ENGINEERING PVT LTD

NEONERGY ENGINEERING PVT LTD SOLAR HYDRO TRANSMISSION LINES BALANCE OF PLANT NEONERGY ENGINEERING PVT LTD Authorized dealer for ZYTECH Solar Modules Bengaluru, Karnataka 560 066 sales@neonergy.co www.neonergy.co +91 80952 41041 Ver

More information

KINGSTON SOLAR LP. Sol-Luce Project Overview. August 13, 2014

KINGSTON SOLAR LP. Sol-Luce Project Overview. August 13, 2014 KINGSTON SOLAR LP Sol-Luce Project Overview August 13, 2014 PROJECT HIGHLIGHTS Facility to be located on approximately 800 acres of land bridging the City of Kingston and Loyalist Township Comprised of

More information

Subtask 1: Economic of PV System Performance and Reliability

Subtask 1: Economic of PV System Performance and Reliability TASK 13: PERFORMANCE AND RELIABILITY OF PV SYSTEMS Subtask 1: Economic of PV System Performance and Reliability Mauricio Richter (3E), Jan Vedde (SiCon) Mike Green (M.G.Lightning Electrical Engineering)

More information

Version 05.1 Page 1 of 16

Version 05.1 Page 1 of 16 CDM-MR-FORM Monitoring report form (Version 05.1) MONITORING REPORT Title of the project activity 15 MW Solar Photovoltaic Power Project at Gujarat UNFCCC reference number of the project activity 8671

More information

ASSESSMENT AND DESIGN OF ROOFTOP SOLAR PV SYSTEM. Click to begin

ASSESSMENT AND DESIGN OF ROOFTOP SOLAR PV SYSTEM. Click to begin ASSESSMENT AND DESIGN OF ROOFTOP SOLAR PV SYSTEM Click to begin TOPICS Solar Energy Systems Types of solar energy systems Solar Energy Terminologies Solar PV system Types of Solar PV systems Solar PV System

More information

Rykove Solar Project Non-Technical Summary

Rykove Solar Project Non-Technical Summary Rykove Solar Project Non-Technical Summary 16 July 2018 1 Introduction This document provides a non-technical overview of the proposed development plans of private company Grin Agro Servis to construct

More information

Source: Ministry of New & Renewable Energy (MNRE)

Source: Ministry of New & Renewable Energy (MNRE) NATURAL POWER Durja Energy is a business unit of renewable energy systems which deals in Solar Products used in various high-growth segments such as Infrastructure, Retail, IT, ITES, Hospitality, Healthcare

More information

Model Curriculum. Solar PV Designer SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: GREEN JOBS RENEWABLE ENERGY Designer SGJ/Q0110, V1.

Model Curriculum. Solar PV Designer SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: GREEN JOBS RENEWABLE ENERGY Designer SGJ/Q0110, V1. Model Curriculum Solar PV Designer SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: GREEN JOBS RENEWABLE ENERGY Designer SGJ/Q0110, V1.0 7 Solar PV Designer Solar PV Designer 2 TABLE OF CONTENTS 1.

More information

GreenCo BANGALORE INTERNATIONAL AIRPORT LIMITED, BENGALURU

GreenCo BANGALORE INTERNATIONAL AIRPORT LIMITED, BENGALURU GreenCo Experience @ BANGALORE INTERNATIONAL AIRPORT LIMITED, BENGALURU ABOUT BIAL Public limited company under Indian Companies Act Private Public Partnership BOOT project transferred after 60 years (30

More information

Customer Sited Solar PV & The Impact of Grid Interactive Systems

Customer Sited Solar PV & The Impact of Grid Interactive Systems Customer Sited Solar PV & The Impact of Grid Interactive Systems Solar Photovoltaic Anguilla bathed in power every day 6 KWh per sq. meter per day (6 full sun hours) Sun comes out every day Anguilla has

More information

Impact of Variable Generation on the Vermont Transmission Grid. Chris Root Vermont Electric Power Company, Inc.

Impact of Variable Generation on the Vermont Transmission Grid. Chris Root Vermont Electric Power Company, Inc. Impact of Variable Generation on the Vermont Transmission Grid Chris Root Vermont Electric Power Company, Inc. croot@velco.com VELCO-managed assets 738 miles of transmission lines, 115kV to 450kV, predominantly

More information

Suburbia 1, Kyoto 0. Why Canadians must link home to environment to achieve Canada s Kyoto targets. by Louise St.Germain

Suburbia 1, Kyoto 0. Why Canadians must link home to environment to achieve Canada s Kyoto targets. by Louise St.Germain Suburbia 1, Kyoto 0 Why Canadians must link home to environment to achieve Canada s Kyoto targets by Louise St.Germain In recent years, much awareness has been raised around the world about climate change

More information

Training: MED-SOLAR MODULE :4. Constructing and Starting-up Of a Solar Power Plant

Training: MED-SOLAR MODULE :4. Constructing and Starting-up Of a Solar Power Plant Training: MED-SOLAR MODULE :4 Constructing and Starting-up Of a Solar Power Plant By: Ramzi AbouSaid Managing Director of ASACO General Trade and Contracting www.asacogtc.com President of the Lebanese

More information

OPERATIONAL ISSUES AND INNOVATIVE APPROACH FOR PERFORMANCE IMPROVEMENT AT NTPC UNCHAHAR SOLAR PV PLANT

OPERATIONAL ISSUES AND INNOVATIVE APPROACH FOR PERFORMANCE IMPROVEMENT AT NTPC UNCHAHAR SOLAR PV PLANT OPERATIONAL ISSUES AND INNOVATIVE APPROACH FOR PERFORMANCE IMPROVEMENT AT NTPC UNCHAHAR SOLAR PV PLANT Ravi Prakash Singh AGM (O&M Opn. & Commg.) NTPC Unchahar Amit K Gautam Sr. Manager (O&M Opn. & Commg.)

More information

Monitoring of 20 kwp photovoltaic system

Monitoring of 20 kwp photovoltaic system Monitoring of 20 kwp photovoltaic system Milan Belik ABSTRACT The document describes influence of basic meteorological value to proposition of photovoltaic arrays. Results from 3 years long measurements

More information

ESD 28 th Annual Solid Waste Technical Conference

ESD 28 th Annual Solid Waste Technical Conference Revenue Stream from Solar Photovoltaic Systems at Landfill Sites ESD 28 th Annual Solid Waste Technical Conference Lansing, Michigan April 11, 2018 ABOUT NOVA A Minority owned company, established in 1992

More information

Solar Energy Generation Potential on National Highways

Solar Energy Generation Potential on National Highways Solar Energy Generation Potential on National Highways Anurag Swain Sr. Deputy General Manager (Electrical & Instrumentation), My Home Power Consultancy Services Pvt. Ltd My Home Hub, 3 rd Block, 5 th

More information

Solar Energy System of the Month: Zero-energy house with photovoltaics and heat pump

Solar Energy System of the Month: Zero-energy house with photovoltaics and heat pump 1 von 5 06.02.2009 11:07 German Solar Energy System of the Month Print this page Banner Advertising Bulletin Board Events Solar Magazine Funding for Solar Energy Companies Solarstore (G) Non-Profit Organizations

More information

PHOTON ENERGY SYSTEMS LIMITED. Solar Energy for today & tomorrow

PHOTON ENERGY SYSTEMS LIMITED. Solar Energy for today & tomorrow PHOTON ENERGY SYSTEMS LIMITED Solar Energy for today & tomorrow COMPANY VISION to be an innovative and competitive global enterprise providing end-toend solar energy solutions to customers COMPANY DIVISIONS

More information

Ref. No.: SRMU/NDP-I/VBMPS-II/ INVITATION FOR QUOTATION FOR SUPPLY OF GOODS UNDER SHOPPING PROCEDURES

Ref. No.: SRMU/NDP-I/VBMPS-II/ INVITATION FOR QUOTATION FOR SUPPLY OF GOODS UNDER SHOPPING PROCEDURES Ref. No.: SRMU/NDP-I/VBMPS-II/ dt.22.09.2017 To INVITATION FOR QUOTATION FOR SUPPLY OF GOODS UNDER SHOPPING PROCEDURES P Dear Sir, Sub : INVITATION FOR QUOTATIONS FOR SUPPLY OF Rooftop Solar PV system

More information

Solar Powered Irrigation Pumps: Opportunities and Challenges for India

Solar Powered Irrigation Pumps: Opportunities and Challenges for India Solar Powered Irrigation Pumps: Opportunities and Challenges for India NILANJAN GHOSE 11 October 2017 Page 1 Presentation Outline Understanding Solar Powered Irrigation Pump (SPIP) :as a technology Market

More information

Module 13 Assignment. Integrating Landscape and Buildings. For one of the projects listed below, describe the methods used by the designers

Module 13 Assignment. Integrating Landscape and Buildings. For one of the projects listed below, describe the methods used by the designers 1 Module 13 Assignment Integrating Landscape and Buildings For one of the projects listed below, describe the methods used by the designers (planners, construction managers) to achieve integration of human

More information

Solar PV, Wind, and Storage System Design. Ilya Chernyakhovskiy, NREL April 26, 2018 Dushanbe, Tajikistan

Solar PV, Wind, and Storage System Design. Ilya Chernyakhovskiy, NREL April 26, 2018 Dushanbe, Tajikistan Solar PV, Wind, and Storage System Design Ilya Chernyakhovskiy, NREL April 26, 2018 Dushanbe, Tajikistan Design Consideration 1: Technology Generation 1 Megawatt installed PV capacity powers ~160 homes

More information

Solar (PV) Panel Installation and Maintenance With The Help Of PVSYST And PVSOL

Solar (PV) Panel Installation and Maintenance With The Help Of PVSYST And PVSOL Solar (PV) Panel Installation and Maintenance With The Help Of PVSYST And PVSOL Training Objective: This training program is designed for new Entrepreneurs, Prospective Entrepreneurs, working Professional

More information

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014.

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014. EXECUTIVE SUMMARY E1 Introduction The proponent is SOLAR FIELD LTD, a consortium between 1. Dhamma Energy, a company based in Spain, specialised in photovoltaic projects 2. Harel Mallac & Co. Ltd, a company

More information

PHOTON ENERGY SYSTEMS LIMITED SYSTEM INTEGRATION & EPC PROFILE

PHOTON ENERGY SYSTEMS LIMITED SYSTEM INTEGRATION & EPC PROFILE PHOTON ENERGY SYSTEMS LIMITED SYSTEM INTEGRATION & EPC PROFILE COMPANY VISION to be an innovative and competitive global enterprise providing end-toend solar energy solutions to customers COMPANY DIVISIONS

More information

Morgan County Planning Commission. Petition for: Text Amendment. Article 7, Regulations for Specific Uses

Morgan County Planning Commission. Petition for: Text Amendment. Article 7, Regulations for Specific Uses Staff Report Morgan County Planning Commission Petition for: Text Amendment Applicant: Applicant s Agent: Zoning Ordinance: Morgan County Zoning Ordinance Article 7, Regulations for Specific Uses Summary

More information

5. Solar Photovoltaic System

5. Solar Photovoltaic System 5. Solar Photovoltaic System 5.1 Introduction Harnessing of non polluting renewable energy resources to control green house gases is receiving impetus from the government of India. Under the JNNSM, rooftop

More information

LEED, Alternative building Materials, Alternative Energy. Yossi Bronsnick 10/8/2015

LEED, Alternative building Materials, Alternative Energy. Yossi Bronsnick 10/8/2015 LEED, Alternative building Materials, Alternative Energy Yossi Bronsnick 10/8/2015 Outline Taitem Engineering Sustainability & USGBC/LEED Alternative Energy Alternative Building Materials Taitem Engineering

More information

OWN YOUR SUN. Ashu Gupta Vice President - Corporate Ujaas Energy Limited

OWN YOUR SUN. Ashu Gupta Vice President - Corporate Ujaas Energy Limited OWN YOUR SUN Ashu Gupta Vice President - Corporate Ujaas Energy Limited A Presentation on Success Stories on investments in Renewable Energy Sector in Uttar Pradesh & Uttrakhand SOLAR POWER A Greener,

More information

Contents. What is a solar water pump? 3-4. Smart Solar Water 5-6. Small Centrifugal Pump Systems 7. MPPT Diaphragm Pump Systems 8

Contents. What is a solar water pump? 3-4. Smart Solar Water 5-6. Small Centrifugal Pump Systems 7. MPPT Diaphragm Pump Systems 8 Solar Water Systems Contents Pages What is a solar water pump? 3-4 Smart Solar Water 5-6 Small Centrifugal Pump Systems 7 MPPT Diaphragm Pump Systems 8 Large Centrifugal Pump Systems 9 Pump Price List

More information

SOLAR SOLUTIONS PROVIDER

SOLAR SOLUTIONS PROVIDER YOUR LEADING SOLAR SOLUTIONS PROVIDER SOLAR MODULES SOLAR EPC 1GW ANNUAL MODULE PRODUCTION CAPACITY SOLAR ROOFTOP THE VIKRAM GROUP With a legacy of over 4 decades VIKRAM SOLAR Renewable Energy India s

More information

Design Guide for Solar Water Pumping. Dankoff Solar Products, Inc.

Design Guide for Solar Water Pumping. Dankoff Solar Products, Inc. Special advance-publication for the Advanced PV Course Solar Energy International May 2001 Design Guide for Solar Water Pumping Dankoff Solar Products, Inc. The world s most diverse selection of solar

More information

6) Penstocks 3.25m dia and 965m long to lead a design discharge of cumecs

6) Penstocks 3.25m dia and 965m long to lead a design discharge of cumecs Project: Sorang Hydro Electric Project - 100 MW Overview: M/s.Himachal Sorang Pvt.Ltd., Hyderabad, is developing the Run of the River Sorang Hydro Electric Project (100MW) in Kinnaur District of Himachal

More information

New York Community Solar Facility Decommissioning Plan

New York Community Solar Facility Decommissioning Plan New York Community Solar Facility Decommissioning Plan July 2017 Prepared For: Town of Dryden, NY Delaware River Solar 33 Irving Place, Suite 1090 New York, NY 10003 Table of Contents Page 1. Introduction

More information

Groundwater resources at risk in the basalts (Deccan traps) of western India

Groundwater resources at risk in the basalts (Deccan traps) of western India Future Groundwater Resources at Risk (Proceedings of the Helsinki Conference, June 1994). IAHSPubl.no. 222, 1994. 513 Groundwater resources at risk in the basalts (Deccan traps) of western India S. D.

More information

EMBRACE THE INFINITE POWER OF THE SUN WITH PV MODULES BY VIKRAM SOLAR 1GW ANNUAL MODULE PRODUCTION CAPACITY

EMBRACE THE INFINITE POWER OF THE SUN WITH PV MODULES BY VIKRAM SOLAR 1GW ANNUAL MODULE PRODUCTION CAPACITY EMBRACE THE INFINITE POWER OF THE SUN WITH PV MODULES BY VIKRAM SOLAR 1GW ANNUAL MODULE PRODUCTION CAPACITY WHO WE ARE Vikram Solar is a globally recognised reliable solar energy solutions provider, specialising

More information

EMBRACE THE INFINITE POWER OF THE SUN WITH PV MODULES BY VIKRAM SOLAR 1GW ANNUAL MODULE PRODUCTION CAPACITY

EMBRACE THE INFINITE POWER OF THE SUN WITH PV MODULES BY VIKRAM SOLAR 1GW ANNUAL MODULE PRODUCTION CAPACITY EMBRACE THE INFINITE POWER OF THE SUN WITH PV MODULES BY VIKRAM SOLAR 1GW ANNUAL MODULE PRODUCTION CAPACITY WHO WE ARE Vikram Solar is a globally recognised reliable solar energy solutions provider, specialising

More information

Critical Load Serving Capability by Microgrid using 100% Renewable Energy

Critical Load Serving Capability by Microgrid using 100% Renewable Energy 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Critical Load Serving Capability by Microgrid using 100% Renewable Energy P. PENKEY,

More information

BOLAND ENVIRONMENTAL CONSULTANTS CC

BOLAND ENVIRONMENTAL CONSULTANTS CC BOLAND ENVIRONMENTAL CONSULTANTS CC y ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Proposed Photo-Voltaic Solar Power Plant On Farm Nuwerus, No. 450 Portion 6, Worcester DEA REF. NO: 12/12/20/2019 BACKGROUND

More information

QUALIFICATIONS PACK - OCCUPATIONAL STANDARDS FOR GREEN JOBS SUB-SECTOR: RENEWABLE ENERGY OCCUPATION: DESIGNER REFERENCE ID: SGJ/Q0109

QUALIFICATIONS PACK - OCCUPATIONAL STANDARDS FOR GREEN JOBS SUB-SECTOR: RENEWABLE ENERGY OCCUPATION: DESIGNER REFERENCE ID: SGJ/Q0109 Insert SSC logo height 0.51, width 2.84 QUALIFICATIONS PACK - OCCUPATIONAL STANDARDS FOR GREEN JOBS Contents 1. Introduction and Contacts.......[1] 2. Qualifications Pack....[2] 3. Glossary of Key Terms....[3]

More information

Floating Solar PV Technology An Introduction

Floating Solar PV Technology An Introduction Floating Solar PV Technology An Introduction Floating Solar Technology Market Outlook The Global Floating Solar Panels Market is expected to reach US$ 842.0 Million by 2023, expanding at a CAGR (Compound

More information

Contents. What is a solar water pump? 3-4. Smart Solar Water 5-6. Small Centrifugal Pump Systems 7. MPPT Diaphragm Pump Systems 8

Contents. What is a solar water pump? 3-4. Smart Solar Water 5-6. Small Centrifugal Pump Systems 7. MPPT Diaphragm Pump Systems 8 Solar Water Systems Contents Pages What is a solar water pump? 3-4 Smart Solar Water 5-6 Small Centrifugal Pump Systems 7 MPPT Diaphragm Pump Systems 8 Large Centrifugal Pump Systems 9 Pump Price List

More information

Now we come to an important power electronic device that makes the modern PV system widely usable.

Now we come to an important power electronic device that makes the modern PV system widely usable. ET3034TUx - 7.4 - Inverters in PV systems Welcome back. Now we come to an important power electronic device that makes the modern PV system widely usable. I am talking about the solar inverter. To know

More information

SUCCESSFUL SOLAR POWER BUSINESS The Power and Renewable Energy Seminar 2016 Hosted by the Indonesian Gas Society

SUCCESSFUL SOLAR POWER BUSINESS The Power and Renewable Energy Seminar 2016 Hosted by the Indonesian Gas Society SUCCESSFUL SOLAR POWER BUSINESS The Power and Renewable Energy Seminar 2016 Hosted by the Indonesian Gas Society Jakarta 8 December 2016 www.canadiansolar.com Canadian Solar Corporate Overview Founded

More information

Grid-connected photovoltaic module and array sizing based on an iterative approach

Grid-connected photovoltaic module and array sizing based on an iterative approach International Journal of Smart Grid and Clean nergy Grid-connected photovoltaic module and array sizing based on an iterative approach F. Q. Alenezi *, J. K. Sykulski, M. Rotaru a lectronics and Computer

More information

Niagara Generation Modeling. David Edelson Market Issues Working Group January 22 th, 2016

Niagara Generation Modeling. David Edelson Market Issues Working Group January 22 th, 2016 Niagara Generation Modeling David Edelson Market Issues Working Group January 22 th, 2016 Purpose The purpose of this presentation is to begin a discussion with Market Participants on the modeling of the

More information

PV Powered DC System for Protection Control and Monitoring (PCM) in Sub-Stations

PV Powered DC System for Protection Control and Monitoring (PCM) in Sub-Stations PV Powered DC System for Protection Control and Monitoring (PCM) in Sub-Stations Avneesh Kumar 1, Jai Dev Sharma 2 1,2 M. Tech Student, Centre of Energy Studies, Indian Institute of Technology Delhi (India)

More information

Preliminary Design Review MARS-OZ PIGLET MARSYSTEMS i MARSYSTEMS

Preliminary Design Review MARS-OZ PIGLET MARSYSTEMS i MARSYSTEMS Preliminary Design Review MARS-OZ PIGLET MARSYSTEMS 2015 i MARSYSTEMS EXECUTIVE SUMMARY The MarsOz Piglet is an analogue research station to be located in Arkaroola, South Australia for Mars Society Australia.

More information

Model Curriculum. Solar PV Structural Design Engineer SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL:

Model Curriculum. Solar PV Structural Design Engineer SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: Model Curriculum Solar PV Structural Design Engineer SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: GREEN JOBS RENEWABLE ENERGY Designer SGJ/Q0109, V1.0 5 Solar PV Structural Design Engineer Solar

More information