1 2015 INSPECTION REPORT FLY ASH DAM and BOTTOM ASH POND COMPLEX JOHN AMOS PLANT ST. ALBANS, WEST VIRGINIA June 2015 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO

2

3

4 2015 INSPECTION REPORT REV 1 BOTTOM ASH COMPLEX JOHN AMOS PLANT ST. ALBANS, WV TABLE OF CONTENT 1 INTRODUCTION SUMMARY OF VISUAL OBSERVATIONS GENERAL BOTTOM ASH POND COMPLEX POND COMPLEX CAPACITY AND DEPTH DATA ASSESSMENT OF INSTRUMENTATION DATA CONCLUSIONS AND RECOMMENDATIONS RECOMMENDATIONS THAT REQUIRE ATTENTION BEYOND REGULAR MAINTENANCE ACTIVITIES RECOMMENDATIONS REGARDING ROUTINE MAINTENANCE ITEMS... 5 Appendix A Inspection Photos Appendix B Figures NOTE: REVISION 1 SUPPLEMENTAL DATA ADDED ON MAY 10 TH, i

5 1 INTRODUCTION AEPSC Civil Engineering administers AEPSC s (American Electric Power Service Corporation) Dam Inspection and Maintenance Program (DIMP). As part of DIMP, staff from the Geotechnical Engineering Section conducts dike and dam inspections annually. This report presents a summary of the inspection and assessment of the condition of the ash disposal facilities at the John Amos plant. The 2015 dam and dike inspection at the Amos fly ash dam and the bottom ash complex was conducted by Mr. J.T. Massey-Norton on June 4 th, Mr. Rich Fuller served as the project facility contact and was present during the inspection. Weather conditions were overcast with a mixture of rain and snow, with temperatures ranging from a low of 65 F to a high of 75 F. There was intermittent precipitation on the proceeding day of inspection and 0.3 accumulative rainfall during the seven day period prior to the inspection. The Bottom Ash Complex consists of Bottom Ash Pond 1A (BAP-1A), Bottom Ash Pond 1B (BAP-1B), Reclaim Water pond (RCWP) Area 3and the Treatment pond (TP). The Main Perimeter Dike is located on three sides of the impoundment and grades into native ground along the southern boundary. The BAP-1B pond is bounded on the west by the filled former sedimentation pond and on the east by the BAP-1A. A splitter dike separates the BAP-1A and BAP-1B and the Reclaim Water pond. Figure 1 (aerial image plan view) illustrates the bottom ash pond complex. 2 SUMMARY OF VISUAL OBSERVATIONS 2.1 GENERAL This summary of the visual observations uses terms to describe the general appearance or condition of an observed item, activity or structure. The meaning of these terms is as follows: Good: A condition or activity that is generally better or slightly better than what is minimally expected or anticipated from a design or maintenance point of view.

6 Fair or Satisfactory: A condition or activity that generally meets what is minimally expected or anticipated from a design or maintenance point of view. Poor: A condition or activity that is generally below what is minimally expected or anticipated from a design or maintenance point of view. Minor: A reference to an observed item (e.g., erosion, seepage, vegetation, etc.) where the current maintenance condition is below what is normal or desired, but which is not currently causing concern from a structure safety or stability point of view. Significant: A reference to an observed item (e.g. erosion, seepage, vegetation, etc.) where the current maintenance program has neglected to improve the condition. Usually, conditions that have been previously identified in the previous inspections, but have not been corrected. Excessive: A reference to an observed item (e.g., erosion, seepage, vegetation, etc.) where the current maintenance condition is above or worse than what is normal or desired, and which may have affected the ability of the observer to properly evaluate the structure or particular area being observed or which may be a concern from a structure safety or stability point of view. 2.2 BOTTOM ASH POND COMPLEX The visual inspection indicated that the Bottom Ash Pond is classified as begin in good condition and is documented with the following visual observation of key features that pertain to dam safety. 1. The crest of the main perimeter dike was observed to be in good condition. No significant settlement, misalignment, erosion, or seepage could be observed on the crest or the slopes of the main perimeter dike (Photos 1, 2, 3). 2

7 2. A riprap revetment had been placed on the downstream toe of the main perimeter dike at the Reclaim and Treatment ponds to control erosion due to minor seepage along this area, reported in the previous inspection (Photo4). Minor seepage (approximate area 2ft x 5ft) discharging less than 0.1gpm was observed near the toe of the riprap area. 3. The inboard slope of the main perimeter dike exhibited a good vegetative cover. There were no visual signs of misalignment, settlement, sloughing, erosion, or bulging that would indicate any instability within the dike (Photo 5). 4. No erosion or seepage was noted along the pipe that extends out from outboard slope of the Main Perimeter dike at the Reclaim pond (Photo 6). A sounding test performed in 2010 on the accessible portion of the pipe did not reveal any change in the thickness of the wall thickness that would be an indication of internal corrosion of the pipe. This pipe was permanently abandoned by welding a steel plate at the discharge end of the pipe. 5. The vegetative cover on the inboard slope was also controlled by timely mowing. Drains (4 inch diameter HDPE) from the block wall were unobstructed and no erosion was noted downstream (Photo 7). 6. No settlement, misalignment or other defects were observed for the 2 emergency spillways (Photos 8). The inlet and outlet to both emergency pipes were observed to be in good condition (Photos 9 and 10). 7. The primary decant structure (outfall 003) was observed to be in excellent condition and a trash rack has been added to the structure (Photos 11). No concrete spalling or other defects were observed at the upstream decant structure or the downstream headwall where the effluent discharges into the Kanawha River. Flow from the pond is discharged thru the submerged diffuser. (Photos 12 and 13). Photo 30 also shows the discharge at the headwall from the storm water pond The staff gage in the Reclaim Pond measures the depth of the water in the pond but does not show the water elevation with respect to the sea level (Photo 14). 3

8 2.3 POND COMPLEX CAPACITY AND DEPTH DATA Based on the previous measurements and estimates and operational variation in the pond system, the capacity and volume estimates for the bottom ash ponds are provided below: Maximum Minimum Present* Pond Media Depth/Elevation ( feet) Water NA/NA NA/NA 6/580 Bottom Ash 1A Solid NA/NA** NA/ NA 14/574 Water NA / NA NA / NA 5/581 Bottom Ash 1B Solid NA / NA** NA / NA 16/576 Capacity (acre-feet) Pond Water Solid Total Bottom Ash 1A Bottom Ash 1B NA Not Available *Date of measurement May 6 th, 2015 ** Assumes base of impoundment to be at an elevation of 560 ft. based on design drawings. 3 ASSESSMENT OF INSTRUMENTATION DATA In 2005 four piezometers were installed in the main perimeter dike, three on the crest and one at the toe. Currently, only the crest piezometers are monitored as a part of the inspection program. The piezometric water levels have been relatively constant with no unusual fluctuations (Figure 2). The March15th, 2015 static water level measurements reflect a sudden spring snowmelt which increased Kanawha River stages with a corresponding increase in piezometric levels. 4 CONCLUSIONS AND RECOMMENDATIONS Visual inspection of the bottom ash pond performed on June 4 th, 2015 and a review of the instrumentation data along with the plant inspection reports did not reveal any adverse or significant condition that would raise concerns on the stability and safety of the facilities. Routine inspections, monitoring, and maintenance by plant personnel should continue. A site 4

9 specific summary of conclusions and recommendations of the visual inspection is presented in the following sections. 4.1 RECOMMENDATIONS THAT REQUIRE ATTENTION BEYOND REGULAR MAINTENANCE ACTIVITIES 1. The plant should install easily readable staff gages in all the ponds that are a part of the bottom ash disposal facility. Pond stage levels should be monitored and recorded during the regular inspections. 2. The pond water level elevations along the main perimeter dike is a key element that is used in conjunction with the piezometric data in interpreting the phreatic surface through the dike. It is recommended that the piezometer that has been installed at the toe of the embankment should also be monitored. This location may require a small walk way to be installed over the rip rap to access the piezometer. 4.2 RECOMMENDATIONS REGARDING ROUTINE MAINTENANCE ITEMS 1. Plant personnel should continue to perform maintenance as currently scheduled. 2. Plant personnel should perform monthly measurements of the four piezometers. 3. Plant personnel should implement and document weekly inspections of the bottom ash perimeter dike. In general, routine inspections, monitoring, and maintenance by plant personnel should continue. AEPSC Geotechnical Engineering Section will continue to inspect the facilities on an annual basis. If you have any questions with regard to this report, please contact J.T. Massey-Norton at (audinet ) or Gary F. Zych (audinet ). 5

10 APPENDIX A INSPECTION PHOTOS 6

11 Photo 1. Photo of the perimeter dike. No cracks, sloughing, bulges, erosion or other defects were observed. Photo 2. Photo of the exterior embankment along the Reclaim Pond showing established vegetation. No erosion, bulges or other signs of slope instability were observed.

12 Photo 3. Photo of the perimeter dike along the bottom ash pond 1A. Vegetation is well established and controlled. Photo 4. Typical view of rip rap along the outboard toe of the reclaim pond. View also shows the backwater area of Bills Creek. Minor seepage along the toe of the rip rap area was observed.

13 Photo 5. Typical view of the inboard slope and block wall. Photo 6. Typical view of the abandoned steel pipe along the outboard slope of the reclaim pond. A steel plate is welded to the end of the pipe.

14 Photo 7. Typical view of the outboard slope and 4 inch diameter HDPE drain pipe. Photo 8. Photo of emergency spillway pipe from bottom ash pond 1B.

15 Photo 9. Photo of emergency spillway pipe headwall from bottom ash pond 1B. Photo 10. View of the (downstream outlet) showing the addition of an animal guard / trash rack for the 36 inch diameter HDPE emergency spillway pipe.

16 Photo 11. View of the primary decant structure (upstream inlet) showing the unobstructed flow through the trash rack with effluent discharge into the elliptical 24 x 38 concrete pipe. Photo 12. View of the primary outfall structure (#003) showing the 6 inch diameter vent pipe.

17 Photo 13. View of the primary outfall structure (#003) showing the transition from the 24 x 38 concrete elliptical pipe to the 36 inch diameter steel pipe. The flange connection from the steel pipe to the 36 inch diameter HDPE is also partially exposed and showed no indication of leakage. The 36 diameter pipe conveys the effluent discharged from the bottom ash pond to 6 diffuser ports submerged along the bottom of the Kanawha River. Photo 14 Typical view of the reclaim pond showing the pond s staff gage. The numeric readings on the staff gage indicate a depth of water within the pond as opposed to a water level elevation.

18 APPENDIX B FIGURES 7

19 1

20 Water Level (ft) Figure 2 Amos Plant Bottom Ash Pond Piezometers B -1 B-3 B /10/06 02/22/08 07/06/09 11/18/10 04/01/12 08/14/13 12/27/14 05/10/16 Date

AMERICAN ELECTRIC POWER (SWEPCO)

AMERICAN ELECTRIC POWER (SWEPCO) 2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION

More information

2016 ANNUAL DAM AND DIKE INSPECTION REPORT. Bottom Ash Ponds. Rockport Plant Spencer County, Indiana. December 6 th, 2016

2016 ANNUAL DAM AND DIKE INSPECTION REPORT. Bottom Ash Ponds. Rockport Plant Spencer County, Indiana. December 6 th, 2016 2016 ANNUAL DAM AND DIKE INSPECTION REPORT Bottom Ash Ponds Rockport Plant Spencer County, Indiana December 6 th, 2016 Prepared for: Indiana Michigan Power Company Rockport Plant 2791 North US 231 Rockport,

More information

AMERICAN ELECTRIC POWER (SWEPCO)

AMERICAN ELECTRIC POWER (SWEPCO) 2015 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-15-034 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION

More information

2017 Annual Dam and Dike Inspection Report

2017 Annual Dam and Dike Inspection Report 2017 Annual Dam and Dike Inspection Report Bottom Ash Pond Complex Mitchell Plant Wheeling Power Company & Kentucky Power Company Marshall County, West Virginia October 20, 2017 Prepared by: American Electric

More information

2016 Annual Dam and Dike Inspection Report

2016 Annual Dam and Dike Inspection Report 2016 Annual Dam and Dike Inspection Report Fly Ash Pond John E. Amos Plant Appalachian Power Co. Putnam County, West Virginia November, 2016 Prepared for: Appalachian Power Co. 1530 Winfield Rd Winfield,

More information

2018 Annual Dam and Dike Inspection Report

2018 Annual Dam and Dike Inspection Report 218 Annual Dam and Dike Inspection Report Bottom Ash Pond Northeastern 3&4 Plant Public Service Company of Oklahoma Oologah, Oklahoma September 218 Prepared for: Public Service Company of Oklahoma Northeastern

More information

2016 DAM AND DIKE INSPECTION REPORT CCR PONDS COMPLEX

2016 DAM AND DIKE INSPECTION REPORT CCR PONDS COMPLEX 2016 DAM AND DIKE INSPECTION REPORT CCR PONDS COMPLEX GERS-16-168 OKLAUNION POWER STATION VERNON, TEXAS PREPARED BY AEP SERVICE CORPORATION CIVIL ENGINEERING DIVISION GEOTECHNICAL ENGINEERING SECTION 1

More information

2017 ANNUAL DAM AND DIKE INSPECTION REPORT

2017 ANNUAL DAM AND DIKE INSPECTION REPORT 2017 ANNUAL DAM AND DIKE INSPECTION REPORT ASH PONDS WELSH POWER PLANT CASON, TEXAS November, 2017 Prepared by: American Electric Power Service Corporation 1 Riverside Plaza Columbus, OH 43215 GERS-17-067

More information

2017 ANNUAL DAM AND DIKE INSPECTION REPORT

2017 ANNUAL DAM AND DIKE INSPECTION REPORT 2017 ANNUAL DAM AND DIKE INSPECTION REPORT CCR PONDS COMPLEX OKLAUNION POWER STATION VERNON, TEXAS November, 2017 Prepared by: American Electric Power Service Corporation 1 Riverside Plaza Columbus, OH

More information

2015 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2015 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO 2015 LANDFILL INSPECTION REPORT GERS-15-021 CARDINAL PLANT BRILLIANT, OHIO PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Cardinal Plant Landfill Inspection

More information

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO 2016 LANDFILL INSPECTION REPORT GERS-16-004 CARDINAL PLANT BRILLIANT, OHIO PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Cardinal Plant Landfill Inspection

More information

DTE Energy St. Clair Power Plant

DTE Energy St. Clair Power Plant DTE Energy St. Clair Power Plant Unit 6 Scrubber Basins CCR Rule Compliance Project Annual Inspection Report - 2017 Project Number: 60546402 June 30, 2017 Prepared by: 27777 Franklin Road, Suite 2000 Southfield,

More information

2016 Annual Dam and Dike Inspection Report

2016 Annual Dam and Dike Inspection Report 21 Annual Dam and Dike Inspection Report Fly Ash Pond and Bottom Ash Pond Complex Big Sandy Plant Kentucky Power Lawerance County, KY December 9, 21 Prepared for: Kentucky Power Big Sandy Plant Louisa,

More information

VICINITY MAP AND SITE MAP. Page 1 of 9

VICINITY MAP AND SITE MAP. Page 1 of 9 INTRODUCTION... 2 1. Background Information of West Bottom Ash Pond (BAP)... 2 1.1 Facility Location Description...2 1.2 Description of West BAP CCR Unit...2 1.2.1 Embankment Configuration...2 1.2.2 Construction

More information

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10 Table of Contents 1.0 Introduction...4 2.0 Description of Landfill...4 3.0 Review of Available Information...5 4.0 Inspection...5 4.1 Changes in Geometry since Last Inspection...5 4.2 Volume...5 4.3 Definitions

More information

2017 Annual Landfill Inspection Report

2017 Annual Landfill Inspection Report 2017 Annual Landfill Inspection Report Ash Landfill Welsh Plant American Electric Power Service Corporation (SWEPCO) Cason, Texas November 17, 2017 Prepared for: SWEPCO. Prepared by: American Electric

More information

DTE Energy Monroe Power Plant

DTE Energy Monroe Power Plant DTE Energy Monroe Power Plant Inactive Bottom Ash Impoundment CCR Rule Compliance Project Annual Inspection Report - 2018 Project Number: 60516675 September 7, 2018 Prepared by: 27777 Franklin Road, Suite

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio

2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio Prepared for: FirstEnergy Generation, LLC 76 South Main St Akron, Ohio 44308 2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio Prepared by: 10211 Wincopin Circle, Floor 4 Columbia,

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Plant Hammond Site Location: Site Address:

More information

2016 ANNUAL DAM AND DIKE INSPECTION REPORT

2016 ANNUAL DAM AND DIKE INSPECTION REPORT 2016 ANNUAL DAM AND DIKE INSPECTION REPORT Fly Ash Dams 1, 2 & Bottom Ash Pond Complex Cardinal PLANT BRILLIANT, OHIO December, 2016 Prepared for: Cardinal Operating Company Brilliant, Ohio Prepared by:

More information

McElroy s Run Impoundment Coal Combustion Residual Annual Report

McElroy s Run Impoundment Coal Combustion Residual Annual Report Allegheny Energy Supply Company, LLC A FirstEnergy Company Pleasants Power Station Pleasants County, West Virginia GAI Project Number: C150917.01 January 2016 Prepared for: Allegheny Energy Supply Company,

More information

Annual Inspection Report CCR Surface Impoundment. MidAmerican Energy Company, Louisa Generating Station

Annual Inspection Report CCR Surface Impoundment. MidAmerican Energy Company, Louisa Generating Station Annual Inspection Report CCR Surface Impoundment MidAmerican Energy Company, Louisa Generating Station Final January 15, 2016 Annual Inspection Report CCR Surface Impoundment Prepared for MidAmerican Energy

More information

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9 Table of Contents 1.0 Introduction...4 2.0 Description of Landfill...4 3.0 Review of Available Information...5 4.0 Inspection...5 4.1 Changes in Geometry since Last Inspection...5 4.2 Volume...5 4.3 Definitions

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Pond 21, Pond 22, Pond 23 & WWSP Oklaunion Power Station Vernon, Texas October, 2016 Prepared for: Public Service Company of Oklahoma Prepared by: American

More information

2018 Annual Landfill Inspection Report

2018 Annual Landfill Inspection Report 2018 Annual Landfill Inspection Report ortheastern Plant Landfill Public Service Company of Oklahoma Oolagah, OK October 5, 2018 Prepared for: Public Service Company of Oklahoma ortheastern Plant Prepared

More information

McElroy s Run Impoundment Structural Stability Assessment Report

McElroy s Run Impoundment Structural Stability Assessment Report Allegheny Energy Supply Company, LLC A FirstEnergy Company Pleasants Power Station Pleasants County, West Virginia October 2016 Prepared for: Allegheny Energy Supply Company, LLC A FirstEnergy Company

More information

CCR Rule Annual Inspection Report 2

CCR Rule Annual Inspection Report 2 Inspection Description An ARCADIS team performed the Trimble County Gypsum Storage Pond (GSP) 2015 annual inspection by a qualified professional engineer. The overall goal of the inspection was to ensure

More information

Pond Closure - Case Study[TP1]

Pond Closure - Case Study[TP1] 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Pond Closure - Case Study[TP1] By Pedro J Amaya, P.E. (1) (1) Civil Engineering and Geotechnical Engineering

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Owner: Address:

More information

Jim Bridger Power Plant

Jim Bridger Power Plant 2015 Coal Combustion Residuals Annual Inspection Jim Bridger Power Plant Industrial Landfill Prepared for PacifiCorp Energy North Temple Office 1407 West North Temple Salt Lake City, Utah 84116 Final December

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) East and West Bottom Ash Pond Pirkey Plant Hallsville, Texas October, 2016 Prepared for: Southwest Electric Power Company (SWEPCO) - Pirkey Plant Hallsville,

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116 (i) Site Name and Ownership Information: HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY Site Name: Site Location: Site Address: Owner: Owner Address:

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company POST CLOSURE PLAN CFR 257.104(d) Pond 1 Clinch Power Plant Russell County, West Virginia November 2016 Prepared for: Appalachian Power Company Prepared by: Amec Foster Wheeler Environment & Infrastructure,

More information

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan) A. B. Brown History of Construction 40 CFR 257.73 (c) (i.) (ii.) (iii.) Owner Name: Southern Indiana Gas and Electric Company dba Vectren Power Supply Owner Address: One Vectren Square, PO Box 209, Evansville,

More information

Annual Inspection Report North CCR Surface Impoundment. MidAmerican Energy Company, Walter Scott Energy Center

Annual Inspection Report North CCR Surface Impoundment. MidAmerican Energy Company, Walter Scott Energy Center Annual Inspection Report North CCR Surface Impoundment MidAmerican Energy Company, Walter Scott Energy Center Rev 0 July 2018 Annual Inspection Report North CCR Surface Impoundment Prepared for MidAmerican

More information

CLOSURE PLAN. CFR (b) Document No. GERS Stingy Run Flyash Pond. Gavin Plant Cheshire, Ohio. October, 2016

CLOSURE PLAN. CFR (b) Document No. GERS Stingy Run Flyash Pond. Gavin Plant Cheshire, Ohio. October, 2016 CLOSURE PLAN CFR 257.102(b) Stingy Run Flyash Pond Gavin Plant Cheshire, Ohio October, 2016 Prepared for: AEP Generation Resources Gavin Plant Cheshire, Ohio Prepared by: American Electric Power Service

More information

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0 Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 257.83

More information

Coal Combustion Facility Assessment Report. October 20, 2010

Coal Combustion Facility Assessment Report. October 20, 2010 Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians

More information

Naughton Power Plant

Naughton Power Plant 2017 Coal Combustion Residuals Annual Inspection Naughton Power Plant North Ash Pond Prepared for PacifiCorp Energy North Temple Office 1407 West North Temple Salt Lake City, Utah 84116 November 29, 2017

More information

TVA Colbert Fossil Facility Ash Disposal Pond 4

TVA Colbert Fossil Facility Ash Disposal Pond 4 2011 World of Coal Ash (WOCA) Conference May 9-12, 2011 in Denver, CO, USA http://www.flyash.info/ TVA Colbert Fossil Facility Ash Disposal Pond 4 Improving Operations While Preparing for Closure May 10,

More information

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Coal Combustion Residuals Unit Structural Stability Assessment

Coal Combustion Residuals Unit Structural Stability Assessment Coal Combustion Residuals Unit Structural Stability Assessment Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number: C1500035.00

More information

Active Coal Combustion Residuals Landfill Annual Inspection Escalante Generating Station

Active Coal Combustion Residuals Landfill Annual Inspection Escalante Generating Station REPORT Active Coal Combustion Residuals Landfill Annual Inspection Escalante Generating Station Submitted to: Tri-State Generation and Transmission Association, Inc. 1100 West 116th Avenue Westminster,

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

POST CLOSURE PLAN. CFR (d) Bottom Ash Pond Complex. Cardinal Plant. Brilliant, Ohio. September, 2016

POST CLOSURE PLAN. CFR (d) Bottom Ash Pond Complex. Cardinal Plant. Brilliant, Ohio. September, 2016 POST CLOSURE PLAN CFR 257.104(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio September, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Suitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion.

Suitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

Visual Inspection Checklist

Visual Inspection Checklist APPENDIX Q. Visual Inspection Checklist Thispageintentionallyleftblank. VISUAL INSPECTION CHECKLIST CITY OF AUBURN PUBLIC WORKS DEPARTMENT INSPECTION YEAR: TYPE OF INSPECTION: (Informal, Regular, Formal):

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 2 (AP-2) GEORGIA POWER COMPANY

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 2 (AP-2) GEORGIA POWER COMPANY HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 2 (AP-2) GEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Owner: Address:

More information

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0 Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 257.83

More information

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report Green CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report January 11, 2018 Prepared By: Project ID: 170138B Big Rivers

More information

Run-on and Run-off Control System Plan

Run-on and Run-off Control System Plan Run-on and Run-off Control System Plan SWEPCO John W. Turk, Jr. Power Plant Fulton, Arkansas Permit No. 0311-S3N-R1 AFIN: 29-00506 October 2016 Terracon Project No. 35167133 Prepared for: SWEPCO 3711 Highway

More information

Annual Inspection Report Jeffrey Energy Center Flue Gas Desulfurization (FGD) Landfill

Annual Inspection Report Jeffrey Energy Center Flue Gas Desulfurization (FGD) Landfill Annual Inspection Report Jeffrey Energy Center Flue Gas Desulfurization (FGD) Landfill Prepared for: Westar Energy Jeffrey Energy Center St. Marys, Kansas Prepared by: APTIM Environmental & Infrastructure,

More information

VISUAL SITE INSPECTION REPORT

VISUAL SITE INSPECTION REPORT VISUAL SITE INSPECTION REPORT - 2016 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00318 DECEMBER 20, 2016 PREPARED

More information

CCR Rule Operating Criteria Closure Plan

CCR Rule Operating Criteria Closure Plan CCR Rule Operating Criteria 257.102 Closure Plan FGD Pond 2 Jim Bridger Plant Point of Rocks, Wyoming PREPARED FOR PacifiCorp 1407 West North Temple Salt Lake City, UT 84116 (801) 521-0376 Fax (801) 220-4748

More information

APPENDIX III Hydrologic and Hydraulic Evaluations

APPENDIX III Hydrologic and Hydraulic Evaluations APPENDI III Hydrologic and Hydraulic Evaluations Hydrologic and Hydraulic Analysis Related to Compliance Requirements South Fly Ash Pond, Boiler Slag Pond and Clearwater Pond Kyger Creek Power Plant, Gallia

More information

Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information

Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information Name of Dam: Inspection Date: Current Weather: Weather During Last Week: Name of Creek,

More information

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report Green CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report January 10, 2017 Prepared By: Project ID: 160122B Big Rivers

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

Fly Ash Reservoir II Dam Initial Safety Factor Assessment. Cardinal Power Plant Brilliant, Ohio S&ME Project No A

Fly Ash Reservoir II Dam Initial Safety Factor Assessment. Cardinal Power Plant Brilliant, Ohio S&ME Project No A Fly Ash Reservoir II Dam Initial Safety Factor Assessment Cardinal Power Plant Brilliant, Ohio S&ME Project No. 7217-15-006A Prepared for: American Electric Power 1 Riverside Plaza, 22 nd Floor Columbus,

More information

Limited Visual Dam Safety Inspections OA Wahiawa Dam. Oahu, Hawaii

Limited Visual Dam Safety Inspections OA Wahiawa Dam. Oahu, Hawaii Limited Visual Dam Safety Inspections OA00017 Wahiawa Dam Oahu, Hawaii Prepared by: U.S. ARMY CORPS OF ENGINEERS HONOLULU DISTRICT STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES May 2006 Dam

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT MCMANUS ASH POND A (AP-1) 40 CFR (c)(1)(i)-(xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT MCMANUS ASH POND A (AP-1) 40 CFR (c)(1)(i)-(xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.73(c)(1)(i)-(xii) (i) Site Name and Ownership Information: Site Name: Site Location: Site Address:

More information

Pleasants Power Station Landfill Coal Combustion Residual 2017 Annual Report

Pleasants Power Station Landfill Coal Combustion Residual 2017 Annual Report Allegheny Energy Supply Company, LLC A FirstEnergy Company Pleasants County, West Virginia December 2017 Prepared for: Allegheny Energy Supply Company, LLC A FirstEnergy Company 800 Cabin Hill Drive Greensburg,

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION NEW CASTLE COUNTY DEPARTMENT OF LAND USE ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION For Permanent Structures, pursuant to Delaware Pond Code 378 and Delaware Sediment and

More information

CCR Annual Inspection (b) for the West Ash Pond at the F. B. Culley Generating Station. Revision 0

CCR Annual Inspection (b) for the West Ash Pond at the F. B. Culley Generating Station. Revision 0 Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 257.83

More information

Types of Inspections. Prior to Inspection. Types of Inspections. Typical Inspection Equipment. Embankment Dams

Types of Inspections. Prior to Inspection. Types of Inspections. Typical Inspection Equipment. Embankment Dams BIA Summer Water Resources Training Dam Safety Inspections Part 4 - Inspections July 28, 2012 Presented by Michael Johnson, Ph.D., P.E. Types of Inspections Periodic Inspections A comprehensive visual

More information

POST CLOSURE PLAN. CFR (d) GERS Landfill. Mitchell Power Plant Marshall County, West Virginia. October, 2016

POST CLOSURE PLAN. CFR (d) GERS Landfill. Mitchell Power Plant Marshall County, West Virginia. October, 2016 POST CLOSURE PLAN CFR 257.104(d) Landfill Mitchell Power Plant Marshall County, West Virginia October, 2016 Prepared for: Wheeling Power Company & Kentucky Power Company Prepared by: American Electric

More information

ALLIANT ENERGY INTERSTATE POWER AND LIGHT OTTUMWA GENERATING STATION CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT.

ALLIANT ENERGY INTERSTATE POWER AND LIGHT OTTUMWA GENERATING STATION CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT. ALLIANT ENERGY INTERSTATE POWER AND LIGHT OTTUMWA GENERATING STATION CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT January 15, 2016 EXECUTIVE SUMMARY This annual inspection report has been prepared

More information

Dam Safety Inspection Checklist

Dam Safety Inspection Checklist Dam Safety Inspection Checklist Complete All Portions of This Section (Pre-inspection) Date of Inspection: Name of Dam: EAP: (yes, no) OM&I: (yes, no) File Number: Review Inventory - Highlight missing

More information

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Sediment Control Practices

Sediment Control Practices Sediment Control Practices SMP-05 Temporary Diversions, Berms or Ditches Symbol TD Description These temporary drains offer features such as conveyance for runoff down cut or fill slopes, subsurface drains

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

1.1 Background Facility Description REVIEW OF AVAILABLE INFORMATION Information Reviewed... 2

1.1 Background Facility Description REVIEW OF AVAILABLE INFORMATION Information Reviewed... 2 Table of Contents 1.0 INTRODUCTION... 1 1.1 Background... 1 1.2 Facility Description... 1 2.0 REVIEW OF AVAILABLE INFORMATION... 2 2.1 Information Reviewed... 2 2.2 Changes in Facility Geometry... 2 2.3

More information

Dam Safety Surveillance. Templates for very low, low consequence category dams

Dam Safety Surveillance. Templates for very low, low consequence category dams Dam Safety Surveillance Templates for very low, low consequence category dams The State of Victoria Department of Environment, Land, Water and Planning 2015 This work is licensed under a Creative Commons

More information

POST CLOSURE PLAN. CFR (d) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

POST CLOSURE PLAN. CFR (d) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016 POST CLOSURE PLAN CFR 257.104(d) East and West Bottom Ash Ponds Pirkey Power Plant Hallsville, Texas October, 2016 Prepared for: Southwest Electric Power Company Pirkey Power Plant Hallsville, Texas Prepared

More information

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B. EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE

More information

Harrison Landfill Run-on and Run-off Control System Plan

Harrison Landfill Run-on and Run-off Control System Plan Harrison Landfill Run-on and Run-off Control System Plan Monongahela Power Company A FirstEnergy Company Harrison Power Station Shinnston, Harrison County, West Virginia October 2016 Prepared for: Monongahela

More information

INSPECTION REPORT. Third Annual RCRA CCR Unit Inspection Report January 2018 WASTE DISPOSAL AREA SURFACE IMPOUNDMENT

INSPECTION REPORT. Third Annual RCRA CCR Unit Inspection Report January 2018 WASTE DISPOSAL AREA SURFACE IMPOUNDMENT INSPECTION REPORT NORTHERN INDIANA PUBLIC SERVICE COMPANY R.M. SCHAHFER GENERATING STATION Third Annual RCRA CCR Unit Inspection Report January 2018 WASTE DISPOSAL AREA SURFACE IMPOUNDMENT Submitted To:

More information

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0 Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 257.83

More information

VISUAL SITE INSPECTION REPORT 2018

VISUAL SITE INSPECTION REPORT 2018 VISUAL SITE INSPECTION REPORT 2018 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00614 January 9, 2019 PREPARED

More information

4.4.6 Underground Detention

4.4.6 Underground Detention 4.4.6 Underground Detention Limited Application Water Quality BMP Description: Detention storage located in underground pipe systems or vaults designed to provide water quantity control through detention

More information

2017 Annual Surface Impoundment Inspection

2017 Annual Surface Impoundment Inspection 2017 Annual Surface Impoundment Inspection Cell 3 Prepared for Minnkota Power Cooperative, Inc. Milton R. Young Station January 2018 2017 Annual Surface Impoundment Inspection Cell 3 Prepared for Minnkota

More information

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety NAME OF DAM: Milltown Dam DEPDAMNO.: 15-146 LOCATION: Municipality: East Goshen Township

More information

POST CLOSURE PLAN. CFR (d) GERS Fly Ash Pond. Big Sandy Plant Louisa, Kentucky. October, 2016

POST CLOSURE PLAN. CFR (d) GERS Fly Ash Pond. Big Sandy Plant Louisa, Kentucky. October, 2016 POST CLOSURE PLAN CFR 257.104(d) Fly Ash Pond Big Sandy Plant Louisa, Kentucky October, 2016 Prepared for : Kentucky Power Big Sandy Plant Louisa, Kentucky Prepared by: American Electric Power Service

More information

ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT. January 15, 2016

ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT. January 15, 2016 ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT January 15, 2016 EXECUTIVE SUMMARY This annual inspection report has been prepared in accordance

More information

NAUGHTON FGD POND 4 STRUCTURAL STABILITY ASSESSMENT

NAUGHTON FGD POND 4 STRUCTURAL STABILITY ASSESSMENT NAUGHTON FGD POND 4 STRUCTURAL STABILITY ASSESSMENT Prepared for: PacifiCorp, Naughton Power Plant Project Manager: Chad Tomlinson Date: 01 September 2016 Document No.: NP-TR-014 Quality Assurance Statement

More information

Emergency Action Plan for Coal Combustion Residuals Unit

Emergency Action Plan for Coal Combustion Residuals Unit Emergency Action Plan for Coal Combustion Residuals Unit J. R. Whiting Facility 22581014.00 Prepared for Consumers Energy Company April 2017 Barr Engineering Co. 3005 Boardwalk Street, Suite 100 Ann Arbor,

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals

More information

Types of Inspections

Types of Inspections BIA Summer Water Resources Training Dam Safety Inspections Part 4 - Inspections July 28, 2012 Presented by Michael Johnson, Ph.D., P.E. Types of Inspections Periodic Inspections A comprehensive visual

More information

Coal Combustion Residuals Inflow Design Flood Control System Plan

Coal Combustion Residuals Inflow Design Flood Control System Plan gaiconsultants.com I transforming ideas into reality., Coal Combustion Residuals Inflow Design Flood Control System Plan Virginia Electric and Power Company Possum Point Power Station Surface Impoundment

More information

CCR Certification: Initial Structural Stability Assessment (d)

CCR Certification: Initial Structural Stability Assessment (d) Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 CCR

More information

VIA . September 19, Mr. Jeffrey Maxted Alliant Energy Sr. Environmental Specialist 4902 North Biltmore Lane Madison, WI

VIA  . September 19, Mr. Jeffrey Maxted Alliant Energy Sr. Environmental Specialist 4902 North Biltmore Lane Madison, WI 932 N. Wright Street, Suite 160, Naperville, IL 60563 Phone (877) 630-7428 www.hardhatinc.com VIA EMAIL September 19, 2016 Mr. Jeffrey Maxted Alliant Energy Sr. Environmental Specialist 4902 North Biltmore

More information