New Gold Inc. Independent Third Party Review. Dam Safety Inspection Report. November 2014 M09783A04.730

Size: px
Start display at page:

Download "New Gold Inc. Independent Third Party Review. Dam Safety Inspection Report. November 2014 M09783A04.730"

Transcription

1 November 2014 M09783A04.730

2 November 28, 2014 New Gold Inc. New Afton Box 948 Stn. Main, Kamloops, British Columbia V2C 5N4 Mr. Scott Davidson Environment and Social Responsibility Manager Dear Mr. Davidson: Please find attached the Third Party Review of the Dam Safety Inspection (DSI) Report for the New Afton Tailings Facilities. The review concludes that the DSI meets the requirements of the Ministry of Mines Guidelines for Annual s and that the consequence classifications for the tailing dams are appropriate. This report documents our review and identifies areas for ongoing improvement. Yours truly, KLOHN CRIPPEN BERGER LTD. Harvey McLeod, P.Eng., P.Geo. Principal HM:cd R 3rd Party Review DSI.docx M09783A Klohn Crippen Berger Ltd Virtual Way Vancouver BC V5M 4X6 CANADA t f

3 Cover.docx M09783A November 2014

4 TABLE OF CONTENTS 1 INTRODUCTION BACKGROUND INFORMATION AND SITE VISIT Site Visit and Document Review Site Visit Document Review Facility Description Site Conditions REVIEW OF DAM SAFETY INSPECTION REPORT General Consequence Classification Review Instrumentation Review Piezometers Settlement Plates and Inclinometers Summary Geotechnical Review Stability Review Seepage Internal Erosion Hydrotechnical Review Mining Dam Considerations REVIEW OF TAILINGS FACILITY STEWARDSHIP General OMS Manual Emergency Preparedness and Response Plan SUMMARY CLOSING List of Tables Table 2.1 Design Documents and Construction Records Review Summary... 7 Table 3.1 Review of MEM Guidelines applicable to the 2014 Draft DSI Table 3.2 Summary of 2014 Piezometer Changes and Threshold Levels Table 4.1 OMS Checklist Table 4.2 Emergency Preparedness and Response Plan Checklist Table 5.1 Summary and Review of Key DSI Recommendations Table 5.2 Summary of 3 rd Party Review Recommendations R 3rd Party Review DSI.docx Page ii

5 TABLE OF CONTENTS (continued) List of Figures Figure 2.1 Orthophoto of New Afton (July 2013, BGC)... 8 List of Appendices Appendix I Appendix II MEM Order and Guidelines for Annual s CDA Consequence Complications R 3rd Party Review DSI.docx M09922A November 2014 Page iii

6 1 INTRODUCTION This report presents the results of an of the Dam Safety Inspection Report (BGC, 2014c) for the New Afton Tailings Storage Facility (TSF). The review included a site visit by the Review Engineer, Mr. Harvey McLeod, P.Eng., P.Geo., accompanied by Mr. David Willms, P.Eng. on November 10, The New Afton Mine is located just west of the city of Kamloops in central British Columbia. The facility consists of a 15,000 tonnes per day underground block cave mine and processing plant, which produces a copper gold concentrate. Tailings are stored within the New Afton tailings impoundment and the adjacent Pothook open pit that was converted to a tailings impoundment. The three cyclone sand impoundment dams (Dam A, Dam B, and Dam C) are currently up to 16.7 m high at centreline and join together for a total length of approximately 2 km. Two rockfill saddle dams (West Dam and South Dam) are up to 23 m high at centreline and are about 170 m long and 280 m long, respectively. The tailings impoundments are regulated under the Mines Act of British Columbia and must comply with the requirements of the Health Safety and Reclamation Code for Mines (HSRC) in BC (BC MEMPR 2008). The requirements related to tailings impoundments in the code include the following: Dams must be designed in accordance with the criteria provided in the Canadian Dam Association, Dam Safety Guidelines (HSRC ). The Operation, Maintenance and Surveillance (OMS) manual must be revised regularly during operations (HRSC10.5.2). Annual (HSRC ) must be carried out and submitted to the Ministry of Mines. The MEM website provides the document Guidelines for Annual Dam Safety Inspection Reports. There must be an Emergency Preparedness Plan for any dam with a consequence classification of High or Very High. (HRSC ). The Ministry of Energy and Mines (MEM) follows the guidance of the Canadian Dam Association, which has also recently published a Technical Bulletin entitled Application of Dam Safety Guidelines to Mining Dams (CDA, 2014). The Mining Dams Bulletin includes the need to consider seepage/groundwater quality impacts and the various stages of a tailings dam The current dam classification under the CDA Guidelines is Very High. The MEM classification under the HSRC is a major impoundment and major dams. KCB have been informed that the Engineer of Record (EOR) for the TSF is BGC Engineering Inc. (BGC), responsible for the design and performance of the New Afton and Pothook tailings facilities, including: 1) dam safety inspections; 2) construction monitoring and quality assurance; 3) instrumentation planning, design and review; and 4) design modifications. Quality control for earthworks construction is being carried out by AMEC Environment and Infrastructure (AMEC) R 3rd Party Review DSI.docx Page 4

7 On August 18, 2014, the Chief Inspector s office of the MEM issued orders (Appendix I) mandating that the 2014 Dam Safety Inspection (DSI) of tailing dams be completed, and that the report be reviewed by a third party Professional Engineer, and submitted by December 1, The order required that an independent party: Assess if the DSI report meets the requirements of MEM; and Review the consequence classification of the dam(s) R 3rd Party Review DSI.docx Page 5

8 2 BACKGROUND INFORMATION AND SITE VISIT 2.1 Site Visit and Document Review Site Visit The site visit was carried out November 10, 2014, and included Mr. Harvey McLeod and Mr. David Willms of KCB, and Mr. Scott Davidson (Environment), Matt Davis (Engineering) and Emily O Hara (Environment) of New Afton. The site tour included inspection of the New Afton and Pothook tailings facilities, as well as the current construction activities. The relevant observations from the site visit include the following: The dams were all in good condition with no evidence of cracking, subsidence or erosion. The water ponds in both the New Afton and Pothook tailings facilities were well below crest level, with over 5 m of freeboard. Sand and gravel stockpiles were in good condition, with no evidence of segregation. Placement of materials was being carried out in an orderly fashion and the materials, from a visual inspection, were suitable for dam fills. Compaction was being carried out with four 10 tonne smooth drum vibratory rollers. Cyclone operations were not active; however, observations of the sand indicated that it was a good clean product, suitable for dam construction. The fine filter and coarse filter zones consisted of well graded sand and fine gravel. Glacial till core material was being screened to 150 mm minus. Reported sinkholes in the right abutment ridge of Pothook Dam appear to be erosion channels and do not appear to be sinkholes that may have developed due to piping. Seepage ponds are small but the dams may high enough to be classified as dams Document Review The documents listed in Table 2.1 were provided to KCB. The review was carried out at a high level to obtain an understanding of the design and site conditions and, as such, does not represent a comprehensive review. Items of interest, relevant to dam safety, are noted R 3rd Party Review DSI.docx Page 6

9 Table 2.1 Design Documents and Construction Records Review Summary Date June 2008 Prepared By Vector Title Design Report for the Tailings Storage Facility at the New Afton Gold & Copper Mine Inspection (I), Design (D) or Construction (C) July 2012 New Gold TSF As Built Report C November 28, 2012 January 31, 2014 (a) March 28, 2014 (b) November 14, 2014 (c) November 14, 2014 (d) March 31, 2014 (a) March 31, 2014 (b) Geo Logic New Afton TSF Dam Audit Memorandum BGC 2013 Record of Construction C BGC BGC BGC New Gold New Gold 2014 (c) New Gold 2013 Annual Inspection Tailings Storage Facility 2014 Annual Inspection Tailings Storage Facility DRAFT New Afton Dam Break and Inundation Assessment Tailings and Water Management Facilities Operation, Maintenance and Surveillance Manual Tailings and Water management Facilities Emergency Preparedness and Response Plan Tailings, Heap Leach and Waste Rock Facilities Management Policy D I I I D Manual Plan Policy Key Items of Interest Dam design Very good QC documentation of Construction. Plans and cross sections Limited information on as built foundations and as built geometry. South and West Dams have redundant filters and drains upstream of the core zone. Fine filter not placed over glacial till. Visual observations. No documentation of construction or monitoring. Very good documentation of QC and construction. Downstream cyclone sand reported 5% fines, upstream 5% to 10%.Fine filter has < 5% fines. Coarse filter is 1 m thick over rockfill and 2 m thick over glacial till Discussion of construction activities and pond level Summary of instrumentation responses Plans and cross sections Discussion of construction activities and pond level Summary of instrumentation responses Inundation Assessment Instrument and pond level thresholds. Key personnel and response plan 2.2 Facility Description The New Afton TSF is located directly to the south of the Afton Pit, and east of the closed Teck TSF. A secondary, and smaller, tailings impoundment is Pothook Pit, located northeast of the New Afton TSF. The facilities are shown in plan on Figure R 3rd Party Review DSI.docx Page 7

10 Approximately 250 m N Pothook TSF Figure 2.1 Orthophoto of New Afton (July 2013, BGC) The New Afton TSF impoundment is formed by a series of dams. Three compacted till starter dams (Dam A, Dam B, and Dam C) were constructed in These dams have subsequently been connected to form one long dam currently up to 16.7 m high at centreline with a total length of approximately 2 km. Three seepage ponds (1, 2, and 3) collect seepage from Dam A, Dam B, and Dam C, respectively. The seepage is pumped back into the impoundment. Two rockfill saddle dams (West Dam and South Dam) are up to 23 m high at centreline and are about 170 m long and 280 m long, respectively., The impoundment covers 92.1 ha and has an up gradient catchment of 36.7 ha. Approximately half of the New Afton TSF is underlain by mine waste rock, which is up to 70 m thick, and was placed during previous mining of the Afton Pit and construction of the Teck TSF. Consequently, a linear low density polyethylene (LLDPE) geomembrane liner was placed over the majority of the New Afton TSF impoundment footprint to prevent excessive seepage and/or piping of R 3rd Party Review DSI.docx Page 8

11 tailings into the rockfill foundation. The dam design cross sections vary and include the following elements: The West and South Dams have a central glacial till core, keyed into the glacial till foundation. Fine filter and coarse filter zones were placed between the glacial till core and both the upstream and downstream rockfill shells. Dam A and Dam B have a central glacial till core, with a downstream chimney filter and compacted cyclone sand shells. Dam C comprises compacted cyclone sand with a LLDPE geomembrane which zigzags on 3H:1V slopes vertically along the centerline. A chimney filter is placed within the downstream cyclone sand shell, just downstream of the centerline. Dams A, B, and C have a blanket drain under the downstream cyclone sand shell. The blanket drain consists of a fine filter overlying a coarse filter, overlying glacial till foundation. Where the foundation is rockfill, a fine filter was placed over the rockfill. The Pothook TSF has a rockfill dam 10 m high at centreline and approximately 350 m long. A LLDPE liner was installed on the upstream face of the dam in 2011 to reduce seepage beneath the dam. Tailings and water are stored in Pothook Pit. Reclaim systems pump water back to the mill for use as process water. The main water reclaim barge is located in the southeast corner of the New Afton TSF and a smaller pump system is installed in Pothook TSF. Water from the seepage recovery ponds are pumped back to the New Afton TSF. 2.3 Site Conditions The New Afton project area is located in the Interior Plateau of British Columbia at an elevation of approximately 720 m above sea level. The climate is semi arid with warm to hot, sunny and dry summers, and mild to cold and dry winters. Average summer temperatures are about 19 C and average winter temperatures are about 6 C. Total annual precipitation is 305 mm. The drainage from the tailings facility is towards Afton Pit and the drainage from the overall site is ultimately towards Kamloops Lake. The area is moderately seismic. The surficial geology consists of a loose surface organic soil, overlying medium dense to dense glacial till (silt sand gravel, with clay). The glacial till can have occasional silty or gravelly interlayers which are typically discontinuous R 3rd Party Review DSI.docx Page 9

12 3 REVIEW OF DAM SAFETY INSPECTION REPORT 3.1 General KCB reviewed the DSI (BGC, 2014c). The document is comprehensive and addresses the MEM Guidelines for Annual DSI Reports and the consequence classification is appropriate. Our general comments are: The report should contain a summary of all recommendations in the document with priority items related to dam safety noted. The representative cross sections should include the measured piezometric levels and foundation soils. The contents of the DSI have been compared against the MEM Guidelines for Annual DSI Reports and the results in Table 3.1. Table 3.1 Review of MEM Guidelines applicable to the 2014 Draft DSI Executive Summary MEM Requirement Consequence Classification of the dam(s) in accordance with Table 2 1 of the CDA Dam Safety Guidelines (2007) Significant changes in instrumentation and/or visual monitoring records Included in 2014 DSI KCB Observations Very High Consequence is appropriate. Consequence categories should be explicitly documented to support the classification. More detail on the instrument locations would be helpful in following the discussion of instrument responses. None. Significant changes to dam stability and/or surface water control OMS Manual Latest revision is March 31, Emergency Preparedness Plan Latest revision is March 31, Scheduled date for the next formal Dam Safety Mid 2017 Review Summary of past years construction (if any) with a description No Construction observations are noted in the of any problems and stabilization Background Information for each dam. Plan and representative cross sections No Appendices for 2014 not received. Plan and cross sections are available in 2013 DSI. Site photographs Review of climate data Water balance review Last water balance update in July Water balance needs to be updated for increased mill throughput and new bathymetry. Freeboard and storage availability (in excess of the design flood) About 5 m freeboard. The design freeboard is 1.1 m. Water discharge system, volumes, and quality N/A Operated as closed facility ; seepage is collected in seepage ponds and pumped back R 3rd Party Review DSI.docx Page 10

13 MEM Requirement Included KCB Observations in 2014 DSI Seepage occurrence and water quality No Seepage discussed but not quantified. Clear seepage noted. Water quality reported by New Gold. Surface water control and surface erosion Routinely monitored. Phreatic surfaces Instrumentation review Phreatic surface not shown but piezometer readings included. Thresholds set according to select piezometer readings but these thresholds appear to be for the ultimate dam. Settlement Settlement plates (no guidelines or thresholds). Lateral movement Inclinometers (no guidelines or thresholds). 3.2 Consequence Classification Review The Canadian Dam Association Dam Safety Guidelines (2007, revised in 2013) provide a classification of dams based on the consequences of failure. The original design report (Vector 2008) assigned a classification of High based on CDA BGC updated the consequence classification based on CDA 2007 and the DSI reports a dam classification of Very High. KCB has reviewed the 2014 Dam Break Inundation Assessment (BGC, 2014d), which was carried out to assess the potential extent of a dam breach under both the sunny day (piping failure of dam with operational water pond) and the rainy day (overtopping under extreme flood conditions). The assessment is appropriate and the breach outflow extent supports the dam consequence classification of Very High. KCB also recommend, for record purposes, that New Afton explicitly document the four main consequence components contributing to the dam classification, as outlined in the 2007 CDA Dam Safety Guidelines: Population at Risk, Incremental Loss of Life, Environmental and Cultural Values, and Infrastructure and Economics (Appendix II). 3.3 Instrumentation Review The DSI (BGC, 2014c) contains a review of the instruments for Over the review period of November 29, 2013 to October 1, 2014 the tailings pond rose about 7 m from about 5726 m (mine grid elevation, which is 5000 m above ground elevation) to about 5733 m. Key observations regarding the instrumentation review are discussed in the following sections Piezometers Threshold values are set for some vibrating wire piezometers. These thresholds are all set at Elevation m (Table 3.2) which was determined for the ultimate dam. This is not appropriate for intermediate stages of construction and the threshold values will need to be modified to reflect the ongoing construction raising. The updated threshold values should be included in the OMS. The locations of the piezometers are not clearly documented or shown in plan and sections, and these details should be added to the piezometer plots to assist in interpretation. The operation fluctuation R 3rd Party Review DSI.docx Page 11

14 range discussed in the OMS Manual states: The Operational Fluctuation Range threshold is exceeded if any aggregate of readings between reviews by the EOR is equal to or exceeds the noted range. If exceeded, action is required. This requires clarification. Observations on the 2014 instrumentation are summarized as follows: Dam A: Piezometer VW29211, which is reported as being in the foundation ; increased approximately 5 m in 2014 and is approximately 1.5 m below pond level. This illustrates a positive hydraulic connection between the pond and the piezometer and it is necessary to provide a clear explanation of its genesis and significance. Dam B: Piezometers VW29220, VW29221 and VW26794, indicate slightly negative pore pressures. VW29221 increased about 1.2 m in July 2014 in response to cyclone sand placement which appears reasonable. Dam C: Piezometer VW29217 increased 6 m in 2014, the genesis and significance of the increased pore pressure should be clearly explained. South Dam, West Dam and Pothook Dam: Piezometer readings are stable and show modest increase with increasing pond level. Table 3.2 Summary of 2014 Piezometer Changes and Threshold Levels Piezometer ID Location Phreatic Surface* (Mine Grid (m)) Threshold Level* (OMS Manual) Operation Fluctuation Range (+/ m) Approximate Range for 2014 (BGC, 2014c) VW29211 Dam A VW29220 Dam B VW29221 Dam B VW29218 Dam B/C VW29214 Dam C VW29216 Dam C VW29217 Dam C *Note that threshold levels are based on the Ultimate Dam height Settlement Plates and Inclinometers Settlement plates and inclinometer plots for the dams at the New Afton TSF and the Pothook TSFindicate that there are no significant deformations of the dams Summary The instrumentation indicates that the structures are behaving according to the expected conditions and do not indicate dam instability. The two anomalies in VW29211 and VW29217, which appear to indicate a positive hydraulic connection with the pond, require further assessment. Low (m) High (m) Range R 3rd Party Review DSI.docx Page 12

15 3.4 Geotechnical Review Stability Review The dams are in good condition and no evidence of cracking, bulging, or deformations were observed during the KCB site visit or reported in the DSI. The dams have a 3H:1V downstream slope and are founded on either competent glacial till, bedrock, or waste rock. KCB have not completed a stability analysis, however, in our opinion this is a robust configuration that would be resistant to static and seismic loading There is some possibility of settling due to the waste rock foundation (under Dam B and Dam C) or due to deformation from the block cave, both of which are well monitored. The dam should be capable of tolerating some displacement Seepage The downstream shell of the dam appears to be well drained. However, the piezometric levels should be plotted on the cross sections and compared to the updated thresholds so it is clear that the phreatic surface is below the point where it would cause instability. With the chimney filter, drainage blanket, and a cycloned sand downstream shell, the probability of instability from a high phreatic surface is low Internal Erosion There was no evidence of piping reported in the DSI or observed on our site visit. Filters are in place against the core to provide protection from piping. The cyclone sand also acts as a filter to prevent fines migration. There is good tie in to the abutments. The probability of piping related instability is very low. 3.5 Hydrotechnical Review The tailings impoundments are operated on a no discharge basis with water recycled to the process plant. In addition to the tailings, the TSF is required to maintain storage for the IDF (0.26 Mm 3 ) which is the Probable Maximum Precipitation (PMP) plus a minimum 0.8 m emergency dam freeboard (BGC 2014c), for a total design freeboard of 1.1 m from the dam crest. In our review of the hydrotechnical components of the 2014 DSI we have the following comments: The pond is being operated with adequate freeboard to meet dam safety requirements. The TSF met storage requirements in 2014 and the 2014 crest elevation should provide storage until the end of 2015 (BGC, 2014c). The pond level threshold for the current dam crest should also be reported in the DSI. The pond thresholds for the dam raise schedule are reported in the OMS Manual R 3rd Party Review DSI.docx Page 13

16 3.6 Mining Dam Considerations The APEGBC Guidelines for Dam Safety Reviews (2014) and the CDA Technical Bulletin for Mining Dams (2014) introduce requirements for consideration of closure and environmental objectives of the dams. The CDA technical bulletin for Mining Dams (2014) recommends higher design criteria for closure passive care, which should be considered in the context of potentially reducing the consequence with a dry landform. This is the current closure plan for New Afton TSF, and is appropriate. Surface water quality is monitored at the following points: Plant Site Pond, Pothook Pit, the New Afton Tailings Storage Facility, Russell Slough, Tailings Perimeter Ditch, Afton Pit, and Muskrat Slough. (New Gold, 2014a) but is reported by New Gold separately from the DSI. Seepage from the TSF ultimately reports to the open pit or underground workings and there is not a concern, at this time, of seepage plumes bypassing the mine area R 3rd Party Review DSI.docx Page 14

17 4 REVIEW OF TAILINGS FACILITY STEWARDSHIP 4.1 General The New Afton and Pothook tailings facilities are well maintained and well documented by New Afton and BGC. New Afton has a good team for managing and constructing the facility; and for providing oversight on the technical, environmental and social aspects of the facilities. The OMS Manual and the EPRP are well documented and procedures are in place to manage and respond to emergencies. 4.2 OMS Manual New Afton has an Operation, Maintenance and Surveillance (OMS) Manual which is comprehensive and was updated in March, In our opinion, the OMS Manual meets the Mining Association of Canada s 2011 guideline for Developing an OMS Manual for Tailings and Water Management Facilities (MAC, 2011). Our observations on the OMS Manual are summarized in Table 4.1. Table 4.1 OMS Checklist Section as per MAC 2011 Included Comments Discussion on preparation of the OMS Manual including: Objectives, team, resources, scheduling, and document control. Roles and responsibilities including: org structure, individual responsibility, competency and training, and managing change Should clearly identify responsibility for TSF including an org chart with individuals responsible for QA, QC, EOR, and Tailings Management. Facility description including: facility overview, site conditions, facility components, regulatory requirements, basis of design and design criteria, construction history, and documents control. Operation of facility including: Objectives, tailings transport and deposition, dam and basin raising, water management, environmental protection, safety and security, documentation, and reporting. Maintenance including: Objective, parameters, routine and predictive maintenance, even driven maintenance, documentation, and reporting Surveillance including: objectives, parameter, and procedures. Thresholds should be defined for intermediate construction phases and operational range should be clarified Emergency Planning and Response 4.3 Emergency Preparedness and Response Plan New Afton has an Emergency Preparedness and Response Plan (EPRP) which is the framework for identifying and responding to emergencies and was updated March, The Health, Safety and Security Department have run desk top trial runs for emergency procedures. In our opinion, the EPRP meets the MEM Guidelines for Mine Emergency Response Plan (MEM, 2013). Our observations on the EPRP are summarized in Table R 3rd Party Review DSI.docx Page 15

18 Table 4.2 Emergency Preparedness and Response Plan Checklist Policy Directive Requirement Included Comments Mine Emergency Response Plan Coordinator and Planning Group Emergency Identification, Prevention and Protection Duties and Responsibilities of Personnel Emergency Notification Plan Emergency Management Organization Emergency Operations Centre Emergency Response Procedures Action Plans Mine Plan and Operation Maps Evacuation Plan and Map of Escape Routes Check in/check out Procedure for Emergencies No Should clearly identify tailings manager. TSF plan only. Consider adding map with all mine operations indicated. Not in EPRP. Maintained by Engineering Coordinator. Mine Rescue Equipment Inventory No Not included Mutual Aid Agreement First Responders Consultation Communication Services Public and Media Relations Training Plan Practice Drills Plan Plan for Review and Updating Costs No R 3rd Party Review DSI.docx Page 16

19 5 SUMMARY The assessment of the physical condition of the dam and associated works is comprehensive and no significant concerns have been identified or observed. Management systems are in pace, including OMS Manual and EPPs. The DSI report is generally compliant with the MEM Guidelines. For reference purposes the recommendations from the executive summary (BGC, 2014c) are summarized in Table 5.1 with comment from KCB. There are other recommendations in the DSI that should be summarized in a table with the status and schedule. Additional recommendations from KCB s Third Party Review are summarized in Table 5.2. Table 5.1 Summary and Review of Key DSI Recommendations Component Recommended Action (BGC, 2104c) KCB Comment Pothook A dam break inundation study should be completed for the Pothook Dam. Minor consequence compared to the New Afton TSF EPRP The EPRP should be updated to include the inundation maps created as part of the dam break inundation study. The recommended edits to the OMS and EPRP should be completed as part of the next revision to these documents planned for the first quarter of TSF The survey monuments removed as part of the 2014 construction activities should be re established as planned, and manual readings of the survey monuments for all dams should be taken monthly following completion of the 2014 construction activities. All instruments should be protected from vehicle traffic with barriers such as Lock Blocks. Pothook/Seepage Pond 1 Dam The vegetation on the Pothook Dam and Seepage Pond 1 Dam should be controlled using the measures utilized successfully at the South and West Dams. Pothook The damage to the LLDPE liner on the Pothook Dam should be completed as soon as possible. Pipelines and equipment should be kept from coming in direct contact with the LLDPE liner on the Pothook Dam. Pothook The Pothook Emergency Spillway assessment and any corresponding changes should be completed. The stability of the overburden along the north rim of the Pothook Pit should be Unlikely that slope failure, if it Pothook assessed. The discharge of water on this slope from the Afton Open Pit should be were to occur, stopped, and an alternate path to the impoundment in the Pothook Pit should be could create a utilized. wave that could overtop the dam TSF The leaking spigot valves on the tailings header pipe upstream of Dam C should be repaired as soon as possible. Procedures for monitoring and criteria for reacting to encroachment of the TSF subsidence zone toward the TSF should be established and incorporated into the OMS Manual R 3rd Party Review DSI.docx Page 17

20 Table 5.2 Summary of 3 rd Party Review Recommendations ID No. Component Recommended Action Schedule KCB14 1 OMS Set annual threshold levels for instrumentation and quantify the + 2 m operational criteria. Q KCB14 2 OMS Prepare a separate organization chart for the TSF that clearly identifies the New Afton Tailings Engineer responsible for the tailings facility. Identify who the person reports to and what other persons report to Q the Tailings Engineer for matters pertaining to the facility. KCB14 3 OMS On an annual basis, name the QA Engineer (e.g. Resident Engineer), who is responsible for QA for construction and signs off on the annual Q As Constructed Report. KCB14 4 DSI Assess the displacement tolerance of the dam and compare to measured displacement identify threshold levels to be included in the Q OMS. KCB14 5 DSI Document genesis and significance of piezometer readings from VW29211 and VW Q KCB14 6 DSI Indicate the location of instrumentation on sections and plans, and plot actual levels on an annual basis. Q KCB14 7 DSI DSI should contain a summary table of all recommendations in the document with the level of importance, schedule and status. Q KCB14 8 Design Document the 4 components of the dam consequence classification. Q Report KCB14 9 Design Review Seepage Ponds to confirm if they should be classified as dams. Q Report KCB14 10 Prepare a Consolidated Design Report that updates all design aspects, Design including: design criteria, stability assessment, design sections and Report geotechnical database. Q R 3rd Party Review DSI.docx Page 18

21

22 REFERENCES Note that additional references are included in Table 2.1. British Columbia Ministry of Energy and Mines (BC MEM) Tailings Dams Independent Review of Dam Safety and Consequence Classification. August 18, British Columbia Ministry of Energy, Mines and Natural Gas Mines and Mineral Resources Division (BC MEM) Mine Emergency Response Plan Guidelines for the Mining Industry. February, British Columbia Ministry of Mines and Petroleum Resources. (BC MEMPR) Health Safety and Reclamation Code for Mines (HSRCM). Canadian Dam Association (CDA) Technical Bulletin Application of Dam Safety Guidelines to Mining Dams. Canadian Dam Association (CDA) Technical Bulletin. Dam Safety Guidelines (update 2013). The Mining Association of Canada (MACC) Developing an Operation, maintenance and Surveillance Manual for Tailings and Water management Facilities R 3rd Party Review DSI.docx Page 20

23 APPENDIX I MEM Order and Guidelines for Annual s R 3rd Party Review DSI.docx M09783A November 2014

24

25

26 Ministry of Energy & Mines GUIDELINES FOR ANNUAL DAM SAFETY INSPECTION REPORTS Reference: Health, Safety and Reclamation Code for Mines in British Columbia (Code) Section : The manager shall submit an annual dam safety inspection report prepared by a professional engineer on the operation, maintenance and surveillance of the tailings and water management facilities and associated dams to the chief inspector. This Code reference applies to every operating and closed mine in BC. The report shall provide the following information: 1. Executive Summary (a) (b) (c) (d) (e) (f) Classification of the dam(s) in terms of Consequence of Failure in accordance with Table 2 1 of the CDA Dam Safety Guidelines (2007). Significant changes in instrumentation and/or visual monitoring records. Significant changes to dam stability and/or surface water control. For major impoundments, as defined in Part 10 of the Code, a current Operation, Maintenance and Surveillance (OMS) Manual is required. The annual report shall indicate the latest revision date of the OMS manual. For tailings dams classified as High, Very High, or Extreme Consequence, an Emergency Preparedness Plan (EPP) is required. The annual report shall indicate the latest revision date of the EPP document. Scheduled date for the next formal Dam Safety Review in accordance with Table 5 1 of the CDA Dam Safety Guidelines (2007). Formal Dam Safety Reviews are required every 5 to 10 years (depending on consequence classification) and differ from annual dam safety inspections. The requirements for Dam Safety Reviews are included in Section 5 of the CDA Dam Safety Guidelines. Dam Safety Reviews may be conducted by the Engineer of Record with third party review, or by an independent third party with involvement of the Engineer of Record.

27 Guidelines for Annual Dam Safety Inspection Reports August Summary of past years' construction (if any) with a description of any problems and stabilization. 3. Plan and representative cross sections. 4. Site photographs. 5. Review of climate data. 6. Water balance review. 7. Freeboard and storage availability (in excess of the design flood). 8. Water discharge system, volumes, and quality. 9. Seepage occurrence and water quality. 10. Surface water control and surface erosion. 11. Instrumentation review including: (a) (b) (c) Phreatic surfaces and piezometric data. Settlement. Lateral movement. The report shall be submitted by a qualified geotechnical engineer registered as a Professional Engineer (P.Eng.) in British Columbia. The professional engineer will be deemed the Engineer of Record for the facility unless another engineer is identified within the Dam Safety Inspection report as having this responsibility. Note, this document modified from the original by George Warnock, P.Eng. (Manager, Geotechnical Engineering) in August Original prepared by Chris Carr, P.Eng. (former Manager) in February 2002.

28 APPENDIX II CDA Consequence Classification R 3rd Party Review DSI.docx M09783A November 2014

29 Appendix II CDA Consequence Classification Table II-1 Dam Classification 1 Dam Class Population at Risk [note 1] Loss of Life [note 2] Incremental Losses Environmental and Cultural Values Infrastructure and Economics Low None 0 Minimal short-term loss. No long-term loss. Low economic losses; area contains limited infrastructure or services. Significant Temporary only Unspecified No significant loss or deterioration of fish or wildlife habitat. Loss of marginal habitat only. Restoration or compensation in kind highly possible. Losses to recreational facilities, seasonal workplaces, and infrequently used transportation routes. High Permanent 10 or fewer Very high Permanent 100 or fewer Extreme Permanent More than 100 Significant loss or deterioration of important fish or wildlife habitat. Restoration or compensation in kind highly possible. Significant loss or deterioration of critical fish or wildlife habitat. Restoration or compensation in kind possible but impractical. Major loss of critical fish or wildlife habitat. Restoration or compensation in kind impossible. High economic losses affecting infrastructure, public transportation, and commercial facilities. Very high economic losses affecting important infrastructure or services (e.g., highway, industrial facility, storage facilities for dangerous substances). Extreme losses affecting critical infrastructure or services (e.g., hospital, major industrial complex, major storage facilities for dangerous substances). Note 1. Definitions for population at risk: None There is no identifiable population at risk, so there is no possibility of loss of life other than through unforeseeable misadventure. Temporary People are only temporarily in the dam-breach inundation zone (e.g., seasonal cottage use, passing through on transportation routes, participating in recreational activities). Permanent The population at risk is ordinarily located in the dam-breach inundation zone (e.g., as permanent residents); three consequence classes (high, very high, extreme) are proposed to allow for more detailed estimates of potential loss of life (to assist in decision-making if the appropriate analysis is carried out). Note 2. Implication for loss of life: Unspecified The appropriate level of safety required at a dam where people are temporarily at risk depends on the number of people, the exposure time, the nature of their activity, and other conditions. A higher class could be appropriate, depending on the requirements. However, the design flood requirement, for example, might not be higher if the temporary population is not likely to be present during the flood season. 1 From the Canadian Dam Association, Dam Safety Guidelines, 2007, updated Appendix II.docx Page II-1 M09783A November 2014

November 27, Bethlehem No. 1 Tailings Storage Facility. Submitted to: Teck Highland Valley Copper Partnership PO Box 1500 Logan Lake, BC V0K 1W0

November 27, Bethlehem No. 1 Tailings Storage Facility. Submitted to: Teck Highland Valley Copper Partnership PO Box 1500 Logan Lake, BC V0K 1W0 INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION AND REVIEW REPORT Bethlehem No. 1 Tailings Storage Facility Submitted to: Teck Highland Valley Copper Partnership PO Box 1500 Logan Lake, BC V0K 1W0 Attention:

More information

REPORT. Giant Nickel Tailings Dams INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT. November 26, 2014

REPORT. Giant Nickel Tailings Dams INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT. November 26, 2014 INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT Giant Nickel Tailings Dams Submitted to: Barrick Gold Inc. PO Box 788 Penticton, BC V2A 6Y7 Attention: Robbin Harmati REPORT Reference Number: 1412161-003-R-Rev1-2000

More information

Dankoe Mine. Report on 2014 Dam Safety Inspection of Tailings Storage Facility

Dankoe Mine. Report on 2014 Dam Safety Inspection of Tailings Storage Facility Peter Lighthall, P.Eng Consulting Geotechnical Engineer Dankoe Mine Report on of Tailings Storage Facility Report prepared for 439813 BC Ltd. December 4, 2014 Peter Lighthall, P.Eng. Consulting Geotechnical

More information

December 12, 2014

December 12, 2014 www.knightpiesold.com File No.:VA101-246/41-A.01 Cont. No.:VA14-01866 Kate Parsons Environmental Manager KGHM Ajax Mining Inc. 200-124 Seymour St. Kamloops, British Columbia Canada, V2C 2E1 Dear Kate,

More information

Third Party Review of Dam Safety Inspection Report MAX Molybdenum Mine

Third Party Review of Dam Safety Inspection Report MAX Molybdenum Mine Third Party Review of Dam Safety Inspection Report MAX Molybdenum Mine Prepared for Forty Two Metals Inc. Prepared by SRK Consulting (Canada) Inc. 1CF011.000 December 2014 Third Party Review of Dam Safety

More information

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY REPORT ON STAGE 3C CONSTRUCTION (REF.NO. VA-101-1/5-1) Rev. No. Revision Date Approved 0 Issued in Final September 23, 2005 AMEC010485_0001

More information

Review of the 2014 Annual Dam Safety Inspection Report, 2-North Pit Tailings Disposal Facility, Quinsam Coal Mine

Review of the 2014 Annual Dam Safety Inspection Report, 2-North Pit Tailings Disposal Facility, Quinsam Coal Mine November 24, 2014 Quinsam Coal Corporation Hillsborough Resources Limited PO BOX 5000 Campbell River BC V9W 8A3 ISSUED FOR USE FILE: V15103102-01 via Email: gbg@hillsboroughresources.com Attention: Subject:

More information

The Afton TSF, situated approximately 12 km west of Kamloops, BC has been under care and maintenance since 1997.

The Afton TSF, situated approximately 12 km west of Kamloops, BC has been under care and maintenance since 1997. November 27, 2014 KGHM Ajax Mining Inc. Ajax Project Suite 200-124 Seymour Street Kamloops, BC V2C 2E1 ISSUED FOR USE FILE: V15103098-01 via Email: kate.parsons@kghm.com Attention: Subject: Kate Parsons,

More information

Understanding of foundation conditions, water balance adequacy and filter adequacy at the closed Nickel Plate tailings impoundment near Hedley, BC

Understanding of foundation conditions, water balance adequacy and filter adequacy at the closed Nickel Plate tailings impoundment near Hedley, BC Barrick Gold Corporation 460 West 50 North, Suite 500 Salt Lake City, Utah 84101 27 June 2015 Al Hoffman, P.Eng. Chief Inspector and Executive Director, Health & Safety British Columbia Ministry of Energy

More information

Dirk J.A. van Zyl, Ph.D., P.Eng. P.E. Tailings and Mine Rock Management

Dirk J.A. van Zyl, Ph.D., P.Eng. P.E. Tailings and Mine Rock Management Dirk J.A. van Zyl, Ph.D., P.Eng. P.E. Tailings and Mine Rock Management MEMORANDUM To: From: Subject: Mr. Brent Murphy, Vice President Environment Affairs Dirk van Zyl, Principal Engineer Review Comments

More information

Teck Coal Ltd. Elkview Operations. Dam Safety Inspection Report Independent Third Party Review. November 2014 M09963A01.730

Teck Coal Ltd. Elkview Operations. Dam Safety Inspection Report Independent Third Party Review. November 2014 M09963A01.730 November 2014 M09963A01.730 November 28, 2014 Teck Coal Limited Sparwood, British Columbia Mr. Adam Walker Geotechnical Engineer ear Mr. Walker: Please find attached the Third Party Review of the am Safety

More information

June 30, 2015 Project No.: C Mr. Kent Christensen, P.Eng. General Manager Huckleberry Mines Limited PO Box 3000 Houston BC, V0J 1Z0

June 30, 2015 Project No.: C Mr. Kent Christensen, P.Eng. General Manager Huckleberry Mines Limited PO Box 3000 Houston BC, V0J 1Z0 Suite 500-980 Howe Street Vancouver, BC Canada V6Z 0C8 Telephone (604) 684-5900 Fax (604) 684-5909 June 30, 2015 Project No.: 1193-005-C Mr. Kent Christensen, P.Eng. General Manager Huckleberry Mines Limited

More information

MINISTRY OF ENERGY AND MINES Mines and Mineral Resources Division. REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act)

MINISTRY OF ENERGY AND MINES Mines and Mineral Resources Division. REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act) MINISTRY OF ENERGY AND MINES Mines and Mineral Resources Division REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act) Name of Property: Permit No.: M-29 Mine Manager: Don

More information

Dam Safety Inspection Report

Dam Safety Inspection Report Tel. (778) 899-5500 e-mail: JRTGeoEngineering@shaw.ca Dam Safety Inspection Report To: SnipGold Corp. Attention: Mr. Jon Zbeetnoff, President From: J. Roland Tosney, P.Eng. Subject: Johnny Mountain Mine

More information

REPORT. Phase 1: Review Possibility of Mount Polley Mine Conditions at Afton TSF site

REPORT. Phase 1: Review Possibility of Mount Polley Mine Conditions at Afton TSF site GEOTECHNICAL ENGINEERING SERVICES FOR AFTON TAILINGS STORAGE FACILITY Phase 1: Review Possibility of Mount Polley Mine Conditions at Afton TSF site Submitted to: Crystal Vandermeulen KGHM Ajax Mining Inc.

More information

KLONDIKE SILVER - SILVANA MINE Annual Dam Safety Inspection

KLONDIKE SILVER - SILVANA MINE Annual Dam Safety Inspection KLONDIKE SILVER - SILVANA MINE 2014 Annual Dam Safety Inspection Submitted to: Klondike Silver Corp. 430-609 Granville Street Vancouver, BC V7Y 1G5 Attention: Mark Luchinski REPORT Reference Number: 1406428-007-R-Rev0-2000

More information

Independent Expert Engineering Investigation and Review Panel. Report on Mount Polley Tailings Storage Facility Breach. Appendix G: Water Balance

Independent Expert Engineering Investigation and Review Panel. Report on Mount Polley Tailings Storage Facility Breach. Appendix G: Water Balance Independent Expert Engineering Investigation and Review Panel Report on Mount Polley Tailings Storage Facility Breach Appendix G: Water Balance January 30, 2015 Report on Mount Polley Tailings Storage

More information

19 November 2014 TE VIA COURIER. Glencore Canada Corporation P.O. Box King Street West, Suite 7200 Toronto, ON M5X 1E3

19 November 2014 TE VIA COURIER. Glencore Canada Corporation P.O. Box King Street West, Suite 7200 Toronto, ON M5X 1E3 19 November 2014 TE143006 VIA COURIER Glencore Canada Corporation P.O. Box 405 100 King Street West, Suite 7200 Toronto, ON M5X 1E3 Attention: Mr. John Stroiazzo Reclamation Manager Dear John; Reference:

More information

RESPONSE TO BCMEM SCREENING COMMENTS QUANTITATIVE PERFORMANCE OBJECTIVES

RESPONSE TO BCMEM SCREENING COMMENTS QUANTITATIVE PERFORMANCE OBJECTIVES DATE January 27, 2016 REFERENCE No. TO Mr. Luke Moger Mount Polley Mining Corporation FROM Germán Pizarro and Terry Eldridge EMAIL German_Pizarro@golder.com; Terry_Eldridge@golder.com RESPONSE TO BCMEM

More information

Peter Lighthall, P.Eng. Consulting Geotechnical Engineer

Peter Lighthall, P.Eng. Consulting Geotechnical Engineer Peter Lighthall, P.Eng. Consulting Geotechnical Engineer Cassiar Gold Corp. China Minerals Mining Corporation Suite 1100 1111 Melville Street Vancouver, BC V6E 3V6 Attn: Re: Ms. Patricia Fong Independent

More information

Reference: 24 Mile Lake Geotechnical Assessment and Standard Operating Procedure

Reference: 24 Mile Lake Geotechnical Assessment and Standard Operating Procedure 20 November 2014 AMEC File: VM00615 VIA EMAIL Teck Highland Valley Copper Partnership P.O. Box 1500 Logan Lake, British Columbia V0K 1W0 Attention: Mr. Chris Fleming Dear Chris, Reference: 24 Mile Lake

More information

MOUNT POLLEY MINE Tailings Storage Facility 2011 Construction. As-Built Report and Annual Review

MOUNT POLLEY MINE Tailings Storage Facility 2011 Construction. As-Built Report and Annual Review AMEC Environment & Infrastructure, a division of AMEC Americas Limited Suite 600-4445 Lougheed Highway, Burnaby, BC Canada V5C 0E4 Tel +1 (604) 294-3811 Fax +1 (604) 294-4664 www.amec.com MOUNT POLLEY

More information

AMERICAN ELECTRIC POWER (SWEPCO)

AMERICAN ELECTRIC POWER (SWEPCO) 2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION

More information

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY OPERATION, MAINTENANCE AND SURVEILLANCE MANUAL Rev. No. Revision Date Approved 0 Issued in Final December 22, 2004 1 Issued in

More information

Understanding of foundation conditions, water balance adequacy and filter adequacy at the closed Snip tailings impoundment in northwest BC

Understanding of foundation conditions, water balance adequacy and filter adequacy at the closed Snip tailings impoundment in northwest BC Barrick Gold Corporation 460 West 50 North, Suite 500 Salt Lake City, Utah 84101 27 June 2015 Al Hoffman, P.Eng. Chief Inspector and Executive Director, Health & Safety British Columbia Ministry of Energy

More information

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE DESIGN OF THE TAILINGS STORAGE FACILITY TO ULTIMATE ELEVATION (REF. NO.

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE DESIGN OF THE TAILINGS STORAGE FACILITY TO ULTIMATE ELEVATION (REF. NO. MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE DESIGN OF THE TAILINGS STORAGE FACILITY TO ULTIMATE ELEVATION (REF. NO. VA101-001/08-1) Rev. No. Revision Date Approved 0 Issued for Report March 14, 2005

More information

Reference No L-Rev0-1000

Reference No L-Rev0-1000 June 29, 2015 Reference No. Mr. Mark Slater Teck Coal Limited Greenhills Operations PO Box 5000 Sparwood, BC V0B 1H0 RESPONSE TO MINISTRY OF ENERGY AND MINES MEMORANDUM DATED FEBRUARY 3, 2015, REGARDING

More information

FINAL REPORT DAM SAFETY REVIEW. Mount Polley Mine Likely, British Columbia. Submitted to:

FINAL REPORT DAM SAFETY REVIEW. Mount Polley Mine Likely, British Columbia. Submitted to: AMEC Earth & Environmental a division of AMEC Americas Limited 2227 Douglas Road, Burnaby, BC Canada V5C 5A9 Tel +1 (604) 294-3811 Fax +1 (604) 294-4664 www.amec.com FINAL REPORT DAM SAFETY REVIEW Mount

More information

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Updated: November 2010 Directive 74 Appendix C Requirement Approval: 8512D Submitted to SHELL CANADA ENERGY MRM DDA PLAN-UPDATE NOV

More information

BRALORNE TAILINGS STORAGE FACILITY UPDATED 2014 ANNUAL DAM SAFETY INSPECTION

BRALORNE TAILINGS STORAGE FACILITY UPDATED 2014 ANNUAL DAM SAFETY INSPECTION BRALORNE TAILINGS STORAGE FACILITY UPDATED 2014 ANNUAL DAM SAFETY INSPECTION PREPARED FOR NOVEMBER 21, 2014 ISSUED FOR USE FILE: V15103090-01 Tetra Tech EBA Inc. 150, 1715 Dickson Avenue Kelowna, BC V1Y

More information

Barkerville Gold Mines Ltd.

Barkerville Gold Mines Ltd. Barkerville Gold Mines Ltd. Goldstream Tailings Storage Facility Background Report for Response to MEM Memorandum M09967A03 June 2015 June 30, 2015 Barkerville Gold Mines Ltd. 11 th Floor, 1111 Melville

More information

MOUNT POLLEY MINE Tailings Storage Facility Stage 8/8A 2012 As-Built Report. Submitted to: Mount Polley Mining Corporation, Likely, BC.

MOUNT POLLEY MINE Tailings Storage Facility Stage 8/8A 2012 As-Built Report. Submitted to: Mount Polley Mining Corporation, Likely, BC. AMEC Environment & Infrastructure, a division of AMEC Americas Limited Suite 600-4445 Lougheed Highway, Burnaby, BC Canada V5C 0E4 Tel +1 (604) 294-3811 Fax +1 (604) 294-4664 www.amec.com MOUNT POLLEY

More information

Mount Polley Mining Corporation IMPERIAL METALS CORPORATION

Mount Polley Mining Corporation IMPERIAL METALS CORPORATION Mount Polley Mining Corporation IMPERIAL METALS CORPORATION 1--\Poo l4 ;;L- February 16, 2006 Nick Rose, P. Eng. Piteau Associates Engineering Ltd. 215-260 West Esplanade North Vancouver, BC V7M3G7 Dear

More information

AMERICAN ELECTRIC POWER (SWEPCO)

AMERICAN ELECTRIC POWER (SWEPCO) 2015 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-15-034 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION

More information

Central Region GeoHazard Assessment H597:02, km Slide May 2011 Site Inspection and Instrumentation Monitoring Report

Central Region GeoHazard Assessment H597:02, km Slide May 2011 Site Inspection and Instrumentation Monitoring Report Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 July 14, 2011 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region GeoHazard Assessment H597:02,

More information

Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps. Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band

Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps. Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band 11 August 2014 Presentation Outline General Introduction

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY OPERATION, MAINTENANCE AND SURVEILLANCE MANUAL Rev. No. Revision Date Approved 0 Issued in Final December 22, 2004 1 Issued in

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Plant Hammond Site Location: Site Address:

More information

Tailings Storage Facility Conceptual Closure Plan Alternatives Assessment

Tailings Storage Facility Conceptual Closure Plan Alternatives Assessment Appendix 17.4-C Tailings Storage Facility Conceptual Closure Plan Alternatives Assessment AJAX PROJECT Environmental Assessment Certificate Application / Environmental Impact Statement for a Comprehensive

More information

DTE Energy St. Clair Power Plant

DTE Energy St. Clair Power Plant DTE Energy St. Clair Power Plant Unit 6 Scrubber Basins CCR Rule Compliance Project Annual Inspection Report - 2017 Project Number: 60546402 June 30, 2017 Prepared by: 27777 Franklin Road, Suite 2000 Southfield,

More information

Tailings dam raise with reinforced walls

Tailings dam raise with reinforced walls Tailings dam raise with reinforced walls Jorge Alvarez Tiburcio Anddes Asociados S.A.C.,Peru ABSTRACT This paper presents the design of a tailings dam raise with reinforced walls lined with geomembrane,

More information

- TAILINGS AND WATER MANAGEMENT FOR A COLD REGIONS MINE - Dr. Michael Davies, P.Eng., P.Geo. and Mr. Mathieu Veillette, P.Eng., P.E.

- TAILINGS AND WATER MANAGEMENT FOR A COLD REGIONS MINE - Dr. Michael Davies, P.Eng., P.Geo. and Mr. Mathieu Veillette, P.Eng., P.E. - - Dr. Michael Davies, P.Eng., P.Geo. and Mr. Mathieu Veillette, P.Eng., P.E. AMEC Earth & Environmental Vancouver, British Columbia, Canada Pogo Gold Mine: Teck Cominco is the operator and the mine is

More information

NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept

NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept Open pit and underground mine The project has 31 Mt of ore reserve Ore to be processed at a rate of 4,650 t/d Life of mine is 20 years

More information

Modified Centreline Construction of Tailings Embankn1ents

Modified Centreline Construction of Tailings Embankn1ents Modified Centreline Construction of Tailings Embankn1ents J.P. Haile & K.J. Brouwer Knight Piesold Ltd. Consulting Engineers Suite 1400-750 West Pender Street Vancouver, B.C., Canada V6C 2T8 Abstract:

More information

Controlling Surface Water at One of Canada s Largest Base Metals Operations: From Legacy Challenges to Environmental Award Winner

Controlling Surface Water at One of Canada s Largest Base Metals Operations: From Legacy Challenges to Environmental Award Winner Controlling Surface Water at One of Canada s Largest Base Metals Operations: From Legacy Challenges to Environmental Award Winner Greg Noack, P.Eng., Associate, Klohn Crippen Berger Ltd., Toronto ON. Lawrence

More information

VISUAL SITE INSPECTION REPORT 2018

VISUAL SITE INSPECTION REPORT 2018 VISUAL SITE INSPECTION REPORT 2018 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00614 January 9, 2019 PREPARED

More information

Appendix 5.3.5B Tailings Storage Facility Seepage Sensitivity Analysis

Appendix 5.3.5B Tailings Storage Facility Seepage Sensitivity Analysis BLACKWATER GOLD PROJECT APPLICATION FOR AN ENVIRONMENTAL ASSESSMENT CERTIFICATE / ENVIRONMENTAL IMPACT STATEMENT ASSESSMENT OF POTENTIAL ENVIRONMENTAL EFFECTS Appendix 5.3.5B Tailings Storage Facility

More information

IN THE MATTER OF THE ENGINEERS AND GEOSCIENTISTS ACT R.S.B.C. 1996, CHAPTER 116. and. IN THE MATTER OF Todd Martin, P.Eng., P.Geo.

IN THE MATTER OF THE ENGINEERS AND GEOSCIENTISTS ACT R.S.B.C. 1996, CHAPTER 116. and. IN THE MATTER OF Todd Martin, P.Eng., P.Geo. IN THE MATTER OF THE ENGINEERS AND GEOSCIENTISTS ACT R.S.B.C. 1996, CHAPTER 116 and IN THE MATTER OF Todd Martin, P.Eng., P.Geo. NOTICE OF INQUIRY TO: Todd Martin, P.Eng., P.Geo. c/o Harris & Company 14

More information

Keeyask Generation Project. Physical Environment. Supporting Volume. Environmental Impact Statement

Keeyask Generation Project. Physical Environment. Supporting Volume. Environmental Impact Statement Keeyask Generation Project Environmental Impact Statement Supporting Volume Physical Environment June 2012 KEEYASK GENERATION PROJECT SUPPORTING VOLUME EFFECTS OF THE ENVIRONMENT ON THE PROJECT June 2012

More information

SCHEDULE. 1 Part 10 of the Health, Safety and Reclamation Code for Mines in British Columbia is repealed and the following is substituted:

SCHEDULE. 1 Part 10 of the Health, Safety and Reclamation Code for Mines in British Columbia is repealed and the following is substituted: REVISIONS TO PART 10 EFFECTIVE AS OF JULY 20, 2016 SCHEDULE 1 Part 10 of the Health, Safety and Reclamation Code for Mines in British Columbia is repealed and the following is substituted: TABLE OF CONTENTS

More information

Enviable water recovery in a desert environment a case study

Enviable water recovery in a desert environment a case study Mine Water Solutions 2013 J. Obemeyer, J. Enriquez and T. Alexieva 2013 InfoMine Inc, Vancouver, Canada, ISBN XXX Enviable water recovery in a desert environment a case study James R. Obermeyer, MWH Americas,

More information

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES SAND AND GRAVEL PERMIT APPROVING WORK SYSTEM AND RECLAMATION PROGRAM (Issued pursuant to Section 10 of the Mines Act R.S.B.C. 1996, C.293) Permit:

More information

DTE Energy Monroe Power Plant

DTE Energy Monroe Power Plant DTE Energy Monroe Power Plant Inactive Bottom Ash Impoundment CCR Rule Compliance Project Annual Inspection Report - 2018 Project Number: 60516675 September 7, 2018 Prepared by: 27777 Franklin Road, Suite

More information

Tailings System Safety Review for the Quirke Tailings Management Area in Elliot Lake

Tailings System Safety Review for the Quirke Tailings Management Area in Elliot Lake Tailings System Safety Review for the Quirke Tailings Management Area in Elliot Lake Shiu N. Kam (Golder Associates Ltd.) Maxine A. Wiber (Rio Algom Limited) Roger A. Payne (Consultant) John B. Davis (Golder

More information

2014 Spring Geotechnical Inspection

2014 Spring Geotechnical Inspection 2014 Spring Geotechnical Inspection Prepared by: Minto Explorations Ltd. Minto Mine August, 2014 2014 Spring Geotechnical Inspection Page ii Table of Contents 1 Introduction...1 1.1 License Requirements...

More information

Central Region GeoHazard Assessment Site C8 SH597:02 East of Blackfalds May 2007 Site Assessment and Instrumentation Monitoring Report

Central Region GeoHazard Assessment Site C8 SH597:02 East of Blackfalds May 2007 Site Assessment and Instrumentation Monitoring Report Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 May 18, 2007 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: Central Region GeoHazard Assessment

More information

Jim Bridger Power Plant

Jim Bridger Power Plant 2015 Coal Combustion Residuals Annual Inspection Jim Bridger Power Plant Industrial Landfill Prepared for PacifiCorp Energy North Temple Office 1407 West North Temple Salt Lake City, Utah 84116 Final December

More information

Request Number 9: Accidents & Malfunctions Dam Safety Cumulative Effects

Request Number 9: Accidents & Malfunctions Dam Safety Cumulative Effects Request Number 9: Accidents & Malfunctions Dam Safety Cumulative Effects References: EIS Guidelines Sec. 23.2; EIS Vol. 5, Section 37.2; EIS, Vol. 6, Technical Memo Dam Safety; Meeting Notes BC Hydro,

More information

Newmont Mining Corporation Tailing & Heap Leach Facility Management Standard

Newmont Mining Corporation Tailing & Heap Leach Facility Management Standard Page No: Page 1 of 5 1 PURPOSE AND OBJECTIVES This (the Standard ) sets the minimum Newmont requirements for the design and management of tailing storage facilities (TSF) and heap leach facilities (HLF)

More information

DRAFT 1 GENERAL. June 15, Alberta Transportation 2 nd Floor, 803 Manning Road NE Calgary, Alberta T2E 7M8

DRAFT 1 GENERAL. June 15, Alberta Transportation 2 nd Floor, 803 Manning Road NE Calgary, Alberta T2E 7M8 2 nd Floor, 83 Manning Road NE Calgary, Alberta T2E 7M8 Ross Dickson Project Services Technologist Dear Mr. Dickson: CON1769 Southern Region GRMP Instrumentation Monitoring Site S2; H22:14, km 12.95 Priddis

More information

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO 2016 LANDFILL INSPECTION REPORT GERS-16-004 CARDINAL PLANT BRILLIANT, OHIO PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Cardinal Plant Landfill Inspection

More information

TAILING & HEAP LEACH FACILITY MANAGEMENT PURPOSE & OBJECTIVES CONTENT. 1. Planning & Design

TAILING & HEAP LEACH FACILITY MANAGEMENT PURPOSE & OBJECTIVES CONTENT. 1. Planning & Design PURPOSE & OBJECTIVES This Tailing & Heap Leach Facility Management Standard (the Standard ) sets the minimum Newmont requirements for the design and management of tailing storage facilities (TSF) and heap

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Types of Inspections. Prior to Inspection. Types of Inspections. Typical Inspection Equipment. Embankment Dams

Types of Inspections. Prior to Inspection. Types of Inspections. Typical Inspection Equipment. Embankment Dams BIA Summer Water Resources Training Dam Safety Inspections Part 4 - Inspections July 28, 2012 Presented by Michael Johnson, Ph.D., P.E. Types of Inspections Periodic Inspections A comprehensive visual

More information

2016 ANNUAL DAM AND DIKE INSPECTION REPORT. Bottom Ash Ponds. Rockport Plant Spencer County, Indiana. December 6 th, 2016

2016 ANNUAL DAM AND DIKE INSPECTION REPORT. Bottom Ash Ponds. Rockport Plant Spencer County, Indiana. December 6 th, 2016 2016 ANNUAL DAM AND DIKE INSPECTION REPORT Bottom Ash Ponds Rockport Plant Spencer County, Indiana December 6 th, 2016 Prepared for: Indiana Michigan Power Company Rockport Plant 2791 North US 231 Rockport,

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116 (i) Site Name and Ownership Information: HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY Site Name: Site Location: Site Address: Owner: Owner Address:

More information

Knight Piésold TAILINGS FACILITY 2014 DAM SAFETY INSPECTION REPORT BARRICK GOLD INC. GIANT NICKEL MINE. C O N S U L T I N G

Knight Piésold TAILINGS FACILITY 2014 DAM SAFETY INSPECTION REPORT BARRICK GOLD INC. GIANT NICKEL MINE. C O N S U L T I N G TAILINGS FACILITY PREPARED FOR: Barrick Gold Nickel Plate Mine PO Box 788 Penticton, BC V2A 6Y7 PREPARED BY: Knight Piésold Ltd. Suite 1400 750 West Pender Street Vancouver, BC V6C 2T8 Canada p. +1.604.685.0543

More information

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton Draft Mine Closure Plan 17 October 2018 Longlac & Geraldton Project Update Federal EA Decision report was issued on October 1 st and Provincial Report is expected to be issued Oct 22 nd Federal approval

More information

Converting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant

Converting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant Converting slurry tailings facilities to filtered dry stacks a case history John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant Objectives General discussion on the geotechnical issues. Case

More information

Golder Associates Ltd. (Golder) was retained by Greenstone Gold Mines to complete a peer review for the Hardrock Project in Geraldton, Ontario.

Golder Associates Ltd. (Golder) was retained by Greenstone Gold Mines to complete a peer review for the Hardrock Project in Geraldton, Ontario. DATE January 5, 2016 PROJECT No. 1543540 TO Mr. Bertho Caron, Ing., Engineering Manager Greenstone Gold Mines FROM Reza Moghaddam and Ken Bocking EMAIL Ken_Bocking@golder.com A PEER REVIEW REGARDING THE

More information

Design, Construction and Operation of a Large Centerline Tailing Storage Facility with High Rate of Rise

Design, Construction and Operation of a Large Centerline Tailing Storage Facility with High Rate of Rise Proceedings Tailings and Mine Waste 2011 Design, Construction and Operation of a Large Centerline Tailing Storage Facility with High Rate of Rise James Obermeyer, Tatyana Alexieva MWH Americas, Inc., Denver,

More information

APPENDIX 3C RISK ASSESSMENT FOR ACCIDENTS AND MALFUNCTIONS OF THE JAY PROJECT

APPENDIX 3C RISK ASSESSMENT FOR ACCIDENTS AND MALFUNCTIONS OF THE JAY PROJECT Developer's Assessment Report Jay Project Appendix 3C, Risk Assessment for Accidents and Malfunctions of the Jay Project October 201 APPENDIX 3C RISK ASSESSMENT FOR ACCIDENTS AND MALFUNCTIONS OF THE JAY

More information

Transition of a major tailings facility in a sensitive environment from operation to decommissioning at Brenda Mine

Transition of a major tailings facility in a sensitive environment from operation to decommissioning at Brenda Mine Mine Closure 2009 A.B. Fourie, M. Tibbett (eds) 2009 Australian Centre for Geomechanics, Perth, ISBN 978-0-9804185-9-0 https://papers.acg.uwa.edu.au/p/908_16_lo/ Transition of a major tailings facility

More information

2018 Annual Dam and Dike Inspection Report

2018 Annual Dam and Dike Inspection Report 218 Annual Dam and Dike Inspection Report Bottom Ash Pond Northeastern 3&4 Plant Public Service Company of Oklahoma Oologah, Oklahoma September 218 Prepared for: Public Service Company of Oklahoma Northeastern

More information

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Terry Eldridge Golder Associates S.A., Chile Ben Wickland Golder Associates Ltd., Canada Adrian Goldstone Dundee Precious Metals

More information

July 7, 2008 File: Mine No.:

July 7, 2008 File: Mine No.: .._. i53s4 BRITISH COLUMBIA The Best Place on Earth July 7, 2008 File: 18040-02-07 Mine No.: 1101163 Tim Fisch Mount Polley Mining Corporation Po Box 12 Likely BC, VOL 1 NO Dear Sir: Re: Mine Inspection

More information

DAM SAFETY REVIEW. Mount Polley Mine Likely, British Columbia DRAFT. Submitted to: Imperial Metals Corporation Hornby Street Vancouver, BC

DAM SAFETY REVIEW. Mount Polley Mine Likely, British Columbia DRAFT. Submitted to: Imperial Metals Corporation Hornby Street Vancouver, BC DAM SAFETY REVIEW Mount Polley Mine Likely, British Columbia DRAFT November 2006 Submitted to: Imperial Metals Corporation 200 580 Hornby Street Vancouver, BC Submitted by: AMEC Earth & Environmental Limited

More information

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Water Management During Construction and Operations

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Water Management During Construction and Operations Black Butte Copper Project Mine Operating Permit Application (Revision 3) APPENDIX K-2: Water Management During Construction and Operations Tintina Montana, Inc. July 2017 www.knightpiesold.com Mr. Bob

More information

2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio

2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio Prepared for: FirstEnergy Generation, LLC 76 South Main St Akron, Ohio 44308 2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio Prepared by: 10211 Wincopin Circle, Floor 4 Columbia,

More information

LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE

More information

APPENDIX B RESPONSE TO ROUND 1 INFORMATION REQUEST DFO&EC_26, SUBMITTED TO THE BOARD ON APRIL 6, 2012

APPENDIX B RESPONSE TO ROUND 1 INFORMATION REQUEST DFO&EC_26, SUBMITTED TO THE BOARD ON APRIL 6, 2012 Veronica Chisholm 11-1365-0012/DCN-104 De Beers Canada Inc. October 2, 2012 APPENDIX B RESPONSE TO ROUND 1 INFORMATION REQUEST DFO&EC_26, SUBMITTED TO THE BOARD ON APRIL 6, 2012 48/48 TECHNICAL MEMO ISSUED

More information

2015 INSPECTION REPORT FLY ASH DAM and BOTTOM ASH POND COMPLEX JOHN AMOS PLANT ST. ALBANS, WEST VIRGINIA. June 2015

2015 INSPECTION REPORT FLY ASH DAM and BOTTOM ASH POND COMPLEX JOHN AMOS PLANT ST. ALBANS, WEST VIRGINIA. June 2015 2015 INSPECTION REPORT FLY ASH DAM and BOTTOM ASH POND COMPLEX JOHN AMOS PLANT ST. ALBANS, WEST VIRGINIA June 2015 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS,

More information

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) SMP-11 PLANNING CONSIDERATIONS: Design Life: 1 yr Acreage

More information

Dam Safety and Seismicity

Dam Safety and Seismicity Dam Safety and Seismicity January 13, 2014 Fort St. John, BC John Nunn, P.Eng, M.Sc., M.I.C.E Chief Project Engineer Tim Little, P. Eng. Topics 1. The Practice of Dam Safety in BC Hydro 2. Bennett Dam

More information

Tailings mobilization estimates for dam breach studies

Tailings mobilization estimates for dam breach studies Tailings mobilization estimates for dam breach studies Daniel Fontaine, P.Eng, Violeta Martin, Ph.D., P.Eng, Knight Piésold Ltd., Vancouver, BC, Canada ABSTRACT Quantitative assessment of potential consequences

More information

Creek East Hill Slide Area, AMEC report submitted to AIT, October 2006, AMEC project number CG25239.

Creek East Hill Slide Area, AMEC report submitted to AIT, October 2006, AMEC project number CG25239. 4.20 S23 HIGHWAY 507:02 EAST OF MILL CREEK Site Description and Background This site is located on Highway 507, immediately east of the bridge across Mill Creek and approximately 5 km eastbound (measured

More information

Category 1 Waste Rock Stockpile Groundwater Containment System

Category 1 Waste Rock Stockpile Groundwater Containment System Memorandum To: Jennifer Saran, Poly Met Mining Inc. Project: 23690862.00-042-008 1.0 Introduction The Co-Lead Agencies have requested a summary of the four containment systems that are planned for the

More information

Block & Aggregate Drop Inlet Protection

Block & Aggregate Drop Inlet Protection Block & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park

CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park CBC Case Study-1212 1 of 5 CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park More Than Geotechnical Engineering DAYTON 125 Westpark Road Centerville, OH 45459 Phone: 937-428-6150 HAZARD

More information

Active Coal Combustion Residuals Landfill Annual Inspection Escalante Generating Station

Active Coal Combustion Residuals Landfill Annual Inspection Escalante Generating Station REPORT Active Coal Combustion Residuals Landfill Annual Inspection Escalante Generating Station Submitted to: Tri-State Generation and Transmission Association, Inc. 1100 West 116th Avenue Westminster,

More information

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY Phong Vo, Manager - Engineering/Gypsum, Mosaic Fertilizer, LLC. 13830 Circa Crossing Drive Lithia, Florida 33547, USA and Ashraf H. Riad, Ph.D., P.E.,

More information

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan EIS Techni cal Support Document 20-12 Magino Project Environmental Impact Statement Technical Support Document 20-12 Rev. No. Revision Date Approved 0 Document issued for EIS Table of Contents SECTION

More information

Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia

Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia Upland Excavating Ltd. Engineering Consultant: GHD Limited Presentation Agenda Project Background Site

More information

2017 Annual Dam and Dike Inspection Report

2017 Annual Dam and Dike Inspection Report 2017 Annual Dam and Dike Inspection Report Bottom Ash Pond Complex Mitchell Plant Wheeling Power Company & Kentucky Power Company Marshall County, West Virginia October 20, 2017 Prepared by: American Electric

More information

Types of Inspections

Types of Inspections BIA Summer Water Resources Training Dam Safety Inspections Part 4 - Inspections July 28, 2012 Presented by Michael Johnson, Ph.D., P.E. Types of Inspections Periodic Inspections A comprehensive visual

More information

WOLVERINE MINE TAILINGS STORAGE FACILITY OPERATION, MAINTENANCE AND SURVEILLANCE MANUAL V

WOLVERINE MINE TAILINGS STORAGE FACILITY OPERATION, MAINTENANCE AND SURVEILLANCE MANUAL V WOLVERINE MINE TAILINGS STORAGE FACILITY OPERATION, MAINTENANCE AND SURVEILLANCE MANUAL Prepared for Yukon Government Energy, Mines and Resources QML-0006 Prepared by Yukon Zinc Corporation and Klohn Crippen

More information

Appendix 4. Soil Management Plan

Appendix 4. Soil Management Plan Appendix 4 Soil Management Plan Soil Management Plan This Soil Management Plan (SMP) has been developed for the Giscome Quarry and Lime Plant Project. The SMP is a living document and will be updated as

More information

Details of the Proposed Action

Details of the Proposed Action Details of the Proposed Action Proposed Action This alternative is based on the proposed Plan of Operations submitted to the Forest Service on June 4, 2010 by Shoshone Silver/Gold Mining Company for the

More information

Information Request 11

Information Request 11 Information Request 11 Information Request 11 11-1 Responses to Information Request 11 Response to Information Request 11a Response to Information Request 11b 11-2 11-6 Federal Review Panel Information

More information