EXHIBIT A JAMES GROUNDWATER STORAGE AND RECOVERY PROJECT NOTICE OF PREPARATION

Size: px
Start display at page:

Download "EXHIBIT A JAMES GROUNDWATER STORAGE AND RECOVERY PROJECT NOTICE OF PREPARATION"

Transcription

1

2 EXHIBIT A JAMES GROUNDWATER STORAGE AND RECOVERY PROJECT NOTICE OF PREPARATION Project Location The Project property, known locally as McAllister Ranch, is located in Kern County, California within Sections 21, 22, and 23, and a portion of Section 16, Township 30 South, Range 26 East, Mount Diablo Meridian (MDM), as shown on Exhibit B. The Project property is located on the Kern River alluvial fan and, combined with its geology, is well suited for groundwater banking operations. The general Project area is shown on Exhibit C. The Project property was formerly a planned residential development that was in the early stages of construction. Due to the downturn in the real estate market and project financing issues, development was discontinued and the property was sold in a bankruptcy proceeding. Buena Vista Water Storage District (BVWSD) and Rosedale-Rio Bravo Water Storage District (RRBWSD) jointly purchased the property in The property is located approximately fourteen miles southwesterly of downtown Bakersfield, totals approximately 2,070 acres, and includes approximately 6,265 planned residential lots (mostly unrecorded and unimproved), as well as areas that were planned for development of schools, public facilities, commercial uses, and recreational uses. The property has been disturbed and continues to be disturbed, with some areas of the site currently being used for agriculture. A portion of the Project property is still subject to potential future development. This area was a proposed residential development and golf course that comprises approximately 600 acres and is referred to as the "Option Property", as depicted on Exhibit B. Due to the compact nature of the Option Property for future urban use, it is not expected that the proposed groundwater storage and recovery project will conflict with the proposed residential and golf course use, if implemented. Project Description The following project description represents the project as currently anticipated; however, the project description is subject to revision based on the analyses conducted as part of the Draft Environmental Impact Report. The James Groundwater Storage and Recovery Project (referred to herein as the Project) includes construction and operation of shallow recharge ponds totaling approximately 1,400 acres, water conveyance facilities, and up to 14 groundwater wells and well pumping plants. Prior to final design of the Project, data will be obtained to determine feasible percolation rates for the Project. Operation of the Project includes storing water in underground aquifers during times of surplus for later recovery of up to 50,000 acre-feet per year during times of need or to assist with overdraft correction. The Project includes water conveyance to and from the Project property using available capacity in any of the canals and facilities that may be available to deliver water to the Project property, including, but not limited to, the Cross Valley Canal, Kern River, Friant-Kern Canal, California Aqueduct, Buena Vista Canal, 2,800-Acre Project, Pioneer Project, Kern Water Bank, Berrenda Mesa Project, and Kern River Canal, subject to applicable rules and regulations. The Project will be constructed, operated, and managed by BVWSD and RRBWSD; although, day-to-day operations, or portions thereof, may be contracted to other parties. It is estimated that approximately 1,400 acres of the 2,070-acre Project property will be used for direct groundwater recharge as part of the Project, and that nearby lands on the Kern River Fan within approximately three miles of the Project property, including the Option Property, may be used for in-lieu and direct recharge and NOTICE OF PREPARATION OF DRAFT EIR EXHIBIT A BUENA VISTA WATER STORAGE DISTRICT NOP-FINAL.DOC JAMES GROUNDWATER STORAGE AND RECOVERY PROJECT PAGE 1 of 2

3 potential recovery. It is further estimated that up to 250,000 acre-feet per year of water could be recharged during wet years. Sources of water for recharge during operation of the Project include water from the Kern River, Friant-Kern Canal, State Water Project, Central Valley Project, flood water, and possibly other sources that may be available to BVWSD or RRBWSD from time to time. Project Purpose The primary purpose of the Project is to recharge, store, and recover water to augment and improve the reliability of the water supply for landowners within BVWSD and RRBWSD. The primary water management objective of BVWSD and RRBWSD is to benefit the lands, landowners, and water users within their respective boundaries through economic and efficient storage, distribution, and use of available water supplies, while facilitating programs that protect and benefit the groundwater basin. In consideration of their objectives, BVWSD and RRBWSD propose implementation of the Project. Potential Environmental Effects of the Project Biological Resources. The Project property has been disturbed and continues to be disturbed, with some portions of the property being actively used for agriculture. Because of this existing disturbance, it is unlikely that any sensitive plant species will be present onsite or that any sensitive animal species will burrow or nest onsite. Nonetheless, in order to ensure that sensitive biological resources are addressed, the Lead Agency will retain a qualified biologist to conduct a biological resources assessment of the Project site. The Draft Environmental Impact Report (DEIR) for the Project will include a discussion of the biological resources assessment, as well as any mitigation measures needed to address potential effects upon sensitive biological resources. Archaeological/Historical Resources. According to previous archaeological/historical resources assessments conducted at the Project property, as described in the Final Environmental Impact Report for the McAllister Ranch Specific Plan, prepared by Kern County Planning and Development Services Department, dated November 15, 1993, State Clearinghouse No , there are several recorded archaeological sites located within the Project property (the property was subsequently annexed to the City of Bakersfield with the Kern County adopted Specific Plan and Final Environmental Impact Report). The DEIR for the Project will include a discussion of the groundwater storage and recovery Project's potential effects, as well as mitigation measures needed to address potential effects upon archaeological/historical resources. Groundwater Levels and Quality. As set forth in BVWSD's Groundwater Monitoring Plan (which is available at BVWSD's office for review during regular business hours), BVWSD monitors depths to groundwater quarterly and monitors groundwater quality at least annually for standard irrigation constituents and other constituents of concern. BVWSD and RRBWSD plan to enter into a Memorandum of Understanding (MOU) with adjoining entities, which will include provisions for addressing potential effects upon groundwater levels and quality. Additional Environmental Impacts. The Project also has the potential to result in environmental effects related to paleontological resources, erosion control, insect and vector control, and stormwater quality, and analysis of these potential effects will be included in the DEIR. Additionally, it is possible that analyses conducted during preparation of the DEIR will indicate the potential for other environmental effects that were not anticipated, and therefore not listed herein, at the time of this Notice of Preparation. NOTICE OF PREPARATION OF DRAFT EIR EXHIBIT A BUENA VISTA WATER STORAGE DISTRICT NOP-FINAL.DOC JAMES GROUNDWATER STORAGE AND RECOVERY PROJECT PAGE 2 of 2

4 Author: o. ogunjobi PIONEER CENTRAL 8 9 Kern River Union Pacific Railroad COB 2800 James Groundwater Storage & Recovery Project Site Map Kern River Canal 14 Date: 4/27/ PIONEER SOUTH 15 Agriculture, Petroleum Production & Open Space 13 Union Pacific Railroad Path: \\BVSVR-DC1\Company\GIS Maps\Maps Completed\McCallister Ranch Groundwater and Banking Map.mxd KERN WATER BANK Panama Ln. Petroleum Production Operations Area KERN WATER BANK S 26 E Agriculture 23 Location Map Location Map «58 Residential & Open Space «99 Groundwater Banking Operations Miles Existing Groundwater Banking Operations Option Property Proposed James Groundwater Storage & Recovery Project ± Miles

5 Date: 4/30/2012 Path: \\BVSVR-DC1\Company\GIS Maps\Maps Completed\Dans Request April 27a.mxd Author: o.ogunjobi Friant-Kern Canal Kern River CALIFORNIA AQUEDUCT 0 KERN WATER BANK KERN WATER BANK Kern River CALIFORNIA AQUEDUCT Location Map of James Groundwater Project Site Pioneer Projects COB 2800 Berenda Mesa James Project Site Kern Water Bank Incorporated Cities Limit ² Miles

6 Buena Vista Water Storage District James Groundwater Storage and Recovery Project Notice of Preparation of Draft Environmental Impact Report May 2012 Distribution List 1 Berrenda Mesa Water District Attn Greg Hammett Highway 33 Lost Hills, CA Buena Vista Museum of Natural History 2018 Chester Avenue 3 Buttonwillow Branch Library Attn Catherine Edgecomb, Branch Supervisor 116 Buttonwillow Drive Buttonwillow, CA California Department of Conservation Division of Oil, Gas & Geothermal Resources 4800 Stockdale Highway, Suite 417 Bakersfield, CA California Department of Fish & Game Central Region Headquarters Office Attn Dr. Jeffrey R. Single, Regional Manager 1234 East Shaw Avenue Fresno, CA x California Department of Parks and Recreation Office of Historic Preservation rd Street Sacramento, CA California Department of Water Resources State Water Project Analysis Office Attn Lincoln King 1416 Ninth Street, Room 1620 Sacramento, CA California Native Plant Society 2707 K Street, Suite 1 Sacramento, CA California Regional Water Quality Control Board Central Valley Region 1685 E Street Fresno, CA City of Bakersfield Planning Department 1715 Chester Avenue 11 City of Bakersfield Water Resources Department Attn Allen E. Tandy 1000 Buena Vista Road Bakersfield, CA County of Kern Planning and Community Development Dept Attn Lorelei H. Oviatt Public Services Building 2700 "M" Street, Suite County of San Luis Obispo Department of Planning and Building Attn Jason Giffen, Director 976 Osos Street, Room 200 San Luis Obispo, CA Henry Miller Water District Attn Joe Lutje P.O. Box 9759 Bakersfield, CA Inyo County Planning Department Attn Joshua Hart, Planning Director 168 North Edwards Street Independence, CA Kern Audubon Society 1604 Duke Drive Bakersfield, CA Reports/CEQA/ NOP Dist List Page 1 of 3

7 Buena Vista Water Storage District James Groundwater Storage and Recovery Project Notice of Preparation of Draft Environmental Impact Report May 2012 Distribution List 17 Kern Council of Governments Attn Robert R. Ball, Interim Executive Director th Street, Suite Kern County Engineering and Survey Services Floodplain Management Division 2700 M Street Kern County Library-Beale (Main Library) Attn Maria Rutledge, Head Librarian 701 Truxtun Avenue Kern County Water Agency Attn Jim Beck 3200 Rio Mirada Drive Bakersfield, CA Kern Delta Water District Attn Mark Mulkay 501 Taft Highway Bakersfield, CA Kern Water Bank Authority Attn Jonathan Parker, General Manager 1620 Mill Rock Way, Room 500 Bakersfield, CA Kings County Community Development Department Attn Greg Gatzka, Deputy Director 1400 West Lacey Boulevard Hanford, CA x Los Angeles County Department of Regional Planning 320 West Temple Street, 13th Floor Los Angeles, CA McMurtrey, Hartsock & Worth Attn Robert W. Hartsock nd Street, Suite Monterey County Resource Management Agency Planning Department Attn Mike Novo, Director of Planning 168 West Alisal Street, 2nd Floor Salinas, CA Natural History Museum of Los Angeles County 900 Exposition Boulevard Los Angeles, CA Robert A. Crewdson, Ph.D th Street, Suite Rosedale-Rio Bravo Water Storage District Attn Eric Averett 849 Allen Road Bakersfield, CA San Bernardino County Community Development and Housing Attn Patricia M. Cole 385 North Arrowhead Avenue, Third Floor San Bernardino, CA Santa Barbara County Planning and Development Attn Glenn Russell, Director 123 East Anapamu Street Santa Barbara, CA Sierra Club-Kern Kaweah Chapter Box 3357 Bakersfield, CA Reports/CEQA/ NOP Dist List Page 2 of 3

8 Buena Vista Water Storage District James Groundwater Storage and Recovery Project Notice of Preparation of Draft Environmental Impact Report May 2012 Distribution List 33 Southern San Joaquin Valley Archaeological Information Center California State University, Bakersfield 9001 Stockdale Highway Bakersfield, CA State Clearinghouse Governor s Office of Planning and Research 1400 Tenth Street, Room 222 Sacramento, CA Tulare County Countywide Planning Division Attn Fred Brusuelas, Chief Planner 5961 South Mooney Boulevard Visalia, CA US Fish & Wildlife Service 2800 Cottage Way, Suite W-2606 Sacramento, CA Ventura County Planning Division Attn Kim Prillhart, Planning Director 800 South Victoria Avenue, L-1740 Ventura, CA Vintage Petroleum LLC Occidental Petroleum Corporation 6851 McDivitt Drive, Suite D Bakersfield, CA West Kern Water District Attn Harry O. Starkey, General Manager 800 Kern Street Taft, CA Reports/CEQA/ NOP Dist List Page 3 of 3

Kern Water Bank Authority. Kern Water Bank Authority

Kern Water Bank Authority. Kern Water Bank Authority in Kern County How is your ground water basin governed and managed? Who is responsible? Who pays? Does this model work? What are the pros and cons? Do you consider this local control or regional control?

More information

KERN COUNTY ECONOMIC SUMMIT THE FUTURE OF WATER AND ITS ECONOMIC IMPACT

KERN COUNTY ECONOMIC SUMMIT THE FUTURE OF WATER AND ITS ECONOMIC IMPACT KERN COUNTY ECONOMIC SUMMIT THE FUTURE OF WATER AND ITS ECONOMIC IMPACT CURTIS CREEL Kern County Water Agency Assistant General Manager CALIFORNIA S WATER SYSTEMS William Mulholland Los Angeles Aqueduct

More information

NOTICE OF PREPARATION. Notice of Preparation of an Environmental Impact Report for the Kern Water Bank Conservation and Storage Project

NOTICE OF PREPARATION. Notice of Preparation of an Environmental Impact Report for the Kern Water Bank Conservation and Storage Project NOTICE OF PREPARATION To: Responsible, Federal and Trustee Agencies (Agency) From: Kern Water Bank Authority 1620 Mill Rock Way, Suite 500 Bakersfield, California 93311 (Address) Subject: Notice of Preparation

More information

Lorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department

Lorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department Lorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department Sept. 16, 2013, Lost Hills Recreation Building, Lost Hills Park, Highway 46, Lost Hills, CA 1. To Introduce the

More information

Water Banking Projects Update for Municipal Water District of Orange County

Water Banking Projects Update for Municipal Water District of Orange County Irvine Ranch Water District Water Banking Projects Update for Municipal Water District of Orange County February 3, 2014 1 Presentation Overview Purpose of IRWD Water Banking Projects Water Banking Projects

More information

Kern Water Bank. Kern Water Bank Authority

Kern Water Bank. Kern Water Bank Authority Kern Water Bank Kern Water Bank Authority THE KERN WATER BANK Ensuring a Reliable Water Supply to the Southern San Joaquin Valley Providing for Exceptional Upland and Riparian Habitat Kern Water Bank Authority

More information

Executive Summary. ES.1 Project Background

Executive Summary. ES.1 Project Background ES.1 Project Background The natural flow of the Kern River has been apportioned among various water users pursuant to a series of court decisions and agreements including, but not limited to, the following:

More information

Irvine Ranch Water District s Groundwater Banking Program

Irvine Ranch Water District s Groundwater Banking Program Irvine Ranch Water District s Groundwater Banking Program National Water Research Institute Drought Response Workshop October 8, 2013 1 Today s Discussion Introduction to IRWD Drought Preparedness at IRWD:

More information

Poso Creek. Integrated Regional Water Management Plan

Poso Creek. Integrated Regional Water Management Plan Poso Creek Integrated Regional Water Management Plan Adopted July 2007 Poso Creek IRWMP Regional Management Group and Region The Poso Creek Regional Management Group (Regional Management Group) comprises

More information

Semitropic Stored Water Recovery Unit Special Study Report

Semitropic Stored Water Recovery Unit Special Study Report Semitropic Stored Water Recovery Unit Special Study Report U.S. Department of the Interior Bureau of Reclamation Mid-Pacific Region Sacramento, California November 2007 Mission Statements The mission of

More information

For Sale. Exclusively Presented By: PEARSON REALTY

For Sale. Exclusively Presented By: PEARSON REALTY For Sale R iver R anch 900 Shares Lemoore Water Stock 1,180± Acres Drip Irrigation System 465± Acres Mature Pomegranates on Drip 715± Acres Tomatoes on Drip 960± Acres Tile Drain Kings River Frontage Exclusively

More information

Woodlake General Plan Draft Environmental Impact Report

Woodlake General Plan Draft Environmental Impact Report 5.0 UNAVOIDABLE ADVERSE ENVIRONMENTAL EFFECTS The following potential adverse environmental effects appear to be unavoidable if the Woodlake General Plan is implemented, even if certain mitigation measures

More information

K.R.E.W.S. Kern River Effort for Watershed Stability. Authors: Chelsi Campbell, Michael Au, Nick Rutigliano, James Hanes

K.R.E.W.S. Kern River Effort for Watershed Stability. Authors: Chelsi Campbell, Michael Au, Nick Rutigliano, James Hanes K.R.E.W.S. Kern River Effort for Watershed Stability Authors: Chelsi Campbell, Michael Au, Nick Rutigliano, James Hanes Table of Contents 1. Mission Statement. 2. Background 2.1 History... 2.2 Watershed

More information

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING FOR COALINGA OIL FIELD EIR No. 7180

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING FOR COALINGA OIL FIELD EIR No. 7180 NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING FOR COALINGA OIL FIELD EIR No. 7180 TO: FROM: SUBJECT: Responsible and Trustee Agencies, other interested agencies,

More information

Madera Irrigation District Water Supply Enhancement Project

Madera Irrigation District Water Supply Enhancement Project Madera Irrigation District Water Supply Enhancement Project Madera County Board of Supervisors Project Summary and Status March 29, 2011 1 Agenda MID Water Supply Enhancement Project Introductions Project

More information

6. Cumulative Impacts

6. Cumulative Impacts 6.1 OVERVIEW Section 15355 of the California Environmental Quality Act (CEQA) Guidelines defines cumulative impacts as: "...two or more individual effects which when considered together, are considerable

More information

CHAPTER 7B TAFT RECYCLING & SANITARY LANDFILL

CHAPTER 7B TAFT RECYCLING & SANITARY LANDFILL CHAPTER 7B RESPONSE TO COMMENTS RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT SCH #2009031008 TAFT RECYCLING & SANITARY LANDFILL General Plan Amendment No. 2, Map 138 Modification Conditional Use Permit

More information

Water Supply Study for the Lyons Canyon Project

Water Supply Study for the Lyons Canyon Project for the Lyons Canyon Project Prepared by: Science Applications International Corporation TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Lyons Canyon Project... 1 1.2 Purpose of the Water Supply Study...

More information

Economics and Alluvial Fans. Alluvial Fan Task Force Plenary Meeting 4 March 14, 2008

Economics and Alluvial Fans. Alluvial Fan Task Force Plenary Meeting 4 March 14, 2008 Economics and Alluvial Fans Presentation by: Dr. W. Bowman (Bo) Cutter, Ph.D. Autumn DeWoody Alluvial Fan Task Force Plenary Meeting 4 March 14, 2008 Economics/Water Resource Management University of California

More information

TULARE LAKE BASIN Portion of KERN COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN

TULARE LAKE BASIN Portion of KERN COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN MEETING OVERVIEW TULARE LAKE BASIN Portion of KERN COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN Stakeholder Meeting #5 March 30, 2009 Park Stockdale Civic Association, Bakersfield The purpose of this

More information

Long-Term Recapture and Recirculation of Restoration Flows Environmental Impact Statement. Public Scoping Meeting

Long-Term Recapture and Recirculation of Restoration Flows Environmental Impact Statement. Public Scoping Meeting Long-Term Recapture and Recirculation of Restoration Flows Environmental Impact Statement Public Scoping Meeting Sacramento Monday, August 10 1:00 3:00 p.m. USBR 2800 Cottage Way Café Conf. Room C-1002

More information

Carpinteria Valley Water District Carpinteria Advanced Purification Project

Carpinteria Valley Water District Carpinteria Advanced Purification Project NOTICE OF PREPARATION AND SCOPING MEETING Carpinteria Valley Water District Carpinteria Advanced Purification Project TO: Agencies, Organizations, and Interested Parties DATE: January 7, 2019 SUBJECT:

More information

Appendix K Public Outreach

Appendix K Public Outreach Appendix K Public Outreach TCAG 2014 Regional Transportation Plan Outreach Meetings The following is a list of the primary outreach meetings that occurred (and are scheduled) during the RTP update process.

More information

PITTSFIELD, MA CERTIFICATE POLLUTANT

PITTSFIELD, MA CERTIFICATE POLLUTANT Central Region AA OFFSETS FOR SALE Facility # C 2955 141 NORTH ST 4134420776 PITTSFIELD, MA 01201 C-196-6 ETH 775 766 771 762 AERA ENERGY LLC Facility # C 1121 10000 MING AVE 6616655000 PO BOX 11164 C-70-6

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION This description has been prepared in accordance with Section 15124 of the California Environmental Quality Act (CEQA) Guidelines. The proposed, known as the Area 9 Specific Plan,

More information

4.6 - Hydrology and Water Quality

4.6 - Hydrology and Water Quality City of Wasco - Wasco Center Walmart Hydrology and Water Quality 4.6 - Hydrology and Water Quality 4.6.1 - Introduction This section provides an evaluation of hydrology and water quality. The analysis

More information

California Water: Looking to the Future. Statistical Appendix

California Water: Looking to the Future. Statistical Appendix Golden Gate University School of Law GGU Law Digital Commons California Agencies California Documents 1-1988 California Water: Looking to the Future. Statistical Appendix California Department of Water

More information

State Water Resources Control Board

State Water Resources Control Board Linda S. Adams Srcrrtaqfir Er~viro~~r,,r,ltaI Protertiorz State Water Resources Control Board Division of Water Rights 1001 I Street, 14Ih Floor t Sacramento, California 95814 t 916.341.5300 P.O. Box 2000

More information

Water for Southern California: How Bay-Delta is Key to All of the Above Strategy

Water for Southern California: How Bay-Delta is Key to All of the Above Strategy Water for Southern California: How Bay-Delta is Key to All of the Above Strategy Stephen N. Arakawa Manager, Bay-Delta Initiatives The Metropolitan Water District of Southern California October 15, 2016

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 JAMES A. NOYES, Director www.ladpw.org ADDRESS ALL CORRESPONDENCE TO:

More information

Subject: Notice of Preparation of a Draft Environmental Impact Report

Subject: Notice of Preparation of a Draft Environmental Impact Report NOTICE OF PREPARATION From: Santa Clara Valley Water District 5750 Almaden Expressway San Jose, CA 95118 Subject: Notice of Preparation of a Draft Environmental Impact Report Project Title: Guadalupe Dam

More information

A G E N D A. REGULAR MEETING JUNE 13, :00 p.m.

A G E N D A. REGULAR MEETING JUNE 13, :00 p.m. A G E N D A KERN COUNTY PLANNING COMMISSION Chambers of the Board of Supervisors Kern County Administrative Center 1115 Truxtun Avenue, Bakersfield, California REGULAR MEETING JUNE 13, 2013-7:00 p.m. All

More information

URBAN WATER MANAGEMENT PLAN UPDATE FOR 2010

URBAN WATER MANAGEMENT PLAN UPDATE FOR 2010 URBAN WATER MANAGEMENT PLAN UPDATE FOR 2010 City of Shafter Public Works Department 336 Pacific Avenue Shafter, CA 93263 Michael James, P.E. Public Works Director City of Shafter R.C.E. #60021 Exp. 6-30-12

More information

year within the area of Kings County (California Department of Water Resources, 1979).

year within the area of Kings County (California Department of Water Resources, 1979). 4.3 WATER RESOURCES 4.3 WATER RESOURCES This section describes the existing hydrological setting for the County, including a discussion of water quality, based on published and unpublished reports and

More information

RESPONSES to COMMENTS on the DRAFT IS-MND

RESPONSES to COMMENTS on the DRAFT IS-MND CSUB Hotel and Conference Center Project Initial Study and Mitigated Negative Declaration RESPONSES to COMMENTS on the DRAFT IS-MND This section includes the comments received during circulation of the

More information

California League of Cities Briefing on Water Supply Issues

California League of Cities Briefing on Water Supply Issues California League of Cities Briefing on Water Supply Issues Stephen N. Arakawa Manager, Bay-Delta Initiatives The Metropolitan Water District of Southern California May 5, 2016 California WaterFix: Securing

More information

NOTICE OF PREPARATION OFA PARTIALLY REVISED, RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING FOR THE FRIANT RANCH PROJECT

NOTICE OF PREPARATION OFA PARTIALLY REVISED, RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING FOR THE FRIANT RANCH PROJECT County of Fresno DEPARTMENT OF PUBLIC WORKS AND PLANNING NOTICE OF PREPARATION OFA PARTIALLY REVISED, RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING FOR THE FRIANT RANCH PROJECT

More information

Members, Delta Vision Blue Ribbon Task Force

Members, Delta Vision Blue Ribbon Task Force DATE: September 20, 2007 FROM: Allan Krauter Kern County Administrative Office TO: Members, Delta Vision Blue Ribbon Task Force Attached please find comments from the Kern County Board of Supervisors regarding

More information

Subject: Notice of Preparation of a Draft Environmental Impact Report

Subject: Notice of Preparation of a Draft Environmental Impact Report NOTICE OF PREPARATION From: Santa Clara Valley Water District 5750 Almaden Expressway San Jose, CA 95118 Subject: Notice of Preparation of a Draft Environmental Impact Report Project Title: Calero Dam

More information

Pearson Realty. Kings and Tulare Counties, California. 5,813.68± Assessed Acres

Pearson Realty. Kings and Tulare Counties, California. 5,813.68± Assessed Acres CENTRAL CALIFORNIA PISTACHIOS & FARMLAND Kings and Tulare Counties, California 5,813.68± Assessed Acres District water, well water and ditch stock Full production and young pistachios Additional land to

More information

Supplying Southern California with Dependable Supplies of Water

Supplying Southern California with Dependable Supplies of Water University of Colorado Law School Colorado Law Scholarly Commons Water Organizations in a Changing West (Summer Conference, June 14-16) Getches-Wilkinson Center Conferences, Workshops, and Hot Topics 6-14-1993

More information

Chapter 1 Introduction

Chapter 1 Introduction ExhibÌt 2b Ðraft Background Report - chapter 1 lntroduction CountY of Ventura Planning Cómmiásion Work Session #3 ' * PLz-0141- Agenda ltem 6 ein oit 2b - Draft Background léóãtt - ChaPter I lntroduction

More information

STRAND RANCH INTEGRATED BANKING PROJECT

STRAND RANCH INTEGRATED BANKING PROJECT STRAND RANCH INTEGRATED BANKING PROJECT Draft Environmental Impact Report Prepared for: Rosedale-Rio Bravo Water Storage District January 2008 STRAND RANCH INTEGRATED BANKING PROJECT Draft Environmental

More information

Tulare County Regional Blueprint. Tulare County Regional Blueprint

Tulare County Regional Blueprint. Tulare County Regional Blueprint Tulare County Regional Blueprint May 2009 1 Table of Contents Section 1: Background Chapter 1 Introduction: Tulare County s Regional Blueprint Chapter 2 Chapter 3 Tulare County: A Brief History Choosing

More information

Re: Revised Draft Environmental Impact Report for the Rosamond Solar Array Project by First Solar, Inc. (PP10231)

Re: Revised Draft Environmental Impact Report for the Rosamond Solar Array Project by First Solar, Inc. (PP10231) PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT Lorelei H. Oviatt, AICP, Director 2700 "M" STREET, SUITE 00 BAKERSFIELD, CA 9330-2323 Phone: (66) 862-8600 FAX: (66) 862-860 TTY Relay -800-735-2929 E-Mail:

More information

FOR SALE Pampa Ranch. 5,130.51± Acres Kern County, California. CA BRE # Exclusively Presented By: Pearson Realty

FOR SALE Pampa Ranch. 5,130.51± Acres Kern County, California.   CA BRE # Exclusively Presented By: Pearson Realty FOR SALE Pampa Ranch 5,130.51± Acres Kern County, California Exclusively Presented By: Pearson Realty Perimeter Fenced and Cross Fenced into 12 Pastures 2 Solar Powered Livestock Wells 16 APN Numbers 36

More information

FOR SALE Pampa Ranch. 5,130.51± Acres Kern County, California. CA BRE # Exclusively Presented By: Pearson Realty

FOR SALE Pampa Ranch. 5,130.51± Acres Kern County, California.   CA BRE # Exclusively Presented By: Pearson Realty FOR SALE Pampa Ranch 5,130.51± Acres Kern County, California Exclusively Presented By: Pearson Realty Perimeter Fenced and Cross Fenced into 12 Pastures 2 Solar Powered Livestock Wells 16 APN Numbers 36

More information

California High-Speed Train Program FEIR/EIS

California High-Speed Train Program FEIR/EIS Page 2-30 Page 2-31 Page 2-32 Page 2-33 Page 2-34 Page 2-35 Page 2-36 of Enrique Manzanilla, Director U.S. Environmental Protection Agency, August 31, 2004 (Letter AF008) AF008-1 Acknowledged. AF008-2

More information

SB 610 Water Supply Assessment

SB 610 Water Supply Assessment SB 610 Water Supply Assessment UPDATED WATER SUPPLY ASSESSMENT Henry Mayo Newhall Memorial Hospital Master Plan Prepared for: The City of Santa Clarita April 2008 Prepared by Valencia Water Company 24631

More information

Draft Environmental Impact Report

Draft Environmental Impact Report Revised Draft Environmental Impact Report San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project Upstream of Highway 101 This notice announces that a Draft Environmental

More information

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below. CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE EAST CAMPUS STUDENT HOUSING PHASE III DEVELOPMENT PROJECT UNIVERSITY OF CALIFORNIA, IRVINE I. ADOPTION OF THE MITIGATED

More information

Notice of Preparation of Draft EIR Notice of Public Scoping Meeting ARB Southern California Consolidation Project

Notice of Preparation of Draft EIR Notice of Public Scoping Meeting ARB Southern California Consolidation Project Date: August 1, 2016 To: Subject: Contact: State Clearinghouse, Responsible Agencies, Trustee Agencies, Federal Agencies, Interested Parties, and Organizations of a Draft Environmental Impact Report and

More information

A Case Study: Imperial Valley, California

A Case Study: Imperial Valley, California University of Colorado Law School Colorado Law Scholarly Commons Western Water: Expanding Uses/Finite Supplies (Summer Conference, June 2-4) Getches-Wilkinson Center Conferences, Workshops, and Hot Topics

More information

Maricopa Table Grapes & Open Ground Bakersfield, California

Maricopa Table Grapes & Open Ground Bakersfield, California Kern County, CA Southlake Exitus I Exitus II Maricopa Native/Grazing Exclusively Presented By: CALIFORNIA S LARGEST AG BROKERAGE FIRM CA BRE #00020875 Property Overview DESCRIPTION A total of 872.00± acres

More information

U.S. Geological Survey minute series Lone Pine, CA topographic quadrangle. Denver, CO.

U.S. Geological Survey minute series Lone Pine, CA topographic quadrangle. Denver, CO. 3.6 LAND USE AND PLANNING As a result of the Initial Study, the Great Basin Unified Air Pollution Control District (District) determined that 2008 Owens Valley PM 10 Planning Area Demonstration of Attainment

More information

Revisions to the Kern County Zoning Ordinance, 2015 C

Revisions to the Kern County Zoning Ordinance, 2015 C Revisions to the Kern County Zoning Ordinance, 2015 C Oil and Gas Activities Joint Briefing Workshop Lorelei H. Oviatt, AICP Director Kern County Planning And Community Development Department July 27,2015

More information

State of the Valley Report

State of the Valley Report State of the Valley Report An overview of the characteristics and trends of natural resources in the San Joaquin Valley s rural spaces, with an eye on resource sustainability for the future Aerial view

More information

Draft Program EIR for thecity of Santa Clarita s Proposed One Valley One Vision General Plan

Draft Program EIR for thecity of Santa Clarita s Proposed One Valley One Vision General Plan Draft Program EIR for thecity of Santa Clarita s Proposed One Valley One Vision General Plan SCH# 2008071133 One Valley One Vision 2010 Volume III Appendix 3.13 (continued) One Valley One Vision 2010 Draft

More information

CADIZ VALLEY WATER CONSERVATION, RECOVERY, AND STORAGE PROJECT Final Environmental Impact Report SCH#

CADIZ VALLEY WATER CONSERVATION, RECOVERY, AND STORAGE PROJECT Final Environmental Impact Report SCH# Volume 6: Responses Response to Comments CADIZ VALLEY WATER CONSERVATION, RECOVERY, AND STORAGE PROJECT Final Environmental Impact Report SCH# 2011031002 Prepared for Santa Margarita Water District July

More information

CADIZ VALLEY WATER CONSERVATION, RECOVERY, AND STORAGE PROJECT Final Environmental Impact Report SCH#

CADIZ VALLEY WATER CONSERVATION, RECOVERY, AND STORAGE PROJECT Final Environmental Impact Report SCH# Volume 5: Comments Response to Comments CADIZ VALLEY WATER CONSERVATION, RECOVERY, AND STORAGE PROJECT Final Environmental Impact Report SCH# 2011031002 Prepared for Santa Margarita Water District July

More information

Kern Groundwater Authority GSA Groundwater Workshop. April 26, 2018 Shafter, California

Kern Groundwater Authority GSA Groundwater Workshop. April 26, 2018 Shafter, California Kern Groundwater Authority GSA Groundwater Workshop April 26, 2018 Shafter, California KERN GROUNDWATER AUTHORITY GROUNDWATER SUSTAINABILITY AGENCY Members of the Kern Groundwater Authority (KGA) Arvin

More information

Adjudication Background and the Watermaster. ABC s of Water Jeffrey Ruesch November 15, 2016

Adjudication Background and the Watermaster. ABC s of Water Jeffrey Ruesch November 15, 2016 Adjudication Background and the Watermaster ABC s of Water Jeffrey Ruesch November 15, 2016 The MWA Mission N MWA Boundary Manage the region s water resources for the common benefit to assure stability

More information

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: South County Recycled Water Pipeline - Short-Term CIP Implementation

More information

FRESNO LOCAL AGENCY FORMATION COMMISSION (LAFCO) EXECUTIVE OFFICER S REPORT

FRESNO LOCAL AGENCY FORMATION COMMISSION (LAFCO) EXECUTIVE OFFICER S REPORT DATE: July 11, 2007 FRESNO LOCAL AGENCY FORMATION COMMISSION (LAFCO) EXECUTIVE OFFICER S REPORT CONSENT AGENDA ITEM NO. 6 TO: FROM: Fresno Local Agency Formation Commission Rick Ballantyne, Executive Officer

More information

FOR SALE. Baroncini s Breckenridge Ranch. 4,631.78± Acres Kern County, California. CA BRE #

FOR SALE. Baroncini s Breckenridge Ranch. 4,631.78± Acres Kern County, California.  CA BRE # FOR SALE Baroncini s Breckenridge Ranch 178 Rio Bravo Country Club Brenckridge Road 99 204 58 184 Brenckridge Road Comanche Road Comanche Road Towerline Road General Beale Road 4,631.78± Acres Kern County,

More information

The Future of Irrigated Agriculture: Where's the Water?

The Future of Irrigated Agriculture: Where's the Water? The Future of Irrigated Agriculture: Where's the Water? California Colloquium on Water UC Berkley February 9 th 2010 David F. Zoldoske, Director Center for Irrigation Technology California State University,

More information

Staff contact: Mr. Bob Holden, Principal Engineer Phone: (831) Fax: (831)

Staff contact: Mr. Bob Holden, Principal Engineer Phone: (831) Fax: (831) SUPPLEMENT TO THE MAY 2013 NOTICE OF PREPARATION FOR THE MONTEREY PENINSULA GROUNDWATER REPLENISHMENT (PURE WATER MONTEREY) PROJECT ENVIRONMENTAL IMPACT REPORT TO: Agencies, Interested Parties, and Members

More information

Overview of Conjunctive Management in California Let s Have a Frank Discussion

Overview of Conjunctive Management in California Let s Have a Frank Discussion Overview of Conjunctive Management in California Let s Have a Frank Discussion Mark S. Nordberg, P.G. Division of Integrated Regional Water Management North Central Region Office Geology and Groundwater

More information

7/20/2011 TECHNICAL FEEDBACK GROUP OBJECTIVES. Seepage and Conveyance Technical Feedback Group. April 29, H Street Los Banos, CA.

7/20/2011 TECHNICAL FEEDBACK GROUP OBJECTIVES. Seepage and Conveyance Technical Feedback Group. April 29, H Street Los Banos, CA. Seepage and Conveyance Technical Feedback Group April 29, 2011 541 H Street Los Banos, CA Agenda Introductions and Technical Feedback Group (TFG) Purpose Action Item Review and Update 2011 Interim Flows

More information

FRESNO LOCAL AGENCY FORMATION COMMISSION (LAFCO) EXECUTIVE OFFICER S REPORT

FRESNO LOCAL AGENCY FORMATION COMMISSION (LAFCO) EXECUTIVE OFFICER S REPORT DATE: July 11, 2007 FRESNO LOCAL AGENCY FORMATION COMMISSION (LAFCO) EXECUTIVE OFFICER S REPORT CONSENT AGENDA ITEM NO. 6 TO: FROM: Fresno Local Agency Formation Commission Rick Ballantyne, Executive Officer

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION DATE: April 6, 2017 TO: FROM: SUBJECT: Responsible Agencies, Trustee Agencies, and Interested Persons Timbisha Shoshone Tribe Attn: NOP Comments P.O. Box 1779 Bishop, CA 93515 Fax:

More information

Lorelei H. Oviatt, AICP Special Projects Division Chief Kern County Planning Department

Lorelei H. Oviatt, AICP Special Projects Division Chief Kern County Planning Department June 18, 2009 Lorelei H. Oviatt, AICP Special Projects Division Chief Kern County Planning Department www.co.kern.ca.us/planning 661-862-8866 Loreleio@co.kern.ca.us Tejon Mountain Village Ranchwide Agreement

More information

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN To: Responsible Agencies, Trustee Agencies, Organizations, and Interested Parties From: Erika

More information

3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY

3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY 3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY 1. PURPOSE The purpose of this section is to explain the methodology for the cumulative project analysis presented in this EIR. This section is important because,

More information

Annual Monitoring Report for Calendar Year 2009

Annual Monitoring Report for Calendar Year 2009 Annual Monitoring Report for Calendar Year 2009 City of Paso Robles Submitted to: Paso Robles Groundwater Basin Groundwater Advisory Committee Date: February 9, 2011 Table of Contents 1 Introduction 2

More information

Friant Dam and Millerton Reservoir

Friant Dam and Millerton Reservoir San Joaquin River Restoration Program Floodplain Management Association Presentation SJRRP Update Continued: Impacts from Subsidence April 18, 2013 1 Friant Dam and Millerton Reservoir Completed in 1942

More information

Notice of Preparation for the Copeland Creek Stormwater Detention Basin (CIP Project )

Notice of Preparation for the Copeland Creek Stormwater Detention Basin (CIP Project ) Copeland Creek Stormwater Detention Basin (CIP Project 2006-04) Date: December 20, 2017 To: Public Agencies and Interested Persons From: Mary Grace Pawson, Director of Development Services, City of Rohnert

More information

AV IRWMP DAC Outreach Lake Los Angeles Tuesday, August 28, 2012

AV IRWMP DAC Outreach Lake Los Angeles Tuesday, August 28, 2012 AV IRWMP DAC Outreach Lake Los Angeles Tuesday, August 28, 2012 Minutes taken by: Los Angeles Rural Town Council The DAC Outreach meeting at Lake Los Angeles was held on August 28, 2012 during the Lake

More information

PLUMAS COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT UPPER FEATHER RIVER INTEGRATED REGIONAL WATER MANAGEMENT MEMORANDUM OF UNDERSTANDING

PLUMAS COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT UPPER FEATHER RIVER INTEGRATED REGIONAL WATER MANAGEMENT MEMORANDUM OF UNDERSTANDING PLUMAS COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT UPPER FEATHER RIVER INTEGRATED REGIONAL WATER MANAGEMENT MEMORANDUM OF UNDERSTANDING November 14, 2014 UPPER FEATHER RIVER INTEGRATED REGIONAL

More information

METROPOLITAN BAKERSFIELD GENERAL PLAN UPDATE GREATER BAKERSFIELD CHAMBER OF COMMERCE

METROPOLITAN BAKERSFIELD GENERAL PLAN UPDATE GREATER BAKERSFIELD CHAMBER OF COMMERCE METROPOLITAN BAKERSFIELD GENERAL PLAN UPDATE GREATER BAKERSFIELD CHAMBER OF COMMERCE JUNE 12, 2009 PURPOSE OF WORKSHOP MAJOR INFLUENCES PUBLIC OUTREACH REPORT EXISTING CONDITIONS REPORT SB 375/AB 32/AB

More information

Hydrologic Characteristics of the Owens River Basin below the Upper Owens River

Hydrologic Characteristics of the Owens River Basin below the Upper Owens River Appendix T. Hydrologic Characteristics of the Owens River Basin below the Upper Owens River The hydrology of Mono Basin is described in detail in Chapter 3A. This appendix describes the Owens River basin

More information

The Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632

The Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632 Study Partners The Nature Conservancy Cosumnes River Preserve 13501 Franklin Boulevard Galt CA 95632 East Bay Municipal Utility District 1 Winemaker Way, Unit K Lodi CA 95240 Sacramento County Water Agency

More information

KERN IRWMP Project List

KERN IRWMP Project List 1 Mountains/Foothills 2 Mountains/Foothills 3 Mountains/Foothills 4 Mountains/Foothills 5 Mountains/Foothills 6 Mountains/Foothills 7 Mountains/Foothills 8 Mountains/Foothills 9 Mountains/Foothills 10

More information

California s s Water Supplies and Uses

California s s Water Supplies and Uses California s s Water Supplies and Uses Presented to Delta Stewardship Council Presented by Joe Grindstaff September 21 1 Place to Place: Most precipitation falls in the mountains in the north and east

More information

FOR SALE Temperance Ranch

FOR SALE Temperance Ranch Temperance Ave. FOR SALE Temperance Ranch E. American Ave. 162.49± Acres Fresno County, California Exclusively Presented By: Pearson Realty New 13,000 S.F. aluminum solar panel pole barn Four pumps and

More information

Investigation Highlights

Investigation Highlights Investigation Highlights May 2014 INVESTIGATION HIGHLIGHTS A Summary North-of-the-Delta Offstream Storage (NODOS) would provide a robust set of benefits, including water supply reliability for municipal

More information

Numerical Groundwater Model for the Kaweah Delta Water Conservation District

Numerical Groundwater Model for the Kaweah Delta Water Conservation District Numerical Groundwater Model for the Kaweah Delta Water Conservation District Nels Ruud and Peter Leffler Fugro West, Inc. Larry Dotson Kaweah Delta Water Conservation District Presentation Outline Background

More information

Paso Robles Groundwater Subbasin Water Banking Feasibility Study

Paso Robles Groundwater Subbasin Water Banking Feasibility Study Paso Robles Groundwater Subbasin Water Banking Feasibility Study Final Report San Luis Obispo County Flood Control And Water Conservation District Date: April 2008 Project No: 064030 Table of Contents

More information

SECTION 1: INTRODUCTION

SECTION 1: INTRODUCTION SECTION 1: INTRODUCTION 1.1 - Overview, Purpose, and Authority of the EIR 1.1.1 - Overview This Draft Environmental Impact Report (Draft EIR) considers a project that includes a series of actions resulting

More information

XI. Thornton Planning Area

XI. Thornton Planning Area XI. A. OVERVIEW The covers 120 square miles in the northwest corner of San Joaquin County. It consists primarily of low-lying Delta islands, sloughs, and large farms. The town of Thornton, a small agriculturally-based

More information

FOR SALE. Cottonwood Creek Ranch ± Acres Madera County, California. CA BRE #

FOR SALE. Cottonwood Creek Ranch ± Acres Madera County, California.   CA BRE # FOR SALE Cottonwood Creek Ranch Avenue 15 Avenue 13 1/2 Road 32 Road 33 Road 33 1/2 Road 34 Road 34 1/2 Avenue 12 2195.50± Acres Madera County, California Exclusively Presented By: Pearson Realty Solar

More information

NOTICE OF PREPARATION AND SCOPING MEETING

NOTICE OF PREPARATION AND SCOPING MEETING April 9, 2013 NOTICE OF PREPARATION AND SCOPING MEETING SUBJECT: Notice of preparation of a Draft Environmental Impact Report (DEIR) for the California Flats Solar Project. The County of Monterey will

More information

California Water Service Company ADOPTED

California Water Service Company ADOPTED ADOPTED December 15, 2006 Table of Contents TABLE OF CONTENTS...2 LIST OF FIGURES...4 LIST OF TABLES...5 CONTACT SHEET...7 1 INTRODUCTION...8 1.1 PURPOSE...8 1.2 PUBLIC REVIEW...8 1.3 PLAN ADOPTION...9

More information

SACOG Board of Directors

SACOG Board of Directors SACOG Board of Directors Item #15-4-7 Consent April 9, 2015 Approve Support for H.R. 1060 (Sacramento Valley Water Storage and Restoration Act of 2015) Issue: Should SACOG support H.R. 1060, the Sacramento

More information

The Los Angeles Desalination Project

The Los Angeles Desalination Project DRAFT PROPOSAL The Los Angeles Desalination Project Author: Brian Nissen Company: Bella Machines www.bellamachines.com The Los Angeles Desalination Project CALIFORNIA WATER The California water crisis

More information

AN ORDINANCE OF THE COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, ADDING ARTICLE 5 TO CHAPTER 6 OF DIVISION

AN ORDINANCE OF THE COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, ADDING ARTICLE 5 TO CHAPTER 6 OF DIVISION ORDINANCE NO. AN ORDINANCE OF THE COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, ADDING ARTICLE TO CHAPTER OF DIVISION OF TITLE OF THE SAN BERNARDINO COUNTY CODE RELATING TO GROUNDWATER MANAGEMENT IN THE

More information