Synthesis Procedure of the Power Supply Systems Topology at Mineral Resource Enterprises based on Logical-Probabilistic Assessments

Size: px
Start display at page:

Download "Synthesis Procedure of the Power Supply Systems Topology at Mineral Resource Enterprises based on Logical-Probabilistic Assessments"

Transcription

1 Synthesis Procedure of the Power Supply Systems Topology at Mineral Resource Enterprises based on Logical-Probabilistic Assessments Denis Anatolyevich Ustinov and Sergey Vasilyevich Baburin National mineral resources university (university of mines) 2, 21st line, Vasilyevsky Island , St. Petersburg, Russian Federation Abstract The article considers synthetic procedure of the power supply systems topology at mineral resource enterprises. The expediency of using general logic probabilistic method and developed on its basis the software "ARBITR" is substantiated to calculate the reliability of power supply systems. The results of the synthesis topology of power supply systems are cited as an example of consumers with underground mining operations and consumers of gas transmission systems. Recommendations are given for raise the reliability power supply of enterprises mineral complex. Keywords: reliability, power supply system, the logicalprobabilistic method, significance, autonomous source. Introduction The main type of energy used in the process of production, processing and transportation of solid, liquid and gaseous mineral resources is electrical energy. Power supply systems (PSS) objects mineral resource complex (MRC) should provide consumers with electricity with a given level of reliability, which is determined primarily by the following parameters: probability of failure-free operation for a given period of time, availability factor, the depth and duration of voltage dips. By the power supply disturbance emerge problems associated with the disorder complex technological processes, leading to considerable material damage with the occurrence of risk to human life, etc. Analysis of the power supply systems topology has allowed to reveal the generalized structure power supply system enterprises MRC, including devices improve power supply reliability: sources of autonomous power supply (APS); Automatic sectioning points (ASP); filter-compensating devices (FCD); fast-acting automatic input of a reserve (FAIR), devices control circuit under voltage of power transformers (fig. 1). On the fig. 1 is not shown power supply of busbar 6 (10) kv from centralized systems power supply of 35 kv, 110 kv, 220 kv through the step-down transformers main step-down substation, and also set of customers and converters of electric power, receiving power from the busbar means of radial, radial-trunk and ring power lines. In conditions of centralized systems power supply with closed structure, voltage dips under emergency conditions arise on all inputs, which does not regard them as independent sources. [1] According to the Energy Strategy of Russia until 2030, approved by the RF Government from November 13, r, it is necessary to increase the probability of deficitfree operation of power systems of Russia with to , which corresponds to a decrease the allowable number of switching-off hours per year from 72 hours to 36 hours, including the time of regenerating of power supply. [2] Standards, constitutive requirements for indicators of reliability and stability of PSS and stability of technological processes at disturbances of power supply are lacking, hence the need for works realization at establishing the boundary parameters that must be provided at the facilities of MRC. According to State Standard R "Quality standards of electric power in the power supply systems, general purpose", point «Voltage dips' duration of the voltage dip can be varied from 10 milliseconds to 1 minute. However, this Standard does not impose requirements for the depth and duration of the voltage dip in power networks for specific and stability of technological processes at the enterprises MRC. As it was shown by studies and experience of operation of existing power supply systems, violation of technological processes in the oil industry arise during brownouts lasting 0.1 seconds.. Under the conditions of the petrochemical industry in emergency conditions occurring during a short circuit (short circuit) on one of the inputs and result in voltage dips to 0.3 from the nominal and during the process of liquidation of short-circuit 0.18 s, there has been a violation of the refining process, which led to the shutdown of 40 processing units with the appropriate material damage. Similar damage in case of a power failure occurs almost all branches the mining industry. Considering variety of industries in the MRC, it is necessary to establish the reliability of power supply, which provide stability of technological processes and develop method for the synthesis topology of power supply systems at MRC enterprises, properties and parameters which satisfy the requirements of the stability and safety of operation of technological objects of MRC. Research Results Justification of structure and parameters of the topology of the PSS should be performed using the methods of mathematical modeling in the process of variant structures for which shall be determined reliability, the number and value of the individual elements. Let us consider possibility of using wellknown methods for assessing the reliability of PSS and MRC based on their complexity and multiply By modeling it is advisable to use automated software systems. At the present time, the following software systems are used: «Risk Spectrum»; Complex by Prourzin V.A. 6402

2 numerical analysis of reliability; «BUNKER»; «RAY»; "Rizikon-reliability"; "ARBITR". In most of the above adducted software systems studied structures presented as event trees, fault trees or graphs of connectivity. However, this presentation of events has some disadvantages: presentation of the structural schemes in the form of event trees, makes it possible to correctly present only monotonous process of functioning of systems that cannot account difficulty in the models designed facilities; construction of fault trees demands the account of all possible variants of events, sequences and combinations is difficult by considering the complex, interconnected systems. These disadvantages are eliminated in the program complex for automated structural logic modeling of systems "ARBITR" [3]. In this method, as the original structural circuit the scheme of functional integrity (SFI) is used, showing the original system consisting of power and included in their structure elements. SFI is a block diagram in which functional tops (large circles) are marked the components of the real of power supply. They linked to each other with conjunctive and disjunctive contacts which characterize the logical connection of components. For each element are set its parameters. As examples two schemes of functional integrity of consumers with underground mining operations and consumers of gas transmission systems are considered below. Fig. 2 shows a generalized system SFI of power supply at gas pipeline compressor station (CS "Torzhok" of "Gazpromtransgaz St. Petersburg"), and fig. 3-SFI generalized system of power supply of mining consumers (mine Vorgashorskaja stock corporation "Vorkutaugol"). Initial data for calculation are the values meantime between failures and mean time to repair each item. They are determined on the basis of statistical data or reference data [4]. After that, it set a logical criterion of operation, such as the probability of obtaining power by any users of the system, and makes logical functions of the system. A the result of modeling parameters are determined by power system reliability, such as uptime, mean time between failures, mean time to repair the system, the probability of failure-free operation for a certain period of time and indicators characterizing the role of the elements in ensuring reliability. These indicators include the significance of positive and negative contributions of each element [5]. The importance of the element shows an increase in the reliability of the system by increasing the probability of failure-free operation of the cell from 0 to 1, then there is the maximum possible improvement: P P. (1) i 1 0 In the fact the existing elements already have a probability of failure of non-zero (p i). Therefore it is more expedient to use in the analysis of the values of the positive contributions of the elements. They represent a possible increase in the reliability of the system by increasing the probability of failure-free operation of the element from its current value to 1, and then there is a real opportunity to improve the reliability: i Pc p P. (2) i 1 c p i The negative contribution on the contrary shows how reduced reliability of the system by reducing the probability of failurefree operation of the element from its current value to 0. That is, it shows the most vulnerable elements of the loss which are most affected the reliability of the system: P P. (3) i 0 As a result of modeling the power supply reliability for mine consumers are established the parameters of power supply reliability for conveyor belt, mining combine and face conveyor. They are indicated at the fig. 3 small circles 74, 80 and 85. For this example the results of the calculations showed that the ratio of system availability factor for the number 74 (conveyor belt) was 0.993, and for 80 (face conveyor) and 85 (mining combine) However, the set value of mean time between failures is T 0 = 1391 hours for belt conveyor and T 0 = 472 hours for face conveyor. The average failure rate in the year was respectively 6.3 and The probability of failurefree operation for the belt conveyor in one year amounted to P = , face conveyor and mining combine-p = As a result of modeling the significance, positive and negative contributions values of the system elements are obtained. The values of the positive contributions ranged from 0 to , and negative contributions from 0 to Elements that have the highest values of positive and negative contributions for the SFI are shown at the fig. 3 in the table. From the obtained results it is possible to identify elements, failure of which will result in the greatest economic damage. For this scheme it is the cable lines, transformer substations and switchgears. At the same time, these elements also have the highest values of positive contributions. The results of modeling for the SFI compressor station (fig. 2) [6] are showed that the cells of indoor switchgear (3, 6, 19, 20, 22, 23) and transformers (28, 29, 31, 32) have the greatest importance. The values of the positive contributions range from 0 to 0.002, negative contributions-from 0 to The analysis of the positive contributions of elements of electric power enterprises MRC is showed that their value does not exceed So, increasing the probability of failure-free operation of power supply systems through the modernization of its individual elements is possible only by an amount equal to the positive contribution of this element. Therefore, ensuring required parameters of reliability is advantageously carried out by means of structural and temporal reserving based on the synthesis of topology power systems enterprises MRC. Such measures include: reservation of the most important elements of the system; the use of additional sources of electrical energy, the role of which can act as a traditional independent sources working on diesel or natural gas, as well as alternative and renewable energy sources; the use of high-speed automatic standby activation [7]; the use of storage in the system, allowing to create some leeway to eliminate failures [8]. This is the 6403

3 most common for transport systems, and it is achieved by a device such as intermediate storage. Uninterruptible power supply for the most demanding consumers of electric power interruptions who allow to create a reserve for the time required to recover the power from the main source. The results of logical-probabilistic modeling are the basis for the synthesis of the topology of power supply systems for enterprises MRC to determine the optimal variant of the power supply system and reconstruction of existing industrial plants [9]. Fig. 4 shows a synthesis algorithm for topology of power supply systems. The algorithm also includes a variety of options for power supply system of the economic criterion. As an economic criterion can be accepted the mentioned level of costs or the value of the net discounted income. There are cases when the system on the contrary has structural redundancy. In such systems, there may be elements that can be excluded without reducing reliability. In some cases other elements can be used instead of the most vulnerable elements. For instance, conducted researches for gas compressor stations with the use of logical-probabilistic of modeling are showed that the option of power supply scheme for compressor station with a two-part indoor switchgear and one section complete transformer substations (one transformer) is more preferable than the traditional scheme with two transformers, however at the same time the costs of establishment and operation of the electricity system of the compressor station are significantly reduced, and reliability satisfies the requirements of normative documents.. It was also found that the comparative figures for the reliability of self-contained power plants and transmission lines of the external network differ by an insignificant value-0.1%. It suggests the establishment of an equivalent power supply system using local power supplies, are not inferior in terms of the reliability of power supply from the external power supply system in non-electrified areas of the country Figure 1: Generalized structure of power supply system enterprises MRC. QF-automatic switch; TC-thyristor commutator. Table I: Importance, positive and negative contributions of the elements Number of element Importance Negative contributions Positive contributions Name of the element 49 0, , ,6561E-008 SB 1 UDS , , ,2466E-007 CL 6 KV 55 0, , ,6896E , , , SB 2 UDS 204 SB 1 UDS , , , CL 6 KV 66 0, , ,0029 TKSHVP 67 0, , ,0029 TKSHVP 71 0, , , CL 1,2 KV 72 0,9932-0, , PVI 73 0,9932-0, , CL 1,2КВ Figure 2: Scheme of the functional integrity of the system of power supply efficiency of the compressor station overhead power line 110 kv; 2.5-transformers 110/10 kv; 3,6,10-12,19,20,22-26-cells of indoor switchgear 10 kv; 7-9- automatic gas-piston station (AGPS); 13,15,17-automatic control system AGPS; 14,16,18 block the ventilation AGPS; transformer 10/0.4 kv; system functions; y- output functions representing the conditions of the sale an element of functionality in the system. 6404

4 Figure 3: Scheme of the functional integrity of the power supply system for mining consumers. Power line-line of electric power transmission; QF-circuit breaker; SB-section busbar; CL-cable line; TSVP, TKSHVP-transformer substations; KRUV-Switchgear; PVI-starter; UDSunderground distribution substation Conclusions 1. It is substantiated the expediency of using general logic probabilistic method and developed on the basis of its software "ARBITR". Logical and probabilistic modeling allows to determine indication of the significance and contributions of components. 2. It is offered the method for the synthesis of the topology of power supply systems of enterprises MRC, properties and parameters which satisfy the requirements of stability and reliability, taking into account the complexity and the multiply of the constituent components and based on the identified indicators of significance and contributions of components in the ensuring of reliability to select ways to optimize the power supply system of the industrial enterprises, allowing to minimize the number of elements and reduce capital and operating costs. 3. For electric power supply of mineral complex enterprises is necessary to use the system with distributed generation by independent power supply, the use of which will allow completely or partially to abandon the centralized power supply plants MRC without compromising reliability. Acknowledgments Work performed as part of the job /K from 11/07/2014 to Ministry of Education and Science Russian Federation. References Figure 4: Algorithm for synthesis topology power systems for enterprises MRC [1] ARBITR. Software for automated structural logic simulation and calculation of reliability and safety for the control system during the design stage (PC ASM SZMA), basic version 1.0. Author: A.S. Mozhaev. Rights holder: OJSC SPIC SZMA. Moscow, [2] M.S. Ershov, A.V. Egorov, V.A. Antsiferov Methods for assessing the reliability and independence of supply sources in industrial power systems, Promyshlennaya energetika, 2014, N 1, pp.2-6. [3] E.Kh. Muratbakeev, B.N. Abramovich, A.V. Medvedev, V.V. Starostin Minimizing the damage caused by oil due to short interruptions of power supply, Promyshlennaya energetika, 2009, N 7, pp [4] V.A. Ovseichuk The reliability and quality of electricity supply to consumers, Novosti elektrotekhniki, 2013, N 3, pp [5] S.P. Petrov, S.V. Baburin, D.A. Ustinov The use of logic and probabilistic modeling method for calculating the reliability of power supply systems, Nauka i tekhnika v gazovoi promyshlennosti, 2011, N 3, pp [6] S.P. Petrov, B.N. Abramovich, S.V. Baburin Identification of optimization directions of energy 6405

5 structure on the criterion of reliability, Gazovaya promyshlennost, 2011, N 9, pp [7] S.P. Petrov, A.N. Makhalin, S.V. Baburin Improving the reliability of gas transport systems with the use logic and probabilistic modeling method, Zapiski Gornogo instituta, 2012, Vol.196, pp [8] RD Guidelines on the application of power systems elements reliability parameters and work units with steam turbine installations. Мoscow: SPO Soyuztekhenergo, 1985, p.20. [9] A.N. Shpiganovich, V.A. Pestunov Improving the efficiency of functioning of the power supply systems, Elets: EGU im. I.A.Bunina, Lipetsk: LGTU, 2004, p

POTOMAC ELECTRIC POWER COMPANY

POTOMAC ELECTRIC POWER COMPANY POTOMAC ELECTRIC POWER COMPANY FERC Form 715 (Part 4) - Transmission Planning Study Guidelines Transmission Reliability Guidelines 1. General Overview The reliability guidelines used to plan the transmission

More information

WILEY A JOHN WILEY & SONS, INC., PUBLICATION

WILEY A JOHN WILEY & SONS, INC., PUBLICATION POWER DISTRIBUTION SYSTEM RELIABILITY Practical Methods and Applications Ali A. Chowdhury Don O. Koval IEEE PRESS SERIES ON POWER ENGINEERING IEEE Press WILEY A JOHN WILEY & SONS, INC., PUBLICATION Preface

More information

Reliability Models for Electric Power Systems

Reliability Models for Electric Power Systems Reliability Models for Electric Power Systems White Paper #23 Revision 0 Executive Summary This note explains the sources of downtime in Electric Power Systems and provides an explanation for site-to-site

More information

Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA. March 21, 2017

Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA. March 21, 2017 Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA March 21, 2017 Contents 1 Background...3 2 National and Regional Criteria and Guides...4 2.1 2.1 NERC Transmission Planning Standards...4 2.2

More information

Optimal network topology and reliability indices to be used in the design of power distribution networks in oil and gas plants *

Optimal network topology and reliability indices to be used in the design of power distribution networks in oil and gas plants * Optimal network topology and reliability indices to be used in the design of power distribution networks in oil and gas plants * R Naidoo and EJ Manning University of Pretoria, Pretoria, South Africa ABSTRACT:

More information

Transmission System Security and Planning Standards

Transmission System Security and Planning Standards ver. 1.4 page 1 from 13 Transmission System Security and Planning Standards April 2014 ver. 1.4 page 2 from 13 TABLE OF CONTENTS 1 Introduction... 4 2 Definitions... 4 2.1 Transmission System... 4 2.2

More information

Reducing The Risk Of Fires In Conveyor Transport

Reducing The Risk Of Fires In Conveyor Transport IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS Reducing The Risk Of Fires In Conveyor Transport To cite this article: M S Cheremushkina and D A Poddubniy 2017 IOP Conf. Ser.:

More information

UNOFFICIAL TRANSLATION SUPPLY OF REACTIVE POWER AND MAINTENANCE OF REACTIVE POWER RESERVES

UNOFFICIAL TRANSLATION SUPPLY OF REACTIVE POWER AND MAINTENANCE OF REACTIVE POWER RESERVES UNOFFICIAL TRANSLATION SUPPLY OF REACTIVE POWER AND MAINTENANCE OF REACTIVE POWER RESERVES Guideline 1 (11) Contents 1 INTRODUCTION... 2 2 PRINCIPLES OF THE SUPPLY OF REACTIVE POWER... 2 2.1 Supply point

More information

Standard TPL (i) System Performance Under Normal Conditions

Standard TPL (i) System Performance Under Normal Conditions Standard TPL-001-0.1(i) System Performance Under rmal Conditions A. Introduction 1. Title: System Performance Under rmal ( Contingency) Conditions (Category A) 2. Number: TPL-001-0.1(i) 3. Purpose: System

More information

GUYANA POWER AND LIGHT INC

GUYANA POWER AND LIGHT INC GUYANA POWER AND LIGHT INC The Terms of Reference REQUEST FOR PROPOSALS: CONSULTANCY SERVICES COORDINATING GENERATOR PROTECTION WITH TRANSMISSION PROTECTION AND GENERATOR CONTROLS (GPL-PI-094-2016) November

More information

Grid Integration of Renewable Energy. Robert S. Kaneshiro, P.E. Operations Assistant Superintendent Hawaii Electric Light Company (HELCO)

Grid Integration of Renewable Energy. Robert S. Kaneshiro, P.E. Operations Assistant Superintendent Hawaii Electric Light Company (HELCO) Grid Integration of Renewable Energy Robert S. Kaneshiro, P.E. Operations Assistant Superintendent Hawaii Electric Light Company (HELCO) October 2012 Contents HELCO System Overview Challenges of integrating

More information

A specific application in the oil-refining industry performed during the preliminary engineering phase

A specific application in the oil-refining industry performed during the preliminary engineering phase A specific application in the oil-refining industry performed during the preliminary engineering phase Objectives: - To provide analytical information to support decisions related to attaining desired

More information

THE IMPACT OF RESTRUCTURING URBAN AND SUBURBAN DISTRIBUTION GRIDS WITH SMART GRID APPROACHES ON SYSTEM RELIABILTY

THE IMPACT OF RESTRUCTURING URBAN AND SUBURBAN DISTRIBUTION GRIDS WITH SMART GRID APPROACHES ON SYSTEM RELIABILTY THE IMPACT OF RESTRUCTURING URBAN AND SUBURBAN DISTRIBUTION GRIDS WITH SMART GRID APPROACHES ON SYSTEM RELIABILTY Matej REJC Gerhard HAFNER Alfred EINFALT, Andreas LUGMAIER Siemens AG - Austria Wiener

More information

PSS E. High-Performance Transmission Planning Application for the Power Industry. Answers for energy.

PSS E. High-Performance Transmission Planning Application for the Power Industry. Answers for energy. PSS E High-Performance Transmission Planning Application for the Power Industry Answers for energy. PSS E architecture power flow, short circuit and dynamic simulation Siemens Power Technologies International

More information

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES --------------------------------------------- GAINESVILLE RENEWABLE ENERGY CENTER OPERATING PROCEDURES Revision 0; September 1, 2012 Revision 1; November

More information

Design and Research on Co-simulation Training System of Large-Scale Power Grid with Distribution Network Based on Intelligent Materials System

Design and Research on Co-simulation Training System of Large-Scale Power Grid with Distribution Network Based on Intelligent Materials System Design and Research on Co-simulation Training System of Large-Scale Power Grid with Distribution Network Based on Intelligent Materials System BaiShan Mei 1, XiPing Zhang 2, Jie Xu 2, and YueHong Xing

More information

STRATEGIC INTERCONNECTED NETWORK TRANSITIONING

STRATEGIC INTERCONNECTED NETWORK TRANSITIONING STRATEGIC INTERCONNECTED NETWORK TRANSITIONING Malcolm BEBBINGTON Russell BRYANS Alberto ELENA DE LEONARDO SP Energy Networks UK TNEI Services Ltd UK SP Energy Networks UK Malcolm.Bebbington2@spenergys.co.uk

More information

Route to Authorisation

Route to Authorisation Route to orisation 1. SCOPE This document was previously included in OPSAF-13-001 orisation Procedures as Attachment 1 Route to orisation Manual. This document has now been issued as an individual document

More information

NP001.7 Reliability Criteria for Distribution Networks

NP001.7 Reliability Criteria for Distribution Networks NP001.7 Reliability Criteria for Distribution Networks This document is extracted from Network Policy NP 001, Design and Construction of Network Assets. Other documents in this series include: NP001.1

More information

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES --------------------------------------------- GAINESVILLE RENEWABLE ENERGY CENTER OPERATING PROCEDURES Revision 0; September 1, 2012 Revision 1; November

More information

Study on the Application of Advanced Power Electronics in Smart Grid

Study on the Application of Advanced Power Electronics in Smart Grid Study on the Application of Advanced Power Electronics in Smart Grid Ma Zhengyou Sichuan College of Architectural Technology Department of Electrical Engineering Deyang, Sichuan, China mazyzhengzy16@126.com

More information

Complete Electrical Engineering Solutions. The Hospital Solution. Prevent Hospital Power Interruptions Improve Energy and Reduce Operating Costs

Complete Electrical Engineering Solutions. The Hospital Solution. Prevent Hospital Power Interruptions Improve Energy and Reduce Operating Costs The Hospital Solution Capability Brochure Prevent Hospital Power Interruptions Improve Energy and Reduce Operating Costs Increase Facility Capital Utilization Complete Electrical Engineering Solutions

More information

Mapping Document for FAC-010-3

Mapping Document for FAC-010-3 Mapping Document for FAC-010-3 The Project 2015 09 standard drafting team (SDT) is proposing the retirement of the NERC FAC 010 3 Reliability Standard. The SDT further proposes a new paradigm regarding

More information

Secure energy supply Energy Automation for Airports

Secure energy supply Energy Automation for Airports Secure energy supply Energy Automation for Airports Power Transmission and Distribution HV Distribution Network ~ MV Main Distribution M M MV Substation Safe Bus LV LV LV LV G ~ Station 1 Station 2 Check-in

More information

The Distribution System Security and Planning Standards

The Distribution System Security and Planning Standards The Distribution System Security and Planning Standards (Demand customers only) Date: September 2003 Status: Approved Distribution System Operator ESB Networks Revision 1 September 2003, Page 1 of 26 Contents

More information

International ejournals

International ejournals ISSN 2249 5460 Available online at www.internationalejournals.com International ejournals International Journal of Mathematical Sciences, Technology and Humanities 21 (2011) 205 212 ENERGY CONTROL CENTER

More information

PJM Manual M36 System Restoration. A.1 Critical Black Start Criteria

PJM Manual M36 System Restoration. A.1 Critical Black Start Criteria 5/1/2018 OC Meeting PJM Manual M36 System Restoration A.1 Critical Black Start Criteria A.1.1 Goal PJM and its stakeholders have developed requirements for the amount and redundancy of Black Start generation

More information

FERC Form No. 715 Part 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

FERC Form No. 715 Part 4 TRANSMISSION PLANNING RELIABILITY CRITERIA FERC Form No. 715 Part 4 TRANSMISSION PLANNING RELIABILITY CRITERIA The following information submitted for this Part 4 of FERC Form No. 715 consists of PJM's current Planning Criteria, and each member

More information

Distribution Information Exchange Code

Distribution Information Exchange Code Distribution Information Exchange Code Version 5.1 Approved September 2007 Comments to this document can be forwarded to: The RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission

More information

Standard MH-TPL Transmission System Planning Performance Requirements

Standard MH-TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: MH-TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

THE DISTRIBUTION SYSTEM SECURITY AND PLANNING STANDARDS. Asset Management & Regulation, ESB Networks

THE DISTRIBUTION SYSTEM SECURITY AND PLANNING STANDARDS. Asset Management & Regulation, ESB Networks THE DISTRIBUTION SYSTEM SECURITY AND PLANNING STANDARDS. Issued by: Review Cycle: Asset Management & Regulation, ESB Networks Three years Contents 1.0 Introduction....3 1.1 Definitions...3 1.2 Aim of Planning...5

More information

Standard Development Timeline

Standard Development Timeline Standard TPL-001-4 Transmission System Planning Performance Requirements Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be

More information

DISTRIBUTION SYSTEM ASSET CONDITION ASSESSMENT UPDATE

DISTRIBUTION SYSTEM ASSET CONDITION ASSESSMENT UPDATE EB-0-0 Exhibit D Page of DISTRIBUTION SYSTEM ASSET CONDITION ASSESSMENT UPDATE 0 EXECUTIVE SUMMARY Background Over the past number of years, THESL has put considerable effort into its Asset Management

More information

Evaluating Your Electrical Distribution System

Evaluating Your Electrical Distribution System Evaluating Your Electrical Distribution System September 22, 2016 Doug Marshall, P.Eng, Reliability Engineer Magna IV Engineering 2 Introduction Virtually all industrial and commercial installations are

More information

Grid Stability and Safety Issues Associated With Nuclear Power Plants

Grid Stability and Safety Issues Associated With Nuclear Power Plants Grid Stability and Safety Issues Associated With Nuclear Power Plants Dr. John H. Bickel, Ph.D. Workshop on International Grid Interconnection in Northeast Asia Beijing, China May 14-16, 2001 1 Items to

More information

RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES

RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES Evangelos Dialynas Professor in the National Technical University of Athens Greece dialynas@power.ece.ntua.gr

More information

Methodological Application to Integrate Renewable Energy Resource into Kuwait s Electrical Grid

Methodological Application to Integrate Renewable Energy Resource into Kuwait s Electrical Grid Methodological Application to Integrate Renewable Energy Resource into Kuwait s Electrical Grid Adel Qabazard Energy and Building Research Center Kuwait Institute for Scientific Research P. O. Box 24885,

More information

IMPLEMENTATION OF DISTRIBUTION AUTOMATION SYSTEMS (DAS) IN THE ELECTRICA COMPANY ROMANIA

IMPLEMENTATION OF DISTRIBUTION AUTOMATION SYSTEMS (DAS) IN THE ELECTRICA COMPANY ROMANIA IMPLEMENTATION OF DISTRIBUTION AUTOMATION SYSTEMS (DAS) IN THE ELECTRICA COMPANY ROMANIA Gheorghe Ion MAZILU - ELECTRICA SA Mihaela CONU - ELECTRICA SA Romania Romania Serban COCULESCU - ANRE Adrian Ion

More information

Connection Study Requirements

Connection Study Requirements Document Release Released: September 20, 2010 The Customer shall comply with all the applicable requirements in this document when performing connection studies to produce the engineering study report.

More information

Analysis of distribution system reliability and outage rates

Analysis of distribution system reliability and outage rates Reclosers Technical Data TD280026EN Supersedes pril 2003 (R280-90-7) COOPER POWER SERIES nalysis of distribution system reliability and outage rates Recloser Technical Data TD280026EN nalysis of distribution

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Standard TPL Transmission System Planning Performance Requirements

Standard TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

ISSN Vol.07,Issue.16, November-2015, Pages:

ISSN Vol.07,Issue.16, November-2015, Pages: ISSN 2348 2370 Vol.07,Issue.16, November-2015, Pages:3181-3185 www.ijatir.org Improvement of Power Quality in A Grid Connected Induction Generator Based Wind Farm using Static Compensator K. YOSHMA 1,

More information

totally integrated power

totally integrated power Integrated Solutions for Power Distribution in Commercial, Institutional and Industrial Buildings Savings potential throughout the entire project cycle totally integrated power www.siemens.com/tip Spectrum

More information

B-R1 TRANSMISSION SYSTEM PLANNING PERFORMANCE REQUIREMENTS

B-R1 TRANSMISSION SYSTEM PLANNING PERFORMANCE REQUIREMENTS Draft 7/15/14 rev7 1 B-R1 TRANSMISSION SYSTEM PLANNING PERFORMANCE REQUIREMENTS A. Reliability Rule NYCA transmission facilities in the NYS Bulk Power System shall be planned to operate reliably over a

More information

Optimum Return Period of an Overhead Line Considering Reliability, Security and Availability with Respect to Extreme Icing Events

Optimum Return Period of an Overhead Line Considering Reliability, Security and Availability with Respect to Extreme Icing Events IWAIS XIV, China, May 0 Optimum Return Period of an Overhead Line Considering Reliability, Security and Availability with Respect to Extreme Icing Events Asim Haldar, Ph.D, P.Eng. ahaldar@nalcorenergy.com

More information

Security Guideline for the Electricity Sector: Identifying Critical Assets

Security Guideline for the Electricity Sector: Identifying Critical Assets Note: The guideline was developed for CIP-002-1 but is also applicable to CIP- 002-2 and CIP-002-3. Security Guideline for the Electricity Sector: Identifying Critical Assets Disclaimer: This supporting

More information

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004 Glossary of Terms Used in Standards Preliminary Draft Version 0 Standards September 1, 2004 Source References (Noted in draft only will not be part of final glossary) Functional Model () Glossary (GL)

More information

East Kentucky Power Cooperative (EKPC) Transmission System Planning Criteria

East Kentucky Power Cooperative (EKPC) Transmission System Planning Criteria East Kentucky Power Cooperative (EKPC) Transmission System Planning Criteria March 2016 Section 1 Overview and General Discussion The primary purpose of East Kentucky Power Cooperative s (EKPC s) transmission

More information

Today s requirements to load shedding schemes against cascading outages in electric power systems

Today s requirements to load shedding schemes against cascading outages in electric power systems Today s requirements to load shedding schemes against cascading outages in electric power systems Abstract The paper presents Russian experience of emergency control of electric power systems with accent

More information

Distributing electrical power safely and economically

Distributing electrical power safely and economically Distributing electrical power safely and economically Integrated solutions for healthcare www.siemens.com/tip Vital and cost-efficient: integrated power supply in hospitals Today, hospitals are exposed

More information

Influence of Distributed Power Generation from Renewable Energy Sources on Reliability of Distribution Networks

Influence of Distributed Power Generation from Renewable Energy Sources on Reliability of Distribution Networks Influence of Distributed Power Generation from Renewable Energy Sources on Reliability of Distribution Networks Case Study Danijel Topić J. J. Strossmayer University of Osijek, Faculty of Electrical Engineering,

More information

Design & Implementation of an Industrial Facility Islanding and Load Shed System

Design & Implementation of an Industrial Facility Islanding and Load Shed System Design & Implementation of an Industrial Facility Islanding and Load Shed System Mark Adamiak GE Digital Energy Bernard Cable GE Energy 1. Abstract The availability of electricity supply in all areas of

More information

ECP SECONDARY COMMISSIONING REQUIREMENTS

ECP SECONDARY COMMISSIONING REQUIREMENTS Document Number: ECP 11-0002 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0002 SECONDARY COMMISSIONING REQUIREMENTS EPN, LPN, SPN This standard details the commissioning requirements

More information

ELECTRICITY SUPPLY - POWER QUALITY AND RELIABILITY Code of Practice

ELECTRICITY SUPPLY - POWER QUALITY AND RELIABILITY Code of Practice ICS 29.240:03.120 Zambian Standard ELECTRICITY SUPPLY - POWER QUALITY AND RELIABILITY Code of Practice Part 2: Measurement and Reporting Procedures ZAMBIA BUREAU OF STANDARD DATE OF PUBLICATION This Zambian

More information

Power and Energy Systems Engineering

Power and Energy Systems Engineering Engineering Planning Project Management Operations Support Provided By J. J. Bergeron & Company, Inc. 1900 Veterans Memorial Blvd. Suite 205 Metairie, La. 70005 Power and Energy Systems Engineering Services

More information

Standard TPL-002-0b System Performance Following Loss of a Single BES Element

Standard TPL-002-0b System Performance Following Loss of a Single BES Element A. Introduction 1. Title: System Performance Following Loss of a Single Bulk Electric System Element (Category B) 2. Number: TPL-002-0b 3. Purpose: System simulations and associated assessments are needed

More information

Technical and economical analysis of the wind turbines interconnection with the windfarm substation

Technical and economical analysis of the wind turbines interconnection with the windfarm substation Technical and economical analysis of the wind turbines interconnection with the windfarm substation NICOLAE COROIU Faculty of Electrical Engineering and Industrial Management University of Oradea Oradea,

More information

Information Document Protection System Information ID# R

Information Document Protection System Information ID# R Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between the Information Document and the related authoritative document(s)

More information

Standard TPL System Performance Following Extreme BES Events

Standard TPL System Performance Following Extreme BES Events A. Introduction 1. Title: System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D) 2. Number: TPL-004-1 3. Purpose: System simulations

More information

ENGINEERING & ECONOMIC PLANNING FOR ELECTRIC POWER GENERATION, TRANSMISSION AND DISTRIBUTION

ENGINEERING & ECONOMIC PLANNING FOR ELECTRIC POWER GENERATION, TRANSMISSION AND DISTRIBUTION ENGINEERING & ECONOMIC PLANNING FOR ELECTRIC POWER GENERATION, TRANSMISSION AND DISTRIBUTION BY Engr. Otis Anyaeji B.Sc.MechE, FNSE, F. Val, FCostE., AEcon @ the 2011 NATIONAL CONFERENCE OF INSTITUTE OF

More information

Standard TPL-004-0a System Performance Following Extreme BES Events

Standard TPL-004-0a System Performance Following Extreme BES Events A. Introduction 1. Title: System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Elements (Category D) 2. Number: TPL-004-0a 3. Purpose: System simulations

More information

Distribution Network Planning for Mumbai

Distribution Network Planning for Mumbai Newsletter Issue 98 January 2006 Distribution Network Planning for Mumbai Carsten Böse Project Manager Siemens AG, PTD SE PT carsten.boese@siemens.com Introduction The Indian utility Reliance Energy Ltd.

More information

ENHANCING RELIABILITY BY RECONFIGURATION OF POWER DISTRIBUTION SYSTEMS CONSIDERING LOSS

ENHANCING RELIABILITY BY RECONFIGURATION OF POWER DISTRIBUTION SYSTEMS CONSIDERING LOSS ENHANCING RELIABILITY BY RECONFIGURATION OF POWER DISTRIBUTION SYSTEMS CONSIDERING LOSS Jency Sara John,S.T.Suganthi 2. Department of Electrical and Electronics Engg, SNS College of Tech, Coimbatore 2

More information

Megacity Moscow M. I. Balabanov page 1

Megacity Moscow M. I. Balabanov page 1 Prof. Grigory Svalov, Session Chairman Our next speaker is Mr. Michael Balabanov. He is Head of the Department for Energy of the Government of the City of Moscow. Please start your presentation. Mr. M.

More information

Reliability Centered Asset Management (RCAM)

Reliability Centered Asset Management (RCAM) Reliability Centered Asset Management () Aiming at Energy Efficient Transmission & Distribution System IRFAN AHMAD (FIEEEP). Energy Management & Energy Audit Electrical Utilities Energy Management: Optimization

More information

TPL 001 AB 0 System Performance Under Normal Conditions

TPL 001 AB 0 System Performance Under Normal Conditions Alberta Reliability Standard System Performance Under rmal Conditions TPL-001-AB-0 TPL 001 AB 0 System Performance Under rmal Conditions 1. Purpose The purpose of this reliability standard is to ensure

More information

DUQUESNE LIGHT COMPANY TRANSMISSION PLANNING CRITERIA

DUQUESNE LIGHT COMPANY TRANSMISSION PLANNING CRITERIA DUQUESNE LIGHT COMPANY TRANSMISSION PLANNING CRITERIA Transmission Planning Criteria Updated: March Compiled: September 2007 Compiled from: s Comprehensive Transmission Reliability Plan, July 2005 s Strategic

More information

Method of Prediction the Performance of Electrochemical Batteries, Long Working in Power Plant of Space-rocket Objects

Method of Prediction the Performance of Electrochemical Batteries, Long Working in Power Plant of Space-rocket Objects Electrical and Electronic Engineering 2013, 3(3): 81-85 DOI: 10.5923/j.eee.20130303.01 Method of Prediction the Performance of Electrochemical Batteries, Long Working in Power Plant of Space-rocket Objects

More information

SQUEEZING MARGINS: REDUCING COSTS WHILE BALANCING RISKS. G.A. Bloemhof, J. Knijp. KEMA T&D Power, the Netherlands

SQUEEZING MARGINS: REDUCING COSTS WHILE BALANCING RISKS. G.A. Bloemhof, J. Knijp. KEMA T&D Power, the Netherlands SQUEEZING MARGINS: REDUCING COSTS WHILE BALANCING RISKS G.A. Bloemhof, J. Knijp KEMA T&D Power, the Netherlands Liberalising the energy market increased the awareness of transmission and distribution companies

More information

Designated Entity Design Standards Task Force (DEDSTF) Minimum Design Requirements for FERC Order 1000 Projects. System Protection Subgroup

Designated Entity Design Standards Task Force (DEDSTF) Minimum Design Requirements for FERC Order 1000 Projects. System Protection Subgroup Designated Entity Design Standards Task Force (DEDSTF) Minimum Design Requirements for FERC Order 1000 Projects System Protection Subgroup For any substation facility included in the scope of a transmission

More information

FLOTATION CONTROL & OPTIMISATION

FLOTATION CONTROL & OPTIMISATION FLOTATION CONTROL & OPTIMISATION A global leader in mineral and metallurgical innovation FLOATSTAR OVERVIEW Flotation is a complex process that is affected by a multitude of factors. These factors may

More information

Electrical Networks Principles and Performance

Electrical Networks Principles and Performance Engineering Standard Electrical Networks Electrical Networks Principles and Performance Version: 1 Issued: January 2015 Owner: Chief Engineer Approved By: Paul O Halloran Chief Engineer PRINTOUT MAY NOT

More information

Addressing System Restoration Issues for the ISO New England System. Michael I. Henderson ISO New England Inc. PES General Meeting July 2015

Addressing System Restoration Issues for the ISO New England System. Michael I. Henderson ISO New England Inc. PES General Meeting July 2015 Addressing System Restoration Issues for the ISO New England System Michael I. Henderson ISO New England Inc. PES General Meeting July 2015 Key Power System and Market Facts (2014) 6.5 million households

More information

Postprint. This is the accepted version of a paper presented at 2017 CIGRÉ SC B3 (Substations) Colloquium.

Postprint.   This is the accepted version of a paper presented at 2017 CIGRÉ SC B3 (Substations) Colloquium. http://www.diva-portal.org Postprint This is the accepted version of a paper presented at 2017 CIGRÉ SC B3 (Substations) Colloquium. Citation for the original published paper: Babu, S., Hilber, P. (2017)

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT NETWORK SYSTEMS SECTION SPECIFICATION EO-4133 REVISION 2 OCTOBER, 2006 GENERAL REQUIREMENTS

More information

TPL Transmission System Planned Performance for Geomagnetic Disturbance Events

TPL Transmission System Planned Performance for Geomagnetic Disturbance Events A. Introduction 1. Title: Transmission System Planned Performance for Geomagnetic Disturbance Events 2. Number: TPL-007-1 3. Purpose: Establish requirements for Transmission system planned performance

More information

2017 NEC Changes for Renewable Energy Systems Session one by Christopher LaForge

2017 NEC Changes for Renewable Energy Systems Session one by Christopher LaForge 2017 NEC Changes for Renewable Energy Systems Session one 2017 by Christopher LaForge Christopher LaForge IREC Certified Master Trainer NABCEP Certified Photovoltaic Installation Professional 30 years

More information

DA concept for higherquality. supplies. 24 ABB Review 4/1996

DA concept for higherquality. supplies. 24 ABB Review 4/1996 DA concept for higherquality power supplies Low power network losses and an uninterrupted supply of electricity are no longer enough to satisfy today s consumers, who take a highquality power supply for

More information

CHILLED WATER PRODUCTION SUB-ELEMENT

CHILLED WATER PRODUCTION SUB-ELEMENT CHILLED WATER PRODUCTION SUB-ELEMENT The University of Central Florida employs three chilled water production plants combined with a three million gallon thermal energy storage tank to augment the chilled

More information

POWER SYSTEM DYNAMICS AND CONTROL

POWER SYSTEM DYNAMICS AND CONTROL POWER SYSTEM DYNAMICS AND CONTROL 1 POWER SYSTEM DYNAMICS AND CONTROL INTRODUCTION Electric power system comprises components and systems like Generators, transformers, transmission lines and distribution

More information

A PARTIAL RELATIONSHIP BETWEEN COSTS AND QUALITY AS A BASIS FOR SETTING REGULATION PARAMETERS OF SUPPLY CONTINUITY

A PARTIAL RELATIONSHIP BETWEEN COSTS AND QUALITY AS A BASIS FOR SETTING REGULATION PARAMETERS OF SUPPLY CONTINUITY A PARTIAL RELATIONSHIP BETWEEN COSTS AND QUALITY AS A BASIS FOR SETTING REGULATION PARAMETERS OF SUPPLY CONTINUITY Petr SKALA Václav DĚTŘICH Jan ŠEFRÁNEK EGÚ Brno, a.s. Czech Republic EGÚ Brno, a.s. Czech

More information

FRCC Requirements for Analysis of Protection Misoperations and Corrective Actions Reporting

FRCC Requirements for Analysis of Protection Misoperations and Corrective Actions Reporting FRCC - PROC - RC PRC-003 FRCC Requirements for Analysis of Protection Misoperations and Corrective Actions Reporting Effective Date: December 2, 2010 Revisions Rev. No. Date Description Developed by: Approved

More information

DOCUMENT A-11 DU NPCC

DOCUMENT A-11 DU NPCC Requête R-3498-2002 DOCUMENT A-11 DU NPCC Original : 2003-02-12 HQT-8, Document 2 (en liasse) Document A-11 1515 BROADWAY, NEW YORK, NY 10036-8901 TELEPHONE: (212) 840-1070 FAX: (212) 302-2782 Special

More information

A computer-aided, reliability-centered maintenance strategy for power networks

A computer-aided, reliability-centered maintenance strategy for power networks A computer-aided, reliability-centered maintenance strategy for power networks The assessment of the technical condition of substation equipment and its influence on the network is basic to a reliability-centered

More information

CENTRE FOR WIND ENERGY TECHNOLOGY CHENNAI INDIAN WIND GRID CODE

CENTRE FOR WIND ENERGY TECHNOLOGY CHENNAI INDIAN WIND GRID CODE CHENNAI INDIAN WIND GRID CODE Rajesh Katyal Unit Chief, R&D Centre for Wind Energy Technology OVERVIEW NEED FOR INDIAN WIND GRID CODE Wind energy constitutes 6% of the installed capacity in the power scenario

More information

NERC PLANNING STANDARDS

NERC PLANNING STANDARDS NERC PLANNING STANDARDS North American Electric Reliability Council April 2004 Version of All Planning Standards Terms and Their Definitions As Used in the Analysis (Study) an examination or simulation

More information

B Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation. G. M. Bastos (*) R. C. Valente E.

B Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation. G. M. Bastos (*) R. C. Valente E. 21, rue d'artois, F-75008 Paris http://www.cigre.org B3-214 Session 2004 CIGRÉ Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation G. M. Bastos (*) R. C. Valente E.

More information

Operations and Maintenance Considerations for Underfrequency Relaying Design

Operations and Maintenance Considerations for Underfrequency Relaying Design Operations and Maintenance Considerations for Underfrequency Relaying Design Edsel Atienza Schweitzer Engineering Laboratories, Inc. Presented at the 38th Annual Western Protective Relay Conference Spokane,

More information

In the Name of God. and Hydro Technology 2011/02/01

In the Name of God. and Hydro Technology 2011/02/01 In the Name of God The Institute for Energy and Hydro Technology (IEHT) 2011/02/01 The Institute for Energy and Hydro Technology The Institute for Energy and Hydro Technology (IEHT) began the modern stage

More information

Kintyre Hunterston Link. The upgrade of grid access in Kintyre

Kintyre Hunterston Link. The upgrade of grid access in Kintyre The upgrade of grid access in Kintyre About us Scottish Hydro Electric Transmission plc (SHE Transmission), part of Scottish and Southern Energy Power Distribution (SSEPD), is the licensed electricity

More information

Influence of automation introduction to power distribution systems on their reliability

Influence of automation introduction to power distribution systems on their reliability Influence of automation introduction to power distribution systems on their reliability H. Meglouli Email:hmeglouli@yahoo.fr Laboratory for the electrification of industrial enterprises Faculty of Hydrocarbons

More information

Reliable and economical power supply for industrial plants

Reliable and economical power supply for industrial plants Infrastructure & Cities Sector Background Information Low and Medium Voltage Division Erlangen, Germany, March 2013 Hannover Messe 2013, Hall 9, Stand D35 Reliable and economical power supply for industrial

More information

The Reliability of the Individual UPS Still an issue?

The Reliability of the Individual UPS Still an issue? The Reliability of the Individual UPS Still an issue? Dipl.-Ing. Frank Herbener, Piller Group GmbH, Frank.Herbener@Piller.com, Germany White Paper No. 054 Revision 0 from 22.02.2010 Contents 1 Introduction...3

More information

Medium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Germany

Medium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Germany Medium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Frank.Herbener@Piller.com, Germany 1 Contents 1 Scope 3 2 Power Demand and Distribution in today s Mission Critical Applications

More information

OUTAGE COORDINATION PROCESS

OUTAGE COORDINATION PROCESS OUTAGE COORDINATION PROCESS October 3, 2016 www.peakrc.com. Classification: Public Page 0 of 67 Effective Date: Apr 01, 2017 Contents 1. Conventions... 2 2. Introduction... 2 3. Purpose... 2 4. Applicability...

More information

OUTAGE COORDINATION PROCESS

OUTAGE COORDINATION PROCESS OUTAGE COORDINATION PROCESS March 13, 2017 www.peakrc.com. Classification: Public Page 0 of 68 Effective Date: Apr 01, 2017 Contents 1. Conventions... 2 2. Introduction... 2 3. Purpose... 2 4. Applicability...

More information

Fuzzy Logic Approach in Controlling the Grid Interactive Inverters of Wind Turbines

Fuzzy Logic Approach in Controlling the Grid Interactive Inverters of Wind Turbines Indian Journal of Science and Technology, Vol 7(8), 1196 1200, August 2014 ISSN (Print) : 0974-6846 ISSN (Online) : 0974-5645 Fuzzy Logic Approach in Controlling the Grid Interactive Inverters of Wind

More information

Investigation of 2006 Oahu Island-Wide Power Outage PUC Docket Number

Investigation of 2006 Oahu Island-Wide Power Outage PUC Docket Number December 28, 2006 Investigation of 2006 Oahu Island-Wide Power Outage PUC Docket Number 2006-0431 111409 Ronald Beazer, P.E. David Gardner, P.E. Page 1 of 11 Executive Summary The State of Hawaii experienced

More information