1 CDOT s Life Cycle Cost Analysis 40 th Annual Rocky Mountain Asphalt Conference and Equipment Show February 28 th, 2013 Jay Goldbaum CDOT Pavement Design Program Manager Sunday, March 17, 13
2 CDOT s Life Cycle Cost Analysis 40 th Annual Rocky Mountain Asphalt Conference and Equipment Show February 28 th, 2013 Jay Goldbaum CDOT Pavement Design Program Manager Sunday, March 17, 13
3 Basics of a CDOT Life Cycle Cost Analysis A Life Cycle Cost Analysis (LCCA) is used to support the pavement type selection Compares pavement types and rehabilitation work over a 40 period Sunday, March 17, 13
4 Basics of a CDOT Life Cycle Cost Analysis A Life Cycle Cost Analysis (LCCA) is used to support the pavement type selection Compares pavement types and rehabilitation work over a 40 period Sunday, March 17, 13
5 When does CDOT run a LCCA Prepared for all new, reconstruction, or surface treatment projects with at least $2,000,000 in material costs for the roadway features i.e. hot mix asphalt, aggregate base course, subgrade soils, shoulder work, etc. Sunday, March 17, 13
6 When does CDOT run a LCCA Prepared for all new, reconstruction, or surface treatment projects with at least $2,000,000 in material costs for the roadway features i.e. hot mix asphalt, aggregate base course, subgrade soils, shoulder work, etc. Sunday, March 17, 13
7 LCCA Process YES 1. Develop preliminary design for typical section. 2. Perform life cycle cost analysis of typical sections. Is one type clearly superior? Greater than 10% NO 3. Evaluate secondary factors by Pavement Type Selection Committee (PTSC). 4. Select preliminary pavement type. NO 7. Select final pavement type and applicable thickness. YES 6. Is detailed design reasonably close to typical section design used in the analysis? 5. Perform detailed pavement design. Sunday, March 17, 13
8 LCCA Process YES 1. Develop preliminary design for typical section. 2. Perform life cycle cost analysis of typical sections. Is one type clearly superior? Greater than 10% NO 3. Evaluate secondary factors by Pavement Type Selection Committee (PTSC). 4. Select preliminary pavement type. NO 7. Select final pavement type and applicable thickness. YES 6. Is detailed design reasonably close to typical section design used in the analysis? 5. Perform detailed pavement design. Sunday, March 17, 13
9 LCCA Factors Used By CDOT Initial Construction Costs Annual Maintenance Cost Design Costs Pavement Construction Engineering Costs Traffic Control Cost Periodic Rehabilitation Costs User Costs Sunday, March 17, 13
10 LCCA Factors Used By CDOT Initial Construction Costs Annual Maintenance Cost Design Costs Pavement Construction Engineering Costs Traffic Control Cost Periodic Rehabilitation Costs User Costs Sunday, March 17, 13
11 Types of Distributions Used by CDOT Triangular Normal Most Likely Average Standard Deviation Minimum Maximum The data should be as accurate as possible Sunday, March 17, 13
12 Types of Distributions Used by CDOT Triangular Normal Most Likely Average Standard Deviation Minimum Maximum The data should be as accurate as possible Sunday, March 17, 13
13 Discount Rate The discount rate reflects the time value of money CDOT s current rate is 2.8 percent Standard Deviation of 0.18 percent Sunday, March 17, 13
14 Discount Rate The discount rate reflects the time value of money CDOT s current rate is 2.8 percent Standard Deviation of 0.18 percent Sunday, March 17, 13
15 Impact of the Discount Rate For example, if we need $1,000,000 in 15 years we would need almost $661,000 in today s dollars using the 2.8 percent rate $1,000,000 $750,000 $500,000 $250,000 $ Years Using a 5.0 percent rate, we would need about $481,000 Sunday, March 17, 13
16 Impact of the Discount Rate For example, if we need $1,000,000 in 15 years we would need almost $661,000 in today s dollars using the 2.8 percent rate $1,000,000 $750,000 $500,000 $250,000 $ Years Using a 5.0 percent rate, we would need about $481,000 Sunday, March 17, 13
17 Statewide Cost Data
18 Statewide Cost Data
19 Statewide Cost Data
20 Statewide Cost Data
21 Annual Maintenance Cost
22 Annual Maintenance Cost
23 Project Cost Preliminary engineering is about 8 to 20 percent with an average of around 18 percent Construction engineering is currently percent Traffic control is about 10 to 18 percent with an average of around 15 percent Sunday, March 17, 13
24 Project Cost Preliminary engineering is about 8 to 20 percent with an average of around 18 percent Construction engineering is currently percent Traffic control is about 10 to 18 percent with an average of around 15 percent Sunday, March 17, 13
25 Performance Life
26 Performance Life
27 User Cost
28 User Cost
29 User Cost Output
30 User Cost Output
31 User Cost Distribution
32 User Cost Distribution
33 CDOT Spreadsheet
34 CDOT Spreadsheet
35 CDOT Spreadsheet
36 CDOT Spreadsheet
37 FHWA RealCost Program
38 FHWA RealCost Program
39
40
41
42
43 RealCost Charts
44 RealCost Charts
45 Next Step When the alternatives are within 10 percent at the 75 percent probability level, they are deemed to be equal The Project Engineer can chose to have the project evaluated by the Pavement Type Selection Committee or use alternate bidding Sunday, March 17, 13
46 Next Step When the alternatives are within 10 percent at the 75 percent probability level, they are deemed to be equal The Project Engineer can chose to have the project evaluated by the Pavement Type Selection Committee or use alternate bidding Sunday, March 17, 13
47 Pavement Type Selection Committee Sunday, March 17, 13 Both industries review the input data Industry comments supported by data would be considered by the PTSC to adjust the LCCA If the LCCA is still within 10 percent, secondary factors such as project extensions, future maintenance and rehabilitation work, that are in alignment with the project s or Regional goals will be used to decide the type of pavement The PTSC makes a recommendation to the Chief Engineer
48 Pavement Type Selection Committee Sunday, March 17, 13 Both industries review the input data Industry comments supported by data would be considered by the PTSC to adjust the LCCA If the LCCA is still within 10 percent, secondary factors such as project extensions, future maintenance and rehabilitation work, that are in alignment with the project s or Regional goals will be used to decide the type of pavement The PTSC makes a recommendation to the Chief Engineer
49 Alternate Bid Sunday, March 17, 13 Two sets of plans are developed with HMA and PCCP bid by the square yard Initial construction costs are removed from the LCCA Both industries review the input data Industry comments supported by data would be considered to adjust the future work in the LCCA The net present value of user cost, maintenance, and rehabilitation work are added to the bid price
50 Alternate Bid Sunday, March 17, 13 Two sets of plans are developed with HMA and PCCP bid by the square yard Initial construction costs are removed from the LCCA Both industries review the input data Industry comments supported by data would be considered to adjust the future work in the LCCA The net present value of user cost, maintenance, and rehabilitation work are added to the bid price
51 Any Questions???
52 Any Questions???
Reclaimed Asphalt Pavement
Reclaimed Asphalt Pavement Roy Guevara CDOT Asphalt Pavement Program Rocky Mountain Asphalt Conference February 2010 Benefits of Using RAP Benefits of Using RAP Conservation of materials Benefits of Using
More informationAMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS
AMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS INTRODUCTION With alternate bidding, road and highway agencies offer the opportunity to
More informationPavement Management Systems
Pavement Management Systems Basics and Benefits David R. Johnson, P.E. Regional Engineer Asphalt Institute Rocky Mountain Region djohnson@asphaltinstitute.org Presentation Outline Definition Requirements
More informationAMERICA RIDES ON US LIFE-CYCLE COST ANALYSIS: A POSITION PAPER
AMERICA RIDES ON US LIFE-CYCLE COST ANALYSIS: A POSITION PAPER LIFE-CYCLE COST ANALYSIS: A POSITION PAPER Introduction Many agencies are turning to life-cycle cost analysis (LCCA) as a means of evaluating
More information603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS
SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this
More informationIntroduction. Key Words: Life-Cycle Cost Analysis (LCCA), Bridge Pile Repair, RealCost, BridgeLCC, BLCCA
Evaluation of Life-Cycle Cost Analysis Programs for Bridge Pile Repair Projects Sangwook Lee, Ph.D., Dayong Wu, and Sang-Wook Bae, Ph.D. Texas Tech University Lubbock, Texas Life-Cycle Cost Analysis (LCCA),
More informationDesign of Illinois Tollway Composite Pavements
Design of Illinois Tollway Composite Pavements William R. Vavrik, Ph.D., P.E. FHWA Tollway National Open House, August 20, 2013 1 Presentation Overview Starting in Composite Pavements Move to 2-Lift Concrete
More informationMNDOT PAVEMENT DESIGN MANUAL
MNDOT PAVEMENT DESIGN MANUAL Chapter 9 truction and Rehabilitation Alternates MnDOT Pavement Engineer Date Contents Introduction... 1 900 Existing Pavement-Types... 2 910 Rehabilitation with HMA Overlay
More informationLife Cycle Cost Analysis
Life Cycle Cost Analysis Executive Summary Senate Bill 402, Section 34.25 requires NCDOT to report to the legislature on our life cycle cost analysis procedure by February 1, 2014. The four topics that
More informationCOLD-IN-PLACE RECYCLING
COLD-IN-PLACE RECYCLING A Cost Effective Pavement Preservation Treatment Kit Black, P.E. October 15, 2013 Footer Text Outline 1 2 3 4 5 6 7 Definition Equipment & Construction Process Project Selection
More informationTABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4
TABLE OF CONTENTS SECTION PAGE Background of Existing Facility 3 Proposed Work 4 Objective of this Report 4 Required Data 4 Pavement Design Procedure 5 Other Data Requirements 7 Pavement Structures 8 Pavement
More informationConnecting South Dakota and the Nation SDDOT Pavement Research Update
Connecting South Dakota and the Nation SDDOT Pavement Research Update David Huft SDDOT Research Program Manager & Intelligent Transportation Systems Coordinator Projects in this Presentation Extent, Severity,
More informationTHE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY
THE COMMONWEALTH OF MASSACHUSETTS Number: P-92-010 Date: 10-08-92 - ) HIGHWAY DEPARTMENT FROM: NON-NHS BRIDGE R&R POLICY The purpose of this Engineering Directive is to formally notify Department Personnel
More informationCHAPTER 10 PAVEMENT DESIGN AND REPORT TABLE OF CONTENTS
CHAPTER 10 PAVEMENT DESIGN AND REPORT TABLE OF CONTENTS Section Title Page 10.1 General... 10-1 10.1.1 Existing Streets...10-1 10.1.2 AASHTO Design...10-1 10.1.3 Pavement Type...10-1 10.1.4 Treated Subgrade...10-1
More informationOpportunities with Concrete Pavements
Opportunities with Concrete Pavements Stewardship, Cost Effectiveness and Innovation North Carolina Concrete Pavement Conference Durham, North Carolina November 17 th, 2016 Leif G. Wathne, P.E. American
More information4-07 Asphalt Treated Permeable Base (ATPB)
1 1 0 1 0 1 Supplement Division with the following: (November 0,, APWA GSP) -0 Asphalt Treated Permeable Base (ATPB) -0.1 Description Asphalt treated permeable base (ATPB) consists of a compacted course
More informationLADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH
LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH Presentation Outline General Introduction Part II Site Preparation & Earthwork Part III Base Courses
More informationRobinette and Epps 1
Robinette and Epps 0 0 0 0 Energy, Emissions, Material Conservation and Prices Associated with Construction, Rehabilitation and Material Alternatives for Flexible Pavement By: Christopher Robinette Granite
More informationProbabilistic Life-Cycle Cost Analysis of Pavements
Probabilistic Life-Cycle Cost Analysis of Pavements Drivers of Variation and Implications of Context Omar Swei, Jeremy Gregory, and Randolph Kirchain Significant research has been conducted over the past
More informationSUPERPAVE FACT SHEET
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION December 2003 SUPERPAVE FACT SHEET stands for SUperior PERforming asphalt PAVEment and is the result of a Strategic Highway Research Program (SHRP) initiative
More informationMaintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments
Asphalt Pavement Preservation: Evaluation, Maintenance & Rehabilitation Maintenance & Rehabilitation Treatments Identification of Alternative Treatments Before selecting a treatment for a pavement, we
More informationPerformance of Aggregate Base Course Pavements in North Carolina
Performance of Aggregate Base Course Pavements in North Carolina Judith Corley-Lay, Ph.D., PE * Pavement Management Unit, NCDOT 1593 Mail Service Center Raleigh, NC 27699-1593 919-212-61 jlay@ncdot.gov
More informationQuality Improvement Series 126. Energy Conservation in Hot-Mix Asphalt Production
Quality Improvement Series 126 Energy Conservation in Hot-Mix Asphalt Production This publication is provided by the Members of the National Asphalt Pavement Association (NAPA), who are the nation s leading
More informationYesterday. Today. Tomorrow
Materials 106 Introduction to Warm Mix Asphalt Yesterday Today Tomorrow Rocky Mountain Asphalt Conference & Equipment Show February 19 February 21, 2014 Materials 106 Introduction to Warm Mix Asphalt Yesterday
More informationPresented by PA V E M E N T M A N A G E M E N T S Y S T E M S. The Washington State Experience
Transportation Asset Management Case Studies c1 Presented by PA V E M E N T M A N A G E M E N T S Y S T E M S The Washington State Experience A comprehensive, fully integrated Transportation Asset Management
More informationCold In-Place Recycling
Cold In-Place Recycling Dan Schellhammer, P.E. Midstate Reclamation and Trucking In 1991, Midstate brought the first reclaimer into the state of Minnesota Emphasis on asphalt recycling techniques (milling,
More informationASPHALT: INNOVATION & SOLUTIONS. Bill Rosener Executive Vice President Asphalt Paving Association of Iowa
ASPHALT: INNOVATION & SOLUTIONS & Bill Rosener Executive Vice President Asphalt Paving Association of Iowa Iowa Asphalt Industry is the Best in the USA What we offer: Project Consultation Design, Methods,
More informationCenter for Transportation Research University of Texas at Austin 3208 Red River, Suite 200 Austin, Texas
1. Report No. SWUTC/01/167205-1 Technical Report Documentation Page 2. Government Accession No. 3. Recipient s Catalog No. 4. Title and Subtitle Life Cycle Cost Analysis of Portland Cement Concrete Pavements
More informationThe Role of Pavement Preservation in Asset Management
The Role of Pavement Preservation in Asset Management Keith D. Herbold, P.E. Senior Pavement Engineer FHWA Resource Center keith.herbold@fhwa.dot.gov 708-283-3548 PRESENTATION TOPICS FHWA Resource Center
More informationITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)
ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) 275.1. Description. This Item shall govern for treating subgrade, new and/or existing base [with or without asphaltic concrete pavement (ACP)], or
More informationFull Depth Reclamation
Full Depth Reclamation FDR Has Been Around A While 2 3 What is Full Depth Reclamation (FDR)? Full Depth Reclamation is a pavement rehabilitation technique in which the full flexible pavement section and
More informationITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS
ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown
More informationSustainable Pavements. Gina Ahlstrom Senior Pavement Engineer Office of Asset Management, Pavements, and Construction
Sustainable Pavements Gina Ahlstrom Senior Pavement Engineer Office of Asset Management, Pavements, and Construction National Concrete Consortium Jacksonville, FL April 22, 2014 2 FHWA Sustainable Pavements
More informationSelecting Projects for Accelerated Bridge Construction
Selecting Projects for Accelerated Bridge Construction In January of 2017, the Engineering Services and Operations Division Directors issued a memo instructing Districts to consider accelerated bridge
More informationWhy Should Every Day Count For You?
Why Should Every Day Count For You? Today s Agenda What is Every Day Counts (EDC)? First Round State Transportation Innovation Council Exchanges Round II What is Every Day Counts? EDC was launched in 2010
More informationPavement Update Track: Engineering
Pavement Update Track: Engineering 2017 ACC Airports Technical Workshop June 21-22, 2017 Arlington, VA Gregory D. Cline, P.E. FAA Airport Engineering AAS-100 gregory.cline@faa.gov (202) 267-8814 Pavement
More informationHighway Cost Index Estimator Tool Final report PRC 17-73
Highway Cost Index Estimator Tool Final report PRC 17-73 Highway Cost Index Estimator Tool Texas A&M Transportation Institute PRC 17-73 March 2018 Authors Brett Huntsman Brianne Glover, J.D. Samir Huseynov
More informationGEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects
GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway
More informationHow to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc.
1 How to Select the Appropriate Pavement Rehabilitation Option David Rettner, PE American Engineering Testing, Inc. 2 Pavement Rehabilitation Selection Understanding the Problem 3 Pavement Assessment Pavement
More informationThe Illinois Tollway s Use of Composite Concrete Pavements with Greener Concrete for Improved Sustainability
The Illinois Tollway s Use of Composite Concrete Pavements with Greener Concrete for Improved Sustainability Steve Gillen. Illinois Tollway / Deputy Program Manager of Materials Arizona Pavements / Materials
More informationA Review and Recommendations for Canadian LCCA Guidelines
A Review and Recommendations for Canadian LCCA Guidelines Mizan Moges, MSc. Eng., EIT Corresponding Author Email: Mizan.Moges@Stantec.com Amr Ayed, Ph.D., P. Eng. Giannin Viecili, M. Eng. Amir Abd El Halim,
More informationComputer-Aided Maintenance Management
52 TRANSPORTATION RESEARCH RECORD 1276 Computer-Aided Maintenance Management JOHN P. ZANIEWSKI AND MICHAEL J. WILES A maintenance management system (MMS) allows managers to organize and control maintenance
More informationSandstone Curb Replacement Standards
Sandstone Curb Replacement Standards Division of Infrastructure Management SCOPE OF CURB REPLACEMENT (Funding Dependent) Sandstone Curb Section I - Purpose: Sandstone curb may be replaced only if existing
More informationInnovative Sustainable Pavement Solutions
2010 Concrete Sustainability Conference Innovative Sustainable Pavement Solutions Fares Abdo, P.E. and David Shepherd, AIA LEED AP Fares Abdo, P.E. and David Shepherd, AIA LEED AP Portland Cement Association
More informationWhat is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process
Emulsion Full Depth Reclamation and Granular Base Stabilization An Engineered Approach 47 th Idaho Asphalt Conference Rocktober 25 th, 2007 Full Depth Reclamation (FDR) What is it? Rehabilitation technique
More informationPavement Design. TTP Orientation Seminar 2011
Pavement Design TTP Orientation Seminar 2011 What are Pavements? Engineered structures in contact with the earth's surface built to facilitate movement of people and goods Pedestrians Personal vehicles
More informationSan Francisco Bay Area Green Initiatives. Theresa Romell, Principal Planner/Analyst, Metropolitan Transportation Commission October 12, 2016
San Francisco Bay Area Green Initiatives Theresa Romell, Principal Planner/Analyst, Metropolitan Transportation Commission October 12, 2016 Metropolitan Transportation Commission 9 counties, 100 cities
More informationTypical Dynamic Modulus Data for HMA Mixture and EMC SQUARED Stabilized Aggregate Mixture
Dynamic modulus is the main input required for design of Hot Mix Asphalt (HMA) pavements using the nationally recognized AASHTO Mechanistic-Emperical Pavement Design Guide (MEPDG). HMA pavement materials
More informationA Contractor s Look at the Changing World of Asphalt Technology
Staying Arizona a step Pavements/Asphalt ahead: Conference A Contractor s Look at the Changing World of Asphalt Technology 2012 Arizona Pavement/Materials Conference Adam J.T. Hand, PhD, PE Granite Construction
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3
CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3
More informationCHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G.
CHAPTER 10: PAVING AGGREGATE Aggregate has become more specific on how it is paid for. Therefore, make sure the plan specifies they type of aggregate to use. Spec 2118 Aggregate Surfacing - Aggregate placed
More informationIntroduction to Asphalt Pavement Design and Specifications
Introduction to Asphalt Pavement Design and Specifications Ensuring Good Performance in Flexible Pavement Design and Construction: accomplished through: 1. Proper structural (thickness) design for the
More informationCold Foam In-Place Recycling (CIR)
Cold Foam In-Place Recycling (CIR) FONSECA/McELROY GRINDING CO., INC. Cold Foam CIR CIR Method/Foamed Asphalt Cold In-Place Recycling Foamed Asphalt Hot Bitumen Water Air Foamed Asphalt The larger surface
More informationPerpetual Pavement Demonstration
Perpetual Pavement Demonstration September 12, 2007 Cedar Road from Brainard Rd. to Lander Rd. Cuyahoga County Engineer s Presenters: Brian Brian Driscoll, P.E. Chief Highway Design Engineer Thomas Thomas
More informationHOT MIX ASPHALT PAVEMENT
Section 700 - Hot Mix Asphalt Pavement HOT MIX ASPHALT PAVEMENT PART - GENERAL.0 SECTION INCLUDES A. Hot Mix Asphalt (HMA) Pavement B. Base Widening.0 DESCRIPTION OF WORK A. Includes the requirements for
More informationEnvironmental Benefits of Using Recycled Materials
Environmental Benefits of Using Recycled Materials Recycled Materials University of Wisconsin-Madison Angela Pakes Ahlman, P.E., LEED AP Tuncer B. Edil, P.E., D.PG. Erik Elliot and Andrew Baker Recycled
More informationUSING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS
Mack, Sullivan 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS Word Count
More informationALTERNATIVE PROJECT DELIVERY DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION ALTERNATIVE PROJECT DELIVERY DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design-Build Requirements for Advertisement SPECIFIC SUBJECT: APPROVED:
More informationADOT s Use of RAP in Asphaltic Concrete
ADOT s Use of RAP in Asphaltic Concrete Updated & Presented by: Nye McCarty, P.E. Originally prepared by: Chad Auker & Scott Weinland ADOT Construction-Materials Group Overview ADOT s Existing RAP Specification
More informationMPC REPORT NO Evaluating the Impace of QC/QA Programs on Asphalt Mixture Variability
MPC REPORT NO. 03-146 Evaluating the Impace of QC/QA Programs on Asphalt Mixture Variability Khaled Ksaibati Nathan Butts June 2003 Evaluating the Impact of QC/QA Programs on Asphalt Mixture Variability
More informationPCCP Pavement Structures, 3D Modeling and Machine Control
PCCP Pavement Structures, 3D Modeling and Machine Control Design-Build P3 Project Contracting Entity: Infrastructure Development Partners Contract Value: $95.03 M Contract Completion Date: December 2015
More informationAn Overview of Low Cost Pavement Alternatives in Canada
An Overview of Low Cost Pavement Alternatives in Canada Venkat Lakkavalli P. Eng., M. Sc. Leader, Pavement Engineering The City of Calgary Alberta, Canada Acknowledgement Acknowledge Authors, Co-authors
More informationFHWA Cooperative Agreement Subtask. Longitudinal Joints Intelligent Compaction
1 FHWA Cooperative Agreement Subtask Longitudinal Joints Intelligent Compaction to improve the overall bonding of pavement layers; to decrease distresses associated with poor bond; and to improve overall
More informationPavement Design. TTP Orientation Seminar 2017
Pavement Design TTP Orientation Seminar 2017 What are Pavements? Engineered structures in contact with the earth's surface built to facilitate movement of people and goods Pedestrians Personal vehicles
More informationPavement Management Systems PMS PAVEMENT MANAGEMENT SYSTEMS OVERVIEW. Dr. Nick Vitillo
Pavement Management Systems PMS PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Dr. Nick Vitillo PMS CONCEPTS DISCUSSION TOPICS DEFINITION OF PM AND PMS PMS SUBSYSTEMS NETWORK & PROJECT LEVEL PMS PAVEMENT EVALUATION
More informationJANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25
General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO
More informationSUDAS Revision Submittal Form
SUDAS Revision Submittal Form Status Date: As of 3/20/2017 Topic: Pavement thickness Manual: Design Manual Location: Section 5F-1 Requested Revision: Reason for Revision: Comments: See attached. Updating
More informationCHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK
------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A CHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK DES.
More informationAsphalt Rubber Surface Treatment & SAMIs in Pavement Preservation
Asphalt Rubber Surface Treatment & SAMIs in Pavement Preservation 62 nd School for Highway Superintendents Cornell Local Roads Program June 5, 2007 By Rod Birdsall, P.E. www.fp2.org Resources www.pavementpreservation.org
More informationEINRIP. Specification and Construction Issues
EINRIP Specification and Construction Issues There are a significant number of changes in the Specification Not all issues can be discussed here A more detailed list of changes will be provided with bid
More informationConditions of Paved Roads in Carbon County, Wyoming
Conditions of Paved Roads in Carbon County, Wyoming By Promothes Saha, Ph.D. and Khaled Ksaibati, Ph.D., P.E. Wyoming Technology Transfer Center University of Wyoming, Laramie, Wyoming, 82071 307-766-6230;
More informationCDOT Cold In-Place Specifications and Construction
CDOT Cold In-Place Specifications and Construction CIR Specifications and Construction CDOT has successfully used CIR from the plains to the high mountains, and from low volume roadways to high volume
More informationDOTD Pavement Research Facility
DOTD Pavement Research Facility Program History Initial PRF Costs FHWA: $1,396,125 LA DOTD: $ 935,375 $2,334,500 Experiment No. 1 February 1996 Experiment No. 2 March 1999 Experiment No. 3 March 2001 Experiment
More informationPavement Design Guide November 2002
Pavement Design Guide November 2002 Prepared by the Pavement Division, Office of Materials and Technology. Forward There are many different approaches that are used in the pavement industry to develop
More informationPlantmix Asphalt Industry of Kentucky Winter Meeting February 10, 2011
Plantmix Asphalt Industry of Kentucky Winter Meeting February 10, 2011 AASHTO Guidelines for Geometric Design of Very Low-Volume Local Roads (2001) ADT 400 AASHTO Guide for Design of Pavement Structures
More informationSD F. Mechanistic-Empirical Pavement Design Guide Implementation Plan Study SD Final Report
SD2005-01-F Mechanistic-Empirical Pavement Design Guide Implementation Plan Study SD2005-01 Final Report Prepared by Applied Pavement Technology, Inc. 115 W. Main St., Suite 400 Urbana, IL 61801 October
More informationGeosynthetic Pavement Interlayers
2015 Geosynthetic Pavement Interlayers This overview is offered to provide general information Building longer lasting, more maintenance free pavements on the construction and functional capabilities of
More informationMaterials Selection in Pavement Design. Flexible Pavements
Materials Selection in Pavement Design Flexible Pavements Pavement Design AASHTO Pavement Design Guide (1993) AASHTOWare Pavement ME Dr. Witczak Traffic = 100 Trucks/day Over 20 Years (730,000 ESAL s)
More informationASSET MANAGEMENT GUIDE
ASSET MANAGEMENT GUIDE For Local Agencies in Indiana JUNE 2017 This Guide was developed for the Indiana LTAP by Applied Pavement Technology, Inc. 115 West Main Street Suite 400 Urbana, Illinois 61801 (217)
More informationNational Superpave Status Present & Future
National Superpave Status Present & Future John R. Bukowski Federal Highway Administration Northeast Asphalt User/Producer Group October 23, 2003 US Department of Transportation Federal Highway Administration
More informationAn Economic Analysis Methodology for Project Evaluation and Programming
JOINT TRANSPORTATION RESEARCH PROGRAM INDIANA DEPARTMENT OF TRANSPORTATION AND PURDUE UNIVERSITY An Economic Analysis Methodology for Project Evaluation and Programming Yi Jiang Guangyuan Zhao Shuo Li
More informationelcap and PaveM: California's Network and Project Level Quantification Tools
elcap and PaveM: California's Network and Project Level Quantification Tools John Harvey University of California Pavement Research Center Pavement LCA 2017 Champaign, IL 12 April 2017 The need for pavement
More informationPerformance Based Practical Design. An FHWA Perspective
Performance Based Practical Design An FHWA Perspective Early Adopters Research on PBPD and Background Materials http://www.fhwa.dot.gov/design/pbpd/ FAST Act Changes that Encourage PBPD On the NHS, design
More informationNational Trends in Pavement Design
National Trends in Pavement Design Southeastern States Pavement Management Association Pavement Management and Design May 11, 2009 New Orleans, Louisiana Gary Crawford Federal Highway Administration gary.crawford@dot.gov
More informationTC3 AASHTO Technical Service Program for Training
TC3 AASHTO Technical Service Program for Training Feb. 7 th 9 th Mid Atlantic Quality Assurance Workshop Ron Stanevich, PE Director of Materials Division, WVDOH TC3 AASHTO Technical Service Program for
More informationFor the past several years, the Colorado
ASPHALT PAVING The right kind of lift Strategy selection + quality + teamwork = road rehab success By Mike McBreen, Mike Coggins and Tom Peterson Contributing Authors For the past several years, the Colorado
More informationAsphalt Guidelines. Courtney Rousseau, P.E. Lloyd Consulting Group, LLC
Asphalt Guidelines Courtney Rousseau, P.E. Lloyd Consulting Group, LLC Objectives Review typical asphalt sections and other key components to ensure optimal material usage for your project Review hot mix
More informationAssessing the Life Cycle Benefits of Recycled Material in Road Construction
Assessing the Life Cycle Benefits of Recycled Material in Road Construction Eleanor F. Bloom 1 ; Gregory J. Horstmeier 2 ; Angela Pakes Ahlman 3 P.E., LEED AP; Tuncer B. Edil 4, Ph.D., P.E., D. GE; Gary
More informationImplementation of HERS-ST in Iowa and Development/Refinement of a National Training Program
Implementation of HERS-ST in Iowa and Development/Refinement of a National Training Program Final Report August 2008 Sponsored by University Transportation Centers Program, U.S. Department of Transportation
More informationTHE STRENGTH AND STIFFNESS MODULUS OF THIN LAYER HOT MIX ASPHALT CONCRETE AT VARIOUS TEMPERATURE
THE STRENGTH AND STIFFNESS MODULUS OF THIN LAYER HOT MIX ASPHALT CONCRETE AT VARIOUS TEMPERATURE Abdulhakim Mustafa Elshawesh 1), Ary Setyawan 2), Sholihin As ad 3) Post Graduate Civil Engineering ProgramsUniversitas
More informationLOCATION AND DESIGN DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form
More informationLife Cycle Cost Analysis: Application to an airport pavement
Life Cycle Cost Analysis: Application to an airport pavement Timothy Heuvinck 1 1 M.Sc. Student, Instituto Superior Técnico, Av. Rovisco Pais, 1, 1049-001 Lisbon, Portugal; timothy.heuvinck@ugent.be Abstract:
More informationEstablishing Hot Mix Asphalt Mixing and Compaction Temperatures at the Project Level
3 30 2 20 1 ot mix asphalt (HMA) mixing and compaction temperatures are emerging as critical issues in current asphalt pavement technology. Other factors, however, such as the total compaction process,
More informationAppendix B. Benefit-Cost Technical Memorandum
Appendix B Benefit-Cost Technical Memorandum This Page Left Blank Intentionally MEMORANDUM TO: FROM: Michael Kalnbach MnDOT District 1 Project Manager Graham Johnson, PE DATE: September 2, 2014 RE: TH
More informationMaterials for Civil and Construction Engineers
Materials for Civil and Construction Engineers CHAPTER 9 Asphalt Binders and Asphalt Mixtures Bituminous Materials Asphalt Natural or Refined from petroleum oil Tar Asphalt Cement Cutback Emulsion 2 Source
More informationInverted Pavement VULCAN MATERIALS COMPANY S EXPERIENCE
erted Pavement VULCAN MATERIALS COMPANY S EXPERIENCE What is an erted Pavement 2 to 3¼ HMA 6 to 8 Unbound Aggregate Base Compacted to 100% + Modified Proctor 6 to 10 Cement-Treated Base ( 4% cement) Prepared
More informationMIDLAND COUNTY ROAD COMMISSION
MIDLAND COUNTY ROAD COMMISSION BID FORM Sealed Proposals will be received at the office of the Board of Road Commissioners, County of Midland, at 2334 N. Meridian Road, Sanford, Michigan, 48657, until:
More informationThe Bituminous Report
The Bituminous Report 2013 Road Tour Pamela Marks, Head Bituminous Section MERO, MTO 1 Outline Hot on Hot Paving Warm Mix Asphalt (WMA) Stone Mastic Asphalt (SMA) Rubber Modified Asphalt (RMA) Asphalt
More informationSection 25 Aggregate Subbase
Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GRANULAR
More information