CDOT s Life Cycle Cost Analysis

Size: px
Start display at page:

Download "CDOT s Life Cycle Cost Analysis"

Transcription

1 CDOT s Life Cycle Cost Analysis 40 th Annual Rocky Mountain Asphalt Conference and Equipment Show February 28 th, 2013 Jay Goldbaum CDOT Pavement Design Program Manager Sunday, March 17, 13

2 CDOT s Life Cycle Cost Analysis 40 th Annual Rocky Mountain Asphalt Conference and Equipment Show February 28 th, 2013 Jay Goldbaum CDOT Pavement Design Program Manager Sunday, March 17, 13

3 Basics of a CDOT Life Cycle Cost Analysis A Life Cycle Cost Analysis (LCCA) is used to support the pavement type selection Compares pavement types and rehabilitation work over a 40 period Sunday, March 17, 13

4 Basics of a CDOT Life Cycle Cost Analysis A Life Cycle Cost Analysis (LCCA) is used to support the pavement type selection Compares pavement types and rehabilitation work over a 40 period Sunday, March 17, 13

5 When does CDOT run a LCCA Prepared for all new, reconstruction, or surface treatment projects with at least $2,000,000 in material costs for the roadway features i.e. hot mix asphalt, aggregate base course, subgrade soils, shoulder work, etc. Sunday, March 17, 13

6 When does CDOT run a LCCA Prepared for all new, reconstruction, or surface treatment projects with at least $2,000,000 in material costs for the roadway features i.e. hot mix asphalt, aggregate base course, subgrade soils, shoulder work, etc. Sunday, March 17, 13

7 LCCA Process YES 1. Develop preliminary design for typical section. 2. Perform life cycle cost analysis of typical sections. Is one type clearly superior? Greater than 10% NO 3. Evaluate secondary factors by Pavement Type Selection Committee (PTSC). 4. Select preliminary pavement type. NO 7. Select final pavement type and applicable thickness. YES 6. Is detailed design reasonably close to typical section design used in the analysis? 5. Perform detailed pavement design. Sunday, March 17, 13

8 LCCA Process YES 1. Develop preliminary design for typical section. 2. Perform life cycle cost analysis of typical sections. Is one type clearly superior? Greater than 10% NO 3. Evaluate secondary factors by Pavement Type Selection Committee (PTSC). 4. Select preliminary pavement type. NO 7. Select final pavement type and applicable thickness. YES 6. Is detailed design reasonably close to typical section design used in the analysis? 5. Perform detailed pavement design. Sunday, March 17, 13

9 LCCA Factors Used By CDOT Initial Construction Costs Annual Maintenance Cost Design Costs Pavement Construction Engineering Costs Traffic Control Cost Periodic Rehabilitation Costs User Costs Sunday, March 17, 13

10 LCCA Factors Used By CDOT Initial Construction Costs Annual Maintenance Cost Design Costs Pavement Construction Engineering Costs Traffic Control Cost Periodic Rehabilitation Costs User Costs Sunday, March 17, 13

11 Types of Distributions Used by CDOT Triangular Normal Most Likely Average Standard Deviation Minimum Maximum The data should be as accurate as possible Sunday, March 17, 13

12 Types of Distributions Used by CDOT Triangular Normal Most Likely Average Standard Deviation Minimum Maximum The data should be as accurate as possible Sunday, March 17, 13

13 Discount Rate The discount rate reflects the time value of money CDOT s current rate is 2.8 percent Standard Deviation of 0.18 percent Sunday, March 17, 13

14 Discount Rate The discount rate reflects the time value of money CDOT s current rate is 2.8 percent Standard Deviation of 0.18 percent Sunday, March 17, 13

15 Impact of the Discount Rate For example, if we need $1,000,000 in 15 years we would need almost $661,000 in today s dollars using the 2.8 percent rate $1,000,000 $750,000 $500,000 $250,000 $ Years Using a 5.0 percent rate, we would need about $481,000 Sunday, March 17, 13

16 Impact of the Discount Rate For example, if we need $1,000,000 in 15 years we would need almost $661,000 in today s dollars using the 2.8 percent rate $1,000,000 $750,000 $500,000 $250,000 $ Years Using a 5.0 percent rate, we would need about $481,000 Sunday, March 17, 13

17 Statewide Cost Data

18 Statewide Cost Data

19 Statewide Cost Data

20 Statewide Cost Data

21 Annual Maintenance Cost

22 Annual Maintenance Cost

23 Project Cost Preliminary engineering is about 8 to 20 percent with an average of around 18 percent Construction engineering is currently percent Traffic control is about 10 to 18 percent with an average of around 15 percent Sunday, March 17, 13

24 Project Cost Preliminary engineering is about 8 to 20 percent with an average of around 18 percent Construction engineering is currently percent Traffic control is about 10 to 18 percent with an average of around 15 percent Sunday, March 17, 13

25 Performance Life

26 Performance Life

27 User Cost

28 User Cost

29 User Cost Output

30 User Cost Output

31 User Cost Distribution

32 User Cost Distribution

33 CDOT Spreadsheet

34 CDOT Spreadsheet

35 CDOT Spreadsheet

36 CDOT Spreadsheet

37 FHWA RealCost Program

38 FHWA RealCost Program

39

40

41

42

43 RealCost Charts

44 RealCost Charts

45 Next Step When the alternatives are within 10 percent at the 75 percent probability level, they are deemed to be equal The Project Engineer can chose to have the project evaluated by the Pavement Type Selection Committee or use alternate bidding Sunday, March 17, 13

46 Next Step When the alternatives are within 10 percent at the 75 percent probability level, they are deemed to be equal The Project Engineer can chose to have the project evaluated by the Pavement Type Selection Committee or use alternate bidding Sunday, March 17, 13

47 Pavement Type Selection Committee Sunday, March 17, 13 Both industries review the input data Industry comments supported by data would be considered by the PTSC to adjust the LCCA If the LCCA is still within 10 percent, secondary factors such as project extensions, future maintenance and rehabilitation work, that are in alignment with the project s or Regional goals will be used to decide the type of pavement The PTSC makes a recommendation to the Chief Engineer

48 Pavement Type Selection Committee Sunday, March 17, 13 Both industries review the input data Industry comments supported by data would be considered by the PTSC to adjust the LCCA If the LCCA is still within 10 percent, secondary factors such as project extensions, future maintenance and rehabilitation work, that are in alignment with the project s or Regional goals will be used to decide the type of pavement The PTSC makes a recommendation to the Chief Engineer

49 Alternate Bid Sunday, March 17, 13 Two sets of plans are developed with HMA and PCCP bid by the square yard Initial construction costs are removed from the LCCA Both industries review the input data Industry comments supported by data would be considered to adjust the future work in the LCCA The net present value of user cost, maintenance, and rehabilitation work are added to the bid price

50 Alternate Bid Sunday, March 17, 13 Two sets of plans are developed with HMA and PCCP bid by the square yard Initial construction costs are removed from the LCCA Both industries review the input data Industry comments supported by data would be considered to adjust the future work in the LCCA The net present value of user cost, maintenance, and rehabilitation work are added to the bid price

51 Any Questions???

52 Any Questions???

Reclaimed Asphalt Pavement

Reclaimed Asphalt Pavement Reclaimed Asphalt Pavement Roy Guevara CDOT Asphalt Pavement Program Rocky Mountain Asphalt Conference February 2010 Benefits of Using RAP Benefits of Using RAP Conservation of materials Benefits of Using

More information

AMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS

AMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS AMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS INTRODUCTION With alternate bidding, road and highway agencies offer the opportunity to

More information

Pavement Management Systems

Pavement Management Systems Pavement Management Systems Basics and Benefits David R. Johnson, P.E. Regional Engineer Asphalt Institute Rocky Mountain Region djohnson@asphaltinstitute.org Presentation Outline Definition Requirements

More information

AMERICA RIDES ON US LIFE-CYCLE COST ANALYSIS: A POSITION PAPER

AMERICA RIDES ON US LIFE-CYCLE COST ANALYSIS: A POSITION PAPER AMERICA RIDES ON US LIFE-CYCLE COST ANALYSIS: A POSITION PAPER LIFE-CYCLE COST ANALYSIS: A POSITION PAPER Introduction Many agencies are turning to life-cycle cost analysis (LCCA) as a means of evaluating

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

Introduction. Key Words: Life-Cycle Cost Analysis (LCCA), Bridge Pile Repair, RealCost, BridgeLCC, BLCCA

Introduction. Key Words: Life-Cycle Cost Analysis (LCCA), Bridge Pile Repair, RealCost, BridgeLCC, BLCCA Evaluation of Life-Cycle Cost Analysis Programs for Bridge Pile Repair Projects Sangwook Lee, Ph.D., Dayong Wu, and Sang-Wook Bae, Ph.D. Texas Tech University Lubbock, Texas Life-Cycle Cost Analysis (LCCA),

More information

Design of Illinois Tollway Composite Pavements

Design of Illinois Tollway Composite Pavements Design of Illinois Tollway Composite Pavements William R. Vavrik, Ph.D., P.E. FHWA Tollway National Open House, August 20, 2013 1 Presentation Overview Starting in Composite Pavements Move to 2-Lift Concrete

More information

MNDOT PAVEMENT DESIGN MANUAL

MNDOT PAVEMENT DESIGN MANUAL MNDOT PAVEMENT DESIGN MANUAL Chapter 9 truction and Rehabilitation Alternates MnDOT Pavement Engineer Date Contents Introduction... 1 900 Existing Pavement-Types... 2 910 Rehabilitation with HMA Overlay

More information

Life Cycle Cost Analysis

Life Cycle Cost Analysis Life Cycle Cost Analysis Executive Summary Senate Bill 402, Section 34.25 requires NCDOT to report to the legislature on our life cycle cost analysis procedure by February 1, 2014. The four topics that

More information

COLD-IN-PLACE RECYCLING

COLD-IN-PLACE RECYCLING COLD-IN-PLACE RECYCLING A Cost Effective Pavement Preservation Treatment Kit Black, P.E. October 15, 2013 Footer Text Outline 1 2 3 4 5 6 7 Definition Equipment & Construction Process Project Selection

More information

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4 TABLE OF CONTENTS SECTION PAGE Background of Existing Facility 3 Proposed Work 4 Objective of this Report 4 Required Data 4 Pavement Design Procedure 5 Other Data Requirements 7 Pavement Structures 8 Pavement

More information

Connecting South Dakota and the Nation SDDOT Pavement Research Update

Connecting South Dakota and the Nation SDDOT Pavement Research Update Connecting South Dakota and the Nation SDDOT Pavement Research Update David Huft SDDOT Research Program Manager & Intelligent Transportation Systems Coordinator Projects in this Presentation Extent, Severity,

More information

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY THE COMMONWEALTH OF MASSACHUSETTS Number: P-92-010 Date: 10-08-92 - ) HIGHWAY DEPARTMENT FROM: NON-NHS BRIDGE R&R POLICY The purpose of this Engineering Directive is to formally notify Department Personnel

More information

CHAPTER 10 PAVEMENT DESIGN AND REPORT TABLE OF CONTENTS

CHAPTER 10 PAVEMENT DESIGN AND REPORT TABLE OF CONTENTS CHAPTER 10 PAVEMENT DESIGN AND REPORT TABLE OF CONTENTS Section Title Page 10.1 General... 10-1 10.1.1 Existing Streets...10-1 10.1.2 AASHTO Design...10-1 10.1.3 Pavement Type...10-1 10.1.4 Treated Subgrade...10-1

More information

Opportunities with Concrete Pavements

Opportunities with Concrete Pavements Opportunities with Concrete Pavements Stewardship, Cost Effectiveness and Innovation North Carolina Concrete Pavement Conference Durham, North Carolina November 17 th, 2016 Leif G. Wathne, P.E. American

More information

4-07 Asphalt Treated Permeable Base (ATPB)

4-07 Asphalt Treated Permeable Base (ATPB) 1 1 0 1 0 1 Supplement Division with the following: (November 0,, APWA GSP) -0 Asphalt Treated Permeable Base (ATPB) -0.1 Description Asphalt treated permeable base (ATPB) consists of a compacted course

More information

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH Presentation Outline General Introduction Part II Site Preparation & Earthwork Part III Base Courses

More information

Robinette and Epps 1

Robinette and Epps 1 Robinette and Epps 0 0 0 0 Energy, Emissions, Material Conservation and Prices Associated with Construction, Rehabilitation and Material Alternatives for Flexible Pavement By: Christopher Robinette Granite

More information

Probabilistic Life-Cycle Cost Analysis of Pavements

Probabilistic Life-Cycle Cost Analysis of Pavements Probabilistic Life-Cycle Cost Analysis of Pavements Drivers of Variation and Implications of Context Omar Swei, Jeremy Gregory, and Randolph Kirchain Significant research has been conducted over the past

More information

SUPERPAVE FACT SHEET

SUPERPAVE FACT SHEET WASHINGTON STATE DEPARTMENT OF TRANSPORTATION December 2003 SUPERPAVE FACT SHEET stands for SUperior PERforming asphalt PAVEment and is the result of a Strategic Highway Research Program (SHRP) initiative

More information

Maintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments

Maintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments Asphalt Pavement Preservation: Evaluation, Maintenance & Rehabilitation Maintenance & Rehabilitation Treatments Identification of Alternative Treatments Before selecting a treatment for a pavement, we

More information

Performance of Aggregate Base Course Pavements in North Carolina

Performance of Aggregate Base Course Pavements in North Carolina Performance of Aggregate Base Course Pavements in North Carolina Judith Corley-Lay, Ph.D., PE * Pavement Management Unit, NCDOT 1593 Mail Service Center Raleigh, NC 27699-1593 919-212-61 jlay@ncdot.gov

More information

Quality Improvement Series 126. Energy Conservation in Hot-Mix Asphalt Production

Quality Improvement Series 126. Energy Conservation in Hot-Mix Asphalt Production Quality Improvement Series 126 Energy Conservation in Hot-Mix Asphalt Production This publication is provided by the Members of the National Asphalt Pavement Association (NAPA), who are the nation s leading

More information

Yesterday. Today. Tomorrow

Yesterday. Today. Tomorrow Materials 106 Introduction to Warm Mix Asphalt Yesterday Today Tomorrow Rocky Mountain Asphalt Conference & Equipment Show February 19 February 21, 2014 Materials 106 Introduction to Warm Mix Asphalt Yesterday

More information

Presented by PA V E M E N T M A N A G E M E N T S Y S T E M S. The Washington State Experience

Presented by PA V E M E N T M A N A G E M E N T S Y S T E M S. The Washington State Experience Transportation Asset Management Case Studies c1 Presented by PA V E M E N T M A N A G E M E N T S Y S T E M S The Washington State Experience A comprehensive, fully integrated Transportation Asset Management

More information

Cold In-Place Recycling

Cold In-Place Recycling Cold In-Place Recycling Dan Schellhammer, P.E. Midstate Reclamation and Trucking In 1991, Midstate brought the first reclaimer into the state of Minnesota Emphasis on asphalt recycling techniques (milling,

More information

ASPHALT: INNOVATION & SOLUTIONS. Bill Rosener Executive Vice President Asphalt Paving Association of Iowa

ASPHALT: INNOVATION & SOLUTIONS. Bill Rosener Executive Vice President Asphalt Paving Association of Iowa ASPHALT: INNOVATION & SOLUTIONS & Bill Rosener Executive Vice President Asphalt Paving Association of Iowa Iowa Asphalt Industry is the Best in the USA What we offer: Project Consultation Design, Methods,

More information

Center for Transportation Research University of Texas at Austin 3208 Red River, Suite 200 Austin, Texas

Center for Transportation Research University of Texas at Austin 3208 Red River, Suite 200 Austin, Texas 1. Report No. SWUTC/01/167205-1 Technical Report Documentation Page 2. Government Accession No. 3. Recipient s Catalog No. 4. Title and Subtitle Life Cycle Cost Analysis of Portland Cement Concrete Pavements

More information

The Role of Pavement Preservation in Asset Management

The Role of Pavement Preservation in Asset Management The Role of Pavement Preservation in Asset Management Keith D. Herbold, P.E. Senior Pavement Engineer FHWA Resource Center keith.herbold@fhwa.dot.gov 708-283-3548 PRESENTATION TOPICS FHWA Resource Center

More information

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) 275.1. Description. This Item shall govern for treating subgrade, new and/or existing base [with or without asphaltic concrete pavement (ACP)], or

More information

Full Depth Reclamation

Full Depth Reclamation Full Depth Reclamation FDR Has Been Around A While 2 3 What is Full Depth Reclamation (FDR)? Full Depth Reclamation is a pavement rehabilitation technique in which the full flexible pavement section and

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

Sustainable Pavements. Gina Ahlstrom Senior Pavement Engineer Office of Asset Management, Pavements, and Construction

Sustainable Pavements. Gina Ahlstrom Senior Pavement Engineer Office of Asset Management, Pavements, and Construction Sustainable Pavements Gina Ahlstrom Senior Pavement Engineer Office of Asset Management, Pavements, and Construction National Concrete Consortium Jacksonville, FL April 22, 2014 2 FHWA Sustainable Pavements

More information

Selecting Projects for Accelerated Bridge Construction

Selecting Projects for Accelerated Bridge Construction Selecting Projects for Accelerated Bridge Construction In January of 2017, the Engineering Services and Operations Division Directors issued a memo instructing Districts to consider accelerated bridge

More information

Why Should Every Day Count For You?

Why Should Every Day Count For You? Why Should Every Day Count For You? Today s Agenda What is Every Day Counts (EDC)? First Round State Transportation Innovation Council Exchanges Round II What is Every Day Counts? EDC was launched in 2010

More information

Pavement Update Track: Engineering

Pavement Update Track: Engineering Pavement Update Track: Engineering 2017 ACC Airports Technical Workshop June 21-22, 2017 Arlington, VA Gregory D. Cline, P.E. FAA Airport Engineering AAS-100 gregory.cline@faa.gov (202) 267-8814 Pavement

More information

Highway Cost Index Estimator Tool Final report PRC 17-73

Highway Cost Index Estimator Tool Final report PRC 17-73 Highway Cost Index Estimator Tool Final report PRC 17-73 Highway Cost Index Estimator Tool Texas A&M Transportation Institute PRC 17-73 March 2018 Authors Brett Huntsman Brianne Glover, J.D. Samir Huseynov

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

How to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc.

How to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc. 1 How to Select the Appropriate Pavement Rehabilitation Option David Rettner, PE American Engineering Testing, Inc. 2 Pavement Rehabilitation Selection Understanding the Problem 3 Pavement Assessment Pavement

More information

The Illinois Tollway s Use of Composite Concrete Pavements with Greener Concrete for Improved Sustainability

The Illinois Tollway s Use of Composite Concrete Pavements with Greener Concrete for Improved Sustainability The Illinois Tollway s Use of Composite Concrete Pavements with Greener Concrete for Improved Sustainability Steve Gillen. Illinois Tollway / Deputy Program Manager of Materials Arizona Pavements / Materials

More information

A Review and Recommendations for Canadian LCCA Guidelines

A Review and Recommendations for Canadian LCCA Guidelines A Review and Recommendations for Canadian LCCA Guidelines Mizan Moges, MSc. Eng., EIT Corresponding Author Email: Mizan.Moges@Stantec.com Amr Ayed, Ph.D., P. Eng. Giannin Viecili, M. Eng. Amir Abd El Halim,

More information

Computer-Aided Maintenance Management

Computer-Aided Maintenance Management 52 TRANSPORTATION RESEARCH RECORD 1276 Computer-Aided Maintenance Management JOHN P. ZANIEWSKI AND MICHAEL J. WILES A maintenance management system (MMS) allows managers to organize and control maintenance

More information

Sandstone Curb Replacement Standards

Sandstone Curb Replacement Standards Sandstone Curb Replacement Standards Division of Infrastructure Management SCOPE OF CURB REPLACEMENT (Funding Dependent) Sandstone Curb Section I - Purpose: Sandstone curb may be replaced only if existing

More information

Innovative Sustainable Pavement Solutions

Innovative Sustainable Pavement Solutions 2010 Concrete Sustainability Conference Innovative Sustainable Pavement Solutions Fares Abdo, P.E. and David Shepherd, AIA LEED AP Fares Abdo, P.E. and David Shepherd, AIA LEED AP Portland Cement Association

More information

What is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process

What is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process Emulsion Full Depth Reclamation and Granular Base Stabilization An Engineered Approach 47 th Idaho Asphalt Conference Rocktober 25 th, 2007 Full Depth Reclamation (FDR) What is it? Rehabilitation technique

More information

Pavement Design. TTP Orientation Seminar 2011

Pavement Design. TTP Orientation Seminar 2011 Pavement Design TTP Orientation Seminar 2011 What are Pavements? Engineered structures in contact with the earth's surface built to facilitate movement of people and goods Pedestrians Personal vehicles

More information

San Francisco Bay Area Green Initiatives. Theresa Romell, Principal Planner/Analyst, Metropolitan Transportation Commission October 12, 2016

San Francisco Bay Area Green Initiatives. Theresa Romell, Principal Planner/Analyst, Metropolitan Transportation Commission October 12, 2016 San Francisco Bay Area Green Initiatives Theresa Romell, Principal Planner/Analyst, Metropolitan Transportation Commission October 12, 2016 Metropolitan Transportation Commission 9 counties, 100 cities

More information

Typical Dynamic Modulus Data for HMA Mixture and EMC SQUARED Stabilized Aggregate Mixture

Typical Dynamic Modulus Data for HMA Mixture and EMC SQUARED Stabilized Aggregate Mixture Dynamic modulus is the main input required for design of Hot Mix Asphalt (HMA) pavements using the nationally recognized AASHTO Mechanistic-Emperical Pavement Design Guide (MEPDG). HMA pavement materials

More information

A Contractor s Look at the Changing World of Asphalt Technology

A Contractor s Look at the Changing World of Asphalt Technology Staying Arizona a step Pavements/Asphalt ahead: Conference A Contractor s Look at the Changing World of Asphalt Technology 2012 Arizona Pavement/Materials Conference Adam J.T. Hand, PhD, PE Granite Construction

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3 CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3

More information

CHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G.

CHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G. CHAPTER 10: PAVING AGGREGATE Aggregate has become more specific on how it is paid for. Therefore, make sure the plan specifies they type of aggregate to use. Spec 2118 Aggregate Surfacing - Aggregate placed

More information

Introduction to Asphalt Pavement Design and Specifications

Introduction to Asphalt Pavement Design and Specifications Introduction to Asphalt Pavement Design and Specifications Ensuring Good Performance in Flexible Pavement Design and Construction: accomplished through: 1. Proper structural (thickness) design for the

More information

Cold Foam In-Place Recycling (CIR)

Cold Foam In-Place Recycling (CIR) Cold Foam In-Place Recycling (CIR) FONSECA/McELROY GRINDING CO., INC. Cold Foam CIR CIR Method/Foamed Asphalt Cold In-Place Recycling Foamed Asphalt Hot Bitumen Water Air Foamed Asphalt The larger surface

More information

Perpetual Pavement Demonstration

Perpetual Pavement Demonstration Perpetual Pavement Demonstration September 12, 2007 Cedar Road from Brainard Rd. to Lander Rd. Cuyahoga County Engineer s Presenters: Brian Brian Driscoll, P.E. Chief Highway Design Engineer Thomas Thomas

More information

HOT MIX ASPHALT PAVEMENT

HOT MIX ASPHALT PAVEMENT Section 700 - Hot Mix Asphalt Pavement HOT MIX ASPHALT PAVEMENT PART - GENERAL.0 SECTION INCLUDES A. Hot Mix Asphalt (HMA) Pavement B. Base Widening.0 DESCRIPTION OF WORK A. Includes the requirements for

More information

Environmental Benefits of Using Recycled Materials

Environmental Benefits of Using Recycled Materials Environmental Benefits of Using Recycled Materials Recycled Materials University of Wisconsin-Madison Angela Pakes Ahlman, P.E., LEED AP Tuncer B. Edil, P.E., D.PG. Erik Elliot and Andrew Baker Recycled

More information

USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS

USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS Mack, Sullivan 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS Word Count

More information

ALTERNATIVE PROJECT DELIVERY DIVISION

ALTERNATIVE PROJECT DELIVERY DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION ALTERNATIVE PROJECT DELIVERY DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design-Build Requirements for Advertisement SPECIFIC SUBJECT: APPROVED:

More information

ADOT s Use of RAP in Asphaltic Concrete

ADOT s Use of RAP in Asphaltic Concrete ADOT s Use of RAP in Asphaltic Concrete Updated & Presented by: Nye McCarty, P.E. Originally prepared by: Chad Auker & Scott Weinland ADOT Construction-Materials Group Overview ADOT s Existing RAP Specification

More information

MPC REPORT NO Evaluating the Impace of QC/QA Programs on Asphalt Mixture Variability

MPC REPORT NO Evaluating the Impace of QC/QA Programs on Asphalt Mixture Variability MPC REPORT NO. 03-146 Evaluating the Impace of QC/QA Programs on Asphalt Mixture Variability Khaled Ksaibati Nathan Butts June 2003 Evaluating the Impact of QC/QA Programs on Asphalt Mixture Variability

More information

PCCP Pavement Structures, 3D Modeling and Machine Control

PCCP Pavement Structures, 3D Modeling and Machine Control PCCP Pavement Structures, 3D Modeling and Machine Control Design-Build P3 Project Contracting Entity: Infrastructure Development Partners Contract Value: $95.03 M Contract Completion Date: December 2015

More information

An Overview of Low Cost Pavement Alternatives in Canada

An Overview of Low Cost Pavement Alternatives in Canada An Overview of Low Cost Pavement Alternatives in Canada Venkat Lakkavalli P. Eng., M. Sc. Leader, Pavement Engineering The City of Calgary Alberta, Canada Acknowledgement Acknowledge Authors, Co-authors

More information

FHWA Cooperative Agreement Subtask. Longitudinal Joints Intelligent Compaction

FHWA Cooperative Agreement Subtask. Longitudinal Joints Intelligent Compaction 1 FHWA Cooperative Agreement Subtask Longitudinal Joints Intelligent Compaction to improve the overall bonding of pavement layers; to decrease distresses associated with poor bond; and to improve overall

More information

Pavement Design. TTP Orientation Seminar 2017

Pavement Design. TTP Orientation Seminar 2017 Pavement Design TTP Orientation Seminar 2017 What are Pavements? Engineered structures in contact with the earth's surface built to facilitate movement of people and goods Pedestrians Personal vehicles

More information

Pavement Management Systems PMS PAVEMENT MANAGEMENT SYSTEMS OVERVIEW. Dr. Nick Vitillo

Pavement Management Systems PMS PAVEMENT MANAGEMENT SYSTEMS OVERVIEW. Dr. Nick Vitillo Pavement Management Systems PMS PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Dr. Nick Vitillo PMS CONCEPTS DISCUSSION TOPICS DEFINITION OF PM AND PMS PMS SUBSYSTEMS NETWORK & PROJECT LEVEL PMS PAVEMENT EVALUATION

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

SUDAS Revision Submittal Form

SUDAS Revision Submittal Form SUDAS Revision Submittal Form Status Date: As of 3/20/2017 Topic: Pavement thickness Manual: Design Manual Location: Section 5F-1 Requested Revision: Reason for Revision: Comments: See attached. Updating

More information

CHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK

CHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK ------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A CHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK DES.

More information

Asphalt Rubber Surface Treatment & SAMIs in Pavement Preservation

Asphalt Rubber Surface Treatment & SAMIs in Pavement Preservation Asphalt Rubber Surface Treatment & SAMIs in Pavement Preservation 62 nd School for Highway Superintendents Cornell Local Roads Program June 5, 2007 By Rod Birdsall, P.E. www.fp2.org Resources www.pavementpreservation.org

More information

EINRIP. Specification and Construction Issues

EINRIP. Specification and Construction Issues EINRIP Specification and Construction Issues There are a significant number of changes in the Specification Not all issues can be discussed here A more detailed list of changes will be provided with bid

More information

Conditions of Paved Roads in Carbon County, Wyoming

Conditions of Paved Roads in Carbon County, Wyoming Conditions of Paved Roads in Carbon County, Wyoming By Promothes Saha, Ph.D. and Khaled Ksaibati, Ph.D., P.E. Wyoming Technology Transfer Center University of Wyoming, Laramie, Wyoming, 82071 307-766-6230;

More information

CDOT Cold In-Place Specifications and Construction

CDOT Cold In-Place Specifications and Construction CDOT Cold In-Place Specifications and Construction CIR Specifications and Construction CDOT has successfully used CIR from the plains to the high mountains, and from low volume roadways to high volume

More information

DOTD Pavement Research Facility

DOTD Pavement Research Facility DOTD Pavement Research Facility Program History Initial PRF Costs FHWA: $1,396,125 LA DOTD: $ 935,375 $2,334,500 Experiment No. 1 February 1996 Experiment No. 2 March 1999 Experiment No. 3 March 2001 Experiment

More information

Pavement Design Guide November 2002

Pavement Design Guide November 2002 Pavement Design Guide November 2002 Prepared by the Pavement Division, Office of Materials and Technology. Forward There are many different approaches that are used in the pavement industry to develop

More information

Plantmix Asphalt Industry of Kentucky Winter Meeting February 10, 2011

Plantmix Asphalt Industry of Kentucky Winter Meeting February 10, 2011 Plantmix Asphalt Industry of Kentucky Winter Meeting February 10, 2011 AASHTO Guidelines for Geometric Design of Very Low-Volume Local Roads (2001) ADT 400 AASHTO Guide for Design of Pavement Structures

More information

SD F. Mechanistic-Empirical Pavement Design Guide Implementation Plan Study SD Final Report

SD F. Mechanistic-Empirical Pavement Design Guide Implementation Plan Study SD Final Report SD2005-01-F Mechanistic-Empirical Pavement Design Guide Implementation Plan Study SD2005-01 Final Report Prepared by Applied Pavement Technology, Inc. 115 W. Main St., Suite 400 Urbana, IL 61801 October

More information

Geosynthetic Pavement Interlayers

Geosynthetic Pavement Interlayers 2015 Geosynthetic Pavement Interlayers This overview is offered to provide general information Building longer lasting, more maintenance free pavements on the construction and functional capabilities of

More information

Materials Selection in Pavement Design. Flexible Pavements

Materials Selection in Pavement Design. Flexible Pavements Materials Selection in Pavement Design Flexible Pavements Pavement Design AASHTO Pavement Design Guide (1993) AASHTOWare Pavement ME Dr. Witczak Traffic = 100 Trucks/day Over 20 Years (730,000 ESAL s)

More information

ASSET MANAGEMENT GUIDE

ASSET MANAGEMENT GUIDE ASSET MANAGEMENT GUIDE For Local Agencies in Indiana JUNE 2017 This Guide was developed for the Indiana LTAP by Applied Pavement Technology, Inc. 115 West Main Street Suite 400 Urbana, Illinois 61801 (217)

More information

National Superpave Status Present & Future

National Superpave Status Present & Future National Superpave Status Present & Future John R. Bukowski Federal Highway Administration Northeast Asphalt User/Producer Group October 23, 2003 US Department of Transportation Federal Highway Administration

More information

An Economic Analysis Methodology for Project Evaluation and Programming

An Economic Analysis Methodology for Project Evaluation and Programming JOINT TRANSPORTATION RESEARCH PROGRAM INDIANA DEPARTMENT OF TRANSPORTATION AND PURDUE UNIVERSITY An Economic Analysis Methodology for Project Evaluation and Programming Yi Jiang Guangyuan Zhao Shuo Li

More information

elcap and PaveM: California's Network and Project Level Quantification Tools

elcap and PaveM: California's Network and Project Level Quantification Tools elcap and PaveM: California's Network and Project Level Quantification Tools John Harvey University of California Pavement Research Center Pavement LCA 2017 Champaign, IL 12 April 2017 The need for pavement

More information

Performance Based Practical Design. An FHWA Perspective

Performance Based Practical Design. An FHWA Perspective Performance Based Practical Design An FHWA Perspective Early Adopters Research on PBPD and Background Materials http://www.fhwa.dot.gov/design/pbpd/ FAST Act Changes that Encourage PBPD On the NHS, design

More information

National Trends in Pavement Design

National Trends in Pavement Design National Trends in Pavement Design Southeastern States Pavement Management Association Pavement Management and Design May 11, 2009 New Orleans, Louisiana Gary Crawford Federal Highway Administration gary.crawford@dot.gov

More information

TC3 AASHTO Technical Service Program for Training

TC3 AASHTO Technical Service Program for Training TC3 AASHTO Technical Service Program for Training Feb. 7 th 9 th Mid Atlantic Quality Assurance Workshop Ron Stanevich, PE Director of Materials Division, WVDOH TC3 AASHTO Technical Service Program for

More information

For the past several years, the Colorado

For the past several years, the Colorado ASPHALT PAVING The right kind of lift Strategy selection + quality + teamwork = road rehab success By Mike McBreen, Mike Coggins and Tom Peterson Contributing Authors For the past several years, the Colorado

More information

Asphalt Guidelines. Courtney Rousseau, P.E. Lloyd Consulting Group, LLC

Asphalt Guidelines. Courtney Rousseau, P.E. Lloyd Consulting Group, LLC Asphalt Guidelines Courtney Rousseau, P.E. Lloyd Consulting Group, LLC Objectives Review typical asphalt sections and other key components to ensure optimal material usage for your project Review hot mix

More information

Assessing the Life Cycle Benefits of Recycled Material in Road Construction

Assessing the Life Cycle Benefits of Recycled Material in Road Construction Assessing the Life Cycle Benefits of Recycled Material in Road Construction Eleanor F. Bloom 1 ; Gregory J. Horstmeier 2 ; Angela Pakes Ahlman 3 P.E., LEED AP; Tuncer B. Edil 4, Ph.D., P.E., D. GE; Gary

More information

Implementation of HERS-ST in Iowa and Development/Refinement of a National Training Program

Implementation of HERS-ST in Iowa and Development/Refinement of a National Training Program Implementation of HERS-ST in Iowa and Development/Refinement of a National Training Program Final Report August 2008 Sponsored by University Transportation Centers Program, U.S. Department of Transportation

More information

THE STRENGTH AND STIFFNESS MODULUS OF THIN LAYER HOT MIX ASPHALT CONCRETE AT VARIOUS TEMPERATURE

THE STRENGTH AND STIFFNESS MODULUS OF THIN LAYER HOT MIX ASPHALT CONCRETE AT VARIOUS TEMPERATURE THE STRENGTH AND STIFFNESS MODULUS OF THIN LAYER HOT MIX ASPHALT CONCRETE AT VARIOUS TEMPERATURE Abdulhakim Mustafa Elshawesh 1), Ary Setyawan 2), Sholihin As ad 3) Post Graduate Civil Engineering ProgramsUniversitas

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form

More information

Life Cycle Cost Analysis: Application to an airport pavement

Life Cycle Cost Analysis: Application to an airport pavement Life Cycle Cost Analysis: Application to an airport pavement Timothy Heuvinck 1 1 M.Sc. Student, Instituto Superior Técnico, Av. Rovisco Pais, 1, 1049-001 Lisbon, Portugal; timothy.heuvinck@ugent.be Abstract:

More information

Establishing Hot Mix Asphalt Mixing and Compaction Temperatures at the Project Level

Establishing Hot Mix Asphalt Mixing and Compaction Temperatures at the Project Level 3 30 2 20 1 ot mix asphalt (HMA) mixing and compaction temperatures are emerging as critical issues in current asphalt pavement technology. Other factors, however, such as the total compaction process,

More information

Appendix B. Benefit-Cost Technical Memorandum

Appendix B. Benefit-Cost Technical Memorandum Appendix B Benefit-Cost Technical Memorandum This Page Left Blank Intentionally MEMORANDUM TO: FROM: Michael Kalnbach MnDOT District 1 Project Manager Graham Johnson, PE DATE: September 2, 2014 RE: TH

More information

Materials for Civil and Construction Engineers

Materials for Civil and Construction Engineers Materials for Civil and Construction Engineers CHAPTER 9 Asphalt Binders and Asphalt Mixtures Bituminous Materials Asphalt Natural or Refined from petroleum oil Tar Asphalt Cement Cutback Emulsion 2 Source

More information

Inverted Pavement VULCAN MATERIALS COMPANY S EXPERIENCE

Inverted Pavement VULCAN MATERIALS COMPANY S EXPERIENCE erted Pavement VULCAN MATERIALS COMPANY S EXPERIENCE What is an erted Pavement 2 to 3¼ HMA 6 to 8 Unbound Aggregate Base Compacted to 100% + Modified Proctor 6 to 10 Cement-Treated Base ( 4% cement) Prepared

More information

MIDLAND COUNTY ROAD COMMISSION

MIDLAND COUNTY ROAD COMMISSION MIDLAND COUNTY ROAD COMMISSION BID FORM Sealed Proposals will be received at the office of the Board of Road Commissioners, County of Midland, at 2334 N. Meridian Road, Sanford, Michigan, 48657, until:

More information

The Bituminous Report

The Bituminous Report The Bituminous Report 2013 Road Tour Pamela Marks, Head Bituminous Section MERO, MTO 1 Outline Hot on Hot Paving Warm Mix Asphalt (WMA) Stone Mastic Asphalt (SMA) Rubber Modified Asphalt (RMA) Asphalt

More information

Section 25 Aggregate Subbase

Section 25 Aggregate Subbase Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GRANULAR

More information