A465 Heads of the Valleys Dualling Sections 5 and 6: Dowlais Top to Hirwaun. PROOF OF EVIDENCE: Noise and Vibration Document WG

Size: px
Start display at page:

Download "A465 Heads of the Valleys Dualling Sections 5 and 6: Dowlais Top to Hirwaun. PROOF OF EVIDENCE: Noise and Vibration Document WG"

Transcription

1 A465 Heads of the Valleys Dualling Sections 5 and 6: Dowlais Top to Hirwaun PROOF OF EVIDENCE: Noise and Vibration Document WG By: Andrew Clarke BSc MIOA March 2018

2 PROOF OF EVIDENCE: Noise and Vibration CONTENTS Page No. 1 Personal Statement Scope of This Proof Baseline Conditions Assessment Methodology Assessment Results Environmental Statement Assessment Results ES Supplement Mitigation Strategy Conclusions Declaration... 31

3 1 Personal Statement 1.1 My name is Andrew Stephen Clarke. I am employed by Jacobs UK Ltd as a Technical Director within the Acoustics team and have over 20 years of experience working in Acoustics consultancy. 1.2 I have a Bachelor of Science (Hons) degree in Biology and have held membership of the Institute of Acoustics since 2000, initially as an Associate Member (AMIOA) and more recently as a Member (MIOA). 1.3 I have been the Noise and Vibration lead for the assessment of over 15 highways schemes in the UK and have given expert witness testimony for National Infrastructure Planning (NIP) Hearings and Public Inquiries (PIs). Recent highway schemes for which I was the Noise and Vibration lead include the Congleton Link Road, Preston Western Distributor, Poynton Bypass, M6 J16 to 19 Smart Motorway Programme and Penwortham Bypass. 1.4 For this scheme, I was first involved in June 2017 shortly before the Environmental Statement (ES) (DD ) was published. I have since been responsible for overseeing the updated assessment work undertaken, evaluating noise mitigation options and producing the ES Supplement (DD 2.4.1) Noise and Vibration chapter produced for the scheme in February I am a member of the project team who are responsible for the delivery of the A465 Sections 5 and 6 Dowlais Top to Hirwaun scheme. Although the noise modelling and analysis work has been carried out by a team of specialists under my direction, I take ownership of the results described below and the opinions given are my own. Andrew Stephen Clarke / March of 31

4 1.6 I am required by the Code of Conduct of the institute of Acoustics (IOA) to uphold the dignity and reputation of the profession and of the Institute and of its members and officers, safeguard the public interest in matters of safety, health and the environment, exercise professional skill and judgement to the best of my ability and discharge my professional responsibilities with integrity, honesty and diligence. This includes giving evidence in a fair and impartial manner. Andrew Stephen Clarke / March of 31

5 2 Scope of This Proof 2.1 This Proof of Evidence addresses Noise and Vibration relating to the A465 scheme proposals. 2.2 An initial assessment of the scheme was undertaken in 2016/2017 and reported in the ES (DD ) published in July Following updates to traffic data, the scheme was reassessed and reported in the ES Supplement (DD 2.4.1), published in February This ES Supplement supersedes the construction and operational assessments presented in the ES. An Updated Operational Assessment has recently been undertaken, to include the small design changes that have occurred since the original assessment work, including those detailed in the Supplementary Orders. The results of this Updated Operational Assessment will be provided in a Future Supplement to this Proof of Evidence. 2.3 This Proof focuses on the assessment within the more recent ES Supplement (DD 2.4.1). It sets out the current baseline and noise issues, the methodology and guidance that has been used for the noise and vibration assessment, the findings from the assessment, the mitigation strategy that has been used and the residual impacts. Andrew Stephen Clarke / March of 31

6 3 Baseline Conditions 3.1 For the purposes of the noise assessment, the baseline scenario is represented by the predicted ambient noise levels in the opening year, without the proposed scheme in place (Do Minimum 2022 scenario). This approach follows the guidance within the Design Manual for Roads and Bridges (DMRB), Volume 11, Section 3, Part 7 Noise and Vibration, HD 213/11 Revision 1 (HD 213/11) (DD ). 3.2 The guidance in HD 213/11 (DD ) advises the use of the Calculation of Road Traffic Noise (CRTN) (DD ) prediction method. This methodology provides predicted noise levels across the entire study area under consistent conditions (i.e. not subject to traffic flow variations, or meteorological variations that would affect propagation scenarios). The CRTN procedure assumes a moderately adverse wind scenario; that is with the wind blowing from the source to the receiver (as described in CRTN (DD ) paragraph 4). 3.3 The noise environment in much of the study area is generally dominated by traffic noise and therefore predictable using the road traffic noise model. This method of using the traffic model to quantify baseline noise levels is standard practice for highway noise assessment. 3.4 Baseline noise monitoring was undertaken during January and February 2016 at eleven locations considered representative of communities along the scheme. The data was used predominantly to provide baseline noise levels for use in the construction assessment, but also to enable comparison with the predicted Do- Minimum 2022 noise levels. Andrew Stephen Clarke / March of 31

7 3.5 The baseline noise monitoring locations chosen included some of the nearest properties to the proposed A465, and therefore, the likely worst affected by the proposed scheme. Long term noise monitoring (approximately 1 week at each location), was carried out at a total of seven locations. The long term noise surveys were supplemented with short term attended monitoring (following the CRTN shortened measurement procedure) at four locations, where access could not be obtained or the garden areas were not considered secure. The proposed noise monitoring locations were discussed with an Environmental Health Officer (EHO) at Merthyr Tydfil County Borough Council (MTCBC) and a Pollution and Public Health Manager at Rhondda Cynon Taf County Borough Council (RCTCBC) in advance of the survey. Full details of the noise monitoring undertaken and results obtained are provided in Section 14.6 and Appendix 14C of the ES Supplement (DD 2.4.1). 3.6 The current noise environment is generally dominated by road traffic noise, caused by traffic on the A465 and the surrounding road network. Noise levels adjacent to the existing A465 carriageway vary from around 50 db LA10,18h to around 80 db LA10,18h, according to the distance between the road and the façade of the property and whether or not there are other properties or other screening structures between them and the road. 3.7 A single Noise Action Plan Priority Area (NAPPA), number 362, is located within the study area, to the south of the proposed scheme in Dowlais Top. Noise levels approaching 80 db LA10,18h are seen at properties situated within the NAPPA, as illustrated by the ST4 noise monitoring location results provided in Table 14.8 of the ES Supplement (DD 2.4.1). Andrew Stephen Clarke / March of 31

8 4 Assessment Methodology 4.1 An assessment of noise and vibration for the proposed scheme has been undertaken in accordance with national guidance, including HD 213/11 (DD ). The assessment of noise and vibration impacts at nearby noise sensitive receptors has followed the Detailed Assessment methodology outlined in HD 213/11 (DD ). 4.2 For construction noise, consideration was given to the likely worstcase phases of construction works. Using the indicative construction activities and plant detailed in Appendix 14E of the ES (DD ), construction noise levels have been predicted at representative receptors located in close proximity to the works. Construction noise levels at nearby sensitive receptors were calculated using the CadnaA noise modelling package, which incorporated the prediction methodologies contained in BS : A1: Code of practice for noise and vibration control on construction and open sites, part 1: Noise (BS ) (DD ). 4.3 The numbers of dwellings and other sensitive receptors (OSRs) where construction noise levels are expected to be close to or exceed the relevant threshold values from BS (DD ) have been estimated. The significance of the impact associated with these exceedances has been classified according to the following categories: potential minor impacts are judged to have occurred where the construction noise levels are within a range of 0-5 db below the relevant threshold; Andrew Stephen Clarke / March of 31

9 potential moderate impacts are judged to have occurred where the construction noise levels are between 0-5 db above the relevant threshold; and potential major impacts are judged to have occurred where the construction noise levels are greater than 5 db above the relevant threshold. 4.4 In determining whether a significant effect would occur, guidance within BS (DD ) advises that consideration should be given to a number of additional factors including the number of receptors affected, the duration of the works and the character of the noise. At this stage, without the actual contractor in place, the assessment is based on reasonable assumptions as to how the scheme would be constructed. Once the construction contractor has been appointed, and the methods of construction and programme of works have been finalised, the construction noise and vibration assessment would need to be updated. 4.5 For construction vibration, consideration has been given to the construction activities with the potential to give rise to the highest levels of vibration at receptors. These were considered to be vibratory earthwork compacting works and piling activities, which would be associated with the construction of structures and earthworks. Predictions of likely vibration levels from these activities have been made for some of the likely closest sensitive receptors, based on the formulae provided in BS : A1: Code of practice for noise and vibration control on construction and open sites, Part 2: Vibration (BS ) (DD ). Andrew Stephen Clarke / March of 31

10 4.6 For the operational assessment, noise levels have been calculated at all residential dwellings and other sensitive receptors within the calculation area as defined in Section of the ES Supplement (DD 2.4.1). Noise levels at receptors have been calculated using the CadnaA noise modelling package, which incorporates the methodology contained in the Calculation of Road Traffic Noise, 1988 (CRTN) (DD ) and supplemental guidance in HD 213/11 (DD ). The following comparisons have been made in accordance with the guidance in HD 213/11: Short-term noise changes on scheme opening - by comparing the Do Minimum (DM) Opening Year (2022) predictions with the Do Something (DS) Opening Year (2022) predictions; Long-term noise changes, without the scheme in place by comparing DM 2022 predictions with DM Design Year (2037) predictions; and Long-term noise changes, with the scheme in place by comparing DM 2022 predictions with DS 2037 predictions. 4.7 In assessing the operational noise impact of the scheme, consideration has been given to the magnitude of impact categories for traffic noise detailed in HD 213/11 (DD ) for both the shortterm and long-term. A change in road traffic noise of 1 db in the short-term, for example when a project is opened, is the smallest that is considered perceptible. In the long-term, a 3 db change is the smallest that is considered perceptible. These magnitude of change criteria have been developed following research into traffic noise and its impact on people. Many of the studies undertaken considered traffic noise and its effect on people in terms of nuisance and annoyance. The early studies focussed on sites where conditions were generally steady (ie. no sudden changes had Andrew Stephen Clarke / March of 31

11 taken place) and these studies yielded steady state relationships between noise exposure and nuisance. Later studies indicated that people were more sensitive to abrupt changes in traffic noise (such as on scheme opening) than would have been expected using the steady state relationships. The differences in the short term and long term magnitudes of impact criteria used, reflects the increased sensitivity of people to noise changes on a scheme s opening. 4.8 In terms of the significance of effects, as discussed in paragraph 3.36 of HD 213/11 (DD ), in terms of road traffic noise, a standard methodology has not yet been developed to assign significance according to both value / sensitivity and magnitude. Instead, HD 213/11 advises that the magnitude of traffic noise impact from a road project should be classified into levels of impact, in order to assist with the interpretation of the road project. 4.9 Given the distance of the scheme to the nearest sensitive receptors and the smooth, new road surface to be introduced, operational ground-borne vibration was not considered to be a significant issue. Vibration nuisance predictions were undertaken and reported following the procedure outlined in HD 213/11 (DD ) Section 14.4 and Appendix 14B of the ES Supplement (DD 2.4.1) provide further details of the methodologies followed for the construction and operational assessments and the assessment criteria adopted Consideration was given to nearby sensitive receptors, including residential properties, schools, churches, cemeteries and healthcare facilities. In addition to the HD 213/11 assessment tables which summarise the overall operational impacts of the proposed scheme, predicted noise levels at a number of representative sample receptors have been presented in assessment to aid the reader in understanding the impacts of the scheme in particular areas. A separate section has been provided considering the impacts of the scheme on the residential properties located within NAPPA no 362, Andrew Stephen Clarke / March of 31

12 which has been identified by Welsh Government as one of those locations in Wales currently exposed to the highest noise levels from road traffic Colour noise change contour plots have also been provided to visually illustrate predicted short-term and long-term noise changes in the area as a result of the proposed scheme. Andrew Stephen Clarke / March of 31

13 5 Assessment Results Environmental Statement 5.1 The construction and operational noise and vibration assessment results are presented in Section 14.8 of the ES (DD ). The results are not discussed further in this Proof, instead the assessment results provided within the ES Supplement (DD 2.4.1) are provided and discussed. Andrew Stephen Clarke / March of 31

14 6 Assessment Results ES Supplement 6.1 The construction and operational noise and vibration assessment results are presented in Section 14.8 of the ES Supplement (DD 2.4.1). Construction 6.2 Sixteen main works locations were identified as having potential to cause construction noise impacts, either due to their close proximity to receptor groups, or the likely equipment and processes required for the works. 6.3 As detailed in Section of the ES Supplement (DD 2.4.1), the vast majority of construction works would take place during typical daytime hours. However, it is anticipated that some construction works would need to be undertaken during evening and weekend possessions. There is the potential for some nighttime working on occasion. Further details of these construction activities are provided in the Constructability and Phasing Report (DD ). Construction Noise 6.4 The potential for significant effects at nearby receptors has been assessed based on criteria derived from the ABC method detailed in Annex E of BS (DD ). The numbers of dwellings and other sensitive receptors (OSRs) where construction noise levels are expected to be close to or exceed the relevant threshold value from BS are presented in Table of the ES Supplement (DD 2.4.1). Andrew Stephen Clarke / March of 31

15 6.5 The assessment concludes that major impacts associated with construction noise could be expected at numerous locations during typical working hours, where dwellings are in close proximity to the proposed works. This is likely to include locations such as Gurnos, Jones St Bridge and Pentwyn Cynon. However, it should be recognised that any such impacts would be temporary in nature. Given the transient nature of construction activities, the worst case predicted construction noise levels provided are likely to occur for a limited period, when construction activities are located in close proximity to the receptors. At other times it is expected that construction noise levels would be lower, and the impacts may be less than those presented in Table of the ES Supplement (DD 2.4.1). 6.6 During evening, weekend and night-time periods, BS (DD ) Threshold Noise Limits would be lower than those presented in Table 14.9 of the ES Supplement (DD 2.4.1), to represent the more noise sensitive nature of these periods. There is the potential for evening and/or weekend working to be required in the vicinity of structures, some of which are near to sensitive receptors. There is therefore the potential for greater numbers of major adverse noise impacts at these locations during evening and weekend working, depending on the proximity and duration of the works proposed. 6.7 Given the potential for greater numbers of major adverse impacts during evening, night-time or over weekend periods, the need for such working would be minimised by the construction contractor. More stringent noise limits would be set for any works outside of typical construction working hours. These requirements, along with proposed noise and vibration mitigation measures, are included in the Register of Environmental Actions and Commitments (REAC) (DD ). Andrew Stephen Clarke / March of 31

16 6.8 Details of noise and vibration mitigation measures that could be adopted during construction are provided in Section of the ES Supplement (DD 2.4.1) and are discussed further in Section 8 of this Proof below. Construction Vibration 6.9 Of the construction activities proposed, those associated with piling and vibratory earthwork compacting works are likely to give rise to the highest vibration levels at nearby receptors For piling works, predicted vibration levels illustrate that driven piling would not be an appropriate piling technique at the proposed works near Trewaun. Instead, it is proposed to use a low vibration technique, for example rotary bored piling. With one of these techniques adopted, vibration levels would likely to be around 1 mm/s or lower at a distance of 15 m, based on the data provided in Table D.6 of Annex D of BS (DD ). At these levels, there would be minimal adverse effects associated with piling vibration at Trewaun. Low vibration piling techniques are also likely to be needed at other locations where sensitive receptors are in close proximity For vibratory compaction works, separation distances of 30 and 50 m were considered within the ES Supplement (DD 2.4.1), which would be typical distances for these works. Predicted vibration levels are provided in Table of the ES Supplement (DD 2.4.1). The vibration levels predicted are likely to be perceptible to residents in residential dwellings and are likely to lead to complaint according to the guidance in BS (DD ). Careful consideration would need to be given to earth compaction in close proximity to sensitive receptors. The Construction Environmental Management Plan (CEMP) would include a requirement for Andrew Stephen Clarke / March of 31

17 vibration soil compaction plant to be set to a low amplitude setting when operating in close proximity to sensitive receptors, where possible The predicted vibration levels fall well below the vibration levels defined in BS (DD ) which could give rise to cosmetic damage to buildings. In addition, given the transient nature of the soil compaction works, this level of vibration would only be experienced for short duration, for example two to three days, when the compaction works occur at the nearest position to the properties Consideration is given to potential noise and vibration mitigation measures during construction in Section of the ES Supplement (DD 2.4.1) and is discussed further in Section 7 of this Proof below. Operational Noise 6.14 Section of the ES Supplement (DD 2.4.1) provides the operational assessment results for the proposed scheme. includes consideration of predicted noise levels at sample receptors (residential dwellings plus health, education and community facilities) along the scheme corridor, the HD 213/11 assessment tables and noise level changes at dwellings within the NAPPA. Short-term Impacts at Sample Receptors 6.15 A total of 38 sample receptors have been selected along the scheme corridor to enable an understanding of the typical magnitudes of noise change, and the reasons for these changes, for different communities. The locations of the sample receptors selected are provided in Figure 14.7 of the ES Supplement (DD 2.4.1). These properties are not intended to be representative of the absolute worst case noise effects for receptor groups along the proposed scheme corridor. It Andrew Stephen Clarke / March of 31

18 6.16 Noise changes on scheme opening are variable along the length of the scheme and are dependent upon a number of factors including the change in alignment, introduction of new roads/slip roads, changes in traffic flows, traffic speeds and the proportion of heavy vehicles, the proposed vertical alignment (compared to the current situation), the inclusion of a low noise road surface (compared to the current situation) and the presence of proposed environmental barriers. The short term noise change contour plot provided in Figure 14.4 of the ES Supplement (DD 2.4.1) visually illustrates the likely noise changes expected along the route Of the sample receptors selected, 22 are residential dwellings. Predicted noise levels on scheme opening for the sample residential dwellings are provided in Table of the ES Supplement (DD 2.4.1) Perceptible adverse noise impacts on scheme opening are anticipated at eight of the sample dwellings considered. Seven of these are predicted to fall within the minor adverse magnitude of impact category, whilst one would fall within the moderate adverse magnitude of impact category. The underlying reasons for the perceptible increases in noise level are discussed in Section of the ES Supplement (DD 2.4.1). It should be noted that at some dwellings a noise increase is anticipated on one façade, whilst a noise decrease is predicted on a different façade Perceptible noise benefits on scheme opening are anticipated for three of the sample dwellings considered, falling within the minor and major beneficial impact categories. The underlying reasons for the perceptible decreases in noise are discussed in Section of the ES Supplement (DD 2.4.1). Andrew Stephen Clarke / March of 31

19 6.20 The remaining 11 sample dwellings are expected to experience negligible noise changes with the proposed scheme in place, on scheme opening of the sample receptors selected are health, educational and community facilities. Predicted noise levels on scheme opening for the sample health, educational and community facilities are provided in Table of the ES Supplement (DD 2.4.1) Of the sample facilities considered, four (Dowlais Primary School (Junior Department), Morlais Medical Centre, Pant Primary School and Ysgol Gyfun Rhydywaun) would be expected to experience a minor adverse noise increase on scheme opening. This would principally be due to a predicted increase in traffic using the local road network in these areas. In the case of Pant Primary School this would also be as a consequence of traffic using the Prince Charles Hospital junction, rather than noise from traffic on the A465 itself Conversely, two of the sample facilities (Hirwaun County Primary School and Hirwaun Infants and Nursey School) would be expected to experience minor decreases in noise level on scheme opening, principally as a result of the realignment of the A465 to the south, as well as the application of LNRS The remaining 10 sample health, educational and community facilities are expected to experience negligible noise changes with the proposed scheme in place, on opening. Long-term Impacts at Sample Receptors Andrew Stephen Clarke / March of 31

20 6.25 Generally, the sample receptors see a similar impact to that experienced in the short term, although the magnitude of change is generally lower in the long term compared to the short term Noise changes in the long term situation, with the scheme in place, are again variable along the length of the scheme. They are dependent upon a number of factors including the change in alignment, introduction of new roads/slip roads, the inclusion of the Cynon Valley Gateway (Aberdare Bypass) scheme, changes in traffic flows, traffic speeds and the proportion of heavy vehicles, the proposed vertical alignment (compared to the current situation), the inclusion of a low noise road surface (compared to the current situation) and the presence of proposed environmental barriers. The long term noise change contour plots provided in Figures 14.5 (with the proposed scheme) and 14.6 (without the proposed scheme) of the ES Supplement (DD 2.4.1) visually illustrate the likely noise changes expected along the route Predicted noise levels in the long term, with the scheme in place, for the sample residential dwellings are provided in Table of the ES Supplement (DD 2.4.1) Perceptible adverse noise impacts in the long term, with the scheme in place, are anticipated at four of the sample dwellings considered, all falling within the minor adverse magnitude of impact category. The underlying reasons for the perceptible increases in noise level are discussed in Section of the ES Supplement (DD 2.4.1) A perceptible noise benefit in the long term, with the scheme in place, is anticipated at a single sample dwelling, falling within the moderate beneficial impact category. The underlying reasons for the perceptible decreases in noise are discussed in Section of the ES Supplement (DD 2.4.1). Andrew Stephen Clarke / March of 31

21 6.30 The remaining 17 sample dwellings are expected to experience negligible noise changes with the proposed scheme in place, in the long term Predicted noise levels in the long term, with the scheme in place, for the sample health, educational and community facilities are provided in Table of the ES Supplement (DD 2.4.1) Of the sample facilities considered, only Penywaun Primary School is predicted to experience a perceptible noise increase in the long term, within the minor adverse magnitude of impact category. This is due to the influence of the proposed Cynon Valley Gateway (Aberdare Bypass) scheme that is included in the Do Something scenario in This Cynon Valley Gateway (Aberdare Bypass) project has been modelled without any mitigation, as the project is not currently at the design stage. This scheme, were it to proceed, would be subject to its own ES to assess the impacts and consider mitigation measures. A noise increase of this magnitude would be unlikely to occur in practice even if both the proposed scheme and the proposed Cynon Valley Gateway (Aberdare Bypass) scheme were to be in operation by Any increase associated with the proposed A465 scheme itself at Penywaun Primary School would be negligible The remaining 15 sample health, educational and community facilities are expected to experience negligible noise changes with the proposed scheme in place, in the long term. HD 213/11 Summary Tables Andrew Stephen Clarke / March of 31

22 6.34 The approach followed within the HD 213/11 (DD ) methodology for reporting noise impacts is conservative, with the least beneficial impact at each receptor location being considered. For example, if a dwelling was predicted to experience a 7 db reduction in noise level for one property façade as a result of the proposed scheme, but a 1 db increase in noise level for another façade, it would only be the 1 db noise increase that was reported in the HD 213/11 assessment tables. The larger noise benefit at that dwelling would not be reported in the HD 213/11 assessment tables. This approach to reporting impacts should be noted when considering the assessment findings detailed in the sections that follow There is one exception to this approach, in the consideration of noise impacts for those dwellings within the NAPPA. These dwellings have been designated on the basis of the noise levels experienced for the facades facing towards the existing A465. As such, the noise impacts reported for the dwellings within the NAPPA (in the section that follows) are for the relevant façade that has led to its designation Table of the ES Supplement (DD 2.4.1) shows that on scheme opening, with the scheme and proposed mitigation measures in place: The majority of sensitive receptors (7,363) would experience no perceptible change in noise levels; 3,607 sensitive receptors would experience perceptible adverse noise impacts; and 395 sensitive receptors would experience perceptible beneficial noise impacts Overall, when comparing the amount of receptors that would experience a perceptible decrease in noise level against those that Andrew Stephen Clarke / March of 31

23 would experience a perceptible increase in noise level, the overall impact of the proposed scheme would be considered to be adverse in the short term Table of the ES Supplement (DD 2.4.1) shows that in the long term, without the scheme in place: changes. No sensitive receptors would experience perceptible noise 6.39 Table of the ES Supplement (DD 2.4.1) shows that in the long term, with the scheme and proposed mitigation measures in place: The vast majority of sensitive receptors (10,518) would experience no perceptible change in noise levels; 807 sensitive receptors would experience perceptible adverse noise impacts; and 40 sensitive receptors would experience perceptible beneficial noise impacts Overall, when comparing the amount of receptors that would experience a perceptible decrease in noise level against those that would experience a perceptible increase in noise level, the overall impact of the proposed scheme would be considered to be adverse in the long term It should be noted that the Cynon Valley Gateway (Aberdare Bypass) scheme is only included in the DS 2037 scenario, it is not included in the DM 2037 scenario. Therefore, the noise impacts associated with this unmitigated scheme are included in the long term with scheme analysis. Andrew Stephen Clarke / March of 31

24 6.42 A visual illustration of the noise change predicted in the short term and long term, with the proposed scheme and mitigation in place, is provided in Figures 14.4 and 14.5 of the ES Supplement (DD 2.4.1), which provide the daytime noise change contours in terms of the magnitude of impacts For comparison, a visual illustration of the noise change predicted in the long term, without the scheme in place, is provided in Figure 14.6 of the ES Supplement (DD 2.4.1). Noise levels within the NAPPA 6.44 According to information held in the existing Pavement Management System, the A465 at this location currently benefits from a low noise road surface (LNRS). The proposed scheme design introduces a new LNRS, and a new 2 m high environmental barrier to the south, designed to reduce noise at properties in the NAPPA. The height of the environmental barrier in the noise model has been selected to take into account the preservation of views from the properties in the NAPPA to the north, and to avoid excessive overshadowing in gardens adjacent to the environmental barrier Tables and of the ES Supplement (DD 2.4.1) present the short term and long term noise changes at all properties within the NAPPA Table of the ES Supplement (DD 2.4.1) demonstrates that, when considering the property facades that face towards the A465, perceptible noise benefits are predicted on proposed scheme opening for 13 of the 20 residential properties situated within the NAPPA, due predominantly to the inclusion of the new LNRS and environmental barrier in this area. Noise changes for the remaining Andrew Stephen Clarke / March of 31

25 seven residential properties situated within the NAPPA are predicted to be imperceptible, falling within the negligible magnitudes of change categories For the long term assessment presented in Table of the ES Supplement (DD 2.4.1), the short term magnitude of impact criteria have mistakenly been applied. The table is reproduced below, with the correct long term magnitude of impact criteria applied. Table 6.1 : Summary of long term noise changes at properties within NAPPA Receptor Do Minimum 2022, L A10,18h (db) Do Something 2037, L A10,18h (db) Noise level change (db) Magnitude of change 1 Beacons View Beacons View CF48 3NJ 2 Beacons View Beacons View CF48 3NJ 3 Beacons View Beacons View CF48 3NJ 4 Beacons View Beacons View CF48 3NJ 5 Beacons View Beacons View CF48 3NJ 6 Beacons View Beacons View CF48 3NJ 7 Beacons View Beacons View CF48 3NJ 8 Beacons View Beacons View CF48 3NJ 9 Beacons View Beacons View CF48 3NJ 31 Guest Cottages Guest Cottages CF48 3NT 32 Guest Cottages Guest Cottages CF48 3NT 33 Guest Cottages Guest Cottages CF48 3NT 34 Guest Cottages Guest Cottages CF48 3NT 1 Cross Houlson Street CF48 3NN Negligible Adverse Negligible Beneficial Negligible Beneficial Negligible Adverse Minor Beneficial Negligible Beneficial Negligible Beneficial Negligible Beneficial Negligible Beneficial Moderate Beneficial Moderate Beneficial Moderate Beneficial Moderate Beneficial Negligible Adverse Andrew Stephen Clarke / March of 31

26 Receptor Do Minimum 2022, L A10,18h (db) Do Something 2037, L A10,18h (db) Noise level change (db) Magnitude of change 2 Cross Houlson Street CF48 3NN 3 Cross Houlson Street CF48 3NN 4 Cross Houlson Street CF48 3NN 5 Cross Houlson Street CF48 3NN 6 Cross Houlson Street CF48 3NN Negligible Adverse Negligible Adverse Negligible Adverse Negligible Adverse Negligible Adverse 9 Houlson Street CF48 3NW Negligible Adverse 6.48 In the long term, the replacement Table above demonstrates that, when considering the property facades that face towards the A465, perceptible noise benefits are predicted for five of the residential properties situated within the NAPPA. No perceptible noise increases are predicted for any of the residential properties within the NAPPA in the long term. Noise changes for the remaining 15 residential properties situated within the NAPPA are predicted to fall within the negligible magnitudes of change categories Overall, the proposed scheme and associated noise mitigation is considered to have a beneficial noise impact for properties situated within the NAPPA. Andrew Stephen Clarke / March of 31

27 7 Mitigation Strategy 7.1 Noise and vibration mitigation measures are detailed in Section 14.9 of the ES Supplement (DD 2.4.1) and discussed below. Construction Noise and Vibration 7.2 The construction design incorporates measures that represent best practice with respect to noise and vibration control, examples of which include: In order to undertake rock breaking in the Cefn Coed cutting, it is proposed to used drill and burst techniques which would reduce the noise levels compared to traditional hydraulic methods of rock breaking; It is proposed to use either rotary boring or augering to construct the retaining walls adjacent to the Trewaun junction, which would significantly reduce noise levels compared to standard driven piling techniques; and The vast majority of works are not proposed during the sensitive evening and / or night-time periods or during Sundays or Bank Holidays. 7.3 These requirements, along with proposed noise and vibration mitigation measures, are included in the Register of Environmental Actions and Commitments (REAC) (DD ). 7.4 Despite the application of these measures, it is acknowledged that there remains the potential for significant construction noise and vibration impacts at some locations. Further mitigation measures, to reduce potential impacts are detailed below. Andrew Stephen Clarke / March of 31

28 7.5 A Construction Environmental Management Plan (CEMP) would be developed setting out the following information in relation to the control of noise and vibration: good practice noise and vibration control measures that the contractor would adopt; noise monitoring procedures, including equipment specification, locations, duration and reporting requirements; vibration monitoring procedures designed to demonstrate that the relevant thresholds within BS and BS are not exceeded; duties and responsibilities for a Public Liaison Officer who would be responsible for the day-to-day communication on noise and vibration issues with the EHO and the general public; contact details (24 hours, seven days a week) for on-site personnel responsible for noise and vibration management; and complaint response protocols. 7.6 Compliance with this CEMP would be a requirement of the contract between the Welsh Government and the key contractors appointed to undertake the works. 7.7 In the CEMP, the selected Contractor would be required to apply Best Practicable Means (BPM) to minimise any residual noise and vibration impact during construction. A list of the measures to be adopted as a minimum are provided in Section of the ES Supplement (DD 2.4.1), to ensure that noise and vibration levels were to be attenuated as far as reasonably practicable. Andrew Stephen Clarke / March of 31

29 7.8 It is anticipated that one or a number of applications for prior consent would be made for the construction works (under the Control of Pollution Act 1974 (DD )), as and when plant lists, programmes and working methods become sufficiently finalised. Each application would contain particulars of the works, working methods and noise control measures and would be submitted to the relevant local authority for approval. The aim of any Section 61 application would be to demonstrate compliance with the relevant noise and vibration thresholds, or to establish that the BPM have been employed to control noise emissions. The local authority may attach conditions to each consent, including a limit on duration of the works. 7.9 During the construction, the contractor would be required, through the procedures set out in the CEMP and Section 61 Applications, to control the effects of noise and vibration from the construction works. However, there may be circumstances where noise impacts would arise which would need to be mitigated still further. In certain circumstances, the Welsh Government would either provide and install (free of charge), or provide grant aid for, noise insulation and / or arrange temporary re-housing (or help residents to arrange it for themselves and recoup the costs). Operational Noise 7.10 As detailed in Section of the ES Supplement (DD 2.4.1), the proposed scheme design incorporates various features that would be effective in reducing potential noise increases, which can be summarised as follows: Provision of a new low noise road surface (LNRS) for much of the scheme. A section of the scheme between just north-east of Croesbychan junction and just west of Baverstock junction has few sensitive receptors in close proximity and a hot rolled Andrew Stephen Clarke / March of 31

30 asphalt (HRA) surface has been assumed for this section of the scheme, instead of a LNRS; the introduction of various cuttings that would screen road traffic noise from certain receptor locations (such as west of Gurnos and at Trewaun); and, the inclusion of various environmental barriers in the design that would provide screening of road traffic noise at local receptors A schedule of the environmental barriers included in the proposed scheme design is presented in Table of the ES Supplement (DD 2.4.1). The locations of these environmental barriers are illustrated on the short-term and long term noise change contour plots provided in Figures 14.4 and 14.5 of the ES Supplement (DD 2.4.1) The above noise mitigation measures are all considered as inherent aspects of the proposed scheme design, and therefore their effects are reflected in the assessment presented in this Proof. Andrew Stephen Clarke / March of 31

31 8 Conclusions 8.1 The assessment has been undertaken in accordance with DMRB Volume 11 Section 3 Part 7 Noise and Vibration, HD 213/11 Revision 1 (HD 213/11) (Highways Agency, 2011b) (DD ). The predicted noise levels for all noise sensitive receptors are presented in Appendix 14F (ES Supplement Volume 2) (DD 2.4.1). 8.2 Despite the application of best practice mitigation measures, major construction noise impacts could occur at properties in close proximity to the proposed works. However, it should be recognised that any such impacts would be temporary in nature. 8.3 Vibration during some piling and ground compaction works is likely to be perceptible to residents in nearby residential dwellings for limited durations. However, expected vibration levels fall below those which could give rise to cosmetic building damage. 8.4 The proposed scheme design includes the use of low noise road surfacing (LNRS), and the use of environmental barriers that provide noise screening for noise sensitive residential dwellings. 8.5 It should be noted that the assessment includes the unmitigated effect of the proposed Cynon Valley Gateway (Aberdare Bypass) scheme in the long term, as the long term traffic forecasts assume it would be operational by 2037 if the proposed scheme were to be constructed. 8.6 In the short term, with the proposed mitigated scheme, there are predicted to be 3,577 dwellings and 30 other noise sensitive receptors (total 3,607) that would experience a perceptible noise increase in noise level of at least 1 db. Conversely there are predicted to be 391 dwellings and four other noise sensitive Andrew Stephen Clarke / March of 31

32 receptors (total 395) that would experience a decrease in noise level of at least 1 db. 8.7 In the long term, with the proposed mitigated scheme, there are predicted to be 798 dwellings and nine other noise sensitive receptors (total 807) that would experience an increase in noise level of at least 3 db during the daytime. By comparison there are predicted to be 40 dwellings that would experience a decrease in noise level of at least 3 db. For the long term night-time situation, four dwellings are predicted to experience perceptible noise increases, whilst two dwellings are predicted to experience perceptible noise decreases. 8.8 Overall, when considering the numbers of receptor experiencing perceptible increases and decreases in the area, the proposed scheme is considered to have an adverse noise impact, both on scheme opening and in the long term. 8.9 A single Noise Action Plan Priority Area (NAPPA) number 362 is located within the study area, to the south of the proposed scheme route in Dowlais. When considering the facades that face the A465, perceptible noise decreases are predicted for 13 properties within the NAPPA in the short term, with no perceptible noise increases anticipated. In the long term situation, five properties within the NAPPA are predicted to experience perceptible noise benefits, with no perceptible noise increases again anticipated Overall, the proposed scheme is considered to have a beneficial noise impact on properties within the NAPPA. Andrew Stephen Clarke / March of 31

33 9 Declaration 9.1 My Proof of Evidence includes all facts which I regard as being relevant to the opinions which I have expressed and the Inquiry s attention has been drawn to any matter which would affect the validity of that opinion. 9.2 I believe the facts I have stated in this Proof of Evidence are true and that the opinions expressed are correct. 9.3 I understand my duty to the Inquiry to assist it with matters within my expertise and I believe that I have complied with that duty. Andrew Stephen Clarke / March of 31

9. NOISE AND VIBRATION

9. NOISE AND VIBRATION 9. NOISE AND VIBRATION 9.1 Introduction 9.1.1 This Chapter details the existing baseline noise and vibration levels together with assessments of the suitability of the site for residential and commercial

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

CHAPTER 8 NOISE NORTHAMPTON GATEWAY

CHAPTER 8 NOISE NORTHAMPTON GATEWAY CHAPTER 8 NOISE NORTHAMPTON GATEWAY 8 NOISE & VIBRATION 8.1 INTRODUCTION 8.1.1 8.1.2 8.1.3 8.1.4 8.1.5 This chapter considers the potential noise and vibration effects that may arise as a result of the

More information

ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE

ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE Technical Report Prepared For Ardstone Capital Ltd. 48 Fitzwilliam Square Dublin Technical Report

More information

Chapter 17 Cumulative Impacts

Chapter 17 Cumulative Impacts Chapter 17 Cumulative Impacts CONTENTS 17. Cumulative Effects... 2 17.1 Introduction... 2 17.2 Summary of Relevant Legislation, Planning Policy and Guidance... 2 17.3 Methods... 5 17.4 Consultation...

More information

APPENDIX C NOISE STUDY TECHNICAL REPORT

APPENDIX C NOISE STUDY TECHNICAL REPORT APPENDIX C NOISE STUDY TECHNICAL REPORT Noise Study Technical Report Watertown South Connector US 81 to 29 th Street SE Watertown, South Dakota HDR Project No. 39319 Prepared by 6300 So. Old Village Place

More information

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS FROM NEW AND UPGRADED NUMBERED HIGHWAYS April, 2014 Prepared for; B.C. Ministry of Transportation

More information

SPECIFICATION FOR NOISE MITIGATION

SPECIFICATION FOR NOISE MITIGATION SPECIFICATION FOR NOISE MITIGATION 1. SCOPE This specification covers the design, construction, documentation and postconstruction review of state highway road-traffic noise mitigation. This specification

More information

USE OF LONG TERM MONITORING DATA FOR DEFINING BASELINE SOUND LEVELS

USE OF LONG TERM MONITORING DATA FOR DEFINING BASELINE SOUND LEVELS 23 rd International Congress on Sound & Vibration Athens, Greece 10-14 July 2016 ICSV23 USE OF LONG TERM MONITORING DATA FOR DEFINING BASELINE SOUND LEVELS Chris Skinner, Paul Shields and Yuyou Liu AECOM,

More information

P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2

P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 C H A P T E R 1 3 Noise and Vibration PORTISHEAD BRANCH LINE PRELIMINARY

More information

CHRISTCHURCH SOUTHERN MOTORWAY STAGE 2 & MAIN SOUTH ROAD 4 LANING. Assessment of Construction Noise & Vibration. Rp009 R C.

CHRISTCHURCH SOUTHERN MOTORWAY STAGE 2 & MAIN SOUTH ROAD 4 LANING. Assessment of Construction Noise & Vibration. Rp009 R C. Level 3 69 Cambridge Terrace PO Box 4071 Christchurch 8140 New Zealand T: +64 3 365 8455 F: +64 3 365 8477 www.marshallday.com CHRISTCHURCH SOUTHERN MOTORWAY STAGE 2 & MAIN SOUTH ROAD 4 LANING Assessment

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

Construction noise and vibration assessment

Construction noise and vibration assessment Construction noise and vibration assessment Peka Peka to North Ōtaki Expressway 12 FEBRUARY 2013 Prepared for NZ Transport Agency 20 Ballance Street PO Box 5084, Lambton Quay Wellington 6145 42176987 BF

More information

APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION

APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION FINAL PROJECT NOISE ANALYSIS Artesian Substation B&V PROJECT NO. 188602 Black & Veatch Holding Company 2015. All rights reserved. PREPARED FOR

More information

Waikato Expressway Cambridge Section Noise Assessment

Waikato Expressway Cambridge Section Noise Assessment Waikato Expressway Cambridge Section Noise Assessment This report has been prepared for the benefit of the NZ Transport Agency (NZTA). No liability is accepted by this company or any employee or sub-consultant

More information

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA Charles M Salter Associates Inc BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA RESIDENTIAL INTERIOR NOISE ANALYSIS Prepared for: Kim Havens Wilson Meany Sullivan Four Embarcadero Center, Suite 3330

More information

Policy for the Assessment and Mitigation of Traffic Noise on County Roads

Policy for the Assessment and Mitigation of Traffic Noise on County Roads Lanark County Policy for the Assessment and Mitigation of Traffic Noise on County Roads d r a f t f o r d i s c u s s i o n Prepared by: AECOM Canada Ltd. 302 1150 Morrison Drive, Ottawa, ON, Canada K2H

More information

M6 J16-19 Smart Motorway. Kate Beirne Highways England Michael Robinson Jacobs Julian Wilson Carillion Kier JV

M6 J16-19 Smart Motorway. Kate Beirne Highways England Michael Robinson Jacobs Julian Wilson Carillion Kier JV M6 J16-19 Smart Motorway Kate Beirne Highways England Michael Robinson Jacobs Julian Wilson Carillion Kier JV Introduction Scheme Update Progress Current Status Delivery timescales Environment Construction

More information

SEWSCAP CONTRACTORS FRAMEWORK CONTRACTORS CONSULTATION REPORT. For RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL. July Page 1.

SEWSCAP CONTRACTORS FRAMEWORK CONTRACTORS CONSULTATION REPORT. For RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL. July Page 1. For RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL July 2010 Page 1 Contents; 1.0 Aims and Objectives of Framework 5 1.1 SEWSCAP Contractors Framework Objectives 5 1.2 21 st Century Schools Objectives 6 1.3

More information

Sydney Metro City and Southwest Sydney Yard Access Bridge Construction Noise and Vibration Management Plan (CNVMP)

Sydney Metro City and Southwest Sydney Yard Access Bridge Construction Noise and Vibration Management Plan (CNVMP) SMC&S-C2S: SYAB Sydney Metro City and Southwest Sydney Yard Access Bridge Construction Noise and Vibration Management Plan () 1/74 Sydney Metro City and Southwest Sydney Yard Access Bridge Construction

More information

Final Revisions : Retention of Trommel in existing position and raising height of acoustic fence on western side of site.

Final Revisions : Retention of Trommel in existing position and raising height of acoustic fence on western side of site. LOCATION: GBN Services Ltd, The Railway Sidings, Oakleigh Road South, London, N11 1HJ REFERENCE: B/03582/12 Received: 20 September 2012 Accepted: 27 September 2012 WARD(S): Brunswick Park Expiry: 27 December

More information

10.0 AIR QUALITY AND CLIMATIC FACTORS

10.0 AIR QUALITY AND CLIMATIC FACTORS .0 AIR QUALITY AND CLIMATIC FACTORS.1 ASSESSMENT METHODOLOGY.1.1 General Section 39 (2) (b) (ii) of the Transport (Railway Infrastructure) Act 2001, requires that proposed developments are examined in

More information

Noise Assessments for Construction Noise Impacts

Noise Assessments for Construction Noise Impacts Noise Assessments for Construction Noise Impacts Weixiong Wu a AKRF, Inc., 440 Park Avenue, 7th floor, New York, NY, 10016, USA. ABSTRACT Construction noise is one of the most disruptive noise sources

More information

Air Quality. Executive Summary

Air Quality. Executive Summary Air Quality Executive Summary Air quality adjacent to the Scheme is currently good with low background concentrations of air pollutants. However, there are areas within Cambridge city centre which currently

More information

Gisborne District Council

Gisborne District Council 11.0 NOISE AND VIBRATION... 1 11.1 STRUCTURE OF THIS CHAPTER... 1 11.2 INTRODUCTION... 1 11.3 ISSUES... 2 11.4 OBJECTIVES (NOISE INCLUDING VIBRATION)... 2 11.5 POLICIES (NOISE INCLUDING VIBRATION)... 2

More information

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Section XXV Preconstruction Assessments and Damage Mitigation Procedures Section XXV Preconstruction Assessments and Damage Mitigation Procedures A. Introduction - In recent years, HRSD has received an increasing number of complaints from residents and locality staff regarding

More information

Rural Living Environment

Rural Living Environment 1 RLE.1 Rural Living Environment RLE.1.1 Description & Expectations The Rural Living Environment (RLE) covers rural areas within the District that are either already characterised by lifestyle activities

More information

COMPONENTS OF THE NOISE ELEMENT

COMPONENTS OF THE NOISE ELEMENT COMPONENTS OF THE NOISE ELEMENT Definitions Following is a list of commonly used terms and abbreviations that may be found within this element or when discussing the topic of noise. This is an abbreviated

More information

Mitigation Monitoring Program

Mitigation Monitoring Program INTRODUCTION Public Resources Code (PRC) Section 08.6 and California Environmental Quality Act (CEQA) Guidelines Section 5097 require adoption of a Mitigation & Monitoring Program (MMP) for all projects

More information

White Paper. A guide to the acoustic performance of Smarts Systems Products. Building Regulations Document E Resistance to the passage of sound

White Paper. A guide to the acoustic performance of Smarts Systems Products. Building Regulations Document E Resistance to the passage of sound White Paper. A guide to the acoustic performance of Smarts Systems Products. Building Regulations Document E Smart Systems Ltd. January 2007 Contents Building Regulations...4 Acoustic Performance - Overview...5

More information

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474

More information

APPENDIX C NOISE STUDY TECHNICAL REPORT

APPENDIX C NOISE STUDY TECHNICAL REPORT APPENDIX C NOISE STUDY TECHNICAL REPORT 1) 9/25/06 Noise Study Technical Report; revised 05/08 2) 9/4/09 Memo Regarding Option 3 Noise Impacts to Pelican Lake Game Production Area Noise Study Technical

More information

Road Safety Audit. Standards. GE-STY March General

Road Safety Audit. Standards. GE-STY March General Road Safety Audit GE-STY-01024 March 2015 General Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing and improving

More information

4.10 NOISE. A. Fundamental Concepts of Environmental Acoustics

4.10 NOISE. A. Fundamental Concepts of Environmental Acoustics 4.10 This section evaluates the noise impacts upon existing and future noise sensitive receivers in and around the project area. The chapter includes background information on acoustics, a summary of the

More information

hard reflecting surfaces close by (such as tall buildings) increasing noise levels by up to 3dB(A)

hard reflecting surfaces close by (such as tall buildings) increasing noise levels by up to 3dB(A) Noise Definition Noise is generally defined as unwanted sound. The noise from a fleet of heavy plant working twelve hours a day within 50m of some houses and always within 500m of a residential property

More information

Noise measurement and mitigation for urban building foundation excavation

Noise measurement and mitigation for urban building foundation excavation PROCEEDINGS of the 22 nd International Congress on Acoustics Challenges and Solutions in Acoustical Measurement and Design: Paper ICA2016-552 Noise measurement and mitigation for urban building foundation

More information

An introduction to HS2 Ltd s approach to managing noise. Community Forums, Sept 2012

An introduction to HS2 Ltd s approach to managing noise. Community Forums, Sept 2012 An introduction to HS2 Ltd s approach to managing noise Community Forums, Sept 2012 Presentation aims Provide a non-technical introduction to noise Aid community understanding of the subject Provide an

More information

Environmental and Social Data Sheet

Environmental and Social Data Sheet Environmental and Social Data Sheet Overview Project Name: S3 EXPRESSWAY Project Number: 2012-0666 Country: POLAND Project Description: The project consists of two components, as follows: (i) construction,

More information

Noise Impact Assessment. For Proposed Extension to Landfill Operations. Gowy Landfill Site Ince Lane Chester. For. FCC Environment

Noise Impact Assessment. For Proposed Extension to Landfill Operations. Gowy Landfill Site Ince Lane Chester. For. FCC Environment 56a Leabrooks Road Somercotes Derbyshire DE55 4HB Tel No: 01773 607483 Fax No:01773 603331 e-mail: drk.nvc@btopenworld.com For Proposed At Gowy Landfill Site Ince Lane Chester For Report No.: R16.0605/DRK

More information

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES NOISE ELEMENT OBJECTIVES AND POLICIES Noise Standards N1. To protect the citizens of Arroyo Grande from the harmful and annoying effects of exposure to excessive noise. Policy N1-1 The noise standards

More information

MONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES

MONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES MONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES DECEMBER 2013 www.mcconnelldowell.com MCCONNELL DOWELL CORPORATION PAGE 1 OF 13 McConnell Dowell Constructors (Aust.)

More information

Environmental Noise Assessment

Environmental Noise Assessment July to September 2014 Rev 0 (Final) Report Details - July to September 2014 Filename: Job #: J0140003 Folder #: F13130 Revision: 0 (Final) Date: Prepared For Clark Potter, Senior Environmental Advisor

More information

Information Sheet - Mountain Highway Interchange Noise Assessment and Sound Mitigation

Information Sheet - Mountain Highway Interchange Noise Assessment and Sound Mitigation Information Sheet - Mountain Highway Interchange Noise Assessment and Sound Mitigation Why is the project needed? The new Mountain Highway Interchange will provide additional Highway 1 access to better

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT LAKEVIEW BOULEVARD ENVIRONMENTAL ASSESSMENT LAKEVIEW BOULEVARD BETWEEN POPLAR AVENUE AND MAPLE AVENUE TOWN OF AJAX PREPARED FOR: TMIG February 2017 Y1610 TABLE OF CONTENTS

More information

Auckland Transport Code of Practice 2013

Auckland Transport Code of Practice 2013 26 Corridor Access Management 26.1 Background Auckland Transport is the Road Controlling Authority and Corridor Manager for all public roads within the Auckland Region (except motorways and state highways

More information

1. Introduction Noise Analysis Results Figures. List of Tables

1. Introduction Noise Analysis Results Figures. List of Tables Traffic Noise Technical Report FM 2218 Widening (From US 59 to SH 36) Fort Bend County Prepared by: Houston District Date: July 2017 CSJ: 2093-01-010 The environmental review, consultation, and other actions

More information

Retention of trommel rubbish sorting conveyor and picking station and raising height of acoustic wall on western side of the site to 8m.

Retention of trommel rubbish sorting conveyor and picking station and raising height of acoustic wall on western side of the site to 8m. LOCATION: GBN Services Ltd, The Railway Sidings, Oakleigh Road South, London, N11 1HJ REFERENCE: B/00951/13 Received: 05 March 2013 Accepted: 05 March 2013 WARD(S): Brunswick Park Expiry: 04 June 2013

More information

Traffic Noise Introduction to Traffic Noise Analysis and Abatement

Traffic Noise Introduction to Traffic Noise Analysis and Abatement Traffic Noise Introduction to Traffic Noise Analysis and Abatement NW Bethany Blvd Improvement Project Michael Minor, President Michael Minor & Associates Inc. Introduction to Acoustics What is Noise?

More information

Flagstone Development - Noise Assessment for Stage 1K and 1U

Flagstone Development - Noise Assessment for Stage 1K and 1U 25 September 2017 620.10512.00900 Flagstone Stage 1K & 1U.docx Peet Flagstone City Pty Ltd Level 2, 167 Eagle Street Brisbane QLD 4000 Attention: Stephanie Clark Dear Stephanie (SLR) has been commissioned

More information

6.0 CONSTRUCTION PROGRAMME

6.0 CONSTRUCTION PROGRAMME 6.0 CONSTRUCTION PROGRAMME Introduction 6.1 This chapter of the ES describes the expected construction works programme and the key activities that will be undertaken. Detailed consideration of potential

More information

The content of this supplement is based upon the that described in our letter of May 28, 2012.

The content of this supplement is based upon the that described in our letter of May 28, 2012. September 20, 2012 30 Wertheim Court, Unit 25 Richmond Hill, Ontario, Canada L4B 1B9 email solutions@valcoustics.com web www.valcoustics.com telephone 905 764-5223 fax 905 764-6813 Davis Howe Partners

More information

ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7

ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7 ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7 ENVIRONMENTAL IMPACT STATEMENT For ease of local identification this Environmental Impact Statement

More information

Board Charter Z Energy Limited

Board Charter Z Energy Limited Board Charter Z Energy Limited Z Energy Limited ( Z Energy ) is committed to the highest standards of corporate governance. This Board Charter ( Charter ) is the foundation document which sets out the

More information

Appendix K. Environmental Noise Assessment

Appendix K. Environmental Noise Assessment Appendix K Environmental Noise Assessment ENVIRONMENTAL NOISE ASSESSMENT THORNTON ROAD NORTH TAUNTON ROAD WEST TO WINCHESTER ROAD WEST SCEDULE 'C' MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT CITY OF OSHAWA

More information

Comparison of compliance results obtained from the various wind farm standards used in Australia

Comparison of compliance results obtained from the various wind farm standards used in Australia Paper Number 50, Proceedings of ACOUSTICS 2011 Comparison of compliance results obtained from the various wind farm standards used in Australia Jonathan Cooper (1), Tom Evans (1) and Luis Najera (2) (1)

More information

6 Risk assessment methodology

6 Risk assessment methodology Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management

More information

ISO 14001:2015. Control of Environmental Aspects & Impacts.

ISO 14001:2015. Control of Environmental Aspects & Impacts. www.iso-9001-checklist.co.uk Insert your company s name or logo, and address. This procedure is the property of Your Company. It must not be reproduced in whole or in part or otherwise disclosed without

More information

Noise Impact Assessment

Noise Impact Assessment APPENDIX C Noise Impact Assessment CBCL Limited Appendices NOISE IMPACT ASSESSMENT PUGWASH WIND FARM, NOVA SCOTIA Client Pugwash Wind Farm Inc. Contact Charles Demond Document No Issue B Status Classification

More information

Noise Analysis Study along I Tim Bjorneberg Project Development Program Manager SDDOT

Noise Analysis Study along I Tim Bjorneberg Project Development Program Manager SDDOT Noise Analysis Study along I - 29 Tim Bjorneberg Project Development Program Manager SDDOT Meeting Format Very informal Meeting is not recorded General questions after presentations Specific questions

More information

NOISE IMPACT ASSESSMENT PROTOCOL. Number Three Wind Farm Lewis County, New York. Case 16-F-0328

NOISE IMPACT ASSESSMENT PROTOCOL. Number Three Wind Farm Lewis County, New York. Case 16-F-0328 NOISE IMPACT ASSESSMENT PROTOCOL Number Three Wind Farm Lewis County, New York Case 16-F-0328 October 2016 CONTENTS 1 Background... 3 2 Noise-Sensitive Receptors... 4 3 Ambient Noise Assessment... 5 3.1

More information

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress IPSWICH NORTHERN ROUTES STUDY Stage 1 Progress 17 th January 2017 STUDY CONTEXT 2 The study is being funded in partnership with the Suffolk district and borough councils. Work forms part of the Suffolk

More information

Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario

Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario Noise Feasibility Study Proposed Residential Development Old Barber ouse 5155 Mississauga Road City of Mississauga, Ontario Prepared for: City Park (Old Barber) omes Inc. 950 Nashville Road Kleinburg,

More information

POLICY EARTHQUAKE PRONE DANGEROUS & INSANITARY BUILDINGS

POLICY EARTHQUAKE PRONE DANGEROUS & INSANITARY BUILDINGS POLICY EARTHQUAKE PRONE DANGEROUS & INSANITARY BUILDINGS Adopted: Council Meeting 30 June 2011 Review date: before 30 June 2016 Contents 1 Introduction and background... 1 2 Policy approach... 2 2.1 Policy

More information

APPENDIX C. Environmental Noise Assessment

APPENDIX C. Environmental Noise Assessment APPENDIX C Environmental Noise Assessment This page intentionally left blank. Environmental Noise Assessment San Joaquin Valley Christian School Merced County, California BAC Job # 2015-085 Prepared For:

More information

Assessment of Vibration Effects

Assessment of Vibration Effects Technical Report 18 Assessment of Vibration Effects Revision History Revision Nº Prepared By Description Date - James Whitlock for internal review 8 August 2011 A James Whitlock For Approvals Team review

More information

Ashtead Neighbourhood Forum. Neighbourhood Development Plan Basic Conditions Statement

Ashtead Neighbourhood Forum. Neighbourhood Development Plan Basic Conditions Statement Neighbourhood Development Plan Basic Conditions Statement Appendix 1 Sustainable Development Assessment of the submission version of the Ashtead NDP (Version 1.1, 5/04/16). Prepared by Mole Valley District

More information

Ibsa House, The Ridgeway, London, NW7 1RN

Ibsa House, The Ridgeway, London, NW7 1RN LOCATION: Ibsa House, The Ridgeway, London, NW7 1RN REFERENCE: H/00807/14 Received: 17 February 2014 Accepted: 27 February 2014 WARD: Mill Hill Expiry: 29 May 2014 APPLICANT: IBSA Final Revisions: PROPOSAL:

More information

Issue 7 24 February Job number

Issue 7 24 February Job number 11/39341499_1 1 Cuadrilla Bowland Limited Temporary Shale Gas Exploration at Preston New Road LCC Application Ref: LCC/2014/0096 Issue 7 24 February 2017 This report takes into account the particular instructions

More information

A proposed new gas-fired power station on the Wilton International site

A proposed new gas-fired power station on the Wilton International site TEES CCPP PROJECT A proposed new gas-fired power station on the Wilton International site Welcome This event is intended to provide you with information about the proposed Tees Combined Cycle Power Plant

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment Ministère de l Environnement ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 4495-9FUQDY Issue Date: February 5, 2014 Holcim (Canada) Inc. 2300 Steeles Ave

More information

EARTHQUAKE- PRONE BUILDINGS POLICY

EARTHQUAKE- PRONE BUILDINGS POLICY EARTHQUAKE- PRONE BUILDINGS POLICY 2009 1. Introduction CONTENTS 2. Policy Objectives and Principles 3. Key Policy Components - Assessing earthquake-prone buildings - Standard of strengthening required

More information

Railway Interface Planning Scheme Rules (RIPS Rules)

Railway Interface Planning Scheme Rules (RIPS Rules) Contents 1. Purpose.. 1 2. Scope... 2 3. Scheme Rules.... 3 4. Roles and Responsibilities... 4 5. Management System Requirements... 7 6. Investigating Breaches of the Railway Interface Planning Scheme

More information

APPENDIX 3.11-A NOISE ANALYSIS DATA

APPENDIX 3.11-A NOISE ANALYSIS DATA APPENDIX 3.11-A NOISE ANALYSIS DATA N O I S E & G R O U N D B O R N E V I B R A T I O N I M P A C T A S S E S S M E N T F OR T H E P R O P O S E D R I N C O N D E L R IO N E V A D A C O U N T Y, CA AUGUST

More information

A. INTRODUCTION B. AIRBORNE NOISE

A. INTRODUCTION B. AIRBORNE NOISE Chapter 12: Noise and Vibration A. INTRODUCTION This chapter of the FEIS assesses the potential for noise and vibration impacts from construction and operation of the proposed Second Avenue Subway. The

More information

APPLICATION for ISO Certification (All Standards) Contents

APPLICATION for ISO Certification (All Standards) Contents Section 1 APPLICATION for ISO Certification (All Standards) Contents General Information (Please complete this section for All standards) (Please complete ONLY the sections for the Standard(s) that you

More information

Level 3 Diploma in Warehousing and Storage ( )

Level 3 Diploma in Warehousing and Storage ( ) Level 3 Diploma in Warehousing and Storage (06-07) Candidate logbook 600/3766/0 www.cityandguilds.com January 202 Version.0 About City & Guilds City & Guilds is the UK s leading provider of vocational

More information

environmental issues Figure 15 and Figure 16 show the road network in and around the Project area. A description follows.

environmental issues Figure 15 and Figure 16 show the road network in and around the Project area. A description follows. 7 assessment of key environmental issues 7 Assessment of key environmental issues 7.1 Traffic and transport Traffic and transport issues associated with the Project relate almost entirely to the construction

More information

Measurement Assurance and Certification Scotland

Measurement Assurance and Certification Scotland Measurement Assurance and Certification Scotland Performance Standard MACS-WAT-02 Sample and data management Version 2 August 2017 Record of amendments Version Date Amendment(s) 1 October 2016 First issue.

More information

London Good Practice Guide Noise & Vibration Control for Demolition and Construction

London Good Practice Guide Noise & Vibration Control for Demolition and Construction London Good Practice Guide Noise & Vibration Control for Demolition and Construction Table of Content Subject Page Table of Content 1 1 Introduction 2 2 Use of the Good Practice Guide 2 3 Locality / Site

More information

MANAGING THE NOISE IMPACT FROM SHALE GAS DRILLING

MANAGING THE NOISE IMPACT FROM SHALE GAS DRILLING WHITE PAPER MANAGING THE NOISE IMPACT FROM SHALE GAS DRILLING Phil Stollery Brüel & Kjær Sound & Vibration Measurement A/S, Denmark ABSTRACT Shale gas has transformed the energy market in the United States

More information

Bluewaters Power 1 Pty Ltd

Bluewaters Power 1 Pty Ltd Bluewaters Power 1 Pty Ltd Electricity Generation Licence (EGL 4) 2014 Performance Audit (Independent Assurance) Report June 2014 Deloitte Touche Tohmatsu ABN 74 490 121 060 Woodside Plaza Level 14 240

More information

9.0 Noise and Vibration

9.0 Noise and Vibration 9.0 Noise and Vibration 9.1 Introduction A noise and vibration assessment was conducted to identify the potential for impacts for the proposed alternatives of the Columbia Pike Transit Initiative proposed

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows: SECTION 9. COMMERCIAL WIND ENERGY FACILITIES 9.1 Purpose. The purpose of this Section 9 of the Zoning Bylaw is to provide by special permit for the construction and operation of commercial wind facilities

More information

APPENDIX H AIR DISPERSION MODELLING REPORT BY PROJECT MANAGEMENT LTD. (REF. CHAPTER 11 AIR QUALITY AND CLIMATIC FACTORS)

APPENDIX H AIR DISPERSION MODELLING REPORT BY PROJECT MANAGEMENT LTD. (REF. CHAPTER 11 AIR QUALITY AND CLIMATIC FACTORS) 101050.22.RP.0001 A Environmental Impact Statement 15 th April 2005 APPENDIX H AIR DISPERSION MODELLING REPORT BY PROJECT MANAGEMENT LTD. (REF. CHAPTER 11 AIR QUALITY AND CLIMATIC FACTORS) S:\Projects\190900\101050

More information

Request for Quotations Acoustic Consultant Services

Request for Quotations Acoustic Consultant Services Request for Quotations Acoustic Consultant Services DESCRIPTION The Cape Cod Commission is seeking an experienced, qualified acoustic consultant to assist the Commission in developing a methodology for

More information

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM 7 November 2017 MINNESOTA S EXPERIENCE WITH HIGHWAY NOISE MITIGATION The Minnesota Department of Transportation (MnDOT) has been constructing noise walls

More information

Centre for Policy on Ageing

Centre for Policy on Ageing This is not a questionnaire. The questions included are for guidance and to act as a prompt. It is not necessary to answer all of the questions or even to use this form to submit your evidence if you find

More information

Contribute towards school decisions regarding the development and improvement of the premises.

Contribute towards school decisions regarding the development and improvement of the premises. JOB TITLE: Facilities Manager SCALE: Kent Range 10 RESPONSIBILITY TO: Business Development Manager RESPONSIBILITIES AND DUTIES To assist the Business Development Manager (BDM) in all aspects of The Beacon

More information

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that:

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that: 6.0 Comparison of Proposed Project and Alternatives This chapter summarizes the environmental advantages and disadvantages associated with the Proposed Project and the alternatives. Based upon this discussion,

More information

VIBRATION AND STRUCTURAL INTEGRITY

VIBRATION AND STRUCTURAL INTEGRITY FACT SHEET VIBRATION AND STRUCTURAL INTEGRITY Objective The Canadian Malartic Mine (CMM) Team wants to harness the creativity of stakeholders to find solutions to eliminate, mitigate or, if necessary,

More information

Non-Technical Summary

Non-Technical Summary RIVERSIDE RESOURCE RECOVERY FACILITY, BEXLEY SECTION 36C VARIATION APPLICATION PROPOSED OPERATIONAL EFFICIENCY IMPROVEMENTS NON-TECHNICAL SUMMARY RIVERSIDE RESOURCE RECOVERY LIMITED SEPTEMBER 2014 Introduction

More information

STAFF CODE OF CONDUCT

STAFF CODE OF CONDUCT STAFF CODE OF CONDUCT FOREWORD This Code describes the standards of behaviour required of all members of staff of the National Assembly for Wales (employees of the Assembly Commission). As an employee

More information

HSE Integrated Risk Management Policy. Part 3. Managing and Monitoring Risk Registers Guidance for Managers

HSE Integrated Risk Management Policy. Part 3. Managing and Monitoring Risk Registers Guidance for Managers HSE Integrated Management Policy Part 3 Managing and Monitoring Registers Guidance for Managers HSE Integrated Management Policy Part 3 Managing and Monitoring Registers Guidance for Managers Identify

More information

Code of practice for noise and vibration control on construction and open sites

Code of practice for noise and vibration control on construction and open sites BSI Standards Publication Code of practice for noise and vibration control on construction and open sites Part 2: Vibration Publishing and copyright information The BSI copyright notice displayed in this

More information

Cuadrilla Bowland Ltd Temporary Shale Gas Exploration Preston New Road, Lancashire. Scheme for a Survey of Baseline Highway Conditions

Cuadrilla Bowland Ltd Temporary Shale Gas Exploration Preston New Road, Lancashire. Scheme for a Survey of Baseline Highway Conditions 11/39343271_1 0 Cuadrilla Bowland Ltd Temporary Shale Gas Exploration Preston New Road, Lancashire Scheme for a Survey of Baseline Highway Conditions LCC Application Ref: LCC/2014/0096 Document Ref: TMP002

More information

PLANNING DECISION NOTICE

PLANNING DECISION NOTICE ] SPACEukONE Limited C/O Kember Loudon Williams LLP F.A.O. Martin Hull Ridgers Barn, Bunny Lane Eridge Tunbridge Wells Kent TN3 9HA 13 October 2017 PLANNING DECISION NOTICE APPLICANT: DEVELOPMENT TYPE:

More information

CASE STUDY. Nippon Expressway Research Institute Company Limited Reducing Environmental Road Noise, Japan

CASE STUDY. Nippon Expressway Research Institute Company Limited Reducing Environmental Road Noise, Japan CASE STUDY Nippon Expressway Research Institute Company Limited Reducing Environmental Road Noise, Japan Environmental PULSE Array Acoustics, Beamforming Noise Scope, a PULSE-based beamforming system that

More information

Noise Compatibility Program Update

Noise Compatibility Program Update Table of Contents 1.0 Introduction Pg. 1 2.0 Purpose and Need Pg. 1 3.0 Airport Environs Pg. 1 4.0 Land Use Compatibility Pg. 1 5.0 Study Methodology Pg. 2 6.0 2008 Existing Baseline Pg. 2 Noise Exposure

More information

Evaluating Appropriate Residential Ventilation Strategies in Dense Urban Environments and the Challenges for Passive Design

Evaluating Appropriate Residential Ventilation Strategies in Dense Urban Environments and the Challenges for Passive Design Evaluating Appropriate Residential Ventilation Strategies in Dense Urban Environments and the Challenges for Passive Design Ashley Bateson CEng CEnv MCIBSE MEI Partner, Hoare Lea Chair, CIBSE Homes for

More information