1 Utility and Sanitary Sewer Permitting & Design Gibson-Thomas Engineering Co., Inc. Consulting Engineers
2 Utility Line Design Provide service to communities in need with minimal piping needed minimize $$ Try to stay within existing right-of-ways Sometimes difficult to get r/w signed Avoid sharp angles between sections Minimize stream & wetland impacts Cross at right angle to stream where possible
3
4 Sewer and Water Line Design Sanitary sewers follow topography to use gravity flow, avoid installing pump stations Waterlines are pressurized, can flow uphill and can usually stay along roads - make loops if possible in distribution lines MHs at bends or < 400, fire hydrants < 1200 No MHs in streams, no PSs in floodway
5 NPDES Permitting NPDES required if > 1 acre disturbed Multiply length pipeline X 10 (for WL) to 20 (for SS) = disturbed area Buffer requirement may be waived on linear projects, alternatives analysis No PCSM or rudimentary PCSM Plan if no impervious DEP requires for individual permit Keep track of expiration date
6 Other Permits General Permits (usually GP-5, maybe GP-4 and/or GP-8) - WCD can issue E&S needs reviewed no matter amount of disturbance HOPs for all state roads, some co. and twp. RR crossings SLLA on larger waters reviewing agency will inform you if needed
7 Waste Sites Arrange waste areas ahead of time Mostly needed for in-road part of projects Many people want fill many sites unsuitable Wetlands are not suitable waste sites No fill within 50 ft. of stream Need E&S plan, CD review if > 5000 SF Need NPDES permit if > 1 acre
8 E&S Control Plans for Utility Lines Show locations of controls on plans Sediment filter fence/socks RCEs where going off road Water bars on slopes Sediment filter bags Stormwater inlets Provide construction details CAN USE SYMBOLS KEYED TO LEGEND Limit length of open trench at days end Written E&S plan if > 5,000 SF disturbed, should be reviewed by CD
9 FLOW Pipe flume crossing LARGE ENOUGH TO HANDLE EXPECTED FLOWS DURING CONSTRUCTION PUMPED WATER FILTER BAG
10
11 Pump Bypass PUMPED WATER FILTER BAG
12 Temporary Cofferdam
13 Water Bars Required Spacing for Permanent Waterbars Percent Slope Spacing (FT) < 5 * > * Permanent waterbars are required at all stream, river, and other water-body crossings as well as upslope from roadway and railroad cut slopes. Otherwise not required.
14 Trench Plugs Required Spacing and Materials for Trench Plugs Trench Slope Spacing (FT) Plug Material (%) < 5 * * ** Earth Filled Sacks ** Earth Filled Sacks ** Earth Filled Sacks ** Earth Filled Sacks > Cement Filled Bags (Wetted) or Mortared Stone * Trench Plugs are required at all stream, river, or water-body crossings regardless of trench slope. Otherwise not required. ** Topsoil may not be used to fill sacks.
15 Inlet protection INLET FILTER BAG STONE AND CONCRETE BLOCK
16 Filter Fabric Fence Usually use 18 or 30 fence if within 50 of water or wetland Place close to trench to prevent sediments from migrating from work area and stay w/in R/W Must be toed in properly to work Must be inspected and maintained
17
18 Compost Filter Socks Compost-filled silt socks for HQ or EV Considered ABACT BMP More effective than silt fence - higher flow rates, better trapping efficieny Less impact when installed or removed May be left in place, cut and spread on site or biodegradable
19 Compost Filter Sock Detail 12 SOCK = 18 SF 18 SOCK = 30 SF NOT 8 SPECS FOR COMPOST FILTER MEDIA
20 Pumped Water Filter Bag OR CAN BE PLACED ON BED OF 2A OR #57 STONE
21 Pipe bedding and backfill Stone or rock dust bedding around pipe Select backfill with no large stones no frozen, muddy, organic, ashes, slag, etc. If within 3 of pavement on state road, 100% stone backfill per PADOT Fill in layers or lifts to within 4 to allow room for topsoil/pavement
22 Pipe bedding and backfill (cont.) Mechanically tamp in lifts to compact backfill and avoid soft spots Do NOT use backhoe bucket to tamp Restoration - repave/revegetate ASAP Cold patch for temporary repaving in cold weather Reserve topsoil and spread 4 thick, lime and fertilizer, seed & mulch
23 Mechanical Tampers
24 Not Adequately Compacted FAIL
25 RESTORED PAVEMENT
26 General Permits for Utility Lines GP-5 for Utility Line Crossings* for wetlands and streams if drainage area > 100 acres GP-8 for Temporary Equipment Crossings GP-4 for Outfall Structures for effluent from plants Can use 1 form for multiple crossings/outfalls * If EV streams and/or associated wetlands, must have Joint Permit, issued by DEP
27 GP-5 Conditions Maximum size utility line allowed is 36 inches in diameter Under streambeds, must have a minimum of three (3) feet of cover Trenches excavated shall be the minimum width necessary Prevent sediments from entering the stream Lay pipe so as to eliminate the formation of a permanent ridge in the streambed
28 GP-5 Conditions (cont.) Protect existing vegetation and features Investigate for drinking water intakes or reservoirs for public and private water supplies within five (5) miles downstream Mats, pads, or other similar devices shall be used where equipment will cross wetlands. Mounding of fill material to allow for settlement in the trench is permitted in wetland crossings Minimize erosion and prevent sediments from going into any wetland
29 GP-5 Conditions (cont.) Archaeological artifacts that are discovered must be protected and their discovery promptly reported to PHMC Utility line crossings of streams should at a right angle to the stream where possible If possible, crossings made in the dry by using a pipe flume or pump bypass Need permit from the Fish & Boat Comm. To use explosives in streams
30 Stream/Wetland Impacts Minimize amount of disturbance Minimze length of time of impact Minor stream crossings completed w/in 24 hrs Major stream crossings completed w/in 48 hrs Contact PA F&B 10 days prior No in-stream work in TSF March 1 June 15
31 Stream/Wetland Impacts (cont.) Segregate and replace hydric soils in wetlands Place riprap along disturbed stream banks R-6 minimum, R-7 on large stream Place trench plugs on either side of stream or wetland Use matting at swale crossings
32
33 Types of Utility Crossings for GP-5 Open cut trench must divert stream flow around work area, either flumed, pumped, or cofferdam Boring under streams or wetlands Under or over an existing culvert if > 100 ac. Along existing bridge
34 Open-cut Stream Crossing Sketch SHOW STREAM FLOW, CONTROLS, LIMIT OF DISTURBANCE
35 Stream Crossing Cross-section
36 CONCRETE ENCASEMENT
37 Boring Under Stream/Wetland SHOW DIRECTION OF FLOW, LIMIT OF DISTURBANCE, CONTROLS
38 Bored Cross-section SHOW DIMENSIONS, PITS, SILT BARRIERS, SEDIMENT BAG
39 This can be so boring!
40 Pipe/Culvert Crossing Sketch Plan LIMIT OF DISTURBANCE SHOW DIRECTION OF FLOW, CONTROLS, LIMIT OF DISTURBANCE
41 Pipe/culvert Crossing Section View
42 Crossing Under Existing Pipe
43 Wetland Crossing Sketch Plan SHOW DIRECTION OF FLOW, LIMIT OF DISTURBANCE AND CONTROLS NOTE RIPRAP ALONG BENDS IN STREAM
44 Wetland Crossing Cross-section GENERAL NOTES: 1. Trench width and disturbance shall be kept to minimum. 2. Protect and preserve vegetation to the maximum extent possible. 3. Mats, pads or similar devices shall be used where equipment cannot avoid crossing wetlands. 4. Restore original grades through wetlands after trenching and backfilling. 5. Mounding of fill material to allow for settlement in trench is permitted. 6. Minimize erosion and preclude its entering wetland areas.
45 WOOD BRIDGE, SWAMP MAT, GEOTEXTILE W/ EXPANDED METAL, PVC, TIRE MATS, WIDE TIRES
46 GP-4 Outfall Structure Sketch Plan SHOW STREAM FLOW, OUTLET STRUCTURE, APRON DIMENSIONS, LIMIT OF STREAM DISTURBANCE
47 GP-4 Outfall Structure Cross-section
48 GP Registrations & Attachments Original signed GP Registration form (Rev. 6/2011) Sketch plan and cross-section for each crossing USGS with crossing numbers/locations shown PNDI results and responses/clearances
49 More Attachments to GP Act 14 notices and proof of receipt (certified mail reciept) Color photographs Cumulative Impacts Screening Form signed by applicant (Rev. 7/2011) E&S Plan (send to CD if DEP will review the GP)
50 ACOE 45 Day Review > 250 ft. stream impact Permanent loss of > 1 acre waters of the U.S. including wetlands Need PHMC clearance Provide table with Lat & Long, name of water, linear feet and acreage of impact, Ch. 93 designation, and description of impact
51 Questions? CONTACT INFO: PEG NOVELLO, CPESC GIBSON-THOMAS ENGINEERING CO., INC
Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)
Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationHolly Swartz and Jason Shirey
Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes
More informationErosion and Sediment Control Plan for a Timber Harvesting Operation
3930-FM-WM0155 Rev. 7/2004 Erosion and Sediment Control Plan for a Timber Harvesting Operation 1. GENERAL INFORMATION A. Location Municipality B. Timber sale area = acres Date County C. Landowner Name
More informationU.S. ARMY CORPS OF ENGINEERS. Little Rock District
U.S. ARMY CORPS OF ENGINEERS Little Rock District SEDIMENT AND EROSION CONTROL GUIDELINES FOR PIPELINE PROJECTS Table of Contents 1.0 INTRODUCTION... - 1-2.0 PROJECTS IN WATERS OF THE UNITED STATES...
More informationErosion & Sedimentation Control Policy
Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of
More informationStandards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition
STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm
More information10:00 AM, Wednesday, April 8, 2015
NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference
More informationNEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL
NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by
More informationTown of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL
CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with
More informationErosion Control for Home Builders
Erosion Control for Home Builders By controlling erosion, home builders help keep our lakes and streams clean. Eroding construction sites are a leading cause of water quality problems in Wisconsin. For
More informationCOMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF WATER MANAGEMENT OFFICE OF OIL AND GAS MANAGEMENT
8000-PM-OOGM0005 Rev. 1/2014 Notice of Intent COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF WATER MANAGEMENT OFFICE OF OIL AND GAS MANAGEMENT ID # Date Received OFFICIAL
More informationPART 1 GENERAL REQUIREMENTS
PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...
More informationMODEL Stormwater Local Design Manual. City of Centerville
MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge
More informationSection 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012
Section 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012 Site Restoration Regulations Act 13-3216(a) The Oil and Gas Act 25 Pa. Code 78.65 Oil
More informationSection 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012
Site Restoration Regulations Section 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012 Act 13-3216(a) The Oil and Gas Act 25 Pa. Code 78.65 Oil
More informationSOIL EROSION CONTROL PERMIT APPLICATION
SOIL EROSION CONTROL PERMIT APPLICATION Pursuant to Part 91, Soil Erosion and Sedimentation Control, of Act 451 of the Public Acts of 1994, as amended A Soil Erosion Control Permit is required for earth
More informationCHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS
CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS 8.1 INTRODUCTION To minimize the detrimental effects of erosion and sedimentation, Henrico County requires that those individuals responsible for
More informationStormwater Local Design Manual For Houston County, Georgia
Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.
More informationTemporary Watercourse Crossing: Culverts
Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol
More informationTEMPORARY SEDIMENT TRAP CODE
ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY SEDIMENT TRAP CODE 960 Source: DEFINITION A small temporary stormwater storage structure designed to trap sediment. PURPOSE The purpose of this practice
More informationReview of State and Federal Stormwater Regulations November 2007
Review of State and Federal Stormwater Regulations November 2007 By: James T. Spaulding, PE, CPESC Joseph M. Ducharme, Jr., PE TTG ENVIRONMENTAL CONSULTANTS, LLC 27 LOCKE ROAD, CONCORD, NH 03301-5301 TELEPHONE:
More informationINSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION
Permits will be processed only when ALL required information is provided Application MUST be accompanied by the following: Property address or road location with distance from nearest intersection. IT
More informationE. STORMWATER MANAGEMENT
E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson
More information2.1 Backfill - General
2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately
More information901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL
SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL 901.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID
More informationModule 4 Regulatory requirements for Land Disturbing Activities
Module 4 Regulatory requirements for Land Disturbing Activities MODULE 4 REGULATORY REQUIREMENTS FOR A LDA Module 4a Overview MODULE 4A REGULATORY REQUIREMENTS FOR A LDA ESC Regulations Overview 1990 First
More informationConstruction Best Management Practices Handbook BEST MANAGEMENT PRACTICES
Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN
More informationSECTION EROSION AND SEDIMENTATION CONTROLS
SECTION 312500 EROSION AND SEDIMENTATION CONTROLS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationGeneral Permit No.: OHR Page 53 of 146
Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated
More informationPERMEABLE INTERLOCKING PAVERS
PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement
More informationB. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.
SECTION 312333 TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain
More information***************************************************************************************************************
02735 WASTE WATER DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 22 14 00 ***************************************************************************************************************
More informationRichland County Department of Public Works Engineering (Land Development) Division
Richland County Department of Public Works Engineering (Land Development) Division Commercial Projects What is a Commercial Project? Projects that are not related to residential single family homes and/or
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationNorth Umpqua Hydroelectric Project (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form
(FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form Site # CW2-3 Priority Ranking Med Locator Information/GPS Lat: Long: Impact Rating 3 Start Project Development: Clearwater 2 Risk Rating
More informationSECTION STORM WATER MANAGEMENT CONSTRUCTION STANDARD PART 1: GENERAL Scope of Standard
PART 1: GENERAL 1.01 Scope of Standard A. This standard provides general guidance concerning the specific preferences of The University of Texas at Austin for site storm water management. B. UT recognizes
More informationStorm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationPERMIT APPLICATION UNDER THE EROSION AND SEDIMENT POLLUTION CONTROL PERMIT
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS ID # Date Received OFFICIAL USE ONLY PERMIT APPLICATION UNDER THE EROSION AND SEDIMENT POLLUTION
More informationSECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES
SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.
More informationFilter Tube Barriers (Instream)
Filter Tube Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo
More informationCATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE
3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).
More informationElements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)
Elements of the Storm Water Management Plan Storm Water Pollution Prevention Plan (SWPPP) Small Construction Site Storm Water Management Rodney Hendrick Water Quality Specialist LSU Ag Center Plan Requirements
More informationConstruction Application for Permit (CAP) Instructions
Construction Application for Permit (CAP) Instructions A CAP is required to be completed and submitted to the Wayne Soil & Water Conservation District (SWCD) office for non-farm, earth-disturbing activities
More informationSpecifications for Electrical Underground Residential Distribution Systems
Specifications for Electrical Underground Residential Distribution Systems Specification DDS-2 Revision 13, February 2010 ONCOR ELECTRIC DELIVERY COMPANY SPECIFICATIONS FOR ELECTRICAL UNDERGROUND RESIDENTIAL
More informationContact the Jurisdictional Engineer for materials allowed by each jurisdiction.
Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain
More information[Rev - 1] 06/
WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 33 UTILITIES SECTION 334100 STORMWATER MANAGEMENT PART 1 GENERAL 1.1. Any deviances from the following instructions must be approved during design
More informationInstallation and Maintenance of Erosion Control BMPs
Installation and Maintenance of Erosion Control BMPs Or Common BMPs Applications Specifications Installation Problems Maintenance Utility Design Professionals Clarifications, proactive problem solving
More informationSPECIFICATION FOR PIPE CULVERT CONSTRUCTION
SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.
More informationThe Good, The Bad, and The Ugly
Overview The Good, The Bad, and The Ugly Stormwater Regulations for the Construction Industry Seminar March 20, 2012 Wendy Terlizzi Arizona Department of Transportation Office of Environmental Services
More informationODOT Design & Construction Requirements for MSE Walls
ODOT Design & Construction Requirements for MSE Walls Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering 2006 Ohio Transportation
More informationITEM 506 Temporary Erosion Control
ITEM 506 Temporary Erosion Control TEMPORARY EROSION, SEDIMENTATION AND ENVIRONMENTAL CONTROLS ITEM 506 (2004 Specifications) 506.1. Description. Install, maintain, and remove erosion, sedimentation, and
More informationCITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587
CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE
More informationC. This project shall be designed to meet LEED Silver design criteria. Construction activity pollution prevention is a mandatory requirement.
SECTION 31 25 13 EROSION AND SEDIMENTATION CONTROL PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the provisions for the control of erosion in the construction area and in stockpile areas
More informationSUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields
4.1-d SUBSURFACE INFILTRATION SYSTEM Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields BMP DESIGN APPROACH Pollutant Source Control Hydrologic Source Control Stormwater
More informationALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting
ALABAMA S BEST MANAGEMENT PRACTICES Protection of Water Quality During Timber Harvesting Water Quality Responsibility Landowners and/or involved professional forestry practitioners such as: Forest resource
More informationCITY OF FARGO SPECIFICATIONS EROSION AND SEDIMENT CONTROL
EROSION AND SEDIMENT CONTROL PART 1 DESCRIPTION OF WORK The work to be completed under this section of the Specifications and the accompanying plans shall include all labor, materials, and equipment necessary
More informationC. Foundation stabilization for pipe and utility structures.
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization
More informationMed (3) Locator Information/GPS GPS shows 16 ft accuracy Lat: Impact Rating
(FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form Site # Med (3) LM2-25 Priority Ranking Locator Information/GPS GPS shows 16 ft accuracy Lat: Long: Impact Rating 5 Start Project Development:
More informationBASED ON DFD MASTER SPECIFICATION DATED 2/24/2014
1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,
More informationLyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual
Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This
More informationSECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements
SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature
More informationBRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report
BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2010) Start of trenching operations for the offsite Sanitary Sewer Force Main pipe through the Caltrans Right
More informationAlternative BMPs for Erosion Prevention & Sediment Control
Alternative BMPs for Erosion Prevention & Sediment Control J.P. Johns, PE - Woolpert March 11, 2011 Agenda + Traditional BMPs + Performance Specifications + Erosion Prevention + Sediment Control + The
More informationAt least 2 feet above the seasonal high water table Overflow path or structure provided
General Conditions Map of proposed subwatershed to each subbasin, including total area and CN Design Flow or Design Volume to each STF, as appropriate Operation and Maintenance instructions for each STF
More informationPonds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.
POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made
More informationCITY OF MIDDLETOWN, OHIO EROSION AND SEDIMENT CONTROL RULES & REGULATIONS
CITY OF MIDDLETOWN, OHIO EROSION AND SEDIMENT CONTROL RULES & REGULATIONS July 2009 TABLE OF CONTENTS CHAPTER Chapter 1: Purpose... 2 Chapter 2: Definitions...2-4 Chapter 3: Disclaimer of Liability....4
More informationSACHSE EROSION CONTROL GUIDELINES
SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the
More informationSECTION UTILITY MANHOLES AND STRUCTURES
SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition
More informationStandards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose
STANDARD FOR GRASSED WATERWAYS Definition A natural or constructed watercourse shaped or graded in earth materials and stabilized with suitable vegetation for the safe conveyance of runoff water. Purpose
More informationEROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180
EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: 1-16-07 (Rev 1-15-08) SP1 G180 General Schedule and conduct construction activities in a manner that will minimize soil erosion and the resulting sedimentation
More informationSEPTIC TANK CONSTRUCTION GUIDELINES
SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic
More informationSITE DESIGN ENGINEER'S STATEMENT:
SITE DESIGN ENGINEER'S STATEMENT: THESE DETAILED PLANS AND SPECIFICATIONS WERE PREPARED UNDER MY DIRECTION AND SUPERVISION. SAID PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ACCORDING TO THE CRITERIA ESTABLISHED
More informationJune 2007
CONCRETE PIPE 101 www.concrete-pipe.org June 2007 2007 Agenda o Terminology o Manufacturing Methods o ASTM Specifications o Pipe Joints o Pipe Testing o Fittings o Manholes o Sizing o Flotation Manufacturing
More informationRecommended Resources: The following resources may be useful in teaching this lesson:
Unit E: Basic Principles of Soil Science Lesson 7: Understanding Soil Erosion and Management Practices Student Learning Objectives: Instruction in this lesson should result in students achieving the following
More informationNevada Contractors Field Guide for Construction Site BMPs
Nevada BMP Field Guide 2013 Update Nevada Contractors Field Guide for Construction Site BMPs This document has been approved by the Nevada Division of Environmental Protection (NDEP) and reflects best
More informationSTATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY
STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY In the Matter of the Decision on the Need for an Environmental Impact Statement for the Proposed Remer Wastewater Treatment Facility Expansion FINDINGS
More informationSECTION RIPRAP, BOULDERS, AND BEDDING
SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and
More informationAPPENDIX E. CONSTRUCTION SPECIFICATIONS FOR ACCESS ROADS (January 2005)
APPENDIX E CONSTRUCTION SPECIFICATIONS FOR ACCESS ROADS (January 2005) i TABLE OF CONTENTS 1.0 INTRODUCTION...1 2.0 CONSTRUCTION SPECIFICATIONS FOR ACCESS ROADS................... 1 3.0 PLANNING AND LOCATION...2
More informationSTATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT
STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LESTER PRAIRIE WASTEWATER TREATMENT FACILITY EXPANSION
More informationTYPE "A" CATCH BASIN
27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,
More information***************************************************************************************************************
02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************
More informationUnit E: Basic Principles of Soil Science. Lesson 7: Understanding Soil Erosion and Management Practices
Unit E: Basic Principles of Soil Science Lesson 7: Understanding Soil Erosion and Management Practices 1 Important Terms Accelerated erosion Conservation tillage Cover crops Diversion ditches Geologic
More informationBefore we get to the E&SC
Erosion and Sedimentation Control on Mine Sites Ashley Rodgers, PE Assistant Regional Engineer NC DENR DEMLR RRO Before we get to the E&SC There are major differences in the application and review process
More informationSECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1
CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1
More informationSECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES
SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and
More informationCOON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432
PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:
More informationSECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION
820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing
More informationADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.
ADDENDUM #2 JUNE 30, 2017 APRON REHABILITATION PHASE 3 HENRY E. ROHLSEN AIRPORT ST. CROIX, U.S. VIRGIN ISLANDS FAA AIP No.: 3-78-0002-037-2017 This addendum modifies or interprets the proposal documents
More informationSECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS
SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS Page 4-1 INTRODUCTION 4-3 4-1.01 Applicability of VMCs 14.24, 14.25, 14.26 4-4 4-1.02 Minimum Requirements - Projects Below Threshold
More informationSPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project
RES. NO. PROPOSAL FOR THE COMPLETION OF 2015-28 TO THE SATISFACTION OF THE BUTLER COUNTY COMMISSIONERS AND THE COUNTY ENGINEER: SAID WORK CONSISTING OF TYLERSVILLE ROAD IMPROVEMENTS, PHASE I TO THE COUNTY
More informationStraw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow
Straw Bale Barrier SE-9 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control
More information1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.
MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction
More informationExcavation for Natural Gas Mains and Services
Excavation for Natural Gas Mains and Services Trench Padding & Backfilling Requirements for Mains General Install mains with a minimum of 36 of cover. Exceptions may be made within state and federal codes
More informationB. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.
SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution
More informationSECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS
SECTION 2100 - GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS The City of Lee s Summit hereby adopts Section 2100 of the Kansas City Metropolitan Chapter of APWA Construction
More informationJEFFERSON COUNTY STORM WATER MANAGEMENT
JEFFERSON COUNTY STORM WATER MANAGEMENT B-210 Courthouse, Birmingham, Alabama 35203 Telephone: (205) 325-8741 Erosion and Sedimentation Control Measures for Commercial Projects (Plans Requirements) -All
More information