1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Cheng County Moba Gorge Water Source Engineering of Gansu Province Environmental Management Plan Construction Unit: Water Source Engineering Construction Management Department of Moba Gorge for City Water Supply of Cheng County Assessment unit: Lanzhou University May 2012

2 Environmental Management Plan for Cheng County Moba Gorge Water Source Engineering of Gansu Province Cheng County Moba Gorge Water Source Engineering of Gansu Province Engineering of Gansu Province Project Name: Cheng County Moba Gorge Water Source Engineering of Gansu Province Commissioned By: Water Source Engineering Construction Management Department of Moba Gorge for City Water Supply of Cheng County Assessed By: Lanzhou University Supervisor: Wu Junnian Technical Director: Wu Junnian Major Establishment Strength: Wu Junnian, Liu Guannan

3 Environmental Management Plan for Cheng County Moba Gorge Water Source Engineering of Gansu Province Directory 1. General Instruction Project Brief Objectives of Environmental Management Plan Compilation of Environmental Management Plan Design of Environmental Management Plan Details of Compilation Technology.3 2. Policy, Law and Administrative Management Framework Environmental Policies and Regulations Document Environmental Management Organizations and Responsibilities Project Description Construction Objective of the Project Implementation Schedule of the Project Project Overview Environmental Impact of the Project and Mitigation Measures Summary Environmental Impact Assessment Public Participation Environmental Management Organization of the Project Introduction Environmental Organization of Construction Period Environmental Management Organization in Operation Period Details of Environmental Management Organization of the Project Implementation of Environmental Management Plan Project Environmental Management Detailed Task for Implementation of Environmental Management Plan Contract Requirements of Environmental Management Information Exchange and Resolution of Undesirable Condition Training-- Necessary Capacity Building and Means Building Land Acquisition Compensation and Resettlement Compensation temporary Site Restoration Environmental Monitoring Plan Monitoring Purposes Environmental Monitoring Organization Detailed Environmental Monitoring Requirements Acceptance Investigation Content of Environmental Protection Measures Investigation of Water Environmental Protection Measures Investigation of Atmospheric Environmental Protection Measures Investigation of Acoustic Environmental Protection Measures Investigation of Solid Waste Treatment Measures Investigation of Ecological Protection Measures Investigation of Water Loss and Soil Erosion Control..70

4 8.7 Investigation of Population Health Impact and Protection Measures Investigation for Environmental Protection Measures of Resettlement Area Investigation of Risk Prevention Measures "Three Meantime" of Project Acceptance Environmental Management Cost Budget and Capital Source Budget Distribution Capital Source and EMP Budget Information Management of Environmental Management Plan Environmental Management Plan Information Exchange Recording Mechanism Reporting Mechanism.77 Appendix...79 Appendix 1 Project Involves Environmental Standards...79 Appendix 2 Detailed Project Environmental Management Standards of Contractor..83 Appendix 3 Detailed Project Environmental Management Standards of Project Operation Department 87 Appendix 4 Summary of Project Environmental Management Plan and Environmental Action Plan of Construction Period.89 Figure Figure 1 Environmental Protection Measures Layout Figure for Cheng County Moba Gorge Water Source Engineering of Gansu Province Figure 2 Water and Soil Conservation Measures Layout Figure for Cheng County Moba Gorge Water Source Engineering of Gansu Province Figure 3-1 Atmosphere and Noise Monitoring Points Figure in Construction Period of Moba Gorge Water Source Engineering of Gansu Province Figure 3-2 Environmental Monitoring Points Figure in Construction and Operation Period Cheng County Moba Gorge Water Source Engineering of Gansu Province Figure 4 Water and Soil Conservation Monitoring Points Figure for Cheng County Moba Gorge Water Source Engineering of Gansu Province

5

6

7 Environmental Management Plan for Cheng County Moba Gorge Water Source Engineering of Gansu Province 1. General Instruction 1.1 Project Brief Cheng County is located in Longnan City of the six parts in southern Gansu Province, and located in '~ ' of east longitude and 33 31'~ 34 02' of north latitude. The county is east to Hui County, west to Xihe County, southwest to Kang County with interval of Western Han River, and the southeast is adjacent to the Lueyang County of Shaanxi Province. The length of north to south is 55 km, the width of east to west is 52 km, the area is about 1701 km2, the highest elevation within the county is 2377 m, the lowest elevation is 50 m, and the county is a relatively wide graben basin in West Qinling fold belt. Cheng County mainly comprises One water and three rivers, i.e. Western Han River, Qingni River, Nan River and Luo River, the total water resources of the whole county is 1,276 billion m3, in which the self-produced water is billion m3. The total land area of the county is km2, the total population is million, of which the agricultural population is million people. The benefited area of the project comprises 3 towns and 38 administrative villages, and the total population thereof is million people. The county town of Cheng County is divided into Hedong District and Hexi District by taking the East River as the boundary. Hedong District is called as new town, Hexi District is called as old town, and the south of the Nan River is called as new Nanhe District. The population of the urban area is about 80,000. according to the Urban Master Plan of Cheng County ( ), the central city comprises Chengguan Town, Paosha Town and Chenyuan Town; to the recent 2015, the population of the central city planed is 130,000, the construction land area is 13 km2; to the forward 2025, the population is 220,000, and the construction land area is 22 km2; to the forward 2025, Chengnan water plant, Hedong water plant and Paosha water plant will be built, and the total amount of urban water supply will be reached to 65,000 m3/d. At present, Cheng County has two tap water supply units for supplying water to the urban area, namely County Tap Water Company and Gaofeng Water Supply Company; the water supply source of County Tap Water Company is the well located in West Bank of Qingni River in the Chengguan Shunjia Dam, the water of the well belongs to the quaternary gap sedimentary water and occurs in gravel layer, and the water is mainly supplied by the water of Qingni River and the atmospheric precipitation; however, the contents of lead and COD contained in the surface water of Qingni River exceed the standards of Class IV in the standard of water environmental quality, and due to the influence of Wenchuan earthquake of Sichuan, the turbidity of the well water in the water source is increased, odor and floaters are presented, and the health of urban residents is impacted seriously; the water supply source of Gaofeng Water Supply Company is Gaofeng water reservoir, and the actual daily water supply capacity of the company is 1000 m3 only as the drainage area of the water reservoir is less than 10 km2 and the spatial and temporal distribution of precipitation is uneven. According to the survey, the

8 existing water supply project of the urban area cannot meet the urban water demand. In order to solve the contradiction of urban water supply, improve water quality, reduce cost of water supply, achieve the sustainable economic and social development of Cheng County and improve the physical health of urban residents, the Water Authority of Cheng County consults with the relevant personnel of the World Bank to build a new urban water supply dam by means of the loans of the World Bank, and the loan planned is million Yuan. Cheng County Moba gorge water source project is located in the west of the Cheng County with 11 km, is apart from Paosha Town with 6 km and is located downstream the Nan River basin; the geographic location of the project is as follows: 33 45' ' of northern latitude and '55" '60" of east longitude, and the project belongs to Jialing River system upstream the Yangtze River. The content of project construction comprises project construction and management system and institutional capacity building. The project construction mainly comprises dams, water intake structures, water pipelines, and dam roads and etc. The content of management system institutional capacity building comprises water resources and comprehensive environmental management projects based on the concepts and methods of integrated river basin management. The content of institutional capacity building comprises water source engineering construction management department of Moba gorge for city water supply of Cheng County, monitoring and assessment, and management of information system; when the project is completed, the problem of difficult water supply in the urban area of Cheng County can be solved, so that the project has good social and economic benefits. The objectives of the project are as follows: comprehensively and effectively use the water resources of Cheng County, solve the problem that the domestic water of Cheng County after the disaster is difficult, and improve the water environment of Cheng County. 1.2 Objectives of Environmental Management Plan The compilation of EMP aims at developing a set of detailed, technically feasible, financially sustainable and workable environmental measures by targeting to the inevitable potential adverse impact of the project to the environment, clearing the environmental mitigation, environmental management and institution building measures to be implemented by project contractors, supervision side, operators, environment management department in the project construction and operation period, so as to eliminate or compensate the adverse environmental and social impact of the project, and reduce the adverse environmental and social impact to an acceptable level. The specific objectives are as follows: (1) Clear the environmental management obligations of the contractor and the operator The environmental protection bureau of Gansu Province, the environmental protection bureau of Longnan City, the environmental assessment unit and the design unit carry out detailed onsite check and confirmation to the environmental protection targets, and provide effective environmental mitigation measures, wherein the measures are incorporated into the project design and are taken as the contractual obligations of the contractor and the operator of the project construction. (2) Operational guidelines for environmental management The environmental monitoring plan of construction period and operation period provided in

9 the environmental management plan can ensure the effective implementation of environmental mitigation measures, and the monitoring plan will be provided to the construction supervision unit, the environmental supervision unit and other relevant units as an environmental protection file, so as to clear the responsibilities and the roles of the relevant functional departments, and provide the various communication channels and methods among the departments. (3) Ensure the cost of environmental management action In the environmental management plan, the cost of environmental management, environmental supervision and capacity building are estimated, and the capital sources are described, so as to ensure the various environmental management activities can be implemented, wherein the management cost comprises staff salaries, office costs and transportation costs. The role of environmental management plan is in avoiding and controlling the adverse environment effect in the construction and operation process of the project, so that the impact mitigation measures, monitoring measures, legal regulatory means and safeguard measures of the measures above to be implemented are provided; at the same time, the environmental management plan is a critical link in connecting the impact mitigation measures and replacement measures for the assessment and detailed description in the environmental impact and environment assessment. For each environmental management measure, the environmental management plan provides the technical content, the investment estimation, the implementation plan, the functions of government agencies, the capital sources, and the monitoring schemes of the measure. In order to achieve reduction objective, the method involved by the environmental impact assessment report and the environmental management plan must be implemented. 1.3 Compilation of Environmental Management Plan The environmental management plan of the Cheng County Moba Gorge Water Source Engineering of Gansu Province is compiled by the engineering environmental assessment unit, the environmental management plan is compiled by strictly complying with national and provincial environmental management regulations. Meanwhile, the environmental management plan particularly paid attention to the requirements of security regulations of the World Bank under the premise of meeting the requirements of China's environmental assessment, specifically refers to relevant provisions of the operation regulation The information source for the environmental management plan of the project is as follows: (1) Feasibility evaluation report of the project (2) Preliminary design of the project (3) Environmental assessment of the project (4) Soil and water conservation scheme of the project 1.4 Design of Environmental Management Plan For the detailed description of environmental management, environmental supervision and environmental monitoring and other aspects, the environmental management plan compiled is a guiding document in the implementation process of the project, and the action plan thereof mainly includes the following four parts:

10 Environmental impacts and mitigation measures: the main environmental impacts in project construction period and operation period, and project measures and management measures taken for preventing or mitigating the adverse environmental impact caused by the project. Environmental management and monitoring plan: environmental monitoring action taken for ensuring the synchronous implementation of environmental protection measures and the project construction. Environmental monitoring plan: environmental monitoring action taken for supervising whether the environment of construction period and operation period is standard and ensuring the safe operation of the project and the improvement of project condition in the project area. Capacity building plan (i.e. personnel training): knowledge and skills training of the management personnel, the environmental supervision personnel, full-time or part-time personnel in the project implementation process for ensuring the implementation of environmental management plan. 1.5 Details of Compilation Technology The environmental management plan is compiled by appropriately altering and replenishing on the basis of the Primary Design of Cheng County Moba Gorge Water Source Engineering of Gansu Province and the Environmental Impact Assessment of Cheng County Moba Gorge Water Source Engineering of Gansu Province. As an independent file, the environmental management plan comprises all the environmental management activities to be implemented in the construction period and operation period of the project; and the plan further provides action guidelines and working framework to the adverse impact mitigation measures, environmental supervision, environmental management and environmental monitoring in the construction period and the operation period.

11 Environmental Management Plan for Cheng County Moba Gorge Water Source Engineering of Gansu Province 2. Policy, Law and Administrative Management Framework 2.1 Environmental Policies and Regulations Document Overview Through the comprehensive analysis for the type, the size, the location, the environmental sensitivity and the characteristic and degree of potential environmental impact of the project, the main basis of the environmental assessment of the project and the revolved policies, laws and regulations and standards comprise: (1) Environmental protection laws and regulations; (2) Pollution control technology policy; (3) Socio-economic development and environmental protection plans and programs; (4) Overall urban planning; (5) Technical guidelines of environmental impact assessment; (6) Environmental quality standards; (7) Control of pollutant emission standards; (8) Safeguard policies of the World Bank. The policies, laws and regulations and standards above construct a frame for the policies, laws and regulations and standards in guiding and regulating the environmental assessment work of the project. In addition, the environmental assessment of the project takes the feasibility study report and the administrative examination and approval documents of the government administrative authorities and the relevant documents with specific embodiment and application of the policies, laws and regulations and standards above as one of the basis of environmental assessment Environmental protection Laws and Regulations (1) Environmental Protection Law of the People s Republic of China, (December 1989); (2) Air Pollution Prevention Law of the People s Republic of China, (September 2009); (3) " Water Pollution Prevention Law of the People s Republic of China", (June 1, 2008); (4) " Environmental Noise Pollution Prevention Law of the People s Republic of China", (March 1997); (5) "Solid Waste Pollution Prevention Law of the People s Republic of China", (April 2005); (6) "Environmental Impact Assessment Law of the People s Republic of China", (September 1, 2003); (7) "Cleaner Production Promotion Law of the People s Republic of China", (January 1, 2003); (8) " Water and Soil Conservation Law of the People s Republic of China", (June 1991); (9) "Forest Law of the People s Republic of China", (January 1998); (10) "Wildlife Protection Law of the People s Republic of China", (adopted by the fourth meeting of the Standing Committee of the Seventh National People's Congress on November 8, 1988, and implemented from March 1, The amendment for the Decision on the Amendments to the Wildlife Protection Law of the People s Republic of

12 China in the eleventh meeting of the Standing Committee of the Tenth National People's Congress on August 28, 2004); (11) "Land Management Law of the People s Republic of China", (August 28, 2004); (12) "Flood Control Law of the People s Republic of China", (January 1, 1998) Environmental Protection Regulations, Ministries Rules and Protection List (1) "Implementation Regulations of Soil and Water Conservation Law of the People s Republic of China", (August 1, 1993); (2) " Wild Plant Protection Regulations of the People s Republic of China", (September 30, 1996); (3) " Regulations on the Nature Protection Regions of the People's Republic of China", (October 9, 1994); (4) "Regulations of the People's Republic of China Governing the Administration of River", (June 10, 1988); (5) "Regulations on the Administration of Construction Project Environmental Protection", (November 29, 1998); (6) "Outline of National Ecological Environmental Protection", (April 10, 2001); (7) " Eleventh Five-Year Plan of National Eco-protection", (UNCED 2006 [158]); (8) "Regulations on Pollution Control of Drinking Water Source Protection Area, (July 10, 1989); (9) "Public Participation and Interim Measures of Environmental Impact Assessment", (UNCED 2006 [28]); (9) "Notice for Strengthening Environmental Impact Assessment Work of Loan Construction Projects of International Financial Organization (four ministries, EM [1993] No. 324). (10) "Notice for Strengthening Environmental Protection Work of Hydropower Construction, (UNCED [2005] No. 13); (11) "Notice for Printing and Issuing National Ecological Environmental Protection Program of State Environmental Protection Administration of the State Council, (December 21, 2000); (12) UNCED [2005] No. 24 Document Suggestion for Strengthening Ecological Environment Protection Supervision Work of Resource Development of the State Environmental Protection Administration; (13) "Notice for Strengthening Ecological Environment Management of Natural Resources Development and Construction Project (National Environmental Protection Agency, December 1994); (14) "Case for Issuing the Meeting Summary of Water Environment and Aquatic Ecosystem Protection Technology Seminar Minutes of Water Conservancy and Hydropower Construction Project (Environmental Office letter [2006] No. 11); (15) "Notice for Strengthening Environmental Impact Assessment Management and Environmental Risk Prevention, (UNCED [2005] No. 152); (16) "Construction Project Environmental Protection Classification Management List" (2008); (17) "List for National Nature Reserve of China", (2004) (18) "List of National Key Protected Wild Animals" (National Bureau of Forestry Decree No.

13 7 revised, February 2003); (19) " List of National Key Protected Wild Plants (the First Amendment) (August 4, 2001) Local Environmental Protection Regulations and List (1) "Geological Environmental Protection Regulations of Gansu Province" (Gansu Provincial People's Congress Standing Committee); (2) "Basic Farmland Protection Regulations of Gansu Province" (Gansu Provincial People's Congress, September 29, 1997); (3) "Provisions (Amendments) for Implementation of Forest Law of Gansu Province (Gansu Provincial People's Congress, July 30, 1997) (4) "Measures (Amendments) for Implementation of Water Law of Gansu Province" (Gansu Provincial People's Congress, May 28, 1997); (5) "Measures (Amendments) for Implementation of Land Administration Law of Gansu Province" (Gansu Provincial People's Congress, September 29, 1997) (6) "Measures for Implementation of Fisheries Act of Gansu Province" (Gansu Provincial People's Congress, September 29, 1997); (7) "Measures for Implementation of Water and Soil Conservation Law of Gansu Province" (amended by Gansu Provincial People's Congress in May 28, 1997); (8) "Decision on Environmental Protection Problems of People's Government of Gansu Province (February 20, 1997) Socio-economic Development and Environmental Protection Plan (1) "Overall Plan for Urban Area of Cheng County" ( ); (2) "Eleventh Five-Year" Development Plan of Longnan City; (3) "Eleventh Five-Year" Development Plan of Cheng County; (4) Overall Plan for Restoration and Reconstruction of Cheng County after 5.12 Wenchuan Earthquake; (5) "Eleventh Five-Year" Plan for Reasonable Use of Water Resources and Water Resources Guarantee of Cheng County; (6) Security Guarantee Plan of Drinking Water Source for Area of Cheng County; (7) Special Plan for Prevention of Geological Disasters of Cheng County (2008 ~ 2015); (8) Planning Report for Geological Disaster Prevention of Cheng County of Gansu Province; (9) Overall Plan of Mineral Resources of Cheng County Technical Guidelines and Specifications of Environmental Impact Assessment (1) "Technical Guidelines of Environmental Impact Assessment--Master" (HJ/T ); (2) "Technical Guidelines of Environmental Impact Assessment--Surface Water" (HJ/T2.3-93); (3) "Technical Guidelines of Environmental Impact Assessment--Acoustic Environment" (HJ ); (4) "Technical Guidelines of Environmental Impact Assessment--Atmospheric Environment" (HJ ); (5) "Technical Guidelines of Environmental Impact Assessment--Non-pollution Ecological Impact" (HJ/T ); (6) "Technical Guidelines of Environmental Impact Assessment--Hydropower Project"

14 (HJ/T ); (7) "Technical Specification for Water and Soil Conservation of Development and Construction project (GB ); (8) "Technical Guidelines for Environmental Risk Assessment of Construction Project (HJ/T ); (9) "Technical Specification for Management and Protection Infrastructure Construction of Nature Reserves (HJ/T ); (10) "Technical Specification for Water and Soil Conservation of Development and Construction Projects" (GB ); (11) "Technical Specification for Eco-environment Evaluation" (HJ/T ); (12) "Technical Specification for Comprehensive Treatment of Soil and Water Conservation" (GB/T ); (13) "Quality Standard of Surface Water Environment" (GB ); (14) "Quality Standard of Ambient Air" (GB ); (15) "Quality Standard of Acoustic environmental" (GB ); (16) "Health Standards of Drinking Water" (GB ); (17) "Noise Limit of Construction Site Boundary" (GB ); (18) "Quality Standard of Soil Environmental" (GB ); (19) "Integrated Wastewater Discharge Standard" (GB ); (20) "Technical Specification for Cleaning Solid Waste on the Bottom of Three Gorges Reservoir" (HJ ); (21) "Technical Guidelines for Construction Waste of earthquake Area" (trial) Environmental Quality Standard (1) "Surface Water Environmental Quality Standard" (GB ); (2) "Ambient Air Quality Standard" (GB ); (3) "Acoustic Environmental Quality Standards" (GB ); (4) "Soil Environmental Quality Standard" (GB ). The environmental quality assessment standards and the assessment factors used in the environmental impact assessment of the project are shown in Table The relevant environmental quality standards are shown in the Appendix 1-1 to the Appendix Control Standards of Pollutant Discharge (1) "Integrated Wastewater Discharge Standard" (GB ); (2) "Integrated Discharge Standard of Air Pollutant" (GB ), wherein the concentration limit value of unorganized discharged should be monitored. (3) "Noise Limit of Construction Site Boundary" (GB ). The control standards of pollutant discharge and the assessment factors used in the environmental impact assessment of the project are shown in Table The relevant control standards of pollutant discharge are shown in the Appendix 1-6 to the Appendix Health Standards The water of water source of Moba gorge water supply project should meet the requirements of Drinking Water Health Standards" (GB ) after treating, wherein the quality standards and assessment factors are shown in Table

15 The relevant control standards of pollutant discharge are shown in the Appendix 1-9. Environmental Quality Standards and Assessment Factors for Environmental Table Impact Assessment of the Project No. Standard Name Level Assessment Factors 1 "Surface Water Environmental Quality Standards" (GB ) "Ambient Air Quality 2 Standard" (GB ) "Acoustic Environment 3 Quality Standard" (GB ) 4 "Soil Environmental Quality Standards" (GB ) Class II Grad e two Class II Grad e one ph, COD, NH3-N, total nitrogen, zinc, selenium, mercury, lead, cyanide, oil, sulfide, dissolved oxygen, BOD5, total phosphorus, copper, fluoride, arsenic, cadmium, chromium (hexavalent), volatile phenols, anionic surfactants, fecal coliform, potassium permanganate index, water temperature, sulfate (by SO42-), chloride (by Cl-), nitrate (by N), iron, manganese PM10, NO2, CO, SO2 Continuous equivalent sound level A Copper, zinc, cadmium, hexavalent chromium, lead, total chromium, sulfur, mercury and arsenic Control Standards of Pollutant Discharge and Assessment Factors for Environmental Impact Assessment of the Project Table No. Standard Name Level Assessment Factors 1 "Surface Water Environment Quality Grade ph, suspended solids, BOD5, Standard" (GB ) one CODcr, ammonia "Integrated Discharge Standard of Air 2 Pollutant (GB ), wherein the concentration limit value of unorganized Particulate matter discharged should be monitored. 3 "Noise Limit of Construction Site Boundary" (GB ) continuous equivalent sound level A Health Standards and Assessment Factors for Environmental Impact Assessment Table of the Project Standard Name Indexes Assessment Factors "Drinking Water Health Microbial index Total coliforms, heat-resistant coliform Standards" Toxicological index Arsenic, cadmium, chromium (hexavalent), (GB ) lead, mercury Sensory properties and general chemical index Radioactive index Chromaticity, turbidity, smell and taste, PH, aluminum, zinc Total alpha radioactivity, total beta

16 radioactivity Note: the radioactive indexes are guide values Security Policies of the World Bank (1) "Operational Manual of the World Bank Program of the World Bank" (bp ); (2) "Operational Manual of the World Bank Operational Policies Environmental Impact Assessment" (OP4.01); (3) "Operational Manual of the World Bank Operational Policies Involuntary Resettlement" (OP4.12); (4) "Operational Manual of the World Bank Operational Policies Natural Habitat" (OP4.04); (5) "Operational Manual of the World Bank Operational Policies Dam Safety" (OP4.37). The proposed project will not involve indigenous people, will not involve forest sector activities or have significant impact on forested areas, will not lead to purchase or use of any pesticides, will not have impact on any known physical cultural resources. It also does not involve international waters or disputed areas. Therefore, other Bank safeguards policies are not triggered Relevant Documents of the Project (1) Feasibility study report of the project; (2) Preliminary design of the project; (3) Environmental impact assessment report of the project; (4) Approval for environmental impact assessment report of the project; (5) Soil and water conservation program report of the project; (6) Approval for soil and water conservation program report of the project; (7) Water resources assessment report of the project. 2.2 Environmental Management Organizations and Responsibilities The Central People's Government and the people's governments of the provinces (municipalities and autonomous regions, the city (state), county (district) of China set up environmental authorities according to the laws, and fulfill the corresponding environmental management responsibilities according to the laws. The environmental management institution related to the project mainly comprises the Environmental Protection Bureau of Gansu Province, the Department of Water Resources of Gansu Province, the Environmental Protection Bureau of Longnan City, the Department of Water Resources of Longnan City, the Environmental Protection Bureau of Cheng County, and the Department of Water Resources of Cheng County and etc. (1) Environmental Protection Bureau of Gansu Province The environmental protection bureau of Gansu Province is responsible for the administration of the province's environmental and administrative law enforcement work, its main responsibilities include: A. Implement national environmental policies, laws, regulations, administrative rules and standards; draft environmental regulations across the region, administrative regulations, and supervise the implementation; B. Implement environmental impact assessment of province's major economic and technological policies, development programs and major economic development plans according to the commission of the Provincial People's Government.

17 C. Develop environmental protection plan, organize and compile environmental function zoning plan and area and watershed pollution prevention plan and ecological conservation plan, and supervise the implementation; D. Participate in the compilation of the policies development plans of environmental protection industry; E. Be responsible for supervision and management of environmental protection area and ecological environmental construction project supervision and management; and organize plans and supervise the implementation of pollution control plan period; F. Develop the province's total pollutant discharge control program, be responsible for discharge application registration and permit management, and organize discharge fee collection and supervision work; G. Be responsible for administrative audit of environmental supervision and environmental protection; H. Organize the activities of international environmental protection treaties in the province; I. Be responsible for the international economic and technological cooperation and exchange activities of environmental protection; J. Deal relevant foreign environmental protection affairs according to the commission of the provincial government and etc. The environmental protection bureau of Gansu Province has an environmental impact assessment division specializing in the administrative work of environmental impact assessment of each project. (2) Department of Water Resources of Gansu Province The department of water resources of Gansu Province is responsible for the administration of the province's water and administrative law enforcement work, and the main responsibilities thereof include: A. Develop the strategies of provincial irrigation, hydropower and aquatic development, the plans of middle- and long-term water development, and the plans of middle- and long-term water supply of the whole province; B. Be responsible for organizing and compiling integrated river basin plan and professional plan; C. Organize the compilation, submission and approval works of front plan of key water conservancy and hydropower project, be responsible for organizing the review of the project proposal, feasibility study report and preliminary design of the province's water projects; D. Be responsible for the supervision and inspection of the plan and capital implementation and completion conditions of the water conservancy construction project; E. Organize review, submission and approval works for the application plan of the costs of flood control and drought protection, the cost of water conservancy construction and the water charges and other capitals; F. Research the regulation advices provided in water prices, taxes, fees and credit and etc.; G. Be responsible for organizing and guiding water resources and water environment protection works, organize water quality and water quantity monitoring and analysis work and dynamic monitoring work of groundwater and etc., organize the division of water

18 function zoning and discharge control to the drinking water area and etc., view the assimilative capacity and the setting of the discharge port of the water area, provide the advice of total discharge amount, and supervise the implementation; H. Be responsible for the safety supervision and management of reservoir, hydropower and dam; I. Develop the province's soil and water conservation policies and regulations, compile soil and water conservation plan and annual implementation plan, and organize the implementation; J. Organize and guide the province's comprehensive management work of water and soil conservation, be responsible for organizing the pre-project and construction management work for the soil and water conservation of a small watershed and the comprehensive treatment of a small area; K. Organize dynamic monitoring of the province's water loss and soil erosion, and regularly publish; L. Organize he compilation, approval, test and acceptance work of the soil and water conservation program of the project; M. Be responsible for the enforcement and supervision work of relevant regulations in the "Water and Soil Conservation Law". The department of water resources of Gansu Province has a water and soil conservation bureau which is responsible for the guidance and supervision work of the province's water and soil conservation. (3) Environmental Protection Bureau of Longnan City The environmental protection bureau of Longnan City is responsible for the administrative management and administrative law enforcement work of local environment protection, and the main responsibilities thereof include: A. Implement national environmental policies, laws, regulations, administrative rules and standards; B. Draft environmental regulations and administrative regulations in the region, and supervise implementation work; implement environmental impact assessment for the major economic and technological policies, development programs and major economic development plan in the region according to the commission of the regional administrative office; C. Develop environmental protection plan, organize the compilation of river basin pollution control plan and ecological conservation plan, and supervise the implementation work; D. Be responsible for supervising and managing the natural ecological environmental protection work in the jurisdiction and the environmental protection, supervision and management work of the construction project; E. Organize, develop and supervise the implementation of pollution control plan period; F. Develop a total discharge amount plan of the region, be responsible for the discharge application registration and license management, and organize and implement discharge fee collection and supervision work; G. Be responsible for environmental supervision and environmental protection administrative inspection, and be responsible for international economic and technological cooperation and exchange activities of environmental protection;

19 H. Handel the relevant environmental protection foreign affairs according to the commission of the local administrative office and etc. The environmental protection bureau of Longnan City generally has an environmental assessment management division (or pollution control division, regulatory division, natural ecology division), which is specifically responsible for the administrative management work of the local environmental impact assessment, and the main responsibilities of the division comprises: be responsible for the implementation of the environment impact assessment in the region and the unified supervision and management of the Three Meantime" system; implement national and regional laws, regulations, rules and policies about the environmental impact assessment and the Three Meantime" system; develop and implement environmental impact assessment and Three Meantime" and other regional laws, regulations and policies; supervise the implementation work; guide and supervise the environmental impact assessment approval work of the regional construction project; be responsible for the administrative license of environmental impact assessment documents of the construction project in the range of the local environment protection bureau; and be responsible for the administrative licensing and guidance of trial production (run) of the construction project in the right of the region and the completion environmental protection acceptance of the construction project and etc. (4) Department of Water Resources of Longnan City The department of water resources of Longnan City is responsible for the city's water administration and administrative law enforcement work, and the main responsibilities thereof include: A. Be responsible for organizing and compiling integrated river basin plan and professional plan; B. Be responsible for the supervision and inspection of the plan and capital implementation and completion conditions of the water conservancy construction project; C. Organize review, submission and approval works for the application plan of the costs of flood control and drought protection, the cost of water conservancy construction and the water charges and other capitals; D. Be responsible for organizing and guiding water resources and water environment protection works, organize water quality and water quantity monitoring and analysis work and dynamic monitoring work of groundwater and etc., organize the division of water function zoning and discharge control to the drinking water area and etc., view the assimilative capacity and the setting of the discharge port of the water area, provide the advice of total discharge amount, and supervise the implementation; E. Be responsible for the safety supervision and management of reservoir, hydropower and dam of the whole city; F. Organize and implement soil and water conservation policies and regulations, compile soil and water conservation plan and annual implementation plan. The department of water resources of Longnan City has a water conservation division, which is mainly responsible for organizing the implementation of regional water and soil conservation project plan, reviewing and reporting the work, and inspecting and supervising the soil and water conservation work of the whole region. (5) Environmental Protection Bureau of Cheng County

20 The environmental protection bureau of Cheng County of the project is responsible for the administrative management and administrative law enforcement work, and the main responsibilities thereof include: A. Implement national environmental policies, laws, regulations, administrative rules and standards; B. Develop the environmental protection plan of the county, and supervise the implementation work; C. Be responsible for supervising the natural ecological environment protection work in the jurisdiction and the environmental protection supervision and management of the construction project; D. Organize, develop and supervise the implementation of the development plan pollution sources within the specified period; E. Develop a total pollutant discharge amount control plan of the county, be responsible for discharge application registration and license management, and organize and implement discharge fee collection and supervision work; F. Be responsible for environmental supervision and environmental protection administrative inspection and etc. (6) Department of Water Resources of Cheng County The department of water resources of Cheng County of the project is responsible for water administrative management and administrative law enforcement of the county. The department of water resources of Cheng County has a soil and water conservation agency with the main responsibilities as follows: A. Develop the soil and water conservation plan and annual implementation plan of the county, and organize the implementation work; B. Organize the comprehensive management works of the county soil and water conservation; C. Organize the dynamic monitoring of water loss and soil erosion in the county, and regularly publish; D. Organize the compilation and implementation work of the soil and water conservation scheme of the construction project; E. Guide to the soil and water conservation work of the whole county; F. Monitor water loss and soil erosion, specifically soil erosion surveys, water loss and soil erosion monitoring report, water loss and soil erosion notice data providing, integrated control of water loss and soil erosion, benefits investigation and analysis, information system construction and management of soil and water conservation; G. Propagandize and implement personnel training of soil and water conservation. The administrative framework of environmental management of China (and the relevant part of the project) is shown in Figure Environmental Protection Bureau of Gansu Province Department of Water Resources of Gansu Province Environmental Protection Bureau of Longnan City Department of Water Resources of Longnan City People's Government of Cheng County

21 Relevant Institutions of Cheng County Government Department of Water Resources of Longnan City Water Source Engineering Construction Management Department of Moba Gorge for City Water Supply of Cheng County Figure administrative framework for environmental management of China

22 Environmental Management Plan for Cheng County Moba Gorge Water Source Engineering of Gansu Province 3. Project Description 3.1 Construction Objective of the Project The construction objectives of the project are as follows: construction of a reservoir with a total capacity of 1.79 million m3 and an utilizable capacity of 1.04 million m3 in Moba gorge, wherein the maximum daily water supply of the reservoir is 47,500 m3, the average annual water supply capacity is million m3, and the average daily water supply is 45,200 m3. So that the urban water supply contradiction can be solved, the water quality can be changed, the cost of water supply can be reduced, the sustainable economic and social development of Cheng County can be achieved, and the physical health of urban residents can be improved. 3.2 Implementation Schedule of the Project The total construction period of the project is 27 months, of which the construction preparation period is 11 months, the main construction period is 11 months, and the completion period of the project is 5 months. The preparation period of 6 months of the project is not included in the total construction period (1) Construction preparation period The construction preparation period is 11 months from the January of the first year to the November, the construction content of the contractors after entering into the field comprises field engineering, onsite traffic, construction tunnel, aggregate processing system, concrete mixing system, temporary housing and construction factories, diversion tunnel and excavation of dam abutments on the two banks which are implemented for the main construction project. The control project is the diversion tunnel which has over-current conditions in the October of the first year. (2) Main construction period The main construction period is 11 months from the December of the first to the October of the next year, i.e. from closure to concrete pouring of the dam, instillation of metal structure, and impletion of curtain grouting. The construction of the dam project is the control project in the main construction period. (3) Completion period of the project The completion period of the project is 5 months from the November of the second year to the March of the third year, and the content of the period comprises diversion tunnel closure, reservoir storage, and completion and acceptance. 3.3 Project Overview The project is a reservoir type project, and the characteristics are shown in Table Characteristics Table of the Project Table No. Name Unit Quantity Remark

23 I Hydrology 1 Basin area Whole basin km Over the dam site km Age limit of used hydrological system Year 51 Actual measurement, Average annual runoff of many years Ten 4352 thousand m3 4 Representative flow Average annual flow of many years m3/s 1.38 Normal use (design) of flood standard and m3/s 954 P=2% flow Abnormal use (check) of flood standards m3/s 1550 P=0.2% and flow Diversion standards and flow of diversion m3/s 544 P=10%, yearly tunnel m3/s 29.4 P=20%, October to May 5 Sediment Average amount of sediment suspended Ten sediment of many years thousand t Average sediment concentration of many kg/m years Annual sediment amount of annual average bed load of many years Ten thousand t 2.21 II Project overview 1 Reservoir Checked flood level m Designed flood level m Normal water level m Dead water level m Total storage capacity Ten 1790 thousand m3 Utilizable capacity Ten 1040 thousand m3 Dead storage Ten 380 thousand m3 The maximum discharge capacity while checking flood level m3/s 1410

24 The maximum discharge capacity while designing flood level m3/s Urban water supply Average annual water supply Ten 1651 thousand m3 Guaranteed rate of water supply % Water pipeline Length of the pipeline km 5.15 Number of the pipeline Pcs 0.65 Design water supply flow m3/s 0.65 Leakage loss rate % 10 III Flood damage and permanent area of the project 1 Backwater length km Submerged land hm Flooded forest hm Relocation of population People 14 5 Residents of flooded area Family 3 6 Important special facilities in flood affected 10kv line km Project area Mu Arable land thereof Mu IV Main building 1 Retaining building Type Ground characteristics Basic seismic intensity Degree 8 Crest height m Maximum dam height m 91.4 Crest length m Crest width m 10 2 Discharge structure 2.1 Crest overflowiring Ground characteristics Crest height m Net width of overflow section m 39 Energy dissipation form Designed flow discharge flow m3/s 462 Roller compacted concrete gravity dam Limestone Limestone Energy dissipation by trajectory jet

25 Checked flow discharge flow m3/s Flood discharge sand flushing hole Orifice size m 3.5x4.8 Hole length m 46.9 Maximum discharge capacity m3/s Road over the dam Length m 2810 Road width m 7 V Construction Open excavation of earthwork Ten thousand m3 Earthwork backfilling Ten 5.54 thousand m3 Rock hole dug Ten 2.31 thousand m3 Concrete Ten thousand m3 Installation of metal structure t Curtain grouting m 8580 Consolidation grouting m Number of major construction material Cement Ten 4.79 thousand t Fly ash Ten 2.66 thousand t Steel bar and steel material Ten thousand t Labor required Labor of construction period Day Construction labor and resource Power supply km 12 35kv, Cheng County 5 External transportation Distance km 5 Reconstruction of existing rural road 6 Construction diversion Mode Cofferdam retaining water Type Tunnel division Dimension of diversion tunnel (length x mxm 6x7.5 Type of gate hole

26 width) 7 Construction period Construction preparation period Month 11 Main construction period Month 11 Completion period Month 5 Total period Month 27 VI Economic Indicator 1 Static total investment Ten thousand Yuan Construction project Ten thousand Yuan Mechanical and electrical equipment and Ten installation thousand Yuan Metal structure equipment and installation Ten project thousand Yuan Temporary construction project Ten thousand Yuan Basic reserve fund Ten thousand Yuan Financing interest construction period Ten thousand Yuan Compensation cost of reservoir Ten inundation treatment thousand Yuan Acquisition cost of construction and construction site Ten thousand Yuan Environmental protect engineering cost Ten thousand Yuan Soil and water conservation cost Ten thousand Yuan Comprehensive Economic Indicator Net economic present value Ten thousand 7493

27 Yuan Internal economic rate of return % Ratio of economic benefit 1.22 Environmental Management Plan for Cheng County Moba Gorge Water Source Engineering of Gansu Province 4. Environmental Impact of the Project and Mitigation Measures Summary 4.1 Environmental Impact Assessment In the implementation process of environmental impact assessment, the layout of the project, the main environmental protection objectives in surrounding assessment range and the sensitive points are identified (see the Figure 4.1-1), the possible adverse environmental impacts caused by the project are as follows: Impact on the hydrology and sediment Hydrological changes Impact on regional water resource In the Cheng County Moba gorge water supply project, water is stored in a reservoir, wherein the normal water level of the reservoir is m, the total capacity is1.79 million m3, the backwater length is about 3.5 km, and the designed reference water is million m3/a. In running period, the downstream of the dam comprises a diversion effect river section of 4 km Ecological water of river and mitigation measures When the reservoir of Moba gorge is completed, the inflow of Nan River over the dam (the basin area is km2) is retained, and the mean runoff of many years is 1.22 million m3 when the reliability is 95%. The ecological water use of the river is calculated according to the Tennant method recommended by the Environmental Impact Assessment Specification of River Basin Planning, in which the ecological water use of Nan River is the minimum, namely about 10% of the annual average flow as the minimum use of ecological water, and according to the calculation of the method, the minimum ecological water use of Nan River is m3/s. Thus, the ecological water of the diversion effect river section is ensured, and the dam should be provided with permanent plug holes while construction. The plug hole should lower than the water inlet while higher than the flood discharge sand flushing port, specifically the elevation is 1024 m-1065 m, the discharge amount is m3/s, thereby ensuring the minimum ecological water use of the diversion effect river section Impact on the diversion effect river section Due to the abouchement of Nan River from the Fengquan River downstream the dam of 4 km, and the normally annual runoff of the Fengquan River is 2.06 million m3, it can be determined that the diversion effect river section is 4 km. The section comprises eight villages, i.e. Zhuanwancun, Ganlushi, Majiaya, Jianjiagou, Xiaozhuang, Zhangjiashan, Luangoumen and Niujiaya. Zhuanwancun comprises about 900 people or more, Ganlushi comprises about 1000 people or more, Majiaya comprises about 300 people or more, Jianjiagou comprises about 350 people or more, Xiaozhuang comprises about 250 people or more, Zhangjiashan comprises about 600 people or more, Luangoumen comprises

28 about 100 people or more, and Niujiaya comprises about 120 people or more. The water of the eight villages is mainly supplied from the local mountain spring and groundwater which are not the water in the river section, so that the impact of the project to the water source is controllable. The ecological water use can be ensured in case of the discharge flow ensured is m3/s. Erliang River Plantatio Forest Reservoir region Along the river Majiaya Jianjiago Xiaozhuangcun Zhangjiasha Zhuanwancun Luangoumen Niujiaya Ganlushi Legend Sensitive point Dam Scale Figure Location Diagram of Sensitive Points of the Project Impact on Sediment Load and Mitigation Measures The factor impacts the bedload sediment is more. According to the current technology and the test means and equipment thereof, the accuracy of the test data is not high, the relation of push and suspension ratio of the sediment to the various hydrological factors is bad. In the project, the bedload sediment of the region is designed to the 15% of the suspended load sediment by combining with the general relation of the mountain stream

Three Gorges Project. A Project with Tremendous Benefits and in Favour of Environmental Improvement. By Cao Guangjing May 22, 2004

Three Gorges Project. A Project with Tremendous Benefits and in Favour of Environmental Improvement. By Cao Guangjing May 22, 2004 Three Gorges Project A Project with Tremendous Benefits and in Favour of Environmental Improvement By Cao Guangjing May 22, 2004 Contents 1. Brief Introduction 2. Why Should TGP Be Built? 3. Investment

More information

Water and Waste Water Management in Yangon, Myanmar

Water and Waste Water Management in Yangon, Myanmar Union of Myanmar Ministry of Agriculture and Irrigation Irrigation Department Water and Waste Water Management in Yangon, Myanmar Mu Mu Than Staff Officer, Irrigation Department Myanmar March,2010 Socio-economical

More information

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES Nova Scotia Environment and Labour CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES Approval Date: October 24, 1997 Effective Date: October 24, 1997 Approved By: Peter Underwood Version Control:

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

4.0 SAN GABRIEL RIVER WATERSHED MANAGEMENT AREA

4.0 SAN GABRIEL RIVER WATERSHED MANAGEMENT AREA 4.0 SAN GABRIEL RIVER WATERSHED MANAGEMENT AREA 4.1 Watershed Description 4.1.1 Watershed Land Use, Percent Impervious, and Population Land use in the San Gabriel River Watershed Management Area is approximately

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Guangdong Provincial Green Freight Demonstration Project by Grant of GEF

Guangdong Provincial Green Freight Demonstration Project by Grant of GEF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Grant Project of Global Environment Facility (GEF) Guangdong Provincial Green Freight

More information

INCHEM Tokyo Current Status and Implementation Approach for Industrial Zones Wastewater Management In Yangon Region

INCHEM Tokyo Current Status and Implementation Approach for Industrial Zones Wastewater Management In Yangon Region INCHEM Tokyo 2017 Current Status and Implementation Approach for Industrial Zones Wastewater Management In Yangon Region Than Than Thwe Director, Ministry of Construction Joint Secretary-1, Thilawa SEZ

More information

The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc

The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc Dubrovnik, 07 October 2009 Structure of Presentation 1. A Bit

More information

Reconstruction Project for CDQ Clean Production on 4.3m Coke Oven in Coking Plant Environmental Impact Assessment Report (Final version)

Reconstruction Project for CDQ Clean Production on 4.3m Coke Oven in Coking Plant Environmental Impact Assessment Report (Final version) Reconstruction Project for CDQ Cleaner Production on 4.3m Coke Oven in Coking Plant, Guangdong SGIS Songshan Co., Ltd. Guangdong SGIS Songshan Co., Ltd. Reconstruction Project for CDQ Clean Production

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

Briefing Summary. Board Meeting on Nam Theun 2 Project: November 22, 2010

Briefing Summary. Board Meeting on Nam Theun 2 Project: November 22, 2010 Board Meeting on Nam Theun 2 Project: Briefing Summary November 22, 2010 Introduction The World Bank and Asian Development Bank (ADB) circulated a written Update on project progress to their respective

More information

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University. 13. 6C-21.208 CONSERVATION ELEMENT Information Sources George F. Young, Interview notes, June 2002 Sasaki Associates, Inc., interview notes, April, 2000 Interviews between DRMP Staff and USF Staff, May,

More information

Newmont Mining Corporation Water Management Standard

Newmont Mining Corporation Water Management Standard Page No: Page 1 of 5 1 PURPOSE AND OBJECTIVES This Global Standard sets the minimum Newmont requirements to proactively plan and manage water from exploration to post-closure in accordance with Newmont

More information

CHINA UPDATE NATIONAL SOIL POLLUTION PREVENTION ACTION PLAN OCTOBER 2016

CHINA UPDATE NATIONAL SOIL POLLUTION PREVENTION ACTION PLAN OCTOBER 2016 CHINA UPDATE OCTOBER 2016 1 NATIONAL SOIL POLLUTION PREVENTION ACTION PLAN 2 NATIONAL CATALOGUE OF HAZARDOUS WASTE 3 IMPACT ASSESSMENT LAW (2016 REVISION) 4 OCCUPATIONAL DISEASE PREVENTION AND CONTROL

More information

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) 1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) The national water legislative framework in the Republic of Macedonia is comprehensive and regulates, from different perspectives,

More information

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project ABSTRACT & POWERPOINT PRESENTATION Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project Tim Smith Principal Engineer Helix Water District La Mesa,

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE DETAILING THE IMPLEMENTATION OF A NUMBER OF ARTICLES

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

Municipal Stormwater Management Planning

Municipal Stormwater Management Planning Municipal Stormwater Management Planning Christopher C. Obropta, Ph.D., P.E. Water Resources Extension Specialist with Rutgers Cooperative Extension Assistant Professor with Department of Environmental

More information

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT WATER QUALITY ASSESSMENT OF Salmon River AT SALMON ARM (1985 24) Prepared by: L. G. Swain, P. Eng. B.C. Ministry of Environment Prepared for:

More information

China s Ecological compensation policy

China s Ecological compensation policy China s Ecological compensation policy Contents 1. Background of eco-compensation in China 2. Progress of eco-compensation in China 3. Characteristics of eco-compensation in China 1. Background of China

More information

Hydrology and Water Quality. Water. Water 9/13/2016. Molecular Water a great solvent. Molecular Water

Hydrology and Water Quality. Water. Water 9/13/2016. Molecular Water a great solvent. Molecular Water Hydrology and Water Quality Water Molecular Water Exists as an equilibrium But equilibrium altered by what is dissolved in it Water Molecular Water a great solvent In reality, water in the environment

More information

Session: For more information:

Session: For more information: Session: For more information: www.hydropower.org/congress General Institute of Water Resources and Hydropower Planning and Design, Ministry of Water Resource Regulation of Downstream Flows in China Li

More information

4.05. Groundwater Program. Chapter 4 Section. Background. Follow-up to VFM Section 3.05, 2004 Annual Report. Ministry of the Environment

4.05. Groundwater Program. Chapter 4 Section. Background. Follow-up to VFM Section 3.05, 2004 Annual Report. Ministry of the Environment Chapter 4 Section 4.05 Ministry of the Environment Groundwater Program Follow-up to VFM Section 3.05, 2004 Annual Report Chapter 4 Follow-up Section 4.05 Background Groundwater is defined as water located

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan 1.Name of the Project Country: The Republic of Indonesia Project: Upper Citarum Basin Flood Management Sector Loan Loan Agreement: March 28,

More information

Manitoba Water Quality Standards, Objectives, and Guidelines Dwight Williamson, Manager Water Quality Management Section Manitoba Conservation

Manitoba Water Quality Standards, Objectives, and Guidelines Dwight Williamson, Manager Water Quality Management Section Manitoba Conservation Manitoba Water Quality Standards, Objectives, and Guidelines 2002 Dwight Williamson, Manager Water Quality Management Section Manitoba Conservation 1 Outline Brief history Review process Overview of proposed

More information

What Determines water Quality? Well Maintenance Well water Testing AZ survey on individual systems water quality Final remarks

What Determines water Quality? Well Maintenance Well water Testing AZ survey on individual systems water quality Final remarks Private Water Wells 1# 1 Overview Numbers Regulations What Determines water Quality? Well Maintenance Well water Testing AZ survey on individual systems water quality Final remarks Private Wells In AZ

More information

Discipline Chemical Testing Issue Date Certificate Number T-3553 Valid Until Last Amended on - Page 1 of 9

Discipline Chemical Testing Issue Date Certificate Number T-3553 Valid Until Last Amended on - Page 1 of 9 Last Amended on - Page 1 of 9 I. ORES & MINERALS 1. Iron Ore Total Iron IS 1493: 1981 (RA 2006) 10 % to 70 % Silicon IS 1493: 1981 (RA 2006) 0.5 % to 25 % Aluminum IS 1493: 1981 (RA 2006) 0.5 % to 20 %

More information

Introduction. General Description

Introduction. General Description Introduction General Description The 3-Gorges project is a vitally important and backbone project in the development and harnessing of the Yangtze River (Changjiang River). The dam site is situated at

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

Background, Pattern and Policy of China for Developing Circular Economy

Background, Pattern and Policy of China for Developing Circular Economy Background, Pattern and Policy of China for Developing Circular Economy Zhu Dajian Research Institute of Governance for Sustainable Development under Tongji University, 200092 Shanghai, China Abstract:

More information

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana Last Amended on - Page 1 of 7 I. AIR, GASES & ATMOSPHERE 1. Ambient Air Monitoring RSPM ( PM 10) IS 5182 (Part 23): 2006 (RA ) 5 µg/m 3 to 750 µg/m 3 PM 2.5 SOP 11 dated 17.11.2014 12.5 µg/m 3 to 500 µg/m

More information

ALMY POND TMDL MANAGEMENT PLAN

ALMY POND TMDL MANAGEMENT PLAN ALMY POND TMDL MANAGEMENT PLAN PUBLIC WORKSHOP Presented by: City of Newport Department of Utilities And Pare Corporation May 7, 2014 Presentation Overview Introduction to Almy Pond Project Introduction

More information

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water The diversion works for the Cua Dat CFRD in Vietnam Michel Ho Ta Khanh, Dinh Sy Quat, Prof Pham Hong Giang VNCOLD No 95/10 Chua Boc Street Dong Da District Hanoi Vietnam Abstract The Cua Dat CFRD is constructed

More information

LABORATORY TURNAROUND TIMES AND CHARGES

LABORATORY TURNAROUND TIMES AND CHARGES LABORATORY TURNAROUND TIMES AND CHARGES The enclosed prices reflect a 5 business day turnaround time. There will be a $25.00 minimum charge per report. Same Day Rush 24 Hour Rush 48 Hour Rush 72 Hour Rush

More information

Unofficial Translation. The Prime Ministerial Decree on The Organization and Functionalities of the Ministry of Agriculture and Forestry

Unofficial Translation. The Prime Ministerial Decree on The Organization and Functionalities of the Ministry of Agriculture and Forestry The Prime Minister Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity ------xxxx00000xxxx------ No.99/PM Vientiane Capital, dated 09.03.2017 The Prime Ministerial Decree on

More information

Water Security Agency. Plan for saskatchewan.ca

Water Security Agency. Plan for saskatchewan.ca Water Security Agency Plan for 2016-17 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 8 Financial Summary...

More information

Laos Country Report on Environmental Management in the Lao PDR Mining Sector. International Conference A Greater Mekong?

Laos Country Report on Environmental Management in the Lao PDR Mining Sector. International Conference A Greater Mekong? Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Laos Country Report on Environmental Management in the Lao PDR Mining Sector International Conference A Greater Mekong? Poverty,

More information

Questionnaire (Wood Processing)

Questionnaire (Wood Processing) Questionnaire (Wood Processing) QUESTIONNAIRE FOR WOOD PROCESSING (SECTOR-RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant questions as completely

More information

Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living

Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living organisms that inhabit a geographic area and depend on it

More information

Notification of Department of Industrial Works

Notification of Department of Industrial Works tification of Department of Industrial Works Subject: Type or category of factory required to prepare a report of type and quantity of pollutants discharged from a factory B.E. 2553 (2010) It is deemed

More information

CONSUMER CONFIDENCE REPORT

CONSUMER CONFIDENCE REPORT City of Amboy 2014 Drinking Water Report The City of Amboy is issuing the results of monitoring done on its drinking water for the period from January 1 to December 31, 2014. The purpose of this report

More information

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning) Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

EMERGENCY STORAGE PROJECT San Vicente Pipeline and San Vicente Dam Raise Update Presentation Summary

EMERGENCY STORAGE PROJECT San Vicente Pipeline and San Vicente Dam Raise Update Presentation Summary EMERGENCY STORAGE PROJECT San Vicente Pipeline and San Vicente Dam Raise Update Presentation Summary DATE: Nov. 2, 2005 EVENT: MEETING LOCATION: PRESENTER(S): STAFF RESOURCES: TIME: 7:30 p.m. Lakeside

More information

Earth s Pools of Water What is the residence time of these pools?

Earth s Pools of Water What is the residence time of these pools? (1) The Hydrologic Cycle What are the major pools (reservoirs) of water on EARTH? More than enough water on our planet to sustain life. Why then do we have water shortages? And, why are we concerned about

More information

Annual Drinking Water Quality Report 2015 MINERAL WELLS PSD 53 Fox Run Dr. Mineral Wells WV, PWS# WV June 13, 2016

Annual Drinking Water Quality Report 2015 MINERAL WELLS PSD 53 Fox Run Dr. Mineral Wells WV, PWS# WV June 13, 2016 Why am I receiving this report? Drinking Water Quality Report 2015 MINERAL WELLS PSD 53 Fox Run Dr. Mineral Wells WV, 26150 PWS# WV3305405 June 13, 2016 In compliance with the Safe Drinking Water Act Amendments,

More information

STREAM AND BUFFER AREA PROTECTION/RESTORATION

STREAM AND BUFFER AREA PROTECTION/RESTORATION STREAM AND BUFFER AREA PROTECTION/RESTORATION AMENDMENT OPTIONS TO STRENGTHEN POLICY IN HEADWATERS AREAS DRAFT SUBSEQUENT TO THE JANUARY 25, 2007 MEETING OF THE PLANNING COMMISSION ENVIRONMENT COMMITTEE

More information

Water Quality Monitoring Report. Tom Ash Assistant Director Water Management Division October 16, 2014

Water Quality Monitoring Report. Tom Ash Assistant Director Water Management Division October 16, 2014 Water Quality Monitoring Report Tom Ash Assistant Director Water Management Division October 16, 2014 basic to any approach toward protections of the aquatic environment in the Tampa Bay area would be

More information

WATERSHED. Maitland Valley. Report Card 201

WATERSHED. Maitland Valley. Report Card 201 Maitland Valley WATERSHED Report Card 201 The Maitland Valley Conservation Authority has prepared this report card as a summary on the state of our forests, wetlands, surface water, and ground water resources.

More information

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW HOUSE BILL 609

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW HOUSE BILL 609 GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW 2011-374 HOUSE BILL 609 AN ACT TO PROMOTE THE DEVELOPMENT OF WATER SUPPLY RESERVOIRS AND OTHER WATER SUPPLY RESOURCES, TO PROVIDE THAT FUNDS

More information

Hydropower and Water Resources

Hydropower and Water Resources Hydropower and Water Resources Hydropower and Water Resources The development, planning, design, and construction of hydropower as well as large-scale irrigation schemes and special hydraulic structures

More information

RURAL WATER SUPPLY IN CHINA

RURAL WATER SUPPLY IN CHINA RURAL WATER SUPPLY RURAL WATER SUPPLY IN CHINA MINISTRY OF WATER RESOURCES, PEOPLE'S REPUBLIC OF CHINA Ministry of Water Resources, People s Republic of China Address: No. 2, Lane 2, Baiguang Road, Xicheng

More information

Careers List Professional Careers in Construction

Careers List Professional Careers in Construction Careers List Professional Careers in Construction Architect Designs buildings, including the preparation of detailed construction drawings and specifications, and advises on their construction. May specialize

More information

LABORATORY ACTIONS, DECISIONS & SAFETY WITHIN THE EUROPEAN UNION

LABORATORY ACTIONS, DECISIONS & SAFETY WITHIN THE EUROPEAN UNION LABORATORY ACTIONS, DECISIONS & SAFETY WITHIN THE EUROPEAN UNION Kardzhali,, 7-9 7 9 December 2012 Research Center Environment and Health-Regional Health inspectorate George Papageorgiou Chemical Analyst

More information

Warm Mineral Springs Sampling by Sarasota County

Warm Mineral Springs Sampling by Sarasota County Warm Mineral Springs Sampling by Sarasota County John Ryan, Kathryn Meaux, Rene Janneman and Jon S. Perry Sarasota County Environmental Services Sarasota, Florida September 11 Warm Mineral Springs is a

More information

Final Report DMR-QA 36. NPDES Permit: IL DMR-QA Study. Open Date: 03/18/16. Close Date: 07/01/16. Report Issued Date: 07/29/16

Final Report DMR-QA 36. NPDES Permit: IL DMR-QA Study. Open Date: 03/18/16. Close Date: 07/01/16. Report Issued Date: 07/29/16 Keith Richard Decatur Sanitary District Decatur, IL 62522-1842 USA DMR-QA 36 Final Report NPDES Permit: IL0028321 DMR-QA Study Open Date: 03/18/16 Close Date: 07/01/16 Report Issued Date: 07/29/16 Study

More information

7 Frame of Environmental Impact Assessment. 7.1 Outline of Project

7 Frame of Environmental Impact Assessment. 7.1 Outline of Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 7 Frame of Environmental Impact Assessment 7.1 Outline of Project The subprojects of

More information

Maintaining healthy rivers and lakes through water diversion from Yangtze River to Taihu Lake in Taihu Basin

Maintaining healthy rivers and lakes through water diversion from Yangtze River to Taihu Lake in Taihu Basin Water Science and Engineering, Sep. 2008, Vol. 1, No. 3, 36-43 ISSN 1674-2370, http://kkb.hhu.edu.cn, e-mail: wse@hhu.edu.cn Maintaining healthy rivers and lakes through water diversion from Yangtze River

More information

The Mekong River Report Card on Water Quality ( )

The Mekong River Report Card on Water Quality ( ) The Mekong River Report Card on Water Quality (2000-2006) Volume 1: September 2008 Mekong River Commission Background The water resources of the Mekong River support the livelihoods of most of the 60 million

More information

Chapter 16 Minerals: A Nonrenewable Resource

Chapter 16 Minerals: A Nonrenewable Resource Lecture Outline: Chapter 16 Minerals: A Nonrenewable Resource I. Introduction to Minerals A. Minerals are elements or compounds of elements that occur naturally in Earth s crust and have precise chemical

More information

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA Overview Romania has built 2,617 dams out of which 246 are large and medium dams and 1260 are small dams, as per

More information

Micro Methods Laboratory Quality Assurance Manual

Micro Methods Laboratory Quality Assurance Manual 15.2 List of Approved Methods Petroleum Analysis Methodology Reference Table Method ASTM 977 ASTM C25 ASTM C39 ASTM D129 ASTM D1298 ASTM D156 ASTM D1744 ASTM D189 ASTM D2159 ASTM D2270 ASTM D2276 ASTM

More information

These potential changes and their implications are outlined in Annex 1.

These potential changes and their implications are outlined in Annex 1. Guidance Note Hydropower Guidance Note: This Guidance Note has been prepared by Natural Resources Wales (NRW) to provide applicants for abstraction and impoundment licences for hydropower schemes with

More information

The Ideas of the Development of a Circular Economy in the "Twelfth Five-Year " Plan of China

The Ideas of the Development of a Circular Economy in the Twelfth Five-Year  Plan of China 3R Policy and Technology Development in China for Circular Economy: The Ideas of the Development of a Circular Economy in the "Twelfth Five-Year " Plan of China Guo Qimin Circular Economy Development Division,

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION Date: June 12, 2014 To: From: Subject: Governor s Office of Planning and Research/State Clearinghouse Unit, Responsible Agencies, Trustee Agencies, and Interested Parties Announcement

More information

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines Howard J. Hayes, Program Administrator April 2011 What is a mine? Nonphosphate mine: Subsections

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

Land Application of Biosolids Rules, Regulations and Benefits EPA regulations, under Title 40 Code of Federal Regulations Part 503 (40 CFR 503) -

Land Application of Biosolids Rules, Regulations and Benefits EPA regulations, under Title 40 Code of Federal Regulations Part 503 (40 CFR 503) - Land Application of Biosolids Rules, Regulations and Benefits Biosolids are frequently used for land application on cropland, pastures or timberland, where they decompose and furnish N-nitrogen, P- phosphorus

More information

Annual Drinking Water Quality Report 2016 Ripley Water Works 108 South Street Ripley, WV PWSID# January 30, 2017

Annual Drinking Water Quality Report 2016 Ripley Water Works 108 South Street Ripley, WV PWSID# January 30, 2017 Why am I receiving this report? Annual Drinking Water Quality Report 2016 Ripley Water Works 108 South Street Ripley, WV 25271 PWSID#3301811 January 30, 2017 In compliance with the Safe Drinking Water

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

Annual Drinking Water Quality Report. Washington City 2015

Annual Drinking Water Quality Report. Washington City 2015 Annual Drinking Water Quality Report Washington City 2015 We're pleased to present to you this year's Annual Drinking Water Quality Report. This report is designed to inform you about the quality of the

More information

Available online at ScienceDirect. Procedia Engineering 154 (2016 )

Available online at  ScienceDirect. Procedia Engineering 154 (2016 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 154 (2016 ) 326 333 12th International Conference on Hydroinformatics, HIC 2016 Water Resources Monitoring System Construction

More information

Environment Management Plan

Environment Management Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized World Bank Financed Project New Countyside Project in Yellow Mountain Anhui P. R. China

More information

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced

More information

Information for File # PRH

Information for File # PRH Information for File # 2016-02602-PRH Applicant Corps Contact Tom Morley Paul Hauser Address 152 Baker Drive, Redwood Falls, MN 56283 E-Mail Paul.R.Hauser@usace.army.mil Phone 651-290-5357 Primary County

More information

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination WATER ELEMENT INTRODUCTION Water is one of the most critical resources for the Merced County economy and for the quality of life of its residents. Both surface water and groundwater supplies are an important

More information

REGULATIONS OF ENVIRONMENTAL MANAGEMENT OF THE CONSTRUCTION PROJECTS Dr. Pham Van Bo Vice president Academy of Managers for Construction and Cities Ministry of Construction - Vietnam List of abbreviations

More information

YEŞİL ENERJİ ELEKTRİK ÜRETİM SAN. TİC. A.Ş. POYRAZ HYDROELECTRIC POWER PLANT (HEPP)

YEŞİL ENERJİ ELEKTRİK ÜRETİM SAN. TİC. A.Ş. POYRAZ HYDROELECTRIC POWER PLANT (HEPP) YEŞİL ENERJİ ELEKTRİK ÜRETİM SAN. TİC. A.Ş. POYRAZ HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Kahramanmaras Province, Andirin District PROJECT SPECIFIC ASPECTS FOR RENEWABLE ENERGY

More information

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017 Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach October 2017 (Simulated FPF) INTRODUCTION Noront is proposing to develop a Ferrochrome Production Facility (FPF) in Northern

More information

Susan P. Abano Engineer IV Policy and Program Division

Susan P. Abano Engineer IV Policy and Program Division National Water Resources Board Integrated Water Resources Management Susan P. Abano Engineer IV Policy and Program Division National Water Resources Board Outline Philippines Water Resources Situationer

More information

2016 Water Quality Report to Consumers

2016 Water Quality Report to Consumers 2016 Water Quality Report to Consumers Is Our Water Safe To Drink? Absolutely! Ascension Consolidated Utilities District #2 is proud of the fine drinking water it provides. This 19th annual water quality

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

For more information regarding this report contact: Jim Keenan, Chairperson, Water and Sewer Committee, or

For more information regarding this report contact: Jim Keenan, Chairperson, Water and Sewer Committee, or Consumer Confidence Report from the Illinois Environmental Protection Agency (IEPA) Annual Drinking Water Quality Report for the Bayles Lake Lot Owners (Homeowners) Association Public Water System IL0755110

More information

No. 33 [2010] of the General Office of the State Council

No. 33 [2010] of the General Office of the State Council Notice of the General Office of the State Council about Forwarding Guiding Opinions on Pushing Forward the Joint Prevention and Control of Atmospheric Pollution to Improve the Regional Air Quality Developed

More information

Drinking Water Analyses

Drinking Water Analyses Environmental & Analytical Services 350 Hills Street, Suite 107, Richland, WA 99354 (509) 377-8058 FAX (509) 377-8464 ANALYSES AND PRICE LIST, JANUARY 2016 TO DECEMBER 2016 Drinking Water Analyses BACTERIOLOGICAL

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/21/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

CHAPTER 4 MINIMUM DESIGN CRITERIA

CHAPTER 4 MINIMUM DESIGN CRITERIA 4.1 INTRODUCTION CHAPTER 4 MINIMUM DESIGN CRITERIA Establishing realistic design criteria is paramount to evaluation of the existing water system s adequacy and planning for future water system improvements.

More information

Chen Kelin April 2013

Chen Kelin April 2013 Wetlands Conservation in China Chen Kelin April 2013 Main Contents Status Achievements Threats and challenges Future actions Area of Wetlands in China Total area of wetlands = 38.5 million ha Natural wetlands

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

Water Resources on PEI: an overview and brief discussion of challenges

Water Resources on PEI: an overview and brief discussion of challenges Water Resources on PEI: an overview and brief discussion of challenges Components: Components and links Atmospheric water Surface water (including glacial water) Groundwater Links: Precipitation (atm(

More information

Wetland Restoration Study in China. Institute of Wetland Research, CAF

Wetland Restoration Study in China. Institute of Wetland Research, CAF Wetland Restoration Study in China Contents Characteristics of wetlands and its threatens in China National policies and plans related to wetland restoration Wetland Restoration Study: Habitat Function

More information

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Full title of the Project The Study on Integrated Development Strategy for Danang City and Its Neighboring

More information

SCHEDULE I LIST I GENERAL STANDARDS AND CRITERIA FOR THE DISCHARGE OF INDUSTRIAL EFFLUENTS INTO INLAND SURFACE WATERS

SCHEDULE I LIST I GENERAL STANDARDS AND CRITERIA FOR THE DISCHARGE OF INDUSTRIAL EFFLUENTS INTO INLAND SURFACE WATERS SCHEDULE I LIST I GENERAL STANDARDS AND CRITERIA FOR THE DISCHARGE OF INDUSTRIAL EFFLUENTS INTO INLAND SURFACE WATERS UNIT TOLERANCE LIMIT NO. PARAMETER TYPE OF LIMIT VALUES 01 Total suspended solids mg/1,

More information