1 DIN Annotated Outline Draft Environmental Impact Statement Durham-Orange Light Rail Transit Project December 2013

2

3 Table of Contents Executive Summary... E-1 1. Purpose and Need Problem Statement Corridor Description Needs of the D-O Corridor Goals and Objectives Alternatives Considered No-Build Alternative Build Alternative TSM Transportation Regional Travel Patterns Public Transportation Roadways Parking Freight and Passenger Rail Airports Bicycle and Pedestrian Facilities Affected Environment and Environmental Consequences Land Use, Public Policy, and Zoning Socio-Economic and Demographic Conditions Neighborhoods, Community Services, and Community Facilities Visual and Aesthetic Considerations Cultural, Historic, and Archaeological Resources Public Parkland and Recreational Areas Natural Resources and Ecosystems Water Quality and Hydrology Soils and Farmlands Air Quality and Greenhouse Gases Noise and Vibration Hazardous, Contaminated, and Regulated Materials Durham-Orange Light Rail Transit Project December 2013 i DRAFT

4 4.13 Safety and Security Energy Use Climate Change and Adaptation Planning Acquisitions, Relocations, and Displacements Utility Impacts Environmental Justice, Limited English Proficiency, and Title VI Construction Impacts Secondary and Cumulative Effects Resources Considered Section 4(f) Financial Analysis Capital Costs Operating and Maintenance Costs Evaluation of Alternatives Public Involvement and Agency Coordination List of Tables Table 1: D-O Corridor Goals and Objectives... 2 List of Figures Figure 1: D-O LRT Alternatives to be Evaluated in the DEIS... 5 Figure 2: TSM Alignment and Stop Locations... 6 Appendices Appendices... A-1 Durham-Orange Light Rail Transit Project December 2013 ii DRAFT

5 Executive Summary This chapter will present a summary of the Durham-Orange Light Rail Transit Project (D-O LRT) Draft Environmental Impact Statement (DEIS). It will describe the draft Purpose and Need of the proposed project, the alternatives under study, will summarize the environmental consequences associated with the studied alternatives, will summarize major impacts of the alternatives, will provide summaries of proposed mitigation measures, and will outline the steps for the selection of a preferred alternative. This chapter will also summarize the coordination with the public and federal and state agencies. Durham-Orange Light Rail Transit Project December 2013 E-1 DRAFT

6

7 1. Purpose and Need 1.1 Problem Statement Travel between Chapel Hill and Durham is becoming increasingly difficult as more and more people move to the Triangle region. High growth rates in the Triangle are expected to continue over the next twenty years, adding to the strain on the transportation network. As traffic congestion increases, the reliability of the existing transportation network decreases. For some time, local leaders and transportation planners have recognized the need for predictable and dependable alternatives to driving in the congested corridor between Chapel Hill and Durham, two of the Triangle region s most prominent municipalities. 1.2 Corridor Description The Durham-Orange (D-O) Corridor extends roughly 17 miles from southwest Chapel Hill to east Durham. The D-O Corridor includes several key activity centers, which generate a large number of trips each day. These activity centers include a number of higher education institutions (University of North Carolina at Chapel Hill [UNC], Duke University, North Carolina Central University [NCCU], Durham Technical Community College [DTCC]), major medical facilities (UNC Hospitals, Durham Veterans Affairs [VA] Medical Center, Duke University Medical Center), and employment centers (e.g., Patterson Place, South Square, downtown Durham). The D-O Corridor accounts for approximately 28 percent of the jobs in Durham and Orange Counties. Employment in the D-O Corridor is expected to increase by more than 60 percent from 2010 to 2040, and the population is expected to double during the same time period. 1.3 Needs of the D-O Corridor D-O Corridor residents and their elected officials have identified four core needs that a transit project in the D-O Corridor should address to support the purpose of the project. Those core needs are as follows: Serve diverse populations with a high propensity for transit use by providing convenient and accessible transit service for the large and growing numbers of university students and employees, visitors to renowned medical centers, a broad labor force of entrepreneurs, creative class members, moderate and low-income residents, thriving numbers of active seniors, vibrant minority and immigrant communities, limited-english speaking populations, and environmental justice-protected populations throughout the D-O Corridor. Enhance mobility within the Triangle region by providing a competitive and reliable alternative to congested roadways. Expand transit options for residents and visitors between Durham and Chapel Hill to seamlessly serve the many popular destinations and major activity centers.; and, Foster compact development along the high-capacity transportation network to sustainably support local land use plans and long-term economic development through planned growth management initiatives and continued environmental stewardship. 1.4 Goals and Objectives D-O Corridor residents and their elected officials also identified a set of goals and objectives to measure the alternatives ability to meet the project s purpose and needs (see Table 1). Durham-Orange Light Rail Transit Project December DRAFT

8 Table 1: D-O Corridor Goals and Objectives Goals Goal 1: Improve mobility through and within the D-O Corridor. Goal 2: Increase transit efficiency and quality of service within the D-O Corridor. Goal 3: Improve transit connections within the D-O Corridor. Goal 4: Support local and regional economic development and planned growth management initiatives within the D-O Corridor. Goal 5: Foster environmental stewardship within the D-O Corridor. Goal 6: Provide a cost-effective transit investment within the D-O Corridor. Objectives Minimize future vehicular congestion. Provide a competitive and reliable option to auto use. Serve regional trips as well as trips between and within major activity centers. Maintain or improve travel times between existing and planned activity centers. Provide convenient and accessible transit services for employment and non-employment trips. Improve and expand transit access for transit-dependent persons. Complement existing and planned transportation systems, plans, and infrastructure. Develop a seamless interface with local and regional transit systems. Develop transit investments that help focus sustainable development near activity centers. Maximize the potential for long-term economic development consistent with regional and local plans and policies. Minimize adverse impacts to the natural and built environment. Utilize and enhance existing and underutilized transportation rights-of-way. Maintain or improve regional and corridor air quality. Maximize capital and operating cost-effectiveness and efficiency. Meet Federal Transit Administration (FTA) cost-effectiveness standards. Durham-Orange Light Rail Transit Project December DRAFT

9 2. Alternatives Considered This chapter will identify the reasonable alternatives considered throughout the planning process as a means to meet the objectives of the Purpose and Need defined in Chapter 1. Chapter 2 will summarize the history of transit corridors studied in the Triangle region and the identification of the D-O Corridor as the priority transit corridor evaluated in the Alternatives Analysis (AA). This chapter will also describe the public and agency involvement efforts through the previous planning work. Based on FTA guidance, the alternatives evaluated in the AA for the D-O Corridor included No-Build, Transportation System Management (TSM), and Build Alternatives comprised of various alignments and transit technologies including, but not limited to, bus rapid transit (BRT) and light rail transit (LRT). The Draft Environmental Impact Statement (DEIS) will include the development and analysis of the three primary alternatives between UNC Hospitals and east Durham. 2.1 No-Build Alternative In the National Environmental Policy Act (NEPA) process, the No Build Alternative is used as a starting point to provide a comparison of all Build Alternatives in terms of costs, benefits, and impacts. The No Build Alternative includes all highway and transit facilities that are likely to exist in 2040 based on the fiscally-constrained 2040 Long Range Transportation Plan (LRTP) and the Durham County and Orange County Bus and Rail Investment Plans. However, the No-Build Alternative excludes the rail transit network, which includes the D-O LRT Build Alternative The Build Alternative consists of LRT on a new fixed-guideway rail alignment and support facilities. This alternative represents the Locally Preferred Alternative (LPA) as currently proposed. a. 17 stations are proposed; refinements to station locations, layouts, and designs will occur during the DEIS phase of the project. b. Potential Rail Operation and Maintenance Facility (ROMF) sites will be addressed. Four sites for the LRT ROMF were identified in the AA: Leigh Village, Farrington, Patterson, and Cornwallis. A fifth potential ROMF site, Alston, was added based on comments received during scoping. All of the LRT ROMF alternatives will be evaluated in the DEIS phase of the project. The proposed LPA would result in impacts to environmental resources including, but not limited to, streams, wetlands, natural resources (significant natural heritage areas and wildlife habitats), floodplains, and federal lands (including those managed for wildlife). Alternative alignment options 1 DCHC MPO 2040 MTP, Durham County Bus and Rail Investment Plan, Orange County Bus and Rail Investment Plan and appendices, Durham-Orange Light Rail Transit Project December DRAFT

10 avoiding or minimizing impacts to these resources will be developed and described in this section of the DEIS. The DEIS will address both alignment and station alternatives for crossing Little Creek and US Army Corps of Engineers (USACE) property in the vicinity of Alternatives C1, C1A, C2, C2A, including alignment options along NC 54. Alternatives for the proposed crossing of New Hope Creek and Sandy Creek, including alignment options along US 15/501 (Figure 1), will also be studied. 2.3 TSM The TSM Alternative consists of an enhanced bus network that provides a level of transit service roughly equivalent to that of a fixed-guideway transit service (Figure 2). TSM was advanced from the AA process and was identified as an alternative during the project scoping process prior to the implementation of Map-21. While the TSM is no longer required to be included as a baseline alternative to which other alternatives will be compared, it will nevertheless be addressed in the DEIS since it was included in the project scoping process. Durham-Orange Light Rail Transit Project December DRAFT

11 Figure 1: D-O LRT Alternatives to be Evaluated in the DEIS Durham-Orange Light Rail Transit Project December DRAFT

12 Figure 2: TSM Alignment and Stop Locations Durham-Orange Light Rail Transit Project December DRAFT

13 3. Transportation Chapter 3 will address existing and projected transportation conditions in the D O Corridor and the impacts associated with the implementation of a major transit investment. Transportation conditions will be described in terms of travel patterns, public transit service, street and highway facilities, freight and passenger rail service, airports, bicycle and pedestrian facilities, and parking. 3.1 Regional Travel Patterns The potential effects on travel patterns within the region and the area to be served by the proposed transit system will be described in this section. 3.2 Public Transportation This section will present an analysis focused on projected ridership, rail and bus operating plans, travel speeds, travel times, service coordination, transit vehicles, and level of service for each of the alternatives. 3.3 Roadways This section will describe the existing street and highway network, evaluate traffic impacts that would result from implementation of the project, and identify mitigation measures where applicable. 3.4 Parking This section of the DEIS will include an assessment of the existing parking and any proposed changes to parking. 3.5 Freight and Passenger Rail Existing freight and passenger rail service within the D-O Corridor and potential impacts to this service will be described. The eastern-most 2.8 miles of the proposed D-O LRT alignment are located within the state-owned railroad right-of-way which is managed by the North Carolina Railroad Corporation (NCRR). The NCRR Corridor is used by Norfolk Southern Railroad freight service and Amtrak passenger rail services. 3.6 Airports This section will address airports located within five miles of the D-O Corridor. Horace Williams Airport is a general aviation airport located in Chapel Hill. Currently, the Federal Aviation Administration (FAA) Airport Improvement Program is administered by the North Carolina Department of Transportation (NCDOT) Division of Aviation on behalf of the FAA for all general aviation airports located in North Carolina. Although the airport is no longer in use, it has not been decommissioned. To ensure no hazards to aviation are created by the proposed project, the analysis will ensure that all design and construction elements of the project, including any proposed mitigation measures, consider and incorporate the guidance found in FAA Advisory Circular 150/ B. 3.7 Bicycle and Pedestrian Facilities Existing and planned bicycle and pedestrian facilities and impacts to these facilities will be described in this section of the DEIS. Durham-Orange Light Rail Transit Project December DRAFT

14 4. Affected Environment and Environmental Consequences 4.1 Land Use, Public Policy, and Zoning This section will include an evaluation of transportation and land use policies as well as the following potential direct effects of the alternatives on land use: The affected environment includes several activity centers: UNC, Meadowmont, and East 54 in Orange County; the Leigh Village planned development, New Hope Commons, Patterson Place, South Square, Duke University Medical Center, Ninth Street, downtown Durham, and east Durham in Durham County Potential economic and joint development opportunities surrounding station locations. Properties that would be acquired by construction and/or operation of the proposed alternatives. Other land uses will be identified in the DEIS study and alternatives will be evaluated for consistency with state, county, and local land use and zoning plans. 4.2 Socio-Economic and Demographic Conditions This section will include descriptions of existing population and demographics (i.e., gender, age, and ethnicity), housing and home ownership, and economic conditions (employment, economic output, and government finance) located within the study area for the proposed alternatives as follows: Analysis of trends over time and potential of alternative affect those trends. Discussion of the potential socio-economic effects of the project and its impact on the local economy. Potential mitigation measures will be included where necessary. Project effects on economic development in the region and cost savings for transit users vs. families using automobiles. Economic impacts will be assessed, particularly for transit oriented development (TOD) and other commercial and residential development. 4.3 Neighborhoods, Community Services, and Community Facilities This section will address the neighborhoods and communities within the project study area as follows: Notable neighborhoods and communities along the proposed alignment that may be affected include, but are not limited to, the Meadowmont community, Downing Creek neighborhood, Trinity Park, and those neighborhoods in the vicinity of the project terminus at Alston Avenue in east Durham. This DEIS will incorporate actions for the protection of the health and safety of children through compliance with Executive Order 13045, which mandates that federal agencies identify and assess environmental safety risks that may disproportionately affect children as a result of implementation of federal policies, programs, activities, and standards. Potential mitigation measures will also be included where necessary. Durham-Orange Light Rail Transit Project December DRAFT

15 4.4 Visual and Aesthetic Considerations This section will provide a general overview of visual conditions along the D-O Corridor of the proposed alternatives and will identify potential impacts to the visual environment that may arise. This section will then discuss potential mitigation measures related to visual quality. The build alternatives will be evaluated based on views of the project from surrounding communities, views of the communities from the project, and views of the project from other transportation facilities. New visual elements resulting from the proposed project will also be assessed. 4.5 Cultural, Historic, and Archaeological Resources The archaeological and historic architectural resources within the area of potential effect (APE) for the D-O LRT will be presented in the DEIS as follows: The APE will be determined in coordination with the FTA and the North Carolina State Historic Preservation Office (SHPO) and field reconnaissance will be conducted to identify resources within the APE. It will identify the potential effects of the alternatives under study and their associated impacts in compliance with Section 106 of the Historic Preservation Act. Historic properties, archeological sites, parklands, and other cultural resources will be identified and best efforts will be made to minimize or avoid potential impacts. The DEIS will document consultation with SHPO, Native American Tribes, and other consulting parties in the determinations of effects, and efforts to minimize potential harm during construction and operation of the proposed project. Mitigation measures will also be discussed. The study will address the location of marked and unmarked cemeteries; recognize and account for the historic Meadowmont Farm House on the Rizzo property; identify the location and potential effect to historic resources through downtown Durham, and others that may be within the D-O Corridor. 4.6 Public Parkland and Recreational Areas Potential direct impacts to parks and recreational resources through the acquisition of land or proximity impacts from the proposed alternatives will be identified. These will include recreational facilities (sports fields, gymnasiums, gamelands), publicly-owned parks and green areas, greenway trails, and wildlife and waterfowl refuges located within the study area for the proposed project. The facilities and services will be recorded and the nature of the project s effects will be described. During the AA several sites were identified within 50 feet of the proposed D-O LRT alignment including the USACE property in the Meadowmont area. Several parcels owned by Durham County, which have been zoned as Open Space/Recreational, will be addressed in the New Hope Creek area. These resources will be analyzed to determine whether they are protected Section 6(f) and/or Section 4(f) resources. If the proposed project would use a Section 4(f) resource, a Section 4(f) Evaluation will be prepared as a separate chapter in the DEIS. 4.7 Natural Resources and Ecosystems This section will assess the impact of the proposed project on natural resources including wildlife and habitats within the project study area with a focus on ecologically-sensitive areas and contiguous expanses of undisturbed lands. The DEIS will identify and document federal and state-listed threatened Durham-Orange Light Rail Transit Project December DRAFT

16 and endangered species (both fauna and flora; aquatic and terrestrial) and habitats critical to their survival as well as other natural resources as follows: Little Creek Bottomlands and Slopes and New Hope Creek Significant Natural Heritage Areas (SNHA). Permanent wildlife lands and gamelands in the study area including Little Creek Waterfowl Impoundment which serves as mitigation for impacts from the construction of B. Everett Jordan Lake (a 31,300-acre USACE reservoir and recreational area) and is managed by the NC Wildlife Resources Commission (NCWRC). High quality habitats identified as Piedmont Bottomland Forest (on both New Hope and Little Creeks), Mesic Mixed Hardwood Forest (on Little Creek), and Piedmont Levee Forest (on New Hope Creek), and the population of Carya laciniosa (big shellbark hickory) in the New Hope Creek Bottomland Forest SNHA south of US 15/501 The DEIS will evaluate the study area by assessing natural resources including an expanded study area that may not impact natural resources. Habitat connections will be addressed, including the New Hope Creek and Sandy Creek corridor, the piedmont swamp forest ecological corridor connecting Duke Forest and Jordan Game Land, and other conservation measures which address avoiding or minimizing environmental impacts to fish and wildlife resources. 4.8 Water Quality and Hydrology This section will document the surface water, ground water, wellhead and source water protection areas, as well as the location, delineation, classification, and type of streams, wetlands and buffers, floodplains, and other water resources that may be impacted by the alternatives and will document potential impacts and mitigation measures as follows: Both state and federal water resources including wetlands associated with the alternatives will be delineated. Measures to avoid or minimize potential impacts will be identified. A determination will be made regarding the extent to which properties in the study area are located within the 100-year floodplain. A detailed analysis of potential changes in existing runoff patterns will be developed. Design elements will be recommended to mitigate potential impacts. Specific floodplain/flood storage areas include, but are not limited to those associated with the Jordan Lake watershed in the vicinities of Little Creek and New Hope and Sandy Creeks. Impacts to jurisdictional waters of Little Creek and New Hope Creek within the Cape Fear Watershed will be assessed through the process identified in the USACE and the US Environmental Protection Agency (EPA) memorandum of agreement (MOA) establishing procedures for permit authorization in compliance with the Clean Water Act Section 404(b)(1) Guidelines. For impacts that cannot be avoided, practical mitigation will be provided. Efforts to minimize unavoidable impacts will be exercised and incorporated into the project design process. Jurisdictional delineation and mapping will be provided for the entire corridor and aerial crossings (bridging) of the proposed project s unavoidable jurisdictional water crossings. Durham-Orange Light Rail Transit Project December DRAFT

17 Crossings of wetland systems to connect logical termini associated with the project purpose will be addressed and wherever possible made perpendicular and at the narrowest point of the jurisdictional wetland system. Characterization of and potential effects on water resources in a watershed context that include surface water, ground water, wellhead and source water protection areas, soils, topographic features affecting basin hydrology, existing water quality conditions, and land use patterns affecting runoff conditions will be addressed. Potential sediment and erosion impacts will be addressed. Project designs and construction methods will include highly protective sediment and erosion control best management practices (BMP) as per the North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Program s Stormwater Best Management Practices. Morgan Creek, Little Creek, New Hope Creek, Sandy Creek, and Ellerbe Creek will be evaluated for the most protective BMPs to be used in accordance with Design Standards in Sensitive Watersheds (15A NCAC 04B.0124). The project is within the Jordan Lake and Neuse River Basins, and riparian buffer impacts will be avoided and minimized to the greatest extent possible pursuant to 15A NCAC 2B.0267 and 15A NCAC 2B.0233, respectively. Buffer mitigation will be addressed where applicable. 4.9 Soils and Farmlands This section will describe the geologic and subsurface conditions within the D-O Corridor, including topography and geology (types of soil/rock, depth to bedrock, groundwater depth), and will identify potential geologic hazards. This section will discuss measures needed to protect geologic and/or topographic features as they relate to the structural integrity of the proposed project. This section will identify and discuss impacts, if any, on natural landmarks and landforms. If necessary, measures to reduce visual impacts on geologic and/or topographic features will also be discussed. This discussion may be cross-referenced in the Visual and Aesthetic Conditions section. Soils in the project study area will be evaluated as part of the Farmland Protection Policy Act (FPPA). This regulation requires federal agencies to evaluate the impacts of federally funded projects that may involve converting farmlands to nonagricultural uses and to consider alternative actions that would lessen the adverse effects of the lands conversion. The evaluation process will focus on identifying any prime, unique, or statewide important farmlands. National Resources Conservation Service (NRCS) form CPA-106 will be submitted to the State Conservationist to obtain information on the farmland resources. This will cover the immediate construction area, the full parcels that are impacted by construction, and any areas impacted by the construction of park and ride lots, stations, or maintenance facilities. This section will explain potential impacts to important farmlands along and within the D-O Corridor as to the various constructed project elements: the proposed D-O LRT line, stations, and ROMF. The impacts analysis will describe how the proposed project will convert farmlands to suburban or urban use, particularly at station sites and park-and-ride lots. The avoidance and minimization of impacts will be made to the extent possible. Where impacts are unavoidable, mitigation plans will be developed and incorporated into the DEIS Air Quality and Greenhouse Gases The potential impact on air quality, compliance with the 1990 Clean Air Act Amendments, and an evaluation of conformity with the North Carolina State Implementation Plan will be documented. This Durham-Orange Light Rail Transit Project December DRAFT

18 section will describe the existing air quality within the study area for the proposed alternatives and discuss the National Ambient Air Quality Standards and federal regulations protecting air quality. In addition, projected year (2040) air quality conditions at various intersections and proposed parking facilities associated with the alternatives under consideration will be analyzed in the DEIS. Motor Vehicle Emission Simulator (MOVES) modeling will be used to model air quality impacts. Mitigation measures will be identified Noise and Vibration This section will describe the locations of potential noise and vibration sensitive receptors within the study area for the proposed alternatives. It will include an analysis of potential noise and vibration impacts on noise and vibration sensitive resources such as schools, hospitals, residences, hotels/motels, natural areas/wildlife habitats, and historic structures associated with the build alternatives. It will also discuss the potential long-term and short-term effects to receptors for the alternatives under consideration. The process for assessing the potential impact for noise and vibration will follow the U.S. Federal Transit Administration (FTA) guidance manual Transit Noise and Vibration Impact Assessment (May 2006). This process involves three levels of assessment: 1) screening, 2) general assessment and 3) a detailed assessment. A screening is typically done for locating project alignments and involves the identification of noise sensitive receptors along a corridor. Mitigation measures will be identified where noise or vibration impacts are predicted Hazardous, Contaminated, and Regulated Materials The procedures to determine the potential presence for known hazardous and contaminated materials within the study area of the proposed alternatives will be described in this section of the DEIS. In addition, this section will present the results of a corridor-level field review and a search of local, state, and federal databases for known hazardous, contaminated, or regulated materials sites for the alternatives. The DEIS will document any known hazardous wastes or contamination within the study area. Sites requiring further analysis will be identified. Mitigation measures to minimize impacts will be described Safety and Security This section will describe the efforts of Triangle Transit to provide safe and secure operations of its transit services, vehicles, transit centers, park-and-ride lots, proposed LRT stations, ROMF, and administrative facilities associated with the alternatives under study in the DEIS. Mitigation will be identified as necessary Energy Use This section will quantify the expenditure of energy associated with the construction, maintenance, and operation of transportation systems in alternatives under study. Transportation energy use is typically evaluated in terms of direct energy and indirect energy. Direct energy involves energy associated with the direct operation of the transportation system consisting primarily of vehicle propulsion energy. Indirect energy consumption involves the energy expenditures associated with the physical implementation of the transportation system (facility and vehicle construction). Transportation energy consumption in the state of North Carolina and the Triangle region will be documented. Direct energy consumption of the No-Build and other alternatives will be evaluated as well as indirect energy consumption. Energy consumption measures the net impact on energy savings as a Durham-Orange Light Rail Transit Project December DRAFT

19 result of changes in automobile travel in the region offset in part by the energy requirements for operation of the proposed service Climate Change and Adaptation Planning This section will address the effects of climate change and how the FTA capital investment in the proposed high-capacity transit system would be protected against extreme weather events such as flooding and heat waves that may affect transit infrastructure and passenger comfort. The FTA issued a Policy Statement on Climate Change Adaptation on May 2011, Integration of Climate Change Adaptation into FTA Planning, Operations, Policies, and Programs. The policy states that the FTA will integrate consideration of climate change impacts and, to the extent practicable, the adaptation of the planning, operations, policies, and programs of the agency in order to ensure proper stewardship of the federal investment in public transportation systems for the safety of the traveling public, mobility, and to maintain a state of good repair. The DEIS will address climate change adaptation planning and will also address the North Carolina Climate Change Adaptation Strategy to the extent it is applicable to the proposed project Acquisitions, Relocations, and Displacements This section describes the potential property acquisitions, relocations, and displacements for the proposed alternatives. "Full acquisitions" entail the purchase of an entire parcel, whereas partial acquisitions entail the purchase of a portion of a parcel. Displacements and Relocations occur when individuals are physically displaced from the land on which they reside, conduct business, or use for farming operations. The Uniform Relocation Assistance and Real Property Acquisition Policy Act of 1970 (Uniform Act) provides for uniform and equitable treatment of persons displaced from their homes, businesses, or farms by federal and federally assisted programs, and establishes uniform and equitable land acquisition policies. The Uniform Act ensures that property owners receive fair market value for their property and that displaced persons receive fair and equitable treatment and do not suffer disproportionate injuries because of programs designed for overall public benefit. The North Carolina Relocation Assistance Act (N.C.G.S through ) and the Municipal Codes of the City of Durham and the Town of Chapel Hill contain regulations that also ensure property owner protections Utility Impacts Utilities within the D-O Corridor and potential conflicts with the project build alternatives will be identified in this section of the DEIS. This section will also identify the utility owners, both public and private, and document coordination activities to be undertaken during future phases of the project Environmental Justice, Limited English Proficiency, and Title VI This section of the DEIS will document the incorporation of principles of environmental justice (Executive Order 12898) and Title VI of the Civil Rights Act of 1964, which prohibit discrimination by recipients of federal financial assistance on the basis of race, color, and national origin, including matters related to language access for limited English proficient persons. Documentation will be prepared in accordance with Environmental Justice Policy, Guidance for Federal Transit Administration Recipients, FTA Circular The DEIS will assess project benefits and impacts on study area neighborhoods and communities with specific attention paid to minority, low-income, and limited- Durham-Orange Light Rail Transit Project December DRAFT

20 English language proficient populations such as those already identified in the east Durham section of the proposed project Construction Impacts Anticipated construction impacts and mitigation measures for the build alternatives will be summarized in this section. A qualitative analysis will be performed to identify construction impacts in order to determine where preventative measures to minimize the adverse impacts of construction activities might be warranted. Since the No-Build Alternative would not include construction activities, it will not create any construction-related impacts. Impacts to the natural and built environments will be anticipated during construction of the build alternatives. Transportation, traffic, parking, airports, land use, community facilities and services, businesses, displacement and relocation, visual and aesthetic qualities, neighborhoods, environmental justice, air quality, noise, vibration, natural resources, water resources, cultural resources, parklands, energy, hazardous and contaminated materials, and safety and security will be addressed Secondary and Cumulative Effects This section will assess the secondary (indirect) effects and cumulative effects of the proposed alternatives when added to the past, present, and reasonably foreseeable future actions of related projects in the study area. This section will also include a discussion of the recommended mitigation measures where necessary. The No-Build Alternative will not be included in this assessment, as there would not be any actions likely to result in secondary or cumulative effects. The regulations promulgated by the Council on Environmental Quality define indirect effects as effects which are caused by the [proposed] action and are later in time or farther removed in distance, but are still reasonably foreseeable. Indirect effects may include growth inducing effects and other effects related to changes in the pattern of land use, population density, or growth rate (40 C.F.R (b)). The transportation and land use goals, plans, and regulations identified within the D-O Corridor provide a platform for assessing the project s indirect and cumulative effects. Particular attention will be paid to the principles of environmental justice (Executive Order 12898) and Title VI of the Civil Rights Act of 1964 with respect to indirect and cumulative impacts. Indirect impacts may include growth inducing effects and other effects related to induced changes in the pattern of land use, population density, or growth rate, and related effects on air, water, and other natural systems, including ecosystems. Potential indirect and cumulative effects throughout the entire project corridor will be addressed in the DEIS and particular attention will be paid to the Jordan Lake watershed and SNHAs on Little Creek, New Hope Creek, and Sandy Creek. Potential effects that will be addressed include fragmentation of habitats, disruption of animal movements, growth of invasive species, effects to floodplains, potential effects on water quality, and connections between the Jordan Game Land, Duke Forest, and New Hope Creek Preserve. Cumulative impacts result from the incremental impact of the action when added to other past, present, and reasonably foreseeable future actions regardless of what agency (federal or non-federal) or person Durham-Orange Light Rail Transit Project December DRAFT

21 undertakes such other actions. Cumulative impacts can result from individually minor but collectively significant actions taking place over a period of time. Evaluation of cumulative impacts of this project will assess the additive effects of past, present, and reasonably foreseeable infrastructure and development projects throughout the project corridor. Particular attention will be paid to development activities occurring around the margins of Little Creek, New Hope Creek, and Sandy Creek Resources Considered This section will list the resources that were considered during scoping and which will unlikely be impacted by the proposed project. These resource areas will not be described in detail in the DEIS. Rather, the discussion will include a brief explanation about why environmental impacts are unlikely. Citations will be made to correspondence with resource agencies, database surveys, and any preliminary field investigations. Durham-Orange Light Rail Transit Project December DRAFT

22 5. Section 4(f) Documentation of compliance with Section 4(f) is required for transportation projects that may receive federal funding and/or discretionary approvals through one or more agencies of the U.S. Department of Transportation, including the Federal Railroad Administration (FRA), the Federal Highway Administration (FHWA), and/or the FTA. A Section 4(f) evaluation will be conducted pursuant to federal regulations codified in 23 U.S.C. 138 and 49 U.S.C. 303 and implemented through 23 C.F.R. 774 as of April 2008, which were originally enacted as Section 4(f) of the U.S. Department of Transportation Act of 1966 and are still commonly referred to as Section 4(f). Durham-Orange Light Rail Transit Project December DRAFT

23 6. Financial Analysis 6.1 Capital Costs This section will discuss the anticipated capital costs associated with each of the proposed alternatives. The analysis will include identification of potential funding sources to cover the capital costs associated with each of the build alternatives. The analysis will build upon the financial plan developed as part the New Starts submission for the D-O LRT. 6.2 Operating and Maintenance Costs In addition to capital costs, each of the alternatives has associated reoccurring operating and maintenance costs. These costs will be quantified on an annual basis for comparison between alternatives. This section will also identify the sources of revenue to cover the on-going costs associated with each alternative. Similar to the capital costs, the operating and maintenance cost section will build upon the financial plan developed for the New Starts submission. Durham-Orange Light Rail Transit Project December DRAFT

24 7. Evaluation of Alternatives This chapter will evaluate how the proposed alternatives would meet the Purpose and Need from Chapter 1 and evaluate the effectiveness of the alternatives under consideration. The information in this chapter is derived from the other chapters of the DEIS and provides the basis for decision-makers and the public to assess the benefits, costs, and environmental consequences of the alternatives against the goals of the proposed project. Equity considerations and trade-offs will also be presented. Durham-Orange Light Rail Transit Project December DRAFT

25 8. Public Involvement and Agency Coordination This chapter will summarize the public involvement and agency coordination processes and the results of these activities. It describes the early and continuous efforts to involve the general public, interested and affected parties, stakeholders, and federal, state, and local agencies. Public involvement and agency coordination includes the review and selection of alternatives, identification of topics assessed in the DEIS, and the minimization, reduction, or avoidance of potential social, economic, and environmental impacts. Durham-Orange Light Rail Transit Project December DRAFT

26

27 Appendices The order of appendices will be determined as documentation progresses and will include, at a minimum, the following subjects: Index Glossary Environmental Justice Analysis Plans and Profiles Agency Correspondence Public Correspondence Acquisitions and Easements Technical Reports List of Preparers Distribution List Legal Regulation Context/Methods References Durham-Orange Light Rail Transit Project November 2013 A-1 DRAFT

Durham-Orange Light Rail Transit Project

Durham-Orange Light Rail Transit Project Durham-Orange Light Rail Transit Project Scoping Information Booklet WHAT S INSIDE What is Scoping? p. 3 How was the LPA determined? p. 3 Project development process p. 4 Project Purpose & Need p. 5 Alternatives

More information

Alternatives Analysis Executive Summary

Alternatives Analysis Executive Summary Durham-Orange County Corridor APRIL 2012 Prepared for: TriangleTransit Prepared by: URS Team Executive Summary Introduction The 2035 Long Range Transportation Plan, jointly adopted by the Durham Chapel

More information

12 Evaluation of Alternatives

12 Evaluation of Alternatives 12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information

More information

11 Joint Development Regulatory Context and Methodology

11 Joint Development Regulatory Context and Methodology 11 Joint Development This chapter describes the long-term direct and potential indirect impacts, and short-term direct and potential indirect impacts, of the proposed METRO Blue Line Light Rail Transit

More information

Appendix E: Legal and Regulatory Context. Durham-Orange Light Rail Transit Project

Appendix E: Legal and Regulatory Context. Durham-Orange Light Rail Transit Project Appendix E Durham-Orange Light Rail Transit Project August 2015 Table of Contents Chapter 1: Purpose and Need... 1 Chapter 2: Alternatives Considered... 1 Chapter 3: Transportation... 2 3.1 Public Transportation...

More information

U.S. Department of Transportation, Federal Transit Administration

U.S. Department of Transportation, Federal Transit Administration Durham-Orange Light Rail Transit Project Durham and Orange Counties, North Carolina Combined Final Environmental Impact Statement and Record of Decision Prepared pursuant to federal environmental laws,

More information

6.0 Indirect Effects and Cumulative Impacts

6.0 Indirect Effects and Cumulative Impacts 6.0 Effects and Impacts 6.1 Introduction This chapter of the Draft EIS addresses potential indirect and cumulative impacts of the Bottineau Transitway project. effects are those that are caused by the

More information

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS). This document is scheduled to be published in the Federal Register on 11/18/2015 and available online at http://federalregister.gov/a/2015-29418, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit

More information

I-20 East Transit Initiative

I-20 East Transit Initiative I-20 East Transit Initiative Open Houses Monday, June 24 6 7 PM: Open House 7 8 PM: Presentation & Q/A City of Atlanta Old Council Chambers Atlanta City Hall 55 Trinity Avenue Atlanta, GA 30303 Tuesday,

More information

Indirect and Cumulative Effects

Indirect and Cumulative Effects Chapter 21: Indirect and Cumulative Effects 21-1 INTRODUCTION The federal Council on Environmental Quality s (CEQ) regulations implementing the procedural provisions of the National Environmental Policy

More information

Draft Environmental Impact Statement

Draft Environmental Impact Statement Durham-Orange Light Rail Transit Project Draft Environmental Impact Statement Chapters 1 9 August 2015 D-0 LRT Project...,._. Durham-Orange Light Rail Transit Project Durham and Orange Counties, North

More information

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Environmental Analysis, Chapter 4 Consequences, and Mitigation Environmental Analysis, Chapter 4 Table 4.17-3. Summary of Adverse Environmental Justice Impacts Topic No Build TSM At-Grade Emphasis LRT Underground Emphasis LRT Locally Preferred Alternative Transit

More information

Table Table 7.2 Potential Environmental Impacts and Mitigation Measures

Table Table 7.2 Potential Environmental Impacts and Mitigation Measures 7.2 Natural Environment/Environmental Planning Executive Summary/Key Points The Environmental Consultation and Mitigation Plan establishes: o A process for consultation with environmental resource agencies

More information

APPENDIX M CEQA Initial Study Checklist

APPENDIX M CEQA Initial Study Checklist APPENDIX M CEQA Initial Study Checklist Appendix G ENVIRONMENTAL CHECKLIST FORM (To be Completed by Applicant) 1. Project title: 2. Lead agency name and address: 3. Contact person and phone number: 4.

More information

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

SOUTHWEST LRT (METRO GREEN LINE EXTENSION) 8 Evaluation of Alternatives This chapter evaluates the effectiveness of the No Build Alternative and the Southwest Light Rail Transit (LRT) Project (the Project) based on the information contained in

More information

Evaluation of Alternatives

Evaluation of Alternatives Chapter 9.0 Evaluation of Alternatives Chapter 9.0 provides a summary evaluation of the No Build Alternative and the Preferred Alternative. The evaluation contained within this chapter is an assessment

More information

An Overview and Comparison of the Tennessee Department of Transportation s Environmental Evaluation Process

An Overview and Comparison of the Tennessee Department of Transportation s Environmental Evaluation Process Introduction This document provides a brief overview of the policy and procedures that govern the environmental evaluation process that the Tennessee Department of Transportation (TDOT) must follow for

More information

I-20 East Transit Initiative

I-20 East Transit Initiative I-20 East Transit Initiative Technical Advisory Committee (TAC) Meeting June 11 th, 2013 Introductions Purpose of Today s Meeting Project Review Preliminary Environmental Findings Next Steps Project Status

More information

Section 7 Environmental Constraints

Section 7 Environmental Constraints Section 7 Environmental Constraints i Yakima Valley Metropolitan and Regional Transportation Plan Public Comment DRAFT 1/27/2016 Environmental Constraints Analysis A programmatic-level review of potential

More information

16.1 Significant and Unavoidable Impacts

16.1 Significant and Unavoidable Impacts Chapter 16 NEPA requires an EIS and CEQA requires an EIR to evaluate a number of other types of environmental impacts in addition to those already addressed in the resource chapters. The analysis required

More information

SECTION 9.0 Effects Found Not To Be Significant

SECTION 9.0 Effects Found Not To Be Significant SECTION 9.0 Effects Found Not To Be Significant 9.0 EFFECTS FOUND NOT TO BE SIGNIFICANT The City of Santa Clarita conducted an Initial Study in April 2006 to determine significant effects of the proposed

More information

City of Bishop. Environmental Checklist Form

City of Bishop. Environmental Checklist Form City of Bishop Environmental Checklist Form 1. Project title: Environmental Review / 2007 California Building Codes 2. Lead agency name and address: City of Bishop 377 W. Line Street Bishop, Ca 93514 3.

More information

Orange County Transit

Orange County Transit Orange County Transit Plan Progress Report Fiscal Year 2017 July 1, 2016 June 30, 2017 BACKGROUND Recognizing the benefits of transit for all, voters in 2012 approved a half-cent sales tax to support funding

More information

TITLE VI EQUITY ANALYSIS RAIL OPERATIONS AND MAINTENANCE FACILITY

TITLE VI EQUITY ANALYSIS RAIL OPERATIONS AND MAINTENANCE FACILITY AECOM DIN 01770 TITLE VI EQUITY ANALYSIS RAIL OPERATIONS AND MAINTENANCE FACILITY Durham-Orange Light Rail Transit Project November 2015 Table of Contents 1. Purpose and Summary... 1 2. Background... 1

More information

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING TIER 2 EIS OVERVIEW SOUTH SUBURBAN INAUGURAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT The proposed, (SSA) will require

More information

2035 LRTP Transportation Options Introduction

2035 LRTP Transportation Options Introduction 2035 LRTP Transportation Options Introduction What is the 2035 LRTP? The 2035 Long-Range Transportation Plan (LRTP) is the guide for major transportation investments in the Durham-Chapel Hill-Carrboro

More information

AMENDED RECORD OF DECISION. by the Federal Transit Administration. Dulles Corridor Metrorail Project Fairfax and Loudoun Counties, Virginia

AMENDED RECORD OF DECISION. by the Federal Transit Administration. Dulles Corridor Metrorail Project Fairfax and Loudoun Counties, Virginia AMENDED RECORD OF DECISION by the Federal Transit Administration Fairfax and Loudoun Counties, Virginia DECISION The Federal Transit Administration (FTA), in accordance with 23 CFR part 771, the regulation

More information

OPTIONAL STATIONAVIATION/MANCHESTER

OPTIONAL STATIONAVIATION/MANCHESTER CRENSHAW/LAX TRANSIT CORRIDOR PROJECT FEIS/FEIR OPTIONAL STATIONAVIATION/MANCHESTER Aviation and Manchester, Looking East Aviation/Manchester Station (Optional) The Optional Aviation/Manchester Station

More information

Environmental Assessment of Rail Infrastructure in Illinois

Environmental Assessment of Rail Infrastructure in Illinois Environmental Assessment of Rail Infrastructure in Illinois Presentation at the 16 th Railroad Environmental Conference, October 28, 2014. Ning Ai, Marcella Bondie, Anthony Grande, Shuo Ma & Shi Yin Outline

More information

EVALUATION OF ALTERNATIVES CARRIED FORWARD

EVALUATION OF ALTERNATIVES CARRIED FORWARD 1 EVALUATION OF ALTERNATIVES CARRIED FORWARD This chapter presents a comparative evaluation of the alternatives carried forward in this Final Environmental Impact Statement (EIS). The intent of this evaluation

More information

Table of Contents. Green Line Extension Project. Draft Environmental Impact Report/Environmental Assessment and Draft Section 4(f) Evaluation

Table of Contents. Green Line Extension Project. Draft Environmental Impact Report/Environmental Assessment and Draft Section 4(f) Evaluation Table of Contents Acronyms and Abbreviations Secretary s Certificate on the EENF Executive Summary 1 Introduction and Background... 1-1 1.1 Introduction... 1-1 1.2 Project Summary... 1-2 1.3 Permits and

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 17, 2014 Comment Deadline: July 17, 2014 Corps Action ID#: SAW-2009-00655 NC DOT TIP: R-4903 The Wilmington District, Corps

More information

Join the Conversation!

Join the Conversation! Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Transit Project Assessment(TPA) Process Public Consultation Centre (PCC) No.1 November 18, 2015 November 19, 2015 Join the Conversation!

More information

Northwest State Route 138 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816

More information

5. OTHER CEQA CONSIDERATIONS

5. OTHER CEQA CONSIDERATIONS 5. OTHER CEQA CONSIDERATIONS Cumulative Impacts CEQA requires the analysis of impacts due to cumulative development that would occur independent of, but during the same timeframe as, the project under

More information

University Corridor Draft Environmental Impact Statement (DEIS)

University Corridor Draft Environmental Impact Statement (DEIS) University Corridor Draft Environmental Impact Statement (DEIS) Public Meetings/Open Houses August 13, 27 August 14, 27 5: pm to 7: pm 5: pm to 7: pm Holiday Inn Select- Greenway* Wheeler Avenue Baptist

More information

APPENDIX D. 404/401 Permit Approvals

APPENDIX D. 404/401 Permit Approvals APPENDIX D 404/401 Permit Approvals APPENDIX E Agency Correspondence March 4, 2009 Preserving America s Heritage John F. Sullivan, III, P.E. Division Administrator FHWA North Carolina

More information

Sustainability Metrics and Mapping Tool for Environmental Assessment of Rail Infrastructure in Illinois

Sustainability Metrics and Mapping Tool for Environmental Assessment of Rail Infrastructure in Illinois Sustainability Metrics and Mapping Tool for Environmental Assessment of Rail Infrastructure in Illinois Webcast at the Center for Urban Transportation Research, USF December 11, 2014 Ning Ai, Ph.D. Assistant

More information

LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT

LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT Project Name: Project Location: Lead Agency & Contact Person: SEQRA Classification: Project Sponsors:

More information

Work Breakdown Structure Element Dictionary Preliminary Engineering

Work Breakdown Structure Element Dictionary Preliminary Engineering Element Name Initiation PE 3.1 Initiation includes the implementation of the project s funding and notification of the consultant or in-house design staff to commence work, the Kickoff Meeting with the

More information

Categorical Exclusion (CE)

Categorical Exclusion (CE) Categorical Exclusion (CE) Project Information Project Name: Federal Project#: Project Number: 0029-002-135, D624, P101 Project Type: Construction UPC: 77383 Charge Number: Route Number: 29 Route Type:

More information

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION AUGUST 2015 Table of Contents 1 Decision... 1 1.1 Project Description... 2 1.2 Basis for the FHWA Decision... 7 1.2.1

More information

Tri-County Regional Planning Commission 2045 Regional Metropolitan Transportation Plan Goals and Objectives Adopted March 22, 2017

Tri-County Regional Planning Commission 2045 Regional Metropolitan Transportation Plan Goals and Objectives Adopted March 22, 2017 Tri-County Regional Planning Commission 2045 Regional Metropolitan Transportation Plan Goals and Objectives Adopted March 22, 2017 One of the initial steps in the development of the TCRPC 2045 Metropolitan

More information

Charlottesville Albemarle MPO:

Charlottesville Albemarle MPO: Charlottesville Albemarle MPO: Applying The Eco-Logical Approach To Small MPOs September 21, 2015 Charlottesville Albemarle Metropolitan Planning Organization (CAMPO) and The Thomas Jefferson Planning

More information

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan and stage development for forecasted growth through 2040

More information

5. Other Environmental Consequences

5. Other Environmental Consequences 5. Other Environmental Consequences 5.1 Unavoidable Adverse Impacts Impacts to the following environmental resources were evaluated for Alternative D, the preferred alternative, to determine if they would

More information

5 CEQA Required Conclusions

5 CEQA Required Conclusions 5 CEQA Required Conclusions This section presents a summary of the impacts of the proposed Pacifica General Plan on several subject areas specifically required by CEQA, including significant irreversible

More information

Mountain Transportation Study

Mountain Transportation Study EXECUTIVE SUMMARY Salt Lake County and its study partners including the Utah Department of Transportation (UDOT), the Utah Transit Authority (UTA), the United States Forest Service (USFS), Salt Lake City,

More information

Preparation of an Environmental Impact Statement for High Capacity Transit

Preparation of an Environmental Impact Statement for High Capacity Transit This document is scheduled to be published in the Federal Register on 11/19/2013 and available online at http://federalregister.gov/a/2013-27583, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit

More information

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 275

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 275 C-034-001 Thank you for your comments describing the cultural importance of the Latvian Evangelical Lutheran Church. See Section 2.5.1 for a description of the refined Segment A alternatives that avoid

More information

EXECUTIVE SUMMARY RIVER VALLEY INTERMODAL FACILITIES FINAL ENVIRONMENTAL IMPACT STATEMENT ES-1

EXECUTIVE SUMMARY RIVER VALLEY INTERMODAL FACILITIES FINAL ENVIRONMENTAL IMPACT STATEMENT ES-1 ES.1 INTRODUCTION This Final Environmental Impact Statement (FEIS) for the River Valley Intermodal Facilities (RVIF) in the Arkansas River Valley (ARV) has been written in accordance with the National

More information

Northern Branch Corridor CLC Meeting. June 30, 2008

Northern Branch Corridor CLC Meeting. June 30, 2008 Northern Branch Corridor CLC Meeting June 30, 2008 Agenda Introductions Project Status Environmental Process Technical Findings Capital Costs Next Steps Break Out Areas Introductions Project Status Preliminary

More information

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors

More information

Supplemental Draft Environmental Impact Statement

Supplemental Draft Environmental Impact Statement Supplemental Draft Environmental Impact Statement 40 67 Highway 67 - I-40 West Pulaski County, Arkansas January, 2007 Federal Highway Administration Arkansas State Highway and Transportation Department

More information

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT City of American Canyon Broadway District Specific Plan Alternatives to the Proposed Project SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT 5.1 Introduction In accordance with CEQA Guidelines Section

More information

Lynnwood Link Extension 2013 Draft EIS Comments and Responses

Lynnwood Link Extension 2013 Draft EIS Comments and Responses Page 157 C-001-001 Sound Transit acknowledges your opposition to Alternative C1 due to its residential impacts and impacts to Scriber Creek Park and wetlands. Page 158 C-002-001 Following the Draft EIS,

More information

SECTION 6.0 Alternatives to the Proposed Project

SECTION 6.0 Alternatives to the Proposed Project SECTION 6.0 Alternatives to the Proposed Project 6.0 ALTERNATIVES TO THE PROPOSED PROJECT CEQA requires that an EIR include an analysis of a range of project alternatives that could feasibly attain most

More information

SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION S.2 PURPOSE AND NEED

SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION S.2 PURPOSE AND NEED S SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION The Virginia Department of Transportation (VDOT), in cooperation with the Federal Highway Administration (FHWA), is studying alternatives to meet transportation

More information

U.S. Department of Transportation Federal Transit Administration and Metropolitan Atlanta Rapid Transit Authority

U.S. Department of Transportation Federal Transit Administration and Metropolitan Atlanta Rapid Transit Authority ATLANTA BELTLINE CITY OF ATLANTA, FULTON COUNTY, GA TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT/ SECTION 4(F) EVALUATION U.S. Department of Transportation Federal Transit Administration and Metropolitan

More information

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN To: Responsible Agencies, Trustee Agencies, Organizations, and Interested Parties From: Erika

More information

5 CEQA CONSIDERATIONS

5 CEQA CONSIDERATIONS 5 CEQA CONSIDERATIONS 5.1 UNAVOIDABLE ADVERSE IMPACTS For the purposes of this section, unavoidable significant adverse impacts are those effects of the project that would significantly affect either natural

More information

RURAL CENTER COMMUNITY ROLE COUNCIL ROLE RURAL CENTER ALL COMMUNITIES

RURAL CENTER COMMUNITY ROLE COUNCIL ROLE RURAL CENTER ALL COMMUNITIES Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan for forecasted population and household growth at overall

More information

C. ENVIRONMENTAL RESOURCES OF INTEREST

C. ENVIRONMENTAL RESOURCES OF INTEREST Chapter 18: Indirect and Cumulative Effects A. INTRODUCTION The Council on Environmental Quality (CEQ) s regulations implementing the procedural provisions of the National Environmental Policy Act (NEPA),

More information

Appendix A Detailed Environmental and Cultural Analysis

Appendix A Detailed Environmental and Cultural Analysis Appendix A Detailed Environmental and Cultural Analysis CONNECT COBB Northwest Transit Corridor Alternatives Analysis December 2012 Prepared by: July 2012 Table of Contents 1.0 INTRODUCTION AND OVERVIEW...

More information

Willmar Wye Public Open House #4 and Public Hearing

Willmar Wye Public Open House #4 and Public Hearing Willmar Wye Public Open House #4 and Public Hearing February 23, 2017 www.dot.state.mn.us/d8/willmarwye Agenda Time Topic 5:00 pm Open House Opportunity for the public to ask questions of project staff

More information

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050 EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050 Introduction Goals Policies, and Performance Measures Growth Forecast and Planned Land Use Development Key Recommendations i Executive Summary April

More information

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION APPENDIX 4 Analysis Framework 4-1: CEQR Technical Area Guide DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION

More information

Chapter 5 Transportation Draft

Chapter 5 Transportation Draft Chapter 5 Transportation Draft Discussion Similar to the other elements in the Comprehensive Plan, the transportation element impacts the quality of life, economic development and public safety of the

More information

RESOLUTION NO. Resolution No. August 19, 2014 Page 1 of 4

RESOLUTION NO. Resolution No. August 19, 2014 Page 1 of 4 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SIGNAL HILL, CALIFORNIA, APPROVING NEGATIVE DECLARATION 06/20/14(1), RELATIVE TO ZONING ORDINANCE AMENDMENT 14-02, AMENDMENTS TO TITLE 20

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

BUS RAPID TRANSIT CORRIDOR

BUS RAPID TRANSIT CORRIDOR DOWNTOWN UPTOWN OAKLAND EAST END BUS RAPID TRANSIT CORRIDOR Scoping Booklet for National Environmental Policy Act Review City of Pittsburgh Port Authority of Allegheny County Uptown/Downtown Scoping Meeting

More information

Wyandanch Intermodal Transit Facility

Wyandanch Intermodal Transit Facility Wyandanch Intermodal Transit Facility Environmental Assessment July 2010 Prepared by: The United States Department of Transportation Federal Transit Administration in cooperation with The Town of Babylon

More information

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY? WHAT IS AN INTERMODAL TRANSIT FACILITY? An intermodal transit facility gathers many modes of transportation together and is strategically located to increase destination alternatives. Intermodal facilities

More information

Capitol Expressway Light Rail Project Supplemental Environmental Impact Statement ANNOTATED OUTLINE

Capitol Expressway Light Rail Project Supplemental Environmental Impact Statement ANNOTATED OUTLINE Capitol Expressway Light Rail Project Supplemental Environmental Impact Statement ANNOTATED OUTLINE The purpose of this annotated outline is to focus the content of the Environmental Impact Statement (EIS)

More information

D R A F T. SECTION 4(f) EVALUATION. INTERSTATE 73 From I-95 to the Myrtle Beach Region

D R A F T. SECTION 4(f) EVALUATION. INTERSTATE 73 From I-95 to the Myrtle Beach Region D R A F T SECTION 4(f) EVALUATION INTERSTATE 73 From I-95 to the Myrtle Beach Region INTRODUCTION Section 4(f) of the Department of Transportation Act of 1966, 49 USC 303 requires that prior to the use

More information

PUBLIC NOTICE. Attn: Mr. Bill Mumford 1312 Briar Chapel Parkway Chapel Hill, NC 27516

PUBLIC NOTICE. Attn: Mr. Bill Mumford 1312 Briar Chapel Parkway Chapel Hill, NC 27516 US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: December 5, 2016 Comment Deadline: December 20, 2016 Corps Action ID Number: SAW-2001-21252 The Wilmington District, Corps of Engineers

More information

CHAPTER 7 EVALUATION OF ALTERNATIVES

CHAPTER 7 EVALUATION OF ALTERNATIVES CHAPTER 7 EVALUATION OF ALTERNATIVES 7. EVALUATION OF ALTERNATIVES This chapter presents the results of the evaluation and trade-offs analysis conducted for the alternatives developed for the. 1 The purpose

More information

New York Metropolitan Transportation Council. Plan Regional Transportation Plan A Shared Vision for a Sustainable Region

New York Metropolitan Transportation Council. Plan Regional Transportation Plan A Shared Vision for a Sustainable Region New York Metropolitan Transportation Council Plan 2040 Regional Transportation Plan A Shared Vision for a Sustainable Region ADOPTED ON SEPTEMBER 4, 2013 Disclaimer This document was funded in part through

More information

County of Calaveras Department of Planning

County of Calaveras Department of Planning Date: July 18, 2013 To: From: Project: Advisory Agencies Amy Augustine, AICP - Planner County of Calaveras Department of Planning Rebecca L. Willis, AICP ~ Planning Director Phone (209) 754-6394 Fax (209)

More information

Taylorsville-Murray Transit

Taylorsville-Murray Transit Taylorsville-Murray Transit Environmental Study Report April 2013 Prepared for Table of Contents Acronyms & Abbreviations... iv Executive Summary... ES 1 Chapter 1: Purpose and Need 1.1 Project Description...

More information

TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT. 7. Affected Environment, Environmental Consequences, and Mitigation Strategies

TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT. 7. Affected Environment, Environmental Consequences, and Mitigation Strategies TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT 7. Affected Environment, Environmental Consequences, and Mitigation Strategies Table of Contents Chapter 7 7 Affected Environment, Environmental Consequences,

More information

5.0 LONG-TERM CEQA CONSIDERATIONS

5.0 LONG-TERM CEQA CONSIDERATIONS 5.0 LONG-TERM CEQA CONSIDERATIONS Section 15126 of the CEQA Guidelines requires that all phases of a project must be considered when evaluating its impact on the environment, including planning, acquisition,

More information

Appendix M. Criteria, Measures and Indicators for Effects Assessment

Appendix M. Criteria, Measures and Indicators for Effects Assessment Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,

More information

Draft Negative Declaration of Environmental Impact. Project Title: Environmental Review / Tentative Parcel Map No.388

Draft Negative Declaration of Environmental Impact. Project Title: Environmental Review / Tentative Parcel Map No.388 Draft Negative Declaration of Environmental Date: August 7, 2008 Subject: Condominium Conversion / 287 East Line Street Project Title: Environmental Review / Tentative Parcel Map.388 Project Proponent:

More information

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination 4-65 Interstate 73 FEIS: I-95 to the Myrtle Beach Region 4-66 Comment noted. The use of existing roadways was considered during alternative development (refer to Chapter 2, Section 2.1, page 2-1 and the

More information

AT L A N TA B E LT L I N E C I T Y O F AT L A N TA, F U LTO N C O U N T Y, G A

AT L A N TA B E LT L I N E C I T Y O F AT L A N TA, F U LTO N C O U N T Y, G A AT L A N TA B E LT L I N E C I T Y O F AT L A N TA, F U LTO N C O U N T Y, G A T I E R 1 F I N A L E N V I R O N M E N TA L I M PA C T S TAT E M E N T / S E C T I O N 4 ( F ) E VA LUAT I O N U.S. Department

More information

APPENDIX A. NEPA Assessment Checklist

APPENDIX A. NEPA Assessment Checklist APPENDI A NEPA Assessment Checklist NEPA CHECKLIST DATE: January 12, 2009 PREPARER: Frederick Wells, RLA PIN and Project Title: Surplus Property Request Wilder Balter Partners Marketplace Town of Newburgh,

More information

10.0 ENVIRONMENTAL INTEGRATION

10.0 ENVIRONMENTAL INTEGRATION 10.0 ENVIRONMENTAL INTEGRATION Transportation projects in the Kansas City region commonly face a range of complex, interrelated environmental and community issues. These often relate to NEPA requirements

More information

Kern County Environmental Checklist Form Environmental Factors Potentially Affected

Kern County Environmental Checklist Form Environmental Factors Potentially Affected Kern County Environmental Checklist Form Environmental Factors Affected The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a potentially

More information

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012 2030 Transportation Policy Plan SUMMARY PRESENTATION Land Use Advisory Committee November 15, 2012 Today s Topics Transportation Policy Plan (TPP) Requirements and Background Current TPP Policies, Issues

More information

Chapter 5 - Transportation

Chapter 5 - Transportation Chapter 5 - Transportation Discussion Similar to the other elements in the Comprehensive Plan, the transportation element impacts the quality of life, economic development and public safety of the residents

More information

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Discourage future development of rural residential patterns

More information

Interstate 66 Tier 1 Environmental Impact Statement Public Hearing

Interstate 66 Tier 1 Environmental Impact Statement Public Hearing Interstate 66 Tier 1 Environmental Impact Statement Public Hearing 1 Project Corridor Study Process / Tiering Approach Tier 1 EIS focuses on broad issues - Purpose and need - Mode / Technology choice -

More information

Cumulative and Secondary Impacts

Cumulative and Secondary Impacts Chapter 14: Cumulative and Secondary Impacts A. INTRODUCTION SEQRA regulations require the consideration of the Proposed Project s potential to result in cumulative impacts (6 NYCRR 617.9(b)(5)(a)) and

More information

vi Figures viii Summary S.1

vi Figures viii Summary S.1 Contents Contents iii Tables vi Figures viii Summary S.1 Chapter 1: Purpose and Need Project History A.1 Project Description A.2 Project Purpose A.5 Transportation Need A.6 Highway Capacity and Congestion

More information

FINDINGS OF FACT And CONCLUSIONS

FINDINGS OF FACT And CONCLUSIONS FINDINGS OF FACT And CONCLUSIONS SOUTHWEST RECONNECTION PROJECT Highway 61/101 Flood Mitigation State Project No. 1009-24 and State Aid Project No. 010-661-002 Prepared for: Carver County September 2013

More information

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 945

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 945 I-441-001 Thank you for your comments about the importance of the Latvian Center to the Latvian community. Following the Draft EIS, the Sound Transit Board directed Sound Transit to develop a Preferred

More information

Table of Contents. ES Executive Summary. 1.0 Introduction to the Project. 2.0 Alternatives Screened and Evaluated VOLUME 1. Page

Table of Contents. ES Executive Summary. 1.0 Introduction to the Project. 2.0 Alternatives Screened and Evaluated VOLUME 1. Page VOLUME 1 ES Executive Summary ES.1 Project Overview ES.2 Proposed Action ES.3 Other Alternatives Evaluated ES.4 Summary of Beneficial and Adverse Impacts of the Preferred Alternative ES.5 Other Government

More information

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects Lake Elmo Airport Environmental Assessment (EA)/ Environmental Assessment (EAW) Worksheet October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects Agenda Public Event #2

More information

REGIONAL GROWTH STRATEGY

REGIONAL GROWTH STRATEGY THOMPSON-NICOLA REGIONAL DISTRICT REGIONAL GROWTH STRATEGY Bylaw 2409, 2013 Source: Picture BC Thompson-Nicola Regional District 300-465 Victoria Street Kamloops, BC V2C 2A9 Telephone: 1-250-377-8673 Toll