Energy Consumption and CO 2 Emission Reduction for Space Heating using SAP in Chilean Dwellings

Size: px
Start display at page:

Download "Energy Consumption and CO 2 Emission Reduction for Space Heating using SAP in Chilean Dwellings"

Transcription

1 Energy Consumption and CO 2 Emission Reduction for Space Heating using SAP in Chilean Dwellings Angeles Hevia University College London (UCL), London, United Kingdom ABSTRACT: Fifty two percent of the energy consumption in Chilean dwellings comes from space heating. The country depends by an 80% on fuel imports. An increase in energy prices and fuel supply problems have obligated Chile to consider cheaper forms of energy such as wood, affecting people's health. The aim of this study is to reduce energy consumption and CO 2 emissions caused by space heating implementing the UK's SAP methodology in Chilean dwellings. The measures consisted of increasing the airtightness, reducing the thermal bridging and implementing energy efficient building services. Based on the current Chilean Thermal Regulations, walls were improved by making their u-values more even compared to the ones in roof and floor. Zones 1 and 2 reduced energy up to 75% with savings in CO 2 emissions up to 21%, by adding external insulation, reducing thermal bridging and air permeability. In the case of zones 4 to 7, the maximum energy savings were up to 71% considering CO 2 emission reductions of 48%. These were achieved by implementing thermal envelope improvements and solar collectors. Zone 3 was recommended to improve the fabrics in complement to using electric wall panel heaters reducing energy by 43% and CO 2 emissions by 75%. Conference theme: Buildings and energy Keywords: Energy, Space-Heating, SAP, Chile 1.0. INTRODUCTION Chile has a lack in natural gas resources, depending on imports since 1997 (CEI UC, 2009). In 2004, the natural gas exportation from Argentina was restricted halving the supply during some periods (CEI UC, 2009). The capacity of oil production in Chile is only 6.3% of its total real demand, which increases the reliance on foreign imports (CEI UC, 2009). Fifty two percent of the energy consumption in Chilean dwellings comes from space heating (CNE cited in Armijo, 2009). Although wood is the cheapest fuel its combustion is not an environmentally friendly solution because it causes deforestation and reduces absorption of carbon dioxide (CO 2) by tress, increasing health and inequity problems. Burning wood in Chile is a dramatic issue. Being the cheapest fuel, it provides space heating to almost half of the houses. Carbon dioxide emissions in Chile increased by 79% from 1990 to 2008 (IEA, 2008) The Chilean Thermal Regulation has set no target values for thermal bridging or air permeability. It hasn't either considered the efficiency of the heating systems. Neither are considered the free gains such as solar or internal gains or an external base temperature to set the artificial heating. Regulations consider thermal resistance values in walls that are quite distant compared to the ones in roof and floor producing heat losses in the areas with less resistance. This increases the risk of cold spots (Burgos, 2011). No recommended ventilation rates or target humidity levels have been set, such as the ones stated by the UK's CIBSE, which recommends a minimum of 0.4 air changes per hour (ACH) for dwellings and humidity levels between 40% and 70% in order to avoid mould growth. Carbon dioxide emissions are still not considered when applying for a building license in Chile. Notwithstanding, the Standard Assessment Procedure (SAP) is a methodology adopted by the UK Government in order to assess the energy performance of dwellings. It considers energy consumption as well as dwelling emission rate (DER) calculations measured due to space and water heating, ventilation and lighting, deducting the emissions saved by renewable technologies. Thermal bridging and air permeability heat losses are also considered Aims and Objectives The aim of this study is to reduce energy consumption and CO 2 emission caused by space heating in Chilean dwellings using the SAP methodology. The objectives are: - Reduce heat loss produced by the thermal envelope by making u-values comparable - Provide energy efficient solutions by reducing thermal bridging and increasing airtightness but still achieving appropriate ventilation rates - Calculate the energy consumption and CO 2 emission that could be saved by improving efficient measures for space heating - Include free heat gains and heating degree-day calculations for reducing energy and CO 2 emission

2 - Verify if the energy subsidy for solar collectors is a proper solution for reducing space heating 2.0. METHODOLOGY The 2005 SAP methodology, implemented in the UK, is used to measure the energy consumption and CO 2 emission in Chilean dwellings throughout the seven thermal zones. The study is divided in six simulations with dwelling typologies based in the 2002 Chilean Population Census (CChC, 2010) (Figure 1). Thermal zones 1, 2, 6 and 7 used typology 1, whereas thermal zones 3, 4 and 5 used dwelling typology 5. In order to adapt the 2005 SAP version to the Chilean thermal zones, seven weather files had to be found. Carbon Dioxide emission factors for fuels used in Chilean dwelling s heating systems were obtained from the International Energy Agency (IEA, 2008). The energy consumption was measured in kwh/year whereas the CO 2 emitted by the dwellings in this Initial Case represents the Target Emission Rate (TER). Later on, a Dwelling Emission Rate (DER) considers the CO 2 emission after the dwellings were improved. They are both measured in kgco 2/m 2 /year. Source: (CChC) Figure 1: Dwelling typologies 1 and First Simulation: Initial Case The first simulation is based in an Initial Case, which considers a dwelling in compliance with the Second Stage of the Chilean Thermal Regulation, regarding thermal transmittance values for roof, floor, walls and windows (Table 1). Since the Chilean Thermal Regulation has not set target values for heat losses caused by thermal bridging, a value of 0.15 W/mK, was assumed (BRE, 2005). An air leakage rate of 15 m 3 /hm was considered since the pressurisation test result has been avoided as not required by the current regulations (Building Regulations, 2010). The space heating and ventilation systems used are based in the 2002 Census (CChC, 2010). Table 1: Summary Table for Initial Case U-values Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Wall thickness 71 mm. 71 mm. 71 mm. 71 mm. 71 mm. 71 mm. 71 mm. Required Wool Fibre no no 30 mm 30 mm 30 mm 30 mm 50 mm Wall (W/m2K) Floor (W/m2K) Roof (W/m2K) Windows (W/m2K) Thermal Bridging (W/mK) Air permeability (m3/hm2@50pa) Ventilation rate ACH Ventilation system System Natural Natural Natural Natural Natural Natural Natural Category Low Low Low Low Low Low Low Space Heating System (device) Electric LPG LPG Wood Wood Wood Wood 2.2. Second Simulation: Thermal Bridging and Airtightness The second simulation, as well as the other five, uses the same u-values and space heating systems as the ones used in the Initial Case. Since the Chilean Thermal Regulation does not consider target values for thermal bridging or airtightness, this study has been based on the UK's standards such as the Accredited Construction Details, The Government s Standard Assessment Procedure for Energy Rating of Dwellings and the Building Regulations Part L1A Accordingly, the value for thermal bridging was 0.8 W/mK and the air permeability 7 m 3 /hm These values were accomplished as a consequence of using draught proofing in doors and windows, implementing insulation continuity, simple designs with minimum construction types and controlling the air barrier line reducing the air passage between interior and exterior (DCLG, 2007, p.5).

3 2.3. Third Simulation: Building Services A third simulation was made to improve the building services of the Initial Case. These were improved by changing the system, the efficiency or both. Table 2: Proposed Building Services Space Heating Initial System Electric LPG LPG Wood Wood Wood Wood Efficiency 100% 80% 80% 65% 65% 65% 65% Condensing boiler Efficiency N/A 90% 90% 90% 90% 90% 90% Wood Efficiency N/A N/A N/A 75% 75% 75% 75% Electric Wall panels Efficiency N/A 100% 100% 100% 100% 100% 100% Air Heat pump Efficiency 250% 250% 250% 250% 250% 250% 250% 2.4. Fourth Simulation: Renewable Energy The chosen renewable energy system was solar, considering that the Chilean government has a subsidy for implementing solar collectors in dwellings. Flat panels were proposed, with 78% efficiency, orientated towards the north and with an angle of inclination calculated by adding 10º to the latitude of the site where located (The Green Building Bible V2, 2008) Fifth Simulation: Wall Improvements The Chilean Thermal Regulation has distant target thermal transmittance values between roof, walls and floor, with higher heat losses in the areas with higher u-values, such as thermal zones 1 and 5 where wall u-values are five times larger than the ones in the roof. Insulation is added to the brick walls externally, allowing the thermal mass to store the heat during the day releasing it to the inside when the external temperatures decrease at night. Table 3: Proposed wall improvements Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Initial u-values Wall u-value (W/m2K) Floor u-value (W/m2K) Roof u-value (W/m2K) Proposed Walls External insulation (mm) Insulation type EPS Wool Fibre Wool Fibre Wool Fibre Wool Fibre Wool Fibre EPS Wall u-value (W/m2K) RESULTS AND ANALYSIS Energy consumption and CO 2 emission reductions achieved by the proposed measures are presented as follows. A detailed analysis of the impact these measures had in each thermal zone is detailed in the Results Analysis Result 1: Thermal Bridging and Airtightness improvements Reducing thermal bridging and air permeability decreased energy consumption in zones 4 and 7 by almost 18% whereas zone 2 lessened it by 10.9% (Figure 2). Figure 2: Energy efficient measures implementing Thermal Bridging and Air permeability Zones 1, 5 and 6 presented energy reductions of 16% whereas zone 3 by 13.2%. For CO 2 emissions, reductions increased towards the south ranging from 3.1% to 13.2%. Although the airtightness increased, ventilation rates were still appropriate with 0.59 ACH. However, it is assumed that the occupant will open the windows or that vents were implemented to keep proper ventilation rates.

4 3.2. Result 2: Building Services improvements MVHR The use of MVHR did not have major reductions either in energy consumption or CO 2 emissions (Figure 3). The maximum decrease was observed in thermal zone 4 with 1.5%. Zone 5 had a positive result in CO 2 savings with 4% reduction. Figure 3: Energy efficient measures implementing MVHR (left) and Condensing boiler (right) Condensing Gas boiler This measure allowed thermal zone 1 to reduce energy consumption by 59.3% (Figure 3). Zones 5 to 7 achieved reductions of 35%. The DER increased by 44.6% over the TER in thermal zone 1, whereas in zones 2 and 3 it reduced by 45.5%. Wood Stove The wood stove measure was applied in zones 4 to 7 with an average energy reduction of 13% whereas CO 2 emission, achieved the highest reduction of 19.3% in thermal zone 4 (Figure 4). Figure 4: Energy efficient measures implementing Wood Stoves (left) and Electric Resistance Heat (right) Electric Wall Panel Heaters Thermal zones 4 to 7 reduced energy consumption by 40%. The lowest results were observed in thermal zones 2 and 3 with reductions of 3.1% and 17.2% respectively (Figure 4). The DER was reduced by almost 60% in zones 2 and 3, whereas zones 4 to 7 achieved reductions of almost 40%. Heat Pumps Heat pumps demonstrated the maximum energy reduction of 72% in zones 4 to 7. In northern locations, a maximum reduction of 61.4% was observed in thermal zone 3. Carbon dioxide emission presented an important decrease throughout thermal zones 2 to 7 with a DER reduced by over 50%. The maximum reduction was observed in zone 3 with 71.6%, whereas the minimum was detected in thermal zone 1 with 5.7% 3.3. Result 3: Renewable Energy Solar Collectors Figure 5: Energy efficient measures implementing Solar Collectors (left) and Wall Improvements (right)

5 Solar collectors reduced energy by 52.9% in thermal zone 1 (Figure 5). Energy savings decreased towards the south. However, zones 2 and 3 increased their energy consumption by 2.5% and 13.9% respectively. Zone 2 achieved CO 2 emission reductions of 51.2%. Zones 4 to 7 lessened CO 2 emissions ranging from 25.1% to 11.8%. However the DER increased over the TER by 8.4% in zone Result 4: Wall Improvements Increasing the resistance in walls had positive results throughout all zones. The measure had the largest impact in thermal zone 1, reducing energy consumption by 60.1% (Figure 5). Thirty eight percent reduction was observed in zone 2 followed by zone 6 with savings of almost 30%. The lowest rates were observed in zones 3, 4, 5 and 7 ranging from 12% to 15%. The DER was reduced by almost 20% compared to the TER in thermal zone 6 followed by zone 2 with emissions reduced by 16%. Zone 1 and 7 had CO 2 emission reductions of 11.5% and 9.9% respectively whereas the lowest savings were observed in thermal zones 3 to 5 with an average of 7% Analysis of Results The final measures were chosen considering energy savings, CO 2 emission reductions and capital costs. The CO 2 reductions were subordinated to energy consumption that managed to achieve savings of almost 50%, since dwellings with energy reductions up to 60% are currently being constructed as they are attractive to the market Thermal Zone 1 The best results for energy consumption were observed when implementing a condensing gas boiler and reducing the u-values of the walls, saving almost 60% (Figure 6). Solar collectors reduced energy consumption as well as air source heat pumps by 52.9% and 40% respectively. Reducing the thermal bridging ratio and increasing the airtightness, reduced energy consumption by 15.5%. Figure 6: Energy and CO 2 savings for thermal zone 1 Energy savings between adding insulation and implementing a condensing boiler are quite similar, however, the former considers costs 33 whereas the latter 638. Similarly, air heat pumps have a high coefficient of performance (CoP), but their capital cost is too expensive. Accordingly a better option would be adding draught proofing in windows. Therefore, the most suitable measures are reducing thermal bridging, increasing airtightness and externally insulating the walls. The improved dwelling consumes 141 kwh/year for space heating and emits 19.3 kgco 2/m 2 /year Thermal Zone 2 The Initial Case for thermal zone 2 consumes 2,711 kwh/year and releases 95.1 kgco 2/m 2 /year (Figure 7). Implementing a condensing gas boiler diminished CO 2 emissions by 45.4%. The same savings were achieved by reducing thermal bridging and increasing the airtightness. Figure 7: Energy and CO 2 savings for thermal zone 2 Although electric wall panel heaters reduced CO 2 emission by 60.4% fuel usage was only lessened by 3.2%. The measures with the highest energy savings were air heat pumps and wall improvements saving annually 51.8% and 45.4% respectively (Figure 7). Although the latter reduced CO 2 emissions by only 16.1% compared to 59.1% lessened by the former, capital costs are lower when insulating the walls. When insulation was complemented to draught proofing in doors and windows, CO 2 emission diminished by 21.1% with annual energy savings of 56.4%. For

6 thermal zone 2 the most suitable option is to externally insulate walls with 10 mm wool fibre as well as doors and windows with draught proofing. The improved dwelling consumes 1,181 kwh/year emitting 75 kgco 2/m 2 /year Thermal zone 3 The Initial thermal zone 3 consumes 3,847 kwh/year and releases 96 kgco 2/m 2 /year. Air source heat pumps, allowed not only savings of 61.4% but also reduced CO 2 emissions by 71.7% (Figure 8). However, reducing air permeability, lessening thermal bridging ratios, adding external insulation and using electric wall panel heaters reduced altogether energy consumption by 42.9% and CO 2 emissions by 74.7%. The best options for zone 3 include adding draught proofing in windows and doors, adding 40 mm wool fibre insulation to walls with electric wall panel heaters. The improved dwelling showed an energy consumption of 2,196 kwh/year emitting 24.2 kgco2/m2/year of carbon dioxide Thermal zone 4 Figure 8: Energy and CO 2 savings for thermal zone 3 Figure 9: Energy and CO 2 savings for thermal zone 4 The Initial Case for thermal zone 4 consumes 4,249 kwh/year and releases 55.2 kgco 2/m 2 /year. Fabric improvements decreased energy by 33% reducing CO 2 emissions by 15.2%. Electric wall panel heaters and air source heat pumps, permitted energy savings of 41.5% and 72.1% respectively (Figure 9). The former reduced CO 2 emissions by 42.2% whereas the latter achieved a reduction of 54.5%. Condensing gas boilers achieved energy savings of 38.8% with CO 2 reductions of almost 16%. Heat pumps reduced energy by 72.1% and CO 2 by 54.5%. Nonetheless fabric improvements with solar collectors, saved energy up to 62.4% and CO 2 reductions of 40.4% with and initial cost of 114 much lower than condensing boilers or electric systems. The improved dwelling for thermal zone 4 consumes 1,598 kwh/year and releases 32.8 kgco 2/m 2 /year Thermal zone 5 Figure 10: Energy and CO 2 savings for thermal zone 5 The Initial Case for thermal zone 5 consumes 8,280 kwh/year and releases 79 kgco 2/m 2 /year (Figure 10). Solar collectors saved 25.5% in running costs diminishing CO 2 emissions by 18.5%. Improving the thermal envelope with draught proofing and external insulation in walls reduced energy usage by almost 28% reducing CO 2 emissions by 17.2%. Nonetheless, they achieved better results compared to solar collectors and are the cheapest measure

7 compared to electric or gas fuelled systems with a capital cost of 179. Wall panel heaters and air heat pumps had annual energy savings of 40.7% and 72.6% respectively. Carbon dioxide emissions were reduced by 40.8% and 58.6% respectively. Implementing a condensing gas boiler achieved energy savings of 35.4% lessening CO 2 emissions by almost 16%. Although air source heat pumps demonstrated better results compared to a condensing gas boiler, the latter has a lower cost of 638. Nonetheless, implementing a condensing gas boiler in complement to 50 mm wool fibre insulation and draught proofing, reduced energy by 63.4% and CO 2 emissions by 33%. Insulating walls, adding draught proofing and implementing solar collectors saved energy by 53.4% and CO 2 by 35.7%. However, fabric improvements installed with solar collectors has a capital cost of 179, whereas fabric improvements installed with a condensing boiler has a capital cost of 817 (Table 10). For these reasons, the best solution is to improve walls, add draught proofing and implement solar collectors saving 53.4% of energy and CO 2 emission reduction of 35.7%. The improved dwelling has an energy consumption of 3,855 kwh/year releasing 50.7 kgco 2/m 2 /year Thermal zone 6 The Initial Case for thermal zone 6 consumes 9,502 kwh/year and releases kgco 2/m 2 /year (Figure 11). Although CO 2 emissions were reduced by only 16% when implementing a condensing gas boiler, energy decreased by 35.3% (Table 11). Complementing this system with draught proofing as well as externally insulating walls with 80 mm wool fibre reduced energy by 81% and CO 2 by 46.7%. Although heat pumps achieved better results, a gasfuelled system is cheaper. Figure 11: Energy and CO 2 savings for thermal zone 6 Insulating walls and adding draught proofing achieved energy savings of 45.7% reducing CO 2 emissions by 30.5%. On the other hand, although implementing a condensing gas boiler with an improved fabric allowed larger reductions in energy and CO 2 emissions, solar collectors in complement to an airtight well-insulated building accomplished similar savings. These measures allowed not only to take advantage of the government's subsidy but also to achieve energy savings of 71%, lessening CO 2 emissions by 47.4%. The improved dwelling has an energy consumption of 2,754 kwh/year releasing 53.2 kgco 2/m 2 /year Thermal zone 7 The Initial Case for thermal zone 7 consumes 15,460 kwh/year and releases kgco 2/m 2 /year. Fabric improvements achieved annual energy savings of 30.4% decreasing CO 2 emission by 23.4% (Figure 12). Solar collectors achieved energy savings of 21.5% diminishing CO 2 by almost 12%, and when combined with fabric improvements it achieved energy savings of 51.9% and CO 2 emission reductions of 35.3%. The condensing gas boiler achieved cost savings of 32% although CO 2 emissions decreased by only 14.2%. Combining this option with increasing wall insulation and draught proofing it reduced energy by 62.4% lessening CO 2 emissions by 37.5%. Implementing electric wall panel heaters or air heat pumps are attractive solutions with energy reductions of around 70%. However, implementing 100 mm of expanded polystyrene in walls, reducing thermal bridging and air permeability and installing solar collectors has a cost of 520 reducing energy by 51.9% with CO 2 emission savings of 35.3%. The improved dwelling consumes 7,433 kwh/year and releases 92.2 kgco2/m2/year. Figure 12: Energy and CO 2 savings for thermal zone 7

8 4.0. CONCLUSION Increasing wall insulation thickness enabled achieving maximum energy reductions of 60% (zone 1) with maximum CO 2 emission reductions of 20% (zone 6), demonstrating what stated in the Literature Review: resembling the importance of proposing even u-values for achieving a heat loss reduction (Burgos, 2010). Reducing thermal bridging and air permeability achieved the highest energy reductions in zones 4 and 7 with 18% whereas zone 7 reduced CO 2 emission by almost 13%. Ventilation rates obtained in SAP when increasing airtightness (0.59 ACH) demonstrated to comply with minimum requirements (0.4 ACH). However these results considered the occupant behaviour hindering to conclude which are the real effects of airtightness in ventilation. The fabric measures stated above enabled altogether a maximum energy reduction of 75% in zone 1 whereas the minimum was observed in zone 3 with 25% reduction. The maximum CO 2 emission was reduced by 30% in zone 6 whereas the minimum was in zone 3 by 12% (Table 31). This allows us to conclude that fabric improvements are an appropriate solution when intending to reduce energy consumption and CO 2 emissions. The aim of this study was to reduce energy consumption and CO 2 emission caused by space heating in Chilean dwellings throughout the SAP methodology. It was fulfilled because the proposed measures achieved reductions in energy consumption over 50% in most of the zones with CO 2 emission reductions up to 75%. Since zones 1 and 2 have low heating requirements, thermal envelope improvements are suggested, achieving energy reductions of 76% and 56% respectively. Carbon dioxide emission was reduced by 15% in the former whereas the latter diminished by 21%. The suggested measure for zone 3 considers improving the thermal envelope and implementing electric wall resistance enabling savings of 75% in CO 2 emissions. Although this zone presented the lowest results for energy savings (43%) fabric improvements could still be considered to achieve better results by increasing the insulation thickness. Thermal envelope improvements in complement to solar collectors were the most appropriate solution for zones 4 to 7 with maximum energy and CO 2 emission reductions of 71% and 48% respectively. As far as the author is concerned, the Chilean Government does not support measures such as implementing insulation in dwellings. However, these should be taken into account for reducing space heating requirements considering a future subsidy for implementing these, before investing in more expensive technologies such as renewable energies. Sustainable architecture starts from implementing low cost and simple measures such as adding insulation, reducing thermal bridging and increasing airtightness. REFERENCES Armijo, G. (2009) Impact of an Energy Refurbishment Programme in Chile: More than Energy Savings. Earthscan: London, UK BRE, (2005) The Government's Standard Assessment Procedure for Energy Rating of Dwelings. BRE: Watford Building Regulations (2010) Approved Document L1A. NBS: London Burgos, D. (2011) Thermal Regulations: Just the First Step. Retrieved from: CChC (2010) Study of Final Use and Energy Conservation in Residential Sector. CChC: Santiago, Chile CEI UC (2009) Security and Energy Efficiency. Retrieved from: CIBSE (2007) Guide A: Environmental Design. CIBSE: London CNE (2006) Natural Gas market in Chile. [online] Retrieved from: DCLG (2007) Accredited Construction Details. DCLG: London Hevia, A. (2011) Energy Consumption and CO 2 Emission Reduction for Space Heating using SAP in Chilean Dwellinsg (Dissertation for MSc Environmental Design and Engineering UCL) Unpublished IEA (2008) CO 2 Emissions from Fuel Combustion. [online] Retrieved from: MINVU (2006) Second Stage of Thermal Regulation. MINVU: Santiago, Chile MINVU, (2007) Thermal Regulation Manual Part 1. MINVU: Santiago, Chile Nicholls, R., (2008) The Green Building Bible V2. Cambrian Printers: Llandysul SAP (2005) The Standard Assessment Procedure, BRE: London Treasury Department of Chile (2009) Subsidy for Solar Thermal Systems. Treasury Department: Santiago, Chile UTFSM (2008) Solar Irradiance in the Chilean Territory. UTFSM: Santiago, Chile

The BIG Energy Upgrade Energy Innovation for Retrofitting Deprived Community Housing in the UK

The BIG Energy Upgrade Energy Innovation for Retrofitting Deprived Community Housing in the UK The BIG Energy Upgrade Energy Innovation for Retrofitting Deprived Community Housing in the UK Dr. Hasim Altan Lecturer in Sustainable Environmental Design Director of BEAU Research Centre, School of Architecture

More information

Dwellings Energy Assessment Procedure (DEAP) for Building Regulations Compliance. Kevin O Rourke Head, Built Environment Sustainable Energy Ireland

Dwellings Energy Assessment Procedure (DEAP) for Building Regulations Compliance. Kevin O Rourke Head, Built Environment Sustainable Energy Ireland IBCI Conference 2007: Bunratty Shannon Shamrock Hotel 22-23 March 2007 Dwellings Energy Assessment Procedure (DEAP) for Building Regulations Compliance Kevin O Rourke Head, Built Environment Sustainable

More information

CHAPTER 13: Sustainability

CHAPTER 13: Sustainability CONTENTS 13.1 THE CODE FOR SUSTAINABLE HOMES 13.2 LOW CARBON / LOW ENERGY HOMES 13.3 AIR TIGHTNESS AND ROBUSTNESS 13.4 RENEWABLE ENERGY SOURCES Chapter 13 FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS

More information

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles http://lowenergybuildings.org.uk Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles Project Description Projected build start date

More information

BPE Case study of Pippin Close and Barnlea Close

BPE Case study of Pippin Close and Barnlea Close BPE Case study of Pippin Close and Barnlea Close Building Performance Evaluation conference 14 th July 2015 Woking Professor Rajat Gupta and Mariam Kapsali Low Carbon Building Group, Oxford Institute for

More information

Project name SOLAR HOUSE 80/50 Project summary

Project name SOLAR HOUSE 80/50 Project summary http://lowenergybuildings.org.uk Project name SOLAR HOUSE 80/50 Project summary Project Description Projected build start date 01 Mar 2010 Projected date of occupation 19 Jul 2010 Project stage Under construction

More information

Project Description. Projected build start date 01 Apr 2010 Projected date of occupation 31 Jan

Project Description. Projected build start date 01 Apr 2010 Projected date of occupation 31 Jan http://lowenergybuildings.org.uk Project name The Natural Refurbishment of 1960 Laing Easiform System; Housing Study of the application of natural Hemp Insulation and Fuel Cell Technolgy Project summary

More information

Project Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb

Project Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb http://lowenergybuildings.org.uk Project name PassivHaus Retrofit - Octavia Housing Project summary PassivHaus retrofit of a three storey solid brick Victorian terraced house in a conservation area. Produce

More information

This draft design submission has been prepared from plans and specifications and may not reflect the property as constructed.

This draft design submission has been prepared from plans and specifications and may not reflect the property as constructed. This Design Draft submission has been prepared by a Competent, registered with Faero Ltd. Faero Ltd. Scheme membership covers Criterion 1 of this checklist, that is, the requirement for the predicted carbon

More information

> Performance requirements: Part L UK vs Energiesprong vs Passivhaus.

> Performance requirements: Part L UK vs Energiesprong vs Passivhaus. > Performance requirements: Part L UK vs Energiesprong vs Passivhaus. Introduction The purpose of this paper is to highlight and compare the difference in performance requirements between UK Building Regulations

More information

Project name RetroPHit 04 - Steel Frame Bungalow Project summary A steel framed, brick clad bungalow built off a concrete raft foundation

Project name RetroPHit 04 - Steel Frame Bungalow Project summary A steel framed, brick clad bungalow built off a concrete raft foundation http://lowenergybuildings.org.uk Project name RetroPHit 04 - Steel Frame Bungalow Project summary A steel framed, brick clad bungalow built off a concrete raft foundation Project Description Projected

More information

Built examples and project certification. Zeno Bastian, Passive House Institute

Built examples and project certification. Zeno Bastian, Passive House Institute Built examples and project certification Zeno Bastian, Passive House Institute Passive House Standard for Retrofits? Photo Passive House Institute Shape Graphic Passive House Institute Thermal Bridges

More information

Building Better Buildings (BPE) 15 February 2016, UCL. Paul Ciniglio Sustainability & Asset Strategist. First Wessex

Building Better Buildings (BPE) 15 February 2016, UCL. Paul Ciniglio Sustainability & Asset Strategist. First Wessex Building Better Buildings (BPE) 15 February 2016, UCL Paul Ciniglio Sustainability & Asset Strategist First Wessex Introduction to the project North-East Elevation South-West Elevation Two identical block

More information

EPBD and Part L. Anthony Slater. BRE Environment

EPBD and Part L. Anthony Slater. BRE Environment EPBD and Part L Anthony Slater BRE Environment Energy Performance of Buildings Directive Directive 2002/91/EC of the European Parliament and Council published 4 January 2003 Directive lays down requirements

More information

Project Description. Projected build start date 03 May 2010 Projected date of occupation 06 Aug

Project Description. Projected build start date 03 May 2010 Projected date of occupation 06 Aug http://lowenergybuildings.org.uk Project name Retrofit - Appledore, Ashford Project summary The key project approach is to develop a solution that uses complementary technologies and techniques, and primarily

More information

One Size Fits All. Insulation A GUIDE TO BUILDING REGULATIONS / STANDARDS COMPLIANCE FOR NEW DWELLINGS USING STRUCTURAL INSULATED PANELS (SIPS)

One Size Fits All. Insulation A GUIDE TO BUILDING REGULATIONS / STANDARDS COMPLIANCE FOR NEW DWELLINGS USING STRUCTURAL INSULATED PANELS (SIPS) Insulation Second Issue April 2018 One Size Fits All A GUIDE TO BUILDING REGULATIONS / STANDARDS COMPLIANCE FOR NEW DWELLINGS USING STRUCTURAL INSULATED PANELS (SIPS) Low Energy Low Carbon Buildings 2

More information

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec Existing external wall construction

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec Existing external wall construction http://lowenergybuildings.org.uk Project name Tower Hamlets - naturally ventilated Passivhaus Retrofit Project summary The property is a 3 bedroom mid terrace single family residence built in the 1960

More information

Project Description. Projected build start date Projected date of occupation. Existing external wall construction.

Project Description. Projected build start date Projected date of occupation. Existing external wall construction. http://lowenergybuildings.org.uk Project name Admirals Hard Project summary FINALIST of the UK Passivhaus Awards 2015 - Situated on the Stonehouse peninsula, by the banks of the River Tamar, Number 3 Admirals

More information

Energy efficiency and the Code for Sustainable Homes

Energy efficiency and the Code for Sustainable Homes CE290 Energy efficiency and the Code for Sustainable Homes Level 3 Also available: Energy efficiency guidance for level 4 Energy efficiency guidance for levels 5 and 6 Contents 1. Introduction 3 1.1 The

More information

City of York Council Offices West Offices, York for

City of York Council Offices West Offices, York for City of York Council Offices for Part L2A Compliance Report 'As Built' Udox Solutions Ltd Low Carbon & Sustainability Consultants 7 Spur Drive Leeds West Yorkshire LS15 8UD T 0113 260 2855 1010178 / L2A

More information

Project Description. Projected build start date 19 Apr 2010 Projected date of occupation 30 Sep

Project Description. Projected build start date 19 Apr 2010 Projected date of occupation 30 Sep http://lowenergybuildings.org.uk Project name LB Greenwich - How low can we go? Project summary Our project has sought to produce a retrofit solution which is practical to build, easy to run and maintain,

More information

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec http://lowenergybuildings.org.uk Project name Hounslow Council Passivhaus Retrofit - and the development of a decision making matrix Project summary The house is a 3-bedroom semi-detached single-family

More information

Building Control. A Guide to Compliance When Designing Domestic Extensions

Building Control. A Guide to Compliance When Designing Domestic Extensions Building Control Technical Guidance Leaflet No. 18 Approved Document L1B 2010 Conservation of Fuel and Power This leaflet is one of a series produced by the Hertfordshire Building Control Technical Forum

More information

L2A 2010 In 30 Minutes!!

L2A 2010 In 30 Minutes!! 00:14:58 L2A 2010 In 30 Minutes!! The Stroma Group Building Sustainability & Compliance Presented by: Richard de Fleury BEng (hons) MSc 14:59:56 Part L 2010 - Agenda Summary of changes Criterion 1 Criterion

More information

Green Building Guideline of Jordan

Green Building Guideline of Jordan Green Building Guideline of Jordan T. Awadallah 1*, S. Habet 1, A. Mahasneh 1, H. Adas 2 1 Royal Scientific Society, Amman, Jordan 2 National Energy Research Center, Amman, Jordan * Corresponding author.

More information

EDEM detail description part 1: inputs and outputs

EDEM detail description part 1: inputs and outputs EDEM detailed description: Part 1 - inputs and outputs. Summary EDEM is a flexible approach to mapping the possible building carbon and energy performance universe in terms of a matrix of simulation models.

More information

Efficient and smart climate shell. refurbishment of residential buildings PART OF SMART SOLUTION 1: EFFICIENT AND SMART CLIMATE SHELL REFURBISHMENT

Efficient and smart climate shell. refurbishment of residential buildings PART OF SMART SOLUTION 1: EFFICIENT AND SMART CLIMATE SHELL REFURBISHMENT 6 Efficient and smart climate shell FACTSHEET refurbishment of residential buildings PART OF SMART SOLUTION 1: EFFICIENT AND SMART CLIMATE SHELL REFURBISHMENT Fig. 1: Image: www.idae.es LOW ENERGY DISTRICT

More information

Radian Group. Performance Standards. Date November Author Rachel Mitchell. Version Final (V2)

Radian Group. Performance Standards. Date November Author Rachel Mitchell. Version Final (V2) Radian Group Performance Standards Date November 2011 Author Rachel Mitchell Version Final (V2) Radian Building performance standards Contents Introduction... 3 Design considerations for Radian Housing...

More information

Approved Document L1A and L2A

Approved Document L1A and L2A Guide to: Approved Document L1A and L2A For England and Wales NEWBUILD Conservation of fuel and power APPROVED DOCUMENTL1A Conservation of fuel and power APPROVED DOCUMENTL2A Talk to the SIG360 team at

More information

Retrofit of existing housing in the United Kingdom: the carbon reduction possibilities

Retrofit of existing housing in the United Kingdom: the carbon reduction possibilities ARCHITECTURE AND SUSTAINABLE DEVELOPMENT, Proceedings of PLEA 2011, Louvain-la-Neuve, Belgium (July 2011) ISBN xxx-x-xxxx-xxxx-x - ISBN (USB stick) xxx-x-xxxx-xxxx-x @ Presses universitaires de Louvain

More information

The calculation procedure will continue to be known as SAP 2005 but the SAP version number is incremented from 9.80 to 9.81.

The calculation procedure will continue to be known as SAP 2005 but the SAP version number is incremented from 9.80 to 9.81. Amendments to SAP 2005 (version 9.81) April 2008 The calculation procedure will continue to be known as SAP 2005 but the SAP version number is incremented from 9.80 to 9.81. 1 Very little overshading The

More information

Passivhaus Projects and Benefits

Passivhaus Projects and Benefits Passivhaus Projects and Benefits Andrew T. Arthur MPH CMCIEH Arthur Associates Passivhaus not Passive House Need to make distinction between: this and this Passivhaus Standard which was developed in Germany

More information

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 31 May Aberdare, Rhondda Cynon Taff, Wales

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 31 May Aberdare, Rhondda Cynon Taff, Wales http://lowenergybuildings.org.uk Project name Self Heating Social Housing- the zero carbon retrofit Project summary The target for this project is to create the first UK PassivHaus retrofit using low/zero

More information

Engineers Ireland Cork Region CPD lecture series

Engineers Ireland Cork Region CPD lecture series Engineers Ireland Cork Region CPD lecture series NZEB and Emerging Legislation & SEAI s Deep Retrofit Pilot Programme Orla Coyle NZEB Programme Manager Conor Hanniffy Deep Retrofit Pilot Programme Manager

More information

Part L Review New Domestic Buildings Tom Lelyveld, AECOM

Part L Review New Domestic Buildings Tom Lelyveld, AECOM Part L Review New Domestic Buildings 2014 Tom Lelyveld, AECOM 11 th -13 th February 2014 What I will be talking about Introduction Background Key changes to Part L1A 2014 meeting the five new-build compliance

More information

SAP WorkSheet: New dwelling design stage

SAP WorkSheet: New dwelling design stage User Details: Assessor Name: Marco Valori Stroma Number: STRO7212 Software Name: Stroma FSAP 29 Software Version: Version: 1.4..72 Address :, Fife, KY11 4HT 1. Overall dwelling dimensions: Property Address:

More information

I Prophets energy services

I Prophets energy services CIBSE LOW CARBON CONSULTANTS REGISTER SESSION 7 BUILDING REGULATIONS APPROVED DOCUMENT L2B I Prophets energy services 03012013 Key Features Slide 4 ADL2B Details Slide 13 Controlled Fittings Slide 20 Controlled

More information

Residential Energy Code Update

Residential Energy Code Update Residential Energy Code Update www.phrc.psu.edu August 28 th, 2018 Brian Wolfgang Provider # 60114115 PPP ID: 1562 Description On May 1, 2018, the PA Uniform Construction Code (PA UCC) Review and Advisory

More information

BPE Case Study - Lyndhurst Crescent, Swindon

BPE Case Study - Lyndhurst Crescent, Swindon Professor Rajat Gupta Oxford Institute for Sustainable Development, Oxford Brookes University rgupta@brookes.ac.uk BPE Case Study - Lyndhurst Crescent, Swindon Building Better Buildings Conference, Bristol

More information

Thermal performance LIST OF CONTENTS

Thermal performance LIST OF CONTENTS LIST OF CONTENTS Page 1 A brief explanation Page 2 Heat loss through walls Page 3 Heat loss examples Page 4 Secret behind the walls. Thermal Storage Page 5 Air tightness Page 6 Density of EPS Page 7 Insulating

More information

Guide to Building Regulations changes 2010

Guide to Building Regulations changes 2010 T E C H N I C A L PA P E R - N O. 1 0 / 0 2 The authors HUW EVANS has a post-graduate degree in Technical Authorship from Sheffield Hallam University. He has a particular interest in building physics and

More information

Building Performance Evaluation

Building Performance Evaluation BUILDING PERFORMANCE EVALUATION CASE STUDY ONE BRIGHTON One Planet Living Zero carbon (renewable heat, on and off-site renewable electricity) Mechanical ventilation with heat recovery, communal heating,

More information

Passive Strategies and Low-Carbon Technologies: Evaluating the Energy Performance and Thermal Comfort of a Passive House Design

Passive Strategies and Low-Carbon Technologies: Evaluating the Energy Performance and Thermal Comfort of a Passive House Design Proceedings of the 2 nd ICAUD International Conference in Architecture and Urban Design Epoka University, Tirana, Albania, 8- May 14 Paper No. 128 Passive Strategies and Low-Carbon Technologies: Evaluating

More information

Energy Statement. Gainsford Road. For Pocket Living. XCO2 energy. May 2016

Energy Statement. Gainsford Road. For Pocket Living. XCO2 energy. May 2016 For Pocket Living May 2016 XCO2 energy w: www.xco2energy.com :: e: mail@xco2energy.com t: +44 (0) 20 7700 1000 :: f: +44 (0) 20 7183 6620 17-18 Hayward s Place :: Clerkenwell :: London :: EC1R 0EQ Contents

More information

England Building Regulations Part L 2013

England Building Regulations Part L 2013 England Building Regulations Part L 2013 Domestic buildings Tom Lelyveld, David Ross 08 October 2013 Content Introduction Background Changes to meeting the five new-build compliance steps Existing dwellings

More information

Cavity Wall Insulation. Installed costs: around 250 subsidised^ / yr

Cavity Wall Insulation. Installed costs: around 250 subsidised^ / yr Advisor Factsheet November 2008 Wall Insulation This document is intended for energy advice professionals only, and not the consumer Key Points Insulation has a long lifetime - savings are seen year after

More information

Upgrading To An A-Rated Home

Upgrading To An A-Rated Home Upgrading To An A-Rated Home Homeowner Guide HOW SEAI CAN HELP YOU AND YOUR HOME The Sustainable Energy Authority of Ireland (SEAI) is Ireland s national energy authority, investing in and delivering appropriate,

More information

Nocturnal natural ventilation for low and zero energy office buildings in Central Chile

Nocturnal natural ventilation for low and zero energy office buildings in Central Chile SET2009-8 th International Conference on Sustainable Energy Technologies,.Aachen, Germany. August 31 st to 3 rd September 2009 Page 1 of 6 Nocturnal natural ventilation for low and zero energy office buildings

More information

Green Building Guideline of Jordan

Green Building Guideline of Jordan Green Building Guideline of Jordan T. Awadallah 1*, S. Habet 1, A. Mahasneh 1, H. Adas 2 1 Royal Scintific Society, Amman, Jordan 2 National Energy Research Center, Amman, Jordan * Corresponding author.

More information

ZEM ds : Case studies

ZEM ds : Case studies ZEMedS: Case studies Case study: Salamanque Group school, Montpellier, France The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion

More information

Project Description. Projected build start date 15 Aug 2011 Projected date of occupation 19 Dec Existing external wall construction

Project Description. Projected build start date 15 Aug 2011 Projected date of occupation 19 Dec Existing external wall construction http://lowenergybuildings.org.uk Project name Redlands Project summary Deep retrofit of 1955 brick house in Devon based on EnerPHit standard. House had old gas boiler, double glazing, cavity wall insulation

More information

Project Description. Projected build start date 01 May 2010 Projected date of occupation 01 Nov Belfast, County Antrim, Northern Ireland

Project Description. Projected build start date 01 May 2010 Projected date of occupation 01 Nov Belfast, County Antrim, Northern Ireland http://lowenergybuildings.org.uk Project name Eco-Energy Retrofit, Grove Housing Association, Belfast Project summary The mid terrace solid wall house built in 1896, is located in North Belfast and owned

More information

Minimum Energy Consumption 84% energy heating savings*

Minimum Energy Consumption 84% energy heating savings* 3 HOUSE DESIGNS OF 140m² A modern concept for energy efficiency ENERGY EFFICIENCY AND ENVIRONMENTAL QUALITY Minimum Energy Consumption 84% energy heating savings* * According to a home fulfilling thermal

More information

SAP Calculations. M & T Homes Limited. Project: Plot 2, Wombourne Road Wombourne, Swindon, South Staffordshire, DY3 4NB

SAP Calculations. M & T Homes Limited. Project: Plot 2, Wombourne Road Wombourne, Swindon, South Staffordshire, DY3 4NB SAP Calculations Client: M & T Homes Limited Project: Plot 2, Wombourne Road Wombourne, Swindon,, DY3 4NB Contact: Geoff Williams ECCO2 Limited geoffwilliams@ecco2ltd.co.uk Building Regulation Compliance

More information

Regulations Compliance Report

Regulations Compliance Report Regulations Compliance Report Approved Document L1A 21 edition assessed by Stroma FSAP 29 program, Version: 1.5..32 Printed on 17 February 213 at 2:25:45 Project Information: Assessed By: Behdad Yazdani

More information

ECO-RETROFITTING VERY OLD DWELLINGS: CURRENT AND FUTURE ENERGY AND CARBON PERFORMANCE FOR TWO UK CITIES

ECO-RETROFITTING VERY OLD DWELLINGS: CURRENT AND FUTURE ENERGY AND CARBON PERFORMANCE FOR TWO UK CITIES ECO-RETROFITTING VERY OLD DWELLINGS: CURRENT AND FUTURE ENERGY AND CARBON PERFORMANCE FOR TWO UK CITIES HANIYEH MOHAMMADPOURKARBASI, STEVE SHARPLES School of Architecture, University of Liverpool, Liverpool,

More information

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target.

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target. http://lowenergybuildings.org.uk Project name Larch House, Ebbw Vale, Wales Project summary The Larch House, designed by bere:architects, is the UKs first zero carbon (code 6), low cost, Certified Passivhaus,

More information

Healthy Buildings 2017 Europe July 2-5, 2017, Lublin, Poland

Healthy Buildings 2017 Europe July 2-5, 2017, Lublin, Poland Healthy Buildings 217 Europe July 2-5, 217, Lublin, Poland Paper ID 89 ISBN: 978-83-7947-232-1 THERMAL RETROFIT OF A RESIDENTIAL BUILDING IN ROMANIA TO REACH LOW-CONSUMPTION ENERGY TARGETS Andrei DAMIAN

More information

Building Regulations Part L1A (2006)

Building Regulations Part L1A (2006) PART L1A GUIDE ENGLAND & WALES MAY 2006 High performance insulation for new mixed development housing Building Regulations Part L1A (2006) COST EFFECTIVE THERMAL SOLUTIONS House Type A House Type B House

More information

Apartment building Sodastraße 40 in Ludwigshafen, DE

Apartment building Sodastraße 40 in Ludwigshafen, DE Apartment building Sodastraße 40 in Ludwigshafen, DE PROJECT SUMMARY Renovation of an apartment building with exposed brickwork, built in 1892. 78% reduction of annual heat energy demand with interior

More information

A BSRIA Presentation. BSRIA Compliance

A BSRIA Presentation. BSRIA Compliance A BSRIA Presentation BSRIA Compliance Andy McGrath Andy McGrath Business Development Manager That s what it says on the card 2 BSRIA Compliance Provides the Complete Building Regulations Compliance Testing

More information

2000 Antwerp, terraced house

2000 Antwerp, terraced house 2000 Antwerp, terraced house 1. INTRODUCTION PROJECT SUMMARY - First phase energy renovation: 1999 - Second phase energy renovation: 2007 SPECIAL FEATURES - Two phased energy renovation - The owners stayed

More information

Traditional and passive house energy footprint calculation methods

Traditional and passive house energy footprint calculation methods Chapter 6: Case-studies Traditional and passive house energy footprint calculation methods m. arh. Dan Stoian Politehnica University of Timisoara, Timisoara, Romania arh. Ioana Botea Politehnica University

More information

SAP Calculations. Project: SITE 1 PHASE 2 MOYLAGH MEADOWS, MOYLAGH ROAD, BERAGH. Contact:

SAP Calculations. Project: SITE 1 PHASE 2 MOYLAGH MEADOWS, MOYLAGH ROAD, BERAGH. Contact: SAP Calculations Client: CHIEFTAN HOMES Project: SITE 1 PHASE 2 MOYLAGH MEADOWS, MOYLAGH ROAD, BERAGH Contact: Building Regulation Compliance Page 2 of 29 Property Reference: MOYLAGH MEADOWS, BERAGH Survey

More information

The environmental performance of low carbon dwellings using Structural Insulated Concrete blocks

The environmental performance of low carbon dwellings using Structural Insulated Concrete blocks The environmental performance of low carbon dwellings using Structural Insulated Concrete blocks Authors: Dr David Grierson 1, Ciaran Bradley 2, Adam Duff 3, & Michael Macdonald 4 Abstract This role of

More information

The Building Regulations, Part L (2013)

The Building Regulations, Part L (2013) Latest Release November 2013 Technical Briefing Note The Building Regulations, Part L (2013) www.xtratherm.com Technical Briefing Note The Building Regulations, Part L (2013) The latest revisions to energy

More information

Breathing and Airtight? Is this possible. AECB 2006 Peter Warm Buildings Energy Consultant

Breathing and Airtight? Is this possible. AECB 2006 Peter Warm Buildings Energy Consultant Breathing and Airtight? Is this possible AECB 2006 Peter Warm Buildings Energy Consultant Definitions Infiltration Ventilation Definitions -50 Pa Air Leakage Test Infiltration Ventilation How does infiltration

More information

Top Energy Savers: game

Top Energy Savers: game Top Energy Savers: game Playing with the cards The idea of the Top Energy Savers game is to show how the various Green Deal energy saving and generating measures perform in different types of households.

More information

Project Description. Projected build start date 11 Feb 2013 Projected date of occupation 14 Nov

Project Description. Projected build start date 11 Feb 2013 Projected date of occupation 14 Nov http://lowenergybuildings.org.uk Project name Clapham Retrofit Project summary This 4-storey semi-detached Grade II listed Victorian townhouse has been eco retrofitted to a high standard of airtightness

More information

Energy Simulation And Optimized Retrofit Practices Applied To A Real Dwelling

Energy Simulation And Optimized Retrofit Practices Applied To A Real Dwelling Purdue University Purdue e-pubs International High Performance Buildings Conference School of Mechanical Engineering 2014 Energy Simulation And Optimized Retrofit Practices Applied To A Real Dwelling Giulia

More information

AM-55, AM-56) B U I L D I N G P A R T N E R S H I P S F O R E N E R G Y S E C U R I T Y

AM-55, AM-56) B U I L D I N G P A R T N E R S H I P S F O R E N E R G Y S E C U R I T Y Nearly zero-energy building and components of the DIRECTIVE on energy performance of buildings 2010/31/EU Albin Zsebik, PhD, CEM Improving university curricula in the areas of a) energy efficiency in the

More information

Presentation to: CIBSE Homes for the Future Group, 18 July 2013 Key Findings from the CALEBRE Research Project

Presentation to: CIBSE Homes for the Future Group, 18 July 2013 Key Findings from the CALEBRE Research Project Professor Dennis Loveday, Loughborough University Project Principal Investigator Presentation to: CIBSE Homes for the Future Group, 18 July 2013 Key Findings from the CALEBRE Research Project What is Project

More information

exceed your energy performance levels

exceed your energy performance levels exceed your energy performance levels www..co.uk discover the better way to build Welcome to Thermohouse Thermohouse is one of the highest quality low energy building system available in Europe today.

More information

SUSTAINABILITY, ENERGY EFFICIENCY AND LISTED BUILDINGS

SUSTAINABILITY, ENERGY EFFICIENCY AND LISTED BUILDINGS CHAPTER 14 SUSTAINABILITY, ENERGY EFFICIENCY AND LISTED BUILDINGS (Refer to English Heritage s Guidance - Micro generation in the Historic Environment) GENERAL SUSTAINABILITY 14.1 Approximately one in

More information

SAP Calculations. Project: Conversion of the Royal Oak Inn OSWESTRY, Kinnerley Dovaston, Shropshire, SY10 8DP

SAP Calculations. Project: Conversion of the Royal Oak Inn OSWESTRY, Kinnerley Dovaston, Shropshire, SY10 8DP SAP Calculations Mr P Mellor Project: Conversion of the Royal Oak Inn OSWESTRY, Kinnerley Dovaston, Shropshire, SY10 8DP Contact: Julie Lock Energy Surveyor - Shropshire Council 01743 258748 Predicted

More information

Guide to the Government s Standard Assessment Procedure for Energy Rating of Dwellings (SAP)

Guide to the Government s Standard Assessment Procedure for Energy Rating of Dwellings (SAP) Guide to the Government s Standard Assessment Procedure for Energy Rating of Dwellings (SAP) Guide to the Government s Standard Assessment Procedure for Energy Rating of Dwellings (SAP) CONTENTS 1 Introduction...1

More information

Kindergarten Vejtoften, Høje-Taastrup, Denmark

Kindergarten Vejtoften, Høje-Taastrup, Denmark FAIR ON PASSIVE CONSTRUCTION AND RENOVATION WORKSHOP IEA SHC TASK 47, RETROFIT OF NON-RESIDENTIAL BUILDINGS: AN INTERNATIONAL EXPERT VIEW ON EXEMPLARY PROJECTS Brussels, 7 September 2012 Kindergarten Vejtoften,

More information

CE306. Essex Energy Village, Colchester: a case study

CE306. Essex Energy Village, Colchester: a case study CE306 Essex Energy Village, Colchester: a case study Contents 1. Introduction 3 2. Development details 3 2.1 Building fabric 4 2.2 Renewable energy 4 2.3 Costs 5 3. Lessons learned 6 Appendix 1 7 Cover

More information

Building Typology Brochure England September 2014

Building Typology Brochure England September 2014 Building Typology Brochure England September 2014 Disclaimer The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion of the European

More information

A handbook of thermal bridging details incorporating Porotherm blocks

A handbook of thermal bridging details incorporating Porotherm blocks A handbook of thermal bridging details incorporating Porotherm blocks Book 7 Thermal bridging solutions for external wall cavity details using Porotherm Prepared for Wienerberger Ltd by the BBA Constructive

More information

Project Description. Projected build start date 23 May 2016 Projected date of occupation 27 Feb 2017

Project Description. Projected build start date 23 May 2016 Projected date of occupation 27 Feb 2017 http://lowenergybuildings.org.uk Project name Loudon Buildings, Godinton Estate Project summary Conversion of a modern concrete framed straw barn into low energy 4 bedroom house, approved under Class Q

More information

Portuguese Thermal Building Legislation and Strategies for the Future

Portuguese Thermal Building Legislation and Strategies for the Future Chapter 2: Policies to Low Cost Sustainable Construction Portuguese Thermal Building Legislation and Strategies for the Future H. J. P. Gonçalves, M. J. N. Oliveira Panão & S.M.L. Camelo LNEG, Lisboa,

More information

INSULATION, PLASTERBOARD & BUILDING REGULATIONS

INSULATION, PLASTERBOARD & BUILDING REGULATIONS 2016 / 2017 INSULATION, PLASTERBOARD & BUILDING REGULATIONS ENGLA D EDITION N The key to success Keep compliant by using the products MKM stock Continue using traditional construction methods Trust your

More information

Energy Performance Certificate (EPC)

Energy Performance Certificate (EPC) Energy Performance Certificate (EPC) You can use this document to: FLAT 2, 4 ROSEBERY CRESCENT, EDINBURGH, EH12 5JP Dwelling type: Mid-floor flat Date of assessment: 05 December 2014 Date of certificate:

More information

CIBSE Homes for the future debate should all new homes be fully mechanically ventilated?

CIBSE Homes for the future debate should all new homes be fully mechanically ventilated? CIBSE Homes for the future debate should all new homes be fully mechanically ventilated? A briefing, concept and pre planning perspective Lee Hargreaves CEng BEng MCIBSE MEI 18/07/2013 Housing sector energy

More information

Varennes Net-Zero Library City of Varennes

Varennes Net-Zero Library City of Varennes Varennes Net-Zero Library City of Varennes 2016 Canadian Consulting Engineering Awards 2016 Canadian Consulting Engineering Awards Varennes Net-Zero Library 1 ii 2016 Canadian Consulting Engineering Awards

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate Address of dwelling and other details Flat C, 25 Wellmeadow, Blairgowrie, PH10 6AU Dwelling type: Topfloor flat Name of approved organisation: Elmhurst Energy Systems Ltd

More information

Project Description. Projected build start date 18 Mar 2013 Projected date of occupation 11 Nov 2013

Project Description. Projected build start date 18 Mar 2013 Projected date of occupation 11 Nov 2013 http://lowenergybuildings.org.uk Project name Coventry Eco House Project summary A project vision for Coventry & Warwickshire FORCE Group to design and build two 3 bedroom detached houses for Orbit Homes

More information

Available online at ScienceDirect. Energy Procedia 96 (2016 )

Available online at   ScienceDirect. Energy Procedia 96 (2016 ) Available online at www.sciencedirect.com ScienceDirect Energy Procedia 96 (2016 ) 768 778 SBE16 Tallinn and Helsinki Conference; Build Green and Renovate Deep, 5-7 October 2016, Tallinn and Helsinki Energy

More information

SAP Report Submission for Building Regulations Compliance

SAP Report Submission for Building Regulations Compliance SAP Report Submission for Building Regulations Compliance Client: BAUHU Project: 1 Final Design South, Plug & Play Modular House Contact: Guy Smith Easy EPC admin@easyepc.org Report Issue Date: 16/03/2017

More information

Project Description. Projected build start date 01 Feb 2010 Projected date of occupation 31 May Queenborough and Rushenden, Kent, England

Project Description. Projected build start date 01 Feb 2010 Projected date of occupation 31 May Queenborough and Rushenden, Kent, England http://lowenergybuildings.org.uk Project name Low Carbon Sheppey Project summary The project involves 2 houses in Queenborough and Rushenden on the Isle of Sheppey in Kent, one a mid terrace 1974 built

More information

Energy Performance Certificate (EPC)

Energy Performance Certificate (EPC) Energy Performance Certificate (EPC) You can use this document to: FLAT 0/1, 57 AIRLIE STREET, GLASGOW, G12 9SP Dwelling type: Ground-floor flat Date of assessment: 07 August 2015 Date of certificate:

More information

Upgrade your Home Insulation

Upgrade your Home Insulation Baltic Environmental Forum Latvia Antonijas iela 3-8 LV-1010 Riga, Latvia www.bef.lv Regional Environmental Center for Central and Eastern Europe Szentendre Ady Endre u 9-11 Hungary H-2000 www.rec.org

More information

The benefits of polyurethane insulation Today s solution for tomorrow s needs

The benefits of polyurethane insulation Today s solution for tomorrow s needs The benefits of polyurethane insulation Today s solution for tomorrow s needs The benefits of polyurethane insulation Today s solution for tomorrow s needs Did you know that Whenever you get into a car,

More information

PassiveDesign.org. Passive Construction. Name:...

PassiveDesign.org. Passive Construction. Name:... PassiveDesign.org Passive Construction About: This handout contains the information from the Passive Construction topic pages on passivedesign.org. Name:... Passive Construction A Passivhaus is a super-insulated,

More information

The mal B idging. Thermal Bridging Part L1A A Practical Guide

The mal B idging. Thermal Bridging Part L1A A Practical Guide The mal B idging Thermal Bridging Part L1A A Practical Guide Thermal Bridging Part L1A This paper discusses Thermal Bridging in SAP 2009, and to how gain compliance with Part L1A 2010. It is aimed primarily

More information

PIR Insulation. XT/Walk-R. Insulated Loft Decking. Roofs

PIR Insulation. XT/Walk-R. Insulated Loft Decking. Roofs PIR Insulation Roofs XT/Walk-R Insulated Loft Decking Data Sheet XT/Walk-R Insulated Loft decking Thin-R Loft Decking XT/Walk-R is a composite of high performance PIR insulation with tough OSB board that

More information

SAP Calculations. Acheson Construction. Project: Plot 8, Neils View Maiden Newton. Contact: James Frampton Trinity Architecture

SAP Calculations. Acheson Construction. Project: Plot 8, Neils View Maiden Newton. Contact: James Frampton Trinity Architecture SAP Calculations Client: Acheson Construction Project: Plot 8, Neils View Maiden Newton Contact: James Frampton Trinity Architecture james@trinarch.com CODE FOR SUSTAINABLE HOMES - CfSH November 2010 Page

More information

27/10/15. Rod Hughes Architect Director 2030 architects ltd. Penrith

27/10/15. Rod Hughes Architect Director 2030 architects ltd. Penrith Rod Hughes Architect Director 2030 architects ltd. Penrith We specialise in high quality low carbon development, retrofit and community led design We often work with community groups to develop consensus

More information

5 social row houses (Wachtebeke)

5 social row houses (Wachtebeke) 5 social row houses (Wachtebeke) 1. OVERVIEW PROJECT SUMMARY - Year of construction: 1971 - Renovation: 2012 - Building typology: Social housing SPECIAL FEATURE - Demolition of facade brick & adding 30

More information