2 GUJARAT TECHNOLOGICAL UNIVERSITY BRANCH NAME: Mechanical Engineering SUBJECT NAME: Power Plant Engineering SUBJECT CODE: B.E. 7 th SEMESTER Type of course: Applied Engineering Prerequisite: Engineering Thermodynamics, Fluid Mechanics, Heat Transfer Rationale: The course is designed to give fundamental knowledge of construction and working of various types of thermal power plants i.e. steam turbine, gas turbine, nuclear etc. Teaching and Examination Scheme: Teaching Scheme Credits Examination Marks Total L T P C Theory Marks Practical Marks Marks ESE PA (M) ESE (V) PA (E) PA ALA ESE OEP (I) L- Lectures; T- Tutorial/Teacher Guided Student Activity; P- Practical; C- Credit; ESE- End Semester Examination; PA- Progressive Assessment; OEP-Open Ended problem; AL-Active learning; Content: Sr. No. Content 1 Thermal Power Plant: General layout of modern thermal power plant, Site selection, Presents status of power generation in India 2 High Pressure Boilers: (Unique features and advantages of high pressure boilers, La-Mont; Benson; Velox, Loeffler and Schmidt-Hartmann boilers)*, supercritical boilers, Supercharged and fluidized bed combustion, Methods of superheat control, Corrosion in boilers and its prevention 3 Coal and Ash Handling Systems: Coal storage, Burning systems, Types of stokers and their working, Pulverized fuel handling systems, Unit and central systems, Pulverized mills- ball mill, Bowl mill, Ball & race mill, Impact or hammer mill, Pulverized coal burners, Oil burners, Necessity of ash disposal, mechanical; hydraulic; pneumatic and steam jet ash handling system, Dust collection and its disposal, Mechanical dust collector, Electrostatic precipitator 4 Draught System: Natural draught estimation of height of chimney, Maximum discharge condition, Forced; induced and balanced draught, Power requirement by fans 5 Steam Nozzles: Types of nozzles, velocity of steam, discharge through nozzle, critical pressure ratio and condition for maximum discharge, physical significance of critical pressure ratio, nozzle efficiency 6 Steam turbine: (Principle of operation, types of steam turbines, compounding of steam turbines, impulse turbine velocity diagram)*, calculation of work, power and efficiency, condition for maximum efficiency, Reaction turbines velocity diagram, degree of reaction, reheat factor, (governing of steam turbine throttle, nozzle and bypass governing)*, Methods of attachment of blades to turbine rotor, Labyrinth packing, Losses in steam turbine 7 Condensers and Cooling Towers: Types of condensers, sources of air in condenser, Effects of air leakage, Methods of obtaining maximum vacuum in condenser, vacuum & condenser efficiency, Mass of cooling water required, Total Hrs % Weigh tage

3 Edward air pump, Necessity of cooling ponds and cooling towers, Condenser water cooling systems, Types of cooling towers and cooling ponds 8 Feed Water Treatment: Necessity of feed water treatment, Different impurities found in feed water, Effect of impurities, ph & its role in corrosion and scale formation, Internal & external water treatment systems Hot lime soda process, Zeolite ion exchange process, Demineralization plants, Reverse osmosis process, Sea water treatment using reverse osmosis, De-aeration 9 Gas turbine: Classification, open and closed cycle, gas turbine fuels, actual Brayton cycle, optimum pressure ratio for maximum thermal efficiency, work ratio, air rate, effect of operating variables on the thermal efficiency and work ratio and air rate, combined steam and gas turbine plant, gas turbine blade cooling 10 Nuclear Power Plant: Nuclear fusion and fission, Chain reaction, Nuclear fuels, Components of nuclear reactor, Classification of reactors, Pressurized water reactor, Boiling water reactor, Gas cooled reactor, CANDU reactor, Fast breeder reactor, Nuclear waste and its disposal, Nuclear power plants in India 11 Jet Propulsion: Turbojet Engine*, thrust, thrust power, propulsive efficiency, thermal efficiency, (Turboprop, Ramjet and Pulsejet engines, Rocket engines)* 12 Economics of Power Generation: Load curves, Load duration curves, Connected load, Maximum load, Peak load, Base load and peak load power plants, Load factor, Plant capacity factor, Plant use factor, Demand factor, Diversity factor, Cost of power plant, Performance and operating characteristics of power plant, Tariff for electric energy * This topic should be covered during laboratory sessions Suggested Specification table with Marks (Theory): Distribution of Theory Marks R Level U Level A Level N Level E Level C Level Legends: R: Remembrance; U: Understanding; A: Application, N: Analyze and E: Evaluate C: Create and above Levels (Revised Bloom s Taxonomy) Note: This specification table shall be treated as a general guideline for students and teachers. The actual distribution of marks in the question paper may vary slightly from above table. Reference Books: 1. Power Plant Engineering, P.K. Nag, McGraw-Hill Education 2. Power Plant Technology, M.M. El-Wakil, McGraw-Hill Education 3. Thermal Engineering, R.K.Rajput, Laxmi Publication 4. Gas Turbines by V Ganeshan, McGraw Hill Education 5. Steam Turbine Theory and Practice, William J. Kearton, CBS Publication Course Outcome: After learning the course the students should be able to: Understand the different power generation methods, its economics and global energy situation Apply the basic thermodynamics and fluid flow principles to different power generation methods Analyze thermodynamic cycles of steam power plant and understand construction, working and significance of its various systems Analyze thermodynamic cycles of gas turbine power plant, nuclear power plant and jet propulsion systems

4 List of Experiments: (any ten experiments to be performed) 1. Study of Modern Steam Power Plant. 2. Study of Steam Turbines. (Impulse, Reaction and governing). 3. Study of Gas and Steam Turbine Combined Cycles. 4. Study of Nuclear Power Plant. 5. Study of various draught system. 6. Study of different feed water treatment plants. 7. Study of different types of steam nozzle and design a nozzle 8. Comparative study of different types of high pressure boilers 9. Study of Coal and Ash handling system. 10. Study of condenser and cooling tower. 11. Study of Jet Propulsion systems. Design based Problems (DP)/Open Ended Problem: 1. Develop a working draught system. 2. Develop a working model of any water treatment system. 3. Develop a working model of cooling tower. List of Open Source Software/learning website: ACTIVE LEARNING ASSIGNMENTS: Preparation of power-point slides, which include videos, animations, pictures, graphics for better understanding theory and practical work The faculty will allocate chapters/ parts of chapters to groups of students so that the entire syllabus to be covered. The power-point slides should be put up on the web-site of the College/ Institute, along with the names of the students of the group, the name of the faculty, Department and College on the first slide. The best three works should submit to GTU.

5 Seat No.: Enrolment No. GUJARAT TECHNOLOGICAL UNIVERSITY BE - SEMESTER VII (NEW) - EXAMINATION SUMMER 2017 Subject Code: Date: 11/05/2017 Subject Name: Power Plant Engineering Time: PM to PM Total Marks: 70 Instructions: 1. Attempt all questions. 2. Make suitable assumptions wherever necessary. 3. Figures to the right indicate full marks. 4. Use of steam tables, Mollier chart and calculator is permissible. Q.1 (a) Draw a neat layout of thermal power plant and make a list of site selection criteria for the same. (b) Draw a line diagram of a Benson boiler. State the main difficulties experienced in the La Mont boiler and how it is prevented? Q.2 (a) Discuss requirements of oil burners. With neat sketch explain long flame, turbulent burners and tangential Burners. (b) Enumerate different types of Ash handling system. Explain Pneumatic ash handling system with advantages and disadvantages. (b) State the classification of Draught. Derive an expression for maximum discharge through a chimney. Q.3 (a) State and explain losses in steam turbine. (b) The Data pertaining to an impulse turbine is as : Blade speed = 300 m/s, Isenthalpic enthalpy drop in nozzle = 450 kj/kg, Nozzle efficiency = 90 %, Nozzle angle = 20º, Blade velocity co efficient = 0.85, Blade exit angle = 25º. Calculate for a mass of 1 kg/sec; (1) Inlet angle of moving blades (2) The axial thrust (3) The driving force on the wheel (4) The diagram power (5) The energy lost in blades due to friction (6) Blade efficiency Q.3 (a) Define Fill, Drift and cooling efficiency of cooling tower. Explain the methods for obtaining maximum vacuum in condenser. (b) A reaction turbine runs at 3000 RPM and steam consumption is kg/hr. The pressure of Steam at a certain pair is 2 bar, its dryness fraction is 0.94 and the power developed by the pair is 52 kw. The discharge blade angle is 20 º for both fix and moving blades and the axial flow velocity is 0.72 times the blade velocity. Find out the drum diameter and blade height. Take the tip leakage steam as 8 %. Neglect the Blade thickness. Q.4 (a) The air at p1 and T1 enters into a gas turbine cycle and compressed to p2 (R = p2/p1) and then heated to temperature T3. The air is expanded into two stages having same pressure ratio in each turbine. The air after expansion in first stage is reheated to T3 before passing to second stage of the turbine. Considering all processes ideal and intermediate pressure, Prove that, 1

6 Where, T = T3 / T1, K = R m and m = γ -1 / γ Also derive for the maximum specific work output, (b) A gas turbine plant is operated between 1 bar and 9 bar pressures and minimum and maximum cycle temperatures are 25 ºC and 1250 ºC. A compression is carried out in two stages with perfect intercooling. The gases coming out from H.P. turbine are heated to 1250 ºC before entering into L.P. turbine. The expansions in both turbines are arranged in such a way that each stage develops same power. Assuming compressors and turbines isentropic efficiencies as 83 %. (a) Determine the cycle efficiency assuming ideal regenerator. (b) Find the power developed by the cycle in kw if the air flow through the power plant is 16.5 kg/sec. Neglect the mass of fuel. All the components are mounted on a single shaft. Q.4 (a) Describe working of hot sodium zeolite process with neat sketch and chemical reactions. List advantages and disadvantages over ion exchange system. (b) In a closed cycle gas turbine the following data apply, Working substance is air, Cp = 1 kj/kg K and γ = 1.4; Ambient temperature = 27 ºC; Top temperature = 823 ºC; Pressure at compressor inlet = 1 bar; Pressure ratio = 4; Compressor efficiency = 80 %; Turbine efficiency = 85 %; Heating value of fuel = kj/kg; Heater loss = 10 % of heating value; Neglect mass of fuel. Find the following : (1) Specific Compressor work (2) Heat supplied per kg of air (3) Specific Turbine work (4) Specific Net work output (5) Work ratio (6) Thermal efficiency of cycle Q.5 (a) Derive the condition and then equation of maximum discharge through the nozzle, also write maximum discharge for different condition of steam. (b) Steam is expanded in nozzle from 15 bar and 350 ºC to 1 bar. Find the throat 04 and exit area if flow rate is 1 kg/sec. What should be coefficient of velocity if exit velocity is 1150 m/sec? (c) Explain the principle of jet and rocket propulsion with neat sketch. 03 Q.5 (a) Explain with neat sketch construction and working of CANDU type reactor. (b) The maximum load on thermal power plant of 70 MW capacity is 55 MW at an 04 annual load factor of 60 %. The Coal consumption is 0.96 kg per unit of energy generated and the cost of coal is Rs. 2 per kg. Find the annual revenue earned if the electric energy is sold at Rs. 2.5 per kwh. (c) Explain Demand Factor, Diversity Factor and Plant Capacity Factor. 03 ************* 2

7 Seat No.: Enrolment No. GUJARAT TECHNOLOGICAL UNIVERSITY BE - SEMESTER VII(NEW) EXAMINATION WINTER 2016 Subject Code: Date:01/12/2016 Subject Name:Power Plant Engineering Time: AM to 1.00 PM Total Marks: 70 Instructions: 1. Attempt all questions. 2. Make suitable assumptions wherever necessary. 3. Figures to the right indicate full marks. 4. Use of steam table and Mollier chart are allowed. Q.1 (a) Explain working of Bowl pulverizing mill with neat sketch. (b) A 200 MW thermal power plant has peak load of 130 MW. The power station supplies load to four town having their maximum demand of 30 MW, 40 MW, 25 MW and 45 MW. The annual load factor is 65%. Find: (i) Average load on the plant (ii) Energy supplied per year (iii) Diversity factor (iv) Demand factor (v) Plant capacity factor. Q.2 (a) Explain pressure-velocity compounding of impulse turbine with diagram. (b) (i) Draw general layout of modern thermal power plant. 04 (ii) State desirable to control the super heat temperature. Explain desuperheater 03 method. (b) Explain working of Schmidt-Hartmann boiler with neat sketch. Q.3 (a) Define critical pressure. Derive P 2 = ( 2 n ) ; where P2 is throat pressure, P1 is inlet pressure and n is P 1 n+1 the index of isentropic expansion of steam through the nozzle. (b) The pressure and temperature of steam entering the nozzle are 12 bar and C and steam leave the nozzle at 1 bar. The diameter of the nozzle at throat is 10 mm. Calculate the mass flow rate of steam in a nozzle and which type of nozzle is required? Q.3 (a) Steam issues from the nozzles at angle of 18 0 at a velocity of 450 m/sec. the friction factor is For a single stage turbine designed for maximum efficiency, determine (i) Blade velocity (ii) Moving blade angles for equi-angular blades (iii) blade efficiency (iv) stage efficiency if the nozzle efficiency is 95% (v) Power developed for a mass flow rate of steam of 4 kg/sec. (b) Distinguish between force draught and induced draught. 03 (c) Explain Unit pulverized coal handling system with neat sketch. 04 Q.4 (a) In a condenser, vacuum reads 716 mm of Hg while barometer reads 756 mm of Hg. The temperature of condensate is 25 0 C. Determine (i) The pressure of the steam and air (ii) Mass of air per kg of steam (iii) The vacuum efficiency. (b) Explain Zeolite ion exchange process for feed water treatment plant. Q.4 (a) A gas turbine operates on Brayton cycle. The temperature range is 1050 K and 288 K. Find pressure ratio for maximum power output. Also determine thermal efficiency, work ratio and power output, if the mass flow rate of air is 20 kg/sec. Take Cp = kj/kg K and ϒ = 1.4 for compression and expansion process. (b) Explain the parameters affected on work ratio in gas turbine power plant. 1

8 Q.5 (a) List the nuclear reactors. Explain working of Pressurized water reactor. (b) Explain construction and working of Turbojet. Q.5 (a) Define blade efficiency and derive an expression for maximum blade efficiency for single stage impulse steam turbine. (b) Derive an expression for air standard efficiency of ideal Bryton cycle in terms of pressure ratio. State the assumption made. 2

9 Seat No.: Enrolment No. GUJARAT TECHNOLOGICAL UNIVERSITY BE - SEMESTER V (OLD) - EXAMINATION SUMMER 2017 Subject Code: Date: 27/04/2017 Subject Name: Power Plant Engineering Time: 02:30 PM to 05:00 PM Total Marks: 70 Instructions: 1. Attempt all questions. 2. Make suitable assumptions wherever necessary. 3. Use of Steam Table is permitted. Q.1 (a) Draw general layout of modern thermal power plant and label major components. Explain its main four circuits in brief. (b) Explain with neat sketch construction and working of Loeffler boiler. Q.2 (a) Explain construction and working of Electrostatic precipitator with neat sketch. (b) Explain unique features and give advantages of high pressure boilers. (b) Explain working of two pass flow surface condenser with neat sketch. Q.3 (a) Name pulverized coal burners. Explain anyone in detail with neat sketch. (b) Explain with neat sketch Diesel power plant. Explain function of each system in brief. Q.3 (a) Derive expression for chimney height in terms of air and flue gas temperature and air-fuel ratio. (b) A draught of 20mm of water column each produce in 33m high chimney. The air and flue gas temperatures are 300K and 650K. Coal used is 2000Kg/hour. Find (1) quantity of air supplied per Kg of coal (2) The draught in terms of column of hot gases. Q.4 (a) Steam enters in condenser at 308K. The condenser vacuum is 70cm of Hg when barometer reads 75.5cm of Hg. Find (1) Vacuum efficiency (2) mass of air per Kg of steam present in condenser. (b) Compare mechanical draught cooling tower with natural cooling tower. Q.4 (a) Explain working of CANDU reactor with neat sketch. (b) List Nuclear power plants in India with capacity. Give advantages and disadvantages of Nuclear power plant. Q.5 (a) Define the following terms (1) Average load (2) Load factor (3) Use factor (4) Demand factor (5) Diversity factor (6) Utilization factor (7) Plant capacity factor (b) Explain pneumatic ash handling system with neat sketch. Give its advantages and disadvantages. Q.5 (a) List different impurities found in feed water and give their effects on performance of thermal power plant. (b) Explain effect of different pollutants on human health by thermal power plants. ************* 1

10 Seat No.: Enrolment No. GUJARAT TECHNOLOGICAL UNIVERSITY BE - SEMESTER V- EXAMINATION SUMMER 2016 Subject Code: Date: 06/05/2016 Subject Name: Power Plant Engineering Time: 02:30 PM to 05:00 PM Total Marks: 70 Instructions: 1. Attempt all questions. 2. Make suitable assumptions wherever necessary. 3. Figures to the right indicate full marks. 4. Use of steam table is allowed. Q.1 (a) (i) Draw general layout of modern thermal power plant with usual notation. 05 (ii) Explain any six factors considered in selecting a site for big thermal power 03 plant. (b) Draw a line diagram of a benson boiler. State the main difficulties experienced in the La Mont boiler and how it is prevented? 06 Q.2 (a) State requirements of good ash handling plant and explain the working of Electrostatic Precipitator with neat sketch (b) (i) Explain any two method of controlling temperature of super heated steam. 04 (ii) Differentiate between Superheater, Reheater and air Preheater. 03 (b) Steam with dryness fraction of 0.85 enter in surface condenser at an pressure of Mpa and comes out as a water at 50 C.Cooling water enters at 30 C and leaves at 45 C. Estimate quantity of circulating water and efficiency. Q.3 (a) Derive an expression for chimney height in order to obtain a draught of h mm of water column if the boiler used m kg of air/kg of fuel. Assume, surrounding air temperature as T a and flue gas temperature as T g in degree absolute. Also derive an expression for the condition of maximum discharge of flue gases through a chimney. (b) Compare (i) Jet condenser with Surface condenser. (ii) Natural draught cooling tower and Mechanical draught cooling tower Q.3 (a) Describe Ball and Race mill with its diagram. State its merits and demerits (b) (i) A chimney is 28 meter high and temperature of hot gases inside the 04 chimney is 320 C. The temperature of outside air is 27 C and furnace is supplied with 15 kg of air per kg of coal burnt. Calculate 1. Draught in mm of water 2. Draught height in meters of hot gases (ii) Explain any one cooling pond with neat sketch. 03 Q.4 (a) Explain necessity of feed water treatment. What are the major impurities present in feed water? Explain in brief. (b) State the objective of a lubrication system. Explain working with a schematic of dry sump lubrication system. Differentiate between wet sum and dry sump lubrication system. Q.4 (a) With neat sketch explain engine lubrication system of typical diesel power plant (b) What is the importance of term ph value of water in feed water and explain sodium zeolite water treatment with neat sketch. 1

11 Q.5 (a) Explain with neat sketch construction of CANDU type reactor along with its merit and demerits. (b) (i) Define following terms: 04 Connected load, Average demand, Diversity factor, Utilization factor (ii) Discuss bad effect of acid rains. 03 Q.5 (a) Explain with neat sketch Boiling Water reactor. (b) The annual peak load on 30 MW power station is 25 MW. The power station supplies load having maximum demand of 10 MW, 8.5 MW, 5 MW and 4.5 MW. The annual load factor is Calculate: 1. Average load 2. Energy supplied per year 3. Diversity factor 4. Demand factor ************* 2

12 Seat No.: Enrolment No. GUJARAT TECHNOLOGICAL UNIVERSITY BE - SEMESTER V EXAMINATION WINTER 2015 Subject Code: Date:05/12/2015 Subject Name: Power Plant Engineering Time: 10:30am to 1:00pm Total Marks: 70 Instructions: 1. Attempt all questions. 2. Make suitable assumptions wherever necessary. 3. Figures to the right indicate full marks. Q.1 (a) What factors should be taken into consideration while selecting the site for steam power plant? (b) What is the function of super-heaters? Sketch and explain different super heaters briefly. Q.2 (a) Draw line diagram of Velox boiler. Indicate all part of it. How it different from the other type of high pressure boiler? (b) Explain any two from the following boiler accessories with neat sketch. (i) Air-preheater (ii) Economizer (iii) Re-heaters. (b) Describe a neat line diagram of in-plant coal handling system and explain the equipment used at different stage. Q.3 (a) Classify pulverized mill used in modern power plant. Explain any one with neat sketch. (b) Write short note on Electrostatic precipitator. Q.3 (a) Determine the height and diameter of the chimney used to produce a draught for a boiler which has an average coal consumption of 1800 kg/hr and flue gases formed per kg of coal fired are 14 kg. The pressure losses through the system are given below. Pressure loss in fuel bed = 7 mm of water, pressure loss in boiler flues = 7 mm of water, pressure loss in bends = 3 mm of water, pressure loss in chimney = 3 mm of water. Pressure head equivalent to velocity of flue gases passing through the chimney = 1.3 mm of water. The temperature of ambient air and flue gases are 35 0 C and C respectively. Assume actual draught is 80% of theoretical. (b) Classify the condensers. Explain any one surface type condensers with neat sketch. Q.4 (a) Explain diesel engine various starting system briefly. (b) Classify the diesel engine lubrication system. Explain any one with neat sketch. Q.4 (a) What do you mean by CANDU reactor? Explain working and construction of CANDU reactor with neat sketch. (b) Describe Nuclear fuel briefly. Explain nuclear waste and its disposal methods. Q.5 (a) Explain in detail Reverse Osmosis process for water treatment. (b) Why cooling towers used in steam power plant? Compare forced draught cooling tower to induced draught cooling tower in detail. Q.5 (a) How steam power plant pollute air? What are the effects of this pollution on human health? (b) The peak load on a 50 MW power station is 39 MW. It supplies power through 1

13 four transformers whose connected loads are 17, 12, 9 and 10 MW. The maximum demands on these transformers are 15, 10, 8, and 9 MW respectively. if the annual load factor is 50% and plant is operating for 65% of the period in a year, find out the following: (i) Average load on the station (ii) Energy supplied per year (iii) Demand factor (iv) Diversity factor (v) Power Station use load. ************* 2

14 Seat No.: Enrolment No. GUJARAT TECHNOLOGICAL UNIVERSITY BE - SEMESTER V EXAMINATION SUMMER 2015 Subject Code: Date: /05/2015 Subject Name: Power Plant Engineering Time: 02.30pm-05.00pm Total Marks: 70 Instructions: 1. Attempt all questions. 2. Make suitable assumptions wherever necessary. 3. Figures to the right indicate full marks. Q.1 (a) Draw a neat layout of thermal power plant and make a list of site selection criteria for the same. (b) (i) Define base load, average load and peak load for a power plant. 03 (ii)daily load of power generation plant is given in following table. 04 Time 12 AM to 6 AM 6 AM to 8 AM 8 AM to 12PM 12 PM to 2 PM Load (MW) Time 2 PM to 4 PM 4 PM to 6 PM 6 PM to 8 PM 8 PM to 12 PM Load (MW) Solve the following: I Draw load curve II Calculate average load and load factor for maximum demand of 5000 MW. Q.2 (a) Draw a neat sketch of once through drum less boiler. What are its advantages over conventional high pressure boilers? (b) Explain working principal of fluidized bed boiler with necessary diagram. How Sulfur and Nitrogen emissions are controlled in fluidized bed boiler. (b) Why temperature of steam needs to be controlled in thermal power plant? Name different methods to control the temperature of steam and explain any two in detail. Q.3 (a) Classify stokers and explain any one overfeed stoker with necessary diagram. (b) Make a list of advantages of pulverized coal firing system and explain any one mill in detail. Q.3 (a) Prove the following: Maximum discharge through chimney occurs when (b) Where T g and T a are gas and air temperature respectively and m a is mass of air. How impure water affects the boiler. Explain any one method to purify the water. Q.4 (a) (i)why vacuum is required in condenser? Make a list of different methods to 03 achieve it. (ii) Classify cooling tower based on location of fan in it. Explain terms drift, fill 04 and make up water with respect to cooling tower. (b) State application of Diesel power plant. Explain any two systems of Diesel power plant in detail. Q.4 (a) (i) What is de-aerator in thermal power plant? 03 (ii) Explain most common method to purify water in thermal power plant. 04 1

15 (b) Give comparison for the following with respect to Diesel power plant. (i) Dry sump lubrication and wet sump lubrication (ii) Air cooling and water cooling Q.5 (a) Explain with neat sketch boiling water reactor. (b) Define the following for Nuclear power plant (i) Moderator (ii) Control rod (iii) Shield Q.5 (a) Explain nuclear fusion and fission process. Make a list of nuclear power plants of India. (b) Name major pollutants of thermal power plants and their effects on environment and mankind. ************* 2

16 Seat No.: Enrolment No. GUJARAT TECHNOLOGICAL UNIVERSITY BE - SEMESTER V EXAMINATION WINTER 2014 Subject Code: Date: Subject Name: Power Plant Engineering Time: am pm Total Marks: 70 Instructions: 1. Attempt all questions. 2. Make suitable assumptions wherever necessary. 3. Use of steam table is permitted. Q.1 (a) Draw general layout of modern steam power plant label major components and state the function of each component. (b) Explain with neat sketch construction and working of Lamont Boiler Q.2 (a) Explain types of Super heater and state the various methods used for controlling the superheat temperature of steam. (b) Write short note on : "Bowl mill for coal pulverization (b) Explain the working of electrostatic precipitator with neat sketch. Q.3 (a) Explain the function of following in combustion of fuel. 1. Hot primary air 2. Secondary air 3.Teritary air (b) Draught produced by chimney is 3 cm of water column. Temperature of flue gas is 310º C and ambient temperature is 35ºC. The flue gases formed per kg of fuel burnt is 25 kg. Neglect the losses and take the diameter of chimney as 2.0 meter. Calculate 1. Height of chimney in meter 2. Mass of flue gas flowing through the chimney in kg/min Q.3 (a) Comparison between Mechanical draught cooling tower and Natural cooling tower. (b) Steam enters the condenser at 37º C. The condenser vacuum is 70 cm of mercury when the barometer reads 75 cm of mercury. Determine 1. Vacuum efficiency 2. Mass of air per kg of steam present in condenser Q.4 (a) Discuss the methods of meeting variable loads on power plant. (b) The annual peak load on 40 MW power station is 35 MW. The power station supplies load having maximum demand of 14 MW, 10 MW, 8 MW and 6 MW. The annual load factor is Calculate 1. Average load 2. Energy supplied per year 3. Diversity factor 4. Demand factor Q.4 (a) State advantages and disadvantages of nuclear power plant. (b) Explain with neat sketch Boiling Water Reactor Q.5 (a) Explain with neat sketch arrangement of diesel power plant explain in brief function of each system. (b) What are the different methods of cooling diesel engine? Compare different methods. 1

17 Q.5 (a) Explain the effects of impurities in boiler feed water (b) With neat sketch discuss : Hot lime soda process ************* 2

18 Seat No.: Enrolment No. GUJARAT TECHNOLOGICAL UNIVERSITY BE - SEMESTER V EXAMINATION SUMMER 2014 Subject Code: Date: Subject Name: Power Plant Engineering Time: am pm Total Marks: 70 Instructions: 1. Attempt all questions. 2. Make suitable assumptions wherever necessary. 3. Figures to the right indicate full marks. Q.1 (a) Explain with neat sketch, construction and working of La Mont Boiler. (b) Draw a steam power plant and discuss its advantages. Q.2 (a) State general lay of modern steam power plant label major component and state function of each component. (b) Calculate the cost of generation per kwhr for a power station having following data: Installed capacity of plant =200MW; Capital cost=rs400; crores Rate of interest and depreciation =12% Annual cost of fuel, salaries and taxation=rs 5 crores; Load factor=50%. Also estimate the saving in cost per KWhr if annual factor is raised to 60%. (b) Explain the constructional difference between Low pressure and High pressure boiler Q.3 (a) What are the reasons of corrosion in a boiler and how it is control? (b) Derive an expression for maximum discharge through a chimney. Q.3 (a) Draw and explain diesel engine power plant. (b) Explain the working of Electrostatic precipitator with neat sketch. Q.4 (a) Explain with neat sketch construction and working of CANDU type reactor. (b) Discuss bad effects of acid rains. How acid rains are controlled? Q.4 (a) Write short note on sodium zeolite ion exchange process. (b) Differentiate between Jet and Surface condensers. Q.5 (a) Explain seawater treatment using reverse osmosis process. (b) Give the comparison between the following: (i) Nuclear power plant and thermal power plant (ii) Diesel power plant and thermal power plant Q.5 (a) What are fission fragment and fission product? Explain Fission Reaction with an example. (b) With neat sketch explain Pneumatic ash handling system. List its advantages and disadvantages. ************* 1

19 Seat No.: Enrolment No. GUJARAT TECHNOLOGICAL UNIVERSITY BE - SEMESTER V EXAMINATION WINTER 2013 Subject Code: Date: Subject Name: Power Plant Engineering Time: am pm Total Marks: 70 Instructions: 1. Attempt all questions. 2. Make suitable assumptions wherever necessary. 3. Figures to the right indicate full marks. Q.1 (a) Draw general layout of modern steam power plant, label major components and state functions of each component. (b) Explain with neat sketch, construction and working of La Mont Boiler. Q.2 (a) Write a brief note on present status of power generation in India. (b) Explain with neat sketch construction and working of Benson Boiler. (b) What are the advantages and disadvantages of Pulverized coal firing Q.3 (a) What are the reasons of corrosion in a boiler and how it is control? (b) Write a short note on Electrostatic Precipitator. Q.3 (a) Derive an expression for chimney height in order to obtain a draught of h mm of water column if the boiler used m kg of air / kg of fuel. Assume, surrounding air temperature as T a and flue gas temperature as T g in degree absolute. Also derive an expression for the condition of maximum discharge of flue gases through a chimney. (b) Find the minimum height of the chimney required to produce a draught of 16 mm of H 2 O, if 19 kg of air is required / kg of fuel burnt on the grate. The mean temperature of flue gases inside the chimney is 330 C and the atmospheric temperature is 30 C. Q.4 (a) Classify the steam condensers and describe the methods of obtaining maximum vacuum in condenser. (b) Differentiate between Jet and Surface condensers. Q.4 (a) List different impurities found in feed water and their effects on performance of thermal power plant. (b) Explain with neat sketch, arrangement of a Diesel power plant; explain in brief function of each system. Q.5 (a) Define the following terms: (i) Connected load, (ii) Maximum demand, (iii) Average demand, (iv) Load factor, (v) Diversity factor, (vi) Utilization factor, (vii) Plant capacity factor. (b) Compare the following: (i) Nuclear power plant and thermal power plant (ii) Diesel power plant and thermal power plant Q.5 (a) Write a brief note on: (i) Effect of different pollutants on human health by thermal power plants, (ii) Water pollution by thermal power plants and its control. (b) Write short notes on : (i) Fast breeder reactor (ii) Problems in disposal of nuclear waste. ************* 1

20 Seat No.: Enrolment No. GUJARAT TECHNOLOGICAL UNIVERSITY BE - SEMESTER V EXAMINATION SUMMER 2013 Subject Code: Date: Subject Name: Power Plant Engineering Time: am pm Total Marks: 70 Instructions: 1. Attempt all questions. 2. Make suitable assumptions wherever necessary. 3. Figures to the right indicate full marks. Q.1 (a) Draw a neat named general layout of modern thermal power plant. State the function of feed water heaters, economizer, deaerator, steam turbine and electric generator. (b) Dry steam is condensed at a rate of 7000 kg/h and the air leakage amounts to 14 kg/h.the air pump suction is screened off. The exhaust steam temperature is 32 C.The condensate temperature is 30 C and the temperature at the air pump suction is 25 C.Determine (i) the volume of air handled by the pump, (ii) the mass of steam condensed in the air cooler section per hour, and (iii) the mass of water vapour carried away by air. Q.2 (a) Explain Loeffler boiler with a schematic. State the difficulty experienced in La-Mont and Benson boiler. How is it solved? Mention its advantages. (b) (i)name different methods of controlling the superheat temperature of steam. Explain the operation of spray type attemperator. (ii)explain diversity factor and its importance. (b) A 12 MW capacity power plant has the input-output curve defined by the equation, I= (10+8L+0.4L 2 ) kj/h Where L is in MW. Find: (i) Load at which the plant has its maximum efficiency and its value (ii) Increase in input required to increase the output from 4MW to 6MW by using the input-output equation and also by incremental rate curve Q.3 (a) Explain Ball and Race mill with a schematic. State its merits and demerits. (b) Explain cyclone burner with a schematic. State its merits and demerits. Q.3 (a) What do you understand by nuclear fission? Give the functions and materials used for following components of nuclear reactor: Moderator, reflector, control rod, coolant, thermal shield. (b) Explain with neat sketch construction and working of CANDU type reactor. Q.4 (a) State the functions of engine cooling system. Explain with a neat schematic the working of a thermostat cooling system. (b) State the functions of lubrication system in diesel power plant. Explain with neat sketch full pressure lubrication system for diesel power plant. Q.4 (a) Discuss bad effects of acid rains. How acid rains are controlled? (b) Write requirements of a good ash handling system. Explain with a schematic pneumatic ash handling system. 1/2

21 Q.5 (a) Discuss the merits and demerits of mechanical draught over natural draught system. (b) Explain seawater treatment using reverse osmosis process. Q.5 (a) Discuss about different impurities found in feed water. (b) Forced draught fan discharges 1500 m 3 of air per minute through the outlet of 1.7 m diameter and maintains a static pressure of 110 mm.of water. The temperature of air is 25 C. The density of air at NTP is kg/ m 3.Calculate power of motor to drive the FD fan if efficiency of fan is 70%. ************* 2/2

22

ASSIGNMENT 2 Coal and Ash Handling System and Draught Systems

ASSIGNMENT 2 Coal and Ash Handling System and Draught Systems ASSIGNMENT 1 Thermal Power Plant & High Pressure Boiler 1. State the factors to be considered for selection of site for thermal power plant 2. State desirable to control the super heat temperature. Explain

More information

R13 SET - 1 '' ''' '' ' '''' Code No: RT31035

R13 SET - 1 '' ''' '' ' '''' Code No: RT31035 R13 SET - 1 III B. Tech I Semester Regular/Supplementary Examinations, October/November - 2016 THERMAL ENGINEERING II (Mechanical Engineering) Time: 3 hours Max. Marks: 70 Note: 1. Question Paper consists

More information

Code No: R31034 R10 Set No: 1

Code No: R31034 R10 Set No: 1 Code No: R31034 R10 Set No: 1 JNT University Kakinada III B.Tech. I Semester Regular/Supplementary Examinations, Dec - 2014/Jan -2015 THERMAL ENGINEERING-II (Com. to Mechanical Engineering and Automobile

More information

Code No: RR Set No. 1

Code No: RR Set No. 1 Code No: RR310303 Set No. 1 III B.Tech I Semester Regular Examinations, November 2006 THERMAL ENGINEERING-II (Mechanical Engineering) Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad -500 043 MECHANICAL ENGINEERING ASSIGNMENT Course Name : THERMAL ENGINEERING II Course Code : A50518 Class : III B. Tech I Semester

More information

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT B.Tech. [SEM IV (ME-41, 42,43 & 44)] QUIZ TEST-1 (Session: )

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT B.Tech. [SEM IV (ME-41, 42,43 & 44)] QUIZ TEST-1 (Session: ) QUIZ TEST-1 Q.1. In a stage of an impulse turbine provided with a single row wheel, the mean diameter of the blade ring is 80cm and the speed of the rotation is 3000rpm. The steam issues from the nozzle

More information

MECHANICAL ENGINEERING DEPARTMENT, OITM

MECHANICAL ENGINEERING DEPARTMENT, OITM Sem.:4 th Subject: Energy Conversion Paper: ME-201E UNIT-1 Q1. Explain the seismometer with its working principle. (Important Question) (20) Q2. Classify the fuels and define calorific value of fuels.

More information

St.MARTIN S ENGINEERING COLLEGE Dhulapally,Secunderabad,

St.MARTIN S ENGINEERING COLLEGE Dhulapally,Secunderabad, St.MARTIN S ENGINEERING COLLEGE Dhulapally,Secunderabad, 500014. MECHANICAL ENGINEERING TUTORIAL QUESTION BANK Course Name : THERMAL ENGINEERING II Course Code : A50326- Class : III B. Tech I Semester

More information

POWER PLANT ENGINEERING. Time: Three Hours Maximum Marks: 100

POWER PLANT ENGINEERING. Time: Three Hours Maximum Marks: 100 POWER PLANT ENGINEERING Time: Three Hours Maximum Marks: 100 Answer five questions, taking ANY TWO from Group A, any two from Group B and all from Group C. All parts of a question (a, b, etc. ) should

More information

Code No: RR Set No. 1

Code No: RR Set No. 1 Code No: RR410304 Set No. 1 1. (a) Explain the different components used in steam power plant. (b) What are the basic coal ingredients and how do they affect furnace design. 2. Describe the electrostatic

More information

ME 6701 POWER PLANT ENGINEERING -DEPARTMENT OF MECHANICAL ENGINEERING QUESTION BANK

ME 6701 POWER PLANT ENGINEERING -DEPARTMENT OF MECHANICAL ENGINEERING QUESTION BANK See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/318753065 ME 6701 POWER PLANT ENGINEERING -DEPARTMENT OF MECHANICAL ENGINEERING QUESTION BANK

More information

VALLIAMMAI ENGINEERING COLLEGE

VALLIAMMAI ENGINEERING COLLEGE VALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur 603 203 DEPARTMENT OF MECHANICAL ENGINEERING QUESTION BANK VII SEMESTER ME-6701 POWER PLANT ENGINEERING Regulation 2013 Academic Year 2017-2018

More information

VALLIAMMAI ENGINEERING COLLEGE

VALLIAMMAI ENGINEERING COLLEGE VALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur 603 203 DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK V SEMESTER ME6701 POWER PLANT ENGINEERING Regulation 2013 Academic Year

More information

Dr. S.Ramachandran, M.E., Ph.D., Professor and Research Head Faculty of Mechanical Engineering

Dr. S.Ramachandran, M.E., Ph.D., Professor and Research Head Faculty of Mechanical Engineering (For BE Mechanical Engineering Students) (As per New Syllabus of Leading Universities) Dr SRamachandran, ME, PhD, Professor and Research Head Faculty of Mechanical Engineering SATHYABAMA UNIVERSITY Jeppiaar

More information

CHAPTER 1 BASIC CONCEPTS

CHAPTER 1 BASIC CONCEPTS GTU Paper Analysis CHAPTER 1 BASIC CONCEPTS Sr. No. Questions Jan 15 Jun 15 Dec 15 May 16 Jan 17 Jun 17 Nov 17 May 18 Differentiate between the followings; 1) Intensive properties and extensive properties,

More information

[4163] T.E. (Mechanical) TURBO MACHINES (2008 Pattern) (Common to Mech. S/W) (Sem. - II)

[4163] T.E. (Mechanical) TURBO MACHINES (2008 Pattern) (Common to Mech. S/W) (Sem. - II) Total No. of Questions : 12] P1061 SEAT No. : [Total No. of Pages : 7 [4163] - 218 T.E. (Mechanical) TURBO MACHINES (2008 Pattern) (Common to Mech. S/W) (Sem. - II) Time : 3 Hours] [Max. Marks :100 Instructions

More information

R13. (12M) efficiency.

R13. (12M) efficiency. SET - 1 II B. Tech I Semester Regular/Supplementary Examinations, Oct/Nov - 2016 THERMAL AND HYDRO PRIME MOVERS (Electrical and Electronics Engineering) Time: 3 hours Max. Marks: 70 Note: 1. Question Paper

More information

S.E. (Mechanical) (First Semester) EXAMINATION, 2012 APPLIED THERMODYNAMICS (2008 PATTERN) Time : Three Hours Maximum Marks : 100

S.E. (Mechanical) (First Semester) EXAMINATION, 2012 APPLIED THERMODYNAMICS (2008 PATTERN) Time : Three Hours Maximum Marks : 100 Total No. of Questions 12] [Total No. of Printed Pages 8 Seat No. [4162]-111 S.E. (Mechanical) (First Semester) EXAMINATION, 2012 APPLIED THERMODYNAMICS (2008 PATTERN) Time : Three Hours Maximum Marks

More information

T.E. (Mech., Mech. S/W) (Semester II) Examination, 2011 TURBOMACHINES (New) (2008 Pattern)

T.E. (Mech., Mech. S/W) (Semester II) Examination, 2011 TURBOMACHINES (New) (2008 Pattern) *4063218* [4063] 218 T.E. (Mech., Mech. S/W) (Semester II) Examination, 2011 TURBOMACHINES (New) (2008 Pattern) Time : 3 Hours Marks : 100 Instructions : 1) Answer any three questions from each Section.

More information

Lecture No.3. The Ideal Reheat Rankine Cycle

Lecture No.3. The Ideal Reheat Rankine Cycle Lecture No.3 The Ideal Reheat Rankine Cycle 3.1 Introduction We noted in the last section that increasing the boiler pressure increases the thermal efficiency of the Rankine cycle, but it also increases

More information

TIME SCHEDULE. MODULE TOPICS PERIODS 1 Introduction. 17 Steam Generators Properties of Steam Thermodynamic Vapour Cycle 2 Steam Engines

TIME SCHEDULE. MODULE TOPICS PERIODS 1 Introduction. 17 Steam Generators Properties of Steam Thermodynamic Vapour Cycle 2 Steam Engines COURSE TITLE : POWER PLANT ENGINEERING COURSE CODE : 50 COURSE CATEGORY : E PERIODS/WEEK : 4 PERIODS/SEMESTER : 72 CREDITS : 4 TIME SCHEDULE MODULE TOPICS PERIODS 1 Introduction Steam Generators Properties

More information

Alpha College of Engineering

Alpha College of Engineering Alpha College of Engineering Department of Mechanical Engineering TURBO MACHINE (10ME56) QUESTION BANK PART-A UNIT-1 1. Define a turbomahcine. Write a schematic diagram showing principal parts of a turbo

More information

COURSE CODE : 5023 COURSE CATEGORY : E PERIODS/ WEEK : 4 PERIODS/ SEMESTER : 60 CREDIT : 4 TIME SCHEDULE

COURSE CODE : 5023 COURSE CATEGORY : E PERIODS/ WEEK : 4 PERIODS/ SEMESTER : 60 CREDIT : 4 TIME SCHEDULE COURSE TITLE : POWER PLANT ENGINEERING COURSE CODE : 5023 COURSE CATEGORY : E PERIODS/ WEEK : 4 PERIODS/ SEMESTER : 60 CREDIT : 4 TIME SCHEDULE MODULE TOPIC PERIODS 1 Fuels and combustion, Steam boilers,

More information

Problems in chapter 9 CB Thermodynamics

Problems in chapter 9 CB Thermodynamics Problems in chapter 9 CB Thermodynamics 9-82 Air is used as the working fluid in a simple ideal Brayton cycle that has a pressure ratio of 12, a compressor inlet temperature of 300 K, and a turbine inlet

More information

a. The power required to drive the compressor; b. The inlet and output pipe cross-sectional area. [Ans: kw, m 2 ] [3.34, R. K.

a. The power required to drive the compressor; b. The inlet and output pipe cross-sectional area. [Ans: kw, m 2 ] [3.34, R. K. CHAPTER 2 - FIRST LAW OF THERMODYNAMICS 1. At the inlet to a certain nozzle the enthalpy of fluid passing is 2800 kj/kg, and the velocity is 50 m/s. At the discharge end the enthalpy is 2600 kj/kg. The

More information

Course Name : Diploma in Mechanical Engineering Course Code : ME/MH/MI Semester : Fourth Subject Title : Thermal Engineering Subject Code : 17410

Course Name : Diploma in Mechanical Engineering Course Code : ME/MH/MI Semester : Fourth Subject Title : Thermal Engineering Subject Code : 17410 Course Name : Diploma in Mechanical Engineering Course Code : ME/MH/MI Semester : Fourth Subject Title : Thermal Engineering Subject Code : Teaching and Examination Scheme: Teaching Scheme TH TU PR PAPER

More information

Lecture (6) on. Schematic of a Thermal Power Plant. By Dr. Emad M. Saad. Mechanical Engineering Dept. Faculty of Engineering.

Lecture (6) on. Schematic of a Thermal Power Plant. By Dr. Emad M. Saad. Mechanical Engineering Dept. Faculty of Engineering. 1 2 Lecture (6) on Schematic of a Thermal Power Plant By Dr. Emad M. Saad Mechanical Engineering Dept. Faculty of Engineering Fayoum University Faculty of Engineering Mechanical Engineering Dept. 2015-2016

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 500 043 Department of Electrical and Electronics Engineering TUTORIAL QUESTION BANK Course Name : POWER GENERATION SYSTEMS Course

More information

S.Y. Diploma : Sem. III [PG/PT/ME] Thermal Engineering

S.Y. Diploma : Sem. III [PG/PT/ME] Thermal Engineering S.Y. Diploma : Sem. III [PG/PT/ME] Thermal Engineering Time: 3 Hrs. Prelim Question Paper Solution [Marks : 70 Q.1 Attempt any FIVE of the following. [10] Q.1(a) Explain difference between Thermodynamic

More information

OUTCOME 2 TUTORIAL 2 STEADY FLOW PLANT

OUTCOME 2 TUTORIAL 2 STEADY FLOW PLANT UNIT 47: Engineering Plant Technology Unit code: F/601/1433 QCF level: 5 Credit value: 15 OUTCOME 2 TUTORIAL 2 STEADY FLOW PLANT 2 Be able to apply the steady flow energy equation (SFEE) to plant and equipment

More information

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET 1. A vessel of volume 0.04m 3 contains a mixture of saturated water and steam at a temperature of 250 0 C. The mass of the liquid present is 9 kg. Find the pressure, mass, specific volume, enthalpy, entropy

More information

semester + ME6404 THERMAL ENGINEERING UNIT III NOZZLES, TURBINES & STEAM POWER CYCLES UNIT-III

semester + ME6404 THERMAL ENGINEERING UNIT III NOZZLES, TURBINES & STEAM POWER CYCLES UNIT-III ME6404 THERMAL ENGINEERING UNIT III NOZZLES, TURBINES & STEAM POWER CYCLES UNIT-III 3. 1 CONTENTS 3.1 Flow of steam through nozzles: 3.2 Continuity and steady flow energy equations 3.3 Types of Nozzles

More information

Power Engineering II. Technological circuits of thermal power plants

Power Engineering II. Technological circuits of thermal power plants Technological circuits of thermal power plants Lay out scheme of coal power plant climatetechwiki.com Technological circuits 2 Coal and ash circuit Air and gas circuit Feed water and steam circuit Cooling

More information

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER EXAMINATIONS ADMINISTERED BY THE SCOTTISH QUALIFICATIONS AUTHORITY ON BEHALF OF THE MARITIME AND COASTGUARD AGENCY STCW 95 CHIEF

More information

HIGH PRESSURE BOILERS

HIGH PRESSURE BOILERS Power Plant Engg. High Pressure Boilers & FBC Assi. Professor Mechanical Engineering Department HIGH PRESSURE BOILERS High Pressure Boiler, P > 60 bar Critical Pressure Boiler, P = 221.2 bar Super Critical

More information

Chapter 1 STEAM CYCLES

Chapter 1 STEAM CYCLES Chapter 1 STEAM CYCLES Assoc. Prof. Dr. Mazlan Abdul Wahid Faculty of Mechanical Engineering Universiti Teknologi Malaysia www.fkm.utm.my/~mazlan 1 Chapter 1 STEAM CYCLES 1 Chapter Objectives To carry

More information

PESIT Bangalore South Campus Hosur road, 1km before Electronic City, Bengaluru -100 Department of Basic Science and Humanities

PESIT Bangalore South Campus Hosur road, 1km before Electronic City, Bengaluru -100 Department of Basic Science and Humanities USN 1 P E PESIT Bangalore South Campus Hosur road, 1km before Electronic City, Bengaluru -100 Department of Basic Science and Humanities INTERNAL ASSESSMENT TEST 1 Date : 28/08/2017 Marks: 40 Subject &

More information

LESSON PLAN. Sub Name : EE2252- POWER PLANT ENGINEERING Unit: I Branch: EEE Semester: IV. Topics to be covered (Min)

LESSON PLAN. Sub Name : EE2252- POWER PLANT ENGINEERING Unit: I Branch: EEE Semester: IV. Topics to be covered (Min) Unit I Unit: I Branch: EEE Semester: IV LP-EE2252 LP Rev. : 00 Page: 1 of 5 1 THERMAL POWER PLANTS Basic thermodynamic cycles, various components of steam power plant-layout-pulverized coal burners- Fluidized

More information

PAPER-I (Conventional)

PAPER-I (Conventional) 1. a. PAPER-I (Conventional) 10 kg of pure ice at 10 ºC is separated from 6 kg of pure water at +10 O C in an adiabatic chamber using a thin adiabatic membrane. Upon rupture of the membrane, ice and water

More information

Lecture No.1. Vapour Power Cycles

Lecture No.1. Vapour Power Cycles Lecture No.1 1.1 INTRODUCTION Thermodynamic cycles can be primarily classified based on their utility such as for power generation, refrigeration etc. Based on this thermodynamic cycles can be categorized

More information

HEAT ENGINES VOL. I. By Dr. N. C. Pandya, Dr. C. S. Shah & Dr. S. S. Khandare ` Checklist [ THERMODYNAMICS AND THERMAL ENGINEERING ]

HEAT ENGINES VOL. I. By Dr. N. C. Pandya, Dr. C. S. Shah & Dr. S. S. Khandare ` Checklist [ THERMODYNAMICS AND THERMAL ENGINEERING ] HEAT ENGINES VOL. I [ THERMODYNAMICS AND THERMAL ENGINEERING ] By Dr. N. C. Pandya, Dr. C. S. Shah & Dr. S. S. Khandare Edition : 10 th Revised and Enlarged Edition : 2005 ISBN : 81-85594-49-X, 978-81-85594-49-1

More information

CHAPTER 1 BASIC CONCEPTS THEORY

CHAPTER 1 BASIC CONCEPTS THEORY CHAPTER 1 BASIC CONCEPTS THEORY 1. Explain briefly the following terms with diagram (wherever necessary): a) Thermodynamic System, Surroundings & Boundary b) Control Volume & Control Surface c) Intensive

More information

Ms.P.Aileen Sonia Dhas

Ms.P.Aileen Sonia Dhas SUBJECT CODE SUBJECT NAME STAFF NAME : ME8792 : Power Plant Engineering : Prof.V.Tamil Selvi Ms.P.Aileen Sonia Dhas UNIT- I COAL BASED THERMAL POWER PLANTS Rankine cycle - improvisations, Layout of modern

More information

B.E. DEGREE EXAMINATION VII Semester Mechanical Engineering ME2403 Power Plant Engineering

B.E. DEGREE EXAMINATION VII Semester Mechanical Engineering ME2403 Power Plant Engineering 1 B.E. DEGREE EXAMINATION VII Semester Mechanical Engineering ME2403 Power Plant Engineering SHORT QUESTIONS AND ANSWERS 1. Name the four major circuits in steam power plant. Coal and ash circuit Air and

More information

Practice Final Exam (A) Six problems. (Open-book, HW solutions, and notes) (Plus /minus 10 % error acceptable for all numerical answers)

Practice Final Exam (A) Six problems. (Open-book, HW solutions, and notes) (Plus /minus 10 % error acceptable for all numerical answers) ME 3610 Practice Final Exam (A) Six problems. (Open-book, HW solutions, and notes) (Plus /minus 10 % error acceptable for all numerical answers) (18 points) 1. A gasoline engine operating on the ideal

More information

Chapter Two. The Rankine cycle. Prepared by Dr. Shatha Ammourah

Chapter Two. The Rankine cycle. Prepared by Dr. Shatha Ammourah Chapter Two The Rankine cycle Prepared by Dr. Shatha Ammourah 1 The Ideal Rankine Cycle Schematic Diagram of ideal simple Rankine 2 Superheater Economizer line 3 Heat Addition Types In The Steam Generator

More information

Chapter 1 Basic Concepts

Chapter 1 Basic Concepts Jan 15 Jun 15 Chapter 1 Basic Concepts GTU Paper Analysis (New Syllabus) Sr. No. Questions Differentiate between the followings; 1) Intensive properties and extensive properties, 2) Point function and

More information

Secondary Systems: Steam System

Secondary Systems: Steam System Secondary Systems: Steam System K.S. Rajan Professor, School of Chemical & Biotechnology SASTRA University Joint Initiative of IITs and IISc Funded by MHRD Page 1 of 10 Table of Contents 1 SECONDARY SYSTEM

More information

Reg. No. : Question Paper Code : B.E./B.Tech. DEGREE EXAMINATION, NOVEMBER/DECEMBER Second Semester

Reg. No. : Question Paper Code : B.E./B.Tech. DEGREE EXAMINATION, NOVEMBER/DECEMBER Second Semester ws15 Reg. No. : Question Paper Code : 27425 B.E./B.Tech. DEGREE EXAMINATION, NOVEMBER/DECEMBER 2015. Time : Three hours Second Semester Marine Engineering MV 6201 MARINE ENGINEERING THERMODYNAMICS (Regulations

More information

- 2 - SME Q1. (a) Briefly explain how the following methods used in a gas-turbine power plant increase the thermal efficiency:

- 2 - SME Q1. (a) Briefly explain how the following methods used in a gas-turbine power plant increase the thermal efficiency: - 2 - Q1. (a) Briefly explain how the following methods used in a gas-turbine power plant increase the thermal efficiency: i) regenerator ii) intercooling between compressors (6 marks) (b) Air enters a

More information

ANNAI MATHAMMAL SHEELA ENGINEERING COLLEGE VII Semester Mechanical Engineering ME2403 Power Plant Engineering

ANNAI MATHAMMAL SHEELA ENGINEERING COLLEGE VII Semester Mechanical Engineering ME2403 Power Plant Engineering ANNAI MATHAMMAL SHEELA ENGINEERING COLLEGE VII Semester Mechanical Engineering ME2403 Power Plant Engineering SHORT QUESTIONS AND ANSWERS UNIT I INTRODUCTION TO POWER PLANTS 1. Name the four major circuits

More information

ANALYSIS OF DIFFERENT TYPES OF REGULATION AND ITS EFFICIENCY IN STEAM POWER CYCLES MASTER THESIS

ANALYSIS OF DIFFERENT TYPES OF REGULATION AND ITS EFFICIENCY IN STEAM POWER CYCLES MASTER THESIS ANALYSIS OF DIFFERENT TYPES OF REGULATION AND ITS EFFICIENCY IN STEAM POWER CYCLES MASTER THESIS Author: Ricardo Sánchez Pereiro Advisor: Piotr Krzyslak Poznan University of Technology 11/06/2012 INDEX

More information

R13. II B. Tech I Semester Regular/Supplementary Examinations, Oct/Nov THERMODYNAMICS (Com. to ME, AE, AME) Time: 3 hours Max.

R13. II B. Tech I Semester Regular/Supplementary Examinations, Oct/Nov THERMODYNAMICS (Com. to ME, AE, AME) Time: 3 hours Max. SET - 1 1. a) Discuss about PMM I and PMM II b) Explain about Quasi static process. c) Show that the COP of a heat pump is greater than the COP of a refrigerator by unity. d) What is steam quality? What

More information

Prerequisites: Knowledge of Engineering Mathematics, Applied Science and Basic Thermal Engineering

Prerequisites: Knowledge of Engineering Mathematics, Applied Science and Basic Thermal Engineering CIE- 25 Marks Government of Karnataka Department of Technical Education Board of Technical Examinations, Bangalore Course Title: APPLIED THERMAL ENGINEERING Course Code: Scheme (L:T:P) : 4:0:0 Total Contact

More information

NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY

NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY NUCLEAR TRAINING COURSE COURSE 134 1 - Level 3 - Equipment & System Principles 4 - TURBINE, GENERATOR & AUXILIARIES Index 134.00-0 Objectives

More information

NATIONAL CERTIFICATION EXAMINATION 2004 FOR ENERGY MANAGERS

NATIONAL CERTIFICATION EXAMINATION 2004 FOR ENERGY MANAGERS NATIONAL CERTIFICATION EXAMINATION 2004 FOR ENERGY MANAGERS PAPER EM2: Energy Efficiency in Thermal Utilities Date: 22.05.2004 Timings: 1400-1700 HRS Duration: 3 HRS Max. Marks: 150 General instructions:

More information

00046 Term-End Examination June, 2015

00046 Term-End Examination June, 2015 No. of Printed Pages : 5 BIME-013 B.Tech. - VIEP - MECHANICAL ENGINEERING (BTMEVI) 00046 Term-End Examination June, 2015 BIME-013 : TURBO MACHINES Time : 3 hours Maximum Marks : 70 Note : Answer any five

More information

3.1 Syllabus EE2252 POWER PLANT ENGINEERING 3 1 0 4 1 THERMAL POWER PLANTS Basic thermodynamic cycles, various components of steam power plant-layout-pulverized coal burners- Fluidized bed combustion-coal

More information

Steam Power Station (Thermal Station)

Steam Power Station (Thermal Station) Steam Power Station (Thermal Station) A generating station which converts heat energy into electrical energy through turning water into heated steam is known as a steam power station. A steam power station

More information

Actual Gas-Turbine Cycle

Actual Gas-Turbine Cycle Actual Gas-urbine Cycle Fresh air at ambient conditions is drawn into the compressor, where its temperature and pressure are raised. he highpressure air proceeds into the combustion chamber, where the

More information

MCG THERMODYNAMICS II. 22 April 2008 Page 1 of 7 Prof. W. Hallett

MCG THERMODYNAMICS II. 22 April 2008 Page 1 of 7 Prof. W. Hallett Faculté de génie Génie mécanique Faculty of Engineering Mechanical Engineering MCG2131 - THERMODYNAMICS II 22 April 2008 Page 1 of 7 Prof. W. Hallett Closed book. Non-programmable calculators only allowed.

More information

Code No: R Set No. 1

Code No: R Set No. 1 Code No: R050210201 Set No. 1 II B.Tech I Semester Regular Examinations, November 2006 FLUID MECHANICS & HYDRAULIC MACHINERY (Electrical & Electronic Engineering) Time: 3 hours Max Marks: 80 Answer any

More information

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN (EXECUTIVE SESSION) November, 2007 JAPAN EXTERNAL TRADE ORGANIZATION JAPAN CONSULTING INSTITUTE SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN 1. Power Generation

More information

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT B.Tech. [SEM IV (ME-41,42,43,44,45 & 46)] QUIZ TEST-2 (Session: 2012-13) APPLIED THERMODYNAMICS (EME-401) Q.1) In a gas turbine installation air is

More information

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION UDK 621.311.22:502.174 Dip.el.eng. Igor SEKOVSKI NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION Abstract Today people make a lot of analysis, of work of

More information

Boilers & Fired Systems. Clean Coal Technology Dr. Tanveer Iqbal

Boilers & Fired Systems. Clean Coal Technology Dr. Tanveer Iqbal Boilers & Fired Systems Clean Coal Technology Dr. Tanveer Iqbal 1 What is a Boiler? Vessel that heats water to become hot water or steam At atmospheric pressure water volume increases 1,600 times Hot water

More information

Darshan Institute of Engineering & Technology. Certificate

Darshan Institute of Engineering & Technology. Certificate Darshan Institute of Engineering & Technology Certificate This is to certify that Mr./Ms. Enrollment No. Branch: - Mechanical Engineering Semester: VII has satisfactory completed the course in the subject

More information

CHAPTER 2 STUDY OF 210 MW BOILER SYSTEM 2.1 DESCRIPTION OF 210 MW BOILER

CHAPTER 2 STUDY OF 210 MW BOILER SYSTEM 2.1 DESCRIPTION OF 210 MW BOILER 8 CHAPTER 2 STUDY OF 210 MW BOILER SYSTEM 2.1 DESCRIPTION OF 210 MW BOILER Detailed study has been carried out on a 210 MW boiler system with regard to model development, control and optimization. Figure

More information

International Journal of Advance Engineering and Research Development

International Journal of Advance Engineering and Research Development Scientific Journal of Impact Factor (SJIF): 4.72 International Journal of Advance Engineering and Research Development Volume 4, Issue 9, September -2017 Review of Thermal Characteristics of Diesel Fired

More information

2. The data at inlet and exit of the turbine, running under steady flow, is given below.

2. The data at inlet and exit of the turbine, running under steady flow, is given below. 3 rd week quiz 1. Identify the correct path of fluid flow in a steam power plant. a) Steam turbine-pump-boiler-condenser. b) Economizer- evaporator- superheater. c) Pump-turbine-condenser-evaporator. d)

More information

FEE, CTU in Prague Power Engineering 2 (BE5B15EN2) Exercise 3

FEE, CTU in Prague Power Engineering 2 (BE5B15EN2) Exercise 3 Example 1: How is the applied heat for 1 kg of water steam at constant pressure p = 1.47 MPa, if the dryness of wet water is increased from x 1 = 0.8 to x 2 = 0.96? Dryness of wet steam the ratio of steam

More information

Gas turbine power plant. Contacts: Mail: Web:

Gas turbine power plant. Contacts: Mail: Web: Gas turbine power plant Contacts: Mail: poddar05@gmail.com Web: http://www.ajourneywithtime.weebly.com/ Contents Gas turbine power plant Elements of gas turbine power plants Gas turbine fuels Cogeneration

More information

SUMMER 13 EXAMINATION

SUMMER 13 EXAMINATION Important Instructions to examiners: 1) The answers should be examined by key words and not as word-to-word as given in the model answer scheme. 2) The model answer and the answer written by candidate

More information

Chapter 10 POWER CYCLES. Department of Mechanical Engineering

Chapter 10 POWER CYCLES. Department of Mechanical Engineering Chapter 10 VAPOR AND COMBINED POWER CYCLES Dr Ali Jawarneh Department of Mechanical Engineering Hashemite University it 2 Objectives Analyze vapor power cycles in which h the working fluid is alternately

More information

Applied Thermodynamics - II

Applied Thermodynamics - II Gas Turbines - Sudheer Siddapureddy sudheer@iitp.ac.in Department of Mechanical Engineering Auxiliary Devices Other components/arrangements Intercoolers between the compressors Reheat combustion chambers

More information

PEMP RMD & Cycle Performance. M.S.Ramaiah School of Advanced Studies

PEMP RMD & Cycle Performance. M.S.Ramaiah School of Advanced Studies Steam Se Turbine ub ecyces Cycles & Cycle Performance Session delivered by: Prof. Q.H. Nagpurwala 1 Session Objectives This session is intended to discuss the following: Basic construction and classification

More information

16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015

16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015 PAPER 2: Energy Efficiency in Thermal Utilities Date: 19.09.2015 Timings: 1400-1700 HRS Duration: 3 HRS Max.

More information

Feedwater Heaters (FWH)

Feedwater Heaters (FWH) Feedwater Heaters (FWH) A practical Regeneration process in steam power plants is accomplished by extracting or bleeding, steam from the turbine at various points. This steam, which could have produced

More information

Department of Mechanical Engineering. MSc/PGDip/PGCert in Energy Systems and the Environment. Specialist Modules

Department of Mechanical Engineering. MSc/PGDip/PGCert in Energy Systems and the Environment. Specialist Modules Department of Mechanical Engineering MSc/PGDip/PGCert in Energy Systems and the Environment Specialist Modules Wednesday 17 January 2007 2.00pm 5.00pm (3 hours) Full-time MSc/PGDip/PGCert students should

More information

Engineering Thermodynamics

Engineering Thermodynamics Unit 61: Engineering Thermodynamics Unit code: D/601/1410 QCF level: 5 Credit value: 15 Aim This unit will extend learners knowledge of heat and work transfer. It will develop learners understanding of

More information

BEST PRACTICES IN THERMAL POWER PLANT. Confederation of Indian Industry CII Godrej Green Business Centre, Hyderabad, India

BEST PRACTICES IN THERMAL POWER PLANT. Confederation of Indian Industry CII Godrej Green Business Centre, Hyderabad, India BEST PRACTICES IN THERMAL POWER PLANT Confederation of Indian Industry CII Godrej Green Business Centre, Hyderabad, India Agenda Indian Scenario Power Plant Factors affecting Power Plant Performance Case

More information

MARAMA Webinar August 7, Angelos Kokkinos Chief Technology Officer Babcock Power, Inc.

MARAMA Webinar August 7, Angelos Kokkinos Chief Technology Officer Babcock Power, Inc. MARAMA Webinar August 7, 2014 Angelos Kokkinos Chief Technology Officer Babcock Power, Inc. Rankine cycle is a thermodynamic cycle which converts heat into work. The heat is supplied externally to a closed

More information

Chapter 10 VAPOR AND COMBINED POWER CYCLES

Chapter 10 VAPOR AND COMBINED POWER CYCLES Thermodynamics: An Engineering Approach, 6 th Edition Yunus A. Cengel, Michael A. Boles McGraw-Hill, 2008 Chapter 10 VAPOR AND COMBINED POWER CYCLES Copyright The McGraw-Hill Companies, Inc. Permission

More information

CHAPTER 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES

CHAPTER 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES Thermodynamics: An Engineering Approach 8th Edition in SI Units Yunus A. Ç engel, Michael A. Boles McGraw-Hill, 2015 CHAPTER 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES Objectives Develop the conservation

More information

Efficiency improvement of steam power plants in Kuwait

Efficiency improvement of steam power plants in Kuwait Energy and Sustainability V 173 Efficiency improvement of steam power plants in Kuwait H. Hussain, M. Sebzali & B. Ameer Energy and Building Research Center, Kuwait Institute for Scientific Research, Kuwait

More information

19 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS SEPTEMBER, 2018 PAPER 2: ENERGY EFFICIENCY IN THERMAL UTILITIES

19 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS SEPTEMBER, 2018 PAPER 2: ENERGY EFFICIENCY IN THERMAL UTILITIES Paper 2 Set A 19 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS SEPTEMBER, 2018 PAPER 2: ENERGY EFFICIENCY IN THERMAL UTILITIES Section I: OBJECTIVE TYPE Marks: 50 x 1 = 50

More information

Chapter 10. In Chap. 9 we discussed gas power cycles for which the VAPOR AND COMBINED POWER CYCLES. Objectives

Chapter 10. In Chap. 9 we discussed gas power cycles for which the VAPOR AND COMBINED POWER CYCLES. Objectives Chapter 0 VAPOR AND COMBINED POWER CYCLES In Chap. 9 we discussed gas power cycles for which the working fluid remains a gas throughout the entire cycle. In this chapter, we consider vapor power cycles

More information

Exergy Analysis of 210 Mw of Vijayawada Thermal Power Station (V.T.P.S)

Exergy Analysis of 210 Mw of Vijayawada Thermal Power Station (V.T.P.S) Exergy Analysis of 210 Mw of Vijayawada Thermal Power Station (V.T.P.S) N. Naga Varun Department of Mechanical Engineering K L University, Vaddeswaram, Guntur, India. G. Satyanarayana Department of Mechanical

More information

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) Summer 15 EXAMINATION Subject Code: Model Answer Page No: 1/22

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) Summer 15 EXAMINATION Subject Code: Model Answer Page No: 1/22 (ISO/IEC - 700-005 Certified) Summer 5 EXAMINATION Subject Code: 707 Model Answer Page No: / Important Instructions to examiners: ) The answers should be examined by key words and not as word-to-word as

More information

Eng Thermodynamics I: Sample Final Exam Questions 1

Eng Thermodynamics I: Sample Final Exam Questions 1 Eng3901 - Thermodynamics I: Sample Final Exam Questions 1 The final exam in Eng3901 - Thermodynamics I consists of four questions: (1) 1st Law analysis of a steam power cycle, or a vapour compression refrigeration

More information

Chapter 8. Vapor Power Systems

Chapter 8. Vapor Power Systems Chapter 8 Vapor Power Systems Introducing Power Generation To meet our national power needs there are challenges related to Declining economically recoverable supplies of nonrenewable energy resources.

More information

Chapter 10. In Chap. 9 we discussed gas power cycles for which the VAPOR AND COMBINED POWER CYCLES. Objectives

Chapter 10. In Chap. 9 we discussed gas power cycles for which the VAPOR AND COMBINED POWER CYCLES. Objectives Chapter 0 VAPOR AND COMBINED POWER CYCLES In Chap. 9 we discussed gas power cycles for which the working fluid remains a gas throughout the entire cycle. In this chapter, we consider vapor power cycles

More information

THERMAL AND HYDRAULIC MACHINES UNIT 2

THERMAL AND HYDRAULIC MACHINES UNIT 2 THERMAL AND HYDRAULIC MACHINES UNIT 2 A steam turbine is a device that extracts thermal energy from pressurized steam and uses it to do mechanical work on a rotating output shaft. Its modern manifestation

More information

MODEL SOLUTIONS. 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015

MODEL SOLUTIONS. 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015 MODEL SOLUTIONS 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015 PAPER 2: Energy Efficiency in Thermal Utilities Date: 19.09.2015 Timings: 1400-1700 HRS Duration:

More information

SUMMER 15 EXAMINATION

SUMMER 15 EXAMINATION SUMMER 15 EXAMINATION Subject Code: 17413 ( EME ) Model Answer Important Instructions to examiners: 1) The answers should be examined by key words and not as word-to-word as given in the model answer scheme.

More information

UNIT II GAS AND DIESEL POWER PLANTS PART A

UNIT II GAS AND DIESEL POWER PLANTS PART A UNIT II GAS AND DIESEL POWER PLANTS PART A 1. Define heat engine Any type of engine or machine which derives heat energy from the combustion of fuel or any other source and converts this energy into mechanical

More information

Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES

Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES Thermodynamics: An Engineering Approach Seventh Edition in SI Units Yunus A. Cengel, Michael A. Boles McGraw-Hill, 2011 Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES Copyright The McGraw-Hill Companies,

More information

Your partner for the right solution

Your partner for the right solution Your partner for the right solution Project engineering of power stations Environment protection in energy sector Equipment supplying Supervision of installation of the equipment supplied Commissioning

More information

Jahangirabad Institute of Technology Mr.NAPHIS AHAMAD Applied Thermodynamics Semester IV, MASTER SCHEDULE

Jahangirabad Institute of Technology Mr.NAPHIS AHAMAD Applied Thermodynamics Semester IV, MASTER SCHEDULE Jahangirabad Institute of Technology Mr.NAPHIS AHAMAD Applied Thermodynamics Semester IV, 2015-16 MASTER SCHEDULE (Unit-1) Class 1 Monday, 18Jan Introduction Class 3 Wednesday, 20 January,2016 Clapeyron