Assimilative Capacity. Assessment of River Deele

Size: px
Start display at page:

Download "Assimilative Capacity. Assessment of River Deele"

Transcription

1 Assimilative Capacity Assessment of River Deele Text No Attachment No Description Date Check By COV/LA/F1(ii) Attachment F.1 Assimilative Capacity Assessment of River Deele 02/03/09 Donal Casey EPA Export :13:08:04

2 EPA Export :13:08:04

3 EPA Export :13:08:04

4 EPA Export :13:08:04

5 EPA Export :13:08:04

6 EPA Export :13:08:04

7 EPA Export :13:08:05

8 EPA Export :13:08:05

9 EPA Export :13:08:05

10 EPA Export :13:08:05

11 EPA Export :13:08:05

12 EPA Export :13:08:05

13 EPA Export :13:08:05

14 EPA Export :13:08:05

15 EPA Export :13:08:05 se Co n f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y. ra ny nt o se. ru he ot

16 EPA Export :13:08:05

17 EPA Export :13:08:05

18 EPA Export :13:08:05

19 EPA Export :13:08:05

20 EPA Export :13:08:05

21 EPA Export :13:08:05

22 EPA Export :13:08:05

23 EPA Export :13:08:05

24 Addendum to Preliminary Report 2006 Text No Attachment No Description Date Check By COV/LA/G3 Attachment GN Addendum to Preliminary Report /03/09 Donal Casey EPA Export :13:08:05

25 Jennings O'Donovan & Partners Consulting Engineers Sligo DONEGAL COUNTY COUNCIL CONVOY SEWERAGE SCHEME ADDENDUM TO PRELIMINARY REPORT 3463/DT/TC SUMMARY OF FINDINGS CONTENTS Page No. 1.0 INTRODUCTION Terms of Reference Background 2003 Preliminary Report Funding Land Acquisition Overview of Information DESIGN POPULATION REVIEW Preliminary Report Population Equivalent Existing Population Review Proposed Development Possible Future Development Design Population Equivalent Recommended Design Loadings RECEIVING WATERS, DISCHARGE REQUIREMENTS & ENVIRONMENTAL CONSIDERATIONS Introduction Relevant Statutory and Policy Considerations Water Quality data for the River Deele Standard of Treatment Required EXISTING SEWER NETWORK Description of Existing Network Proposed/Recent Modifications to Sewer Network Problematic Sewers Network Survey Post Network Improvements Network Improvements Cost Estimate 20 Contents PR (i) May 2006 EPA Export :13:08:06

26 Jennings O'Donovan & Partners Consulting Engineers Sligo 5.0 SECONDARY TREATMENT PROCESS Design Loadings Preliminary Report Recommendations Secondary Treatment Process Evaluation of Options Discussion of Treatment Options DESCRIPTION OF PROPOSED EXTENSION TO WASTE WATER TREATMENT WORKS Secondary Treatment Sludge Draw Off and Pumping Chamber Sludge Holding Tank Phosphorous Removal Final Effluent Measurement and Sampling Control/ Compressor Buidling Existing Works Site Investigation PROCUREMENT OPTIONS Introduction Options Recommend Procurement Option SUMMARY OF COST ESTIMATES Capital Costs Operation & Maintenance Costs RECOMMENDATIONS 31. APPENDICES Appendix A - Breakdown of Non-Domestic p.e. Appendix B - Water Quality Data for Deele River Appendix C - Drawings Appendix D - Secondary Treatment Options Schematics Appendix E - Cost Estimates Appendix F - Design Calculations for Secondary Treatment Process Contents PR (ii) May 2006 EPA Export :13:08:06

27 Jennings O'Donovan & Partners Consulting Engineers Sligo DONEGAL COUNTY COUNCIL 3463/DT/TC CONVOY SEWERAGE SCHEME ADDENDUM TO PRELIMINARY REPORT 1.0 INTRODUCTION 1.1 Terms of Reference This report is an addendum to the Preliminary Report prepared for Convoy Sewerage Scheme dated June This report assesses suitable secondary treatment options for extending the existing works and recommends the most appropriate method and approach for extending the works. A review of existing and possible future population in Convoy is undertaken and the existing sewer network is examined and assessed with a view to upgrading and extending the network within the village. 1.2 Background 2003 Preliminary Report The Preliminary Report for Convoy Sewerage Scheme prepared by Jennings O'Donovan & Partners and dated June 2003 made recommendations for the upgrade of the wastewater treatment works. Upgrading and extending the sewer network was not considered at that stage. Tender documents for preliminary and storm water treatment were prepared in August 2004 and included for provision of the following elements at the Waste Water Treatment Works: - Storm Overflow Chamber - Inlet Flow Measurement & Sampling - Inlet Screening and Grit Removal - Measurement of Forward Flow to Full Treatment - Modifications to existing Imhoff Tank - Storm Water Holding Tank and Storm Water Return Pumping Chamber - Final Effluent Measurement and Sampling The Contract was tendered in February/March 2005 and was awarded to Waste Water Controls Ltd. Construction and is on-going at present with commissioning and testing scheduled for end- April. Preliminary Report May 2006 EPA Export :13:08:06

28 Jennings O'Donovan & Partners Consulting Engineers Sligo A review of the Preliminary Report is now required due to reflect rapid housing development in Convoy and the impact of the works on the Deele River. 1.3 Funding Under the National Development Plan Water Services Investment Programme , 1,120,000 of funding is available for Convoy Sewerage Scheme. Donegal County Council propose to use this funding to extend the Wastewater Treatment Works to Secondary treatment and to carry out necessary upgrading to the sewer network. 1.4 Land Acquisition Donegal County Council have purchased the field adjacent to the existing Waste Water Treatment Works. The field, 2.38 acres in area, is sufficient to accommodate the proposed extension to the works and any future extension. 1.5 Overview of Information (see attached sheet) Section 2 presents a review of the design population recent, proposed and possible future development in Convoy are discussed. Section 3 discusses the Deele River, legislation and effluent discharge requirements Section 4 discusses the existing sewer network, recent/ proposed modifications to the network, problematic sewers and recommendations for a network survey. Section 5 discusses the secondary treatment options and extends the evaluation carried out in the 2003 Preliminary Report. Section 6 describes the proposed extension to the works. Section 7 of this Report discusses procurement options for the project. Section 8 summaries cost estimates. Section 9 summaries the recommendations of this Addendum to Preliminary Report. Preliminary Report May 2006 EPA Export :13:08:06

29 Jennings O'Donovan & Partners Consulting Engineers Sligo 2.0 DESIGN POPULATION REVIEW Preliminary Report The design population calculated in the Preliminary Report, June 2003 was 2,335 p.e. At a meeting held with Donegal County Council on 15 th June 2004 it was agreed to increase the design p.e. from 2,335p.e. to 3,500p.e. due to a large number of planning applications for housing. At that time, approximately 340 dwellings were proposed. Preliminary and storm water treatment elements are designed and constructed for 3,500 p.e. based on a hydraulic load of 250 l/p.e./day or a Dry Weather Flow of l/s. 2.2 Population Equivalent A review of existing and possible future population was carried out to take into account changes over the last three years since the Preliminary Report was prepared. The review presented in this section reveals that a design p.e. of 3,500 will provide sufficient capacity for Convoy for the next 20 years. Population Equivalent (p.e.) is the value used to estimate the volume and quality of wastewater generated. The EPA wastewater treatment manual for Treatment Systems for small communities, Business, Leisure Centres, Hotels advises that the true per capita wastewater flow is 180 l/p.e./day. Based on this advice, a hydraulic loading of 180 l/p.e./day and an organic loading of 60 g/p.e./day will be used in the design of secondary treatment at Convoy. The dry weather flow loading at 3,500 p.e. at 180 l/p.e./day will be 7.29 l/s. Preliminary and storm water treatment elements will therefore have capacity to deal with flows associated with 4,862 p.e. at 180 l/p.e./day which may be adequate to deal with any further extension of the works. 2.3 Existing Population Review For the purpose of this report, existing population shall be those connected to the existing sewer network. This includes housing developments that are currently under construction that will be connecting to the public sewer. Preliminary Report May 2006 EPA Export :13:08:06

30 Jennings O'Donovan & Partners Consulting Engineers Sligo Domestic Population There are 621 existing houses (including those at construction) connected to public sewer, as follows: Convoy Townparks 114 Main Street (West of Milltown Turn-off) - Houses on Main Street 46 - Rising Main Serving 10 No. County Council Houses to MH Rising Main Serving New Housing Development at Construction 42 Main Street (East of Milltown Turn-off) Oak Park Development 24 Houses on Main Street 20 J. Dolan Housing Development 24 Letterkenny Road Houses Connected 23 Main Street - Milltown County Council Housing Development 19 McGinley 1 Housing Development 50 McGinley 2 Housing Development (at construction) 62 Whiterow Housing Development (at construction) 94 Single House 1 Milltown Road - WWTW Single Houses 35 McFeely Development 49 Ballyboe Single Houses 8 Total Number of Houses Connected 621 Preliminary Report May 2006 EPA Export :13:08:06

31 Jennings O'Donovan & Partners Consulting Engineers Sligo Table 1 of Census 2002 delineates the Number of private households and number of persons in each province, County and City, classified by type of household. The table shows that the average number of persons per private household in County Donegal is 3.0. The state average is 2.94 persons per household. Applying the County Donegal average to the number of dwellings recorded in Convoy equates to a domestic population of 621 x 3 = 1,863 p.e Non-Domestic Population Non-Domestic entities in Convoy include various commercial and retail premises, pubs, a petrol station, two nursing homes, national school and Natural Dairies. The non-domestic entities were identified on a survey of the village and the loading from each premises have been estimated using the Recommended Wastewater loading rates from Commercial Premises delineated in Table 3 of the Environmental Protection Agency s Wastewater Treatment Manuals Treatment Systems for Small Communities, Business, Leisure Centres and Hotels. The non-domestic population equivalent in Convoy has been calculated to be 466 based on (180 l/p/day). A breakdown of all non-domestic entities is presented in Appendix A and summarised in Table 2.1. Sector Population (p.e.) Commercial/Retail 20 Institutional 267 Pubs 12 Industry (Natural Dairies) 167 TOTAL 466 Table 2.1: Summary of Existing Non-Domestic Population Total Existing Population The existing population is calculated to be 2,329 p.e. (1, p.e.) Preliminary Report May 2006 EPA Export :13:08:06

32 Jennings O'Donovan & Partners Consulting Engineers Sligo 2.4 Proposed Development A search of recent planning applications revealed the following proposed development (Refer to Drawing 3463/PR2/001 for location/reference): Reference Developer Development Description p.e. P1 M. Pearson P2 M. Pearson P3 P4 P5 L.. O Neill D. McFeely G&P McCauley * 20 Restaurant Seats Assumed 15 No. Dwellings Restaurant (conversion of railway building) 20 No. Dwellings 26 No. Dwellings 66 No. Dwellings Table 2.2: Summary of Proposed Development * Total p.e Possible Future Development Within the development control points, there are approximately acres of potential development land, labelled F1 to F7 on Drawing 3463/PR2/001. The average housing density of existing developments in Convoy is 5 houses per acre. Applying this density to potential development land equates to 218 possible future houses or 654 p.e. within the development control points. 2.6 Design Population Equivalent The design population equivalent for Convoy is as follows: Existing Domestic Existing Non-Domestic Total Existing p.e. Proposed Development 1,863 p.e. 466 p.e. 2,329 p.e. 391 p.e. Total Existing and Proposed p.e. 2,720 p.e. Spare Capacity Design p.e. 780 p.e. 3,500 p.e. Provision of a wastewater treatment works with capacity to treat 3,500 p.e. would provide 780 p.e. of spare capacity for future domestic and non-domestic growth. This equates to a 28.7% increase on existing/proposed population or an annual growth rate of 1.27% over 20 years. Section 3 of the 2003 Preliminary Report demonstrates that the annual growth rate based on Census figures between 1971 and 2002 to be 0.89%. Based on the pre 2002 growth rate and assuming that the Preliminary Report May 2006 EPA Export :13:08:06

33 Jennings O'Donovan & Partners Consulting Engineers Sligo recent surge of development can not be sustained, the annual growth rate of 1.27% provided as spare capacity at the WWTW is reasonable. As demonstrated in Section 2.5, there is scope within Convoy for provision of a further 218 houses (654 p.e.) leaving spare capacity of 126 p.e. for non-domestic and other domestic. 2.7 Recommended Design Loadings Applying typical hydraulic and organic loadings of 180 l/p.e./day and 60g x BOD/p.e./day respectively, equates to the following loadings: Population Equivalent DWF (m 3 /d) 3 DWF (l/s) 6 DWF (l/s) BOD Load (kg/d) Existing 2, Design 3, Table 2.3: Existing and Design Loadings Preliminary Report May 2006 EPA Export :13:08:06

34 Jennings O'Donovan & Partners Consulting Engineers Sligo 3.0 RECEIVING WATERS, DISCHARGE REQUIREMENTS & ENVIRONMENTAL CONSIDERATIONS 3.1 Introduction Any proposed infrastructure should satisfy relevant legislation, planning policies and environmental designations. The relevant legislation pertaining to outfalls for treated effluent and the protection of surface water are reviewed below for their potential relevance to Convoy Wastewater Treatment Works. 3.2 Relevant Statutory and Policy Considerations Urban Waste Water Treatment Regulations 2001 (S.I. 254 of 2001) These regulations revoke and generally re-enact in consolidation form the Environmental Protection Agency Act, 1992 (Urban Waste Water Treatment) Regulations, 1994, as amended. The regulations concerning Urban Waste Water Treatment give effect to the provisions of directive 91/271/EEC, as amended, concerning urban wastewater treatment. They govern the planning and design of all sewage infrastructures. The Urban Waste Water Treatment Regulations, 2001 require under Article 4 (1) of the regulations that:...a sanitary authority shall provide treatment plants which provide for secondary treatment or an equivalent treatment (a) By 31 December 2005 in respect of all discharges to freshwaters and estuaries from agglomerations within population equivalent of between 2,000 and 10,000. This requirement thus applies to Convoy Waste Water Treatment Works, which has a proposed design population of 3,500p.e. In addition, Article 5 of the Urban Waste Water Treatment Regulations, 2001 states that: Not withstanding the provisions of article 4, more stringent requirements than those specified in Parts 1 and 2 of the Second Schedule shall be applied to discharges from a treatment plant where Preliminary Report May 2006 EPA Export :13:08:06

35 Jennings O'Donovan & Partners Consulting Engineers Sligo this is required to ensure that the receiving waters satisfy any other relevant Community Directives. Part 1Parameter Concentration Minimum % of Reduction Biochemical Oxygen Demand 25mg/l O Chemical Oxygen Demand 125 mg/l O 2 75 Total Suspended Solids 25 mg/l 90 Table 3.1: Concentration of discharge from wastewater treatment works as specified within the second schedule of S.I 254 of The fifth Schedule of S.I 254 of 2001 specifies the frequency of monitoring, which is required dependant upon the size of the treatment plant. Influent and Effluent Parameters Sample Type Frequency BOD (Biological Oxygen Demand) COD (Chemical Oxygen Demand) TSS (Total Suspended Solids) TP (Total Phosphorus) MRP (Molybdate Reactive Phosphate) TN (Total Nitrogen) TON (Total Oxidised Nitrogen) Flow Table 3.2: 24 hour Composite Sample 2,000 to 9,999 p.e. 12 samples during the first year. Four samples in subsequent years, if it can be shown that the water during the first year complies with the provisions of the regulations, if one sample of the four fails, 12 samples must be taken in the year that follows Automatic Continuous Monitoring Frequency of Monitoring required at Convoy Waste Water Treatment Works Water Framework Directive (2000/60/EC) The Water Framework Directive (2000/60/EC) requires, inter alia, a review of the impact of human activity on the status of surface waters and groundwater. The review requires an assessment of the likelihood that water bodies in river basin districts will fail to meet the Directive s environmental objectives. A four-category risk classification scheme has been adopted by the Risk Assessment Working group in Ireland as follows: Preliminary Report May 2006 EPA Export :13:08:06

36 Jennings O'Donovan & Partners Consulting Engineers Sligo EU Commissions reporting risk categories for water bodies Water bodies for which it is already clear without the need for further characterisation or additional monitoring data, that the objectives will be failed; Water bodies for which it is possible that the objectives of the Directive will be failed but, because of inadequate data, further characterisation and operational monitoring are considered necessary to be sufficiently confident that this is the case; Water bodies for which it is already clear, without the need for further characterisation or additional monitoring data, that the achievement of the objectives are not at risk. Table 3.3 Irish equivalent reporting categories for water bodies 1a - Water Body at significant risk on the basis of available information for which confidence in the available information being comprehensive and reliable is high 1b - Water Body probably at significant risk but for which further information will be needed to confirm that this view is correct 2a - Water Body probably not at significant risk on the basis of available information for which confidence in the available information being comprehensive and reliable is lower 2b - Water Body not at risk on the basis of available information for which confidence in the available information being comprehensive and reliable is high Water Framework Directive Category Risk Classification The Deele River is in the North Western International River Basin District and has an overall Risk Result of 1a Water Body at significant Risk. (NS Share, 2005). A copy of the water body report for the Deele River is contained in Appendix B Water Quality Phosphorus Regulations, 1998 (S.I 258/1998) The Local Government (Water Pollution) Act, 1977 (Water Quality Phosphorus) regulations, 1998 (S.I 258/1998) implements in part EU Directive 76/464/EEC on pollution caused by substances discharged into the aquatic environment. The regulations require that water quality has to be maintained or improved by reference to the Biological Quality (Q) Rating assigned by the EPA in Waters, which have specified unsatisfactory Biological Quality (Q) Ratings in 1997(or the first available data thereafter) must be improved to achieve specified minimum target Q or median annual molybdate-reactive phosphorus (MRP) values by There is a strong statistical relationship between biological Q-ratings and MRP concentrations in Irish rivers. The empirical relationship suggests that, once annual median MRP values exceed 30µg P/l, there is a strong statistical likelihood that the river reach in question will have a significant eutrophication problem. Therefore either Q or median MRP targets can be used as a measure of achievement of the Preliminary Report May 2006 EPA Export :13:08:06

37 Jennings O'Donovan & Partners Consulting Engineers Sligo standards set in the regulations (Cleneghan, C., 2003 Phosphorous regulations national Implementation report, 2003 EPA). EPA biological monitoring points on the River Deele are designated for monitoring under the phosphorous regulations. Target and current values at three monitoring stations upstream and downstream of Convoy WWTW are presented in Table 3.4. The location of these monitoring stations are shown in Figure 3.1. EPA monitoring Station No. Location of monitoring point w.r.t Convoy WWT discharge point Q value (1997) Q Value (1998)* Minimum Target Q to be achieved by 2007 Median MRP (µg P/l) to be achieved by 2007** km upstream km downstream km downstream * Most recent published data is 1998 ** There is currently no MRP data available for the EPA monitoring stations on the Deele River. Table 3.4 Current and Target Q and median MRP values for EPA monitoring points on the Deele River (EPA River Code; 01D01) In general, Q values equal to 4 or above 4 are considered as satisfactory, whereas values below 4 are considered unsatisfactory, therefore in general a Q4 or greater value is aspired to in terms of biological quality (Toner et al, 2005 Water Quality in Ireland ). Details of the Q values and their general characteristics are contained in Table 3.5. The EPA Monitoring Station, 0500, downstream of the WWTW has a value of 2-3 and is therefore below the minimum satisfactory standard of Q4 or above. Improvements to the standard of effluent being discharged from the works following secondary treatment will improve the quality of the river and associated Q value. Preliminary Report May 2006 EPA Export :13:08:06

38 Jennings O'Donovan & Partners Consulting Engineers Sligo Table 3.5 General characteristics of the various Biological Quality Classes (Toner et al, 2005 Water Quality in Ireland ) Quality Classes Class A Class B Class C Class D Quality Ratings (Q) Q5 Q4 Q3 4 Q3 Q2 Q1 Pollution Status Pristine, Unpolluted Unpolluted Slight Pollution Moderate Pollution Heavy Pollution Gross Pollution Organic Waste Load None None Light Considerable Heavy Excessive Maximum B.O.D. Low (<3 mg/l) Low (<3 mg/l) Occasionally elevated High at times Usually high Usually very high Dissolved Oxygen Close to 100% 80% - 120% Fluctuates from <80% Very unstable Low, sometimes Very low, often zero to >120% Potential fish-kills zero Annual Median ortho- Phosphate ~0.015 mg P/I ~0.030 mg P/I ~0.045 mg P/I ~0.070 mg P/I Usually > 0.1 P/I Usually >0.1 mg P/I Siltation None May be light May be light May be considerable Usually heavy Usually very heavy and anaerobic Sewage Fungus Never Never Never May be some Usually abundant May be abundant Filamentous Algae Limited Considerable growths Cladophora may be Cladaphora may be May be abundant Usually none development Diverse communities abundant excessive Macrophytes Diverse communities Limited growths Diverse communities Considerable growths Reduced diversity Luxuriant growths Limited diversity Excessive growths Tolerant species only. May be abundant. Usually none or tolerant species only. Macroinvertebrates (from shallow riffles) Diverse communities. High diversity Increased density. Very high diversity. Very high density. Sensitive forms absent. Tolerant Tolerant forms only. Very low diversity. Most tolerant forms. Minimal diversity. Normal density. Sensitive forms usually numerous. Sensitive forms scarce or common. Sensitive forms scarce. forms common. Low diversity. Water Quality Highest quality Fair quality Variable quality Doubtful quality Poor quality Bad quality Abstraction Potential Suitable for all Suitable for all Potential Problems Advance treatment Low grade abstractions Extremely limited Fishery Potential Game fisheries Good game fisheries Game fish at risk Coarse fisheries Fish usually absent Fish absent Amenity value Very high High Considerable Reduced Low Zero Condition Satisfactory Satisfactory Transitional Unsatisfactory Unsatisfactory Unsatisfactory Preliminary Report May 2006 EPA Export :13:08:06

39 Jennings O'Donovan & Partners Consulting Engineers Sligo The parameters, which have defined thresholds in the general characteristics for each Q class and which are measurable in terms of the wastewater treatment works discharge are: Maximum BOD, Dissolved Oxygen (DO) and (Annual Median) orthophosphate. Phosphate data is available and is considered broadly comparable to orthophosphate for the purposes of surface water biological quality. Therefore for the purpose of comparing water quality with standards to be achieved in the phosphorus regulations, Q values as represented by the parameters BOD, DO and orthophosphate/phosphate are used. Based on the requirement for two of three the monitoring stations examined on the Deele River to maintain Q4 by 2007, Q4 will be taken as the standard to be maintained in the receiving waters Salmonid Water Regulations The Deele River is not designated as a Salmonid river under the European Communities Quality of Salmonid Rivers Regulations, SI 293/1988. However, it does contain trout, dipper and probably otter (Ecological Assessment, April 2003) Standards Required in River Deele Table 3.6 summarises the environmental quality standards to be achieved in the receiving waters for parameters associated with discharge from the wastewater treatment plant. Following the precautionary principle, the most stringent of these standards should be adopted where more than one standard exists. Parameter Standard Standard Source Max. BOD <3 mg/l Q4 value: WFD (2000/60/EC) & Phosphorus Regulations (S.I 258/1998) Dissolved Oxygen % Q4 value: WFD (2000/60/EC) & Phosphorus Regulations (S.I 258/1998) Annual Median PO 4 /Orthophosphate Table mg P/l Q4 value: WFD (2000/60/EC) & Phosphorus Regulations (S.I 258/1998) Quality Standards to be achieved in the Deele River Preliminary Report May 2006 EPA Export :13:08:06

40 Jennings O'Donovan & Partners Consulting Engineers Sligo 3.3 Water quality data for the Deele River The most recent data of relevance to the environmental quality standards and the wastewater treatment plant discharge is available from Donegal County Council. This data is presented in Table 3.7. Date Location P.H. B.O.D. (Mg/l) S.S. (Mg/l) C.O.D. (Mg/l) NH3- N(Mg/l) ORTHO P(Mg/l) TOTAL P(Mg/l) 10/01/2005 Convoy - inlet /03/2005 Convoy - inlet /04/2005 Convoy - inlet /05/2005 Convoy - inlet /06/2005 Convoy - inlet /07/2005 Convoy - inlet /08/2005 Convoy - inlet /09/2005 Convoy - inlet /10/2005 Convoy - inlet /11/2005 Convoy - inlet /12/2005 Convoy - inlet /01/2005 Convoy - downstream /02/2005 Convoy - downstream /03/2005 Convoy - downstream /04/2005 Convoy - downstream /06/2005 Convoy - downstream /07/2005 Convoy - downstream /09/2005 Convoy - downstream /11/2005 Convoy - downstream /01/2005 Convoy - outlet /02/2005 Convoy - outlet /03/2005 Convoy - outlet /04/2005 Convoy - outlet /05/2005 Convoy - outlet /06/2005 Convoy - outlet /07/2005 Convoy - outlet /08/2005 Convoy - outlet /09/2005 Convoy - outlet /10/2005 Convoy - outlet /11/2005 Convoy - outlet /12/2005 Convoy - outlet /01/2005 Convoy - upstream /02/2005 Convoy - upstream /03/2005 Convoy - upstream /04/2005 Convoy - upstream /06/2005 Convoy - upstream /07/2005 Convoy - upstream /09/2005 Convoy - upstream /11/2005 Convoy - upstream Table Physio-Chemical Results for inlet & outlet to Convoy WWTW and the Deele River upstream & downstream of the WWTW (Source: Donegal County Council Laboratory, Magheranan, Letterkenny) Preliminary Report May 2006 EPA Export :13:08:06

41 Jennings O'Donovan & Partners Consulting Engineers Sligo The results presented in Table 3.7 indicate that the quality of water within the Deele River is presently meeting the standards specified within Table 3.6 upstream of the discharge point at Convoy WWTW for BOD and orthophosphate (Dissolved oxygen results are not available). Downstream of the works, water quality drops dramatically with the river failing to meet BOD and orthophosphate standards in This is a result of the poor quality of effluent being discharged from the works in The standard of effluent should improve marginally in 2006 following commissioning of the preliminary and storm water treatment elements of the works. Provision of secondary treatment in the next phase of the works will produce an effluent standard compliant with the Urban Waste Water Treatment Directive and water quality downstream of the WWTW will improve. The level of Orthophosphate upstream of Convoy WWTW ranged from mg/l (0.351mg/l recorded on 19/04/05 is assumed to be an isolated incident) indicating that the high levels of orthophosphate downstream of the works ( mg/l) are a consequence of the discharge from the works. In order to maintain the level of orthophosphate at 0.03 mg/l (Q4 Standard) it is recommended that phosphate removal facilities be incorporated within the proposed extension to the treatment plant. The level of ammonia discharged to the Deele River in 2005 as detailed within Table 3.7 was between 2.935mg/l and mg/l. The level of ammonia recorded in the Deele upstream of the discharge point for same period is mg/l N. In order to maintain this level within the Deele and to minimise the effects of the treatment plant discharge on the quality of the receiving waters it is recommended that nitrification and denitrificaiton processes be incorporated into the design of the proposed new treatment works. The construction of the new treatment plant will increase the level of treatment, which is currently being achieved within the treatment plant and will therefore reduce the biological and nutrient load being discharged to the Deele River. 3.4 Standard of Treatment Required According to the Urban Waste Water Treatment Regulations, 1994 appropriate treatment to meet the standards set out in these regulations is what is required at Convoy WWTW. The treated effluent from the proposed upgraded works will discharge through a new outfall to the Deele River. Preliminary Report May 2006 EPA Export :13:08:06

42 Jennings O'Donovan & Partners Consulting Engineers Sligo Table 3.7 below summaries the effluent standards which should be achieved in the discharge to the Deele River. Parameter Standard Required BOD 25 mg/l Suspended Solids 35 mg/l Orthophosphate 1 mg/l (Best Practice) Total Ammonia Best Practice Table 3.7: Standard of Effluent Required Preliminary Report May 2006 EPA Export :13:08:06

43 Jennings O'Donovan & Partners Consulting Engineers Sligo 4.0 EXISTING SEWER NETWORK 4.1 Description of Existing Network The extent of the existing sewer network in Convoy is shown on Drawing 3463/PR2/001. The total length of network is approximately 5.2km with sewers ranging in diameter from 100mm to 300mm. This length excludes networks within housing developments and sewers constructed privately (not taken over by Donegal County Council). 4.2 Proposed/Recent Modifications to Sewer Network The final sewer line to the wastewater treatment works is a 300mm diameter sewer from MH21 to MH30, flowing into a 150mm diameter sewer from MH30 to the works with a storm overflow manhole located at MH31. A 300mm diameter sewer laid in the field on the river side of the road was constructed in January This sewer replaces the 150mm line from MH30 to the wastewater treatment works. The total length of the upsized sewer is 193m A 225mm sewer was constructed from the Oak Park development to MH53. A surface water sewer also from Oak Park runs alongside this foul sewer and discharges to a tributary of the Deele River. A new 225mm sewer from Natural Dairies connects into the 225mm foul sewer at the fork in the road opposite the Catholic Church At present, the 225mm diameter sewer on Smylies Brae flows into a 150mm diameter sewer from MH 53 to MH29 where it connects to the 300mm diameter sewer line leading to the works. It is proposed to lay 360m of 300mm diameter sewer alongside the existing 150mm from MH53 to MH29. The 150mm sewer will then be made redundant. Tenders are currently being sought by Donegal County Council for construction of this sewer line. 4.3 Problematic Sewers A number of problematic sewer lines within the sewer network have been identified by Donegal County Council staff: Preliminary Report May 2006 EPA Export :13:08:06

44 Jennings O'Donovan & Partners Consulting Engineers Sligo (i) Milltown - MH20 to MH25 Surcharging of the sewer with localised flooding at MH 20 and MH21 is known to occur. Two sewer lines (a 150mm and a 225mm diameter) converge at MH20, one sewer serves the Townparks area and buildings on the Northside of the main street, while the second serves buildings on the south side of the Main Street. The 225mm diameter concrete sewer from MH20 to MH21 flows into a 300mm concrete sewer from MH21 to the works. A section of this 300mm sewer from MH21 to MH 25 is in excess of forty years old and it is possible that this section of sewer is subject to high levels of infiltration and associated silting thus causing blockages and surcharging upstream. It is recommended that this section of sewer from MH20 to MH25 be replaced with a new 300mm diameter concrete sewer. The total length is approximately 243m. (ii) Smylies Brae - MH52 to MH53 This section of sewer serves the houses on the south side of Smylies Brae. The sewer line form Natural Dairies used to connect to this sewer line at MH 52 but now connects to a recently constructed 225mm sewer within the road on Smylies Brae that connects to MH53. It is probable that the section of sewer from MH52 to MH53 is corroded by acidic wastewater discharged from Natural Dairies in the past. Natural Dairies have now installed an on-site treatment system and no further problems should be caused to the sewer network. Upgrade of the existing sewer from MH53 to MH28 is proposed and tenders are currently being sought for this section of sewer. The sewer line from Natural Dairies to MH53 has recently been replaced, therefore the sewer from MH52 MH53 will be the only remaining section of sewer affected by corrosion. It is recommended that this 69m of 150mm diameter concrete sewer be replaced. (iii) Main Street MH 43 to MH47 A section of this sewer line runs under the warehouse belonging to the Morris Bros. Wholesalers. It appears that the ground level in this area has been raised as the warehouse has been extended giving a resultant sewer depth of up to 3.5m. It is recommended that this sewer line be replaced with a new sewer taking a direct line from MH44 to MH47 Preliminary Report May 2006 EPA Export :13:08:07

45 Jennings O'Donovan & Partners Consulting Engineers Sligo through the concrete yard, approximately 70m. The existing sewer (82m long) under the building should then be blocked and made redundant. 4.4 Network Survey Section 4.3 outlines the main problems with the sewer network at present. There may be other sections of sewer that require repair or replacement given (1) the age of the sewer network and (2) the recent increase in flows that these sewers are carrying due to rapid housing development. It is therefore recommended that a Network Survey of the main sewer network be carried out to include: CCTV Survey Manhole Survey (e.g. SUS 25, SUS2000) Sewer Flow and Rainfall Survey Organic Load Survey Impermeable Area Survey Network Model CCTV Survey A CCTV Survey of the main sewer lines on Main Street, Townparks, Letterkenny Road and on Smylies Brae would confirm sewer gradients and identify and locate: - Connections to Sewer - Obstructions in Sewers - Collapsed or Dropped Inverts - Cracks, Fractures or breaks - Bad Pipe Joints - Infiltration of Ground Water Preliminary Report May 2006 EPA Export :13:08:07

46 Jennings O'Donovan & Partners Consulting Engineers Sligo The approximate length of sewer to be CCTV surveyed is broken down as follows: Location Diameter Length Comments Letterkenny 150mm 306m Excludes Private Sewer Townparks/Longlands 150mm 225mm 340m 575m Main Street to WWTW 150mm 140m Excludes section MH44 to MH47 to be replaced 225mm 434m 300mm 301m Excludes MH20 MH25 to be replaced and MH30 to WWTW recently replaced Oak Park to MH53 150mm 266m Excludes MH52 to MH53 to be replaced Church Car Park to 225mm 252m MH53 Natural Dairies to 150/225mm 135m Smylies Brae MH58 to MH54 150mm 115m MH61 to MH29 150mm 141m Total Length 3,005m Table CCTV Summary of Sewers to be surveyed Manhole Survey A manhole survey would determine the exact location and condition of manholes within the sewer network. It would also allow new and recent extensions to the network to be identified providing an up to date map of the network. The total number of manholes to be surveyed is estimated at 75 (excluding manholes within housing development) Flow & Load Survey at the Waste Water Treatment Works This survey would identify the quantity and quality of wastewater entering the WWTW and ascertain the amount of surface water that enters the sewer network by recording the response to rainfall events. The survey would normally be carried out over a period of five weeks in order to record at least three significant storm events. A raingauge would be installed to record rainfall during storm events Impermeable Area Survey This survey determines the surface run-off draining into individual pipe lengths and hence the total surface run-off entering the sewer network. Alternatively consultation with County Council staff who are familiar with the network could determine where surface water is entering the network and where it is most feasible to separate surface and foul flows. Preliminary Report May 2006 EPA Export :13:08:07

47 Jennings O'Donovan & Partners Consulting Engineers Sligo Network Survey Cost Estimate The estimated cost of a network survey as detailed above is 59, VAT, broken down as follows: Insurances, Safety, Traffic Management etc 6,000 CCTV Survey 9,400 Provisional Sum for Sewer Cleaning 5,000 Provisional Sum for Raising Manhole Covers 5,000 Manhole Survey 8,900 Sewer Flow & Rainfall Survey 8,500 Impermeable Area Survey 6,000 Organic Load Survey 6,000 Network Model 5,000 Total (excl. VAT) 4.5 Post Network Survey Improvements 59,800 + VAT The network survey will identify sections/areas of the network that require repair or replacement. A budget of 150,000 is provided for such sewer improvements and remedial works. 4.6 Network Improvements Cost Estimate Cost estimates have been prepared for the recommended improvements to the sewer network set out in Section 4.3. Table 4.2 sets out a cost estimate for sewer improvements and sewer network survey/ model. Sewer Improvement/ Upgrade Length Cost Estimate Milltown MH20 to MH25 243m 51, mm upgrade/ replacement Smylies Brae MH52 to MH53 63m 11, mm replacement Main Street MH5 205mm re route/ upgrade 70m 21, Total Improvements to problematic sewers outlined in Section , Network Survey Estimate 59, Post Network Survey Improvements/Remedial Works 150,00.00 Total (excluding VAT) 293, Table 4.2 Cost Estimate for Sewer Improvements and Network Survey Preliminary Report May 2006 EPA Export :13:08:07

48 Jennings O'Donovan & Partners Consulting Engineers Sligo 5.0 SECONDARY TREATMENT PROCESS 5.1 Design Loadings The secondary Waste Water Treatment Process at Convoy will be designed to treat the following loadings. Design Population equivalent (p.e.) = 3,500 p.e. p.e. loading = 180l/day and 60g BOD/day Dry weather flow = 630m 3 / day Peak flow for full treatment (3DWF) = 1,890m 3 / day = 21.87l/s BOD Load = 210kg/day Preliminary Report Recommendations Section 5 of the Preliminary Report prepared in 2003 considered four options for secondary treatment as follows: A Extended Aeration and Settlement in separate tanks B Modular Rotating Biological Contractor Units with Reed Beds C Extended Aeration and Settlement in Concentric Tanks D Membrane Bioreactor Treatment Units Analysis of the above options based on capital and operation costs, treatment efficiency, environmental impact and land area required was carried out and Option B emerged as the most favourable option. RBC units with reed beds was recommended with phased implementation. The analysis and decision making matrix was based on a phased design p.e. of 2,335 which has now increased to 3,500p.e. to be implemented in one phase as discussed in Section 2 of this report. In light of this significant change, the options outlined above are re-evaluated in this report for 3,500 p.e. New capital and operational costs have been prepared for each option. Schematic drawings of the existing works and each of the four options are presented in Appendix D. Preliminary Report May 2006 EPA Export :13:08:07

49 Jennings O'Donovan & Partners Consulting Engineers Sligo 5.3 Secondary Treatment Process The treatment processes were discussed in detail in the 2003 Preliminary Report. They are not reiterated in this report rather they are re-evaluated based on the same criteria used n the earlier evaluation. 5.4 Evaluation of Options Treatment Efficiency All of the process options proposed are expected to achieve a final effluent standard of 25/35 in terms of BOD/Suspended Solids and therefore meet the requirements outlined in Section 3. Options A and C, Extended Aeration and settlement are most able to cope with fluctuating inlet loads and would provide a stable treatment system due to the retention period within the treatment tanks being in excess of 24 hours. The RBC unit Option B will achieve a standard of 25/35 providing the inlet flow is continual and not in excess of the normal parameters for domestic sewage i.e mg/l BOD. With reed beds after the RBC units an effluent standard of 10/10 is anticipated. The membrane bioreactor system (Option D) has an effective solids removal separation system capable of achieving high and suspended solids removal Environmental Impact The extension to the works is proposed within the field adjoining the existing WWTW. The field used for agricultural purposes has good boundary vegetation which will assist in screening the extension. The process chosen may vary the visual impact to an extent as in some instances tanks will be raised out of the ground while in others they will be below ground level. Appropriate landscaping of the site where necessary should mitigate against any visual impacts. An effluent treated to a standard of 25/35 BOD/SS is required from each process. All processes are capable of achieving this standard and will therefore have equal environmental impact the receiving water. Preliminary Report May 2006 EPA Export :13:08:07

50 Jennings O'Donovan & Partners Consulting Engineers Sligo Land Area Required All four options require the existing site to be extended into the adjoining field, now purchased by Donegal County Council. Option B, RBC s and Reed Beds requires the largest area of land Capital Cost Table 5.1 sets out capital cost estimates for each treatment Option. Capital Costs are based on quotations received from various mechanical and electrical suppliers of treatment plants and estimates for civil works. A breakdown of each option is presented in Appendix E. All costs are exclusive of VAT. It can be seen from Table 5.1 Options A and C both extended aeration and secondary clarification have the lowest initial capital cost with Option A 10.3% lower than Option C. Option B and D rotating biological contactors and membrane bioreactors are 86% and 125% more expensive than Option C respectively. Treatment Treatment Total Costs Option Process Civil Costs M & E Costs A. B. C. D Extended Aeration of Secondary Clarifier (Separate tanks) Rotating Biological Contactors Extended Aeration & Secondary Clarifier (Concentric Tanks) Membrane Bioreactor 475, , , , , , ,100 1,160, ,150 1,224, ,600 1,480,100 Table 5.1 Summary of Capital Costs for Secondary Treatment Options Operational and Maintenance Costs All four options have varying degrees of operation and maintenance costs. These costs are outlined in Table 1.4 Appendix F and summarised below in Table 6.2. Preliminary Report May 2006 EPA Export :13:08:07

51 Jennings O'Donovan & Partners Consulting Engineers Sligo Option A Total Operational and Process Maintenance Costs Extended Aeration and Secondary Clarifier (separate tanks) 103,233 B Rotating Biological Contactors & Reed Beds 58,888 C Extended Aeration and Clarification (concentric tanks) 105,379 D Membrane Bioreactor treatment units 103,868 Table 5.2 Summary of Operation and Maintenance Costs for Each Treatment Option The estimated annual costs for secondary treatment range from approximately 59k to 105k. The RBC process which emerged as the most expensive capital cost has the lowest operation and maintenance costs. Essentially what distinguishes this process from the others is that it has significantly lower energy requirements than the other options considered. The Extended Aeration and process is energy intensive due to the blowers providing oxygen to the aeration tanks. 5.5 Discussion of Treatment Options Following on from the discussion above on various criteria and their applicability or relevance to each identified treatment option, a matrix giving a rating for each option under the specified headings is outlined below. In some instances the same rating for a specified criteria is given for each option, thus the specific treatment process is considered to have equal significance on the criteria in question. The scores are as follows. Option A Extended Aeration (Separate Tanks) Option B RBC Option C SBR (Extended Aeration Concentric Tanks) Option D Membrane Bioreactors Capital Cost Operational Costs Environmental Impact Land Area Treatment Efficiency Total Table 5.2 Scoring Matrix for Treatment Process Preliminary Report May 2006 EPA Export :13:08:07

52 Jennings O'Donovan & Partners Consulting Engineers Sligo From the above matrix it can be seen that Option A scores highest of the four options. However, there is very little between Option A and C. Both options are an extended aeration process and have emerged most favourable mainly due to lower initial capital costs. It should also be noted that costs included in this assessment are indicative budget costs and thus are used as guidelines to assess each option. Option A Extended Aeration and Secondary clarifier in separate tanks is recommended as the secondary treatment process at Convoy. This option also includes provision of an anoxic tank for denitrification and phosphate removal facilities as recommended in Section 3.3. Preliminary Report May 2006 EPA Export :13:08:07

53 Jennings O'Donovan & Partners Consulting Engineers Sligo 6.0 DESCRIPTION OF PROPOSED EXTENSION TO WASTE WATER TREATMENT WORKS 6.1 Secondary Treatment It is proposed to provide an anoxic tank, 2 No. aeration tanks, clarifier and a sludge draw-off and pumping chamber. Two precast concrete circular aeration tanks with separate circular pre-aeration/ anoxic tank are proposed. Two adjustable penstocks at the outlet of the anoxic tank to the aeration tanks shall be provided to control flow to one or both aeration tanks. A circular pre-cast clarifier is proposed with a tank scraper mechanism of the rotating half bridge type. Sludge will be drawn from the base of the clarifier to a new sludge draw-off and pumping chamber. Aeration will be carried out by a diffused aeration system using fine pore diffusers. These exhibit higher oxygen transfer efficiencies (OTE s) than surface aerators resulting in lower annual energy consumption. Typical oxygen transfer efficiencies for fine pore diffusers are kgo2/kw.hr compared to kgo2/kw.hr for surface aerators. The diffusers will be uniformly placed to distribute the air evenly at the base of the tank. Transfer efficiencies are also dependant on depth so a minimum tank depth of 4.0 meters is recommended. Design Calculations for the Secondary Treatment process are attached as Appendix F. 6.2 Sludge Draw Off and Pumping Chamber A new sludge draw-off and pumping chamber will be required to return the activated sludge to the anoxic zone or waste it to the existing sludge holding tank. The pumps from the existing sludge pumping station may be suitable for use in the new sludge pumping station. 6.3 Sludge Holding Tank The Donegal County Sludge Management Plan (Draft Revision 2) requires sludge storage at Convoy Waste Water Treatment Works. No thickening or dewatering facilities are required. Table 5.2, Appendix 5 (Transportation Plan Details) indicates that sludge will be collected at Convoy every four days and transported to Letterkenny for further treatment. Assuming 1.0kg sludge dry solids is produced per kg BOD removed for extended aeration sludge, 210 kg/d sludge Preliminary Report May 2006 EPA Export :13:08:07

EPA Waste Water Discharge Licence Application

EPA Waste Water Discharge Licence Application Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update

More information

INFRASTRUCTURE & OPERATION

INFRASTRUCTURE & OPERATION SECTION C: INFRASTRUCTURE & OPERATION Advice on completing this section is provided in the accompanying Guidance Note. C.1 Operational Information Requirements Provide a description of the plant, process

More information

ANNEX C INFRASTRUCTURE & OPERATION

ANNEX C INFRASTRUCTURE & OPERATION ROSCOMMON COUNTY COUNCL MONKSLAND WASTEAWATER DSCHARGE LCENCE ANNEX C NFRASTRUCTURE & OPERATON Roscommon County Council WWD Application Attachment to Form C1.1 Design Criteria The Monksland WWTP is situated

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Ballybay Licence Register. D0207-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Licence Register No. D0302-01 Dromahane and Environs Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on

More information

Waste Water Discharge Licence Attachments

Waste Water Discharge Licence Attachments Kilkenny County Council Water Services Authority County Hall, John Street, Kilkenny Tel: 056 7794050 Fax: 056 7794069 E-mail: waterservices@kilkennycoco.ie Webpage: www.kilkennycoco.ie WS - Water Quality

More information

PLANNING REPORT. For inspection purposes only. MOUNTMELLICK WASTEWATER TREATMENT PLANT PART 8 PROCEDURE

PLANNING REPORT. For inspection purposes only. MOUNTMELLICK WASTEWATER TREATMENT PLANT PART 8 PROCEDURE PLANNING REPORT MOUNTMELLICK WASTEWATER TREATMENT PLANT PART 8 PROCEDURE Donal Kiely Senior Executive Planner John Daly Director of Services Pursuant to Part VIII of the Planning & Development Regulations

More information

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021)

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021) ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE0310818-30-DR-0021) SITE SERVICES LAYOUT SHEET 2 OF 2 (IE0310818-30-DR-0022) LOCATION OF EMISSION TO SURFACE WATER (IE0310818-22-DR-

More information

Attachments A.1 B.3. Consent of copyright owner required for any other use. For inspection purposes only. EPA Export :23:41:07

Attachments A.1 B.3. Consent of copyright owner required for any other use. For inspection purposes only. EPA Export :23:41:07 Attachments A.1 B.3 Attachment A.1 - Non-Technical Summary Attachment B.1 - Drawing - Agglomeration Boundary Attachment B.2 - Drawing - WWTP Site Plan Attachment B.2.1 - Drawing - WWTP Primary Discharge

More information

Annual Environmental Report 2015

Annual Environmental Report 2015 Annual Environmental Report 2015 Agglomeration Name: Licence Register. D0063-01 Blessington Table of Contents Section 1. Executive Summary and Introduction to the 2015 AER 1 1.1 Summary report on 1 Section

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Kanturk Licence Register No. D0203-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section

More information

EPA Export :23:27:55. For inspection purposes only. Consent of copyright owner required for any other use.

EPA Export :23:27:55. For inspection purposes only. Consent of copyright owner required for any other use. Finnea Agglomeration Wastewater Treatment Plant Waste Water Certificate of Authorisation Application (Register Number A0068-01) Regulation 24 Compliance Requirements County Buildings Mullingar Co. Westmeath

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Bantry Licence Register No. D0168-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Borris Licence Register No. D0248-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.

More information

Comhairle Contae Choreai Cork County Council

Comhairle Contae Choreai Cork County Council Comhairle Contae Choreai Cork County Council Halla an Chontae, Corcaigh, Eire. Fon: (021) 4276891 Faics: (021) 4276321 Suiomh Greasain: www.corkcoco.ie County Hall, Cork, Ireland. TeL (021) 4276891 F=

More information

ATTACHMENT D.4. Leachate Management Plan

ATTACHMENT D.4. Leachate Management Plan ATTACHMENT D.4 Leachate Management Plan EPA Export 26-07-2013:01:31:32 Corranure Landfill Waste Licence No. W0077-02 Client Project Title DOCUMENT CONTROL SHEET Cavan County Council Corranure Landfill

More information

2. Discharges to waters

2. Discharges to waters There are 8 discharge points from the agglomeration. The primary discharge (SW001 Note 1 ) occurs into the Folly Stream, which discharges into Lough Leane (1km downstream of the WWTP outfall). There are

More information

Waste Water Discharge. Licence Application. for. Portrane Donabate Rush Lusk Agglomeration.

Waste Water Discharge. Licence Application. for. Portrane Donabate Rush Lusk Agglomeration. Waste Water Discharge Licence Application for Portrane Donabate Rush Lusk Agglomeration. Attachment A1: Non-Technical Summary. WWDL_Application Portrane Donabate Rush Lusk: Section A1 Non Technical Summary

More information

ATTACHMENT E.3 EMISSIONS TO SEWER LOCATION OF EMISSION TO SEWER (IE DR-0003) Consent of copyright owner required for any other use.

ATTACHMENT E.3 EMISSIONS TO SEWER LOCATION OF EMISSION TO SEWER (IE DR-0003) Consent of copyright owner required for any other use. ATTACHMENT E.3 EMISSIONS TO SEWER LOCATION OF EMISSION TO SEWER (IE0310818-22-DR-0003) Page 152 of 217 Attachment E.3 Emissions to Sewer It is proposed that trade and foul effluent from the facility will

More information

Best Practice in Sewage and Effluent Treatment Technologies

Best Practice in Sewage and Effluent Treatment Technologies Best Practice in Sewage and Effluent Treatment Technologies Contents 1 Wastewater - Introduction 1 1.1 Earth s ecological system 1 1.1.1 Water effect on ecology 2 1.1.2 Wastewater generation 3 1.2 Wastewater

More information

Annual Environmental Report

Annual Environmental Report Annual Environmental Report For Waste Water Discharge Licence D0208-01 Dungloe Agglomeration Licensee Donegal County Council Contents; 1.0 Introduction and Summary 2.0 Monitoring Report 3.0 Operational

More information

RENNIA ENGINEERING DESIGN, PLLC CIVIL ENVIRONMENTAL STRUCTURAL. Report. Conceptual Wastewater Facility Plan. Olivet Center.

RENNIA ENGINEERING DESIGN, PLLC CIVIL ENVIRONMENTAL STRUCTURAL. Report. Conceptual Wastewater Facility Plan. Olivet Center. Report Conceptual Wastewater Facility Plan Olivet Center Town of Dover, NY APPLICANT: Olivet Management LLC 73 Wheeler Road Wingdale, NY 12594 LOCATION: NYS Route 22 and Wheeler Road Wingdale, NY 12594

More information

TUAM WASTE WATER DISCHARGE LICENCE APPLICATION

TUAM WASTE WATER DISCHARGE LICENCE APPLICATION GALWAY COUNTY COUNCIL TUAM WASTE WATER DISCHARGE LICENCE APPLICATION NOTICE RESPONSE REGULATION 18(3)(B) July 2009 Report Conlrol Sheet FORM 214 Rev 000 Ryan Hanley conruhing engineers IS0 9001 2000 Quality

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Ardfert Licence Register No. D0282-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section

More information

Mallow Attachment 5. Assimilative Capacity Calculations

Mallow Attachment 5. Assimilative Capacity Calculations Mallow Attachment 5 Assimilative Capacity Calculations a) Mass Balance Equation for Orthophosphate: Gauge number 18055, upstream location of discharge. Median flow of River (station n. 18055) = 20.627

More information

APPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3

APPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3 APPENDIX C Public Consultation Centre (PCC) Displays Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3 Appendix C1 PCC#1 Appendix C2 PCC#2 Township of Red Rock Class Environmental

More information

Delvin Wastewater Treatment Plant

Delvin Wastewater Treatment Plant Delvin Wastewater Treatment Plant WWDL No. D0267-01 ANNUAL ENVIRONMENTAL REPORT 2011 County Buildings Mullingar Co. Westmeath Phone: 04493-32000 Fax: 04493-42330 Delvin Waste Water Discharge Licence (EPA

More information

Construction of first wastewater treatment plant in Kosovo: an EU pilot project

Construction of first wastewater treatment plant in Kosovo: an EU pilot project Water Utility Journal 14: 41-46, 2016. 2016 E.W. Publications Construction of first wastewater treatment plant in Kosovo: an EU pilot project B.Sh. Kajtazi European Union Office in Kosovo, Kosovo Street

More information

ENGINEERING STANDARD FOR DRAIN AND SEWER SYSTEMS OUTSIDE BUILDINGS FIRST EDITION NOVEMBER 2013

ENGINEERING STANDARD FOR DRAIN AND SEWER SYSTEMS OUTSIDE BUILDINGS FIRST EDITION NOVEMBER 2013 ENGINEERING STANDARD FOR DRAIN AND SEWER SYSTEMS OUTSIDE BUILDINGS FIRST EDITION NOVEMBER 2013 This Standard is the property of Iranian Ministry of Petroleum. All rights are reserved to the owner. Neither

More information

This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/ :27

This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/ :27 This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/2014 16:27 OFFICE OF CLIMATE, LICENSING & RESOURCE USE. INSPECTORS REPORT ON A WASTE WATER DISCHARGE

More information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Facility / System: Town of Farmville Wastewater Collection System and Treatment Facilities Responsible Entity:

More information

Duffin Creek Water Pollution Control Plant Technical Information

Duffin Creek Water Pollution Control Plant Technical Information Duffin Creek Water Pollution Control Plant Technical Information Plant History The Duffin Creek Water Pollution Control Plant (WPCP) is located on the northern shore of Lake Ontario in the City of Pickering

More information

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS CHAPTER 4 WASTEWATER CHARACTERISTICS Wastewater collection, treatment, and disposal facilities are designed to handle specific hydraulic and pollutant loads for 20 or more years after they are constructed.

More information

The Membrane Wastewater Treatment Plant in Ihn Layman s report

The Membrane Wastewater Treatment Plant in Ihn Layman s report The Membrane Wastewater Treatment Plant in Ihn Layman s report 1 Entsorgungsverband Saar, Tel. +49 6 81/ 60 00-0, P.O.Box 10 01 22, D-66001 Saarbrücken, www.entsorgungsverband.de The Wastewater Treatment

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

2015 HDR, Inc., all rights reserved.

2015 HDR, Inc., all rights reserved. 2015 HDR, Inc., all rights reserved. Hastings Utilities Water Pollution Control Facility Improvements Brian Bakke, HDR ASCE Environmental Conference 4/6/2017 Review Existing Facilities Need for the Project

More information

OFFICE OF CLIMATE, LICENSING & RESOURCE USE.

OFFICE OF CLIMATE, LICENSING & RESOURCE USE. This report has been cleared for Submission to the Board by the Programme Manager Frank Clinto Signed:. x G DatedWQTfa ~ OFFICE OF CLIMATE, LICENSING & RESOURCE USE. *na7&t&mdllmcwm To: From: DIRECTORS

More information

Carlow County Council

Carlow County Council Carlow County Council WASTEWATER DISCHARGE LICENCE APPLICATION FOR THE AGGLOMERATIO OF CARLOW TOWN AND ENVIRONS AND SECTIONS OF GRAIGUECULLEN IN COUNTY LAOIS WASTEWATER DISCHARGE LICENCE APPLICATION NON-TECHNICIAL

More information

Agglomeration: Cork City Annual Environmental Report 2010

Agglomeration: Cork City Annual Environmental Report 2010 Comhairle Cathrach Chorcaí CORK CITY COUNCIL Agglomeration: Cork City Annual Environmental Report 2010 Licence Register Number: D0033-01 Licensees: Cork City Council and Cork County Council 12/6/2011 Contents

More information

UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING. MSc CIVIL ENGINEERING SEMESTER TWO EXAMINATION 2017/2018 URBAN DRAINAGE SYSTEMS MODULE NO: BLT4022

UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING. MSc CIVIL ENGINEERING SEMESTER TWO EXAMINATION 2017/2018 URBAN DRAINAGE SYSTEMS MODULE NO: BLT4022 [ESS29] UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING MSc CIVIL ENGINEERING SEMESTER TWO EXAMINATION 2017/2018 URBAN DRAINAGE SYSTEMS MODULE NO: BLT4022 Date: Monday 21 st May 2018 Time: 10:00 13:00 INSTRUCTIONS

More information

DISCHARGES TO THE AQUATIC ENVIRONMENT

DISCHARGES TO THE AQUATIC ENVIRONMENT RPS Consulting Engineers SECTION D: DISCHARGES TO THE AQUATIC ENVIRONMENT Advice on completing this section is provided in the accompanying Guidance Note. Give particulars of the source, location, nature,

More information

10. WATER AND EFFLUENT

10. WATER AND EFFLUENT 10. WATER AND EFFLUENT 10.1 General This Chapter addresses the issues of water quality and aqueous emissions associated with the proposed development and includes an assessment of their potential impact

More information

Baltimore City Department of Public Works

Baltimore City Department of Public Works Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water

More information

Domestic Waste Water (Sewage): Collection, Treatment & Disposal

Domestic Waste Water (Sewage): Collection, Treatment & Disposal Domestic Waste Water (Sewage): Collection, Treatment & Disposal Sanitary sewers Storm water sewers Combined sewers Types of sewers: Types of collection system Building sewer/building connections:connected

More information

SECTION 8.0 NEWPCC SECOND PRIORITY CONTROL ALTERNATIVES

SECTION 8.0 NEWPCC SECOND PRIORITY CONTROL ALTERNATIVES SECTION 8.0 NEWPCC SECOND PRIORITY CONTROL ALTERNATIVES 8.1 PREAMBLE Table 8.1 below indicates the target ammonia concentrations for the Best Practicable and the Second Priority Levels of Control for the

More information

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

Design of Sewerage System for Jaffarpur area in Southwest New Delhi International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for

More information

Agglomeration: Cork City Annual Environmental Report 2011

Agglomeration: Cork City Annual Environmental Report 2011 Cork City Agglomeration 2011 Comhairle Cathrach Chorcaí CORK CITY COUNCIL Agglomeration: Cork City Annual Environmental Report 2011 Licence Register Number: D0033-01 Licensees: Cork City Council and Cork

More information

Donata Dubber 1, Laurence W. Gill 1 Corresponding Author Donata Dubber 1

Donata Dubber 1, Laurence W. Gill 1 Corresponding Author Donata Dubber 1 The suitability of packaged wastewater treatment systems for direct surface water discharge in rural Ireland - A review of performance and cost efficiencies Donata Dubber 1, Laurence W. Gill 1 Corresponding

More information

Guide to completing the Pre Connection Enquiry Application Form

Guide to completing the Pre Connection Enquiry Application Form Guide to completing the Pre Connection Enquiry Application Form This form is to be filled out by applicants enquiring about the feasibility of a water and/or wastewater connection to Irish Water infrastructure.

More information

No-Holds-Barred Match: RBC vs. MBR

No-Holds-Barred Match: RBC vs. MBR No-Holds-Barred Match: RBC vs. MBR Northeast Onsite Wastewater Short Course & Exhibition April 6 th, 2016 Erin K. Moore, PE Services provided in NY as T&B Engineering, PC Overview Evaluation target Historic

More information

Course: Wastewater Management

Course: Wastewater Management Course: Wastewater Management Prof. M. M. Ghangrekar Questions 1 1. Describe advantages and disadvantages offered by the water carriage system. 2. What are the possible adverse effects when untreated or

More information

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Steve Russell WRc PLC Swindon UK Steve.russell@wrcplc.co.uk WRc plc 2011 Plan

More information

Waste water treatment

Waste water treatment Waste water treatment Responsible water management means the treatment and disposal of the generated waste water, for which suitable and effective wastewater treatment plants and systems are needed. Based

More information

Clockhouse Lane Pit Lakes - Water Quality and Ecology Overview 2015

Clockhouse Lane Pit Lakes - Water Quality and Ecology Overview 2015 Clockhouse Lane Pit Lakes - Water Quality and Ecology Overview 2015 Heathrow Airport uses specialist consultants to monitor the Clockhouse Lane Pit system of interconnected lakes for water quality and

More information

Appendix D JWPCP Background and NDN

Appendix D JWPCP Background and NDN Appendix D JWPCP Background and NDN JWPCP Background JWPCP Water Quality Primary Clarifiers HPO Reactors Final Clarifiers Unit Influent Primary Effluent Secondary Effluent BOD mg/l 460 240

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 PREPARED: January 2019 2018 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

TALBINGO WASTEWATER TREATMENT PLANT UPGRADE. Kay White

TALBINGO WASTEWATER TREATMENT PLANT UPGRADE. Kay White TALBINGO WASTEWATER TREATMENT PLANT UPGRADE Paper Presented by: Kay White Authors: Kay White, Senior Process Engineer, Tanya Luo, Graduate Civil Engineer, Li Lern Lau, Process Engineer, SMEC Australia

More information

OFFICE OF CLIMATE, LICENSING, RESOURCES & RESEARCH

OFFICE OF CLIMATE, LICENSING, RESOURCES & RESEARCH This report has been cleared for submission to Director/Board by Breen Higgins. Grainne Power, 03/11/2015 14:44 OFFICE OF CLIMATE, LICENSING, RESOURCES & RESEARCH INSPECTORS REPORT ON A WASTE WATER DISCHARGE

More information

Contents General Information Abbreviations and Acronyms Chapter 1 Wastewater Treatment and the Development of Activated Sludge

Contents General Information Abbreviations and Acronyms Chapter 1 Wastewater Treatment and the Development of Activated Sludge Contents Contents General Information Abbreviations and Acronyms... 6 Chapter 1 Wastewater Treatment and the Development of Activated Sludge... 8 The Importance of Wastewater Treatment... 8 The Scope of

More information

CONSTRUCTED WETLANDS OPPORTUNITIES FOR LOCAL AUTHORITIES

CONSTRUCTED WETLANDS OPPORTUNITIES FOR LOCAL AUTHORITIES CONSTRUCTED WETLANDS OPPORTUNITIES FOR LOCAL AUTHORITIES Don McEntee Chartered Engineer Dublin City Council November 2006 CONSTRUCTED WETLANDS OPPORTUNITIES FOR LOCAL AUTHORITIES In September 2006 the

More information

GAIRLOCH WWTW: CAR/L/ APPLICATION FOR TECHNICAL VARIATION SUPPORTING INFORMATION

GAIRLOCH WWTW: CAR/L/ APPLICATION FOR TECHNICAL VARIATION SUPPORTING INFORMATION GAIRLOCH WWTW: CAR/L/1002928 APPLICATION FOR TECHNICAL VARIATION SUPPORTING INFORMATION 1 Introduction Scottish Water is working hard to always do the right thing for the environment and our customers

More information

Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters

Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters PROCEDURE F-5-1 (formerly referenced by 08-01) Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters PROCEDURE F-5-1 DETERMINATION OF TREATMENT

More information

Attachment N o F Control & Monitoring

Attachment N o F Control & Monitoring Attachment N o F Control & Monitoring Attachment F1: Treatment, Abatement and Control Systems Air There is no treatment or abatement systems required for the minor air emission points or the potential

More information

North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of

North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of Greater Chicago Today s Goals Discuss project background Provide

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

: Performance for Customers

: Performance for Customers Table 1 Overall performance assessment (OPA) planned outputs - water Block A Water supply - levels of service Line 1 Inadequate Pressure - Properties below reference level at end of year The total number

More information

Waste Water Discharge

Waste Water Discharge Environmental Protection Agency An Ghnfomhakacht urn Chaomhnl Comhshaoii Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland Waste Water Discharge Certificate of Authorisation Certificate

More information

Annual Environmental Report 2015

Annual Environmental Report 2015 Annual Environmental Report 2015 Agglomeration Name: Licence Register Banteer and Environs. D0448-01 Table of Contents Section 1. Executive Summary and Introduction to the 2015 AER 1 1.1 Summary report

More information

DRAFT. Palmer Wastewater Treatment Plant Preliminary Engineering Report City of Palmer, Alaska

DRAFT. Palmer Wastewater Treatment Plant Preliminary Engineering Report City of Palmer, Alaska City of Palmer, Alaska Prepared by Hattenburg Dilley & Linnell, LLC and G. V. Jones and Associates, Inc. Date: TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PURPOSE AND NEED... 2 3.0 PROJECT PLANNING AREA...

More information

City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012

City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012 City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 PREPARED: January 2015 2014 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Explanatory Note. Interim Classification of Irish Coastal and Transitional Waters for the purposes of the EU Water Framework Directive.

Explanatory Note. Interim Classification of Irish Coastal and Transitional Waters for the purposes of the EU Water Framework Directive. Explanatory Note Interim Classification of Irish Coastal and Transitional Waters for the purposes of the EU Water Framework Directive. Introduction November 2008 The EU Water Framework Directive (2000/60/EC)

More information

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014 Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014 Application type Agency Review Comments Applicable Plan Sections Staff Planner Staff Recommendation Publicly

More information

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population.

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population. Gaza City Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population. Gaza City has the oldest wastewater system in Gaza Strip; it consists of some of 280 kilometers

More information

Appendix A Regulatory Aspects

Appendix A Regulatory Aspects Appendix A Regulatory Aspects APPENDIX A BACKGROUND INFORMATION RELATING TO THE FUNDAMENTAL INTERMITTENT STANDARDS This Appendix provides further background information concerning the Fundamental Intermittent

More information

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven

More information

SBR PROCESS FOR WASTEWATER TREATMENT

SBR PROCESS FOR WASTEWATER TREATMENT SBR PROCESS FOR WASTEWATER TREATMENT IMR E&T S.r.l. Maria Vittoria Marra maria.vittoria.marra@imr.it www.imr.it Purification of wastewater A process aimed at removing organic and inorganic contaminants

More information

CSR Process Simulations Can Help Municipalities Meet Stringent Nutrient Removal Requirements

CSR Process Simulations Can Help Municipalities Meet Stringent Nutrient Removal Requirements CSR Process Simulations Can Help Municipalities Meet Stringent Nutrient Removal Requirements Continuous Flow Sequencing Reactor (CSR) Basin with Moving Bridge, Submerged Diffusers, and Stationary Diffusers

More information

6.2 Umgeni Water Owned Wastewater Works

6.2 Umgeni Water Owned Wastewater Works 6. WASTEWATER 6.1 Overview Umgeni Water owns and operates the Darvill and Ixopo Wastewater Works (WWW), but manages a number of other WWW on behalf of Municipalities. Management contracts are in place

More information

AMPC Wastewater Management Fact Sheet Series Page 1

AMPC Wastewater Management Fact Sheet Series Page 1 Nitrogen removal Nitrogen present in meat processing wastewater are termed a nutrient, since they are essential elements for life. They largely derive from proteins dissolved into wastewater from meat

More information

AMPC Wastewater Management Fact Sheet Series Page 1

AMPC Wastewater Management Fact Sheet Series Page 1 Nitrogen removal Nitrogen present in meat processing wastewater are termed a nutrient, since they are essential elements for life. They largely derive from proteins dissolved into wastewater from meat

More information

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be: Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.

More information

2017 Annual Performance Report

2017 Annual Performance Report Newcastle Water Pollution Control Plant The Regional Municipality of Durham Newcastle Water Pollution Control Plant Environmental Compliance Approval (ECA): 3-2189-87-946 Dated July 26, 1994 Amendments:

More information

3) Din Daeng WWTP. Outline of the Project. Appendix 2-9

3) Din Daeng WWTP. Outline of the Project. Appendix 2-9 3) Din Daeng WWTP Outline of the Project 1. Start of operation 2004 2. Treatment area: 37 km 2 3. Served population: 1,080,000 persons 4. Treatment process: Activated Sludge with Nutrient, (Nitrogen and

More information

Request for Proposals

Request for Proposals Request for Proposals Aeration Basin Improvement Predesign and Design Project Project Number WD1401 You are hereby invited to submit a proposal for consulting services necessary to provide the City of

More information

Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor

Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor J. Komorita 1, P. Burke 2, B. Youker 2, and G. Crawford 2 1 King County, 2 CH2M HILL ABSTRACT Many Membrane Bioreactor (MBR)

More information

RYKI WASTEWATER TREATMENT PLANT FIRST NEREDA IN POLAND Authors: Joana Doutor, Janusz Sławiński and Bart de Bruin

RYKI WASTEWATER TREATMENT PLANT FIRST NEREDA IN POLAND Authors: Joana Doutor, Janusz Sławiński and Bart de Bruin RYKI WASTEWATER TREATMENT PLANT FIRST NEREDA IN POLAND Authors: Joana Doutor, Janusz Sławiński and Bart de Bruin Nereda and Poland In Poland, at the city of Ryki in the Lublin Province, there is a new

More information

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL Alvin C. Firmin CDM Jefferson Mill, 670 North Commercial Street Suite 201 Manchester, New Hampshire 03101 ABSTRACT Sequencing

More information

ISAM INTEGRATED SURGE ANOXIC MIX

ISAM INTEGRATED SURGE ANOXIC MIX ISAM INTEGRATED SURGE ANOXIC MIX P r o v e n T e c h n o l o g y FLUIDYNE S ISAM IS A TOTAL TREATMENT SYSTEM incorporating BOD, TSS and nitrogen removal along with sludge reduction in an integrated system.

More information

Excellent Treatment

Excellent Treatment This information is brought to you by Owls Hall Environmental working in partnership with Klargester products. Excellent Treatment 0845 375 1801 www.ohel.co.uk submerged aerated filter sewage treatment

More information

4.1.2 This Chapter sets out the need for the proposed development through the following:

4.1.2 This Chapter sets out the need for the proposed development through the following: 4. Need 4.1 Introduction 4.1.1 The need for the Upgrade of Deephams STW is driven by the requirements of European Directives, subsequently reflected in the details of a new environmental permit set for

More information

Presenters: Rodrigo Pena-Lang, PE (D&B Engineers), Magdalena Gasior, PE (D&B Engineers) and Paul D. Smith, PE (NYCDEP)

Presenters: Rodrigo Pena-Lang, PE (D&B Engineers), Magdalena Gasior, PE (D&B Engineers) and Paul D. Smith, PE (NYCDEP) NYWEA-NEWEA Joint Conference June 7, 2016 Presenters: Rodrigo Pena-Lang, PE (D&B Engineers), Magdalena Gasior, PE (D&B Engineers) and Paul D. Smith, PE (NYCDEP) Overview Port Jervis WWTP History Division

More information

For inspection purposes only. Consent of copyright owner required for any other use. EPA Export :23:38:35

For inspection purposes only. Consent of copyright owner required for any other use. EPA Export :23:38:35 For inspection purposes only. EP Export 14-05-2015:23:38:35 For inspection purposes only. EP Export 14-05-2015:23:38:35 For inspection purposes only. EP Export 14-05-2015:23:38:35 For inspection purposes

More information

DUBLIN WASTE TO ENERGY PROJECT

DUBLIN WASTE TO ENERGY PROJECT South Dublin County Council DUBLIN WASTE TO ENERGY PROJECT www.dublinwastetoenergy.ie Response to An Bord Pleanála Request for Clarification Reference EF2022 November 2006 EPA Export 25-07-2013:21:19:52

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts: Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment

More information

SECTION-I. b) Write a short note on pumping of savage. 4

SECTION-I. b) Write a short note on pumping of savage. 4 UNIVERSITY OF PUNE [4364]-401 B. E. (Civil Engineering Semester I) Examination - 2013 ENVIRONMENTAL ENGINEERING-II (2008 Pattern) [Total No. of Questions :12] [Total No. of Printed Pages :4] [Time : 3

More information

I/ From: Marian Doyle Environmental Licensing Programme I/ Date: 1 Ot February I

I/ From: Marian Doyle Environmental Licensing Programme I/ Date: 1 Ot February I 1 To: DIRECTORS I/ From: Marian Doyle Environmental Licensing Programme I/ Date: 1 Ot February 20 1 1 I RE: Application for a Waste Water Discharge Licence from Longford County Council, for the agglomeration

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information