A RELATIVE ACCURACY EVALUATION OF VARIOUS METHODS TO DETERMINE LONG TERM COAL-BURNED VALUES FOR COAL PILE INVENTORY RECONCILIATION
|
|
- Antony Holland
- 5 years ago
- Views:
Transcription
1 A RELATIVE ACCURACY EVALUATION OF VARIOUS METHODS TO DETERMINE LONG TERM COAL-BURNED VALUES FOR COAL PILE INVENTORY RECONCILIATION Joseph R. Nasal, P.E. GENERAL PHYSICS CO~PO~ATION David A. Hightower CITY OF COLORADO SPRINGS ABSTRACT This paper presents the results of an engineering study conducted on the City of Colorado Springs' Utilities (CCSU) on Martin Drake Unit # 7 (140 MWe. PC fired) to evaluate the relative accuracy of using various methods to determine "coal burned" over a five month period of time. Since coal-burned is used for calculating coal pile inventory estimates as well as a common means of determining thermal performance. CCSU was interested in the relative accuracies and "agreement of results" associated with using various methods to determine coal consumption at the Martin Drake Station. The scope of the study included examining and comparing plant operational data over five months, using three distinctly different methods to determine unit heal rate and coal consumption, these included: I. Using a high accuracy and routinely-calibrated belt scale that supplied coal 10 the unit's coal bunker (Input-Output Method) 2. Using an on-line performance monitoring system to calculate and archive real-time turbine cycle heat rate (ASME. PTC 6) and boiler efficiency (ASME. PTC 4 ) on a minute-to-minute basis (Heat Balance Method), and J. Using a "Modified Design Curve Method" that is based on design turbine cycle heat rate data modified for actual operating conditions and equipment degradation to determine heat input from the boiler, in combination with ASME PTC 4 based boiler efficiency calculations. The study showed that the Heat Balance Method was the most accurate method of calculating coal consumption. As a backup measure, heat input (fuel consumption) should also be calculated using the Modified Design Curve Method. Use of the belt scale (Input-Output Method) to determine coal consumption was shown to have less accuracy than the other two calculation methods. INTRODUCTION An engineering study was performed by General Physics to improve the methods of determining coal consumption at CCS' Martin Drake Station. The scope of work included examining three different methods: 1) the Heat Balance Method, which is based upon a design heat balance of the steam cycle using primary feedwater flow and other process measurements to calculate turbine cycle heal rate; 2) the Modified Design Curve Method which uses the original design turbine cycle heat rate curve, modified for actual operating conditions and equipment degradation to determine heat input from the boiler; and 3) the Input/Output Method which uses the belt scale coal (Tons/day) readings and the daily coal heating value lab analysis to determine heat input calculations. Based upon the analysis detailed below, the Heat Balance Method shows to be the most accurate method of calculating boiler heat input. As a backup measure, heat input (fuel consumption) should also be calculated using the Modified Design Curve Method. Use of the belt scale to determine boiler heat input is shown to have less accuracy than the other calculation methods.
2 HEAT BALANCE METHOD The purpose of evaluating the Heat Balance Method was to determine if there is any significant improvement in the heat input (fuel consumption) calculations used in an On-line Performance Monitoring System when the primary feedwater flow is calculated from other related data versus direct readings from the feedwater flow meter. Currently the primary flow is read from a snapshot value of the flow indication in PI, and a 5 minute "dampened" value is then stored in the EtaPRO Performance Monitoring System's (PMS) archive, Using the dampen feature in EtaPRO helps to reduce large fluctuations in the data that are common with indicated flow rates. The result of this dampened flow rate, along with several other process data, is used to calculate the turbine cycle heat input. The turbine cycle heat input is then divided by boiler efficiency (using the loss method) to determine unit heat input, and then used to calculate consumption based on the daily coal lab analysis. A study of the turbine cycle heat input calculation from raw data to final result uncovered no errors in the calculation methodology used by the PM$. The method was broken down into individual steps, and the exact method used in the PM$ was reproduced in an Excel spreadsheet. The result based upon raw data obtained from the historian (PI), matched the results of the PMS calculation stored in PI. Note that although the methodology used is correct, the result can be corrupted by bad data, transient data, and low load data obtained from PI. The calculation results were next compared against the results of coal consumption obtained from the belt scale-over a time period from January - May, The turbine cycle heat input is divided by the calculated boiler efficiency, and the result is used to calculate the amount of coal burned in MMBtu/day. Differences were noted between the belt scale and the heat balance method calculation, although no consistency in the deviations was found due to other operational parameters. The current PMS calculation results were also plotted against gross generation to determine the amount of scatter present in the data. For a typical load of 140 MW (+/- 0.5 MW), the turbine cycle heat input averaged MMBtu/hr, with twice the standard deviation equal to 20.9 MMBtu/hr (Table I). Essentially this indicates that for a given population of data at 140 MW, the turbine cycle heat input will be calculated with +/ MMBtu/hr 95% of the time (Figure I). This equates to a deviation in gross heat rate of +/ Btu/kWh, and a deviation in turbine cycle heat rate of +/ Btu/kWh. The calculated uncertainty of 2.73% shown in Table 2 compares well to the calculated turbine cycle heat input, for which two standard deviations is equivalent to 1.68%. Average (MMBtu/hr) Standard Deviation (M MBtu/hr) Accuracy (%) +/- Gross Heat Rate I (MMBtu/hr) Existing EtaPRO PM S % Calculation Using 1st Stage Pressure % Using C RH Pressure % Using Final FW Temp % /- Turbine Cycle Heat Rate (MMBtu/hr) Table I: Turbine Cycle Heat Input Calculation Methods Comparison at 140 MW (+/- 0.5 MW)
3 Bi tsi U Ti θ Ui 2 U R (%) Barometric Pressure Boiler Feedwater Flow Boiler Feedwater Pressure Boiler Feedwater Temp Below Seat Packing LO Above Seat Packing LO ,0046 Percent Load First Stage Efficiency First Stage Enthalpy N2 Leakage Flow N I Inner Leakage Flow N1 Outer Leakage Flow N I Total Leakage Flow Throttle Flow FW H 5 Extraction Flow Reheat Steam Flow Table 2: Turbine Cycle Heat Input Calculated Uncertainty The next step involved reproducing the above calculation, but substituting a calculated value for the primary flow instead of using the indicated (metered) flow rate. The methods evaluated include first stage pressure, cold reheat pressure, and final feedwater temperature as indicators of primary flow. Another method considered was reading feedwater flow rates at a high frequency (e.g. every four seconds) to improve the data. For the first stage pressure, the original design curve of pressure vs. throttle flow was considered. However, over time the original curve does not match the current operating data, most likely due to nozzle block degradation. For example, at a first stage pressure of 800, 1000, and 1200 psia, the design curve predicts that throttle flow will be approximately 605, 760, and 910 kpph respectively. However, the data in PI from the installed feedwater flow meter indicate that throttle flow at these pressures was actually 672, 830, 988 kpph (average) respectively (Table 3). Although there is some deviation in throttle flow versus first stage pressure in the data, the design values are on the low end of deviations and therefore it was recommended that the curve not be used in this evaluation. First Stagc Pressure (psia) Design Throttle Flow (kpph) Actual Throttle Flow (from metered Feedwater Plow) (kpph) Table 3: Comparison of predicted throttle now to metered feedwater flow, using first stage pressure design curve To obtain the relationship for first stage pressure, a constant value was calculated based on the equation W=C* (P/v), where W is the first stage steam flow, C is the nozzle constant, P is the first stage pressure, and v is the first stage specific volume. Using a range of unfiltered PI data, the constant value was calculated for each timestamp and an average of the constants was then calculated. Steady-state filtered data was also used in the analysis over a greater range of time; however the resulting average constant value remained the same. The average constant was then use4d in the turbine cycle heat input calculation to determine first stage flow, throttle flow and finally primary feedwater flow. As noted previously in Table 1, the original method of calculating turbine cycle heat input produced a standard deviation of 10.5 MMBtu/hr at 140 MW. When the first stage pressure method was introduced, the standard deviation was reduced to 8.0 MMBtu/hr (Table 1), a slight improvement. This improvement in accuracy is most likely due to the fact that the calculation of flow from first stage pressure and specific volume produces a slightly more stable
4 result that dampens the flow value over time. The next method considered was to use cold reheat pressure as an indication of primary now. As with first stage pressure, the cold reheat now was calculated using the indicated flows and calculated leakage flows, and then a constant value was calculated based on cold reheat pressure and specific volume. The constant was then used in the turbine cycle heat input calculation to determine the heat input and also the coal consumption. A comparison of this method to the original method resulted in a standard deviation of 13.9 MMBtu/hr (Table 1) versus 10.5 MMBtu/hr. A reduction in accuracy is most likely due to the fact that the calculated feedwater now must be calculated from cold reheat flow and several other flows, which increases the uncertainty of the calculation. The third method evaluated used final feedwater temperature as an indication of primary now. For this method, a relationship between final feedwater temperature and the indicated primary now was established using steady-state filtered and unfiltered data. The resulting relationship was plotted and a curve fit equation was used to calculate feedwater now. As before, the turbine cycle heat input was recalculated using the new primary now. The result compared to the existing calculation was a standard deviation 20.2 MMBtu/hr (Table I), which is considerably less accurate. This increase in the uncertainty is most likely due to the error in curve-fining the final feedwater temperature-to feedwater flow. Although the relationship is linear, there is still significant variations in feedwater flow for a given final feedwater temperature. The final method evaluated was to increase the frequency of feedwater now readings to improve accuracy. An analysis was done on the feedwater flow readings compared to the gross generator output to determine the accuracy of the data. For a given range of generator output averaging MW, the approximate uncertainty of the data was 1.49 MW (twice the standard deviation), or 1.06%. For the same time period, the feedwater flow rate uncertainty was 16 kpph, or 1.67%. This is within the expected measurement uncertainty of the data, which for flow rate is typically 2%. Note that the feedwater data used was the "'dampened'" result from the PMS. This indicates that dampening the data results in a smoother data set with fewer outliers. Therefore, it is not necessary to increase the frequency of flow readings as this would not improve the accuracy of the result. Based upon the above results, it can be concluded that using a different method to calculate the primary flow does improve the calculated result, but only slightly. This also indicated that the current method is appropriate and should produce accurate results for steady-state operation above very low loads. Tons of coal burned is determined from this method by taking the calculated turbine cycle heat input, dividing by the boiler efficiency to obtain the total boiler heat input. This result is then divided by the heating value of the fuel measured in the lab to arrive at the mass of the coal burned in the boiler. A graphical comparison of the four methods discussed above is shown in Figure 2. The daily amount of coal burned predicted by each method is plotted against gross generation for each day. Note that all four methods produce similar results, although the final feedwater temp indication for primary now shows the most scatter of all the methods. MODIFIED TURBINE CYCLE I-O DESIGN CURVE METHOD The second method considered in this study was to use the turbine cycle heat rate vs. gross generation design curve as a basis for calculating the coal heat input. The curve was adjusted for various operational parameters and also for equipment degradation. The adjusted turbine cycle heat input divided by calculated boiler efficiency (loss method) results in the amount of coal burned. For this method, the original turbine cycle design I-O curve of Unit 7 was obtained. The calculation existed in the PMS in order to determine the effect on heat rate of various operational data. The corrections to the design curve are also calculated in the PMS, and include corrections for feedwater temperature, reheat steam temperature, condenser pressure, main steam temperature, hotwell temperature, reheat spray flow. superheat spray flow, and main steam throttle pressure.
5 Also present in EtaPRO are the design and actual efficiencies of the HP and IP steam turbine sections which are used to modify the curve to account for equipment degradation. The effect of the deviation in efficiency of each section on heat rate is determined individually with respect to the other sections. In this manner one can separate out individual section degradation and its effect on heat rate. An Excel spreadsheet was built to reproduce these calculations and test the corrections against the design curve. All of the above correction factors as well as the efficiency calculations and the design turbine cycle heat rate were input into the spreadsheet and tested against a range of PI data. For the first test; turbine backpressure, HP efficiency, and IP efficiency corrections were used, as these are usually the largest contributors to heat rate degradation. The other operational corrections were typically small (less than 0.5%). The application of these three produced a fairly smooth curve that matched the design curve (Figure 3) offset above the curve by an expected deviation. However, this curve predicted a heat input that was much less than that calculated using the heat balance method described above, as well as the belt scale method. The net effect of all corrections was considered next. This includes all of the corrections listed above and also includes the LP turbine efficiency. LP turbine design and actual efficiencies are determined from the Used Energy End Point (enthalpy), which is calculated from a heat balance around the LP turbine by the PMS. LP turbine efficiency appeared to be low compared to design, which would cause the LP efficiency correction factor to be slightly higher than normal. The total correction was then applied to the design curve. It should be noted that the data was filtered this time for steady-state operation only, in order to eliminate any effects of rapid load changes. This unfortunately reduces the amount of visible data at lower loads. The final result obtained matched the calculated turbine cycle heat rate (heat balance method) closely, although it appeared to be slightly higher (Figure 4). This would indicate that the calculated LP efficiency was lower than expected, causing the correction to be greater than it should. However, once any issues with the LP efficiency are corrected it would appear that the modified curve method is a viable solution in calculating turbine cycle heat input (and heat rate). It also confirms that the heat balance method previously discussed is accurate. To obtain the amount of coal burned (similar to the heat balance method), the turbine cycle heat input from the modified design curve is divided by boiler efficiency to gel total heat input to the boiler. The mass of coal burned is then the unit's heat input divided by the healing value of the coal determined in the laboratory. INPUT/OUTPUT METHOD The final method considered in this study is the Input/Output method, which relies on the belt scale readings for coal consumed and the daily lab analysis of the coal. The tons of coal delivered to the unit and the associated heating values are used to calculate the heat input to the unit rather than calculations through a heat balance or correcting design curves. A series of historical data for coal consumption and heating value was obtained from CSU dating back to January A coal sample is collected once per day, and it is assumed that the heating value is constant for the entire day. Currently, the PMS uses a coal heating value which must be changed manually by the user. According to PI data pulled over the last year, this value had been changed only once in the PMS, from 10,614 Btu/lb to 10,343 Btu/lb. The lab analysis, however, varies considerably from day to day over the course of January-May 2003 period. The total coal consumption for Unit 7 in MMBtu per day was plotted against the total generation in MWh per day (Figure 5). For comparison, the other methods under consideration were also plotted. Coal consumption was converted from Tons per day to MMBtu per day with a constant heating value, which is the average of all Unit 7 coal heating values for the time period. A table of results for a specific range of generation is included to compare both average coal consumption and standard deviation over the generation range (Table 4).
6 Average (MMBtu/Day) Standard Deviation (MMBtu/Day) Belt Scale Reading Modified Design Curve Method Existing Heat Balance Calculation Using 1st Stage Pressure Plant Daily Generation (MWh) Table 4: Coal Consumption of Various Methods Compared to Belt Scale with Average Heating Value It can be seen that the belt scale readings produce more scatter for a specific amount of gross generation that either the heat balance method or the design curve method. The heal balance method which uses its stage pressure to indicate primary flow appears to be the most stable method to determine coal consumption. In order to eliminate the variability of the healing value from the lab analysis, the same results were plotted against the belt scale readings using the actual daily heating value instead of an average value (Figure 6). Note that the belt scale readings of coal consumption have a higher standard deviation than before (Table 5) over the range of gross generation. It appears that the variability in the lab analysis from day to day produces more uncertainty in the calculated results of tile belt scale conversion from Tons/day to MMBtu/day. Average (MMBtu/Day) Standard Deviation (MMBtu/Dav) Belt Scale Reading Modified Design Curve Method Existing Heat Balance Calculation Using 1st Stage Pressure Plant Daily Generation (MWh) Table 5: Coal Consumption of Various Methods Compared to Belt Scale with Variable Heating Value A second set of plots shows the same data as before, however the heat balance and design curve methods are converted from MMBtu/day to Tons/day, using both a constant heating value (Figure 7) and the actual daily heating value (Figure 8). By plotting the actual Tons/day measured by the belt scale without converting to MMBtu, one can eliminate the lab analysis from biasing the belt scale readings. The results of the calculations over a range of gross generation are also tabulated for constant heating value (Table 6) and actual heating value (Table 7). Average (Tons/Day) Standard Deviation (Tons/Day) Belt Scale Reading Modified Design Curve Method Existing Heat Balance Calculation Using 1st Stage Pressure Plant Daily Generation (MWh) Table 6: Coal Consumption of Various Methods Compared to Bell Scale with Average Heating Value
7 It can be seen that even the unbiased coal consumption from the belt scale measurement has a higher standard deviation (less accuracy) than either the heat balance or design curve methods. Note that introducing the actual heating value to convert from MMBtu to tons per day results in significantly more scatter in the data in Figure 8 and the standard deviation of the results in Table 7. The use of actual heating value produces worse results with higher uncertainty than using an average or constant heating value. Average (Tons/Day) Standard Deviation (Tons/Day) Belt Scale Reading Modified Design Curve Method Existing Heat Balance Calculation ,3 Using 1st Stage Pressure Plant Daily Generation (MWh) Table 7: Coal Consumption of Various Methods Compared to Belt Scale with Variable Heating Value SUMMARY AND CONCLUSIONS Three methods for calculating heat input from the boiler (tons of coal burned) were investigated in order to determine the most accurate methodology. The Heat Balance Method was tried with multiple calculations of primary feedwater flow to determine the most reliable means of measurement. It was apparent that all of the methods produced similar results over a constant gross generation, although using first stage pressure as an indication of primary now seems to produce the least deviation. The primary feedwater flow measurement seems to have been well calibrated and is a consistent source of information based upon the analyzed data. Therefore the heat balance method above 50% generator load is the most reliable method for determining boiler heat input and has the least amount of scatter. The design curve method was of significant interest to the results. By correcting the turbine cycle heat rate design curve based on current operating conditions and major equipment degradation, one can obtain a heat input which correlates well to the values obtained using the heat balance method. This calculation method is recommended as a check to the heat balance, and should be used at lower loads as the heat balance method does not seem to have enough accuracy below 50% generator load. Finally the Input/Output method was attempted to see if the time delay in receiving the lab analysis or the coal burned was the cause of the deviations between the different methods. Analyses from January through May of 2003 were used to calculate the coal heat input to the boiler; however, this method did not improve the current calculation and in fact produced slightly worse results than using a constant heating value. The preceding analyses were calculated on an hourly and daily basis. However, it is of interest to know what the results are based upon a weekly and monthly computation. Therefore a comparison of the belt scale readings versus the current PMS heat balance calculation was tabulated over the January - May 2003 period. The results for the weekly analysis are shown in Figure 9 and the monthly analysis in Figure 10. Days of low or no load operation were not considered, nor were days where the belt scale readings were not available. While there is variation in the data over a weekly and monthly basis, the total amount of coal burned for the entire five month period is nearly identical between the belt scale measurement (190,885 tons) and the heat balance calculation (190,685 tons). The difference of 200 tons is approximately 0.1%, which is well below the uncertainty of either the belt scale measurement or the heat balance calculation.
8 In conclusion, it appears that the best method for obtaining heat input to the boiler and subsequently the amount or coal burned on an hourly or daily basis is the Heat Balance method. As a backup, the Design Curve method should be implemented to check the results of the heat balance and also at lower loads. Once the boiler heat input is calculated, the heating value obtained from lab analysis can be used to determine the total mass of coal burned. This methodology will result in the most accurate results over a short period of time. However, over a weekly or monthly period either the heat balance calculation or the belt scale may be used to track coal consumption since a longer period of time is insensitive to the uncertainties of either the belt scale measurement or the heat balance calculation. Another recommendation is to have more frequent updates of the average coal heating value into the PMS to provide the most current coal analysis for the calculations. The average of the daily values should be used rather than the actual daily value so that the uncertainty of the result is reduced. Although the feedwater flow measurement is well calibrated, continued maintenance of this measurement will clearly benefit the PMS calculations. It is necessary to also check the feedwater flow calculation to ensure the proper flow calculation methodology is used for the type of meter that is employed. Finally it is also recommended that if these changes are implemented, an automatic report should be set up to monitor the new results. The report should be generated on a weekly or monthly basis and report the differences between the methods. The author would like to acknowledge the pro-active role played by the City of Colorado Springs Electric Generation Department for funding this study and actively participating in the data gathering and evaluation process. I would also like to acknowledge the efforts of Steve R. Fennel, P.E. for his efforts in assimilating the data used in this study as well as applying the appropriate statistical methods and writing the original report upon which this paper is based.
9 Figure 1: Boiler Heat Input Heat Balance Method with 95% Confidence Intervals
10 Figure 2: Comparison of Boiler Heat Input from Belt Scale and Heat Balance Methods
11 Figure 3: Original Design Curve vs. Modified Design Curve Corrected for HP/IP Efficiency and Condenser Pressure
12 Figure 4: Original Design Curve vs. Modified Curve (HP/IP/Cond Corrections), Actual TCHR and Modified Curve (all Corrections)
13 Figure 5: Comparison Coal Burned (MMBtu/day) using Constant Heating Value
14 Figure 6: Comparison Coal Burned (MMBtu/day) using Lab (Variable) Heating Value
15 Figure 7: Comparison of Coal Burned Values (Tons/day) using Constant Heating Value
16 Figure 8: Comparison of Coal Burned (Tons/day) using Lab (Variable) Heating Value
17 Year 1/2 1/9 1/16 1/23 1/30 2/6 2/13 2/20 2/27 3/6 3/13 3/20 3/27 4/3 4/10 4/17 4/24 5/1 5/8 5/15 5/ Belt Scale EtaPRO Figure 9: Comparison Coal Burned (Tons/day) based on weekly data
18 Figure 10: Comparison Coal Burned (Tons/day) based on monthly data
Overview of Gas Turbine Performance Testing: Preparation, Measurements, Corrections, & Uncertainty Analysis. CleanAir Engineering March, 2018
Overview of Gas Turbine Performance Testing: Preparation, Measurements, Corrections, & Uncertainty Analysis CleanAir Engineering March, 2018 Why Do Performance Testing? Acceptance Testing Compliance with
More informationA. the temperature of the steam at the turbine exhaust increases. B. additional moisture is removed from the steam entering the turbine.
P77 Overall nuclear power plant thermal efficiency will decrease if... A. the temperature of the steam at the turbine exhaust increases. B. additional moisture is removed from the steam entering the turbine.
More informationOverall nuclear power plant thermal efficiency will decrease if... A. the temperature of the steam at the turbine exhaust increases.
P77 Overall nuclear power plant thermal efficiency will decrease if... A. the temperature of the steam at the turbine exhaust increases. B. additional moisture is removed from the steam entering the turbine.
More informationEconomic Evaluation of Plant Upgrades Using Plant Optimization Software
g GER-4209 GE Power Systems Economic Evaluation of Plant Upgrades Using Plant Optimization Software Rodney R. Gay Steve Adelman Shrikant Chickerur Ivan Johnson Robert Bell GE Enter Software, LLC Davis,
More informationCategorizing Units Based on Controllable Loss Parameters using PEPSE θ
Categorizing Units Based on Controllable Loss Parameters using PEPSE θ Randolph M. Inman Allegheny Energy Supply Categorizing Units Based on Controllable Loss Parameters using PEPSE θ Randolph Inman Allegheny
More informationKEPCO KEPRI Kim eui hwan
2015 KEPIC PERFORMANCE TEST SEMINAR New Start! Open Soft Speed AGAIN KEPCO! 2015. 9. 22 KEPCO KEPRI Kim eui hwan 1 2 3 test Steam turbine test 2/42 3/42 Thermal analysis of Power Plant Cycle Grasp of the
More information2016 FSRUG Columbia Station Feed Flow Fix
2016 FSRUG Columbia Station Feed Flow Fix Carolyn John Columbia Station Program Engineering John Zielinski Columbia Station Program Engineering Frank Todd True North Consulting Columbia Station Feed Flow
More informationFinding Lost Megawatts at the Harrison Power Station
Finding Lost Megawatts at the Harrison Power Station y William C. Kettenacker Scientech LLC Douglas L. Eakle Allegheny Energy Supply Introduction In today s climate of rising fuel costs, deregulation,
More informationFlexible steam turbine solutions for combined heat and power in combined cycle power plants
Christian Helesch, Product Line Management Steam Turbine Flexible steam turbine solutions for combined heat and power in combined cycle power plants Russia Power - March 2013 Table of content Development
More informationDue Diligence: Efficiency Increase in Existing Power Stations - a Practice Report-
Due Diligence: Efficiency Increase in Existing Power Stations - a Practice Report- Nick Peters, Dr. Wolfgang A. Benesch Steag Energy Services Germany 1 Background and methodology Steag owns and operates
More informationMARAMA Webinar August 7, Angelos Kokkinos Chief Technology Officer Babcock Power, Inc.
MARAMA Webinar August 7, 2014 Angelos Kokkinos Chief Technology Officer Babcock Power, Inc. Rankine cycle is a thermodynamic cycle which converts heat into work. The heat is supplied externally to a closed
More informationCO-LOCATION FIELD STUDY Full Report. Pamplona (SPAIN) August November 2017 (4 Months) Season: Summer-Autumn
CO-LOCATION FIELD STUDY Full Report Pamplona (SPAIN) August November 2017 (4 Months) Season: Summer-Autumn Test Conditions DEVICE UNDER TEST (DUT): KUNAKAIR version 2 provided with CO, NO2, NO, O3, NOx,
More informationTurbine Efficiency Pump Performance. Using AF AUSTIN REGIONAL SEMINAR Copyright 2017 OSIsoft, LLC Copyright 2017 OSIsoft, LLC
Turbine Efficiency Pump Performance Using AF CPS Energy San Antonio s Municipal Gas & Electric Diversified with Coal, Gas, Solar & Wind Business Decision Enterprise Asset Customer Downtown decision Comes
More informationFront Range Power Plant: Air Cooled Condenser Tom Cook, PE Colorado Springs Utilities, Operating Engineering Group Air Cooled Condenser User Group:
Front Range Power Plant: Air Cooled Condenser Tom Cook, PE Colorado Springs Utilities, Operating Engineering Group Air Cooled Condenser User Group: October 2018 Supply Reliability (1,149 MW Total) Martin
More informationPMAX Cycle Isolation Module Greg Alder
PMAX Cycle Isolation Module Greg Alder 1 February 6, 2017 2017 Curtiss-Wright Background What is Cycle Isolation? Impact of Cycle Leakages Heat Rate and Cost Identifying and Tracking Leaking Valves PMAX
More informationHeat Recovery Steam Generators for Flexibility
Heat Recovery Steam Generators for Flexibility Landon Tessmer IAGT October 2016 Overview The grids needs flexible power HRSG and OTSG Designs Supplementary Firing Fresh Air Firing Case Study Balance of
More information3 Steps to Better Steam Temperature Control Proven Strategies to Minimize Thermal Stress and Tube Leaks
December 17 3 Steps to Better Proven Strategies to Minimize Thermal Stress and Tube Leaks www.emerson.com/ December 17 Commercial power generators are having to significantly change how they operate their
More informationNTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013
NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power Plants Speaker Name; Tufani Ram 13-14/02/2013 Introduction Water is a vital Resource Irrigation Potable
More informationUtilization of THERMOPTIM Optimization Method
Utilization of THERMOPTIM Optimization Method Thermoptim optimization method is dedicated to complex systems where a large number of fluids exchange heat, the overall behaviour of the system being governed
More informationHow an ACC Unit Releases Iron, a 3-Month Study with Particle Analyzers
How an ACC Unit Releases Iron, a 3-Month Study with Particle Analyzers Presented by: Paul Sehl, Regional Technology Manager GE Water and Process Technologies-Canada and Jack Otis, Plant Manager TransCanada
More informationCycle Isolation Prioritization and Organization
Cycle Isolation Prioritization and Organization True North Consulting Richard Duggan Greg Alder ValvTechnologies Michael Flaherty ValvTechnologies International Technical Conference Oct 6-7, 6 2011 Houston,
More informationFrom base to cycling operation - innovative concepts for thermal power plants
Dr. Andreas, Expanded Scope Solutions From base to cycling operation - innovative concepts for thermal power plants siemens.com From base to cycling operation Innovative concepts for thermal power plants
More informationDynamic Modeling of a Combined-Cycle Plant
THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS 345 E. 47 St., New York, N.Y. 10017 89-GT-133 iv The Society shall not be responsible for statements or opinions advanced in papers or in dis- C cussion at
More informationOPTIMAX Advanced Control and Optimization of Power Plants
Pekka Immonen, Manager, Plant Optimization, OPTIMAX Advanced Control and Optimization of Power Plants OPTIMAX Suite for Real-Time Optimization Fleet-wide Optimization Unit and Component Optimization Performance
More informationTechnology Options for Existing Coal Units
Technology Options for Existing Coal Units Revis W. James Senior Technical Executive Generation Sector Research and Development Workshop on Best Practices in Production of Electricity from Coal United
More informationCHAPTER 2 STUDY OF 210 MW BOILER SYSTEM 2.1 DESCRIPTION OF 210 MW BOILER
8 CHAPTER 2 STUDY OF 210 MW BOILER SYSTEM 2.1 DESCRIPTION OF 210 MW BOILER Detailed study has been carried out on a 210 MW boiler system with regard to model development, control and optimization. Figure
More informationEng Thermodynamics I - Examples 1
Eng3901 - Thermodynamics I - Examples 1 1 pdv Work 1. Air is contained in a vertical frictionless piston-cylinder. The mass of the piston is 500 kg. The area of the piston is 0.005 m 2. The air initially
More informationPMAX Model Tuning of the Watts Bar Multi-pressure Condenser
Section 7B PMAX Model Tuning of the Watts Bar Multi-pressure Condenser William A. Eberly/James W. Brower Tennessee Valley Authority/Scientech, LLC 7B-1 PMAX MODEL TUNING OF THE WATTS BAR MULTI-PRESSURE
More informationEng Thermodynamics I - Examples 1
Eng3901 - Thermodynamics I - Examples 1 1 pdv Work 1. Air is contained in a vertical frictionless piston-cylinder. The mass of the piston is 500 kg. The area of the piston is 0.005 m 2. The air initially
More informationConsider a simple ideal Rankine cycle with fixed turbine inlet conditions. What is the effect of lowering the condenser pressure on
Chapter 10, Problem 8C. Consider a simple ideal Rankine cycle with fixed turbine inlet conditions. What is the effect of lowering the condenser pressure on Pump work input: Turbine work output: Heat supplied:
More informationIssue Paper: Building Block #1 Heat Rate Improvements for Coal-Fired Power Plants
Heat Rate Improvements for Coal-Fired Power Plants What is Efficiency and Heat Rate? EPA s Clean Power Plan proposes to use a number of different building blocks to gauge the adequacy of state plans to
More information1 st Renewable Energy Technologies, LP. Organic Rankine Cycle
11/18/2010 1 st Renewable Energy Technologies, LP 8147 Clear Shade Drive, Windber, PA 15963 Phone: (814) 467-0431 Fax: (814) 467-8675 Email: Sales@1stRET.com Web: www.1stret.com Organic Rankine Cycle The
More informationModelling and Dynamic Simulation of Cyclically Operated Pulverized Coal-Fired Power Plant
Modelling and Dynamic Simulation of Cyclically Operated Pulverized Coal-Fired Power Plant Juha Kuronen Miika Hotti Sami Tuuri Fortum Power and Heat Oy, Espoo, Finland, {juha.kuronen, miika.hotti, sami.tuuri}@fortum.com
More informationPI Heat and Thermodynamics - Course PI 25 CRITERION TEST. of each of the following a. it
Heat and Thermodynamics - Course PI 25 CRITERION TESTS PI 25-1 - 1. Define: heat temperature (c) enthalpy 2. State the applies to meaning water: of each of the following a. it saturation temperature subcooled
More informationAUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS. Steag Energy Training Center EEC WORKSHOP to
AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS Steag Energy Training Center EEC WORKSHOP-25.09.2013 to 27.09.2013 Heat Input into a Large Coal Fueled Power Plant- Sub Critical design. 3% Stack Clean-up
More informationCost Development Guidelines
PJM Manual 15: Cost Development Guidelines Revision: 18 Effective Date: Prepared by Cost Development Subcommittee PJM 2011 PJM 2011 i This section contains information that is relevant for the development
More informationThermal Distribution in District Energy and Cogeneration Systems
International District Energy Association Thermal Distribution in District Energy and Cogeneration Systems Presented by William A. Liegois, P.E. Stanley Consultants, Inc. Topics Principles of Hot Water
More informationThe consumer and societal benefits of wind energy in Texas
The consumer and societal benefits of wind energy in Texas November 2014 Introduction Texas wind energy provides the state with $3.3 billion in societal benefits per year. These benefits include reducing
More informationCombined Heat and Power. Applications and Guidelines Jeffrey Ihnen, P.E.
Combined Heat and Power Applications and Guidelines Jeffrey Ihnen, P.E. Portions of this Presentation Brought to you by: Views, opinions and bad ideas are mine alone 2 Content CHP Perspectives Status Quo
More informationUse of Software for Improving the Performance of Thermal Power Plants
Use of Software for Improving the Performance of Thermal Power Plants Lalatendu Pattanayak (STEAG Energy Services (India) Pvt. Ltd. ), l.pattanayak@steag.in, +91 8527790977 Taking in view that the power
More informationInstallation and Operation Experiences with the Clyde Bergemann SmartCannon System at Alabama Power s Plant Miller
Installation and Operation Experiences with the Clyde Bergemann SmartCannon System at Alabama Power s Plant Miller Presented at Electric Power Conference 2003 Charles Boohaker Brian Mead John Sorge Southern
More informationA Better Approach To Energy Performance Benchmarking
A Better Approach To Energy Performance Benchmarking John Walter KBC Advanced Technologies, Inc Texas Technology Showcase 2006 Galveston, TX Current Industry Challenges High energy costs driving need for
More informationThe economic benefits of wind energy in the Southwest Power Pool
The economic benefits of wind energy in the Southwest Power Pool November 2014 Introduction Wind energy provides the Southwest Power Pool region (Kansas, Oklahoma, Nebraska, and parts of New Mexico, Texas,
More informationDETERMINING CYCLE LEAKAGE MEGAWATT EFFECTS USING PMAX & PEPSE
DETERMINING CYCLE LEAKAGE MEGAWATT EFFECTS USING PMAX & PEPSE Ricky S. Frazier Sequoyah Nuclear Plant Sequoyah Access Road Soddy-Daisy, TN 37384 (423) 843-6932 Duane H. Morris, P.E. Tennessee Valley Authority
More informationPEMP RMD & Cycle Performance. M.S.Ramaiah School of Advanced Studies
Steam Se Turbine ub ecyces Cycles & Cycle Performance Session delivered by: Prof. Q.H. Nagpurwala 1 Session Objectives This session is intended to discuss the following: Basic construction and classification
More informationFeedwater Flow Measurement with Venturi and Comparison to the other Parameters in NPP Krško
Feedwater Flow Measurement with Venturi and Comparison to the other Parameters in NPP Krško ABSTRACT Vinko Planinc, Aljoša Šumlaj, Robert Rostohar, Dejvi Kadivnik Nuclear Power Plant Krško Vrbina 12, SI-8270
More informationConsequences of the German Energy Transition on the operation regime and the availability of coal fired power plants
Consequences of the German Energy Transition on the operation regime and the availability of coal fired power plants Delhi, December 1, 217 Dr. Oliver Then Agenda 1. Who is VGB? 2. German energy market
More informationCOGENERATION Opportunities in Today s Power Markets
COGENERATION Opportunities in Today s Power Markets R. W. Meidel, Vice-President-Power Projects ExxonMobil Power and Gas Services Inc March 17, 2003 Presentation Outline Cogeneration at ExxonMobil Investment
More informationGuidance page for practical work: optimization of combined cycles by the pinch method
Guidance page for practical work: optimization of combined cycles by the pinch method 1) Objectives of the practical work The objective of the practical work is to study the implementation of the pinch
More informationModeling Techniques for Increased Accuracy
SECTION 1 Modeling Techniques for Increased Accuracy Ed Haack Duke Energy 1-1 Modeling Techniques for Increased Accuracy By Ed Haack, Duke Power Company The PEPSE model for the Catawba Units have been
More informationCoal-Fired Boiler Optimization
Hot Topic Coal-Fired Boiler Optimization Improving Boiler Efficiency September 27, 2012 By Richard F. (Dick) Storm, PE, CEO and Danny Storm, President Optimum Coal Fueled Steam Plant Performance Begins
More informationInternational Journal of Advance Engineering and Research Development
Scientific Journal of Impact Factor (SJIF): 4.72 International Journal of Advance Engineering and Research Development Volume 4, Issue 9, September -2017 Review of Thermal Characteristics of Diesel Fired
More informationREGULATION REQUIREMENTS FOR WIND GENERATION FACILITIES
REGULATION REQUIREMENTS FOR WIND GENERATION FACILITIES Randy Hudson and Brendan Kirby Oak Ridge National Laboratory Oak Ridge, Tennessee Yih-Huei Wan National Renewable Energy Laboratory Golden, Colorado
More informationThermal Performance Indicators (TPI) Monitoring and Reporting Enhanced Using PEPSE
Thermal Performance Indicators (TPI) Monitoring and Reporting Enhanced Using PEPSE Wen Wang Performance &Testing Department Ontario Power Generation 25-January-17 1 OPG - Who and Where We Are Ontario s
More informationAppendices, Thermodynamics, Phases of Water, Laws of Thermodynamics and Thermodynamic Processes By
Appendices, Thermodynamics, Phases of Water, Laws of Thermodynamics and Thermodynamic Processes By S. Bobby Rauf, P.E., CEM, MBA Credit: 11 PDH Thermodynamics Fundamentals Series Appendix A This appendix
More informationScienceDirect. Cogeneration process modelling in a paper factory
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 63 ( 2013 ) 966 972 The Manufacturing Engineering Society International Conference, MESIC 2013 Cogeneration process modelling
More informationThe other alternative fuel
62 ABB review 1 11 The other alternative fuel Energy efficiency is a critical part of a sustainable energy policy for many power plants Werner Janik, Joseph Lauer As the global population continues to
More informationNYSERDA CHP Assessment Report A S S E S S I N G T H E C H P P L A N T A T C O - O P C I T Y - R I V E R B A Y
NYSERDA CHP Assessment Report A S S E S S I N G T H E C H P P L A N T A T C O - O P C I T Y - R I V E R B A Y October 9, 2013 Co-op City - Riverbay Coop City - Riverbay DISCLAIMER OF WARRANTY Information
More informationsco 2 Cycle as an Efficiency Improvement Opportunity for Air-Fired Coal Combustion
March 27, 2017 sco 2 Cycle as an Efficiency Improvement Opportunity for Air-Fired Coal Combustion Charles W. White, Walter W. Shelton, Nathan T. Weiland, Travis R. Shultz 6 th International Supercritical
More informationTECHNICAL PUBLICATION
TECHNICAL PUBLICATION Co-Milling and Suspension Co-Firing of Wood Pellets with Bituminous Coal by John Rath Pulverizer Engineer Riley Power Inc. Samson Kay Fule Equipment Engineer Riley Power Inc. David
More informationOnline flowrate monitoring experiences at Hydro-Québec
Online flowrate monitoring experiences at Hydro-Québec J Nicolle 1, G Proulx 2, L Martell 1 1-Hydro-Québec Research s Institute, 1800 boul. Lionel Boulet, Varennes, Canada, J3X 1S1 2-Hydro-Québec ESP (Essais
More informationTechno-Economic Evaluation of. with Post Combustion Capture
Techno-Economic Evaluation of Biomass Fired or Co-Fired Power Plant with Post Combustion Capture Stanley Santos IEA Greenhouse Gas R&D Programme Cheltenham, UK Regional Workshop for the Baltic Sea and
More informationAir Cooled Condenser Users Group: Corrosion Product Transport Monitoring
Air Cooled Condenser Users Group: Corrosion Product Transport Monitoring Daniel C. Sampson Senior Technical Consultant Power, Water, Wastewater Sept 19-20, 2011 * San Francisco, CA Disclaimer This report
More informationClosed Feedwater Heaters
ASME PTC 12.1-2015 [Revision of ASME PTC 12.1-2000 (R2005)] Closed Feedwater Heaters Performance Test Codes AN AMERICAN NATIONAL STANDARD ASME PTC 12.1-2015 [Revision of ASME PTC 12.1-2000 (R2005)] Closed
More informationBATAAN MW POWER RICE HULL COGENERATION PROJECT
BATAAN 2020 12.5 MW POWER RICE HULL COGENERATION PROJECT Document Prepared By Bataan 2020, Inc. 226 Quirino Highway, Baesa Queson City, Metro Manila, Phillippines. Tel: +632 334 2960 to 67 Email: ayh@bataan2020.net
More informationChapter 10 POWER CYCLES. Department of Mechanical Engineering
Chapter 10 VAPOR AND COMBINED POWER CYCLES Dr Ali Jawarneh Department of Mechanical Engineering Hashemite University it 2 Objectives Analyze vapor power cycles in which h the working fluid is alternately
More informationController Design for a 1000 MW Ultra Super Critical Once-through Boiler Power Plant
Proceedings of the 17th World Congress The International Federation of Automatic Control Controller Design for a 1000 MW Ultra Super Critical Once-through Boiler Power Plant Kwang Y. Lee*, Joel H. Van
More informationFLEXI BURN CFB WP4: Boiler design and performance
Development of High Efficiency CFB Technology to Provide Flexible Air/Oxy Operation for Power Plant with CCS FLEXI BURN CFB WP4: Boiler design and performance 2 nd Project Workshop, 6 th February 2013,
More informationNSSS Design (Ex: PWR) Reactor Coolant System (RCS)
NSSS Design (Ex: PWR) Reactor Coolant System (RCS) Purpose: Remove energy from core Transport energy to S/G to convert to steam of desired pressure (and temperature if superheated) and moisture content
More informationINTELLIGENT CONTROL SOLUTIONS FOR STEAM POWER PLANTS TO BALANCE THE FLUCTUATION OF WIND ENERGY
Proceedings of the 7th World Congress The International Federation of Automatic Control INTELLIGENT CONTROL SOLUTIONS FOR STEAM POWER PLANTS TO BALANCE THE FLUCTUATION OF WIND ENERGY T. Haase*, H. Weber*
More informationMaximizing the value of your predictive maintenance routine
Beyond Vibration: Maximizing the value of your predictive maintenance routine By Dave Geswein, Product Engineer, Azima DLI If your power plant is like most, you have been doing vibration testing diligently
More informationCost Development Guidelines
PJM Manual 15: Cost Development Guidelines Revision: 26 Effective Date: Prepared by: Cost Development Subcommittee PJM 2014 PJM 2013 Revision 20, Effective Date 4/1/2013 i 2.8 Regulation Service Regulation
More informationBOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ. Industrial Boilers used in manufacturing processing, mining, refining or other industry.
BOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ Applicability: Industrial Boilers used in manufacturing processing, mining, refining or other industry. Commercial Boilers used in stores/malls, laundries,
More informationThermal Performance Training Course Outline
Introduction Company Backgrounds Resources (cards, websites, what we do) Instructor Backgrounds Student Introduction (pass around sign up) Class Layout and Overview - Schedule Class Purpose Why? Talk about
More informationAmerican Electric Power
American Electric Power Utility Perspectives on 21 st Century Power Generation Matt Usher, P.E. Director New Technology Development & Policy Support AEP Generation Agenda AEP Overview Issues Impacting
More informationProblem specification
1 of 6 pages University of Rochester Department of Electrical & Computer Engineering ECE227/427 Take-home Exam due: 4-30-10 You are to work entirely alone on this take-home exam. NO COLLABORATION IS ALLOWED.
More informationNUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY
NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY NUCLEAR TRAINING COURSE COURSE 134 1 - Level 3 - Equipment & System Principles 4 - TURBINE, GENERATOR & AUXILIARIES Index 134.00-0 Objectives
More informationNOx CONTROL FOR IGCC FACILITIES STEAM vs. NITROGEN
NOx CONTROL FOR IGCC FACILITIES STEAM vs. NITROGEN GASIFICATION TECHNOLOGIES CONFERENCE SAN FRANCISCO, CALIFORNIA OCT. 27-30, 2002 Phil Amick, Global Energy Inc. Ron Herbanek, Global Energy Inc. Robert
More informationCombined Cycle Power
POWER GENERATION Combined Cycle Power Combined cycle power utilizing the gas turbine (Brayton Cycle) and the steam system (Rankine Cycle) are a lethal weapon against news worthy coal fired emissions worldwide.
More informationENERGY AND EXERGY ANALYSIS OF A 250MW COAL FIRED THERMAL POWER PLANT AT DIFFERENT LOADS
ENERGY AND EXERGY ANALYSIS OF A 250MW COAL FIRED THERMAL POWER PLANT AT DIFFERENT LOADS Soupayan Mitra 1, Joydip Ghosh 2 1 Associate Professor, Mechanical Engineering Department, Jalpaiguri Government
More information5. Steam Turbine Performance
5. Steam Turbine Performance h HP = 88-90% IP = 90-94% Fossil Reheat HP = 82% LP = 85% LP = 87% LP = 90-91% Saturation Line Nuclear Reheat Nuclear Non-Reheat s Steam Turbine 5. Performance 1 / 93 1 2 3
More informationPJM ENERGY PRICES 2005 Response to Howard M. Spinner Paper
PJM ENERGY PRICES 2005 Response to Howard M. Spinner Paper Joseph Bowring PJM Market Monitor Response to Howard M. Spinner Paper Re: PJM Energy Prices 2005 A March 13, 2006 paper ( Spinner paper ) by Howard
More informationAdding operational flexibility to a coal fired plant Integration of renewable Power in the Grid Path ahead, IPS 2017, New Delhi Dr.
Adding operational flexibility to a coal fired plant Integration of renewable Power in the Grid Path ahead, IPS 2017, 2017-02-13 New Delhi Dr. Bernhard Meerbeck, Dr. Andreas Feldmüller, Siemens AG, Germany
More informationAll Carbon All the Time
All Carbon All the Time Ralph L. Roberson, P.E. RMB Consulting & Research, Inc. Two-Part Presentation Regulatory Overview and Update EPA s proposed new source performance standards Status of CO 2 rule
More informationANALYSIS OF DIFFERENT TYPES OF REGULATION AND ITS EFFICIENCY IN STEAM POWER CYCLES MASTER THESIS
ANALYSIS OF DIFFERENT TYPES OF REGULATION AND ITS EFFICIENCY IN STEAM POWER CYCLES MASTER THESIS Author: Ricardo Sánchez Pereiro Advisor: Piotr Krzyslak Poznan University of Technology 11/06/2012 INDEX
More informationENERGY MODEL FOR AN INDUSTRIAL PLANT USING GEOTHERMAL STEAM IN NEW ZEALAND
ENERGY MODEL FOR AN INDUSTRIAL PLANT USING GEOTHERMAL STEAM IN NEW ZEALAND G.W. Hotson 1 and G. Everett 2 1 Project Engineer, Fletcher Challenge Paper Australasia Ltd, Private Bag, Kawerau, New Zealand
More informationNet Revenue. Overview Net Revenue. Net Revenue. Conclusion
Section 7 Net Revenue Net Revenue The Market Monitoring Unit (MMU) analyzed measures of PJM energy market structure, participant conduct and market performance. As part of the review of market performance,
More informationHOW TO SUCCESSFULLY INCREASE THE REVENUE OF WASTE-TO-ENERGY FOR THE LONG TERM
12th North American Waste to Energy Conference May 17-19, 2004, Savannah, Georgia USA NAWTEC12-2213 HOW TO SUCCESSFULLY INCREASE THE REVENUE OF WASTE-TO-ENERGY FOR THE LONG TERM Fred Caillard, Francois
More informationSoftware CEM Advanced Emissions Monitoring
Software CEM Advanced Emissions Monitoring Pavilion8 Software CEM is a predictive emissions monitoring system (PEMS), developed on the Pavilion8 platform, which provides highly accurate measurements of
More informationOPERATING PARAMETERS Reliable Means to Continuously Monitor Facility Performance
OPERATING PARAMETERS Reliable Means to Continuously Monitor Facility Performance RICHARD SCHERRER Ogden Martin Systems, Inc. Fairfield, New Jersey ABSTRACT Energy sales are a major source of revenues for
More informationJournal of Industrial Engineering Research. The Study of Temperature Distribution for Fresh Fruit Bunch during Sterilization Process.
IWNEST PUBLISHER Journal of Industrial Engineering Research (ISSN: 2077-4559) Journal home page: http://www.iwnest.com/aace/ The Study of Temperature Distribution for Fresh Fruit Bunch during Sterilization
More informationTOPIC: KNOWLEDGE: K1.01 [2.5/2.5]
KNOWLEDGE: K1.01 [2.5/2.5] P283 The transfer of heat from the reactor fuel pellets to the fuel cladding during normal plant operation is primarily accomplished via heat transfer. A. conduction B. convection
More informationAdvanced Boiler Technologies for Commercial and Industrial Applications - Ultramizer AHRS
Advanced Boiler Technologies for Commercial and Industrial Applications - Ultramizer AHRS 2012 Emerging Technologies Summit October 16, 2012, Pasadena, CA Neil P. Leslie, P.E., Gas Technology Institute
More informationC. heating turbine exhaust steam above its saturation temperature. D. cooling turbine exhaust steam below its saturation temperature.
P74 (B2277) Condensate depression is the process of... A. removing condensate from turbine exhaust steam. B. spraying condensate into turbine exhaust steam. C. heating turbine exhaust steam above its saturation
More informationDigester Gas Utilization at SWRP Where Should the Biogas Go?
Digester Gas Utilization at SWRP Where Should the Biogas Go? Steve McGowan, P.E., BCEE Malcolm Pirnie The Water Division of Arcadis MWRD Monthly Seminar Series Oct 28 th, 2011 Project Contributors Tom
More informationNYSERDA CHP Assessment Report A S S E S S I N G T H E C H P P L A N T A T V A S S A R C O L L E G E
NYSERDA CHP Assessment Report A S S E S S I N G T H E C H P P L A N T A T V A S S A R C O L L E G E October 9, 2013 Vassar College Vassar College DISCLAIMER OF WARRANTY Information contained on this web
More informationPinch Analysis for Power Plant: A Novel Approach for Increase in Efficiency
Pinch Analysis for Power Plant: A Novel Approach for Increase in Efficiency S. R. Sunasara 1, J. J. Makadia 2 * 1,2 Mechanical Engineering Department, RK University Kasturbadham, Rajkot-Bhavngar highway,
More informationBOILER EFFICIENCY EVALUATIONS
BOILER EFFICIENCY EVALUATIONS Presenter: John F. La Fond, P.E. President Author: Marcel D. Berz, P.E. Manager, Process Technologies 1 OUTLINE 1. Purpose of Evaluating Efficiency 2. Definitions 3. Typical
More informationNet Revenue. Overview Net Revenue. Conclusion
Section 7 Net Revenue Net Revenue The Market Monitoring Unit (MMU) analyzed measures of PJM energy market structure, participant conduct and market performance. As part of the review of market performance,