PIANC Dredging 2012 Conference. Castro Cove Sediment Remediation Project, Richmond, California
|
|
- Milo Gibson
- 5 years ago
- Views:
Transcription
1 PIANC Dredging 2012 Conference Castro Cove Sediment Remediation Project, Richmond, California Ian Austin PhD PE - URS Corporation Paul Ryan Chevron Environmental Management Company Mark Sutton Dixon Marine Services Why of Interest? Technically challenging mudflat environment Specialty equipment designed to place no-net-fill 20-acre cap Consolidation of hydraulically placed beneficial re-use mud layer Shear stress modeling prior to sheet pile removal
2 Site Location Embayment of San Pablo Bay in north San Francisco Bay Adjacent to active refinery Mudflats at +2 to +3 feet MLLW Shear strengths; 50, 150 psf at 1, 2 foot depths
3 AOC Effluent discharged into Cove from early 1900s until 1987 ERA: 20-acre AOC based on PAHs, mercury, benthic risk 2007: Dredged 97,000 cy sediment, placed upland Approximately 6-inch thick layer of residual contamination remained in AOC after dredging
4 Engineered Cap Design Cap designed using lab tests and chemical flux modeling, expert peer review (Danny Reible) Sequential Batch Leach, Thin Column Leach, and cap-loading tests used to develop partition coefficients and sorption capacities Design includes; No-net-fill requirement, < 97,000 cy 1.5 acres of Reactive Core Mats (RCM), 6-inch+ sand layer for chemical isolation and containment, 18-inch+ clean Bay mud layer to restore biological viability for benthic communities
5 Sand Placement Challenge Performed in-the-wet with 3 to 5 feet of water inside 2,700 foot sheet pile enclosure Adjacent to an operating refinery Place a nominal 6-inch layer of sand over 20- acres (45,000 cy maximum) Could not disturb or re-suspension residual contamination RWQCB Order only allowed discharge of water inside sheet-pile after sand placement and WQ confirmation testing: closed loop system Required finesse, rather than bulk production
6 Sand Placement thr Specialized Equipment Design: Worked with DMS on hydrodynamic design of spreader Hydraulic placement of sand pumped 5,000 feet, needed to reduce velocities from 14 fps to 2 > 3 fps Used computer model (HEC-RAS) to design spreader plate, flare width and slope Modular construction based on two 10-ft by 40-ft pontoons
7 Sand Placement Automated sand slurry system used to produce accurate slurry concentrations: spreader position only variable
8 Sand Layer Confirmation: Sand barge delivery volumes Bi-weekly bathymetric surveys using purposebuilt, shallow-water, 5-beam sweep system Sand core collection in clear PVC tubes
9 Mud Layer Placement Challenge: Two weeks prior to start-up, required to change from hydraulic to mechanical dredging due to post-permit (DF&G) change in position regarding impacts to long-fin smelt Beneficial reuse of 37,500 cy of dredge sediment from Richmond Rod & Gun Club Yacht Harbor dredging Beneficial reuse of 13,000 cy from Point San Pablo Yacht Harbor; 8,000 feet of pipe
10 Mechanical Hydraulic Dredge
11 AOC Confirmation Cross Sections Total sand and sediment volume: 95,500 cy
12 Clay Layer Consolidation Challenge: Dewatered AOC to promote consolidation of mud slurry Extended consolidation time from one month to four months based on shear strengths Measured in-situ shear strength in surrounding mudflats Measured strength of mud in AOC along diagonal transect field shear vane measurements
13 Shear Vane Transect
14 MIKE 21 Shear stress modeling of sheet pile removal Modeled tide-specific sequencing options for reintroducing the tide First: 300-ft pushed down to create 1-foot high weir -> minimize initial tidal prism Second: sheet removal with two barge cranes along north face
15 Conclusions Cooperation between regulatory agency, owner, engineer, contractor needed to complete the project (from 1997 to 2012) Integration of science, engineering, construction needed to meet technical challenges (material delivery, mud consolidation, sheet pile removal)
Predictive Modeling and Design Solutions for Beneficial Use of Dredged Material
Predictive Modeling and Design Solutions for Beneficial Use of Dredged Material Presented by Tom Wang, P.E., and Kathy Ketteridge, Ph.D., P.E. January 28, 2016 Overview of Presentation Introductions Examples
More informationDesign of CAD Pits in San José Lagoon, San Juan, Puerto Rico
Second LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCEI 2004) Challenges and Opportunities for Engineering Education, Research and Development 2-4 June
More informationCost and Feasibility of Conventional and Active Sediment Capping
Cost and Feasibility of Conventional and Active Sediment Capping Danny Reible Chevron Professor of Chemical Engineering Director, Hazardous Substance Research Center Louisiana State University Hazardous
More informationIntroduction to Sediment Remediation. Presented to: Lower Passaic River Community Advisory Group July 14, 2011
Introduction to Sediment Remediation Presented to: Lower Passaic River Community Advisory Group July 14, 2011 Overview Feasibility Considerations Conceptual Site Model Dredging / Capping Dredged Material
More informationPLANNING AND ENGINEERING CONSIDERATIONS FOR A 1.5 MILLION CUBIC METER LAKE DREDGING PROJECT
William Hague, Honeywell John McAuliffe, Honeywell Edward Glaza, Parsons Paul LaRosa, Anchor QEA Paul Blue, Parsons PLANNING AND ENGINEERING CONSIDERATIONS FOR A 1.5 MILLION CUBIC METER LAKE DREDGING PROJECT
More informationLessons Learned, Innovations, and Successes from U.S. Great Lakes Areas of Concern Sediment Cleanups
Lessons Learned, Innovations, and Successes from U.S. Great Lakes Areas of Concern Sediment Cleanups Presented at RPIC Federal Contaminated Sites National Workshop April 15, 2014 Gina Bayer, CH2M HILL
More informationContaminated sediment management in the U.S.
Contaminated sediment management in the U.S. Rebecca Gardner Anchor QEA, USA and Norway company logo comes here Contents Brief overview of beneficial use activities in the United States (U.S.) Relating
More informationBuffalo River, New York Great Lakes Restoration Initiative (GLRI) Dredging
Buffalo River, New York Great Lakes Restoration Initiative (GLRI) Dredging Partners: U.S. EPA New York State DEC Buffalo Niagara Riverkeeper U.S. Army Corps of Engineers Presented by: Scott Cieniawski
More informationAnacostia Active CappingC Demonstration. Status
Anacostia Active CappingC i Demonstration Status Danny Reible, PhD, PE, DEE, A N E Smith Chair of Environmental Health Engineering University of Texas at Austin NATO CCMS- Ljubljana, Slovenia June 19,
More informationNew York- New Jersey Harbor Estuary. Lower Passaic River
Lower 8 Miles of the Lower Passaic River Focused Feasibility Study November 7, 2013 New York- New Jersey Harbor Estuary Lower Passaic River 2 Diamond Alkali Superfund Site: Contaminated with dioxins, PCBs,
More informationCurrent Trends and Case Studies in Contaminated Sediment Capping
Current Trends and Case Studies in Contaminated Sediment Capping Archie Filshill, Ph.D. Theresa Andrejack Loux, Ph.D. Golder Associates Bristol, PA Sediment Removal Dublin, Ireland Royal Canal Job bid
More informationIdentifying and Managing Key Cost Drivers During Investigation, Remedy Selection and Design at Contaminated Sediment Sites
Identifying and Managing Key Cost Drivers During Investigation, Remedy Selection and Design at Contaminated Sediment Sites Doug Crawford, PE Kendrick Jaglal, PE Brian White, PE Steve Anagnost, PE Trevor
More informationAPPENDIX C DESIGN & ENGINEERING
APPENDIX C DESIGN & ENGINEERING Study Authority. This study is authorized under Section 204 of the Water Resources Development Act of 1992, as amended. Study Description. This appendix presents the results
More informationLess than 8 feet finished water depth. 4-Foot Cap 3-Foot Cap Foot Cap. 4 Ft
Herbivorous Animals Consuming Plants & Sediment Piscivorous Wildlife Consuming Fish Insectivorous Wildlife Consuming Emerging Aquatic Invertebrates Burrowing Organisms Contacting Contaminated Sediment
More informationParcel F Carbon Amendment Placement Pilot Study, Hunters Point Naval Shipyard, San Francisco, California
Parcel F Carbon Amendment Placement Pilot Study, Hunters Point Naval Shipyard, San Francisco, California Presented By George L. Hicks Global Practice Director / CH2M Objective Present an overview of the
More informationEast Branch of Grand Calumet River, Reaches 4A/4B. WEDA WODCON XXI June 13-17, 2016 The Hyatt Regency, Miami, FL
East Branch of Grand Calumet River, Reaches 4A/4B WEDA WODCON XXI June 13-17, 2016 The Hyatt Regency, Miami, FL Project Representatives Agencies and Stakeholders USEPA Great Lakes National Program Office
More informationEVALUATION OF ENVIRONMENTAL MONITORING DATA GATHERED DURING ASHTABULA RIVER DREDGING, ASHTABULA RIVER, OHIO
EVALUATION OF ENVIRONMENTAL MONITORING DATA GATHERED DURING ASHTABULA RIVER DREDGING, ASHTABULA RIVER, OHIO D. Plomb 1, S. Cieniawski 2, and D. Pham 3 ABSTRACT The Ashtabula River Area of Concern (AOC)
More informationUsing Dredging Lessons Learned in a Large Contaminated Sediment Feasibility Study. Presented by John Laplante, Carl Stivers, and Clay Patmont
Using Dredging Lessons Learned in a Large Contaminated Sediment Feasibility Study Presented by John Laplante, Carl Stivers, and Clay Patmont October 24, 2012 Presentation Outline Engineered Barriers Best
More informationManagement of Thunder Bay Contaminated Sediment
Management of Thunder Bay Contaminated Sediment Sue-Jin An Kay Kim, Roger Santiago, and Rupert Joyner Environment Canada Oct. 24, 2012 Great Lakes Areas of Concern (AOC) Thunder Bay was designated an AOC
More informationHudson River Remedial Design Treatability Study Data Quality Objectives
Hudson River Remedial Design Treatability Study Data Quality Objectives USACE/USEPA/SMWG Joint Sediment Conference October 26-28, 2004 1 Hudson River: EPA Dredging Decision Remedy Decision (2/02 Record
More informationUpdate on Lower Fox River Remediation Project, Green Bay, Wisconsin
Update on Lower Fox River Remediation Project, Presented by P. LaRosa, PE, and D. Binkney, Anchor QEA, LLC R. Feeney, PE, and T. Blackmar, PE, Tetra Tech, Inc. G. Smith and D. Bauman, J.F. Brennan Company,
More informationAppendix N. Remedial Alternatives Evaluation
Appendix N Remedial Alternatives Evaluation Appendix N Remedial Alternatives Evaluation Mayflower Pipeline Incident Mayflower, Arkansas 1. Introduction ARCADIS U.S. Inc. (ARCADIS) has prepared this Remedial
More informationMass Stabilization Virgin & Contaminated Soil / Sediment
Mass Stabilization Virgin & Contaminated Soil / Sediment Presented at: Remediation Technologies Symposium 2013 Charles Wilk, Manager Stabilization and Remediation Applications ALLU Group Inc. What is Mass
More informationEmerging Trends in Contaminated Sediment Cleanup
Emerging Trends in Contaminated Sediment Cleanup Presented to Best Practices Group Presented by Clay Patmont Anchor Environmental, LLC August 28, 2008 Presentation Outline Overview of emerging trends Regulatory
More informationOPEN WATER SITE MANAGEMENT AND CONTROLS
OPEN WATER SITE MANAGEMENT AND CONTROLS Susan E. Bailey US Army ERDC, Vicksburg, MS Susan.E.Bailey@usace.army.mil Risk Management Risk Assessment Risk Management CONTROL CONTROL CONTROL Implemented controls
More informationExpedited Remediation of Coal Tar Containing Sediments: Design-to-Build Approach with a Beneficial Reuse
Expedited Remediation of Coal Tar Containing Sediments: Design-to-Build Approach with a Beneficial Reuse Mike Crystal Sevenson Environmental Services Kurt Paschl Beazer East Inc. Alan Fowler ARCADIS Presentation
More informationPortland Harbor CAG Feasibility Study Sediment Capping and Treatment Concepts. July 14, 2010 Jim McKenna Carl Stivers
Portland Harbor CAG Feasibility Study Sediment Capping and Treatment Concepts July 14, 2010 Jim McKenna Carl Stivers 1 Quick Review! June Dredging and Monitored Natural Recovery! July Capping and Treatment!
More informationDesign Specifications- Micropile Foundation System. Geopier Calculations
Design Specifications- Micropile Foundation System Zone Total Piles Average Length (ft) Total Length 1- Primary Area 233 65 15145 2-Radiotherapy Area (Linac Valuts) 70 65 4550 3-Shell Space & ED Canopy
More informationSalt Marsh Restoration
Salt Marsh Restoration through the Beneficial Re-Use of Dredged Material JACQUELINE JAHN PROJECT ECOLOGIST, GREENVEST, LLC Project Background Objective: Three trial projects to test the marsh restoration
More informationAPPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN
APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN SUMMARY The construction team of Environmental Restoration,
More information6 Preliminary Assessment of Construction Method and Constructability Issues
6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual
More informationSan Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018
San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018 PRESENTATION OVERVIEW Introductions Project Overview Summary of Analysis Supporting Model Development Model Development
More informationONONDAGA LAKE CAPPING FIELD DEMONSTRATION WORK PLAN
CAPPING FIELD DEMONSTRATION WORK PLAN Prepared For: 301 Plainfield Road, Suite 330 Syracuse, New York 13212 Prepared By: Parsons 301 Plainfield Road, Suite 350 Syracuse, New York 13212 Phone: (315) 451-9560
More informationEscanaba Tie Treating Plant Remediation
Escanaba Tie Treating Plant Remediation Construction of Remedy to Address NAPL Migration to Great Lakes Authors Geoffrey Reeder/ Union Pacific Railroad Tom Hutchinson/CH2M Jeff Gentry/CH2M Railroad Environmental
More informationA World of Solutions
Project Goals Engineering, Economics, & Environmental Principles Minimization of execution risks Construction industry s highest standards Cost savings vs. conventional methods Consistency with Master
More informationEnvironmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation. U.S. Army Corps of Engineers New York District
Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation U.S. Army Corps of Engineers New York District January 2004 APPENDIX H SECTION 404(b)(1) GUIDELINES EVALUATION SECTION 404(b)(1)
More informationENVIRONMENTAL RESTORATION IN COASTAL MISSISSIPPI: MARSH RE-ESTABLISHMENT PROJECT HARRISON AND JACKSON COUNTIES, MISSISSIPPI
SECTION 404(b)(1) EVALUATION REPORT FOR THE SECTION 204 ECOSYSTEM RESTORATION PROJECT IN CONNECTION WITH CONSTRUCTION, OPERATION, OR MAINTENANCE DREDGING OF A FEDERALLY AUTHORIZED PROJECT ENVIRONMENTAL
More informationALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT. January 15, 2016
ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT January 15, 2016 EXECUTIVE SUMMARY This annual inspection report has been prepared in accordance
More informationUtilization of Barrier and Treatment Designs to Address Irregular Shoreline Surfaces and Control of Contaminant Migration. John H. Hull, P.E.
Utilization of Barrier and Treatment Designs to Address Irregular Shoreline Surfaces and Control of Contaminant Migration John H. Hull, P.E., BCEE Contaminated Site Assessment, Remediation, and Redevelopment
More informationDanny Reible, University of Texas Research supported by EPA, DOD ESTCP/SERDP, NIH & Industrial Sources
Danny Reible, University of Texas Research supported by EPA, DOD ESTCP/SERDP, NIH & Industrial Sources 1 PhD Chemical Engineering Caltech Long range transport of atmospheric pollutants 2 3 4500 4000 3500
More informationHighland Lake Dredging Feasibility Study
Highland Lake Dredging Feasibility Study Final Report, September 2015 Prepared For: The Town of Highland Lake 612 Lakeshore Drive Oneonta, AL 35121 Prepared By: Tetra Tech 2110 Powers Ferry Road SE Suite
More informationTo: WEDA Environmental Award Committee. From: R.E. Staite Engineering. Feb. 26, Re: Application Environmental Dredging Award
To: WEDA Environmental Award Committee From: R.E. Staite Engineering Feb. 26, 2015 Re: Application Environmental Dredging Award Background: The R.E. Staite Engineering, Inc. ("RES") team successfully completed
More informationSource Control Early Action Focused Feasibility Study
Source Control Early Action Focused Feasibility Study Engineering Presentation Scott E. Thompson, PE Malcolm Pirnie, Inc. Remedial Options Workgroup Meeting June 27, 2007 Outline Target Area Selection
More informationMcCormick and Baxter Superfund Site Long-Term Performance Monitoring
Northwest Region Cleanup Program McCormick and Baxter Superfund Site Long-Term Performance Monitoring Scott Manzano Oregon Department of Environmental Quality Background Background Wood treatment facility;
More informationSan Francisco Bay Long Term Management Strategy. 12-Year Review Process Meeting
San Francisco Bay Long Term Management Strategy 12-Year Review Process Meeting In the Days Before LTMS Public Objections to In-Bay Disposal Blockade! Severe Mounding at the Alcatraz Disposal Site Severe
More informationActive Geosynthetic Composites for Subaqueous Capping
Active Geosynthetic Composites for Subaqueous Capping Kristof Thimm, Romain Durand HUESKER Synthetic 03.04.2017 Unternehmenspräsentation 1 Initial Situation 2 Remediation approaches Alternatives Dredge,
More informationThe Port of Hueneme Confined Aquatic Disposal Project: A Unique Partnership for Contaminated Sediment Management
The Port of Hueneme Confined Aquatic Disposal Project: A Unique Partnership for Contaminated Sediment Management Presented by Jack Malone, Ph.D. Steve Cappellino May 11, 2011 Report Documentation Page
More informationDISTRIBUTION STATEMENT A ?
AAMS Application: Hydrologie Evaluation of Leachate Production and Quality (HELPQ) Module in CFs PURPOSE: This technical note describes the application of the Hydrologie Evaluation of Leachate Production
More informationDESIGN OF THE CAMPBELL SHIPYARD SEDIMENT REMEDIATION PROJECT, SAN DIEGO, CALIFORNIA
DESIGN OF THE CAMPBELL SHIPYARD SEDIMENT REMEDIATION PROJECT, SAN DIEGO, CALIFORNIA T. S. Wang P.E. 1, M. Whelan P.E. 2, D. Keith R.G. 3, J. Verduin P.E. 4 and P. Brown 5 ABSTRACT The former Campbell Shipyard
More informationA Story of Revitalization Onondaga Lake Dredging, Capping, and Habitat Restoration Project, Syracuse, New York
A Story of Revitalization Onondaga Lake Dredging, Capping, and Habitat Restoration Project, Syracuse, New York Prepared for: WEDA - 2017 Environmental Dredging Excellence Award Submitted by: William Hague
More informationAPPENDIX L PROJECT COST ESTIMATE
APPENDIX L PROJECT COST ESTIMATE GENERAL REEVALUATION REPORT (GRR) AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT (SEIS) FOR THE POPLAR ISLAND ENVIRONMENTAL RESTORATION PROJECT CHESAPEAKE BAY, TALBOT
More informationREQUEST FOR CONSTRUCTION BIDS February 22, 2010
REQUEST FOR CONSTRUCTION BIDS February 22, 2010 Roaring Branch Channel and Floodplain Restoration Project 1.0 Project Background Roaring Branch (watershed area ~ 41 square miles) flows generally west through
More informationTABLE OF CONTENTS LEGAL NOTICE
Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED
More informationSmarter, Cheaper, Ash Pond Dewatering
2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Smarter, Cheaper, Ash Pond Dewatering David M. Seeger, PhD, Steven Kosler AECOM, 9400 Amberglen Blvd.,
More informationUse of High Value Amendments to Address Contaminated Sediments in Sensitive Ecological Systems
Use of High Value Amendments to Address Contaminated Sediments in Sensitive Ecological Systems ARC 2016 November 8-9, 2016 Halifax, Canada John A. Bleiler, Upal Ghosh, Charles A. Menzie November 2016 Overview
More informationCapping Materials and Design
EPA/OSRTI Sediment Remedies: Capping Technical Considerations for Evaluation and Implementation Capping Materials and Design Danny Reible Environment and Water Resources The University of Texas at Austin
More informationAppendix N. Remedial Alternatives Evaluation
Appendix N Remedial Alternatives Evaluation Appendix N Remedial Alternatives Evaluation Mayflower Pipeline Incident Mayflower, Arkansas 1. Introduction ARCADIS U.S. Inc. (ARCADIS) has prepared this Remedial
More informationDucks Unlimited M&T Ranch / Llano Seco Intake Project Final Alternatives
Ducks Unlimited M&T Ranch / Llano Seco Intake Project Final Alternatives M&T Ranch / Llano Seco Intake Project Final Alternatives Draft Engineering Analysis Technical Memorandum Ducks Unlimited September,
More informationTremie Concrete. Lecture 8. Tremie concrete. Temporary Structures. Tremie Concrete. Temporary Structures
Tremie Concrete Lecture 8 Tremie concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e.,
More informationBPP Technical Studies
BPP Technical Studies Representative Sample of Brake Pad Wear Debris (BMC/Link Test Labs) Air Deposition Modeling (AER) Air Deposition Monitoring (SFEI) Physical & Chemical Characterization of Wear Debris
More informationEAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE
EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE Ravi Sanga 1 ABSTRACT In 2003, the EPA entered into an agreed order with
More informationSITE INVESTIGATION. Foundation Engineering
SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface
More informationConsiderations for Environmental Dredging of Contaminated Sediments. Michael R. Palermo, PhD, PE
Considerations for Environmental Dredging of Contaminated Sediments Michael R. Palermo, PhD, PE 1 Outline 4 Objectives, Definitions 4 Site/ Sediment Characterization 4 Removal Requirements 4 Equipment
More informationUSE OF POLYMERS IN HIGH SPEED DEWATERING OF FINE GRAINED SEDIMENTS TO REPLACE CONFINED DISPOSAL FACILITIES - A CASE STUDY
USE OF POLYMERS IN HIGH SPEED DEWATERING OF FINE GRAINED SEDIMENTS TO REPLACE CONFINED DISPOSAL FACILITIES - A CASE STUDY Karen C. Kabbes, PE, D.WRE. 1 and Michael Hodges 2 ABSTRACT Hydraulically dredging
More informationDetermination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities
Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission
More informationOverview of Dredged Material Testing and Evaluation
Overview of Dredged Material Testing and Evaluation Jeffery Steevens US Army Corps of Engineers Engineer Research and Development Center 23 July 2012 Guidance Documents for Management of Dredged Material
More informationSUSTAINABLE SOLUTIONS FOR DREDGED MATERIAL MANAGEMENT IN OHIO
SUSTAINABLE SOLUTIONS FOR DREDGED MATERIAL MANAGEMENT IN OHIO Western Dredge Association Midwest Chapter Omaha, Nebraska Friday, March 10, 2017 David Emerman, Ohio EPA/Ohio Lake Erie Commission James White,
More informationProject Alternatives: The Parsons Sill Project History
Project Alternatives: The Parsons Sill Project History Project Impetus Over the past 150 years, human actions have altered the tidal, freshwater, and sediment processes that are essential to support and
More informationBAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION
APPENDIX I BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION South Bay Salt Pond Restoration Project Phase 2 July 2015 Draft Environmental Impact Statement/Report 2185 N. California Blvd., Suite
More informationVillage Creek Harbor & Estuary
Village Creek Harbor & Estuary A Study on the Feasibility of Restoring Degraded Saltmarsh with Dredged Material Public Presentation September 7 th and 9 th 2017 Village Creek Harbor & Estuary Salt Marsh
More informationSummary: project description: goals, objectives, accomplishments
Summary: project description: goals, objectives, accomplishments The Lower Fox River Cleanup Project is designed to reduce risk to human health and the environment due to the presence of PCBs in the river
More informationWeldcraft Boatyard Clean-up and Redevelopment Project
Weldcraft Boatyard Clean-up and Redevelopment Project Habitat Mitigation Mike Stoner Environmental Director Port of Bellingham 1801 Roeder Avenue Bellingham, WA 98227 mikes@portofbellingham.com June 10,
More informationCHAPTER 3 LOGISTICAL CONSIDERATIONS
CHAPTER 3 LOGISTICAL CONSIDERATIONS 3-1. General. With the huge quantities of dredged material created during dredging operations, site utilization, economic transport handling, and storage plans become
More informationNew Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement
New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement Public Informational Meeting NEPA Scoping 24 January 2017 Planning Division New England District
More informationIndiana Harbor and Canal (IHC) Confined Disposal Facility (CDF) and Navigational Dredging
Indiana Harbor and Canal (IHC) Confined Disposal Facility (CDF) and Navigational Dredging Purdue Water Institute 05 November 2013. US Army Corps of Engineers Topics for Today Brief Introduction to USACE
More informationSection 7 Dredging Implementation Plan
7.1 Overview Section 3 of this report presented level of service criteria to identify those areas where the existing system does not provide an acceptable level of service. Canals were selected for more
More informationCONSTRUCTION OF THE CAMPBELL SHIPYARD SEDIMENT REMEDIATION PROJECT, SAN DIEGO, CALIFORNIA
CONSTRUCTION OF THE CAMPBELL SHIPYARD SEDIMENT REMEDIATION PROJECT, SAN DIEGO, CALIFORNIA M. Whelan P.E. 1, T. S. Wang P.E. 2, J. Verduin P.E. 3, E. Berschinski 4, M. Akhavain 5 and W. Melton 6 ABSTRACT
More informationEngineering with Nature In Action: SLR AOC Living Shoreline Design Basis
Engineering with Nature In Action: SLR AOC Living Shoreline Design Basis Joseph P. Kreitinger, PhD US Army Engineer Research and Development Center Ithaca, NY Adam C. Wagner, PE USACE LRE Detroit, MI Dan
More informationREUSE OF DREDGED SEDIMENTS
REUSE OF DREDGED SEDIMENTS Lake Erie Waterkeeper Conference W.W. Knight Nature Preserve, Perrysburg, Ohio Friday, March 18, 2016 John H. Hull, P.E., BCEE Hull & Associates, Inc. SEDIMENT ENTERING LAKE
More informationBEAST SCREED SYSTEM INSTALLATION INSTRUCTIONS
BEAST SETUP PROCEDURES P of 5 4 The concrete crew responsible for placement of the concrete should be made aware Beast Screed will be utilized on the project. The placement crew should have input on, or
More informationWQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description
Greenville County Technical Specification for: WQ-06 SAND FILTER 1.0 Sand Filter 1.1 Description Sand Filters remove pollutants through sedimentation and filtration within the sand. The primary components
More informationAnnex V Concrete Structures Removal Plan
Appendix D Annex V Concrete Structures Removal Plan Figure V1 Lower Granite Sequences of Concrete Removal and Cofferdam Figure V2 Little Goose Sequence of Concrete Removal and Cofferdam Figure V3 Lower
More informationRestore America s Estuaries October 24, 2012
Coordinating Dredged Material Management in the Pacific Coast s Largest Estuary with Construction of the Pacific Coast s Largest Tidal Wetland Restoration Project. Restore America s Estuaries October 24,
More informationExcavation Of Pcb-Contaminated Sediment Adjacent To The Intake Of A 12-Mgd Drinking Water Plant
Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 11 Article 21 January 2010 Excavation Of Pcb-Contaminated Sediment Adjacent To The Intake Of A 12-Mgd Drinking
More informationLEAF Method Testing of MGP-impacted Sediments in Gowanus Canal
LEAF Method Testing of MGP-impacted Sediments in Gowanus Canal RE3 Conference 2014 Jeff Gentry, P.E. Principal Technologist January 28, 2014 Gowanus Canal Superfund Site 1.8 mile long canal in Brooklyn,
More informationTARGETED DREDGING OF NEAR-SHORE DEBRIS AND SEDIMENT, UPPER TRENTON CHANNEL, DETROIT RIVER: A CASE STUDY
TARGETED DREDGING OF NEAR-SHORE DEBRIS AND SEDIMENT, UPPER TRENTON CHANNEL, DETROIT RIVER: A CASE STUDY M.J. Erickson, P.E. 1, R.K. Mohan, P.E. 2, W.J. Dinicola 3, and M.R. Henderson 4 ABSTRACT Under regulatory
More information1. Overview 2 2. Definitions 2 3. Laboratory Testing Criteria 2. A. Laboratory Qualifications 2. B. Analysis of TSS Samples 2. C.
New Jersey Department of Environmental Protection Laboratory Protocol to Assess Total Suspended Solids Removal by a Hydrodynamic Sedimentation Manufactured Treatment Device January 25, 2013 Contents 1.
More informationSAN FRANCISCO BAY LONG-TERM MANAGEMENT STRATEGY PROGRAM 12-YEAR REVIEW
SAN FRANCISCO BAY LONG-TERM MANAGEMENT STRATEGY PROGRAM 12-YEAR REVIEW BACKGROUND INFORMATION FOR MARCH 29, 2012, MEETING Prepared by San Francisco Bay Conservation and Development Commission San Francisco
More informationSuccessful Sediment Remediation Strategies at Contaminated Sites Across the Commonwealth. Mille Garcia-Serrano
Successful Sediment Remediation Strategies at Contaminated Sites Across the Commonwealth Mille Garcia-Serrano Deputy Regional Director MassDEP Environmental Business Council New England Energy Environment
More informationExposure Processes and Assessment
Exposure Processes and Assessment Dr. Paul R. Schroeder Dr. Joe Z. Gailani Paul.R.Schroeder@usace.army.mil Joe.Z.Gailani@usace.army.mil RISK FRAMEWORK RISK ASSESSMENT PARADIGM Exposure Assessment Economic
More informationCompaction and Jet Grouting
Compaction and Jet Grouting Alan Ringen, PE Senior Vice President Breakthroughs in Tunneling Short Course August 16, 2017 Grouting Principles Geotechnical Grouting: The injection of pumpable fluid materials
More informationPUBLIC NOTICE PROJECT: Paradise Cay Yacht Harbor Maintenance Dredging
SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: Paradise Cay Yacht Harbor Maintenance Dredging Regulatory Division 1455 Market Street, 16 th Floor San Francisco, CA 94103-1398 PUBLIC NOTICE NUMBER: 2015-00034N
More informationNUMERICAL MODELING IN THE WATER ENVIRONMENT
NUMERICAL MODELING IN THE WATER ENVIRONMENT Capabilities and Experience Noble Consultants, Inc. NUMERICAL MODELING SERVICES IN THE WATER ENVIRONMENT NCI utilizes the most advanced numerical models in the
More informationLarge Scale Sediment Management
Large Scale Sediment Management Content Introduction The Netherlands: 1. CDF IJsseloog 2. Regional Processing: DWR Amsterdam 3. CDF Slufter Northern America: 1. Miami River Project 2. Fox River Cleanup
More informationGround Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging
Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging James J. Serpico (&) Geotechnical Services, Maser Consulting P.A.,
More informationMorris Cove as a Confined Aquatic
Morris Cove as a Confined Aquatic Disposal (CAD) Cell Bridgeport Maintenance Dredging Project Public Meeting 25 October 2010 Thomas J. Fredette, PhD USACE Army Engineer Research Lab Vicksburg, MS Sediment
More informationSubsurface Seawater Intake Gallery
Long Beach Water Department Subsurface Seawater Intake Gallery 7 Years and Going Strong Sunny Wang, Brown and Caldwell Tai Tseng, Long Beach Water Department Yan Zhang, Long Beach Water Department Contents
More informationThe planned conversion of part of the Port of
South Port of Copenhagen: Clean-up of Contaminated Sediments NIELS LYKKEBERG & HELGE GRAVESEN, Carl Bro a/s, Glostrup, Denmark KAJ HOLM JØRGENSEN, Port of Copenhagen, Denmark A BSTRACT The planned conversion
More informationConsidering Climate Change Impacts in Selection and Design of Sediment Remedies
Considering Climate Change Impacts in Selection and Design of Sediment Remedies June 8, 2015 Environmental Law Education Center Conference Seattle, Washington Barry Kellems, P.E. U.S. Climate Change Impacts
More information