1 PIANC Dredging 2012 Conference Castro Cove Sediment Remediation Project, Richmond, California Ian Austin PhD PE - URS Corporation Paul Ryan Chevron Environmental Management Company Mark Sutton Dixon Marine Services Why of Interest? Technically challenging mudflat environment Specialty equipment designed to place no-net-fill 20-acre cap Consolidation of hydraulically placed beneficial re-use mud layer Shear stress modeling prior to sheet pile removal

2 Site Location Embayment of San Pablo Bay in north San Francisco Bay Adjacent to active refinery Mudflats at +2 to +3 feet MLLW Shear strengths; 50, 150 psf at 1, 2 foot depths

3 AOC Effluent discharged into Cove from early 1900s until 1987 ERA: 20-acre AOC based on PAHs, mercury, benthic risk 2007: Dredged 97,000 cy sediment, placed upland Approximately 6-inch thick layer of residual contamination remained in AOC after dredging

4 Engineered Cap Design Cap designed using lab tests and chemical flux modeling, expert peer review (Danny Reible) Sequential Batch Leach, Thin Column Leach, and cap-loading tests used to develop partition coefficients and sorption capacities Design includes; No-net-fill requirement, < 97,000 cy 1.5 acres of Reactive Core Mats (RCM), 6-inch+ sand layer for chemical isolation and containment, 18-inch+ clean Bay mud layer to restore biological viability for benthic communities

5 Sand Placement Challenge Performed in-the-wet with 3 to 5 feet of water inside 2,700 foot sheet pile enclosure Adjacent to an operating refinery Place a nominal 6-inch layer of sand over 20- acres (45,000 cy maximum) Could not disturb or re-suspension residual contamination RWQCB Order only allowed discharge of water inside sheet-pile after sand placement and WQ confirmation testing: closed loop system Required finesse, rather than bulk production

6 Sand Placement thr Specialized Equipment Design: Worked with DMS on hydrodynamic design of spreader Hydraulic placement of sand pumped 5,000 feet, needed to reduce velocities from 14 fps to 2 > 3 fps Used computer model (HEC-RAS) to design spreader plate, flare width and slope Modular construction based on two 10-ft by 40-ft pontoons

7 Sand Placement Automated sand slurry system used to produce accurate slurry concentrations: spreader position only variable

8 Sand Layer Confirmation: Sand barge delivery volumes Bi-weekly bathymetric surveys using purposebuilt, shallow-water, 5-beam sweep system Sand core collection in clear PVC tubes

9 Mud Layer Placement Challenge: Two weeks prior to start-up, required to change from hydraulic to mechanical dredging due to post-permit (DF&G) change in position regarding impacts to long-fin smelt Beneficial reuse of 37,500 cy of dredge sediment from Richmond Rod & Gun Club Yacht Harbor dredging Beneficial reuse of 13,000 cy from Point San Pablo Yacht Harbor; 8,000 feet of pipe

10 Mechanical Hydraulic Dredge

11 AOC Confirmation Cross Sections Total sand and sediment volume: 95,500 cy

12 Clay Layer Consolidation Challenge: Dewatered AOC to promote consolidation of mud slurry Extended consolidation time from one month to four months based on shear strengths Measured in-situ shear strength in surrounding mudflats Measured strength of mud in AOC along diagonal transect field shear vane measurements

13 Shear Vane Transect

14 MIKE 21 Shear stress modeling of sheet pile removal Modeled tide-specific sequencing options for reintroducing the tide First: 300-ft pushed down to create 1-foot high weir -> minimize initial tidal prism Second: sheet removal with two barge cranes along north face

15 Conclusions Cooperation between regulatory agency, owner, engineer, contractor needed to complete the project (from 1997 to 2012) Integration of science, engineering, construction needed to meet technical challenges (material delivery, mud consolidation, sheet pile removal)

Predictive Modeling and Design Solutions for Beneficial Use of Dredged Material

Predictive Modeling and Design Solutions for Beneficial Use of Dredged Material Predictive Modeling and Design Solutions for Beneficial Use of Dredged Material Presented by Tom Wang, P.E., and Kathy Ketteridge, Ph.D., P.E. January 28, 2016 Overview of Presentation Introductions Examples

More information

Design of CAD Pits in San José Lagoon, San Juan, Puerto Rico

Design of CAD Pits in San José Lagoon, San Juan, Puerto Rico Second LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCEI 2004) Challenges and Opportunities for Engineering Education, Research and Development 2-4 June

More information

Cost and Feasibility of Conventional and Active Sediment Capping

Cost and Feasibility of Conventional and Active Sediment Capping Cost and Feasibility of Conventional and Active Sediment Capping Danny Reible Chevron Professor of Chemical Engineering Director, Hazardous Substance Research Center Louisiana State University Hazardous

More information

Introduction to Sediment Remediation. Presented to: Lower Passaic River Community Advisory Group July 14, 2011

Introduction to Sediment Remediation. Presented to: Lower Passaic River Community Advisory Group July 14, 2011 Introduction to Sediment Remediation Presented to: Lower Passaic River Community Advisory Group July 14, 2011 Overview Feasibility Considerations Conceptual Site Model Dredging / Capping Dredged Material

More information

PLANNING AND ENGINEERING CONSIDERATIONS FOR A 1.5 MILLION CUBIC METER LAKE DREDGING PROJECT

PLANNING AND ENGINEERING CONSIDERATIONS FOR A 1.5 MILLION CUBIC METER LAKE DREDGING PROJECT William Hague, Honeywell John McAuliffe, Honeywell Edward Glaza, Parsons Paul LaRosa, Anchor QEA Paul Blue, Parsons PLANNING AND ENGINEERING CONSIDERATIONS FOR A 1.5 MILLION CUBIC METER LAKE DREDGING PROJECT

More information

Lessons Learned, Innovations, and Successes from U.S. Great Lakes Areas of Concern Sediment Cleanups

Lessons Learned, Innovations, and Successes from U.S. Great Lakes Areas of Concern Sediment Cleanups Lessons Learned, Innovations, and Successes from U.S. Great Lakes Areas of Concern Sediment Cleanups Presented at RPIC Federal Contaminated Sites National Workshop April 15, 2014 Gina Bayer, CH2M HILL

More information

Contaminated sediment management in the U.S.

Contaminated sediment management in the U.S. Contaminated sediment management in the U.S. Rebecca Gardner Anchor QEA, USA and Norway company logo comes here Contents Brief overview of beneficial use activities in the United States (U.S.) Relating

More information

Buffalo River, New York Great Lakes Restoration Initiative (GLRI) Dredging

Buffalo River, New York Great Lakes Restoration Initiative (GLRI) Dredging Buffalo River, New York Great Lakes Restoration Initiative (GLRI) Dredging Partners: U.S. EPA New York State DEC Buffalo Niagara Riverkeeper U.S. Army Corps of Engineers Presented by: Scott Cieniawski

More information

Anacostia Active CappingC Demonstration. Status

Anacostia Active CappingC Demonstration. Status Anacostia Active CappingC i Demonstration Status Danny Reible, PhD, PE, DEE, A N E Smith Chair of Environmental Health Engineering University of Texas at Austin NATO CCMS- Ljubljana, Slovenia June 19,

More information

New York- New Jersey Harbor Estuary. Lower Passaic River

New York- New Jersey Harbor Estuary. Lower Passaic River Lower 8 Miles of the Lower Passaic River Focused Feasibility Study November 7, 2013 New York- New Jersey Harbor Estuary Lower Passaic River 2 Diamond Alkali Superfund Site: Contaminated with dioxins, PCBs,

More information

Current Trends and Case Studies in Contaminated Sediment Capping

Current Trends and Case Studies in Contaminated Sediment Capping Current Trends and Case Studies in Contaminated Sediment Capping Archie Filshill, Ph.D. Theresa Andrejack Loux, Ph.D. Golder Associates Bristol, PA Sediment Removal Dublin, Ireland Royal Canal Job bid

More information

Identifying and Managing Key Cost Drivers During Investigation, Remedy Selection and Design at Contaminated Sediment Sites

Identifying and Managing Key Cost Drivers During Investigation, Remedy Selection and Design at Contaminated Sediment Sites Identifying and Managing Key Cost Drivers During Investigation, Remedy Selection and Design at Contaminated Sediment Sites Doug Crawford, PE Kendrick Jaglal, PE Brian White, PE Steve Anagnost, PE Trevor

More information

APPENDIX C DESIGN & ENGINEERING

APPENDIX C DESIGN & ENGINEERING APPENDIX C DESIGN & ENGINEERING Study Authority. This study is authorized under Section 204 of the Water Resources Development Act of 1992, as amended. Study Description. This appendix presents the results

More information

Less than 8 feet finished water depth. 4-Foot Cap 3-Foot Cap Foot Cap. 4 Ft

Less than 8 feet finished water depth. 4-Foot Cap 3-Foot Cap Foot Cap. 4 Ft Herbivorous Animals Consuming Plants & Sediment Piscivorous Wildlife Consuming Fish Insectivorous Wildlife Consuming Emerging Aquatic Invertebrates Burrowing Organisms Contacting Contaminated Sediment

More information

Parcel F Carbon Amendment Placement Pilot Study, Hunters Point Naval Shipyard, San Francisco, California

Parcel F Carbon Amendment Placement Pilot Study, Hunters Point Naval Shipyard, San Francisco, California Parcel F Carbon Amendment Placement Pilot Study, Hunters Point Naval Shipyard, San Francisco, California Presented By George L. Hicks Global Practice Director / CH2M Objective Present an overview of the

More information

East Branch of Grand Calumet River, Reaches 4A/4B. WEDA WODCON XXI June 13-17, 2016 The Hyatt Regency, Miami, FL

East Branch of Grand Calumet River, Reaches 4A/4B. WEDA WODCON XXI June 13-17, 2016 The Hyatt Regency, Miami, FL East Branch of Grand Calumet River, Reaches 4A/4B WEDA WODCON XXI June 13-17, 2016 The Hyatt Regency, Miami, FL Project Representatives Agencies and Stakeholders USEPA Great Lakes National Program Office

More information

EVALUATION OF ENVIRONMENTAL MONITORING DATA GATHERED DURING ASHTABULA RIVER DREDGING, ASHTABULA RIVER, OHIO

EVALUATION OF ENVIRONMENTAL MONITORING DATA GATHERED DURING ASHTABULA RIVER DREDGING, ASHTABULA RIVER, OHIO EVALUATION OF ENVIRONMENTAL MONITORING DATA GATHERED DURING ASHTABULA RIVER DREDGING, ASHTABULA RIVER, OHIO D. Plomb 1, S. Cieniawski 2, and D. Pham 3 ABSTRACT The Ashtabula River Area of Concern (AOC)

More information

Using Dredging Lessons Learned in a Large Contaminated Sediment Feasibility Study. Presented by John Laplante, Carl Stivers, and Clay Patmont

Using Dredging Lessons Learned in a Large Contaminated Sediment Feasibility Study. Presented by John Laplante, Carl Stivers, and Clay Patmont Using Dredging Lessons Learned in a Large Contaminated Sediment Feasibility Study Presented by John Laplante, Carl Stivers, and Clay Patmont October 24, 2012 Presentation Outline Engineered Barriers Best

More information

Management of Thunder Bay Contaminated Sediment

Management of Thunder Bay Contaminated Sediment Management of Thunder Bay Contaminated Sediment Sue-Jin An Kay Kim, Roger Santiago, and Rupert Joyner Environment Canada Oct. 24, 2012 Great Lakes Areas of Concern (AOC) Thunder Bay was designated an AOC

More information

Hudson River Remedial Design Treatability Study Data Quality Objectives

Hudson River Remedial Design Treatability Study Data Quality Objectives Hudson River Remedial Design Treatability Study Data Quality Objectives USACE/USEPA/SMWG Joint Sediment Conference October 26-28, 2004 1 Hudson River: EPA Dredging Decision Remedy Decision (2/02 Record

More information

Update on Lower Fox River Remediation Project, Green Bay, Wisconsin

Update on Lower Fox River Remediation Project, Green Bay, Wisconsin Update on Lower Fox River Remediation Project, Presented by P. LaRosa, PE, and D. Binkney, Anchor QEA, LLC R. Feeney, PE, and T. Blackmar, PE, Tetra Tech, Inc. G. Smith and D. Bauman, J.F. Brennan Company,

More information

Appendix N. Remedial Alternatives Evaluation

Appendix N. Remedial Alternatives Evaluation Appendix N Remedial Alternatives Evaluation Appendix N Remedial Alternatives Evaluation Mayflower Pipeline Incident Mayflower, Arkansas 1. Introduction ARCADIS U.S. Inc. (ARCADIS) has prepared this Remedial

More information

Mass Stabilization Virgin & Contaminated Soil / Sediment

Mass Stabilization Virgin & Contaminated Soil / Sediment Mass Stabilization Virgin & Contaminated Soil / Sediment Presented at: Remediation Technologies Symposium 2013 Charles Wilk, Manager Stabilization and Remediation Applications ALLU Group Inc. What is Mass

More information

Emerging Trends in Contaminated Sediment Cleanup

Emerging Trends in Contaminated Sediment Cleanup Emerging Trends in Contaminated Sediment Cleanup Presented to Best Practices Group Presented by Clay Patmont Anchor Environmental, LLC August 28, 2008 Presentation Outline Overview of emerging trends Regulatory

More information

OPEN WATER SITE MANAGEMENT AND CONTROLS

OPEN WATER SITE MANAGEMENT AND CONTROLS OPEN WATER SITE MANAGEMENT AND CONTROLS Susan E. Bailey US Army ERDC, Vicksburg, MS Susan.E.Bailey@usace.army.mil Risk Management Risk Assessment Risk Management CONTROL CONTROL CONTROL Implemented controls

More information

Expedited Remediation of Coal Tar Containing Sediments: Design-to-Build Approach with a Beneficial Reuse

Expedited Remediation of Coal Tar Containing Sediments: Design-to-Build Approach with a Beneficial Reuse Expedited Remediation of Coal Tar Containing Sediments: Design-to-Build Approach with a Beneficial Reuse Mike Crystal Sevenson Environmental Services Kurt Paschl Beazer East Inc. Alan Fowler ARCADIS Presentation

More information

Portland Harbor CAG Feasibility Study Sediment Capping and Treatment Concepts. July 14, 2010 Jim McKenna Carl Stivers

Portland Harbor CAG Feasibility Study Sediment Capping and Treatment Concepts. July 14, 2010 Jim McKenna Carl Stivers Portland Harbor CAG Feasibility Study Sediment Capping and Treatment Concepts July 14, 2010 Jim McKenna Carl Stivers 1 Quick Review! June Dredging and Monitored Natural Recovery! July Capping and Treatment!

More information

Design Specifications- Micropile Foundation System. Geopier Calculations

Design Specifications- Micropile Foundation System. Geopier Calculations Design Specifications- Micropile Foundation System Zone Total Piles Average Length (ft) Total Length 1- Primary Area 233 65 15145 2-Radiotherapy Area (Linac Valuts) 70 65 4550 3-Shell Space & ED Canopy

More information

Salt Marsh Restoration

Salt Marsh Restoration Salt Marsh Restoration through the Beneficial Re-Use of Dredged Material JACQUELINE JAHN PROJECT ECOLOGIST, GREENVEST, LLC Project Background Objective: Three trial projects to test the marsh restoration

More information

APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN

APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN SUMMARY The construction team of Environmental Restoration,

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018

San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018 San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018 PRESENTATION OVERVIEW Introductions Project Overview Summary of Analysis Supporting Model Development Model Development

More information

ONONDAGA LAKE CAPPING FIELD DEMONSTRATION WORK PLAN

ONONDAGA LAKE CAPPING FIELD DEMONSTRATION WORK PLAN CAPPING FIELD DEMONSTRATION WORK PLAN Prepared For: 301 Plainfield Road, Suite 330 Syracuse, New York 13212 Prepared By: Parsons 301 Plainfield Road, Suite 350 Syracuse, New York 13212 Phone: (315) 451-9560

More information

Escanaba Tie Treating Plant Remediation

Escanaba Tie Treating Plant Remediation Escanaba Tie Treating Plant Remediation Construction of Remedy to Address NAPL Migration to Great Lakes Authors Geoffrey Reeder/ Union Pacific Railroad Tom Hutchinson/CH2M Jeff Gentry/CH2M Railroad Environmental

More information

A World of Solutions

A World of Solutions Project Goals Engineering, Economics, & Environmental Principles Minimization of execution risks Construction industry s highest standards Cost savings vs. conventional methods Consistency with Master

More information

Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation. U.S. Army Corps of Engineers New York District

Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation. U.S. Army Corps of Engineers New York District Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation U.S. Army Corps of Engineers New York District January 2004 APPENDIX H SECTION 404(b)(1) GUIDELINES EVALUATION SECTION 404(b)(1)

More information

ENVIRONMENTAL RESTORATION IN COASTAL MISSISSIPPI: MARSH RE-ESTABLISHMENT PROJECT HARRISON AND JACKSON COUNTIES, MISSISSIPPI

ENVIRONMENTAL RESTORATION IN COASTAL MISSISSIPPI: MARSH RE-ESTABLISHMENT PROJECT HARRISON AND JACKSON COUNTIES, MISSISSIPPI SECTION 404(b)(1) EVALUATION REPORT FOR THE SECTION 204 ECOSYSTEM RESTORATION PROJECT IN CONNECTION WITH CONSTRUCTION, OPERATION, OR MAINTENANCE DREDGING OF A FEDERALLY AUTHORIZED PROJECT ENVIRONMENTAL

More information

ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT. January 15, 2016

ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT. January 15, 2016 ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT January 15, 2016 EXECUTIVE SUMMARY This annual inspection report has been prepared in accordance

More information

Utilization of Barrier and Treatment Designs to Address Irregular Shoreline Surfaces and Control of Contaminant Migration. John H. Hull, P.E.

Utilization of Barrier and Treatment Designs to Address Irregular Shoreline Surfaces and Control of Contaminant Migration. John H. Hull, P.E. Utilization of Barrier and Treatment Designs to Address Irregular Shoreline Surfaces and Control of Contaminant Migration John H. Hull, P.E., BCEE Contaminated Site Assessment, Remediation, and Redevelopment

More information

Danny Reible, University of Texas Research supported by EPA, DOD ESTCP/SERDP, NIH & Industrial Sources

Danny Reible, University of Texas Research supported by EPA, DOD ESTCP/SERDP, NIH & Industrial Sources Danny Reible, University of Texas Research supported by EPA, DOD ESTCP/SERDP, NIH & Industrial Sources 1 PhD Chemical Engineering Caltech Long range transport of atmospheric pollutants 2 3 4500 4000 3500

More information

Highland Lake Dredging Feasibility Study

Highland Lake Dredging Feasibility Study Highland Lake Dredging Feasibility Study Final Report, September 2015 Prepared For: The Town of Highland Lake 612 Lakeshore Drive Oneonta, AL 35121 Prepared By: Tetra Tech 2110 Powers Ferry Road SE Suite

More information

To: WEDA Environmental Award Committee. From: R.E. Staite Engineering. Feb. 26, Re: Application Environmental Dredging Award

To: WEDA Environmental Award Committee. From: R.E. Staite Engineering. Feb. 26, Re: Application Environmental Dredging Award To: WEDA Environmental Award Committee From: R.E. Staite Engineering Feb. 26, 2015 Re: Application Environmental Dredging Award Background: The R.E. Staite Engineering, Inc. ("RES") team successfully completed

More information

Source Control Early Action Focused Feasibility Study

Source Control Early Action Focused Feasibility Study Source Control Early Action Focused Feasibility Study Engineering Presentation Scott E. Thompson, PE Malcolm Pirnie, Inc. Remedial Options Workgroup Meeting June 27, 2007 Outline Target Area Selection

More information

McCormick and Baxter Superfund Site Long-Term Performance Monitoring

McCormick and Baxter Superfund Site Long-Term Performance Monitoring Northwest Region Cleanup Program McCormick and Baxter Superfund Site Long-Term Performance Monitoring Scott Manzano Oregon Department of Environmental Quality Background Background Wood treatment facility;

More information

San Francisco Bay Long Term Management Strategy. 12-Year Review Process Meeting

San Francisco Bay Long Term Management Strategy. 12-Year Review Process Meeting San Francisco Bay Long Term Management Strategy 12-Year Review Process Meeting In the Days Before LTMS Public Objections to In-Bay Disposal Blockade! Severe Mounding at the Alcatraz Disposal Site Severe

More information

Active Geosynthetic Composites for Subaqueous Capping

Active Geosynthetic Composites for Subaqueous Capping Active Geosynthetic Composites for Subaqueous Capping Kristof Thimm, Romain Durand HUESKER Synthetic 03.04.2017 Unternehmenspräsentation 1 Initial Situation 2 Remediation approaches Alternatives Dredge,

More information

The Port of Hueneme Confined Aquatic Disposal Project: A Unique Partnership for Contaminated Sediment Management

The Port of Hueneme Confined Aquatic Disposal Project: A Unique Partnership for Contaminated Sediment Management The Port of Hueneme Confined Aquatic Disposal Project: A Unique Partnership for Contaminated Sediment Management Presented by Jack Malone, Ph.D. Steve Cappellino May 11, 2011 Report Documentation Page

More information

DISTRIBUTION STATEMENT A ?

DISTRIBUTION STATEMENT A ? AAMS Application: Hydrologie Evaluation of Leachate Production and Quality (HELPQ) Module in CFs PURPOSE: This technical note describes the application of the Hydrologie Evaluation of Leachate Production

More information

DESIGN OF THE CAMPBELL SHIPYARD SEDIMENT REMEDIATION PROJECT, SAN DIEGO, CALIFORNIA

DESIGN OF THE CAMPBELL SHIPYARD SEDIMENT REMEDIATION PROJECT, SAN DIEGO, CALIFORNIA DESIGN OF THE CAMPBELL SHIPYARD SEDIMENT REMEDIATION PROJECT, SAN DIEGO, CALIFORNIA T. S. Wang P.E. 1, M. Whelan P.E. 2, D. Keith R.G. 3, J. Verduin P.E. 4 and P. Brown 5 ABSTRACT The former Campbell Shipyard

More information

A Story of Revitalization Onondaga Lake Dredging, Capping, and Habitat Restoration Project, Syracuse, New York

A Story of Revitalization Onondaga Lake Dredging, Capping, and Habitat Restoration Project, Syracuse, New York A Story of Revitalization Onondaga Lake Dredging, Capping, and Habitat Restoration Project, Syracuse, New York Prepared for: WEDA - 2017 Environmental Dredging Excellence Award Submitted by: William Hague

More information

APPENDIX L PROJECT COST ESTIMATE

APPENDIX L PROJECT COST ESTIMATE APPENDIX L PROJECT COST ESTIMATE GENERAL REEVALUATION REPORT (GRR) AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT (SEIS) FOR THE POPLAR ISLAND ENVIRONMENTAL RESTORATION PROJECT CHESAPEAKE BAY, TALBOT

More information

REQUEST FOR CONSTRUCTION BIDS February 22, 2010

REQUEST FOR CONSTRUCTION BIDS February 22, 2010 REQUEST FOR CONSTRUCTION BIDS February 22, 2010 Roaring Branch Channel and Floodplain Restoration Project 1.0 Project Background Roaring Branch (watershed area ~ 41 square miles) flows generally west through

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

Smarter, Cheaper, Ash Pond Dewatering

Smarter, Cheaper, Ash Pond Dewatering 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Smarter, Cheaper, Ash Pond Dewatering David M. Seeger, PhD, Steven Kosler AECOM, 9400 Amberglen Blvd.,

More information

Use of High Value Amendments to Address Contaminated Sediments in Sensitive Ecological Systems

Use of High Value Amendments to Address Contaminated Sediments in Sensitive Ecological Systems Use of High Value Amendments to Address Contaminated Sediments in Sensitive Ecological Systems ARC 2016 November 8-9, 2016 Halifax, Canada John A. Bleiler, Upal Ghosh, Charles A. Menzie November 2016 Overview

More information

Capping Materials and Design

Capping Materials and Design EPA/OSRTI Sediment Remedies: Capping Technical Considerations for Evaluation and Implementation Capping Materials and Design Danny Reible Environment and Water Resources The University of Texas at Austin

More information

Appendix N. Remedial Alternatives Evaluation

Appendix N. Remedial Alternatives Evaluation Appendix N Remedial Alternatives Evaluation Appendix N Remedial Alternatives Evaluation Mayflower Pipeline Incident Mayflower, Arkansas 1. Introduction ARCADIS U.S. Inc. (ARCADIS) has prepared this Remedial

More information

Ducks Unlimited M&T Ranch / Llano Seco Intake Project Final Alternatives

Ducks Unlimited M&T Ranch / Llano Seco Intake Project Final Alternatives Ducks Unlimited M&T Ranch / Llano Seco Intake Project Final Alternatives M&T Ranch / Llano Seco Intake Project Final Alternatives Draft Engineering Analysis Technical Memorandum Ducks Unlimited September,

More information

Tremie Concrete. Lecture 8. Tremie concrete. Temporary Structures. Tremie Concrete. Temporary Structures

Tremie Concrete. Lecture 8. Tremie concrete. Temporary Structures. Tremie Concrete. Temporary Structures Tremie Concrete Lecture 8 Tremie concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e.,

More information

BPP Technical Studies

BPP Technical Studies BPP Technical Studies Representative Sample of Brake Pad Wear Debris (BMC/Link Test Labs) Air Deposition Modeling (AER) Air Deposition Monitoring (SFEI) Physical & Chemical Characterization of Wear Debris

More information

EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE

EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE Ravi Sanga 1 ABSTRACT In 2003, the EPA entered into an agreed order with

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

Considerations for Environmental Dredging of Contaminated Sediments. Michael R. Palermo, PhD, PE

Considerations for Environmental Dredging of Contaminated Sediments. Michael R. Palermo, PhD, PE Considerations for Environmental Dredging of Contaminated Sediments Michael R. Palermo, PhD, PE 1 Outline 4 Objectives, Definitions 4 Site/ Sediment Characterization 4 Removal Requirements 4 Equipment

More information

USE OF POLYMERS IN HIGH SPEED DEWATERING OF FINE GRAINED SEDIMENTS TO REPLACE CONFINED DISPOSAL FACILITIES - A CASE STUDY

USE OF POLYMERS IN HIGH SPEED DEWATERING OF FINE GRAINED SEDIMENTS TO REPLACE CONFINED DISPOSAL FACILITIES - A CASE STUDY USE OF POLYMERS IN HIGH SPEED DEWATERING OF FINE GRAINED SEDIMENTS TO REPLACE CONFINED DISPOSAL FACILITIES - A CASE STUDY Karen C. Kabbes, PE, D.WRE. 1 and Michael Hodges 2 ABSTRACT Hydraulically dredging

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

Overview of Dredged Material Testing and Evaluation

Overview of Dredged Material Testing and Evaluation Overview of Dredged Material Testing and Evaluation Jeffery Steevens US Army Corps of Engineers Engineer Research and Development Center 23 July 2012 Guidance Documents for Management of Dredged Material

More information

SUSTAINABLE SOLUTIONS FOR DREDGED MATERIAL MANAGEMENT IN OHIO

SUSTAINABLE SOLUTIONS FOR DREDGED MATERIAL MANAGEMENT IN OHIO SUSTAINABLE SOLUTIONS FOR DREDGED MATERIAL MANAGEMENT IN OHIO Western Dredge Association Midwest Chapter Omaha, Nebraska Friday, March 10, 2017 David Emerman, Ohio EPA/Ohio Lake Erie Commission James White,

More information

Project Alternatives: The Parsons Sill Project History

Project Alternatives: The Parsons Sill Project History Project Alternatives: The Parsons Sill Project History Project Impetus Over the past 150 years, human actions have altered the tidal, freshwater, and sediment processes that are essential to support and

More information

BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION

BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION APPENDIX I BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION South Bay Salt Pond Restoration Project Phase 2 July 2015 Draft Environmental Impact Statement/Report 2185 N. California Blvd., Suite

More information

Village Creek Harbor & Estuary

Village Creek Harbor & Estuary Village Creek Harbor & Estuary A Study on the Feasibility of Restoring Degraded Saltmarsh with Dredged Material Public Presentation September 7 th and 9 th 2017 Village Creek Harbor & Estuary Salt Marsh

More information

Summary: project description: goals, objectives, accomplishments

Summary: project description: goals, objectives, accomplishments Summary: project description: goals, objectives, accomplishments The Lower Fox River Cleanup Project is designed to reduce risk to human health and the environment due to the presence of PCBs in the river

More information

Weldcraft Boatyard Clean-up and Redevelopment Project

Weldcraft Boatyard Clean-up and Redevelopment Project Weldcraft Boatyard Clean-up and Redevelopment Project Habitat Mitigation Mike Stoner Environmental Director Port of Bellingham 1801 Roeder Avenue Bellingham, WA 98227 mikes@portofbellingham.com June 10,

More information

CHAPTER 3 LOGISTICAL CONSIDERATIONS

CHAPTER 3 LOGISTICAL CONSIDERATIONS CHAPTER 3 LOGISTICAL CONSIDERATIONS 3-1. General. With the huge quantities of dredged material created during dredging operations, site utilization, economic transport handling, and storage plans become

More information

New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement

New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement Public Informational Meeting NEPA Scoping 24 January 2017 Planning Division New England District

More information

Indiana Harbor and Canal (IHC) Confined Disposal Facility (CDF) and Navigational Dredging

Indiana Harbor and Canal (IHC) Confined Disposal Facility (CDF) and Navigational Dredging Indiana Harbor and Canal (IHC) Confined Disposal Facility (CDF) and Navigational Dredging Purdue Water Institute 05 November 2013. US Army Corps of Engineers Topics for Today Brief Introduction to USACE

More information

Section 7 Dredging Implementation Plan

Section 7 Dredging Implementation Plan 7.1 Overview Section 3 of this report presented level of service criteria to identify those areas where the existing system does not provide an acceptable level of service. Canals were selected for more

More information

CONSTRUCTION OF THE CAMPBELL SHIPYARD SEDIMENT REMEDIATION PROJECT, SAN DIEGO, CALIFORNIA

CONSTRUCTION OF THE CAMPBELL SHIPYARD SEDIMENT REMEDIATION PROJECT, SAN DIEGO, CALIFORNIA CONSTRUCTION OF THE CAMPBELL SHIPYARD SEDIMENT REMEDIATION PROJECT, SAN DIEGO, CALIFORNIA M. Whelan P.E. 1, T. S. Wang P.E. 2, J. Verduin P.E. 3, E. Berschinski 4, M. Akhavain 5 and W. Melton 6 ABSTRACT

More information

Engineering with Nature In Action: SLR AOC Living Shoreline Design Basis

Engineering with Nature In Action: SLR AOC Living Shoreline Design Basis Engineering with Nature In Action: SLR AOC Living Shoreline Design Basis Joseph P. Kreitinger, PhD US Army Engineer Research and Development Center Ithaca, NY Adam C. Wagner, PE USACE LRE Detroit, MI Dan

More information

REUSE OF DREDGED SEDIMENTS

REUSE OF DREDGED SEDIMENTS REUSE OF DREDGED SEDIMENTS Lake Erie Waterkeeper Conference W.W. Knight Nature Preserve, Perrysburg, Ohio Friday, March 18, 2016 John H. Hull, P.E., BCEE Hull & Associates, Inc. SEDIMENT ENTERING LAKE

More information

BEAST SCREED SYSTEM INSTALLATION INSTRUCTIONS

BEAST SCREED SYSTEM INSTALLATION INSTRUCTIONS BEAST SETUP PROCEDURES P of 5 4 The concrete crew responsible for placement of the concrete should be made aware Beast Screed will be utilized on the project. The placement crew should have input on, or

More information

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description Greenville County Technical Specification for: WQ-06 SAND FILTER 1.0 Sand Filter 1.1 Description Sand Filters remove pollutants through sedimentation and filtration within the sand. The primary components

More information

Annex V Concrete Structures Removal Plan

Annex V Concrete Structures Removal Plan Appendix D Annex V Concrete Structures Removal Plan Figure V1 Lower Granite Sequences of Concrete Removal and Cofferdam Figure V2 Little Goose Sequence of Concrete Removal and Cofferdam Figure V3 Lower

More information

Restore America s Estuaries October 24, 2012

Restore America s Estuaries October 24, 2012 Coordinating Dredged Material Management in the Pacific Coast s Largest Estuary with Construction of the Pacific Coast s Largest Tidal Wetland Restoration Project. Restore America s Estuaries October 24,

More information

Excavation Of Pcb-Contaminated Sediment Adjacent To The Intake Of A 12-Mgd Drinking Water Plant

Excavation Of Pcb-Contaminated Sediment Adjacent To The Intake Of A 12-Mgd Drinking Water Plant Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 11 Article 21 January 2010 Excavation Of Pcb-Contaminated Sediment Adjacent To The Intake Of A 12-Mgd Drinking

More information

LEAF Method Testing of MGP-impacted Sediments in Gowanus Canal

LEAF Method Testing of MGP-impacted Sediments in Gowanus Canal LEAF Method Testing of MGP-impacted Sediments in Gowanus Canal RE3 Conference 2014 Jeff Gentry, P.E. Principal Technologist January 28, 2014 Gowanus Canal Superfund Site 1.8 mile long canal in Brooklyn,

More information

TARGETED DREDGING OF NEAR-SHORE DEBRIS AND SEDIMENT, UPPER TRENTON CHANNEL, DETROIT RIVER: A CASE STUDY

TARGETED DREDGING OF NEAR-SHORE DEBRIS AND SEDIMENT, UPPER TRENTON CHANNEL, DETROIT RIVER: A CASE STUDY TARGETED DREDGING OF NEAR-SHORE DEBRIS AND SEDIMENT, UPPER TRENTON CHANNEL, DETROIT RIVER: A CASE STUDY M.J. Erickson, P.E. 1, R.K. Mohan, P.E. 2, W.J. Dinicola 3, and M.R. Henderson 4 ABSTRACT Under regulatory

More information

1. Overview 2 2. Definitions 2 3. Laboratory Testing Criteria 2. A. Laboratory Qualifications 2. B. Analysis of TSS Samples 2. C.

1. Overview 2 2. Definitions 2 3. Laboratory Testing Criteria 2. A. Laboratory Qualifications 2. B. Analysis of TSS Samples 2. C. New Jersey Department of Environmental Protection Laboratory Protocol to Assess Total Suspended Solids Removal by a Hydrodynamic Sedimentation Manufactured Treatment Device January 25, 2013 Contents 1.

More information

SAN FRANCISCO BAY LONG-TERM MANAGEMENT STRATEGY PROGRAM 12-YEAR REVIEW

SAN FRANCISCO BAY LONG-TERM MANAGEMENT STRATEGY PROGRAM 12-YEAR REVIEW SAN FRANCISCO BAY LONG-TERM MANAGEMENT STRATEGY PROGRAM 12-YEAR REVIEW BACKGROUND INFORMATION FOR MARCH 29, 2012, MEETING Prepared by San Francisco Bay Conservation and Development Commission San Francisco

More information

Successful Sediment Remediation Strategies at Contaminated Sites Across the Commonwealth. Mille Garcia-Serrano

Successful Sediment Remediation Strategies at Contaminated Sites Across the Commonwealth. Mille Garcia-Serrano Successful Sediment Remediation Strategies at Contaminated Sites Across the Commonwealth Mille Garcia-Serrano Deputy Regional Director MassDEP Environmental Business Council New England Energy Environment

More information

Exposure Processes and Assessment

Exposure Processes and Assessment Exposure Processes and Assessment Dr. Paul R. Schroeder Dr. Joe Z. Gailani Paul.R.Schroeder@usace.army.mil Joe.Z.Gailani@usace.army.mil RISK FRAMEWORK RISK ASSESSMENT PARADIGM Exposure Assessment Economic

More information

Compaction and Jet Grouting

Compaction and Jet Grouting Compaction and Jet Grouting Alan Ringen, PE Senior Vice President Breakthroughs in Tunneling Short Course August 16, 2017 Grouting Principles Geotechnical Grouting: The injection of pumpable fluid materials

More information

PUBLIC NOTICE PROJECT: Paradise Cay Yacht Harbor Maintenance Dredging

PUBLIC NOTICE PROJECT: Paradise Cay Yacht Harbor Maintenance Dredging SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: Paradise Cay Yacht Harbor Maintenance Dredging Regulatory Division 1455 Market Street, 16 th Floor San Francisco, CA 94103-1398 PUBLIC NOTICE NUMBER: 2015-00034N

More information

NUMERICAL MODELING IN THE WATER ENVIRONMENT

NUMERICAL MODELING IN THE WATER ENVIRONMENT NUMERICAL MODELING IN THE WATER ENVIRONMENT Capabilities and Experience Noble Consultants, Inc. NUMERICAL MODELING SERVICES IN THE WATER ENVIRONMENT NCI utilizes the most advanced numerical models in the

More information

Large Scale Sediment Management

Large Scale Sediment Management Large Scale Sediment Management Content Introduction The Netherlands: 1. CDF IJsseloog 2. Regional Processing: DWR Amsterdam 3. CDF Slufter Northern America: 1. Miami River Project 2. Fox River Cleanup

More information

Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging

Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging James J. Serpico (&) Geotechnical Services, Maser Consulting P.A.,

More information

Morris Cove as a Confined Aquatic

Morris Cove as a Confined Aquatic Morris Cove as a Confined Aquatic Disposal (CAD) Cell Bridgeport Maintenance Dredging Project Public Meeting 25 October 2010 Thomas J. Fredette, PhD USACE Army Engineer Research Lab Vicksburg, MS Sediment

More information

Subsurface Seawater Intake Gallery

Subsurface Seawater Intake Gallery Long Beach Water Department Subsurface Seawater Intake Gallery 7 Years and Going Strong Sunny Wang, Brown and Caldwell Tai Tseng, Long Beach Water Department Yan Zhang, Long Beach Water Department Contents

More information

The planned conversion of part of the Port of

The planned conversion of part of the Port of South Port of Copenhagen: Clean-up of Contaminated Sediments NIELS LYKKEBERG & HELGE GRAVESEN, Carl Bro a/s, Glostrup, Denmark KAJ HOLM JØRGENSEN, Port of Copenhagen, Denmark A BSTRACT The planned conversion

More information

Considering Climate Change Impacts in Selection and Design of Sediment Remedies

Considering Climate Change Impacts in Selection and Design of Sediment Remedies Considering Climate Change Impacts in Selection and Design of Sediment Remedies June 8, 2015 Environmental Law Education Center Conference Seattle, Washington Barry Kellems, P.E. U.S. Climate Change Impacts

More information