1 2017 Annual Performance Report Thornbury Wastewater Treatment Plant and Associated Collection System Prepared by: Wastewater Operations Staff Reporting Period: January 1 December 31, P age
2 Executive Summary This report has been prepared as required by Amended Environmental Compliance Approval No ZGLNA, Section 10 issued to the Thornbury Wastewater Treatment Plant. Section 10 (6) requires the Owner to prepare and submit a performance report to the Ministry of the Environment and Climate Change (MOECC) Water Supervisor on an annual basis, within ninety (90) days following the end of the period being reported upon. All the requirements listed in Section 10 (6) have been met and will be further explored throughout the report. The Town continues to successfully operate the Thornbury Wastewater Treatment System in accordance with regulatory requirements. Facility Information The Thornbury Wastewater Treatment Plant is a modification of the extended aeration treatment process. The original plant was a lagoon system constructed in In 1993 the plant was expanded to a mechanical facility utilizing the Sutton Concept for sludge disposal. The plant design included provision for phosphorus removal facilities and U.V. disinfection with continued use of existing outfall to the Beaver River on a continuous basis. The Sutton process was developed in the early 1980 s following a research project which involved installing a package treatment facility in line with active lagoons. The system provides nitrification and denitrification for the control of ammonia and hydrogen sulphide in waste stabilization lagoon effluents. A high nitrified effluent is obtained from an extended aeration activated sludge process which provides a high sludge and high solids level in the aeration cells (low F/Mv ratio). The high concentration of nitrates in the secondary effluent, prevents the reduction of sulphates to hydrogen sulphide in the lagoon. The Thornbury Wastewater Treatment Plant is currently rated at 3,580 m³/d operating under Amended Environmental Compliance Approval # ZGLNA. 1.0 Monitoring and Compliance Town Staff ensure that at all times the sewage works and related equipment and appurtenances which are installed or used to achieve compliance are properly operated and maintained. 2 P age
3 2.0 Interpretation of Monitoring Data and Analytical Data A comprehensive interpretation of all monitoring data and analytical data collected during the reporting period, in comparison to the effluent quality and quantity criteria, is outlined below: Capacity Assessment Table No. 1 Year Average Day Flow (m³/d) 2,773 2,335 1,835 2,055 2,540 Average Design Capacity 3,580 3,580 3,580 3,580 3,580 (m³/d) % of capacity (based on 5 64% 65% 51% 57% 71% year rolling average daily flows) Peak Day Flow (m³/d) 7,617 10,580 4,546 7,327 7,448 Peak Design Capacity 7,196 7,196 7,196 7,196 7,196 Raw Sewage Total Flow (m³) 1,010, , , , ,345 Capacity rating is based on Annual Flow Data. 3 P age
4 Chart No. 1: Thornbury WWTP 2017 Monthly Flow Data Thornbury WWTP 2017 Monthly Flow Data (m³/d) Flow m³/d Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Average Daily Flow Average Daily Design Capacity Peak Daily Flow Peak Design Capacity The high flow events in March and April were attributed to the heavy rain fall event experienced. Chart No. 2: Thornbury WWTP Historical Average and Peak Day Flow Flow m³/d Thornbury WWTP Historical Average and Annual Peak Day Flow Annual Average Day Flow Average Daily Design Capacity Annual Peak Day Flow Peak Design Capacity The Annual Peak Day Flow is calculated using the average of the monthly Peak Day Flow events. 4 P age
5 2017 Raw Sewage Loading Objectives (kg/d) Table No. 2 Influent Parameter Design Annual Average Loading % of Design Was Designed Exceeded CBOD % No Total Suspended % No Solids Total % No Phosphorus Total Kjeldahl Nitrogen % No 2017 Effluent Objectives Amended Compliance Approval Number ZGLNA establishes the following effluent limits: Table No. 3 Effluent Parameter Concentration Concentration Was Objective Met? Objective (mg/l) Achieved (mg/l) CBOD Yes Total Suspended Yes Solids Total Phosphorus Yes Ammonia Freezing Yes Ammonia Non Yes Freezing E.Coli (Geometric Mean) Yes ph was maintained at 8.0 which is compliant with the range of 6.5 to 9.0 inclusive, at all times Plant Performance Table No. 4 Effluent Parameter Avg. Daily Effluent Flow 2,967 Annual Average Loading (kg/d) Design Objective (kg/d) Was Design Exceeded? CBOD No Total Suspended Solids No Total Phosphorus No Ammonia Freezing No Ammonia Non-Freezing No 1 Freezing Period November 01 March 31 each year 2 Non-Freezing Period April 01 October 31 each year 5 P age
6 Chart No. 3 Thornbury WWTP Monthly Average Effluent Waste Loadings Thornbury WWTP Monthly Average Effluent Waste Loadings kg/d BOD Design kg/d Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec BOD Objective Chart No. 4 Thornbury Effluent Waste Loadings Suspended Solids Effluent Waste Loadings kg/d Suspended Solids Design kg/d Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec SS Objective P age
7 Table No. 5 Parameter Maximum Month Average Effluent Concentration (mg/l) Achieved Parameter Parameter Limit Non- Limit Freezing Freezing Maximum Month Average Effluent Loading (kg/d) Achieved Parameter Parameter Limit Non- Limit Freezing Freezing Was Effluent Parameter Limit Met? CBOD Yes Suspended Solids Total Phosphorus Ammonia Freezing Ammonia Non- Freezing Yes Yes Yes Yes Effluent Quality Control Measures Effluent quality assurance is controlled by monthly effluent concentrations and waste loading calculations which are submitted to the Owen Sound Office of the Ministry of the Environment and Climate Change (MOECC). As indicated by the effluent concentration and waste loading chart, the Thornbury Wastewater Treatment Plant continues to experience a high degree of removal efficiency, thus this facility was operated within its Certificate of Approval design objective. Table No. 6 Effluent Parameter % Removal Efficiency % Removal Comment (Annual Average) Criteria CBOD 95% Not Applicable High Efficiency Achieved Suspended Solids 95% Not Applicable High Efficiency Achieved Total Phosphorus 82% Not Applicable High Efficiency Achieved Total Ammonia 96% Not Applicable High Efficiency Achieved 4.0 Sampling The influent and effluent samples are taken with an automated composite sampler. The composite samplers are located at the plant head-works and effluent channel after U.V. Bi-weekly, effluent and influent samples are analyzed for CBOD, Suspended Solids, Total Phosphorus and Total Ammonia. SGS Lakefield Laboratory is used for chemical analysis. 7 P age
8 For quality assurance purposes, the Operator will split-sample. This means a sample is collected and split into two portions. One portion is sent to the lab for analyses while one portion is analyzed in-house. The results are compared and the precision of the in-house analysis is evaluated. While the Certificate of Approval requires monthly sampling for raw sewage parameters, operations have increased sampling to bi-weekly for increased risk assessment. 5.0 Maintenance Summary Thornbury Wastewater Treatment Plant New roof and HVAC unit One (1) new Compressor Chart Recorders replaced with a PLC for flow Lethality testing was performed quarterly Hydrogen Sulfide Monitor installed in Inlet Thornbury Wastewater Collection System One (1) pump at Lakeshore rebuilt Eight (8) pumps at four (4) Sewage Lift Station annual service and/or rebuilt 1,600 meters of Collection System flushed and videoed 125 Manholes inspected Pressure transmitter installed in Lakeshore Sewage Pump Station for smoother pump operation New door was installed on Shore Acres Sewage Lift Station Control Panel Sanitary sewer modelling started 6.0 Operating Problems and Corrective Actions This facility was not inspected by MOECC Officials in In September 2017 while work was being completed at the Craigleith Sewage Lift Station, leachate was introduced into the Thornbury WWTP. This process was stopped when the MLSS in the aeration tanks was depleted. The Thornbury WWTP was reseeded from the Craigleith WWTP and the hauling of leachate to the Craigleith SLS was resumed. 7.0 Proposed Alterations, Extensions, and Replacements for 2017 No major modifications and improvements are required during the next reporting period which may require approval under the Ontario Water Resources Act. 8.0 Volume of Sludge generated in 2017 / Anticipated Volumes in 2018 Sludge disposal incorporates the Sutton concept whereas a high sludge age and solids level combined with increased concentration of nitrates in the secondary effluent, prevents the reduction of sulphates to hydrogen sulphide in the lagoon. There were no biosolids removed in The mapping of biosolids accumulation is planned for P age
9 9.0 Sludge Handling Methods and Disposal Areas to be used in 2018 The Sutton process digested sludge will be monitored to determine if the sludge requires removal Summary of Complaints Received in 2017 A record of complaints is maintained. There were recorded odour complaints received for the Thornbury Wastewater Treatment Plant and Collection System. The odour complaints were investigated and the leachate generator was informed that odours must be controlled Summary of all By-pass, Spill or Abnormal Discharge Event There were no by-pass or spill events in Evaluation of Calibration and Maintenance Conducted on Monitoring Equipment The Town is required to install and maintain continuous flow measuring devices to measure the flow rate and quantity of septage added to the Works for co-treatment. The accuracy must fall within plus or minus fifteen percent (± 15%) of the actual flow rate for the entire design range of flow measuring devices. Calibration of the monitoring equipment was completed in 2017 and is attached for reference as Appendix A. All calibration results received met the accuracy requirement Notice of Modifications submitted to the MOECC Water Supervisor as a result of Schedule B, Section 1 There was one Notice of Modification to Sewage Works completed for the replacement of the existing ultraviolet irradiation unit with a Trojan 3000 Plus system including full redundancy. The new unit has been designed for the current design capacity of the treatment plant which is 7,196 m³/day. Two (2) banks will be supplied in one (1) channel with automatic level control. Each bank will contain three (3) modules. Each module will contain eight (8) Lamps. A total of twenty-four (24) lamps are provided per bank. One bank is required to treat the design flow, the other is provided for redundancy. 9 P age
10
11
12
13
14
15
This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works
This document can be made available in other accessible formats as soon as practicable and upon request Staff Report Infrastructure & Public Works Report To: Committee of the Whole Meeting Date: March
More informationRE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System
14 th, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Wardsville Wastewater Treatment Plant and Collection System The Ontario Clean Water Agency
More informationStonecrest Estates Sewage Treatment Plant 2017 Annual Report
2017 Stonecrest Estates Sewage Treatment Plant 2017 Annual Report The Corporation of the City of Quinte West 0 Contents Table of Figures... 1 Executive Summary... 3 Summary and Interpretation of Monitoring
More informationIroquois Wastewater Treatment Plant 2016 Annual Performance Report
Iroquois Wastewater Treatment Plant 2016 Annual Performance Report The Iroquois WWTP is a Class II wastewater treatment facility owned and operated by the Municipality of South Dundas. Raw sewage is conveyed
More informationMUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT
MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-871-88-949 Prepared by: Table of Contents Section 1: Overview...
More informationBRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT
BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT ENVIRONMENTAL COMPLIANCE APPROVAL: 6801-7VKNAQ ENVIRONMENTAL COMPLIANCE APPROVAL: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater
More informationFeel free to contact me should you require any additional information regarding the report. I can be reached at
February 28, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Glencoe Wastewater Treatment Plant The Ontario Clean Water Agency is the Operating
More informationEGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT
EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT Township of Bonnechere Valley Water and Sewage Department January 2014 Table of Contents Executive Summary... 3 Introduction... 4 Report Availability...
More informationBRACEBRIDGE WASTEWATER TREATMENT
2014 BRACEBRIDGE WASTEWATER TREATMENT ENVIRONMENTAL COMPLIANCE APPROVAL: #6801-7VKNAQ INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District Municipality of Muskoka.
More informationMUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT
MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-442-9-938 Prepared by: Table of Contents Section 1: Overview...
More informationBracebridge Wastewater Treatment 2017 Summary Report
Bracebridge Wastewater Treatment 2017 Summary Report Environmental Compliance Approval: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District
More informationCITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT
CITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT FEBRUARY 2014 Adelaide Wastewater Treatment Plant 2013
More informationFebruary 16, Ministry of the Environment Southwestern Region 733 Exeter Road London, Ontario N6E 1L3. Attn.: Mr. Tom Clubb
February 16, 2018 Ministry of the Environment Southwestern Region 733 Exeter Road London, Ontario N6E 1L3 Attn.: Mr. Tom Clubb Re: Listowel 2017 Annual Report Please find enclosed the 2017 Annual Report
More information2017 Annual Performance Report
Newcastle Water Pollution Control Plant The Regional Municipality of Durham Newcastle Water Pollution Control Plant Environmental Compliance Approval (ECA): 3-2189-87-946 Dated July 26, 1994 Amendments:
More informationThe Corporation of the City of St. Thomas. Water Pollution Control Plant Annual Performance Report. Under Ontario Ministry of the Environment
The Corporation of the City of St. Thomas Water Pollution Control Plant 2008 Annual Performance Report Under Ontario Ministry of the Environment Certificate of Approval 5276-5M9JW7 February 2009 John Mansell,
More informationMACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT
MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT CERTIFICATE OF APPROVAL: # 7599-7PCKPU INTRODUCTION The Conger Marsh Water Pollution Control Plant (WPCP), which services the community of MacTier, is owned
More information2017 Performance Report for Bobcaygeon Waste Water Treatment Facility
2017 Performance Report for Bobcaygeon Waste Water Treatment Facility Amended Environmental Certificate of Approval (ECA) #3028-AEUKDQ Section 11(4) requires the Performance Reports to contain the following:
More informationBruce Mines Lagoon Annual Operating Report
Bruce Mines Lagoon Annual Operating Report January 1, 2010 to December 31, 2010 Prepared by Ontario Clean Water Agency March 04, 2011 Ministry of the Environment 289 Bay Street, 3 rd Floor Sault Ste. Marie,
More information2017 ANNUAL WASTEWATER TREATMENT SYSTEM SUMMARY REPORT. Wastewater Treatment Plant:
2017 ANNUAL WASTEWATER TREATMENT SYSTEM SUMMARY REPORT Drumbo Wastewater Treatment Plant 1. General Information Oxford County prepares individual annual reports summarizing each wastewater treatment plant
More informationPORT SEVERN WASTEWATER TREATMENT 2016 SUMMARY REPORT
PORT SEVERN WASTEWATER TREATMENT 2016 SUMMARY REPORT ENVIRONMENTAL COMPLIANCE APPROVAL: #3-0429-96-006 INTRODUCTION The Lone Pine Road Water Pollution Control Plant in Port Severn was a design / build
More informationYours very truly, Municipality of West Perth. Environmental Services
January 30, 2018 Municipality of West Perth 169 St. David Street Mitchell, Ontario N0K 1N0 ATTENTION: Mr. Jeff Brick CAO REFERENCE: Municipality of West Perth Annual Wastewater Report 2017 Please find
More informationCollingwood Wastewater Treatment Plant Annual Compliance Report
Collingwood Wastewater Treatment Plant 2017 Annual Compliance Report Table of Contents Definitions... 3 Wastewater System General Information... 4 Executive Summary... 5 Section 1.0 The Facility... 6 Section
More informationCITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT
CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT FEBRUARY 2014 SUMMARY This annual report is in response
More informationCITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2012 ANNUAL REPORT
CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2012 ANNUAL REPORT FEBRUARY 2013 SUMMARY This annual report is in response
More informationRE: Year-End Report Woodstock Wastewater Treatment Plant (WWTP), 2012
Public Works P. O. Box 1614, 21 Reeve St.,, Woodstock Ontario N4S 7Y3 Phone: 519-539-9800 Fax: 519-421-4711 Website: www.oxfordcounty.ca March 15, 2013 District Manager Ministry of the Environment London
More informationMISSISSIPPI MILLS WASTEWATER TREATMENT FACILITY 2012 ANNUAL REPORT. Prepared by Deborah Turner Process & Compliance Technician Ottawa Valley Hub
MISSISSIPPI MILLS WASTEWATER TREATMENT FACILITY 2012 ANNUAL REPORT Prepared by Deborah Turner Process & Compliance Technician Ottawa Valley Hub Mississippi Mills Wastewater Treatment Plant Annual Report
More informationWater Resources Director: Chris Graybeal
Water Resources Director: Chris Graybeal Our Mission To promote and protect the environment, preserve natural resources, and ensure the health and safety of our customers. Granite Falls Wastewater Treatment
More informationCase Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race
Case Study BiOWiSH Aqua has Positive Long-Term Effects After Two Years, Sustains Improved Effluent Quality in South Korean Slaughterhouse Executive Summary BiOWiSH Aqua was implemented in a South Korean
More informationRenfrew Wastewater Treatment System
Renfrew Wastewater Treatment System 2016 Annual Report January 1, 2016 December 31, 2016 Prepared By This report has been prepared to meet the requirements set out in the facility Environmental Compliance
More information2014 Annual Wastewater Report
214 Annual Wastewater Report Mar 6, 215 v.1. 214 Annual Wastewater Report Table of Contents REPORTS PAGE Wastewater Capital Spending Overview 1 Wastewater North - 214 1 Wastewater South 214 2 Lift Stations
More informationDundalk Wastewater Treatment Plant
Township of Southgate Dundalk Wastewater Treatment Plant 2014 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2014 Annual Report Table of Contents Wastewater Treatment Plant
More informationCITY OF BROCKVILLE WATER POLLUTION CONTROL CENTRE
CITY OF BROCKVILLE WATER POLLUTION CONTROL CENTRE 2014 ANNUAL SUMMARY REPORT FOR COUNCIL Peter Raabe, P. Eng., Director of Environmental Services Ed Malcomnson, Supervisor Wastewater Systems Division DATE:
More informationResult data last updated. 10 July Map of Norske Skog Albury Paper Mills Environmental Protection Licence compliance monitoring sites
A full copy of our license can be found on the EPA website under the following address http://www.epa.nsw.gov.au/prpoeoapp/viewpoeolicence.aspx?docid=32757&sysuid=1&licid=1272 Result data last updated
More information2014 Annual Compliance Report Operation & Maintenance Of Tara Wastewater System
2014 Annual Compliance Report Operation & Maintenance Of Tara Wastewater System March 2015 Prepared for: Municipality of Arran-Elderslie 1925 Bruce Road 10 Box 70 Chesley, ON N0G 1L0 Prepared by: GSS Engineering
More informationDundalk Wastewater Treatment Plant
Township of Southgate Dundalk Wastewater Treatment Plant 2016 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2016 Annual Report Table of Contents Wastewater Treatment Plant
More information2017 Annual Compliance Report. Operation & Maintenance Of Tara Wastewater System
2017 Annual Compliance Report Operation & Maintenance Of Tara Wastewater System March 2018 13-028 Prepared for: Municipality of Arran-Elderslie 1925 Bruce Road 10 Box 70 Chesley, ON N0G 1L0 Prepared by:
More informationDirector of Operations and Compliance Report. October 17, Biochemical Oxygen Demand, 5-Day (Avg lbs/day)
Director of Operations and Compliance Report October 17, 218 Plant Loading, CSO Report, and Director s Notes Plant Loading Biochemical Oxygen Demand, 5-Day (Avg. 16475 lbs/day) Total Suspended Solids (Avg.
More informationCannington Water Pollution Control Plant Annual Performance Report Annual Performance Report 2015
Cannington Water Pollution Control Plant Cannington Water Pollution Control Plant Cannington Water Pollution Control Plant The Regional Municipality of Durham Cannington Water Pollution Control Plant 2015
More informationAssuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:
Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.
More information2017 Annual Compliance Report. Operation & Maintenance of Paisley Wastewater System. March
2017 Annual Compliance Report Operation & Maintenance of Paisley Wastewater System March 2018 13-028 Prepared for: Municipality of Arran-Elderslie 1925 Bruce Road 10 Box 70 Chesley, ON N0G 1L0 Prepared
More informationUV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP
UV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP Acknowledgements 2 Northern Rockies Regional Municipality Northern Rockies Engineering
More informationIntroduction. Background. Case Study: The Role of Optimization in Plant Re-rating Prepared by D.T. Chapman, CPO Inc.
Prepared by D.T. Chapman, CPO Inc. Introduction The Grand River Conservation Authority (GRCA) initiated a program in 2010 to optimize wastewater treatment plants (WWTPs) in the watershed to improve water
More informationCollingwood Wastewater Treatment Plant 2016 Annual Compliance Report
Collingwood Wastewater Treatment Plant 2016 Annual Compliance Report Table of Contents Definitions...2 Wastewater System General Information...3 Executive Summary...4 Section 1.0 The Facility...5 Section
More informationTales from the Field: Troubleshooting Denitrification
Tales from the Field: Troubleshooting Denitrification OWEA Plant Operations Conference North Pointe Conference Center May 21, 2014 Jon van Dommelen Ohio EPA Compliance Assistance Unit Denitrification Denitrification
More informationEfficient Design Configurations for Biological Nutrient Removal
Efficient Design Configurations for Biological Nutrient Removal A Case Study: Upper Blackstone Water Pollution Abatement District Jane E. Madden, P.E., BCEE August 30, 2017 UBWPAD Wastewater Treatment
More informationMississippi Mills Wastewater Treatment Plant Annual Report 2013
Mississippi Mills Wastewater Treatment Plant Annual Report Please find below the Annual Performance Report and other supporting documents for the Mississippi Mills Wastewater Treatment Plant. This report
More informationJEDDAH INDUSTRIAL CITY
JEDDAH INDUSTRIAL CITY WASTEWATER TREATMENT PLANT A Presentation by : Engr. Mowafaq Al-Sugeir Managing Director ICDOC SAWEA 2007 WORKSHOP, AL-KHOBER 4 December 2007 Built & Being Operated by : on Build-Operate-Transfer
More informationCommunal Sewage Inspection Report
Ministry of the Environment Ministère de l Environnement Communal Sewage Inspection Report Client: Inspection Site Address: City of Ottawa, Business/Facility Name: Robert O. Pickard Environmental Centre
More informationDealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017
Dealing with Unexpected Wastewater Treatment Plant Disruptions February 16, 2017 Location Map WPCP History Original WPCP constructed on this site in 1928 consisting of primary treatment and chlorination;
More informationCollingwood Wastewater Treatment Plant. Annual Compliance Report Collingwood Public Utilities
Collingwood Wastewater Treatment Plant Annual Compliance Report -2013- Collingwood Public Utilities Table of Contents Executive Summary. 3 General Information. 4 Section 1.0 The Facility.... 5 Section
More informationWIARTON WASTEWATER TREATMENT PLANT
WIARTON WASTEWATER TREATMENT PLANT ANNUAL PERFORMANCE REPORT For the period of JANUARY 1, 2016 TO DECEMBER 31, 2016 Prepared by the Ontario Clean Water Agency For The Corporation of the Town of South Bruce
More information2017 Annual Performance Report
Duffin Creek Water Pollution Control Plant Page 1 of 17 Duffin Creek Water Pollution Control Plant Environmental Compliance Approval (ECA): 5531-9FJJT5 Dated 3, 2014 Environmental Compliance Approval (Air):
More informationTABLE OF CONTENTS 1.0 INTRODUCTION 1. Classification and Control Document Information. 2.0 CONTACT INFORMATION 2
TABLE OF CONTENTS Page 1.0 INTRODUCTION 1 Classification and Control Document Information. 2.0 CONTACT INFORMATION 2 Owner/Operator contact information 3.0 WASTEWATER TREATMENT PLANT & TREATMENT PROCESS
More informationWastewater Facility Plan City of Marshall, Minnesota
Wastewater Facility Plan City of Marshall, Minnesota Public Hearing March 14, 2017 Bolton & Menk, Inc. Project No. T22.108560 Glossary of General Terms & Abbreviations MPCA - Minnesota Pollution Control
More informationUpgrading Lagoons to Remove Ammonia, Nitrogen, and Phosphorus *nutrient removal in cold-climate lagoon systems
Upgrading Lagoons to Remove Ammonia, Nitrogen, and Phosphorus *nutrient removal in cold-climate lagoon systems October 7, 2015 3:15 4:00pm Session M Room Tamboti / Aloes-wood Treatment Processes Aerated
More informationEPA Waste Water Discharge Licence Application
Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update
More informationDundalk Wastewater Treatment Plant
Township of Southgate Dundalk Wastewater Treatment Plant 2017 Annual Report Staff Report PW2018-010 - Dundalk Wastewater Treatment Plant 2017 Annual Report Moved by Councillor Pallister, Seconded by Councillor
More informationAPPENDIX C EXISTING CONDITIONS
Environmental Study Report APPENDICES APPENDIX C EXISTING CONDITIONS R331670101001.docx C XCG File No.: 3-3167-01-01 June 6, 2013 TECHNICAL MEMORANDUM SUMMARY OF EXISTING CONDITIONS ARTHUR WWTP Prepared
More informationTABLE OF CONTENTS Page No. or Following HERITAGE SPRINGS WASTEWATER TREATMENT PLANT REVIEW Background... 1 Physical Condition... 2 Operating Condition
TABLE OF CONTENTS Page No. or Following HERITAGE SPRINGS WASTEWATER TREATMENT PLANT REVIEW Background... 1 Physical Condition... 2 Operating Condition... 2 Permit Review... 3 Unit Process Sizing... 4 DMR
More informationAilsa Craig Wastewater Treatment Plant Operations Report 2017 THIRD QUARTER
Ailsa Craig Wastewater Treatment Plant Operations Report 2017 THIRD QUARTER Submitted by: Ontario Clean Water Agency Date: July 1 September 30, 2017 Ailsa Craig Wastewater Treatment Plant and Collection
More informationDESIGNING LAGOON-BASED WWTP FOR <1 MG/ L AMMONIA (AND TN) IN <34 F WATER. Nick Janous Regional Manager
DESIGNING LAGOON-BASED WWTP FOR
More informationKelvin Grove Wastewater Treatment Plant 2017 Annual Report
Kelvin Grove Wastewater Treatment Plant 2017 Annual Report Naizam Jaffer Public Works Manager CONTENTS INTRODUCTION... 2 TREATMENT... 2 KELVIN GROVE WWTP OPERATING PERMIT... 3 WATER QUALITY... 3 MAINTENANCE...
More informationDesign, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund
Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund Rip Copithorn, Jeff Sturdevant, Vince Maillard GHD Clients People
More informationThe enclosed report documents findings of the inspection that was performed at the Carleton Place sewage works on March 22, 2017.
Ministry of the Environment and Climate Change Safe Drinking Water Branch Ottawa District Office 2430 Don Reid Drive Ottawa ON K1H 1E1 Ministère de l Environnement et de l Action en matière de changement
More informationCHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS
CHAPTER 4 WASTEWATER CHARACTERISTICS Wastewater collection, treatment, and disposal facilities are designed to handle specific hydraulic and pollutant loads for 20 or more years after they are constructed.
More informationThis report documents the performance of the sewage works as specified in the Amended Environmental Compliance Approval QJKSD.
Executive Summary The Guelph Wastewater Treatment Plant (WWTP) Operating within the Wastewater Services Department provides treatment of domestic, commercial, institutional and industrial wastewater collected
More informationCold Weather Ammonia Removal
MWEA Annual Conference June 21, 2016 Cold Weather Ammonia Removal Mark Prein Welcome to Charlevoix the Beautiful Project Need NPDES Permit Project Need NPDES Permit Project Need MDEQ Compliance Schedule
More information2011 SEWAGE TREATMENT PLANT ANNUAL REPORT
ENVIRONMENTAL DIAGNOSTICS INC. 2011 SEWAGE TREATMENT PLANT ANNUAL REPORT Prepared for: KICKING HORSE MOUNTAIN SANITARY SEWER SERVICES LTD. 1505-17 Avenue SE Calgary, Alberta T2T 0E2 Prepared by: ENVIRONMENTAL
More informationAgglomeration: Cork City Annual Environmental Report 2010
Comhairle Cathrach Chorcaí CORK CITY COUNCIL Agglomeration: Cork City Annual Environmental Report 2010 Licence Register Number: D0033-01 Licensees: Cork City Council and Cork County Council 12/6/2011 Contents
More information75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT
75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT Basis of Design Memorandum Design Memo No.: DM-1 Date: August 26, 24 Project/Task: 24487.41 Subject: Prepared by: Reviewed by: Design Flows and
More informationUPGRADING WEST WODONGA BNR WASTEWATER TREATMENT PLANT. Peter Tolsher. Peter Tolsher, Supervisor Operator. North East Region Water Authority
UPGRADING WEST WODONGA BNR WASTEWATER TREATMENT PLANT Paper Presented by: Peter Tolsher Author: Peter Tolsher, Supervisor Operator North East Region Water Authority 62 nd Annual Water Industry Engineers
More informationEmerging Issues in the Water/Wastewater Industry. Austin s Full-Scale Step-BNR Demonstration
Summer Seminar Emerging Issues in the Water/Wastewater Industry Austin s Full-Scale Step-BNR Demonstration Rajendra P. Bhattarai, P.E., DEE Austin Water Utility, City of Austin 625 East 10 th Street, Suite
More informationAltoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation
Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim
More informationCommunal Sewage Inspection Report
Ministry of the Environment Ministère de l Environnement Communal Sewage Inspection Report Client: Inspection Site Address: City of Ottawa, Business/Facility Name: Robert O. Pickard Environmental Centre
More informationDawson City Wastewater
Ken Johnson Planner and Engineer CRYOFRONT COOL IDEAS for management - technology - media Oxygen Concentration Dawson City Wastewater What is bad about sewage? Environment Oxygen depletion Eutrification
More informationFACT SHEET And NPDES WASTEWATER DISCHARGE PERMIT EVALUATION
FACT SHEET And NPDES WASTEWATER DISCHARGE PERMIT EVALUATION Department of Environmental Quality Northwest Region - Portland Office 2020 SW 4th Ave., Suite 400, Portland, OR 97201 Telephone: (0) 229-2 PERMITTEE:
More informationThe Town of Petrolia Waste Management of Canada ENVIRONMENTAL STUDY REPORT EXECUTIVE SUMMARY
The Town of Petrolia Waste Management of Canada CLASS ENVIRONMENTAL ASSESSMENT FOR WASTEWATER TREATMENT AND LANDFILL LEACHATE MANAGEMENT ENVIRONMENTAL STUDY REPORT EXECUTIVE SUMMARY 7880 Keele Street,
More informationPlanning for the Future Battle Creek s Approach to Upgrading its Secondary Treatment Processes
Planning for the Future Battle Creek s Approach to Upgrading its Secondary Treatment Processes Michigan Water Environment Association Annual Conference June 21, 2016 Richard Beardslee, City of Battle Creek
More informationSoggy in Snohomish - Biofilm Media Improves Wet-Weather Lagoon Nitrification
Soggy in Snohomish - Biofilm Media Improves Wet-Weather Lagoon Nitrification Chuck McCall 1*, Erin Gallimore 1, Tom Giese 2, Steve Schuller 3, Karen Allen 3, Duane Leach 3 1 Entex Technologies Inc., Chapel
More informationThis report documents the performance of the sewage works as specified in the Amended Environmental Compliance Approval AQP3C.
Executive Summary The Guelph Wastewater Treatment Plant (WWTP) Operating within the Wastewater Services Department provides treatment of domestic, commercial, institutional and industrial wastewater collected
More informationIroquois Wastewater Treatment Plant 2017 Annual Performance Report
Iroquois Wastewater Treatment Plant 2017 Annual Performance Report The Iroquois WWTP is a Class II wastewater treatment facility owned and operated by the Municipality of South Dundas. Raw sewage is conveyed
More informationGroundwater Discharge Permit Application ~ Part A Business Information
Groundwater Discharge Permit Application ~ Part A Business Information INSTRUCTIONS: Complete application in its entirety, incomplete applications will not be processed. A copy of this application will
More information. ARUSHA URBAN WATER SUPPLY AND SANITATION AUTHORITY (AUWSA)
. ARUSHA URBAN WATER SUPPLY AND SANITATION AUTHORITY (AUWSA) ENVIRONMENT STATISTICS IN SUPPORT OF THE IMPLEMENTATION OF THE FRAMEWORK FOR THE DEVELOPMENT OF ENVIRONMMENT (FDES 2013) PRESENTED BY MKAMA
More informationPerformance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility
Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Richard W. Gullick, Ph.D. Director of Operations Timothy Castillo Wastewater Manager Presented to the Albemarle County
More informationCorporation of the Town of Carleton Place Resiliency Plan Wastewater Treatment Plant
JLR No.: 27871 Revision: 0 April 16, 2018 Corporation of the Town of Carleton Place Resiliency Plan Wastewater Treatment Plant Final Version Value through service and commitment Corporation of the Town
More informationUPDATED CAPACITY ANALYSIS REPORT FOR. Hontoon Island State Park. Wastewater Treatment Plant
UPDATED CAPACITY ANALYSIS REPORT FOR Hontoon Island State Park Wastewater Treatment Plant Volusia County, Florida Facility ID: FLA011276 Permit No.: FLA011276 Expires: 2/28/2015 Prepared For: FDEP Division
More informationBLACK & VEATCH CORPORATION NISP EIS SUPPORT. Carl Brouwer, Northern Colorado Water Conservancy District
NISP EIS SUPPORT To: Carl Brouwer, Northern Colorado Water Conservancy District From: Mark Maxwell, Black & Veatch Corporation Reviewed by: Klint Reedy, Black & Veatch Corporation Subject: Wastewater Treatment
More informationSECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION
SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION Analytical Environmental Services 2-1 Jamul Indian Village Wastewater Treatment Plant Analytical Environmental Services 2-2 Jamul
More informationFinch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities
Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities This report is a summary of water quality information for Finch s Drinking Water System, published in accordance
More informationOperational Certificate: PE # 11652
Regional District of Central Okanagan Westside Regional Wastewater Treatment Plant 2010 Operational Certificate: PE # 11652 Table of Contents Table of Contents... 1 List of Tables and Figures... 2 List
More informationADAMSTOWN BOROUGH SEWAGE TREATMENT PLANT LANCASTER COUNTY, PENNSYLVANIA
ADAMSTOWN BOROUGH SEWAGE TREATMENT PLANT LANCASTER COUNTY, PENNSYLVANIA NPDES# PA0021865 WASTEWATER TREATMENT EVALUATION Prepared By: Marc Neville Water Program Specialist Department of Environmental Protection
More informationClean Water 2020 Program
Clean Water 2020 Program WWTP OPERATIONS PROGRAM Updated December 2015 Table of Contents WWTP Operations Program 2015 List of Tables... 2 Program Summary and Intent... 3 Operations Plan... 3 Process Control
More informationDetermination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters
PROCEDURE F-5-1 (formerly referenced by 08-01) Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters PROCEDURE F-5-1 DETERMINATION OF TREATMENT
More informationall in accordance with the supporting documents set out in Schedule A attached to this Approval.
Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Sunni-Greenacres Limited 499 Seacliff Drive Leamington,
More informationThe operator stated that the rollers in one of the drum filters was recently replaced.
vember 30, 2017 Hon. Carolyn Price, Supervisor Town of Windsor 124 Main Street Windsor, NY 13865 Re: West Windsor Sewer District Dear Supervisor Price: On vember 17, 2017, Department staff inspected the
More informationCity of Pocatello Water Pollution Control. Collections Systems, Operations, Maintenance, Laboratory and Pretreatment
City of Pocatello Water Pollution Control Collections Systems, Operations, Maintenance, Laboratory and Pretreatment WPC Mission statement To collect and treat wastewater at the lowest practical cost while
More informationFinch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities
Finch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities This report is a summary of water quality information for Finch s Drinking Water System, published in accordance
More informationDrinking-Water Systems Regulation O. Reg. 170/03
Drinking-Water Systems Regulation O. Reg. 170/03 ANNUAL REPORT TEMPLATE Drinking-Water System Number: 220001762 Drinking-Water System Name: The Blue Mountains Drinking Water System Drinking-Water System
More informationRecovering a Failed Sand Filter Wastewater Treatment System
Recovering a Failed Sand Filter Wastewater Treatment System By Michael C. Brandt, PE Advanced Designer of Subsurface Sewage Treatment Systems Project Manager MFRA, Inc. All subsurface treatment systems
More informationArlington East WRF Influent Channel Rehabilitation - Final
T E C H N I C A L M E M O R A N D U M 135-11 ARLINGTON EAST WRF INFLUENT CHANNEL 135-11 Arlington East WRF Influent Channel Rehabilitation - Final PREPARED FOR: PREPARED BY: JEA Capital Budget Planning
More information