1 City of Pocatello Water Pollution Control Collections Systems, Operations, Maintenance, Laboratory and Pretreatment
2 WPC Mission statement To collect and treat wastewater at the lowest practical cost while meeting regulations and providing excellent customer service
3 Employee Count: 27 Full-time 4 Seasonal Budget Account: WPC Operation/Maintenance Budget Account: WPC Lab Pretreatment Budget Account: WPC Lift Stations Budget Accounts: WPC Operation/Maintenance Sludge Reuse
4 Budget comparison FY 15 vs FY 2016 FY 15 Revenue $10,770,661 Expenses $10,876, $5,813, $2,615, $1,292, $698, $455,735 FY 16 Revenue $10,321,338 Expenses $10,372, $6,899, $1,035, $1,235, $710, $490,765
5 Millions WPC Financial Plan for FY15 FY19 Revenue Produced $15.0 Revenues Revenue Requirements Reserves Minimum Reserves $10.0 $5.0 $ $5.0 -$10.0 5
6 WPC Cost of Service Recognizes industry standard rate making principals of WEF Manual of Practice No. 27 Identifies annual cost to provide wastewater service to customer classes Recognizes differing service characteristics Flows Strengths 6
7 Rate comparison Area Sewer Rates FY16 Residential Monthly $60.00 $54.95 $50.00 $40.00 $30.00 $48.58 $45.00 $39.43 $33.79 $29.00 $26.40 $25.90 $21.66 $20.00 $10.00 $0.00 Chubbuck Nampa Ammon Meridian Post Falls Pocatello Coure de alene Blackfoot Idaho Falls 7
8 Collection Systems Supervisor 1 Engineering Tech 5 Collections Operators 2 Seasonal Laborers 23 Lift Stations 269 Miles of Sewer Line
9 Collection-Sewer line cleaning The collection crew annually cleans 231 miles of 15 inch and under sewer lines Additional trouble spots semi, quarterly, and monthly Big line cleaning 18 inch sewer and larger Staffed 8 hours/day but on call 24/7
10 Lift Stations 23 lift stations Low lying areas along the river typically McKinley LS by Costco 5.5 mile force main Typically two to three pumps Alarms SCADA Level controlled
11 Problems that occur Roots Grease
12 Additional duties CCTV sewer lines New construction Problems Manholes raising
13 Additional duties Cure in Place Pipe (CIPP) Point repair
14 Dig Line Pocatello Dig Line Notifications Year Jan Feb Mar Apr May June July August Sept Oct Nov Dec
15 Pretreatment and Laboratory Full time employees 1 Supervisor 1 Lead lab/pretreatment 1 Laboratory technician 1 Pretreatment technician
16 Pretreatment 40CFR, Part 403 Federally approved in 1985 Ensure public safety Protect the WPC facility Protect the Portneuf River Public education
17 Pretreatment 1,957 permitted facilities on file 429 facilities have pretreatment equipment Pretreatment staff works closely with the Collection crew by investigating discharges, spills, and complaints that are found by the collection crew On average inspections on these facilities are performed each year
18 Pretreatment There are 7 Significant Industrial Users that have monthly monitoring and sampling requirements along with twice yearly inspection and sampling requirements Annual report to EPA detailing pretreatment activities and data collected On Semiconductor UPRR Amy s Kitchen Great Western malt
19 Laboratory Provide laboratory services in support of the WWTP Collects samples in accordance with NPDES Permit #ID Runs analysis of wastewater in accordance with NPDES permit #ID Report results to EPA to ensure compliance Administers Quality Assurance program to meet Federal Regulations (40CFR,Part 136) and State regulations (NR149)
20 Laboratory Provides drinking water testing for City of Pocatello Provides plant process testing Provides testing for Industrial users
21 Water Pollution Control Facility
22 Plant Treats all wastewater from Pocatello 6 million gallons/day Chubbuck 1 million gallons/day Treats 800,000 gallons of septage per year from Bannock, Power, and Bingham counties
23 Operation and Maintenance Superintendent 1 Administrative assistant 2 Supervisors 5 Operators 1 Maintenance tech 1 Instrumentation tech 1 Electrician 2 Seasonal laborers Staffed 8 hours/day 7 days/week but on call 24/7
24 Plant history Built in 1958 Upgrade in 1974 to secondary treatment per Clean Water Act- New NPDES permit Upgrade in Chlorine/Sulfur Dioxide and #3 Digester caused by new NPDES permit
25 Plant history 1996 Headworks facility upgrade 1997 Selector basin upgrade for filament control 2001 upgrade for DAF thickener/primary clarifier rehab 2004 upgrade for Nitrification caused by New NPDES permit
26 Plant history 2015 Phase 1 WPCF Phosphorus project caused by new NPDES permit in 2012 New NPDES permit after September 2017, what will come next?
27 Capital 3011 For Capital outlay Infrastructure Sewer line problems CIPP projects Lift station projects Fixed equipment rebuild consulting services Engineering design services
28 Land Treatment Maintenance tech 1 Operator 1 Building and grounds
29 Biosolids CFR 40,Part 503 Beneficial reuse on agricultural lands City owned lands WPC=786 acres Airport=1099 acres Not able to be used=135 acres Promised=701 acres Promised to development
30 Issues moving forward Development at airport reducing land available for Biosolids application-future cost to WPC of $10M to dewater/thickening Land available in NPDES permitted area Business licenses for move in/move out
Documents: WATER.PDF. WATER POLLUTION CONTROL DEPARTMENT Jon Herrick, Superintendent. Documents: WPC.PDF
1. CITY OF POCATELLO BUDGET RESTRUCTURING MEETING AGENDA October 1, 2015 9:00 AM Council Chambers 911 N 7th Avenue WATER DEPARTMENT Justin Armstrong, Superintendent Documents: WATER.PDF 2. WATER POLLUTION
More informationWater Pollution Control Utility Financial Planning Study
City of Pocatello 911 North 7th Avenue P.O. Box 4169 Pocatello, ID 83205-4169 Water Pollution Control Utility Financial Planning Study June 16, 2014 Report Prepared By: 12835 E Arapahoe Rd. Tower II, Suite
More informationWater / Wastewater Fund
WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services
More informationWater / Wastewater Fund
WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services
More informationWater / Wastewater Fund
WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services
More information2017 Annual Performance Report
2017 Annual Performance Report Thornbury Wastewater Treatment Plant and Associated Collection System Prepared by: Wastewater Operations Staff Reporting Period: January 1 December 31, 2017 1 P age Executive
More informationEGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT
EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT Township of Bonnechere Valley Water and Sewage Department January 2014 Table of Contents Executive Summary... 3 Introduction... 4 Report Availability...
More informationThis document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works
This document can be made available in other accessible formats as soon as practicable and upon request Staff Report Infrastructure & Public Works Report To: Committee of the Whole Meeting Date: March
More informationWater Resources Director: Chris Graybeal
Water Resources Director: Chris Graybeal Our Mission To promote and protect the environment, preserve natural resources, and ensure the health and safety of our customers. Granite Falls Wastewater Treatment
More informationSanitary Sewer Collection System Annual Performance Report 2018 WDR R
Sanitary Sewer Collection System Annual Performance Report 218 WDR R3-22-78 January 31, 219 Sanitary Sewer Collection System Performance Report State of California Water Quality Control Board. WDR R3-22-78
More informationWASTEWATER DIVISION DECEMBER 2016 MONTHLY REPORT
WASTEWATER DIVISION DECEMBER 216 MONTHLY REPORT 1 P age Table of Contents Section 1: Regulatory Compliance Reporting pg. 6 Section2: OWTP Operations & Maintenance pg. 6 Section 3: Advanced Water Purification
More informationCapital Improvement Plan Update:
Board of Supervisors Meeting Carson City Public Works Department Capital Improvement Plan Update: Wastewater Collection, Treatment and Reuse March 14, 2013 Topics of Discussion Regionalization Existing
More informationBRACEBRIDGE WASTEWATER TREATMENT
2014 BRACEBRIDGE WASTEWATER TREATMENT ENVIRONMENTAL COMPLIANCE APPROVAL: #6801-7VKNAQ INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District Municipality of Muskoka.
More informationBRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT
BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT ENVIRONMENTAL COMPLIANCE APPROVAL: 6801-7VKNAQ ENVIRONMENTAL COMPLIANCE APPROVAL: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater
More informationBracebridge Wastewater Treatment 2017 Summary Report
Bracebridge Wastewater Treatment 2017 Summary Report Environmental Compliance Approval: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District
More informationPima County Regional Optimization Master Plan
Pima County Regional Optimization Master Plan Proposed extent of screen enclosure Existing and Expanded Ina Road WPCF Approximately 160 acres Sports Park Michael Gritzuk, P.E., Director Edward Curley,
More informationPresentation Overview
Montara Water and Sanitary District 2011 Master Plan Presentation to MWSD Board February 3, 2011 Prepared By: 1 Presentation Overview Master Plan Purpose and Approach General System Statistics Production
More informationFACT SHEET and NPDES WASTEWATER DISCHARGE PERMIT EVALUATION. Department of Environmental Quality Western Region-Salem Office
FACT SHEET and NPDES WASTEWATER DISCHARGE PERMIT EVALUATION Department of Environmental Quality Western Region-Salem Office PERMITTEE: City of Aumsville P.O. Box 227 Aumsville, OR 97325 File Number: 4475
More informationResult data last updated. 10 July Map of Norske Skog Albury Paper Mills Environmental Protection Licence compliance monitoring sites
A full copy of our license can be found on the EPA website under the following address http://www.epa.nsw.gov.au/prpoeoapp/viewpoeolicence.aspx?docid=32757&sysuid=1&licid=1272 Result data last updated
More informationGroundwater Discharge Permit Application ~ Part A Business Information
Groundwater Discharge Permit Application ~ Part A Business Information INSTRUCTIONS: Complete application in its entirety, incomplete applications will not be processed. A copy of this application will
More informationSERVICES DEPUTY CITY MANAGER I ADMINISTRATIVE SERVICES PUBLIC WORKS ClOY ENGINEER DIRECTOR DIRECTOR PROJECT & CONSTRUCTION ENGINEERING
Operation and Maintenance This section summarizes key operation and maintenance aspects of the City's sewer system. Included in this section is a description of the wastewater system personnel, instrumentation
More informationQUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 INFLUENT MONTHLY AVERAGE EFFLUENT MONTHLY AVERAGE
QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE INFLUENT MONTHLY AVERAGE Month Flow MGD CBOD mg/l TSS mg/l July 26.7 350 320 August 29.1 370 340 September 27.3 380
More informationWastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013
Wastewater Treatment Plant Facility Plan Update City Project #11-013 City of Liberty, Missouri May 6, 2013 Background 2 HDR Begins Feasibility Study to Evaluate Construction of a New Wastewater Treatment
More informationNorthport Wastewater Treatment Plant
Operations Management Services 2015 Annual Report Northport Wastewater Treatment Plant Contents Project Description... 1 2015 Project Overview...2-6 Financial Summary...8 Project Staff...10 Community
More informationAugust 22, City of Gooding. Public Meeting. Keller Associates, Inc. 305 N. 3 rd, Suite A Pocatello, ID Water System Evaluation
August 22, 2012 City of Gooding Public Meeting Water System Evaluation Keller Associates, Inc. 305 N. 3 rd, Suite A Pocatello, ID 83201 Existing Conditions The City maintains two water systems: Non-potable
More informationSEWER CITY AND BOROUGH MANAGER'S OFFICE. PUBLIC WORKS DEPARTMENT Ernie Mueller, Director WASTEWATER UTILITY SUPERINTENDENT.
MISSION STATEMENT Our mission is to enhance the health and quality of life for the City and Borough of Juneau Wastewater Utility Division s customers by providing them an effective efficient system for
More informationWastewater Treatment Works and Collections System Annual Report Year 2005 General Information
Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Facility / System: Town of Farmville Wastewater Collection System and Treatment Facilities Responsible Entity:
More informationEngineering Department Wastewater Treatment
Engineering Department Wastewater Treatment Prepared by: Rich Davidson, Director Assisted by: Mary Phelps Verle Holland Steven Tam Andy Yeung Gina De la Torre Serenity Cummings Engineering Department Wastewater
More informationRE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System
14 th, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Wardsville Wastewater Treatment Plant and Collection System The Ontario Clean Water Agency
More informationToday s Goals for Learning
Today s Goals for Learning Outline MCWS s job consolidation of mechanics and electricians Discuss program s implementation Review self directed training modules Review 1.5 year status Review implementation
More informationTO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Shawn Wilson DATE: June 30, 2017 RE: Water Renewal Fund Capital Projects
TO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Shawn Wilson DATE: June 30, 2017 RE: Water Renewal Fund Capital Projects MAJOR PROJECTS, INITIATIVES, CURENT ISSUES Clean Water: Major Projects
More informationManatee County Utilities. Water/Wastewater Rates Public Hearing February 7, 2017
Water/Wastewater Rates Public Hearing February 7, 2017 1 What we do Responsible for water supply, treatment, distribution and metering to 117,000 retail accounts and 4 wholesale customers Wastewater treatment
More informationQUARTERLY OPERATIONS REPORT 3 rd Quarter, January March 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 EFFLUENT MONTHLY AVERAGE INFLUENT MONTHLY AVERAGE
QUARTERLY OPERATIONS REPORT 3 rd Quarter, January March 2018 WASTEWATER PERMIT COMPLIANCE INFLUENT MONTHLY AVERAGE Month Flow MGD CBOD mg/l TSS mg/l July 26.7 350 320 August 29.1 370 340 September 27.3
More information6/22/2018 INTRODUCTIONS. Wastewater Rates and Charges Citizens Advisory Committee. June 21, 2018 June 21, Why are we here?
Wastewater Rates and Charges Citizens Advisory Committee Wastewater Rates and Charges Citizens Advisory Committee June 21, 2018 June 21, 2018 INTRODUCTIONS Why are we here? Because we need your help! Larry
More informationIndex Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL
T E C H N I C A L M E M O R A N D U M DISTRICT II PRIMARY CLARIFIER #2 AND #3 REHABILITATION PROJECT DEFINITION Index Number 129-15 and #3 Rehabilitation Project Definition FINAL PREPARED FOR: JEA Capital
More informationPolishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers.
Wastewater Treatment Facility (2012) Polishing Ponds Biosolids Storage Ammonia Removal Digesters Thickeners Pretreatment Primary Clarifiers Activated Sludge Final Clarifiers OVERVIEW Whenever a home, business,
More informationAssuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:
Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.
More informationVILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY
EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire
More informationTraffic Division Public Works Department Anchorage: Performance. Value. Results.
Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the
More informationKansas Case Study Kanopolis Reservoir and Salina, KS
Kansas Case Study Kanopolis Reservoir and Salina, KS Western State Water Council Water Quantity/Quality Workshop October 6, 2015 Mike Tate, P.E. Kansas Department of Health and Environment Kanopolis Reservoir
More informationCHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION
CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven
More informationAnaerobic Digestion of High Strength Wastes within a TMDL
Anaerobic Digestion of High Strength Wastes within a TMDL A POTW s Perspective on cost, benefits and considerations Appleton Wastewater Treatment Plant WWOA LMD Conference 1 Overview Overview of the Appleton
More informationCHAPTER 2 WASTEWATER REGULATORY ISSUES
CHAPTER 2 WASTEWATER REGULATORY ISSUES 2.1 Introduction The principal regulations affecting GWA s wastewater utility are included in the federal Clean Water Act. This important body of regulations includes
More informationPotential Public Private Partnership Projects. Miami-Dade Water and Sewer Department
Potential Public Private Partnership Projects Miami-Dade Water and Sewer Department www.miamidade.gov/water Who We Are Number of People Served by Our Utility Each Day 2.3 Million Residential Monthly Rates
More informationCITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT
CITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT FEBRUARY 2014 Adelaide Wastewater Treatment Plant 2013
More informationBOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS
Water & Sewer SERVICE AREA: PHYSICAL ENVIRONMENT BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS PROGRAM DESCRIPTION: This program
More informationDeveloping a MOM Program 2015 OWEA Annual Conference Sean P. O Rourke, P.E. Hazen and Sawyer David Reimer, City of Miamisburg
2015 OWEA Annual Conference Sean P. O Rourke, P.E. Hazen and Sawyer David Reimer, City of Miamisburg Four Questions: 1. Who is Miamisburg? 2. What is a MOM Program? 3. Why develop one? 4. How was the City
More informationTraffic Department Anchorage: Performance. Value. Results.
Traffic Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements.
More informationCity of Newton Department of Public Works Wastewater
Mission - We are committed to providing efficient and safe city services that enhance the quality of life for all Newton residents on a daily basis. Park, Public Works, and Public Facilities Department
More informationHOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN
HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins
More informationOperations Report. September 10, 2015
Operations Report September 1, 215 Plant Loading and Operations Summary August 215 Biochemical Oxygen Demand, 5-Day (Avg. 2,151 lb./day) Total Suspended Solids (Avg. 33,197 lb./day) Average Daily Flow
More informationMassachusetts Water Resources Authority. [Presenter Title]
Massachusetts Water Resources Authority [Presenter Title] Deer Island Operations: Self-Generation Self-Generation Power Generation, MWh J A S O N D J F M A M J Hydro CTGs STGs 100% 90% 80% 70% 60% 50%
More informationEFFECTIVE UTILITY MANAGEMENT A CASE STUDY OF MANCHESTER, NH
EFFECTIVE UTILITY MANAGEMENT A CASE STUDY OF MANCHESTER, NH NEWEA ANNUAL CONFERENCE 2018 January 22, 2018 Frederick J. McNeill, P.E. Agenda Background Wastewater Assets Organization Effective Utility Management
More informationImpacts of Permit-Exempt Wells
Impacts of Permit-Exempt Wells Dave Nazy, LHG August 24, 2018 1 Impacts of Permit-Exempt Wells Introduction ESSB 6091 Example Impacts Calculation Basin Estimate & 20-year Projections Offsetting Impacts
More informationOKLAHOMA CITY: FIRST YEAR ACCOMPLISHMENTS
CASE STUDY OKLAHOMA CITY: FIRST YEAR ACCOMPLISHMENTS BACKGROUND After outsourcing the management, operation and maintenance of its wastewater facilities for over 30 years, Oklahoma City opted not to exercise
More informationSystem Performance Annual Report Fiscal Year 2014
System Performance Annual Report Fiscal Year 2014 I. General Information Facility name - Metropolitan Sewerage District of Buncombe County 2028 Riverside Drive, William H. Mull Building Asheville, North
More informationWASTEWATER COLLECTIONS AND TREATMENT SYSTEMS ANNUAL PERFORMANCE REPORT
WASTEWATER COLLECTIONS AND TREATMENT SYSTEMS July 1, 2016 - June 30, 2017 enjoyed another year of truly excellent performance at both of our treatment plants and the collection systems which they serve.
More informationWASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:
Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment
More informationKnowledge, Skills Abilities -- Gap Analysis Tool
Collection System Maintenance Grade I 101. Participates in inspecting, cleaning, maintaining, constructing, and repairing of wastewater collection systems utilizing a variety of mechanical and specialized
More informationSANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL
SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL Greg Diehl DFW Region Office Wastewater Work Leader QUALITY OVERVIEW: The TCEQ s SSO Initiative What is it and how does it work? The data
More informationTO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Paul Zimmerman DATE: April 5, 2017 RE: Water Renewal Fund Capital Projects
TO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Paul Zimmerman DATE: April 5, 2017 RE: Water Renewal Fund Capital Projects MAJOR PROJECTS, INITIATIVES, CURENT ISSUES Clean Water: Major
More informationFindlay Performs. As of September 30, 2018 (unless otherwise noted)
Findlay Performs Findlay Performs connects the performance of City departments to the City s Strategic Plan. Our Journey framework is a map for the City s overall direction and lays out our Vital Few Objectives.
More informationDecentralized Wastewater Management
Decentralized Wastewater Management An Overview of Experiences in Mobile, AL Kevin D. White, Ph.D., P.E. University of South Alabama Department of Civil Engineering Mobile, AL, 36609 kwhite@usouthal.edu
More informationLucas County Sanitary Engineer 2015 Strategic Plan
Lucas County Sanitary Engineer 2015 Strategic Plan MISSION Defines scope of responsibilities and expectations of the desired level of service TO PROVIDE CUSTOMERS WITH HIGH QUALITY, SAFE, COST EFFECTIVE
More informationGRASS VALLEY WASTEWATER TREATMENT INQUIRY
GRASS VALLEY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated
More informationA Happy Marriage? How Your Friends in Sewer will Save Your Stormwater
A Happy Marriage? How Your Friends in Sewer will Save Your Stormwater Zach Henderson Woodard & Curran Tim Haskell and Phillip Tucker York Sewer District AMERICAS WASTEWATER AND STORMWATER INFRASTRUCTURE
More informationSEWER SYSTEM MANAGEMENT PLAN (SSMP)
SEWER SYSTEM MANAGEMENT PLAN (SSMP) August 2010 TABLE OF CONTENTS SYSTEM OVERVIEW... 1 1.0 GOALS... 2 2.0 ORGANIZATION... 3 3.0 OVERFLOW AND EMERGENCY RESPONSE PLAN... 4 4.0 FATS, OILS AND GREASE (FOG)
More informationMWRA s Climate Change Strategy
Massachusetts Water Resources Authority MWRA s Climate Change Strategy Frederick A. Laskey Executive Director June 15, 2018 Changing Precipitation Quantity and Patterns Currently, we average 104 rain events
More informationSanitary Sewer. Infiltration & Inflow (I/I) Study. Presented by:
Sanitary Sewer Infiltration & Inflow (I/I) Study City of Beatrice, Nebraska IAWEA Collection System Specialty Conference Presented by: Brian Mulinix, P.E. March 10, 2011 Discussion Topics Definition of
More informationHillsdale Wastewater Treatment Plant
Hillsdale Wastewater Treatment Plant SRF Project Plan Public Hearing sdgfdgdf June 10, 2014 Presented by: Jeff Pugh, PE and Elaine Venema, PE Synopsis/Agenda Purpose of Presentation Project Background
More informationP.O. Box North Little Rock, AR North Little Rock Waste Water Utility Annual Report ... Consent Administrative Order LIS
P.O. Box 17898 North Little Rock, AR 72117-0898 North Little Rock Waste Water Utility 2012 Annual Report.......... Consent Administrative Order LIS 10-218 North Little Rock Waste Water Utility 2012 Annual
More informationDitches for Energy Efficiency and Improved Nitrogen Removal
Upgrade of the Big Gulch WWTP Oxidation Ditches for Energy Efficiency and Improved Nitrogen Removal Thomas G. Authors: Thomas E. Coleman, dtec Systems Bridges, Mukilteo Water & Wastewater District Bend,
More informationLEVEE SAFETY UPDATE. June 28,2017
LEVEE SAFETY UPDATE 1 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 June 28,2017 The
More informationCity of Columbia South Carolina. Discussion of Public Private Partnership. April 24, 2012
City of Columbia South Carolina Discussion of Public Private Partnership April 24, 2012 1 KEY HISTORICAL DATES Rich 142 Year History 1869-Founded as Hackensack Water Company 1890-Listed on the New York
More informationOverview of Local Facilities. Integrated Resource Planning Advisory Committee
Overview of Local Facilities Integrated Resource Planning Advisory Committee City of Henderson Utility Services System Overview 2 CITY OF HENDERSON Department of Utility Services The Department of Utility
More informationAECOM Amendment 2. Thien Ng Interim Public Works Director. December 13, 2017
AECOM Amendment 2 Thien Ng Interim Public Works Director December 13, 2017 AECOM Agreements to be Combined Public Works Department On-Call Engineering Services $250,000 Increase $250,000 Existing Water
More informationFeel free to contact me should you require any additional information regarding the report. I can be reached at
February 28, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Glencoe Wastewater Treatment Plant The Ontario Clean Water Agency is the Operating
More informationCHAPTER 4 SYSTEM DESIGN CRITERIA
INTRODUCTION CHAPTER 4 SYSTEM DESIGN CRITERIA Adequate design of the District s wastewater conveyance facilities requires the determination of the quantity of wastewater from contributing sources. The
More informationStonecrest Estates Sewage Treatment Plant 2017 Annual Report
2017 Stonecrest Estates Sewage Treatment Plant 2017 Annual Report The Corporation of the City of Quinte West 0 Contents Table of Figures... 1 Executive Summary... 3 Summary and Interpretation of Monitoring
More informationSpringfield Water and Sewer Commission. Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016
Springfield Water and Sewer Commission Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016 Joshua Schimmel Executive Director Introduction Overview of System Presentation Summary Commission
More informationWater Recycling Facility Project
Water Recycling Facility May 15, 2006 How did we get here? December 2002 City facing $8,000,000 fines from the Regional Water Quality Control Board (RWQCB) for Wastewater Discharge Violations. Existing
More informationRational IPP Permitting
Rational IPP Permitting Protect POTW/Environment and Promote Local Economy FISHBECK, THOMPSON, CARR, & HUBER INC. Jerald O. Thaler, PE MWEA IPP Seminar October 6, 2016 Rational IPP Permitting? Accurate/Up-to-Date
More informationNCAWWA-WEA Finance and Management Committee. Billing and Collection Systems. February 27, 2013
NCAWWA-WEA Finance and Management Committee Billing and Collection Systems February 27, 2013 Background - CMUD Facts Serves City of Charlotte, Towns in Mecklenburg County (272,000 metered accounts) City
More informationWastewater Treatment Systems, Wastewater Issues and Permits
Wastewater Treatment Systems, Wastewater Issues and Permits Lucas Gregory Texas Water Resources Institute November 29, 2017 Debbie Magin Guadalupe Blanco River Authority Ryan Gerlich Texas A&M AgriLife
More informationStreet Maintenance Section Maintenance and Operations Division Public Works Department Anchorage: Performance. Value. Results.
Street Maintenance Section Anchorage: Performance. Value. Results. Purpose Protect, maintain, and improve Municipal roads and drainage systems through organized efforts and effective use of resources.
More informationPilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility"
Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility" Presented by: Mark J. Halm, P.E. - Yokhana Alkass, LEED AP EEC, PC Darrin B. Boyer - City of Plano- Illinois
More informationHow to Read Your Water Bill and related topics. Tom Heikkinen, General Manager
How to Read Your Water Bill and related topics Tom Heikkinen, General Manager All about us INTRODUCTION Our History In The Beginning 1870s: Water from Madison s private wells and lakes was unfit to drink
More informationMACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT
MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT CERTIFICATE OF APPROVAL: # 7599-7PCKPU INTRODUCTION The Conger Marsh Water Pollution Control Plant (WPCP), which services the community of MacTier, is owned
More informationINTEROFFICE MEMORANDUM
INTEROFFICE MEMORANDUM DATE: October 23, 29 TO: Boise Public Works Commission FROM: Matt Hightree, Civil Engineer SUBJECT: Energy Consumption at Major Facilities Managed by Public Works This memo is presented
More informationUniversity of California Santa Cruz
University of California Santa Cruz Sewer System Management Plan May 2009 Rev July 2013 Rev May 2014 Rev June 2016 UCSC SSMP 062016.doc 2 Table of Contents 1.0 Goals of the SSMP Page 4 2.0 Organization
More informationSpokane Valley-Rathdrum Prairie Aquifer Storage and Recovery for Summer Flow Augmentation
Spokane Valley-Rathdrum Prairie Aquifer Storage and Recovery for Summer Flow Augmentation Dr. Michael Barber 1, Mr. Colt Shelton 2, Mr. Matt McDonald 2, Dr. Akram Hossain 3, Dr. Cara Poor 1 1 State of
More informationAppendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM
Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM I. General Information A. Agency Name B. Agency Address
More informationITEM 9 - APPROVAL OF DEMANDS DASHBOARD FOR SEPTEMBER 2015 Summary Operating $ 1,691,544 Capital $ 397,448 September Demands $ 2,088,992 YTD Demands $
ITEM 9 - APPROVAL OF DEMANDS DASHBOARD FOR SEPTEMBER 2015 Summary Operating $ 1,691,544 Capital $ 397,448 September Demands $ 2,088,992 YTD Demands $ 5,825,226 FY2016 Budget $ 29,654,971 19% September
More informationTAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP
ABSTRACT TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP Tim Baldwin, PE, Senior Vice President McKim & Creed, Inc. Pender County s Commerce Park was created as a vehicle to attract
More informationWastewater Treatment Plant Compliance. Strategies for Surviving an NPDES Permit Inspection (National Pollutant Discharge Elimination System)
Wastewater Treatment Plant Compliance Strategies for Surviving an NPDES Permit Inspection (National Pollutant Discharge Elimination System) Plus some general info about permits & reporting Eric Dunlavey
More informationPEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING December 5, 2018 ROUTINE STATUS REPORTS ITEM 1
PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING December 5, 218 ROUTINE STATUS REPORTS ITEM 1 Hydrologic Conditions Report MEMORANDUM Project: Hydrologic Conditions Report
More informationCULTUS LAKE SEWER UPGRADE
CULTUS LAKE SEWER UPGRADE January 18, 2018 Presentation by Taryn Dixon, Electoral Area H Director (Elected Official), FVRD Paul Gipps, Chief Administrative Officer, FVRD OVERVIEW Introduction Existing
More informationBuffalo Sewer Authority. David P. Comerford General Manager
Buffalo Sewer Authority David P. Comerford General Manager Introduction Like it has since its inception in 1938, the Buffalo Sewer Authority has successfully safeguarded the public health and protected
More informationCity of San Clemente Water Usage Report
Monthly Usage (AF) ACRE FEET City of San Clemente Overview of Usage FY 217-18 Monthly Water Use Type of Supply Total MWDOC 723 722 657 629 - - - - - - - - 2,731 Local Groundwater 33 23 69 84 - - - - -
More informationEnergy Efficiency / Conservation Case Studies in Waste Water Treatment Facilities
Energy Efficiency / Conservation Case Studies in Waste Water Treatment Facilities Prepared for: Energy Saving Opportunities for Wastewater Treatment Facilities: Energy Efficiency and CHP Workshop May 19