2

3

4

5

6 1) Zone: Commercial, Min. Lot Size 0.5 Ac. Min. Fontage 100' Setbacks = 50' Front, 15' Side, 20' Rear Permitted Lot Coverage 75% 2) Existing Use: Retail Convenience Store with Fuel, and Dunkin Donuts Drive-Thru Window as, shown. Municipal Sewer & Water Exist. Special Exception granted July 17, 1996 Prior approval: Existing Lot Coverage (not counting gravel parking) 74.8%. Existing Lot Coverage pavement and gravel 90% Existing Parking 20 Spaces. 3) Proposed: Relocate existing propane tank filling station. Remove Existing Diesel Pump. Replace existing pumps, add extinguishing systems and emergency shutoffs and portable fire extingishers to the existing fuel island. Prior approval to expand Walk-in Cooler, add bollards and add Canopy over Existing Drive-In window. Modify Traffic Pattern withsignage, Painted Islands, Painted Directional Arrows and Wording, Painted Traffic Lanes and Parking Spaces (ADA Compliant). Proposed Lot Coverage 89.1%. Proposed Parking 26 Spaces. Dunkin: 18 seats x 1sp/2seats =9 5 employ x 1sp/empl = 5 Retail: 3351sf Display x 1sp/200sf = sf Storage x 1sp/600sf =1.5 Total 32 spaces required, 26 Provided spaces on-site, waiver granted 8/24/15. ADA 1990 requires 1 space, provided Approved by the Belmont Planning Board Approval Date: Chairperson: SUBMITTED BY: Dry Well/ Catch Basin SITE PLAN ENGINEERING & SEPTIC DESIGNS Cell Phone (603) Mattm-engineer@comcast.net 644 Loudon Ridge Road Loudon, NH PROPOSED CONDITIONS PROPERTY OF: BELMONT-PENGUIN REAL ESTATE HOLDINGS, LLC 916 LACONIA ROAD B.C.R.D. BOOK 2954 PAGE 780 LOCATION: MAP 122 / LOT 58, LACONIA ROAD, BELMONT DRN. BY: MEM SCALE N/A CHECKED BY: MEM DATE: June 9,'16 DRAWING #: 1 of 2

7 CONSTRUCTION SEQUENCE & SUPPLEMENTAL REQUIREMENTS: 1. CALL DIGSAFE 2. MARK, PROTECT, AND RELOCATE (WHERE NECESSARY) THE BURIED UTILITIES. 3. LAYOUT - SEE SURVEY/LAYOUT NOTES. 4. IMPLEMENT AND MAINTAIN TRAFFIC CONTROL MEASURES AS REQUIRED. 5. PROVIDE PROTECTIVE BARRIOR AROUND TREES, SHRUBS THAT REMAIN OR REMOVE AND STORE THEM. 6. INSTALL STABILIZED CONSTRUCTION ENTRANCE(S). 7. INSTALL AND MAINTAIN SILT SOXS AND CHECK DAMS AND OTHER MEASURES TO: PREVENT EROSION; CONTROL SEDIMENTS FROM BEING CARRIED OFF THE SITE, INTO OR INTO DRAINAGE DEVICES; AND, TO PREVENT SEDIMENT TRACKING ON TO STREETS. 8. STABILIZE FLOW DIVERSION/CONVEYANCE DITCHES. 9. STRIP TOPSOIL. INSTALL SILT FENCE ALONG THE DOWNHILL SIDE OF STOCKPILES, UNLESS ENGINEER INDICATES IT IS NOT REQUIRED. 10. INSTALL TEMPORARY FLOW DIVERSION AS REQUIRED TO MAINTAIN FLOW IN THE STREAMS WHERE CULVERTS ARE OR TO BE INSTALLED. 11. ROUGH-GRADE THE DITCHES AND SLOPES AND INSTALL TEMPORARY EROSION CONTROL MEASURES. 12. PLACE, GRADE, AND COMPACT GRANULAR BACKFILL AS REQUIRED TO BRING THE GRADE UP TO THE LEVEL OF THE AGGREGATE BASE 13. INSTALL BURIED UTILITIES SUCH AS DRAINAGE, WATER, SANITARY SEWER, STORMTECHS, POWER, COMMUNICATIONS. 14. SAWCUT EXISTING PAVEMENT AND PLACE AND COMPACT THE HOT MIX ASPHALT BASE COURSE OVER THE DRIVEWAY. 15. INSTALL THE TREE/SHRUB PLANTINGS. 16. RESTORE ALL SURFACE FEATURES TO THE CONDITION THAT EXISTED PRIOR TO CONSTRUCTION OR BETTER. 17. UPON CONCLUSION OF CONSTRUCTION, CLEAN SITE AS NECESSARY TO REMOVE ALL EXCESS CONSTRUCTION DEBRIS. 18. WITHIN 30-DAYS OF THE VEGETATION ESTABLISHMENT, REMOVE ALL ACCUMULATED SILT/SEDIMENT AND THE TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES. 19. PROVIDE AS-BUILT MEASUREMENTS AS NOTED IN THE "GENERAL REQUIREMENTS. CONSTRUCTION TIMING & WINTER CONTINGENCY PLAN: FOLLOWING WINTER STABILIZATION STANDARDS SHALL BE IMPLEMENTED AT A MINIMUM: 1. ALL PROPOSED VEGETATED AREAS WHICH DO NOT EXHIBIT A MINIMUM OF 85% VEGETATIVE GROWTH BY OCTOBER 15TH, OR WHICH ARE DISTURBED AFTER OCTOBER 15TH, SHALL BE STABILIZED BY SEEDING AND INSTALLING EROSION CONTROL FABRIC ON SLOPES GREATER THAN 3:1, AND SEEDING AND PLACING 3 TO 4 TONS OF STRAW MULCH PER ACRE, SECURED WITH ANCHORED NETTING, ELSEWHERE. THE INSTALLATION OF EROSION CONTROL FARBIC OR MULCH AND NETTING SHALL NOT OCCUR OVER ACCUMULATED SNOW OR ON FROZEN GROUND AND SHALL BE COMPLETED IN ADVANCE OF THAW OR SPRING MELT EVENTS; 2. ALL DITCHES OR SWALES WHICH DO NOT EXHIBIT A MINIMUM OF 85% VEGETATIVE GROWTH BY OCTOBER 15TH, OR WHICH ARE DISTURBED AFTER OCTOBER 15TH, SHALL BE STABILIZED TEMPORARILY WITH STONE OR EROSION CONTROL FARBIC APPROPRIATE FOR THE DESIGN FLOW CONDITIONS (PER THE ENGINEER AND MANUFACTURER) GENERAL EROSION-CONTROL NOTES: 1. THE AREA OF GROUND DISTURBANCE IS CONTIGUOUS FOR THIS PROJECT. 2. LIMIT THE SITE DISTURBANCE TO THE LEAST PRACTICAL FOR STAGING. RESTORE THE STAGING AREAS OUTSIDE OF THE PROJECT LIMITS TO THEIR EXISTING CONDITION OR BETTER. 3. THE WORK SHALL GENERALLY BE STAGED AS OUTLINED IN THE CONSTRUCTION SEQUENCE. 4. AREAS SHALL BE CONSIDERED STABILIZED WHEN ONE OF THE FOLLOWING HAS OCCURRED: EROSION-CONTROL FABRIC HAS BEEN INSTALLED PER THE MANUFACTURER'S INSTRUCTIONS AT LEAST 85% VEGETATED GROWTH HAS BEEN ESTABLISHED (UNIFORMLY DISTRIBUTED) STONE/FILL, UNDERLINE BY GEOTEXTILE, HAS BEEN PLACED TO THE DEPTH INDICATED A WINTER-STABILIZATION STANDARD HAS BEEN IMPLEMENTED PER THE WINTER-CONTINGENCY PLAN ABOVE. 5. ALL DITCHES AND SWALES ARE TO BE STABILIZED WITH EROSION CONTROL FABRIC OR STONE FILL (AS SHOWN) PRIOR TO DIRECTING RUNOFF TO THEM. 6. ALL DISTURBED EARTH AREAS THAT ARE NOT TO BE WORKED OR ANTICIPATED NOT TO BE WORK FOR TWO WEEKS SHALL BE STABILIZED BY APPLYING TEMPORARY MULCH. 7. PERMANENTLY STABILIZE ALL CUT/FILL AREAS (WITH PERMANENT TURF ESTABLISHMENT) AND THE DRIVE (WITH AGGREGATE BASE COURSES) AND OTHER ALL DISTURBED AREAS WITHIN 72 HOURS OF FINAL GRADING. 8. ALL DISTURBED AREAS NOT SPECIFICALLY MENTIONED IN THE CONSTRUCTION SEQUENCE SHALL BE STABILIZED AS SOON AS PRACTICAL AFTER BEING WORKED. 9. ANY ONE AREA SHALL BE STABILIZED WITHIN 45-DAYS OF ITS INITIAL DISTURBANCE. 10. ALL SEDIMENTATION AND EROSION CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY 7 DAYS AND FOLLOWING ANY STORM EVENT OF 0.5 INCHES OF RAINFALL OR GREATER. INSPECTION SHALL GENERALLY CONSIST OF VERIFYING THAT ALL SEDIMENTATION AND EROSION CONTROL MEASURES ARE IN GOOD WORKING ORDER AND IF NOT, MAKING REPAIRS. IF A REPAIR IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS OF THE REPORT. ADDITIONALLY, A SITE "WALK-THROUGH" SHALL BE MADE BEFORE ANY ANTICIPATED STORM EVENT. 11. REMOVE SEDIMENT FROM SEDIMENT TRAPPING DEVICES (CHECK DAMS, SILT FENCE, SEDIMENT BASINS, ETC.) WHEN THE SEDIMENT DEPTH REACHES 1/3 TO 1/2 OF THE MAXIMUM SEDIMENT DEPTH. 12. REMOVE THE TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES WITHIN ONE MONTH AFTER THE SITE IS PERMANENTLY STABILIZED. THE SITE IS CONSIDERED PERMANENTLY STABILIZED WHEN ALL PERMANENT NON-VEGETATIVE MEASURES ARE INSTALLED AND THE VEGETATION IS 90% ESTABLISHED UNIFORMLY OVER THE PORTION OF THE SITE TO BE VEGETATED. 13. All Erosion and Sediment Control Measures must meet the design Standards and Specifications set forth in "Stormwater Management and Erosion and Sediment Control for Urban and Developing Areas in New Hampshire", latest edition as amended. TEMPORARY MULCH WITH TACKIFIER 1. ROUGHEN SOIL SURFACE SUCH THAT GROOVES/ROWS ARE FORMED PARALLEL TO THE CONTOURS. THE INTENT IS THAT THE GROOVES WILL TRAP RUNOFF AND SEED, IF USED. 2. APPLY SEEDLESS HAY OR STRAW MULCH EVENLY DISTRIBUTED AT A RATE OF 1 TO 2 TONS PER ACRE, SUCH THAT THE SOIL IS BARELY VISIBLE THROUGH THE MULCH. 3. APPLY AN ORGANIC TACKIFIER TO ANCHOR THE MULCH. ORGANIC TACKIFIER SHALL BE ONE THAT IS LISTED ON THE NHDOT "QUALIFIED PRODUCT LIST". APPLY AT RATE ANBY METHOD RECOMMENDED BY TACKIFIER MANUFACTURER. 4. MAINTAIN BY RE-ROUGHING SOIL IF RUNOFF-INDUCED RILLS FORM AND APPLYING ADDITIONAL MULCH AND TACKIFIER WHERE BARE GROUND IS EXPOSED. Dry Well/Catch Basin Drainage Direction SUBMITTED BY: SITE PLAN ENGINEERING & SEPTIC DESIGNS Cell Phone (603) Mattm-engineer@comcast.net 644 Loudon Ridge Road Loudon, NH STORMWATER AND EROSION CONTROL PLAN PROPERTY OF: BELMONT-PENGUIN REAL ESTATE HOLDINGS, LLC 916 LACONIA ROAD B.C.R.D. BOOK 2954 PAGE 780 LOCATION: MAP 122 / LOT 58, LACONIA ROAD, BELMONT DRN. BY: SCALE N/A DATE: June 9,'16 MEM CHECKED BY: MEM DRAWING #: 2 of 2

Chairperson: Approved by the Belmont Planning Board SITE PLAN ENGINEERING & SEPTIC DESIGNS B.C.R.D. BOOK 2954 PAGE 780

Chairperson: Approved by the Belmont Planning Board SITE PLAN ENGINEERING & SEPTIC DESIGNS B.C.R.D. BOOK 2954 PAGE 780 Dry Well/ Catch Basin Approved by the Belmont Planning Board Approval Date: Chairperson: SUBMITTED BY: CHECKED BY: MEM MEM SCALE N/A DRAWING #: 1 of 2 DRN. BY: LOCATION: MAP 122 / LOT 58, LACONIA ROAD,

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

Appendix B Construction SWPPP Short Form

Appendix B Construction SWPPP Short Form Appendix B Construction SWPPP Short Form Projects falling within the thresholds listed below may use this short form instead of preparing a formal Construction Stormwater Pollution Prevention Plan (SWPPP).

More information

Please print or type.

Please print or type. SOIL EROSION AND SEDIMENTATION CONTROL PERMIT APPLICATION 6-18-07 Ann kjjkjkff- ANN ARBOR CHARTER TOWNSHIP 3792 Pontiac Trail, Ann Arbor, Michigan 48105-9656 Phone (734) 663-3418 Website: www.aatwp.org

More information

City of Glendale Stormwater Management Plan Checklist

City of Glendale Stormwater Management Plan Checklist City of Glendale Stormwater Management Plan Checklist Project: Title of Plan: Date: Date of Plan: Reviewer: Most Recent Revision: Criteria Yes No Identify a SWMP Administrator and an alternate - The SWMP

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STATE OF COLORADO GENERAL PERMIT APPLICATION Updated 11/04 STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY This application is for use by all stormwater dischargers engaged in construction

More information

Construction Site Inspections

Construction Site Inspections Construction Site Inspections Keep The Mud Out of The Creek Barry Tonning, Tetra Tech Inspections help to identify and correct problems! Inspection requirements Must inspect site every 14 days (LA) Some

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.) Module 2: Selection of Controls and Site Planning for Construction Site Erosion Prevention Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa,

More information

Stormwater Pollution Prevention Plan Engineering Department Requirements

Stormwater Pollution Prevention Plan Engineering Department Requirements Stormwater Pollution Prevention Plan Engineering Department Requirements The following are the stormwater pollution prevention plan requirements for the above referenced project. If you have any questions

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Figure Inlet protection (Source: Minnesota DOT)

Figure Inlet protection (Source: Minnesota DOT) 3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.

More information

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

Construction Site Erosion Control and Phase II of the Stormwater Permit Program Construction Site Erosion Control and Phase II of the Stormwater Permit Program Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL Some Features of Phase

More information

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Appendix K: Soil Erosion and Sedimentation Control Plan Check List Appendix K: Soil Erosion and Sedimentation Control Plan Check List Drain Commissioner 46 February 2005 SOIL EROSION AND SEDIMENTATION CONTROL PLAN CHECK LIST Items listed below must be clearly depicted

More information

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION EROSION AND SEDIMENTATION CONTROLS SECTION 312500 EROSION AND SEDIMENTATION CONTROLS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL

More information

The Construction General Permit and Erosion Prevention and Sedimentation Control

The Construction General Permit and Erosion Prevention and Sedimentation Control The Construction General Permit and Erosion Prevention and Sedimentation Control Presented at the Tennessee Gas Association Conference April 23, 2008 More than thirty years ago, two-third of the nation's

More information

New Administration Building

New Administration Building New Administration Building Stormwater Pollution Prevention Plan Hudson Valley Community College Troy, New York Prepared for: Hudson Valley Community College 80 Vandenburgh Avenue Troy, New York 12180

More information

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative Model Poultry Burial E&S Plan (7-2-15) 1. GENERAL INFORMATION Name of project Name of person responsible Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative Address Phone number Municipality

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

Sediment Control Practices

Sediment Control Practices Sediment Control Practices SMP-05 Temporary Diversions, Berms or Ditches Symbol TD Description These temporary drains offer features such as conveyance for runoff down cut or fill slopes, subsurface drains

More information

LAND DISTURBANCE PLAN AND IMPLEMENTATION REQUIREMENTS

LAND DISTURBANCE PLAN AND IMPLEMENTATION REQUIREMENTS For any site that disturbs land through excavation, embankment or grading activities, as defined by the city s Land Disturbance Ordinance, the owner shall, at minimum, conform to the provisions of these

More information

SECTION EROSION AND SEDIMENTATION CONTROL

SECTION EROSION AND SEDIMENTATION CONTROL SECTION 02160 EROSION AND SEDIMENTATION CONTROL PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The Contractor shall be held to have read all Bidding Requirements; all of the General Conditions and Supplementary

More information

1.2 REGULATORY REQUIREMENTS

1.2 REGULATORY REQUIREMENTS Table 1.1. Soil textural classes and general terminology used in soil descriptions (Source: US Environmental Protection Agency 1977). Name Texture Basic soil textural common class names Sandy soils Coarse

More information

APPENDIX C DURING CONSTRUCTION BMP TABLES

APPENDIX C DURING CONSTRUCTION BMP TABLES APPENDIX C DURING CONSTRUCTION BMP TABLES Table C.1 Table C.2 Table C.3 Erosion Prevention BMPs Sediment Control BMPs Stormwater Runoff and Ground Control Measures STORM WATER QUALITY DESIGN MANUAL Appendix

More information

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01. Description. This work consists of installing and maintaining erosion and sedimentation controls to minimize soil erosion and control

More information

Construction Phasing Bad

Construction Phasing Bad Construction Entrances Construction Phasing Remove mud and dirt from the tires of construction vehicles before they enter a paved roadway. Propoerly size entrance BMP's for all anticipated vehicles. Make

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL 902.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

WAKULLA SITE PLANNING

WAKULLA SITE PLANNING WAKULLA CIVIL SURVEYING SITE PLANNING TRAFFIC CONTROL PLAN WAKULLA ARRAN ROAD WIDENING & RESURFACING UTILITY CONTACT LIST NO. DATE: APPR. REVISION: DATE: CIVIL SURVEYING SITE PLANNING GENERAL NOTES WAKULLA

More information

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN SITUATED IN THE SW ¼ OF SECTION 18, T.2S., R.67W., OF THE 6 TH P.M. COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone

More information

SECTION TRENCHING, BACKFILL AND COMPACTION

SECTION TRENCHING, BACKFILL AND COMPACTION SECTION 312333 TRENCHING, BACKFILL AND COMPACTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. Native Backfill Material 2. Crushed Stone Bedding 3. Select Backfill Material 4. Shoring and Bracing

More information

Review of State and Federal Stormwater Regulations November 2007

Review of State and Federal Stormwater Regulations November 2007 Review of State and Federal Stormwater Regulations November 2007 By: James T. Spaulding, PE, CPESC Joseph M. Ducharme, Jr., PE TTG ENVIRONMENTAL CONSULTANTS, LLC 27 LOCKE ROAD, CONCORD, NH 03301-5301 TELEPHONE:

More information

Building Better Storm Water Quality

Building Better Storm Water Quality Building Better Storm Water Quality s Storm Water Pollution Prevention Guidelines for Development Construction Projects City of El Segundo 350 Main Street (310) 524-2380 El Segundo, California 90245 Introduction

More information

SECTION 903 EROSION CONTROL

SECTION 903 EROSION CONTROL SECTION 903 EROSION CONTROL Delete this Section in its entirety and replace with the following: SECTION 903 EROSION CONTROL 903-1 DESCRIPTION: This work consists of providing all; administrative, labor,

More information

Description. Installation and Implementation Requirements

Description. Installation and Implementation Requirements Earth Dike SC-6 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description Structure that prevents erosion by intercepting, diverting, and conveying surface run-on (storm water

More information

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION EROSION AND SEDIMENTATION CONTROLS SECTION 312500 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made

More information

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water Storm Water Permitting Requirements for Construction Activities John Mathews Storm Water Program Manager Division of Surface Water Why Permit Storm Water? Impacts During Construction Not an issue until

More information

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions) Adams Co. Conservation District 670 Old Harrisburg Road, Suite 201 Gettysburg, PA 17325 Telephone: 334-0636 Fax: 337-0730 www.adamscounty.us Erosion and Sediment Pollution Control Guidelines for Residential

More information

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY 1. PURPOSE: SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY The purpose of this policy is to establish procedures to facilitate compliance with federal, state and local stormwater regulations

More information

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows:

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows: DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION 00 91 11.02 ADDENDUM NUMBER TWO June 22, 2016 TO: PLANHOLDERS SUBJECT: PCT TRUCK STAGING PROJECT PROJECT NO. 091606 CONTRACT NO. 070287 This

More information

Stormwater Management. Cayuga County NY 20 July 2016 Presenter : John B. Zepko, CPESC

Stormwater Management. Cayuga County NY 20 July 2016 Presenter : John B. Zepko, CPESC Stormwater Management Cayuga County NY 20 July 2016 Presenter : John B. Zepko, CPESC Agenda What is Stormwater? Why is Stormwater a Problem? NY State Regulations Stormwater Pollution Prevention Plans What

More information

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 General: Sections of the Minnesota Department of Transportation (Mn/DOT), Standard Specification for Construction, 2000 or Current

More information

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

Construction Site Erosion Control and Phase II of the Stormwater Permit Program Construction Site Erosion Control and Phase II of the Stormwater Permit Program Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa, AL In Georgia,

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL Section Number Title 801 GENERAL 802 STANDARD METHODS OF EROSION AND SEDIMENT

More information

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

Construction Site Erosion Control and Phase II of the Stormwater Permit Program Construction Site Erosion Control and Phase II of the Stormwater Permit Program Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa, AL In Georgia,

More information

Soil Erosion and Sedimentation Control Application Packet 2011

Soil Erosion and Sedimentation Control Application Packet 2011 Soil Erosion and Sedimentation Control Application Packet 2011 The following items are required to apply for a Soil Erosion and Sedimentation Control permit for a construction project in Chippewa County:

More information

Jackson County Environmental Health Department Lansing Avenue Ste. 221 Jackson, MI Phone (517) Fax (517)

Jackson County Environmental Health Department Lansing Avenue Ste. 221 Jackson, MI Phone (517) Fax (517) Jackson County Environmental Health Department 1715 Lansing Avenue Ste. 221 Jackson, MI 49202 Phone (517) 788-4433 Fax (517) 788-4616 Jackson County Environmental Health Department 1715 Lansing Avenue

More information

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities. SECTION 01 5713 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. Prevention of erosion due to construction activities. B. Prevention of sedimentation of waterways, open drainage

More information

Best Management Practice (BMP) Guidance Manual

Best Management Practice (BMP) Guidance Manual Best Management Practice (BMP) Guidance Manual INTRODUCTION BMP examples in this guide provide ways to meet erosion and sediment control requirements. Best Management Practices are not limited to these

More information

Single Family Residential Construction Erosion/Sediment Control Standards

Single Family Residential Construction Erosion/Sediment Control Standards Single Family Residential Construction Erosion/Sediment Control Standards Introduction: This booklet contains standard plans and procedures sufficient for typical building construction. It is not intended

More information

G RRILL P LMER SHEET 7 SHEET SHEET. Relationships. Responsiveness. Results GOULD RD N LISBON RD

G RRILL P LMER SHEET 7 SHEET SHEET. Relationships. Responsiveness. Results GOULD RD N LISBON RD GOULD RD SHEET 7 N LISBON RD LISBON RD (ROUTE 196) SHEET 9 SHEET 8 DESIGN NOTES: NOTE: BASE DETAIL OPTION 1 BASE DETAIL OPTION 2 CONFIGURATION DETAIL TYPICAL INSTALLATION 1" PVC ANTI-SIPHON PIPE ADAPTER

More information

BMP 6.4.4: Infiltration Trench

BMP 6.4.4: Infiltration Trench BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a

More information

Division of Water Quality (701)

Division of Water Quality (701) Division of Water Quality (701) 328-5210 stormwater@nd.gov March April 2018 1 Construction Permit Permit #: NDR10-0000 Reissued April 1, 2015 Expires March 31, 2020 2 Discharges Covered Stormwater Discharges

More information

SITE DESIGN ENGINEER'S STATEMENT:

SITE DESIGN ENGINEER'S STATEMENT: SITE DESIGN ENGINEER'S STATEMENT: THESE DETAILED PLANS AND SPECIFICATIONS WERE PREPARED UNDER MY DIRECTION AND SUPERVISION. SAID PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ACCORDING TO THE CRITERIA ESTABLISHED

More information

GENERAL NOTES AND CONDITIONS STORM SEWER 1. ALL EARTHWORK, GRADING AND PAVING SHALL BE PERFORMED IN ACCORDANCE WITH STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION IN ILLINOIS, STATE OF ILLINOIS

More information

SECTION EROSION CONTROLS

SECTION EROSION CONTROLS SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment

More information

Re: Erosion Control Report and Drawings Requirements Accompanying Document

Re: Erosion Control Report and Drawings Requirements Accompanying Document Re: Erosion Control Report and Drawings Requirements Accompanying Document This document was created to help engineers and other design staff to better understand, meet and exceed the erosion control requirements

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering) Compliance Assistance Program Checklist 1 Start of Construction Stormwater Self-Certification Checklist Note: This checklist must be completed and submitted to the DEM no later than 30 days after initiating

More information

VILLAGE OF HODGKINS 8990 LYONS STREET, HODGKINS, ILLINOIS OFFICE: FAX:

VILLAGE OF HODGKINS 8990 LYONS STREET, HODGKINS, ILLINOIS OFFICE: FAX: VILLAGE OF HODGKINS 8990 LYONS STREET, HODGKINS, ILLINOIS 60525 OFFICE: 708.579.6700 FAX: 708.579.6707 Village Ordinance #07-10 Soil Erosion & Sedimentation Control The Village of Hodgkins is responsible

More information

Performance Standards Compliance Checklist

Performance Standards Compliance Checklist Truckee Meadows Regional Stormwater Quality Management Program Performance Standards Compliance Checklist The checklist that follows identifies the BMPs that can be used at construction sites to meet each

More information

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE

More information

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET Permit. ARR150000 SITE WITH AUTOMATIC COVERAGE (LESS THAN 5 ACRES) CONSTRUCTION SITE NOTICE FOR THE Arkansas Department of Environmental Quality (ADEQ) Storm Water Program NPDES GENERAL PERMIT NO. ARR150000

More information

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET Permit. ARR150000 SITE WITH AUTOMATIC COVERAGE (LESS THAN 5 ACRES) CONSTRUCTION SITE NOTICE FOR THE Arkansas Department of Environmental Quality (ADEQ) Storm Water Program NPDES GENERAL PERMIT NO. ARR150000

More information

Rock Sock (RS) Rock Sock height.

Rock Sock (RS) Rock Sock height. Rock Sock (RS) SC-5 Description A rock sock is constructed of gravel that has been wrapped by wire mesh or a geotextile to form an elongated cylindrical filter. Rock socks are typically used either as

More information

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER Tavares, Florida Jones Edmunds & Associates, Inc. Project No. 06806-012-01 CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE STORM WATER POLLUTION PREVENTION PLAN TEMPLATE Cover Page Certifications Project, Owner, Operator, SWPPP Preparer, Date, Project Dates Signed by RIDOT (Owner) and CONTRACTOR (as Operator) of Contents Introduction

More information

Soil erosion and resulting sedimentation from developing areas are leading sources of water quality degradation.

Soil erosion and resulting sedimentation from developing areas are leading sources of water quality degradation. & Soil erosion and resulting sedimentation from developing areas are leading sources of water quality degradation. Sediment is the number one pollutant, by volume, of surface water. The major source of

More information

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Materials and Waste Management - WM DESCRIPTION AND PURPOSE A gravel

More information

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH) City of St. Catharines Standard Drawings SEPTEMBER 2018 Revised September 6, 2018 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 2 Monolithic Curb-Faced Sidewalk 110-2002 3 Sidewalk

More information

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL 901.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 8 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Note: This Special Provision is generally written in the imperative mood. The subject, the

More information

Erosion Control Blankets

Erosion Control Blankets 2.3 Erosion Control Description: An erosion control blanket (ECB) is a temporary, degradable, rolled erosion control product that reduces soil erosion and assists in the establishment and growth of vegetation.

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information

Soil Erosion and Sedimentation Control (SESC) Information and Application Packet

Soil Erosion and Sedimentation Control (SESC) Information and Application Packet ARENAC COUNTY BUILDING DEPARTMENT SOIL EROSION & SEDIMENT CONTROL P.O. BOX 724 * 120 NORTH GROVE ST * STANDISH, MI 48658 PH. 989-846-9791 FAX: 989-846-9188 This institution is an equal opportunity provider.

More information

SHORELAND PROTECTION PERMIT APPLICATION

SHORELAND PROTECTION PERMIT APPLICATION SHORELAND PROTECTION PERMIT APPLICATION CODE ENFORCEMENT OFFICE 85 UNION STREET BRUNSWICK, MAINE 04011 (207) 725-6651 FAX (207) 725-6663 For Office Use Appl # Date Fee MAP LOT Appr By GENERAL INFORMATION

More information

RESIDENTIAL BUILDING PERMIT

RESIDENTIAL BUILDING PERMIT A APPLICATION FOR A RESIDENTIAL BUILDING PERMIT JACKSON CO. MS. PLAN CASE NUMBER: PERMIT NUMBER: ACCEPTED BY: APPROVED BY: Application is hereby made for a permit under the provisions of the Comprehensive

More information

Storm Water Pollution Prevention Plan for CES Gravel #3800

Storm Water Pollution Prevention Plan for CES Gravel #3800 David Lewis Cell: (870) 310-2757 Rickey Vaughn Cell: (870) 310-9602 Buddy McAdams Cell: (870) 310-8733 Local (870) 881-8830 Fax: (870) 881-8809 LICENSED, BONDED & INSURED Howard Cupp, Jr. Cell: (870) 314-2877

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 01 29 00 PAYMENT PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. For each BID item, the WORK will be measured and paid for on either a unit price basis or on a lump sum basis. The quantities

More information

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site.

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site. INLET PROTECTION From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.state.ma.us/dep/brp/stormwtr/files/esfull.pdf Definition: A sediment filter or an excavated

More information

Ordinance No NOW THEREFORE, be it hereby ordained by the Glasgow City Council as follows:

Ordinance No NOW THEREFORE, be it hereby ordained by the Glasgow City Council as follows: Ordinance No. 2424 ORDINANCE PROVIDING FOR PREVENTION OF EROSION AND CONTROL OF SEDIMENT; DEFINING TERMS USED IN THE ORDINANCE; ESTABLISHING THE SCOPE OF COVERAGE OF THE ORDINANCE AND EXCEPTING THEREFROM

More information

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads No. 6 December, 1995 Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads Steve Holaday, Wisconsin Dept. of Natural Resources, and Jeff Martin, Dept. of Forestry, UW-Madison BMPs

More information

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018 STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -

More information

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Erosion and Sediment Control Plan for a Timber Harvesting Operation 3930-FM-WM0155 Rev. 7/2004 Erosion and Sediment Control Plan for a Timber Harvesting Operation 1. GENERAL INFORMATION A. Location Municipality B. Timber sale area = acres Date County C. Landowner Name

More information

Accessory Building/Detached Building Permit

Accessory Building/Detached Building Permit Accessory Building/Detached Building Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning

More information

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth

More information

SECTION SOIL EROSION, SEDIMENTATION CONTROL AND LANDSCAPING TABLE OF CONTENTS

SECTION SOIL EROSION, SEDIMENTATION CONTROL AND LANDSCAPING TABLE OF CONTENTS SECTION 04000 SOIL EROSION, SEDIMENTATION CONTROL AND LANDSCAPING 04010 SCHEDULING 04020 TEMPORARY MEASURES 04030 PERMANENT MEASURES 04040 COMPUTATIONS 04050 CONSTRUCTION SEQUENCE TABLE OF CONTENTS 04000-1

More information