1 ORANGE COUNTY EMPIRICAL ANALYSIS: USING LOOP DETECTOR DATA TO IDENTIFY BOTTLENECK LOCATIONS AND CHARACTERISTICS by LEAH S. TOMLINSON A research project report submitted in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE in CIVIL AND ENVIRONMENTAL ENGINEERING Portland State University 2009

2 PROJECT APPROVAL The research project report of Leah S. Tomlinson for the Master of Science in Civil and Environmental Engineering submitted on April 28, 2009, is accepted by the faculty advisor and the department. ADVISOR APPROVAL Robert L. Bertini, Advisor DEPARTMENT APPROVAL Scott A. Wells, Chair Department of Civil and Environmental Engineering

3 iii ACKNOWLEDGEMENTS I would like to thank Dr. Robert Bertini for supervising this project and for his support, guidance and motivation on this project and during the course of my graduate career. I would like to acknowledge the California DOT and the University of California at Berkeley for allowing access to the PeMS database and Lianyu Chu for providing clarification and troubleshooting on issues that arose during the course of the project. Finally, I would like to the Department of Civil Engineering and Environmental Engineering at Portland State University that funded a portion of this project.

4 iv Abstract An abstract of the research project report of Leah S. Tomlinson for the Master of Science in Civil and Environmental Engineering submitted on April 28, Title: Orange County Empirical Analysis: Using Loop Detector Data to Identify Bottleneck Locations and Characteristics. In order to evaluate and understand congestion issues of a freeway, it is important to understand how traffic on that freeway flows. Using archived freeway data and manipulating it in ways that allow researchers to better understand that flow is a very useful tool. This study, inspired by previous studies of the same freeway segment, determines bottleneck locations and queue characteristics using archived freeway data. The freeway segment, a 6-mile stretch of Northbound I-405 in Orange County, California was studied. Data were taken from three dates. This data included occupancy, speed and count measures from on- and off-ramps and lane by lane from the mainline of the freeway. Speed diagrams were created for the mainline lanes to determine bottleneck locations, queue locations when they occurred and how long those queues lasted. Then, oblique plots of count, occupancy and speed were created to determine exactly how traffic was moving in the mainline lanes. Then the on-ramp data was examined and it was determined that surges in on-ramp traffic were creating the bottlenecks. There were some limitations that stemmed from inaccurate data that future research would be able to correct.

5 v TABLE OF CONTENTS 1. Introduction Background Methodology Data Analysis May 22, Speed Diagrams Oblique Plots May 23, Results/Conclusions Further Research...18 References...19

6 vi LIST OF FIGURES Figure Title Page 1 Bottleneck example Speed Diagram and Site Map (May 22, 2001) University and I Oblique Count Plot (May 22, 2001) Oblique Occupancy Plot (May 22, 2001) Oblique Speed Plot (May 22, 2001) On-ramp Oblique Count Plot (5/22/03) Speed Diagram (May 23, 2001) Oblique Count Plot (May 23, 2001) Oblique Occupancy Plot (May 23, 2001) Oblique Occupancy Plot (May 23, 2001) On-ramp Oblique Count Plot (May 23, 2001)...17

7 1 1. Introduction The objective of this study is to identify bottleneck locations and characteristics given inductive loop detector data (vehicle counts, lane occupancies and speed data). The data used is from a sixmile stretch of Interstate 405 (northbound lanes) in Orange County, California. This study was inspired by and is related to a previous study titled, Use of Performance Measurement System Data to Diagnose Freeway Bottleneck Locations Empirically in Orange County, California (1). That study was conducted using data from a summer day in 1998 and it was concluded in that study that there were limitations in bottleneck locations, no on-ramp detector data and that there may be a need for a larger scale analysis. The current study will take another look at this same freeway segment to see if detector data at more frequent locations (including on-ramps) can give more detailed bottleneck information and characteristics. The data came from the California Performance Measurement System (PeMS) database. This resource was developed by the California Department of Transportation and The University of California at Berkeley. PeMS collects historical and real-time freeway data from California freeways in order to compute freeway performance measures (1). This study focused on the AM peak period from 7:00 to 9:00. Because of data restrictions, only 3 different queues were analyzed. The tools used to examine the bottlenecks are several oblique plots of different performance measures (speed, occupancy and count) along with speed diagrams Background A bottleneck is a point at which upstream of the point, traffic is flowing freely and downstream, there is a queue (Figure 1). Daganzo (2) defines a bottleneck such that it would be serving vehicles at a maximum rate, and discharge outflows measured downstream of a queue would not be affected by traffic conditions further downstream. A bottleneck is considered active when it meets the foregoing conditions and deactivated when there is a decrease in demand or when there is a spillover from a downstream bottleneck (1). Figure 1 Bottleneck Example (3)

8 2 Because bottlenecks can propagate for many miles and last for hours, it is important to understand the way they form their characteristics while active and how they dissipate. There have been many studies and much research done on the subject of bottlenecks. There are several implications of this research. They include the demonstration of the benefits of traffic management sensor investments, the revelation of the benefits of archived raw data, the better understanding of traffic behavior at a merge and much more. (3) In this study, data are taken from loop detectors and analyzed. This allowed for the identification of the bottleneck locations, the times at which the bottlenecks were activated and deactivated and perhaps, what caused the bottlenecks. 2. Methodology As noted previously, this study was conducted using loop detector data. The archived, raw speed data were used to create a speed contour plot (Figure 2).

9 Figure 2 - Speed Diagram and Site Map (May 22, 2001) 3

10 4 The red areas represent a slower speed while the green areas represent faster speeds closer to freely flowing conditions. The three aforementioned queues are labeled as Queue 1, 2 and 3. Because these queues form at Milepost 4.03 (University Drive), subsequent focus will take place at Milepost Since we have data from the on-ramp at Milepost 3.86 and from all lanes at Milepost 4.03, our evaluation at Milepost 3.86 should provide a good idea of what is happening on that segment of the freeway. The site map is to the right of the speed diagram. The diamonds represent loop detector locations. Loops shown in red are those that are located in high occupancy vehicle (HOV) lanes and the loops that are grayed out show the locations where the data is either missing or corrupt. As can be seen from the diagram, the second on-ramp detector at Sand Canyon Avenue is grayed out because the data for that location is missing. This makes the evaluation of the queues at Milepost 3.31 impossible since we don t know the volume of traffic entering the freeway at that location. For this reason, only the queues and bottlenecks at Milepost 3.86 will be considered. After identifying where the queues were and subsequently, where the bottlenecks formed and dissipated, the next step in the process was to take the same speed data along with the occupancy and count data and examine them. This gave a better picture of what is causing the bottlenecks and allowed us to determine other characteristics of the traffic flow at this location during this time period. The next step in evaluating the bottlenecks and queues was to create and examine oblique plots of speed, occupancy and vehicle count. From these plots, it can be seen when speed, count and occupancy increase and decrease. When a bottleneck activates, speed decreases, count also decreases and occupancy increases. This makes sense because as traffic moves more slowly, fewer vehicles pass over the loop detectors in a given time period and stay over the loops for a larger percentage of that time period. By knowing the exact time of speed, count and occupancy changes and having the same information for the upstream on-ramp traffic, it is possible to determine what affect the on-ramp traffic has on the mainline traffic. Since it was determined where the queues formed from the speed diagrams, oblique plots were made at the same location and everything was looked at together. 3. Data As can be seen from Figure 1 and Figure 3, the study site is located on northbound I-405 between Mileposts 0.93 and 6.21 in Orange County, California. Along the study site, there are four northbound mainline travel lanes. On the left-hand side of these lanes, there is a high occupancy vehicle (HOV) lane that is separated by a wide, striped buffer. There are several locations where an auxiliary lane is present as well. These can be seen in Figure 1 at Mileposts 1.11, 1.73, 2.35, 5.74 and There are 14 mainline loop detector stations that are labeled

11 5 according to their corresponding milepost. In addition, all on- and off-ramps have detectors on them. The following figure shows the site where a majority of the analysis takes place. The locations of the on-ramp loop detector and the upstream and downstream freeway loop detectors are shown. Data were pulled from the PeMS database for the days of May 22, 2001, May 23, 2001 and June 1, Loop detectors collected count, occupancy and speed data. The data was aggregated in 30 second intervals for each lane. As was previously mentioned, there are some locations where the data were missing or the data were collected but somehow corrupted and inaccurate. These loops are indicated as being faulty by being grayed over where the site map is displayed. Figure 3 - University and I 405 (Courtesy of Google Maps)

12 6 4. Analysis 4.1 May 22, 2001 May 22, 2001 was the first day s data to be examined. It was manipulated and analyzed by processes previously explained. The plots and figures in this section explain what was found after processing that data Speed Diagrams As explained earlier, the first thing that was done to the data was the creation of a speed diagram. The data from the 3 different days showed similar trends so only the graphs from the May 22, 2001 will be displayed. The speed diagram for this day is seen in Figure 2. Queue 1 was activated at 7:34AM and deactivated at 7:44AM. Queue 2 was activated at 7:56AM and deactivated at 8:11AM. The last queue, Queue 3 was activated at 8:23AM and deactivated at 8:49AM. After determining these queue times, the next step was to take a look at the oblique plots to get a picture of the flow of traffic at this location at the times that the queues began and ended Oblique Plots Figure 4 shows the oblique count plots for Milepost The red lines indicate the beginning and ending of the queue and are labeled as Queue 1, 2 and 3. As can be seen from this plot, at around 7:34AM, the time of the activation of Queue 1, there is a sharp decline in count in lanes 1, 3 and 4 (the data for lane 2 in this instance was corrupt). The trend continues until approximately 7:44AM, at which time, the count begins to increase again. This too is consistent with the end of Queue 1. The same trends occur at the beginning and end of Queue 2 and Queue 3. The numbers on the plot are values for the flow of vehicles in vehicles per hour. They show bottleneck pre-queue flows and discharge flows. Because all lanes follow the same trends, only lane 1 flows were labeled. Figures 5 and 6 show oblique occupancy and oblique speed counts respectively. Again, the queue beginnings and endings are outlined in red. Similar trends can be observed in these plots. At approximately the same times as the beginnings and ends of the queues that correspond with the increases and decreases in count (as shown on the oblique count plot), decreases in speeds and increases in occupancy can be observed. Note that during the when between the queues are active, there are steep increases (occupancy) or decreases (speed) and in between the queues, speed and occupancy level off. Again, this is logical and expected since a queue would slow traffic speeds and therefore increase the amount of time vehicles spend over the loop detectors (occupancy).

13 7 Queue 1 Figure 4 - Oblique Count Plot

14 8 Queue 3 Figure 5 - Oblique Occupancy Plot

15 9 Queue 1 Queue 2 Queue 3 Figure 6 - Oblique Speed Plot

16 10 At this point in the study, it had become apparent that at this particular location, the data were good (with the exception of lane 2). It was making sense and the different types of data were lining up together in a way that reinforced what we know about traffic flow. After it was understood how the traffic was flowing at that location, where the queue was forming and how traffic is responding to that queue, attempts were made to solve the question of why the queue is forming in first place. In order to do that, the next step was to look at the on-ramp flow at that location. It was hypothesized that where the formation of queues and the slowing of traffic occurred, there would be a surge in traffic from the on-ramp onto the mainline freeway. Upon examining the on-ramp count, it was determined that the hypothesis was correct.

17 11 Queue 1 Queue 2 Queue 3 Figure 7 On-ramp Oblique Count Plot

18 12 The arrows and number in Figure 7 show surges in on-ramp flow. As can be seen, the queues were activated almost immediately after the surges. The arrow labeled 1, points to an onramp surge that most likely caused Queue 1. There was a sharp surge in on-ramp flow, this increased traffic volume on the mainline, slowing speeds, decreasing count and increasing occupancy. The same series of events occur with Queue 2 and Queue 3. Again, surges in onramp flow occur right before these queues form as indicated by the arrows labeled 2 and 3. Arrow 4 shows another very sharp surge in on-ramp traffic. This surge can be seen in Figure 1 as well. Over the duration of Queue 3, there is a slight increase in traffic speed followed by another period of very slow speeds that correspond with the on-ramp flow increase shown as arrow May 23, 2001 The same trends were seen for the other 2 days that were evaluated. Figures 8-12 show the same plots for May 23, 2001 which were previously shown for May 22, Although the same trends can be seen for June 1, 2001, they are not as defined and sharp as the other 2 days. For this reason, plots for that date have been omitted from this paper. The information from the two dates given should provide enough information and illustrate the objectives and results of this study well enough to not include the third day. Again, the queues beginning and ending times are shown by red lines and are labeled. In the oblique occupancy plot, during queues, the occupancy decreases. The same is true for the speeds on the oblique speed plot. Just the opposite occurs on the oblique occupancy plot for reasons previously explained. Also, as can been seen in the on-ramp flow from May 22, 2001, there are surges just prior to the queue beginning times as can be seen on the oblique count plots for May 23, 2001 (Figure 12).

19 13 Milepost Culver Drive 5.01 Travel Direction Queue 1 Queue 2 Queue 3 7:20 7:20 7:29 7:44 8:01 7:30 7:45 8:01 8:03 8:03 8:35 8: University Drive 7:14 7:21 8:02 8:04 8:31 8: :15 8: Sand Canyon Ave. 40 7:16 8: :17 8: :18 8: Hwy :19 8: :31 8: Irvine Center Drive Figure 8 - Speed Diagram (May 23, 2001)

20 14 Queue 1 Queue 3 Figure 9 - Oblique Count Plot

21 15 Queue 1 Queue 2 Queue 3 Figure 10 - Oblique Occupancy Plot

22 16 Queue 1 Queue 2 Queue 3 Figure 11 - Oblique Speed Plot

23 vph Figure 12 - On-ramp Oblique Count Plot

24 18 5. Results/Conclusions As previously noted, it was able to be determined that the data were accurate and that different data sets matched up with one another. By looking at the data in oblique plots, we can see exactly how traffic is moving and to what degree it is slowing or getting faster. The main thing that this study determined was that surges in on-ramp flow from University Drive onto Northbound Interstate 405 in Orange County, California cause bottlenecks and queues at this location. The data proves this in the three cases presented in this study and it is certain that it would do so over and over again with data from other dates. The fact that so much can be determined about the dynamics of freeway travel from the data that is collected speaks volumes. By recording speed, occupancy and count data and manipulating it in the ways shown in this study (and in other ways), it is possible to see exactly how traffic flows without having to directly observe it. One of the real successes of this study was being able to use this performance measurement system to identify the bottleneck locations. It shows that not only is the use of loop detector warranted but also extremely helpful and the data they pick up very useful. Solving the problem of the congestion in this location is not as simple as identifying the problem itself. This area of California has some of the worst congestion in the country and no one change will repair it. A ramp signal at this location could improve the flow of traffic by providing a more even flow of vehicles to the freeway but ramp signals alone will not completely erase the congestion in this area. Another issue that is present is the lack of data and the quality of data at certain loops. The more accurate the data, the closer researchers can come to identifying issues and the more precise they can be in their proposed solutions to these problems. 6. Further Research The same technique used on the correct data from the on-ramp at Sand Canyon Avenue would be beneficial as the queue from the bottlenecks identified at University Drive could be backing up into that area. There also seems to be bottlenecks forming at that location so it would be useful to know if on-ramp surges were causing them as well. We know that this process can show us where bottlenecks occur and where queues form. Further research could include a system that automatically creates the plots shown in this paper so that more detailed trends could be observed. This would also help see if problem areas were getting better or worse over time or after an improvement like the installation of a ramp signal.

25 Having not only the archived freeway data, but also archived plots showing how traffic moved on any given date could be extremely useful in evaluating the long term congestion issues of a freeway. 19

26 20 References 1. Bertini, Robert L. and Myton, Aaron M. Use of Performance Measurement System Data to Diagnose Freeway Bottleneck Locations Empirically in Orange County, California. Transportation Research Record Daganzo, C.F. Fundamentals of Transportation Engineering and Traffic Operations. Elsevier Science. Oxford, Bertini, Robert L. Capacity and the Breakdown Phenomenon at a Freeway Merge Bottleneck: Unlocking the Potential of Loop Sensor Data. Portland State University. February 2002.

Session 8A ITS. Bottleneck Identification and Forecasting in Traveler Information Systems

Session 8A ITS. Bottleneck Identification and Forecasting in Traveler Information Systems Session 8A ITS Bottleneck Identification and Forecasting in Traveler Information Systems Robert L. Bertini and Huan Li, Department of Civil and Environmental Engineering, Portland State University, Portland,

More information

Goleta Ramp Metering Study

Goleta Ramp Metering Study DRAFT Technical Memorandum Goleta Ramp Metering Study Subtasks 2.1 and 2.2: Data Collection and Existing Baseline Analysis June 5, 2017 DRAFT Technical Memorandum Goleta Ramp Metering Study Subtasks 2.1

More information

Evaluating the Benefits of a System-Wide Adaptive Ramp-Metering Strategy in Portland, Oregon

Evaluating the Benefits of a System-Wide Adaptive Ramp-Metering Strategy in Portland, Oregon Evaluating the Benefits of a System-Wide Adaptive Ramp-Metering Strategy in Portland, Oregon Soyoung Ahn Department of Civil and Environmental Engineering Arizona State University P.O. Box 875306 Tempe,

More information

GOOD ONYA, AUSTRALIA!

GOOD ONYA, AUSTRALIA! International Experiences Driving Managed Mobility GOOD ONYA, AUSTRALIA! Darren Henderson, WSP USA M1, Melbourne, VIC MANAGED FREEWAYS The most important transportation strategy you ve probably never

More information

S203: The Caltrans Performance Measurement System (PeMS) An Introduction to PeMS and a Demonstration of its Multimodal Tools

S203: The Caltrans Performance Measurement System (PeMS) An Introduction to PeMS and a Demonstration of its Multimodal Tools S203: The Caltrans () An Introduction to and a Demonstration of its Multimodal Tools Presented By: Ellison Alegre, San Diego Association of Governments Jane Berner, Caltrans APA s 2012 National Planning

More information

INTERIM ADVICE NOTE 103/08. Advice Regarding the Assessment of Sites for Ramp Metering

INTERIM ADVICE NOTE 103/08. Advice Regarding the Assessment of Sites for Ramp Metering INTERIM ADVICE NOTE 103/08 Advice Regarding the Assessment of Sites for Ramp Metering Summary This document provides advice on identifying on-slip locations that are likely to be suitable for the implementation

More information

Analysis of Queue Estimation Methods Using Wireless Magnetic Sensors

Analysis of Queue Estimation Methods Using Wireless Magnetic Sensors Analysis of Queue Estimation Methods Using Wireless Magnetic Sensors Rene O. Sanchez, Roberto Horowitz, and Pravin Varaiya Four queue estimation methodologies were studied with wireless magnetic sensors

More information

FREEWAY PERFORMANCE MEASUREMENT SYSTEM (PeMS): AN OPERATIONAL ANALYSIS TOOL

FREEWAY PERFORMANCE MEASUREMENT SYSTEM (PeMS): AN OPERATIONAL ANALYSIS TOOL FREEWAY PERFORMANCE MEASUREMENT SYSTEM (PeMS): AN OPERATIONAL ANALYSIS TOOL Tom Choe Office of Freeway Operations California Department of Transportation District 7 120 S Spring Street Los Angeles, CA

More information

Automating Variable Speeds and Traveler Information with Real-Time Traffic and Weather

Automating Variable Speeds and Traveler Information with Real-Time Traffic and Weather Automating Variable Speeds and Traveler Information with Real-Time Traffic and Weather Joshua Crain, Jim Peters, P.E., PTOE, and Carl S. Olson ABSTRACT The Highway 217 freeway in Portland, Oregon was the

More information

Low-Cost Improvements for Recurring Freeway Bottlenecks

Low-Cost Improvements for Recurring Freeway Bottlenecks NCHRP 3-83 Low-Cost Improvements for Recurring Freeway Bottlenecks Draft Technical Guide November 2012 TRANSPORTATION RESEARCH BOARD NAS - NRC LIMITED USE DOCUMENT This report, not released for publication,

More information

Performance Evaluation of Adaptive Ramp-Metering Algorithms Using Microscopic Traffic Simulation Model

Performance Evaluation of Adaptive Ramp-Metering Algorithms Using Microscopic Traffic Simulation Model Performance Evaluation of Adaptive Ramp-Metering Algorithms Using Microscopic Traffic Simulation Model Lianyu Chu 1 ; Henry X. Liu 2 ; Will Recker 3 ; and H. Michael Zhang 4 Abstract: Adaptive ramp metering

More information

Algorithms for Identifying and Ranking Bottlenecks Using Probe Data

Algorithms for Identifying and Ranking Bottlenecks Using Probe Data 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Algorithms for Identifying and Ranking Bottlenecks Using Probe Data Andrew Lund Senior DBA, CATT Lab 301.405.2874 Alund1@umd.edu

More information

OPTIMIZING RAMP METERING STRATEGIES

OPTIMIZING RAMP METERING STRATEGIES OPTIMIZING RAMP METERING STRATEGIES Presented by Kouros Mohammadian, Ph.D. Saurav Chakrabarti. ITS Midwest Annual Meeting Chicago, Illinois February 7, 2006 Background Ramp control is the application of

More information

Operational Analyses of Freeway Off-Ramp Bottlenecks

Operational Analyses of Freeway Off-Ramp Bottlenecks Transportation Research Procedia Volume 15, 2016, Pages 573 582 ISEHP 2016. International Symposium on Enhancing Highway Performance Operational Analyses of Freeway Off-Ramp Bottlenecks Alexander Skabardonis

More information

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence. THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive

More information

GENERATING PERFORMANCE MEASURES FROM PORTLAND S ARCHIVED ADVANCED TRAFFIC MANAGEMENT SYSTEM DATA

GENERATING PERFORMANCE MEASURES FROM PORTLAND S ARCHIVED ADVANCED TRAFFIC MANAGEMENT SYSTEM DATA GENERATING PERFORMANCE MEASURES FROM PORTLAND S ARCHIVED ADVANCED TRAFFIC MANAGEMENT SYSTEM DATA Robert L. Bertini Department of Civil Engineering Portland State University P.O. Box 751 Portland, OR 97207-0751

More information

1. Controlling the number of vehicles that are allowed to enter the freeway,

1. Controlling the number of vehicles that are allowed to enter the freeway, Chapter 25 Ramp Metering 25.1 Introduction Ramp metering can be defined as a method by which traffic seeking to gain access to a busy highway is controlled at the access point via traffic signals. This

More information

USING TRAVEL TIME RELIABILITY DATA TO DEVELOP CONGESTION MANAGEMENT STRATEGIES IN THE TRANSPORTATION PLANNING PROCESS.

USING TRAVEL TIME RELIABILITY DATA TO DEVELOP CONGESTION MANAGEMENT STRATEGIES IN THE TRANSPORTATION PLANNING PROCESS. USING TRAVEL TIME RELIABILITY DATA TO DEVELOP CONGESTION MANAGEMENT STRATEGIES IN THE TRANSPORTATION PLANNING PROCESS by Shuangshuo Wang B.S. Engineering, Tongji University, 2014 Submitted to the Graduate

More information

Techniques for Validating an Automatic Bottleneck Detection Tool Using Archived Freeway Sensor Data

Techniques for Validating an Automatic Bottleneck Detection Tool Using Archived Freeway Sensor Data Techniques for Validating an Automatic Bottleneck Detection Tool Using Archived Freeway Sensor Data Jerzy Wieczorek, Rafael J. Fernández-Moctezuma, and Robert L. Bertini Bottlenecks are key features of

More information

Ramp Metering. Chapter Introduction Metering strategies Benefits Objectives

Ramp Metering. Chapter Introduction Metering strategies Benefits Objectives Chapter 46 Ramp Metering Traffic signal on merge ramp Direction of travel Merge lane Vehicle detectors monitoring traffic density through lane occupancy Figure 46.1: Schematic diagram of ramp metering

More information

Generating Performance Measures From Portland s Archived Advanced Traffic Management System Data

Generating Performance Measures From Portland s Archived Advanced Traffic Management System Data Generating Performance Measures From Portland s Archived Advanced Traffic Management System Data Robert L. Bertini Department of Civil and Environmental Engineering Portland State University P.O. Box 751

More information

Variable Speed Advisory/Limit and Coordinated Ramp Metering for Freeway Traffic Control

Variable Speed Advisory/Limit and Coordinated Ramp Metering for Freeway Traffic Control Variable Speed Advisory/Limit and Coordinated Ramp Metering for Freeway Traffic Control Project Meeting Caltrans DRI Xiao-Yun Lu and Steven Shladover California PATH Program, U. C. Berkeley Sept 7, 2012

More information

Using Cooperative Adaptive Cruise Control (CACC) to Form High- Performance Vehicle Streams: Simulation Results Analysis

Using Cooperative Adaptive Cruise Control (CACC) to Form High- Performance Vehicle Streams: Simulation Results Analysis Using Cooperative Adaptive Cruise Control (CACC) to Form High- Performance Vehicle Streams: Simulation Results Analysis February 2018 Hao Liu Xingan (David) Kan Steven E. Shladover Xiao-Yun Lu California

More information

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County 07 - LA - 605 - PM 2.87/PM 6.36 07 - LA - 91 - PM 14.10/PM 19.81 Vicinity Map N On Routes Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County I-605 between Excelsior Dr UC (PM 6.36)

More information

Measuring Freeway Safety Performance: The Freeway Accident Risk Analysis (ARA) Tool

Measuring Freeway Safety Performance: The Freeway Accident Risk Analysis (ARA) Tool Measuring Freeway Safety Performance: Introduction Presenter: Coco Briseno; Division Chief Caltrans Division of Research, Innovation, & System Information (DRISI) Caltrans Project Manager: Fred Yazdan;

More information

A Probabilistic Approach to Defining Freeway Capacity and Breakdown

A Probabilistic Approach to Defining Freeway Capacity and Breakdown A Probabilistic Approach to Defining Freeway Capacity and Breakdown MATT LORENZ LILY ELEFTERIADOU The Pennsylvania Transportation Institute The Pennsylvania State University 201 Transportation Research

More information

NCDOT I-540 Ramp Metering in Raleigh, Lessons Learned. Meredith McDiarmid NCDOT Transportation Mobility and Safety October 2018

NCDOT I-540 Ramp Metering in Raleigh, Lessons Learned. Meredith McDiarmid NCDOT Transportation Mobility and Safety October 2018 NCDOT I-540 Ramp Metering in Raleigh, Lessons Learned Meredith McDiarmid NCDOT Transportation Mobility and Safety October 2018 What is Ramp Metering? Traffic signals on the freeway onramp Controls flow

More information

Copyright 2013 by Seyedbehzad Aghdashi. All Rights Reserved

Copyright 2013 by Seyedbehzad Aghdashi. All Rights Reserved ABSTRACT AGHDASHI, SEYEDBEHZAD. Traffic Flow Optimization in a Freeway with Stochastic Segments Capacity. (Under the direction of committee Dr. Yahya Fathi and Dr. Nagui M. Rouphail). In this dissertation,

More information

Comparison of I-210 and I-710 as Potential ICM Corridors

Comparison of I-210 and I-710 as Potential ICM Corridors Comparison of I-210 and I-710 as Potential ICM Corridors Positive Aspects Traffic sensors Very good PeMS coverage of freeway mainline, HOV lanes, and ramps Many intersections within Pasadena already equipped

More information

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT February 2016 INTERSTATE 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION PROJECT Commonwealth of Virginia Virginia

More information

HCM2010 Chapter 10 Freeway Facilities User s Guide to FREEVAL2010

HCM2010 Chapter 10 Freeway Facilities User s Guide to FREEVAL2010 HCM200 Chapter 0 Freeway Facilities User s Guide to FREEVAL200 Prepared by: N. Rouphail, and B. Schroeder Institute for Transportation Research & Education (ITRE) Brian Eads, Crawford, Murphy and Tilly

More information

Highway Performance Measures for a Multimodal Corridor

Highway Performance Measures for a Multimodal Corridor Highway Performance Measures for a Multimodal Corridor James Strathman Center for Urban Studies Portland State University P.O. Box 751 Portland, OR 97207-0751 Phone: 503-725-4069 Fax: 503-725-8480 Email:

More information

Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning. Hiron Fernando, BSCE. A Thesis CIVIL ENGINEERING

Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning. Hiron Fernando, BSCE. A Thesis CIVIL ENGINEERING Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning by Hiron Fernando, BSCE A Thesis In CIVIL ENGINEERING Submitted to the Graduate Faculty of Texas Tech

More information

Woodburn Interchange Project Transportation Technical Report

Woodburn Interchange Project Transportation Technical Report Final Report Woodburn Interchange Project Transportation Technical Report Prepared for Oregon Department of Transportation April 212 Prepared by DKS Associates Contents Methodologies... 4 Volume Development...

More information

The Potential for Real-Time Traffic Crash Prediction

The Potential for Real-Time Traffic Crash Prediction The Potential for Real-Time Traffic Crash Prediction A KEY TO IMPROVING FREEWAY SAFETY IS THE ABILITY TO PREDICT CRASH OCCURRENCE. THIS FEATURE ADDRESSES THE PREDICTION OF CRASH POTENTIAL USING REAL-TIME

More information

Congestion Management Safety Plan Phase 4

Congestion Management Safety Plan Phase 4 AUGUST 2018 Congestion Management Safety Plan Phase 4 Executive Summary Report for MnDOT Metro District Prepared by: SRF Consulting Group, Inc. and Sambatek, Inc. BACKGROUND The Congestion Management Safety

More information

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office VDOT and MAP-21 Performance Management VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office Overview Map-21- How is VDOT Preparing?

More information

Variable Speed Limit Strategies to Reduce the Impacts of Traffic Flow Breakdown at Recurrent Freeway Bottlenecks

Variable Speed Limit Strategies to Reduce the Impacts of Traffic Flow Breakdown at Recurrent Freeway Bottlenecks Florida International University FIU Digital Commons FIU Electronic Theses and Dissertations University Graduate School 11-4-2014 Variable Speed Limit Strategies to Reduce the Impacts of Traffic Flow Breakdown

More information

Investigating the Impacts of Fixed-Time Ramp Metering through Microsimulation

Investigating the Impacts of Fixed-Time Ramp Metering through Microsimulation Investigating the Impacts of Fixed-Time Ramp Metering through Microsimulation Vahid POORJAFARI a, Wen Long YUE b a PhD Candidate, School of Natural and Built Environment, University of South Australia,

More information

Evaluation of Congestion Pricing for Management Highway in Seattle

Evaluation of Congestion Pricing for Management Highway in Seattle Evaluation of Congestion Pricing for Management Highway in Seattle Aman J. Aman, Diana C. Nuñez, Mohammed Hamideddin, Pankaj Laungani, Wail Abbo Abstract Congestion is one of the most important and complex

More information

Toward Validation of Freeway Loop Detector Speed Measurements Using Transit Probe Data

Toward Validation of Freeway Loop Detector Speed Measurements Using Transit Probe Data Toward Validation of Freeway Loop Detector Speed Measurements Using Transit Probe Data Ahmed M. El-Geneidy and Robert L. Bertini Abstract Inductive loop detectors are used throughout the world to report

More information

Evaluation of Potential ITS Strategies under Non-recurrent Congestion Using Microscopic Simulation

Evaluation of Potential ITS Strategies under Non-recurrent Congestion Using Microscopic Simulation Paper #04-5201 Evaluation of Potential ITS Strategies under Non-recurrent Congestion Using Microscopic Simulation Lianyu Chu Institute of Transportation Studies University of California, Irvine Irvine,

More information

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project 06/2014 PROJECT STUDY REPORT (Cal Poly Pomona Senior Project) For Conceptual Approval of an Interchange Improvement And Cooperative Agreement with The City of Lake Elsinore for completion of Project Approval

More information

Using Travel Time Reliability Measures to Improve Regional Transportation Planning and Operations

Using Travel Time Reliability Measures to Improve Regional Transportation Planning and Operations See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/228916118 Using Travel Time Reliability Measures to Improve Regional Transportation Planning

More information

Transportation Problems and Issues Excerpts from WWW Links

Transportation Problems and Issues Excerpts from WWW Links Transportation Problems and Issues Excerpts from WWW Links Reference Bok, D. (2018). Transportation policy and planning. https://www.hks.harvard.edu/courses/transportation-policy-and-planning Transportation

More information

Minnesota Statewide Freight Bottlenecks

Minnesota Statewide Freight Bottlenecks Minnesota Statewide Freight Bottlenecks Transportation Performance Measures Reporting for MAP21 Compliance Oct. 1, 2018 2018 Minnesota Statewide Freight Bottlenecks Report Report Prepared by: Minnesota

More information

Ramp Metering 2010 evaluation report

Ramp Metering 2010 evaluation report Ramp Metering 2010 evaluation report Maximizing the flow Riverside Piper North Kansas City Kansas City, MO Independence Lake Quivera Shawnee Westwood Mission Merriam Raytown Prairie Village Lenexa Overland

More information

The Secrets to HCM Consistency Using Simulation Models

The Secrets to HCM Consistency Using Simulation Models The Secrets to HCM Consistency Using Simulation Models Ronald T. Milam, AICP David Stanek, PE Chris Breiland Fehr & Peers 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 r.milam@fehrandpeers.com (916)

More information

Low-Cost Improvements for Recurring Freeway Bottlenecks

Low-Cost Improvements for Recurring Freeway Bottlenecks NCHRP 3-83 Low-Cost Improvements for Recurring Freeway Bottlenecks Draft Final Report November 2012 TRANSPORTATION RESEARCH BOARD NAS - NRC LIMITED USE DOCUMENT This report, not released for publication,

More information

4.0 Method of Measurement. Measurement for Optional Temporary Pavement Marking will be made to the nearest linear foot.

4.0 Method of Measurement. Measurement for Optional Temporary Pavement Marking will be made to the nearest linear foot. 4.0 Method of Measurement. Measurement for Optional Temporary Pavement Marking will be made to the nearest linear foot. 5.0 Basis of Payment. Payment for OPTIONAL TEMPORARY PAVEMENT MARKING as described

More information

Improving Arterial Performance Measurement Using Traffic Signal System Data

Improving Arterial Performance Measurement Using Traffic Signal System Data Portland State University PDXScholar Civil and Environmental Engineering Faculty Publications and Presentations Civil and Environmental Engineering 7-2007 Improving Arterial Performance Measurement Using

More information

TPF-5-(081) & DOT #09810

TPF-5-(081) & DOT #09810 1. Report No. TPF-5-(081) & DOT #09810 2.Government Accession No. 4. Title and Subtitle Missouri Work Zone Capacity: Results of Field Data Analysis TECHNICAL REPORT STANDARD TITLE PAGE 3. Recipient s Catalog

More information

USING A SIMULATION ENVIRONMENT FOR DYNAMIC TOLL ANALYSIS

USING A SIMULATION ENVIRONMENT FOR DYNAMIC TOLL ANALYSIS USING A SIMULATION ENVIRONMENT FOR DYNAMIC TOLL ANALYSIS ABSTRACT Robert Kerns and Darryn Paterson Transurban, USA 1421 Prince Street, Suite 200 Alexandria, Virginia 22314 571-527-2050; rkerns@transurban.com;

More information

FREEWAY RESPONSIVE SYSTEM IH 10 TxDOT Houston. Steve Chiu, TxDOT Roma Stevens, P.E., PTOE, TTI

FREEWAY RESPONSIVE SYSTEM IH 10 TxDOT Houston. Steve Chiu, TxDOT Roma Stevens, P.E., PTOE, TTI FREEWAY RESPONSIVE SYSTEM IH 10 TxDOT Houston Steve Chiu, TxDOT Roma Stevens, P.E., PTOE, TTI Oct 14, 2015 FREEWAY MOBILITY Address Congestion AIM Help alleviate freeway traffic through signalized intersections

More information

COOPERATIVE APPLICATIONS ON A MANAGED LANE

COOPERATIVE APPLICATIONS ON A MANAGED LANE Turner-Fairbank Highway Research Center COOPERATIVE APPLICATIONS ON A MANAGED LANE McLean, VA Saxton Transportation Operations Lab - Office of Operations R&D Oct 2, 2018 Jiaqi Ma, University of Cincinnati

More information

Variable Speed Limits: An Overview of Safety and Operational Impacts

Variable Speed Limits: An Overview of Safety and Operational Impacts Transportation Engineering Department, Schulich School of Engineering Variable Speed Limits: An Overview of Safety and Operational Impacts ITS Technology Workshop Karan Arora Email ID: karanarora.iitr@gmail.com

More information

Missouri Work Zone Capacity: Results of Field Data Analysis

Missouri Work Zone Capacity: Results of Field Data Analysis University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Final Reports & Technical Briefs from Mid-America Transportation Center Mid-America Transportation Center 2011 Missouri

More information

Quantifying the performance of a traffic data collection system: Scout Connect match rate evaluation

Quantifying the performance of a traffic data collection system: Scout Connect match rate evaluation Technology Showcase Miovision Scout Quantifying the performance of a traffic data collection system: Scout Connect match rate evaluation Contents Executive summary 2 Elements of the study 2 Objectives

More information

Deployment and Evaluation of ITS Technology in Work Zones

Deployment and Evaluation of ITS Technology in Work Zones Deployment and Evaluation of ITS Technology in Work Zones Authors: Rob Bushman, P.Eng. University of Saskatchewan Saskatoon, Saskatchewan, Canada e-mail: rjb230@mail.usask.ca phone: (306) 653-6600 fax:

More information

Lunch. Raffle Prizes. Raffle. Date. and Timee. Wednesday. Place. Wedgewoo. Emerald Room. Fresno, CA Program. Business Meeting. infrastructure.

Lunch. Raffle Prizes. Raffle. Date. and Timee. Wednesday. Place. Wedgewoo. Emerald Room. Fresno, CA Program. Business Meeting. infrastructure. INSTITUTE OF TRANSPORTATION ENGINEERS CENTRAL CALIFORNIA SECTION Lunch Meeting Date and Timee Wednesday y, October 28, 2015 12 Noon 2:00 PM Place Wedgewoo od Banquett Center http://wedgewoodbanquet.com/

More information

Dec 20, 2007 Operations Performance Measures Conference Call

Dec 20, 2007 Operations Performance Measures Conference Call Dec 20, 2007 Operations Performance Measures Conference Call Required Accuracy of Measures Performance Measure Traffic Engineering Transportation Planning Applications Traffic Management OPERATIONS Traveler

More information

Wireless Magnetic Sensor Applications in Transportation Infrastructure. Rene Omar Sanchez

Wireless Magnetic Sensor Applications in Transportation Infrastructure. Rene Omar Sanchez Wireless Magnetic Sensor Applications in Transportation Infrastructure by Rene Omar Sanchez A dissertation submitted in partial satisfaction of the requirements for the degree of Doctor of Philosophy in

More information

Members of the Board of Directors. Laurena Weinert, Clerk of the Board

Members of the Board of Directors. Laurena Weinert, Clerk of the Board COMMITTEE TRANSMITTAL July, 06 To: From: Subject: Members of the Board of Directors Laurena Weinert, Clerk of the Board Update on the State Route Improvement Project Between Interstate 0 and Interstate

More information

Chapter 3 FREEWAY CORRIDOR TRAFFIC MANAGEMENT

Chapter 3 FREEWAY CORRIDOR TRAFFIC MANAGEMENT Chapter 3 FREEWAY CORRIDOR TRAFFIC MANAGEMENT TABLE OF CONTENTS PAGE 3-1.00 INTRODUCTION...................................................3-3 1.01 Purpose 1.02 Chapter Organization 3-2.00 GLOSSARY.......................................................3-3

More information

Freeway Data Collection, Storage, Processing, and Use

Freeway Data Collection, Storage, Processing, and Use Freeway Data Collection, Storage, Processing, and Use Pravin Varaiya PeMS Development Group Department of Electrical Engineering and Computer Science University of California, Berkeley CA 94720 Tel: (510)

More information

Military Highway Interchange

Military Highway Interchange III. Military Highway Interchange Deficiencies Design Challenges Proposed Alternatives III.1.2 Volumes & Operations Figure III.2: Existing Volumes displays the existing volumes for the Military Highway

More information

Use of TMC Data for Performance Measurement and Improving Operations. National Rural ITS Conference August 25, 2014 Ming Shiun Lee URS Corporation

Use of TMC Data for Performance Measurement and Improving Operations. National Rural ITS Conference August 25, 2014 Ming Shiun Lee URS Corporation Use of TMC Data for Performance Measurement and Improving Operations National Rural ITS Conference August 25, 2014 Ming Shiun Lee URS Corporation 1 Presentation Outline Motivations Performance Measures

More information

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.1 MODEL RUN SUMMARY NOTEBOOK The Model Run Summary Notebook (under separate cover) provides documentation of the multiple

More information

1. Introduction. 1.1 Project Background. ANTONY JOHNSTONE Transport Associate Aurecon

1. Introduction. 1.1 Project Background. ANTONY JOHNSTONE Transport Associate Aurecon ANTONY JOHNSTONE Transport Associate Aurecon Antony.johnstone@aurecongroup.com RAFAEL CARVAJAL Operational Modelling and Visualisation Coordinator Main Roads WA Rafael.CARVAJALCIFUENTES@mainroads.wa.gov.au

More information

Evaluation of Rural Interstate Work Zone Traffic Management Plans in Iowa Using Simulation

Evaluation of Rural Interstate Work Zone Traffic Management Plans in Iowa Using Simulation 184 MID-CONTINENT TRANSPORTATION SYMPOSIUM 2000 PROCEEDINGS Evaluation of Rural Interstate Work Zone Traffic Management Plans in Iowa Using Simulation STEVEN D. SCHROCK AND T. H. MAZE Traffic levels on

More information

South County Traffic Relief Effort (SCTRE) Draft Project Study Report (PSR)-Project Development Support (PDS)

South County Traffic Relief Effort (SCTRE) Draft Project Study Report (PSR)-Project Development Support (PDS) July 25, 2018 Mr. David Speirs Project Manager Corridor Management Group Transportation Corridor Agencies 125 Pacifica, Suite 120 Irvine, CA 92618 RE: South County Traffic Relief Effort (SCTRE) Draft Project

More information

Evaluation Study of Inflow Traffic Control by Ramp Metering on Tokyo Metropolitan Expressway

Evaluation Study of Inflow Traffic Control by Ramp Metering on Tokyo Metropolitan Expressway Evaluation Study of Inflow Traffic Control by Ramp Metering on Tokyo Metropolitan Expressway 1 Tsubota, Y., 2 M. Iwata and 2 H. Kawashima 1 Obirin University, 2 Keio University, E-Mail: masafumi@ae.keio.ac.jp

More information

Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project

Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project NRITS & ITS AZ Annual Conference October 2018 Presented by: April Wire, P.E., PTOE ITS

More information

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013 I-64 Peninsula Shoulder Usage Evaluation Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013 Briefing Purpose Evaluation Area / Existing Conditions Code and Policy Engineering Facts

More information

Environmental Consequences and Mitigation

Environmental Consequences and Mitigation Chapter 4 Environmental Consequences and Mitigation 4.1 Introduction This chapter provides a detailed description of the impacts (and indirect impacts where applicable) associated with the alternatives

More information

Interstate 80 Integrated Corridor Mobility Project. Ramp Metering Plan

Interstate 80 Integrated Corridor Mobility Project. Ramp Metering Plan Interstate 80 Integrated Corridor Mobility Project Revised Final By DKS Associates 1000 Broadway, Suite 450 Oakland, CA 94607 (510) 763 2061 July 23, 2010 Client DKS Project / Proposal Number Project /

More information

National Capital Region Congestion Report

National Capital Region Congestion Report NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD National Capital Region Congestion Report 2nd Quarter 2014 Metropolitan Washington Council of Governments 777 North Capitol Street, N.E., Suite 300,

More information

RELATIONSHIP BETWEEN TRAFFIC FLOW AND SAFETY OF FREEWAYS IN CHINA: A CASE STUDY OF JINGJINTANG FREEWAY

RELATIONSHIP BETWEEN TRAFFIC FLOW AND SAFETY OF FREEWAYS IN CHINA: A CASE STUDY OF JINGJINTANG FREEWAY RELATIONSHIP BETWEEN TRAFFIC FLOW AND SAFETY OF FREEWAYS IN CHINA: A CASE STUDY OF JINGJINTANG FREEWAY Liande ZHONG, PhD Associate professor, Certified Safety Engineer, Research Institute of Highway, Ministry

More information

Validating Dynamic Message Sign Freeway Travel Time Messages Using Ground Truth Geospatial Data

Validating Dynamic Message Sign Freeway Travel Time Messages Using Ground Truth Geospatial Data Validating Dynamic Message Sign Freeway Travel Time Messages Using Ground Truth Geospatial Data Christopher M. Monsere Department of Civil & Environmental Engineering Portland State University P.O. Box

More information

Internship Report. Spring 2014 Florida International University Rodney Carrero-Vila

Internship Report. Spring 2014 Florida International University Rodney Carrero-Vila Internship Report Spring 2014 Florida International University Rodney Carrero-Vila My name is Rodney Carrero-Vila. I am an undergraduate student in the College of Engineering at Florida International University

More information

Readily Implementable Signal Phasing Schemes for Diverging Diamond Interchanges

Readily Implementable Signal Phasing Schemes for Diverging Diamond Interchanges Tian, Xu, de-camp, Kyte, and Wang Readily Implementable Signal Phasing Schemes for Diverging Diamond Interchanges Zong Tian*, Ph.D., P.E. Hao Xu, Ph.D Center for dvanced Transportation Education and Research

More information

SERPM 7/DTA Application FSUTMS Users Group Meeting

SERPM 7/DTA Application FSUTMS Users Group Meeting SERPM 7/DTA Application FSUTMS Users Group Meeting Ana Elias, PhD, PE, PTOE Leigh Ann White, PE, PTOE June, 2015 www.jacobs.com worldwide Agenda 1. Mesoscopic Modelling and Cube Avenue Principles 2. Background

More information

1971 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District

1971 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District 1971 HISD REPORTS This is a description of the HISD reports compiled annually by HISD. HISD-4 HISD-4T HISD-5 HISD-6 HISD-7 HISD-8 HISD-9 Highway Mileage on State, State Toll, County and Municipal Systems

More information

CHAPTER 3 - FREEWAY CORRIDOR TRAFFIC MANAGEMENT

CHAPTER 3 - FREEWAY CORRIDOR TRAFFIC MANAGEMENT CHAPTER 3 - FREEWAY CORRIDOR TRAFFIC MANAGEMENT Table of Contents 3-1.00 INTRODUCTION...3-2 3-1.01 Purpose...3-2 3-1.02 Chapter Organization...3-2 3-2.00 GLOSSARY...3-2 3-3.00 REGIONAL TRANSPORTATION MANAGEMENT

More information

A New Algorithm for Vehicle Reidentification and Travel Time Measurement on Freeways

A New Algorithm for Vehicle Reidentification and Travel Time Measurement on Freeways A New Algorithm for Vehicle Reidentification and Travel Time Measurement on Freeways Benjamin Coifman Institute of Transportation Studies University of California Berkeley, California, 9472 zephyr@eecs.berkeley.edu

More information

REQUIREMENTS FOR THE CALIBRATION OF TRAFFIC SIMULATION MODELS

REQUIREMENTS FOR THE CALIBRATION OF TRAFFIC SIMULATION MODELS REQUIREMENTS FOR THE CALIBRATION OF TRAFFIC SIMULATION MODELS Bruce R. Hellinga Department of Civil Engineering University of Waterloo Waterloo, ON N2L 3G1 ABSTRACT The recent emphasis on utilising advanced

More information

Dynamic Lane Merge Systems

Dynamic Lane Merge Systems Dynamic Lane Merge Systems Acknowledgements Maryland State Highway Administration University of Maryland, College Park Michigan Department of Transportation Wayne State University Lane Merging Issues Merging

More information

NDOT Active Traffic Management System Las Vegas, Nevada

NDOT Active Traffic Management System Las Vegas, Nevada CONCEPT OF OPERATIONS NDOT Active Traffic Management System Las Vegas, Nevada Prepared for: Prepared by: Prepared In Accordance With: TABLE OF CONTENTS NDOT Active Traffic Management (ATM) 1 Overview...

More information

Using Transit Vehicles to Measure Freeway Traffic Conditions

Using Transit Vehicles to Measure Freeway Traffic Conditions Using Transit Vehicles to Measure Freeway Traffic Conditions Benjamin Coifman, PhD Associate Professor The Ohio State University Joint appointment with the Department of Civil and Environmental Engineering

More information

Copyright. Michael DeGaspari

Copyright. Michael DeGaspari Copyright by Michael DeGaspari 2012 The Thesis Committee for Michael DeGaspari Certifies that this is the approved version of the following thesis: Evaluation of the Mobility Impacts of Proposed Ramp Metering

More information

35 Moving Forward. O p t i m i z a t i o n P l a n E x e c u t i v e S u m m a r y. Project # KA Johnson and Wyandotte Counties

35 Moving Forward. O p t i m i z a t i o n P l a n E x e c u t i v e S u m m a r y. Project # KA Johnson and Wyandotte Counties Moving Forward Johnson and Wyandotte Counties Project # -106-KA-2597-01 O p t i m i z a t i o n P l a n E x e c u t i v e S u m m a r y June 2013 I- Corridor Optimization Plan Executive Summary Study Purpose

More information

Analysis of Freeway Bottlenecks. Srinivasa Srivatsav Kandala

Analysis of Freeway Bottlenecks. Srinivasa Srivatsav Kandala Analysis of Freeway Bottlenecks by Srinivasa Srivatsav Kandala A Dissertation Presented in Partial Fulfillment of the Requirements for the Degree Doctor of Philosophy Approved June 2014 by the Graduate

More information

THE EFFECTS OF ENTRANCE RAMP CLOSURE ON FREEWAY OPERATION DURING MORNING PEAK PERIODS. Roy C. Lautzenheiser Engineering Research Associate

THE EFFECTS OF ENTRANCE RAMP CLOSURE ON FREEWAY OPERATION DURING MORNING PEAK PERIODS. Roy C. Lautzenheiser Engineering Research Associate THE EFFECTS OF ENTRANCE RAMP CLOSURE ON FREEWAY OPERATION DURING MORNING PEAK PERIODS by Roy C. Lautzenheiser Engineering Research Associate Research Report 139-9 Freeway Control and Information Systems

More information

Oregon Department of Transportation. OR217: Active Traffic Management

Oregon Department of Transportation. OR217: Active Traffic Management Oregon Department of Transportation OR217: Active Traffic Management Dec. 29, 2015 Table of Contents Executive Summary...3 1.0 Introduction...4 1.1 Travel Time Reliability... 4 1.2 Average Corridor Travel

More information

INTERCHANGE MODIFICATION REPORT

INTERCHANGE MODIFICATION REPORT INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation District One May 2017 Interchange

More information

National Capital Region Congestion Report

National Capital Region Congestion Report NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD National Capital Region Congestion Report 4th Quarter 2014 Metropolitan Washington Council of Governments 777 North Capitol Street, N.E., Suite 300,

More information

Evaluation of A Dynamic Late Merge System PART I EVALUATION OF A DYNAMIC LATE MEREGE SYSTEM

Evaluation of A Dynamic Late Merge System PART I EVALUATION OF A DYNAMIC LATE MEREGE SYSTEM PART I EVALUATION OF A DYNAMIC LATE MEREGE SYSTEM 3 1. Overview of Dynamic Late Merge Systems 1.1 Core concept of Dynamic Late Merge control PCMS 1 PCMS 2 PCMS 3 PCMS 4 TAKE YOUR TURN USE BOTH LANES USE

More information

The I-80 Integrated Corridor Mobility (ICM) Project

The I-80 Integrated Corridor Mobility (ICM) Project The I-80 Integrated Corridor Mobility (ICM) Project ITE San Francisco Bay Area Section Presented by Randy Durrenberger February 21, 2013 Presentation Outline Introduction / Background Project Element Strategy

More information

Deployment and Evaluation of ITS Technology in Work Zones

Deployment and Evaluation of ITS Technology in Work Zones Deployment and Evaluation of ITS Technology in Work Zones Rob Bushman, P. Eng. Department of Civil Engineering University of Saskatchewan Saskatoon, SK, Canada Curtis Berthelot, Ph. D., P. Eng. Department

More information