Lean for Internal Audit Overview

Size: px
Start display at page:

Download "Lean for Internal Audit Overview"

Transcription

1 Lean for Internal Audit Overview November 26, 215 Paul Choquette Lean Six Sigma Black Belt, CIA, CCSA Craig Szelestowski MBA, Lean Black Belt Copyright of this material is owned by Lean Agility Inc. Not for duplication or distribution without prior written consent.

2 LEAN less inventory NOT less people 2

3 The Challenge With fewer resources : you must still deliver as much, and maybe more to your clients faster and better while increasing staff engagement 3

4 4 94 days 5 days

5 Retirements Review Improvement plan over three weeks 45 Retirements backlog reduction plan New process start date /1/213 16/1/213 17/1/213 18/1/213 21/1/213 22/1/213 23/1/213 24/1/213 25/1/213 28/1/213 29/1/213 3/1/213 31/1/213 1/2/213 4/2/213 5/2/213 6/2/213 7/2/213 8/2/213 11/2/213 12/2/213 13/2/213 14/2/213 15/2/213 18/2/213 19/2/213 2/2/213 21/2/213 22/2/213 18/4/213 Cases in queue Planned reduction In queue actual Stabilization (remaining cases too far in the future to process) Date

6 Reduce time to staff a position by 5% Reduce claims and payments time: days Waiting time for a hearing: two years four months. Top 35 companies to work for in Canada list Report on Business Magazine 6

7 7 Difficult to believe until you see how.

8 What is Lean? A way of thinking + habits leading to speed, flow, effectiveness and efficiency Find ways to stop doing things that are not necessary in the eyes of your Client/end user/key stakeholders. Apply this found capacity to higher value added activities, creating speed and quality without working harder or adding resources. 8

9 Business System People System LEAN Processes that flow; constantly makes problems visible Willing, able, and enabled people who constantly solve these problems 9 Faster, better, more capacity with inspired people

10 Elapsed Time: 9+ % non-value added It takes us three weeks to process a file but the time we spend actually touching it or working on it is only four hours. 1

11 Flow If you took a file, put an imaginary video camera on it and sent it through your process, what would it see? bottlenecks backlogs unnecessary approvals chronic errors missing info unbalanced work last-in, first-out clarifications unnecessary steps too many handoffs waiting waiting waiting 11

12 How backlogs often develop MURA: Unevenness MURI: Overburden MUDA: Waste creates made worse by Defects Overproduction Waiting Not using skills Transport Inventory Motion Excessive Processing 12

13 DOWNTIME THE CLASSIC EIGHT LEAN WASTES 13

14 Defects When something is missing, or must be: corrected, clarified, or adjusted/adapted in order to be used. 14

15 Overproduction When The work is started too early Too much work passed to next step Too much work is taken on 15

16 Waiting When the work flow is stopped to wait for 16

17 Not fully utilizing people When people are not used to their full potential 17

18 Transport When material and information travels further than necessary 18

19 Inventory When work piles up and stops flowing. 19

20 Motion People move more than required to do their work 2

21 Send written questions in advance to referees Correction Demand % Time/ week C&A % 1 Batch wks Total CT 3 mins Inv C PT 15 P/week Inv P evaluation of checks; logistics, references/candidate 2 contact templates, Build CHRBP: check references, Delegated Manager Checks Reference initial screening At eg. appropriate if process the in earlier parallel in done be Can BIZ Touch Time: 2-3 hours/candidate weeks 2-4 Time: Lead References Check % Time/ week Demand Correction 1 Batch C&A % Total days CT C Inv hrs PT P Inv P/week Delegated Manager and Board Follow Up if references not ok mins week Time/ % Demand Correction 1 Batch C&A % Total days 2 CT C Inv hrs 1 PT P Inv P/week OK 9% Create forms and sign Delegated Manager and Board Board, candidates, exams, screening forms, (3X) % Time/ week Demand Correction 1 Batch C&A % Total days CT C Inv hrs 2 PT P Inv P/week Delegated Manager and Board results/report Assessment Compile pools to website interdepartmental and national regional, local, Add % Time/ week Demand Correction 1 Batch C&A % Total days CT C Inv hrs PT P Inv P/week Delegated Manager and Board pool create & pkg results/report Assessment Review posssible pools where on date expiration Eliminate % Time/ week Demand Correction 1 Batch 3 C&A % Total days 1 CT C Inv hrs 1 PT P Inv P/week HR Assistant Letters Results Create % Time/ week Demand Correction 1 Batch 66 C&A % Total wks 1 CT C Inv mins 15 PT P Inv P/week HR Advisor Letters Results Review Correction Demand % Time/ week Batch 1 % C&A 2 CT Total days 1 PT C Inv hrs Inv P/week P CHRBP Manager Delegated out Fill form Fit Right Added Value % Time/ week Demand Correction 1 Batch 5 C&A % Total days 2 CT C Inv mins 3 PT P Inv P/week HR Advisor Form Fit Right Review % Time/ week Demand Correction 1 Batch 5 C&A % Total days CT C Inv mins 5 PT P Inv P/week HR Assistant Employment of Conditions Verify % Time/ week Demand Correction 1 Batch C&A % Total hrs 3 CT C Inv mins 15 PT P Inv P/week Delegated Manager Verbally Candidate Notify % Time/ week Demand Correction 1 Batch C&A % Total hrs 3 CT C Inv mins 5 PT P Inv P/week CHRBP Delegated Manager / Admin Asst Form Clearance Security out Fill % Time/ week Demand Correction 1 Batch 5 C&A % Total days CT C Inv mins 5 PT P Inv P/week HR Assistant Process Languages Official Touch Time HR: 5 minutes Touch Time BIZ: 1-3 minutes clearance, Secret) Security Lead Time: 1 day (existing clearance) 6 months (no existing demand correction Total mins mins Correction Demand % Time/ week C&A % Batch 1 CT 26 wks Total PT mins Inv C P/week Inv P mins mins Security mins (Secret) Clearance Security Conduct week Time/ % Demand Correction 1 Batch C&A % Total days 3 CT C Inv mins PT P Inv P/week Security (Reliability) Clearance Security Conduct appropriate the process if earlier in parallel in done be Can appropriate the process if earlier in parallel in done be Can Correction Demand % Time/ week C&A Batch 1 % hrs Total CT C Inv mins PT P Inv P/week Added? Non-Value clearance; priority first from months 2-3 than more if Occurs Advisor HR Clearance Priority Re-Verify CT:.5 days minutes 2 PT: Officer/Manager WF request for HRSR Issue CT:.5-1 day minutes 5-1 PT: Coordinator Clerk/Admin HRSR Create CT:.5 day minutes 2 PT: Officer Manager / WF changes required) (if make and HRSR Review CT:.5 day PT: 2 minutes covers WMB challenge (meets every 2 weeks); Board Management Regional Review Board Management Regional CT:.5 day minutes 2 PT: Officer or Coordinator WF Signed docs to HR Send % Time/ week Demand Correction 1 Batch C&A % Total days 1 CT C Inv mins 2 PT P Inv P/week CHRBP HR Assistant Consideration of Notice Create NO COMPLAINTS Correction Demand % Time/ week C&A % Batch 1 CT wks Total PT mins Inv C P/week Inv P CHRBP Delegated Manager Discussion Informal demand correction Total mins mins mins mins mins week Time/ % Demand Correction 1 Batch 75 C&A % Total wks 1 CT C Inv mins 5 PT P Inv P/week CHRBP HR Assistant Appointment of Notice Create % Time/ week Demand Correction 1 Batch 75 C&A % Total days 1 CT C Inv mins 2 PT P Inv P/week HR Assistant Offer of Letter Prepare % Time/ week Demand Correction 1 Batch 75 C&A % Total days 1 CT C Inv mins 1 PT P Inv P/week HR Advisor Offer of Letter Review % Time/ week Demand Correction 1 Batch 2 C&A % Total wks 2 CT C Inv mins 3 PT P Inv P/week Delegated Manager Offer of Letter Verify % Time/ week Demand Correction 1 Batch C&A % Total wks 1 CT C Inv mins PT P Inv P/week HR Assistant / Coordinator employee to letter Send Maximum Lead Time: 67 weeks (7 months) Touch Time: 19 days FUTURE STATE Minimum Lead Time: 21 weeks (5 months) % Time/ week Demand Correction 1 Batch C&A % Total wks 1 CT C Inv mins PT P Inv P/week CHRBP Candidate offer Candidate signs of letter Added Value % Time/ week Demand Correction 1 Batch 8 C&A % Total wks 1 CT C Inv mins PT P Inv P/week CHRBP HR Assistant PeopleSoft into letter signed Enter Excessive Processing When the work is processed more than required Requestor 1- Create a file 2- Add Line A Department of Addition (DoA) Current State Value Stream Map (VSM) 3- Add Line B and Grand Total 4- Verify File Requestor 5- Review & Approve JOB TITLE File Creator JOB TITLE Addition A Officers JOB TITLE Addition B Officers JOB TITLE Supervisor JOB TITLE Manager Process Description Create blue file with Post-It notes Process Description Add up the first line, sign Process Description Add up the second line, subtotal, grand total, sign Process Description Verify accuracy of file, sign Process Description Verify accuracy of file, sign Batch: 3 Piece(s) Batch: 3 Piece(s) Batch: 3 Piece(s) Batch: 3 Piece(s) Batch: 3 Piece(s) P/T: 1 seconds P/T: 2 seconds P/T: 3 seconds P/T: 1 seconds P/T: 15 seconds CT: 2 minutes CT: 2 minutes CT: 72 seconds CT: 5 minutes CT: 29 seconds C&A: 1 % C&A: 1 % C&A: 99 % C&A: 6 % C&A: 5 % Inv/WIP 52 Piece(s) Inv/WIP 5 Piece(s) Inv/WIP 6 Piece(s) Inv/WIP 31 Piece(s) Inv/WIP 6 Piece(s) NOT OK 1% COMPLAINTS 21

22 Tools: Value Stream Mapping 22

23 Sustaining: Visual Management 23

24 Sustaining: Stand-Up Meetings 24

25 Typical Typical Challenges Challenges to Implementing Lean Government 1% technical 9% human 1% technical 9% human 25

26 Autonomy Mastery Purpose 27

27 How does Lean apply to Internal Audit work? 28

28 Specific Lean Issues in IA Too much work taken on lowers productivity and quality Audit plan not executed consistently inconsistent data needs rework or recollection Documents: Audit Plan and Audit Reporting Too many edits, takes too long and too much effort to get to final version 29

29 Specific Lean Issues in IA TOO MUCH WORK TAKEN ON 3

30 Too much work is taken on When we multi-task*, we get less done. 31 *actually, switch-task

31 Time Yourself Scenario 1 (Focus-Tasking) Write: Multitasking eats time Note how long that took. 32

32 Time Yourself Scenario 2 (Context Switching) Write one letter, then one number, one letter, one number, etc: Multitasking eats time Write down how long that took. 33

33 34

34 Specific Lean Issues in IA AUDIT PLAN NOT EXECUTED CONSISTENTLY INCONSISTENT DATA NEEDS REWORK OR RE-COLLECTION 35

35 Poka Yoke Error Proofing Visual warning Predictive Preventive 36

36 Sustaining: Stand-Up Meetings 37

37 Repeatability and Reproducibility Gage R&R Individual accuracy Assessment Agreement Appraiser # Inspected # Matched Percent (%) 95.% CI Sally ( 3, 16.5) Joe ( 8.6, 34) Betty 5 1 (.1, 6) Bob 5 5 ( 3, 28) Sue ( 2, 19.2) David ( 11, 38.2) # Matched: Appraiser's assessment across trials agrees with standard. Repeatability Assessment Agreement Appraiser # Inspected # Matched Percent (%) 95.% CI Sally ( 35.5, 65) Joe ( 53, 8.5) Betty (, 58.7) Bob ( 43, 7.) Sue ( 35.5, 65) David ( 57.5, 88) # Matched: Appraiser agrees with him/herself across trials. 38

38 Gage R&R (cont d) Reproducibility Assessment Agreement # Inspected # Matched Percent (%) 95.% CI 5. (., 5.8) # Matched: All appraisers' assessments agree with each other. Overall accuracy Decisions routinely made using this data as a base % accuracy! Assessment Agreement # Inspected # Matched Percent (%) 95.% CI 5. (., 5.8) # Matched: All appraisers' assessments agree with standard. 39

39 Specific Lean Issues in IA AUDIT PLAN & REPORTING TAKES TOO LONG, TOO MUCH EFFORT 4

40 Fall Creation of Spring project update (intranet article) ADM ADM EA DM DM EA Two-page intranet article Article approved Handoffs 97 Lead Time Effort Time Organizational Learning 9 months >1 hours? Project DG Project DG EA DG Comms CIO CFO CHRO COO Project Director Project Liaison Project Manager Comms. Liaison Article posted on Intranet Subject Matter Expert Subject Matter Expert Subject Matter Expert Subject Matter Expert 41 Subject Matter Expert

41 Preventable work / 8 Lean wastes Unclear voice of client Waterfall Development Issues in document creation work Too much work in progress Workflow is invisible Many review loops 42

42 Lean for Internal Audit SUMMARY 43

43 Summary Not a project a business approach and tools, create habits Applies equally to your client s work as well as IA work Makes Internal Auditors more effective and delivers better results to clients 44

44 Lean Internal Audit Yellow Belt Training Ottawa, Feb , 216 To register: or leanagility.com Craig Szelestowski (613) Paul Choquette (819)

Improving Scrum with. Lean Thinking Nuno Rafael SGMUN 2016

Improving Scrum with. Lean Thinking Nuno Rafael SGMUN 2016 Improving Scrum with Lean Thinking Nuno Rafael Gomes @ SGMUN 2016 https://twitter.com/nrgomes https://www.linkedin.com/in/nrgomes A Product Owner in contact with Industry since 2003 1 Once upon a time

More information

Lean + Agile: Deliver Half the Software and Delight your Clients Canadian Lean Summit

Lean + Agile: Deliver Half the Software and Delight your Clients Canadian Lean Summit Lean + Agile: Deliver Half the Software and Delight your Clients 2018 Canadian Lean Summit 1 What goes wrong in technology projects? 2 Why do many public sector technology projects fail? Research consensus:

More information

A Rapid Ride Through Input to Output Costing and Options for Measuring Efficiency

A Rapid Ride Through Input to Output Costing and Options for Measuring Efficiency A Rapid Ride Through Input to Output Costing and Options for Measuring Efficiency PPX Learning Event January 27, 2015 Mike Haley Presentation Agenda Current Drivers for Improved GOC Cost Information The

More information

October 21, Workbook. Co-sponsored by

October 21, Workbook. Co-sponsored by October 21, 2015 Workbook Activity: Value-Added, Essential Non-Value-Added or Non-Value-Added Are the below value-added, essential non-value-added or non-value-added activities? Please circle your answer.

More information

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processes, the Value-Added and Non-Value Added. 2. The later

More information

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processes, the Value-Added and Non-Value Added. 2. The later

More information

C8: Stream Mapping: Making Improvements That Add Value

C8: Stream Mapping: Making Improvements That Add Value C8: Stream Mapping: Making Improvements That Add Value February 16, 2011 Roger Chaufournier This presenter has nothing to disclose. Session Objectives At the end of this session you will be able to: Describe

More information

welcome to Agile Learning Labs Understanding Kanban

welcome to Agile Learning Labs Understanding Kanban welcome to Agile Learning Labs Understanding Kanban Nikos Batsios Agile Coach personal thoughts: https://escapelocaloptimum.wordpress.com A Kanban Bitamin Injection start from where you are right now If

More information

The ISO Solved solution was build to accomplish the following in most optimised and automated way possible.

The ISO Solved solution was build to accomplish the following in most optimised and automated way possible. 1. ISO Solved Solution The ISO Solved solution was build to accomplish the following in most optimised and automated way possible. 1. Measure and manage output 2. Manage the definition and sequence of

More information

Process Mapping. You cannot improve a process until everyone agrees on what the process is.

Process Mapping. You cannot improve a process until everyone agrees on what the process is. Process Mapping You cannot improve a process until everyone agrees on what the process is. 1 Topics I. What is a Process Map? II. III. IV. Types of Process Maps A. Process Flow Chart B. SIPOC Diagram C.

More information

Profit = Price - Cost. TAKT Time Map Capacity Tables. Total Productive Maintenance. Visual Control. Poka-yoke (mistake proofing) Kanban.

Profit = Price - Cost. TAKT Time Map Capacity Tables. Total Productive Maintenance. Visual Control. Poka-yoke (mistake proofing) Kanban. GPS Mod 1 Introduction MUDA MUDA Cost Reduction By Eliminating Waste Just-in-Time Profit = Price - Cost GPS Depth Study NVA/VA- Functions/Mgrs Quality Cost Delivery Safety Measures Morale TAKT Time Map

More information

Metrics-Based Process Mapping (MBPM)

Metrics-Based Process Mapping (MBPM) Metrics-Based Process Mapping (MBPM) Society for Health Systems Webinar February 17, 2009 Company LOGO Learning Objectives The key time and quality metrics for designing Lean processes. The difference

More information

Lean Project Delivery Operating System

Lean Project Delivery Operating System Lean Project Delivery Operating System David MacNeel & Dan Passick, On Point Lean OCTOBER 16, 2017 LCI Education & Training Lean Construction Institute Provider Number H561 LCI Learning Module: Introduction

More information

Using Lean Thinking to Drive HIT Efficiency and Hospital Performance

Using Lean Thinking to Drive HIT Efficiency and Hospital Performance Using Lean Thinking to Drive HIT Efficiency and Hospital Performance Rural Hospital Performance Improvement August 10, 2012 Melissa P. Lin, MS, LSSBB, CPHQ Learning Objectives Discuss the five principles

More information

IT 470a Six Sigma Chapter X

IT 470a Six Sigma Chapter X Chapter X Lean Enterprise IT 470a Six Sigma Chapter X Definitions Raw Materials component items purchased and received from suppliers WIP work in process, items that are in production on the factory floor

More information

I MPROVEMENT S TRATEGIES G UIDE. Maximizing the Enrollment and Retention of Adults and Children in Medicaid and SCHIP

I MPROVEMENT S TRATEGIES G UIDE. Maximizing the Enrollment and Retention of Adults and Children in Medicaid and SCHIP I MPROVEMENT S TRATEGIES G UIDE Maximizing the Enrollment and Retention of Adults and Children in Medicaid and SCHIP MARCH 2007 IMPROVEMENT STRATEGIES FOR MAXIMIZING ENROLLMENT AND RETENTION OF ADULTS

More information

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 MODULE 1 LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 1. Cultural Enablers 15% 20% 25% 1.1. Principles of Cultural Enablers 3% 4% 5% 1.1.1. Respect for the individual 1.1.2. Humility 1.2. Processes

More information

Lean Gold Certification Blueprint

Lean Gold Certification Blueprint The Lean Certification Blueprint provides additional useful information beyond the Body of Knowledge. The Body of Knowledge specifies the competencies, topics, and subtopics required by different types

More information

The Cost of Poor Quality (COPQ) Speaking the Language of Money

The Cost of Poor Quality (COPQ) Speaking the Language of Money The Cost of Poor Quality (COPQ) Speaking the Language of Money Background and Satisfied Clients Walter Tighe President/Owner of Sustaining Edge Solutions, Inc. Management Consulting & Training Firm Founded

More information

A PM on Lean Production Randel Ltd.

A PM on Lean Production Randel Ltd. A PM on Lean Production Randel Ltd. RANDEL LTD. INDUSTRY STREET 8 38267 WOMANCHESTER ENGLAND Written by: Tobias Reith, BSc Course: Lean Production (2016) Linköping University, Sweden A PM ON LEAN PRODUCTION

More information

From Modern Management to

From Modern Management to Lean Network Annual Conference Covington, KY May 14, 2009 From Modern Management to Lean Management James P. Womack, Chairman, Lean Enterprise Institute Recessions Are Good Times for Lean Lean thinking

More information

Kanban kick- start (v2)

Kanban kick- start (v2) Kanban kick- start (v2) By Tomas Björkholm at Crisp, October 2011 INTRODUCTION... 1 AN APPROACH TO GET STARTED WITH KANBAN... 2 STEP 1 GET TO KNOW YOUR SYSTEM... 2 STEP 2 IDENTIFY YOUR SOURCES AND PRIORITIZE...

More information

Session III. LEAN Enterprise and Six Sigma

Session III. LEAN Enterprise and Six Sigma Session III LEAN Enterprise and Six Sigma LEAN Enterprise Is a methodology that relies on a collaborative team effort to improve performance by systematically removing waste; combining Lean Manufacturing,

More information

Process Mapping What It Means for You. FAQs. Desired Results. 5) What are Fastenal s objectives? 1) What is a process mapping?

Process Mapping What It Means for You. FAQs. Desired Results. 5) What are Fastenal s objectives? 1) What is a process mapping? Process Mapping What It Means for You At Fastenal, we do much more than just ship products out of a catalog; we can work closely with you to uncover hidden sources of supply chain waste and provide total

More information

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar L9: Lean synchronization 1 Lean operations Operations strategy Design Improvement Lean operations Planning and control The market requires

More information

Michigan Manufacturing Technology Center Presents: Improving Government Using Lean Principles. Bryan Beach, Program Manager, MMTC

Michigan Manufacturing Technology Center Presents: Improving Government Using Lean Principles. Bryan Beach, Program Manager, MMTC Michigan Manufacturing Technology Center Presents: Improving Government Using Lean Principles Bryan Beach, Program Manager, MMTC Michigan Manufacturing Technology Center Created for the sole purpose of

More information

LCI CAROLINAS COP MAY 14, 2014

LCI CAROLINAS COP MAY 14, 2014 LCI CAROLINAS COP MAY 14, 2014 lean intro WHAT IS LEAN? Production practice that considers the expenditure of resources for any goal other than the creation of value for the end customer to be wasteful,

More information

An Introduction to Lean. Heidi Maier Sagstad

An Introduction to Lean. Heidi Maier Sagstad An Introduction to Lean Heidi Maier Sagstad Agenda Objective: Provide you with a basic understanding of key lean principles and tools. Topics: Lean defined Waste Value Stream Mapping 5S Balanced Flow 2

More information

The VALUE of Value Stream Mapping

The VALUE of Value Stream Mapping The VALUE of Value Stream Mapping Daniel Breston Virtual Clarity: DevOps, Lean, ITSM coach & advisor What do you expect when you turn on a tap?? ITSM, Agile, DevOps: we all love Flow, Feedback and to Improve

More information

BraindumpStudy. BraindumpStudy Exam Dumps, High Pass Rate!

BraindumpStudy.   BraindumpStudy Exam Dumps, High Pass Rate! BraindumpStudy http://www.braindumpstudy.com BraindumpStudy Exam Dumps, High Pass Rate! Exam : CSSGB Title : CSSGB (Six Sigma Green Belt) Vendor : ASQ Version : DEMO Get Latest & Valid CSSGB Exam's Question

More information

Driving organizational improvement

Driving organizational improvement Driving organizational improvement Context Top 10 Critical Success Factors Results NB Government 10 Critical success factors 1. Have an executive champion 2. Demonstrate what is possible Wave 3 Departments

More information

Learning Objectives. 1. Explain how lean systems improve internal and supply chain operations

Learning Objectives. 1. Explain how lean systems improve internal and supply chain operations CHAPTER EIGHT Lean Systems McGraw-Hill/Irwin Copyright 2011 by the McGraw-Hill Companies, Inc. All rights reserved. Learning Objectives 1. Explain how lean systems improve internal and supply chain operations

More information

Lean Basics Overview. EMC 2011 Training. NCDENR April Copyright 2010 EMC Corporation. All rights reserved.

Lean Basics Overview. EMC 2011 Training. NCDENR April Copyright 2010 EMC Corporation. All rights reserved. Lean Basics Overview EMC 2011 Training NCDENR April 2011 1 Topics Lean Six Sigma defined Why Lean Six Sigma? What s a process? Interrogating the process by identifying Value & Waste Brief overview of some

More information

Changing the way we lead

Changing the way we lead Jennifer Richardson, Senior Vice President Operations Blue Cross & Blue Shield of Nebraska Agile Operations: Changing the way we lead Where we were The health insurance industry Whet we were IT Stable

More information

Introduction to. An Overview for WVU Hiring Managers

Introduction to. An Overview for WVU Hiring Managers Introduction to An Overview for WVU Hiring Managers What will you learn today? How to Navigate through the Recruiting Center. Create a requisition in the Recruiting Center using a Template. View Requisitions

More information

Lean & Agile: Move like Starlings in the Sky

Lean & Agile: Move like Starlings in the Sky Lean & Agile: Move like Starlings in the Sky Peter Matthijssen Adaptive to change What we do today, is not good enough for tomorrow We need to constantly adapt and improve About Peter Matthijssen Consultant

More information

Using Lean Six Sigma to Accelerate CMMI Implementation

Using Lean Six Sigma to Accelerate CMMI Implementation Using Lean Six Sigma to Accelerate CMMI Implementation Briefers: Diane A. Glaser Michael D. Barnett US Army CECOM LCMC SEC CMMI Coordinator Communication Software ASQ SSGB Engineering Support Division

More information

WICSEC Conference. Improving Performance through Business Process Improvement. September 7th - September 11th, Presentation to WICSEC

WICSEC Conference. Improving Performance through Business Process Improvement. September 7th - September 11th, Presentation to WICSEC WICSEC Conference September 7th - September 11th, 2008 Improving Performance through Business Process Improvement Presentation to WICSEC T. Vernon Drew President Center for the Support of Families Mike

More information

PUBLIC SECTOR RESOURCING. Fieldglass Hiring Manager Guide. June 2018 V1.5

PUBLIC SECTOR RESOURCING. Fieldglass Hiring Manager Guide. June 2018 V1.5 Fieldglass Hiring Manager Guide June 2018 V1.5 TABLE OF CONTENTS PURPOSE....4 FIELDGLASS FAQ S...5 LOCATIONS... 5 APPROVERS... 6 COST CENTRES... 7 REQ APPROVALS... 8 FIELDGLASS SYSTEM INSTRUCTIONS...9

More information

Lean Government Metrics Guide

Lean Government Metrics Guide Lean Government Metrics Guide Lean Government Metrics Guide This Lean Government Metrics Guide is a resource to help government agencies understand and select metrics to support their implementation of

More information

Input to Output Performance Advances in Costing

Input to Output Performance Advances in Costing Expand Your Horizons Webinar Series Input to Output Performance Advances in Costing January 27, 2015 8:30 10:00am The Webinar will begin shortly. You can ask a question in the box on the right hand side.

More information

Instructor Info: Dave Tucker, LSSMBB ProModel Senior Consultant Office:

Instructor Info: Dave Tucker, LSSMBB ProModel Senior Consultant Office: Instructor Info: Dave Tucker, LSSMBB ProModel Senior Consultant Office: 321.567.5642 dtucker@promodel.com 1 Understand how simulation models can be utilized within the DMAIC approach Examine a completed

More information

Managing Toward Perfection

Managing Toward Perfection CHAPTER 3 Evaluating Process Capacity The maximum amount a process can produce in a given unit of time. Objective: to take a fairly technical and complex operation and simplify it to a level suitable for

More information

lean value assessment Creating Higher Profi ts by Reducing Waste

lean value assessment Creating Higher Profi ts by Reducing Waste lean value assessment Creating Higher Profi ts by Reducing Waste Lean Value Stream Assessment Tool A diagnostic tool developed from industry standards to compare ISI clients against World Class metrics

More information

Increasing capacity without increasing headcount

Increasing capacity without increasing headcount Increasing capacity without increasing headcount More business, more work, more people. Wouldn t it be great if we could break the retrench : rehire cycle by taking on less people this time round. Then

More information

Banishing Waste and Delivering Value in Your BCM Program

Banishing Waste and Delivering Value in Your BCM Program Lean Times Require Lean Thinking Banishing Waste and Delivering Value in Your BCM Program Session B19: Milen Kutev, MBCP, SCPM, PMP British Columbia Automobile Association / BCAA Why am I talking today?

More information

Lean Healthcare Metrics Guide

Lean Healthcare Metrics Guide Lean Healthcare Metrics Guide Lean Metrics Guide Page 1 This Lean Metrics Guide is a resource to help organizations understand and select metrics to support their implementation of Lean and Six Sigma two

More information

Ottawa Public Sector Quality Fair HR Modernization Moving to PeopleSoft 9.1 My GC HR

Ottawa Public Sector Quality Fair HR Modernization Moving to PeopleSoft 9.1 My GC HR Ottawa Public Sector Quality Fair HR Modernization Moving to PeopleSoft 9.1 My GC HR JFT Management Consulting Inc. 5381 Long Island Rd Ottawa, Ontario K4M 1J7 Tel: 613 692 1391 Fax: 613 692 1396 Cell

More information

Lean Operations. PowerPoint slides by Jeff Heyl. Copyright 2017 Pearson Education, Inc.

Lean Operations. PowerPoint slides by Jeff Heyl. Copyright 2017 Pearson Education, Inc. Lean Operations 16 PowerPoint presentation to accompany Heizer, Render, Munson Operations Management, Twelfth Edition Principles of Operations Management, Tenth Edition PowerPoint slides by Jeff Heyl 16-1

More information

Applying Lean Principles to Any Process

Applying Lean Principles to Any Process Applying Lean Principles to Any Process Michigan Manufacturing Technology Center 2013 MMTC 2 Lean Simulation Round 1 ACME, Inc. 1. Get into teams of 6 and sit next to each other in a straight line 2. Each

More information

DATE DUE DATE COMP. 9/30/2007 9/30/2007 9/30/2007 9/30/2007 9/30/2007 9/30/2007 9/30/2007 9/30/2007 9/30/2007

DATE DUE DATE COMP. 9/30/2007 9/30/2007 9/30/2007 9/30/2007 9/30/2007 9/30/2007 9/30/2007 9/30/2007 9/30/2007 8 Inventory either in or logs but not both. Tom/ IT Availability Staff Resistance Processing Reduce Overproduction Deliv - Standard Log 50% reduction in cycle time Deliv - SOP fully compliant w/accrediting

More information

The Seven Deadly Wastes

The Seven Deadly Wastes The Seven Deadly Wastes Facilitator s Guide Seven Deadly Wastes Overview Learn what the seven wastes are and why they are so deadly to your organization. A step by step guide to presenting Gemba Academy

More information

Template AMS Professional Sample Set01 V1, group A. Questionnaire

Template AMS Professional Sample Set01 V1, group A. Questionnaire Questionnaire Name: Matriculation number: Signature: In order to receive the AMS 19011 Professional Examination Certificate, the examination passed in the multiple-choice procedure must be successfully

More information

Ernst & Young Lean Management

Ernst & Young Lean Management Ernst & Young Lean Management LEAN excellence in operations Lean is a methodology currently used by most leading multinationals, which allows companies to gain competitive advantage, provides the organization

More information

Lean Six Sigma with Akron Children s Hospital

Lean Six Sigma with Akron Children s Hospital Lean Six Sigma with Akron Children s Hospital Lean at Akron Children s Hospital Eight people dedicated to leading and coaching other employees to lead process improvement efforts throughout the organization

More information

Recognition of Prior Learning (RPL) Information Guide & Application

Recognition of Prior Learning (RPL) Information Guide & Application Recognition of Prior Learning (RPL) Information Guide & Application This information guide is designed to assist you through the recognition of prior learning and workplace assessment process. VERSION

More information

Using Oracle s User Productivity Kit (UPK) Record It! Wizard. A Lean Approach for Training Development and User Adoption

Using Oracle s User Productivity Kit (UPK) Record It! Wizard. A Lean Approach for Training Development and User Adoption Using Oracle s User Productivity Kit (UPK) Record It! Wizard A Lean Approach for Training Development and User Adoption INTRODUCTIONS Kathy Jacobs, Organizational Change Partner Avery Wills, Learning and

More information

Lean Facilities Management Concept: Possible Wastes and Mitigation Action

Lean Facilities Management Concept: Possible Wastes and Mitigation Action Lean Facilities Management Concept: Possible Wastes Mitigation Action Ahmad Hazwan Ahmad Hariri Consultant, GFM Services Berhad 4 th June 2018 Lean is an operational excellence strategy which allows change

More information

PMO17BR402 Promote Many Options: PMOs That Are Traditional, Hybrid, and Agile Friendly Mike Griffiths Chair of PMI s Agile Practice Guide

PMO17BR402 Promote Many Options: PMOs That Are Traditional, Hybrid, and Agile Friendly Mike Griffiths Chair of PMI s Agile Practice Guide HOUSTON, TX, USA 5 8 NOVEMBER 2017 #PMOSym PMO17BR402 Promote Many Options: PMOs That Are Traditional, Hybrid, and Agile Friendly Mike Griffiths Chair of PMI s Agile Practice Guide Agenda Project Manager

More information

Morgan International Workshops

Morgan International Workshops Morgan International Workshops 2017 Morgan International s Workshops As a leading professional training provider, Morgan International is dedicated to offering our clientele the latest and most relevant

More information

OM (Fall 2016) Outline

OM (Fall 2016) Outline Lean Operations Outline Global Company Profile: Toyota Motor Corporation Lean Operations Lean and Just-in-Time Lean and the Toyota Production System Lean Organizations Lean in Services 2 Toyota Motor Corporation

More information

About TechSolve. Non-profit process improvement consulting firm

About TechSolve. Non-profit process improvement consulting firm LOCAL GOVERNMENT Lean Government Process Improvement The Basics It s Not Brain Surgery Ohio Association of Public Treasurers June 11, 2015 David Krings Director, Non-Profit and Local Government Solutions

More information

A Disappearing Act: Using lean principles to develop winning proposals

A Disappearing Act: Using lean principles to develop winning proposals A Disappearing Act: Using lean principles to develop winning proposals Presenter: Keera Godfrey, MBA, M.S. Naris Communications LLC Sponsored by Georgia, Carolinas, and Florida APMP Chapters Are you certified?

More information

TEN STEPS to Lean Electrical Controls

TEN STEPS to Lean Electrical Controls Complements of: TEN STEPS to Lean Electrical Controls EXECUTIVE SUMMARY Globalization is forcing companies to constantly become more efficient. To drive efficiencies, many companies are implementing Lean

More information

IARJSET. International Advanced Research Journal in Science, Engineering and Technology AGNI-PANKH 16

IARJSET. International Advanced Research Journal in Science, Engineering and Technology AGNI-PANKH 16 Concept of Heijunka Akshay M. Ramekar 1, Vivek D. Muneshwar 2, Ajinkya S. Kute 3, Ashish M. Choube 4 1, 2, 3 Student, Mechanical Engineering, JDIET, Yavatmal, India Assistant Professor, Mechanical Engineering

More information

Wrapper Line Improvement

Wrapper Line Improvement February 21, 2014 Wrapper Line Improvement Six Sigma Project Final Tollgate Presentation Define Measure Analyze Improve Control Alah Raqab Varun Nandakumar Scott Shepfer Rohit Subramanian Project Charter

More information

ABB Ability Ellipse WFM Cloud-based mobile workforce management designed to enhance efficiency, productivity and safety.

ABB Ability Ellipse WFM Cloud-based mobile workforce management designed to enhance efficiency, productivity and safety. CONNECTED ASSET LIFECYCLE MANAGEMENT ABB Ability Ellipse WFM Cloud-based mobile workforce management designed to enhance efficiency, productivity and safety. 2 CONNECTED ASSET LIFECYCLE MANAGEMENT ABB

More information

MBSE in a Lean Context

MBSE in a Lean Context MBSE in a Lean Context Agenda: 9.15 10.45 MBSE what and why Model Driven Architecture Lean Product Development, an overview Waste in Product Development 11.00 12.00 Value Stream Mapping Agile and MBSE

More information

Lean Thinking. Continuous improvement is about removing stuff that get in the way of your things working well.

Lean Thinking. Continuous improvement is about removing stuff that get in the way of your things working well. Lean Thinking Continuous improvement is about removing stuff that get in the way of your things working well. What is LEAN Maximize customer value Minimizing waste. More value fewer resources. Understands

More information

Feeding the Agile Beast

Feeding the Agile Beast http://www..com Feeding the Agile Beast Focusing Development on Delivering Business Value Dean Stevens - Agile Methods (Scrum, Lean, Agile, Kanban) Faster and Higher Quality Product Backlog Ready Backlog

More information

A Framework of Sample Metrics for Evaluating the Efficiency and Effectiveness of Environmental Permitting Systems

A Framework of Sample Metrics for Evaluating the Efficiency and Effectiveness of Environmental Permitting Systems A Framework of Sample Metrics for Evaluating the Efficiency and Effectiveness of Environmental Permitting Systems OVERVIEW This document was developed at the direction of the E-Enterprise Leadership Council

More information

A Framework of Sample Metrics for Evaluating the Efficiency and Effectiveness of Environmental Permitting Systems

A Framework of Sample Metrics for Evaluating the Efficiency and Effectiveness of Environmental Permitting Systems A Framework of Sample Metrics for Evaluating the Efficiency and Effectiveness of Environmental Permitting Systems OVERVIEW This document was developed at the direction of the E-Enterprise Leadership Council

More information

to Save Time and Money Presenter: Anita Patel Business & Finance Administrator Lake County Planning, Building & Development Department

to Save Time and Money Presenter: Anita Patel Business & Finance Administrator Lake County Planning, Building & Development Department Utilizing i Lean Thinking to Save Time and Money Presenter: Anita Patel Business & Finance Administrator Lake County Planning, Building & Development Department Agenda Overview of Lean and Process Improvements

More information

Before and After: A Study of Nomacorc s Lean Journey

Before and After: A Study of Nomacorc s Lean Journey Before and After: A Study of Nomacorc s Lean Journey How Nomacorc leaned into a world class facility Tom Shank Gary Strickland Tom Shank Supply Chain Manager at Nomacorc, LLC in Zebulon, NC Nomacorc is

More information

ENGR 1181 Lab 2: Quality and Productivity Lab

ENGR 1181 Lab 2: Quality and Productivity Lab ENGR 1181 Lab 2: Quality and Productivity Lab - Preparation Material - Lab Procedure - Report Guidelines ENGR 1181 Lab 2: Quality and Productivity Lab Preparation Material Preparation Material ENGR 1181

More information

Organizational Excellence & Lean Initiatives at UC Riverside. April 26, 2016

Organizational Excellence & Lean Initiatives at UC Riverside. April 26, 2016 Organizational Excellence & Lean Initiatives at UC Riverside April 26, 2016 1 Overview Vision Strategy Impacts Q & A 2 Our Vision 21 st Century National Model of Excellence To be a preeminent research

More information

Lean Methods for High-Variety, Low-Volume Industries

Lean Methods for High-Variety, Low-Volume Industries Setpoint Systems, Inc. Authored By: Malorie Rasmussen & Nate Morris Lean Methods for High-Variety, Low-Volume Industries www.setpointusa.com info@setpointusa.com 801-621-4117 Page 1 Setpoint provides lean

More information

The Independent Regulatory Board for Auditors (IRBA)

The Independent Regulatory Board for Auditors (IRBA) The Independent Regulatory Board for Auditors (IRBA) THE AUDIT DEVELOPMENT PROGRAMME BOOKLET 2015 THE AUDIT DEVELOPMENT PROGRAMME 1. What is the ADP? The Audit Development Programme (ADP) is a period of

More information

Key of Toyota management success By Yi Jiang

Key of Toyota management success By Yi Jiang Key of Toyota management success By Yi Jiang What is Kaizen? Kaizen 改善 Change Better Make it better (to improve) What s the difference between Kaizen and improve? Continuity Why do we need kaizen? Need

More information

Handling Product Management Across The Enterprise. copyright Net Objectives, Inc.

Handling Product Management Across The Enterprise. copyright Net Objectives, Inc. Handling Product Management Across The Enterprise copyright 2010. Net Objectives, Inc. Lean for Executives Product Portfolio Management Business Lean Enterprise ASSESSMENTS CONSULTING TRAINING COACHING

More information

Applying Lean Principles to PMBOK Projects. Dr. Martina Ryan

Applying Lean Principles to PMBOK Projects. Dr. Martina Ryan Applying Lean Principles to PMBOK Projects Dr. Martina Ryan About Martina Ryan... Pharma background MRA Consulting Ltd. founded in 2005 - Located in Waterford. Lean/6-Sigma Services include: Consultancy

More information

INVESTIGATIVE REPORT ON WORKSTATION STABILITY AND CONTINUOUS IMPROVEMENT MAPPING TECHNIQUE TO REDUCE MANUFACTURING WASTE

INVESTIGATIVE REPORT ON WORKSTATION STABILITY AND CONTINUOUS IMPROVEMENT MAPPING TECHNIQUE TO REDUCE MANUFACTURING WASTE International Journal of Production Technology and Management (IJPTM) Volume 7, Issue 2, July-December, 2016, pp. 01 08, Article ID: IJPTM_07_02_001 Available online at http://www.iaeme.com/ijptm/issues.asp?jtype=ijptm&vtype=7&itype=2

More information

Lean 101: An Introduction

Lean 101: An Introduction Lean 101: An Introduction What is Lean? A systematic way of designing or improving a process or value stream that: Eliminates waste Improves quality Reduces costs Delights customers Improves employee satisfaction

More information

The Goal is Lean. MTA English

The Goal is Lean. MTA English MTA English The Goal is Lean Eliyahu Goldratt s novel, The Goal, was a landmark book in the field of manufacturing management and is considered by many to be the book that sparked the Lean Manufacturing

More information

Using Visual Management to Identify Office Waste

Using Visual Management to Identify Office Waste Using Visual Management to Identify Office Waste Tenmast Software Case Study Nick Katko, Vice President of Finance & Lean Agenda Introduction to Tenmast Software Overview of Process Tenmast Used Case Study:

More information

Lean Overview. Northeast Indiana Advanced Manufacturing (Lean) Network Meetings: February 21 Fort Wayne February 29 Warsaw

Lean Overview. Northeast Indiana Advanced Manufacturing (Lean) Network Meetings: February 21 Fort Wayne February 29 Warsaw Lean Overview Northeast Indiana Advanced Manufacturing (Lean) Network Meetings: February 21 Fort Wayne February 29 Warsaw What is Lean "Lean," is a production practice that considers the expenditure of

More information

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing. Ch 26 Just-In-Time and Lean Production Sections: 1. Lean Production and Waste in Manufacturing 2. Just-in-time Production Systems 3. Autonomation 4. Worker Involvement What is Lean Production? Lean production

More information

Lab Quality Confab LEAN Principles. 4 Fundamental LEAN Tools to Transform your Laboratory. Rita D Angelo, Bonnie Messinger, Bill Krzisnik

Lab Quality Confab LEAN Principles. 4 Fundamental LEAN Tools to Transform your Laboratory. Rita D Angelo, Bonnie Messinger, Bill Krzisnik Lab Quality Confab 2018 LEAN Principles 4 Fundamental LEAN Tools to Transform your Laboratory Rita D Angelo, Bonnie Messinger, Bill Krzisnik Learning Objectives The Learner will be able to: 1. Understand

More information

World Class Manufacturing SMED. Single-Minute Exchange of Die

World Class Manufacturing SMED. Single-Minute Exchange of Die World Class Manufacturing Single-Minute Exchange of Die After completing this chapter you will understand Meaning and Basic of. History of Purpose of. Basic steps Implementation. Process of Benefits of

More information

A Lean RACE Model for Continuous Improvement in Four Possible Directions

A Lean RACE Model for Continuous Improvement in Four Possible Directions A Lean RACE Model for Continuous mprovement in Four Possible Directions Hung-da Wan, Associate Professor Department of Mechanical Engineering Center for Advanced Manufacturing and Lean Systems The University

More information

LEAN IS A LEAN IS JOURNEY

LEAN IS A LEAN IS JOURNEY INTRODUCTION TO LEAN LEAN IS A JOURNEY NOT A DESTINATION Lean is a State of Mind that leads to behaviors that drive process improvements and result in a more productive use of time. Lean is not something

More information

The Toyota Way Chapters January 30, 2014

The Toyota Way Chapters January 30, 2014 The Toyota Way Chapters 10-12 January 30, 2014 1 Level Out the Workload (Heijunka) Chapter 10 2 If production levels vary from day to day, there is no sense in trying to apply those other systems, because

More information

The Toyota Way Chapters September 23, 2014

The Toyota Way Chapters September 23, 2014 The Toyota Way Chapters 10-12 September 23, 2014 1 Level Out the Workload (Heijunka) Chapter 10 2 If production levels vary from day to day, there is no sense in trying to apply those other systems, because

More information

South Central. Course Catalog

South Central. Course Catalog Contents Lean Operations Solutions... 1 Principles of Lean Manufacturing 4 hr... 1 Value-Stream Management & Mapping - 4 hr, 24 hr... 1 5S: Workplace Organization 4 hr, 40 hr... 1 Total Productive Maintenance

More information

Accelerate Digital Transformation by Connecting Your Manufacturing and Supply Chain Data

Accelerate Digital Transformation by Connecting Your Manufacturing and Supply Chain Data Accelerate Digital Transformation by Connecting Your Manufacturing and Supply Chain Data Six steps to unlocking new levels of operational excellence and business value Digital transformation is the integration

More information

Two Branches of Software Engineering

Two Branches of Software Engineering ENTERPRISE SOFTWARE ENGINEERING & SOFTWARE ENGINEERING IN THE ENTERPRISE Two Branches of Software Engineering 1 Crafting Software Resource Input Code Debug Product Test 2 Engineering Software Resource

More information

NEW HIRE PROCESS: PART-TIME FACULTY - PAGE 1

NEW HIRE PROCESS: PART-TIME FACULTY - PAGE 1 NEW HIRE PROCESS: PART-TIME FACULTY - PAGE 1 My Recruiter/HR Associate: Department #: Location #: Generic Job Openings Generic job openings (i.e. PT Faculty College of Business Administration) will be

More information

Project Overview Key System Principles Roles System Overview & New Features by Function Best Practices Status Flags and Workflow Key Dates &

Project Overview Key System Principles Roles System Overview & New Features by Function Best Practices Status Flags and Workflow Key Dates & Project Overview Key System Principles Roles System Overview & New Features by Function Best Practices Status Flags and Workflow Key Dates & Transitional Issues What? Design and development of NEW framework

More information

Measure Phase Measurement System Analysis

Measure Phase Measurement System Analysis Measure Phase Measurement System Analysis Measurement System Analysis Welcome to Measure Process Discovery Six Sigma Statistics Measurement System Analysis Basics of MSA Variables MSA Attribute MSA Process

More information

BETTER, FASTER, CHEAPER: FINDING AND REMOVING WASTE FROM YOUR LEGAL PROCESSES. August 2017

BETTER, FASTER, CHEAPER: FINDING AND REMOVING WASTE FROM YOUR LEGAL PROCESSES. August 2017 BETTER, FASTER, CHEAPER: FINDING AND REMOVING WASTE FROM YOUR LEGAL PROCESSES August 2017 SPEAKERS David Rueff Legal Project Management Officer Baker Donelson Kim Craig Managing Director, Lean Solutions

More information