NEW TRENCHING TECHNOLOGIES & SERVICES FOR PIPELINES Experience in Chile
|
|
- Robert Carroll
- 5 years ago
- Views:
Transcription
1 NEW TRENCHING TECHNOLOGIES & SERVICES FOR PIPELINES Experience in Chile
2 A widespread network of people The Tesmec Group is Leader in the market of infrastructures related to the transportation and distribution of energy, data and material. +60years of experience +600people Our goal is to create a high performance environment, which supports the implementation of our business strategy. All this will be possible with the collaboration of our people - employees, customers, and partners - all over the world. R&D investment avg. Customers from worldwide choose +135Countries Tesmec 8% of total revenues 90%Export
3 We focus on strategic markets for the growth and modernization of every country. Solutions partner for your world Tesmec designs, manufactures and sells products, technologies and integrated solutions for the construction, maintenance and efficiency of infrastructures related to the transport and distribution of energy, data and material, such as: overhead and underground networks, traditional and high speed railway lines, energy cables and pipelines. In addition to traditional businesses, Tesmec is increasing its market presence offering solutions for Power Grid's efficiency & management. ENERGY UNDERGROUND PIPELINES, TELECOM, DRAINAGE BULK EXCAVATION, SURFACE MINING SPECIALIST DIGGING SERVICE RAILWAY UNDERGROUND 3
4 Innovation is the key factor that allowed Tesmec to become what it is today. The (R)evolution The electronic control system TRENCHTRONIC 3.0 comes mainly with the need to improve ease of use of the trencher, increase productivity and make it less dependent on operator skills. The Re.M Remote Monitoring system provides on-demand retrieval of operating, maintenance and troubleshooting information to help improving each machine s bottom-line performance. The new 3D GPS technology gives the input to develop an integrated system that automatically controls machine alignment and digging depth, with relevant benefits in jobsite management, machine performance and excavation accuracy. Benefits demonstrated are: Easy to use Overall efficiency increase Productivity and profitability increase Reduce costs Reliability New generation machines (TT, ReM, GPS3D ) Tesmec premium selection teeth Service and Fleet Management UP TO +40% PRODUCTIVITY UP TO -75% CONSUMPTION UP TO +50% JOBSITE EFFICIENCY *Data listed in this report are taken from actual and historical job sites or estimation, on given and defined conditions, which may vary on a case by case basis. The data and the Tesmec's products shown are for illustrative purposes only, and are subject to change without notice or obligation. As a consequence TESMEC cannot accept any liability for damages, losses (both direct or consequential) or other claims arising from the use of this report, productivity data or any part of thereof. This report and its content is confidential and shall not be divulged without Tesmec consent. 4
5 The Escondida Water Supply (EWS) Project Antofagasta EWS Project The Tesmec Group was approached in 2014 because its machines were needed for one of the toughest jobs in the region yet. When completed, this modern marvel-style undertaking will comprise the largest desalination facilities in the Americas and two 75 mile (120 kilometers) pipeline. The new facility and water supply were deemed fundamental for the continued operation of the mining complex, therefore the project was appointed to a joint venture between two major experiences players: Bechtel Group and Techint. Location: Antafagasta, Chile Chile s Atacama Desert is considered one of the most arid and toughest places on Earth. Project Scope: New desalination plant at sea level Delivery of 2,500 liters per second of water to the Minera Escondida Limitada (MEL) mine site. 185 km x 2 Ø 42 the whole trench dug with 4 Tesmec trenchers between Antofagasta Coloso Port and a copper mine (3100 m AMSL) in the Atacama Desert Pipeline Portion of Project: Total of Kilometers of pipe installed Total of 14 Months to complete pipe installation Peak manpower of 4,200 (staff and craft) 5
6 CHILE 4 x 1675 Chainsaw Rock conditions Caliche and Basalt Productivity rate: 50 linear meters per hour Trench Width: 54 (137 cm) Trench Depth: 10 (300 cm) Main features : Max digging width : 72 (183 cm) Max digging depth : 24 (732 cm) Operating weight: 145 tons Engine: Cummins QSK HP6
7 The production of usable backfill material means waste material reduction and transportation cost savings.
8 Customer said: Tesmec The obvious choice Experienced leader in pipeline trenching Hard rock trenching Superior support (Technical +After sales) Performance Reliability Market leader 8
9 Success Maximization of Uptime ~85% of uptime during project Average Daily Production 593 meters per day On Site Parts
10 Tesmec Support Onsite parts inventory to maintain maximum uptime during the project Full time factory technician on site to assist in maximizing uptime during the operation Daily production & maintenance reports by machine Tesmec remained in daily contact with customer to assure satisfaction and resolution of any outstanding issues
11 11
12
ROCK HAWG TECHNOLOGY. Hardcore Solutions for the Toughest Applications
Hardcore Solutions for the Toughest Applications Unit 3F Lyncastle Way Appleton Thorn Trading Estate Warrington Cheshire WA4 4ST Telephone +44 (0) 1925 265333 Fax; +44 (0) 1925 211700 Enquiries@westquaytrading.co.uk
More informationIN-MOTION WEIGHING & SAFETY SPECIALISTS... PLUS
LOADER SCALES BY IN-MOTION WEIGHING & SAFETY SPECIALISTS... PLUS SAFETY BACKUP CAMERAS BY GRAPPLE SCALES BY ROCK-SOLID PRODUCTS IRON-CLAD SERVICE When your business runs on heavy equipment, you have to
More informationGold Mine Project Altyn Land transportation of mills from Luoyang, China to South-Eastern Kazakhstan for a gold mine project
Projects Case Study Gold Mine Project Altyn Land transportation of mills from Luoyang, China to South-Eastern Kazakhstan for a gold mine project Copper Mine Project Bozshakol Multimodal transportation
More informationGENERAL NOTES FOR FORCE MAINS: *CONTACTOR SHALL HAVE RICHMOND UTILITIES PERSONNEL ON SITE WHEN DIGGING OVER OR AROUND UTILITY LINES AND PUMP STATIONS. CONTRACTOR SHALL SCHEDULE EXCAVATION WITH RICHMOND
More informationIntegrated Bedding, Padding and Backfilling
KNI dynapad Integrated Bedding, Padding and Backfilling www.knidynapad.com The KNI dynapad techlogy The KNI dynapad techlogy for bedding, padding and backfilling gives premium advantages to reduce costs
More informationOptimizing Operations with Connected Devices
Optimizing Operations with Connected Devices White Paper Abstract Machine-to-Machine (M2M) technology allows organizations to gather data from the edge of the enterprise and apply it in ways that impact
More informationMAPR: THE CONVERGED DATA PLATFORM FOR MANUFACTURING
MAPR: THE CONVERGED DATA PLATFORM FOR MANUFACTURING 1 SOLVE COMPLEX MANUFACTURING CHALLENGES USING BIG DATA The manufacturing industry is the most important segment for increased automation and digitization.
More informationApplying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity & Crossing Permit. Design and Construction Guidelines
Applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity & Crossing Permit Design and Construction Guidelines A Guide to Applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationExperts in tunneling with Tunnel Boring Machines
www.eurohinca.com www.terratest.es Experts in tunneling with Tunnel Boring Machines info@eurohinca.com EUROHINCA Europea de Hincas Teledirigidas, S.A., EUROHINCA, was incorporated in 1996 for the execution
More informationYOUR PARTNERS IN EXCELLENCE
YOUR PARTNERS IN EXCELLENCE TABLE OF CONTENTS Atyrau Office 2D Azzatyk Street - 1st Floor Atyrau, Kazakhstan, 060002 +7 712 276 6057 info@arctic-group.com Tengiz Office R/V Tengiz Atyrau Area, Zhiloi Region,
More informationCRAFTSMEN SERVING THE OIL / GAS & MANUFACTURING INDUSTRY
CRAFTSMEN SERVING THE OIL / GAS & MANUFACTURING INDUSTRY ABOUT R-TEX Founded in 1996, R-Tex Services has developed into a multi-disciplinary construction firm focused on developing projects and solutions
More informationInternational Construction Consulting, LLC. Modularization Overview.
International Construction Consulting, LLC Modularization Overview Presentation Overview 1 Modularization Overview 2 An Alternative Construction Method to Deliver Projects 3 Quick Selection Criteria for
More informationWind Power Development on Port of Corpus Christi Authority Property
Wind Power Development on Port of Corpus Christi Authority Property Prepared for American Association of Port Authorities Harbors, Navigation and Environment Committees Seminar May 1, 2012 San Francisco,
More informationTransforming Service Delivery with the Industrial Internet. Maximizing Customer Lifetime Value
Transforming Service Delivery with the Industrial Internet Maximizing Customer Lifetime Value There are few times in history when a perfect storm is poised to shift an entire industry. We are experiencing
More information[ sample ] Copyright 2014 by PEC Safety, Inc. First Edition, revised October 23, 2014
Copyright 2014 by PEC Safety, Inc. First Edition, revised October 23, 2014 All rights reserved. Printed in the United States of America. Per the United States Copyright Act of 1976, no part of this publication
More informationS e r v i c e s a t t h e c o r e o f p e r f o r m a n c e
S e r v i c e s a t t h e c o r e o f p e r f o r m a n c e Beyond cable, dedicated services Nexans is committed to expanding its offer far beyond cables to include a host of exciting new solutions and
More informationInterim Guideline for Excavating in the Proximity of Underground Distribution Lines
Interim Guideline for Excavating in the Proximity of Version 2.0 Ontario Regulation 22/04 Electrical Distribution Safety Issue date: January 9, 2019 Legal Disclaimer. This document contains GUIDELINES
More informationQuebrada Blanca Phase 2. April 2012
Quebrada Blanca Phase 2 April 2012 Forward Looking Information Both these slides and the accompanying oral presentation contain certain forward-looking statements within the meaning of the United States
More informationAPPENDIX D DIRECTIONAL BORING GUIDELINES
The City of Winnipeg Appendix D Bid Opportunity No. 180 163-2016 Page 1 of 1 Template Version: C420150806 - RW APPENDIX D DIRECTIONAL BORING GUIDELINES Corporate Safety & Health Division Directional Boring
More informationAPPENDIX D C DIRECTIONAL BORING GUIDELINES
The City of Winnipeg Appendix C D Bid Opportunity No. 19-2015 18 2015 Page 1 of 1 Template Version: C420150116 - RW APPENDIX D C DIRECTIONAL BORING GUIDELINES Corporate Safety & Health Division Directional
More informationTeledyne RESON SeaBat T20-P. The new SeaBat T20-P Designed with a deeper understanding of your needs
The new SeaBat T20-P Designed with a deeper understanding of your needs 2 Teledyne RESON SeaBat T20-P A vision of quality and performance For almost 30 years, RESON has been the world s most trusted provider
More information70% OF EARTH SURFACE IS OCEAN WATER
70% OF EARTH SURFACE IS OCEAN WATER A man may die, nations may rise and fall, but an idea lives on. John F. Kennedy 1961 John F. Kennedy said: If mankind will find a way to desalinate the ocean water in
More informationSaudi Work Bases SWB is one of the emerging multi-disciplined contractors in the Saudi Arabia. SWB offers clients a complete, onestop solution to
Saudi Work Bases SWB is one of the emerging multi-disciplined contractors in the Saudi Arabia. SWB offers clients a complete, onestop solution to equipment rental, all construction, development and asset
More informationThe Standards referred to shall be the most recent edition.
Page 1 of 7 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described hereunder shall consist of the excavation of trenches and tunnels; the supply and installation of pipe and/or encasement pipe; the
More informationUNDERSTANDING WATER NETWORK MAPPING
UNDERSTANDING WATER NETWORK MAPPING totalwatersolutions.co.uk UNDERSTANDING WATER NETWORK MAPPING Did you know that if your building is more than 30 years old, you probably have no idea where your water
More informationfas Copper, Chile & Antofagasta plc Ivan Arriagada Chief Executive Officer Melbourne Mining Club August 3 rd 2017
fas Copper, Chile & Antofagasta plc Ivan Arriagada Chief Executive Officer Melbourne Mining Club August 3 rd 2017 Cautionary Statement This presentation has been prepared by Antofagastaplc. By reviewing
More informationAPPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.
CHAPTER 21 PART 2 TUNNELING AND EXCAVATIONS 201. Definitions. The following words and phrases, when used in this Part, shall have the meanings ascribed to them in this 201, except in those instances where
More informationChapter 10. Pipeline Installation
Chapter 10 CHAPTER 10 STOCKWATER PIPELINE INSTALLATION TABLE OF CONTENTS PART 10.1 TRENCHING 10-1 10.1.1 Backhoe Constructed Trench 10-1 10.1.2 Trencher Constructed Trench 10-1 10.1.3 Backfilling and Maintenance
More informationIntelligent Machine Control Business Plan Donald Gex
Donald Gex Intelligent Machine Control Business Plan Donald Gex Company Anderson Equipment Company is a distributor of heavy equipment for the Construction, Mining and Forestry industries. The term heavy
More informationTeledyne RESON SeaBat T20-P. The new SeaBat T20-P Designed with a deeper understanding of your needs
The new SeaBat T20-P Designed with a deeper understanding of your needs 2 Teledyne RESON SeaBat T20-P A vision of quality and performance For almost 30 years, Reson has been the world s most trusted provider
More informationCWM Group Sdn. Bhd. WATER. Earth s freshwater is only 0.3%. We create more K
WATER Earth s freshwater is only 0.3%. We create more 7 Introduction With the upsurge in economic growth in the recent years, come new challenges to the environment. The demand for potable water is always
More informationMicrotunnelling. Building infrastructures and power supply systems underground, while life above continues unaffected.
Microtunnelling Building infrastructures and power supply systems underground, while life above continues unaffected. 2 Comprehensive Microtunnelling Solutions A reliably functioning infrastructure which
More informationFEBRUARY 2015 MONITORING
FEBRUARY 2015 MONITORING Licensing Exam 100 Years Too Late Pole of Inaccessibility Experience or not? Then and now Cartographic features MOVING LONDON SAFELY FORWARD An artist s impression of the new Paddington
More informationLOCAL SERVICE. NATIONWIDE NETWORK.
LOCAL SERVICE. NATIONWIDE NETWORK. Local Service. Nationwide Network. Bringing Lifetime Value through Comprehensive Service Solutions SupportPro is a nationwide service organization specializing in supporting
More informationPipe Jacking. Progress is built on ideas.
Pipe Jacking Progress is built on ideas. Frankfurt airport, enlargement of hydrant-fuelling system elongation of southeast-sewer, Nuremberg U 55 subway station, Brandenburger Tor, Berlin subway station
More informationScorecard - Toronto Hydro-Electric System Limited
Scorecard - Toronto Hydro-Electric System Limited 9/23/2015 Performance Outcomes Performance Categories Measures 2010 2011 2012 2013 2014 Trend Industry Distributor Target Customer Focus Services are provided
More informationPermanent Buried Reference Electrodes: Technical Note on Significant Inaccuracies and Medium Term Trials
Permanent Buried Reference Electrodes: Technical Note on Significant Inaccuracies and Medium Term Trials Brian S Wyatt Eur Ing, BSc (Hons), CEng, MIMMM, FICorr, FCS Corrosion Control, 3 Ivy Court, Acton
More informationThe power to predict!
The power to predict! CONiQ condition monitoring in mineral processing: Maximum uptime. For a lifetime. Because downtime has become more expensive than ever, CONiQ detects machine faults before they become
More information1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.
MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction
More informationHeavy-Duty Rolling and Plain Bearings. for Mining, Processing, On- and Offshore Technology
Heavy-Duty Rolling and Plain Bearings for Mining, Processing, On- and Offshore Technology E x p e r t i s e For Advanced Bearings in the Mining and Processing Sector... Technical progress in the fields
More informationworldwide network Thousands since 1986 hardware software data data applications
RIGID DUMP TRUCK AND ADT Payload Monitoring System TEchnology carved for the toughest job RIGID Dump truck AND ADT On board Weighing technology forefront THE INSTALLATION OF ACCURATE AND EASY-TO-VIEW ONBOARD
More informationRexroth Service the Original! Your experts for professional service.
Rexroth Service the Original! Your experts for professional service. 2 Rexroth Service the Original! Individual full service from experts for professionals One partner for the entire life cycle Rexroth
More informationApplying machine intelligence to network management
ericsson.com/ mobility-report Applying machine intelligence to network management Extract from the Ericsson Mobility Report June 2018 2 Articles Applying machine intelligence to network management Advances
More informationPipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.
Pipe Jacking/Microtunnelling Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods
More informationFor more information on ordering from Federal Supply Schedules click on the
GENERAL SERVICES ADMINISTRATION Federal Supply Service AUTHORIZED FEDERAL SUPPLY SCHEDULE PRICE LIST SCIENTIFIC EQUIPMENT AND SERVICES SCHEDULE #66 Leica Geosystems Phone number: (770) 326-9500 Fax number:
More informationE-Power Pipe : A new trenchless method for underground cable installation
E-Power Pipe : A new trenchless method for underground cable installation Dr. Gerhard Lang Jan 31, 2018 - UCT 2018, Track XI High Voltage Power Grid in Germany. Intention to replace nuclear power plants
More informationDamage to Underground Infrastructure British Columbia, Ontario and Quebec
Damage to Underground Infrastructure, and and Highlights Data collection The Common Ground Alliance (CGA) created the Damage Information Reporting Tool (DIRT) in 2003. DIRT is an online database used to
More informationCONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 APRIL 1999 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS
More informationAGRICULTURAL AWARENESS COMMITTEE MINNESOTA REGIONAL COMMON GROUND ALLIANCE (MNCGA)
www.gopherstateonecall.org AGRICULTURAL AWARENESS COMMITTEE MINNESOTA REGIONAL COMMON GROUND ALLIANCE (MNCGA) MNCGA Damage Prevention Bulletin No. 2015-3 Agricultural Drainage: Call 811, A Safety Tool
More informationUSA STARTER KIT. For Dealer Executives
USA STARTER KIT For Dealer Executives Table of Contents The Race...3 4 Steps to Success...4 FLEET INTELLIGENCE OVERVIEW...5 Benefits for Dealers...6 FREE Inspection App...7 Features for Contractors...8
More informationTechnical Guidelines for Construction near Pipeline Facilities
Plains Midstream Canada Damage Prevention Department Technical Guidelines for Construction near Pipeline Facilities Table of Contents 1.0 PURPOSE...3 2.0 REGULATORY GOVERNANCE...3 3.0 ACTIVITIES REQUIRING
More informationLOCAL SERVICE, NATIONWIDE NETWORK
LOCAL SERVICE, NATIONWIDE NETWORK Local Service, Nationwide Network Bringing Lifetime Value through Comprehensive Service Solutions SupportPro is a nationwide service organization specializing in supporting
More informationA GUIDE TO WORKING SAFELY AROUND VECTOR S ELECTRICITY, GAS AND COMMUNICATIONS NETWORKS.
A GUIDE TO WORKING SAFELY AROUND VECTOR S ELECTRICITY, GAS AND COMMUNICATIONS NETWORKS. Date of issue 27/01/2017 Date of next review 29/01/2018 Page 1 V4 18/07/2018 CONTENTS CONTENTS... 2 WORKING SAFELY...
More informationCompany Profile LYNX TRADING & CONTRACTING W.L.L. Delivering the promise
Company Profile 2017 an overview of who we are WHO WE ARE Lynx Trading & Contracting W.L.L., is a multi-disciplined company established to cater for the growing and multifaceted needs of Qatar's industry.
More informationMANUFACTURERS OF HIGH QUALITY CRUSHING, SCREENING AND MATERIALS HANDLING SOLUTIONS FOR THE WORLD MINING, AGGREGATE AND RECYCLING INDUSTRIES
MANUFACTURERS OF HIGH QUALITY CRUSHING, SCREENING AND MATERIALS HANDLING SOLUTIONS FOR THE WORLD MINING, AGGREGATE AND RECYCLING INDUSTRIES MANUFACTURERS OF HIGH QUALITY CRUSHING, SCREENING AND MATERIALS
More informationSpecifications for Electrical Underground Residential Distribution Systems
Specifications for Electrical Underground Residential Distribution Systems Specification DDS-2 Revision 13, February 2010 ONCOR ELECTRIC DELIVERY COMPANY SPECIFICATIONS FOR ELECTRICAL UNDERGROUND RESIDENTIAL
More informationSALT LAKE POTASH PLANS SOP PILOT PLANT AT GOLDFIELDS SALT LAKES PROJECT. ONGOING DISCUSSIONS WITH PROSPECTIVE GLOBAL INDUSTRY PARTNERS.
ASX ANNOUNCEMENT 21 April 2017 SALT LAKE POTASH PLANS SOP PILOT PLANT AT GOLDFIELDS SALT LAKES PROJECT. ONGOING DISCUSSIONS WITH PROSPECTIVE GLOBAL INDUSTRY PARTNERS. The Directors of Salt Lake Potash
More informationImprove Field Performance at A Lower Operating Cost with Oracle Utilities Mobile Workforce Management
Improve Field Performance at A Lower Operating Cost with Oracle Utilities Mobile Workforce Management Oracle Utilities Mobile Workforce Management provides fully integrated, realtime, best-of-breed planning,
More informationField Instruction. All Horizon Power workers who work in and around excavations.
6.4 Excavation work and directional drilling Purpose This instruction provides the minimum requirements for: All Horizon Power workers who work in and around excavations. All Horizon Power workers who
More informationRockwell Automation Drive Systems
Rockwell Automation Drive Systems Solutions for the Crane Industry WELCOME TO THE WORLD OF COMPLETE AUTOMATION Rockwell Automation: Experience You Can Trust Before new equipment is installed, we can assist
More informationDRAINAGE SOLUTIONS SINCE 1908 NEW PRODUCT BOSS 3000 LARGE DIAMETER STEEL REINFORCED POLYETHYLENE PIPE DURABLE LIGHTWEIGHT COST-EFFECTIVE ARMTEC.
DRAINAGE SOLUTIONS SINCE 1908 NEW PRODUCT BOSS 3000 LARGE DIAMETER STEEL REINFORCED POLYETHYLENE PIPE DURABLE LIGHTWEIGHT COST-EFFECTIVE ARMTEC.COM BOSS 3000 the next generation of BOSS pipe. BIGGER. STRONGER.
More informationQuality management system. Environmental management system. Occupational health and safety management system.
Company Profile Gulf Rock Engineering Group was started in 1975 as a specialist blasting sub-contractor and has since developed into one of the Gulf regions leading earthworks and underground construction
More informationASX Announcement 29 October 2012
ASX Announcement 29 October 2012 NEW TARGET ZONE IDENTIFIED AT CERRO VERDE CERRO VERDE, CHILE New Copper Gold Silver corridor delineated Strongly anomalous samples returned over 4km of strike New corridor
More information1 HB By Representative Greer. 4 RFD: Transportation, Utilities and Infrastructure. 5 First Read: 03-MAR-15. Page 0
1 HB62 2 164367-2 3 By Representative Greer 4 RFD: Transportation, Utilities and Infrastructure 5 First Read: 03-MAR-15 Page 0 1 2 ENROLLED, An Act, 3 To amend Section 37-15-2 of the Code of Alabama 4
More informationGUIDELINES FOR PREPARATION OF MINE CLOSURE PLAN
Preamble : GUIDELINES FOR PREPARATION OF MINE CLOSURE PLAN 1. The Central Government vide Notification No. GSR 329 (E) dated 10.04.2003 and No. GSR 330 (E) dated 10.04.2003 amended the Mineral Concession
More informationSECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES
SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.
More informationABENGOA. Chile, changing the energy matrix. Completing Transformation. Ivan Araneda. Innovative Technology Solutions for Sustainability
Innovative Technology Solutions for Sustainability ABENGOA Chile, changing the energy matrix Completing Transformation 9th Annual Analyst and Investor Day Ivan Araneda General Manager Abengoa Chile New
More informationFingerPrints. Faster Service, At Your Fingertips.
Faster Service, At Your Fingertips. delivers the speed and reliability quick service restaurants need to delight guests Simplify Processes. Reduce Errors. Accelerate Performance. Engage Guests. Maximize
More informationATLAS COPCO CONSTRUCTION TECHNIQUE
ATLAS COPCO CONSTRUCTION TECHNIQUE Capital Markets Day Focus on Service November 17, 2015 Andrew Walker, Business Area President AGENDA 2 1. Facts in Brief 2. Two distinctive service businesses - Service
More informationMeeting the Challenges of the Oil and Gas Industry
Meeting the Challenges of the Oil and Gas Industry Manufacturing a wide range of quality pipe, casings, connectors and couplings in the Economic-Techno development zone of Qingdao, China, one plant was
More informationWhy Choose DIG IT Skid Steer Hire?
Skid Steer Hire Skid DIG IT's Steer Vision Hire Sydney Our Metropolitan modern fleet and of Central earthmoving Coast equipment regions. will help you power through your excavation, with skid steers and
More informationSECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES
PART 1 - GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged or temporarily relocated utilities and improvements
More informationEnabling Asset Integrity Management for the Oil & Gas Industry
Enabling Asset Integrity Management for the Oil & Gas Industry THE CHALLENGE Ensuring operational integrity of critical assets and installations is of paramount importance to oil field operators and the
More informationArt caption: Natural resources such as rocks are mined in rock quarries (KWOR-eez) like this one. DRAFT
1 OBSERVING EARTH S RESOURCES INVESTIGATION Humans use a lot of materials found naturally on Earth. There are many materials, including metals such as copper and woods such as pine. Materials that are
More informationAPI & AOPL Provisions of a Model State One Call Law
API & AOPL Provisions of a Model State One Call Law Ranking: A highest priority; B medium priority; C low priority 1. Mandatory membership in the one call system (A) Any entity that operates underground
More informationExpert service. Professional cleaning machines
Expert service Professional cleaning machines Expert service Expert service Professional cleaning machines >20,000 Parts stocked 5,000+ Customers nationwide 60+ Engineers and technicians >100,000 Callouts
More informationPalpsht Company FOR CONSTRUCTIONS AND GENERAL CONTRACTING
Palpsht Company FOR CONSTRUCTIONS AND GENERAL CONTRACTING Palpsht Company is a 100% Iraqi Kurdish Company and registered at MNR and AVL, and has served the Oil & Gas Field Construction needs of clients
More informationSECTION ROCK REMOVAL
SECTION 31 23 16.26 ROCK REMOVAL PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required to perform rock
More informationSECTION EXCAVATION AND FILL
SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to
More informationComprehensive Services for Process Analytics.
Comprehensive Services for Process Analytics. Process Analytics www.siemens.com/processanalytics Efficiency and cost reduction through competent services Siemens can call upon more than 40 years of experience
More informationPress Release: L5 announces strategic partnership with CARLSON LMD, a Laser Measurement Division from Carlson Software
Press Release: L5 announces strategic partnership with CARLSON LMD, a Laser Measurement Division from Carlson Software For surface operations: L5 s commitment In offering its customers, the best solution
More informationThe services solution for unlocking industry s next growth opportunity
The services solution for unlocking industry s next growth opportunity At high-growth industrial companies, services aren t just an optional add-on, but an essential revenue driver deserving thoughtful
More informationEdge Support Trench Lining System
User Guide Conquip Trench Box Edge Support Trench Lining System Introduction The Conquip 3.5m Trench Box is a simple to assemble, two sided trench lining support system designed to be installed by an excavator
More informationDATE: $ FEE: DUE AT TIME OF APPLICATION
PERMIT # LA GRANGE PUBLIC WORKS DEPARTMENT 307 W. JEFFERSON STREET LA GRANGE, KY 40031 PHONE (502) 222-1433 FAX (502) 222-5875 APPLICATION FOR RESIDENTIAL UTILITIES ENCROACHMENT PERMIT DATE: $100.00 FEE:
More informationHandling and Installation Instructions
Handling and Installation Instructions SUPERTANK Water Reclamation Solutions, LLC Unloading and Handling NOTE: It is the responsibility of the installer to follow OSHA safety guidelines during the installation,
More informationUtility Vegetation Management in the 21st Century. 3D Virtualization Reduces Risks, Maintenance Costs
3D Virtualization Reduces Risks, Maintenance Costs The Vegetation-Powerline Threat Trees and branches falling onto power lines are among the leading causes of power outages in North America. Dealing with
More informationCORPORATE POLICY C3.H17
Page 1 of 6 DEVELOPED BY: APPROVED BY: APPROVAL DATE: Corporate Services Department CMT TBD EFFECTIVE DATE: September 1, 2013 LATEST REVISON: NEXT REVIEW: Definitions...2 Scope...2 Purpose...3 Legislative
More informationMAXIMIZE PERFORMANCE AND REDUCE RISK
PREMIER SERVICES MAXIMIZE PERFORMANCE AND REDUCE RISK FOR ASTRO 25 AND DIMETRA SYSTEMS LATIN AMERICA REGION COMPLEXITIES IN MISSION CRITICAL SYSTEMS CONTINUE TO INCREASE Mission critical communications
More informationADVANCE DOCK LIFTS KEEP YOUR DOCK OPERATIONS ON THE LEVEL WITH A DOCK LIFT RECESSED DOCK LIFTS (DISAPPEARING DOCKS)
D RECESSED KEEP YOUR DOCK OPERATIONS ON THE LEVEL WITH A DOCK LIFT DOCK LIFTS (DISAPPEARING DOCKS) TOP OF GROUND DOCK LIFTS (INSTANT DOCKS) ADVANCE DOCK LIFTS RECESSED DOCK LIFTS Advance Lifts offers the
More informationTechnology to Transform Your Mine Site
Technology to Transform Your Mine Site Since 1979, Modular Mining Systems, Inc. has provided mining customers around with world with powerful innovative software to enhance productivity, improve efficiency,
More informationCONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 APRIL 2008 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS
More informationMaintenance Service. 1.0 Executive Summary 1.1 ANNUAL PREVENTIVE MAINTENANCE VISIT 1.2 ON-SITE REMEDIAL SERVICES
Maintenance Service Statement of Work Advantage Plus Plan for UPS & PDU with RMS Advantage - 1 - Plus Plan for UPS & PDU with RMS Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0
More informationSouthern Copper Corporation November, 2013
Southern Copper Corporation November, 013 0 I. Introduction 1 Management Presenters Presenter Raul Jacob Title Vice President of Finance & CFO Safe Harbor Statement This presentation contains certain statements
More informationPHILADELPHIA GAS WORKS SPECIFICATION BOOK For Common Trenching For Natural Gas Mains and Services
PHILADELPHIA GAS WORKS SPECIFICATION BOOK For Common Trenching For Natural Gas Mains and Services Introduction This manual is designed as a guide and reference source for developers, builders, contractors,
More informationSECTION NATURAL GAS DISTRIBUTION
SECTION 33 51 00 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph
More informationCONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 401 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01 SCOPE 401.02 REFERENCES 401.03 DEFINITIONS
More informationProject CAPS: Structured analysis of field quality data with integration of enhanced machine data at CLAAS
Project CAPS: Structured analysis of field quality data with integration of enhanced machine data at CLAAS Rome, 8. - 10. November 2016 Axel Holtkotte, CLAAS Service & Parts GmbH Agenda CLAAS CLAAS Service
More informationMISSISSIPPI CODE of *** Current through the 2015 Regular Session ***
MISSISSIPPI CODE of 1972 *** Current through the 2015 Regular Session *** TITLE 77. PUBLIC UTILITIES AND CARRIERS CHAPTER 13. REGULATION OF EXCAVATIONS NEAR UNDERGROUND UTILITY FACILITIES 77-13-1. Legislative
More informationCO 2 Capture from Steam Methane Reformers: Commercial Scale Demonstration Project
CO 2 Capture from Steam Methane Reformers: Commercial Scale Demonstration Project Vince White Air Products and Chemicals Research Associate, Energy Technology June 11-14, 2012 Agenda Air Products Background
More information