STATNAMIC LOAD TESTING OF HIGH CAPACITY MARINE FOUNDATIONS

Size: px
Start display at page:

Download "STATNAMIC LOAD TESTING OF HIGH CAPACITY MARINE FOUNDATIONS"

Transcription

1 STATNAMIC LOAD TESTING OF HIGH CAPACITY MARINE FOUNDATIONS Mike Muchard, P.E., Applied Foundation Testing, Inc., Tampa, FL, USA STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles on many large marine construction projects. The paper focuses on one particularly interesting large marine project involving a new bridge to St. George Island, Florida where instrumentation and STATNAMIC load testing was used in conjunction with static load testing on high capacity piles. The information presented includes embedded instrumentation measurements taken during pile fabrication (posttensioning), during pile driving, during static load testing, and STATNAMIC load testing. As much of this data is the first of its kind on concrete cylinder piles, it is exciting to present the foundation industry with this additional insight as to the behavior of this pile type and the accuracy of the methods used to test them. INTRODUCTION Construction projects in marine applications require demanding foundation designs. Large diameter spun cast concrete cylinder piles have many advantages in this application, most notable is their ability to resist large axial and lateral loads. As designers continue to push the capacity envelope, STATNAMIC load testing augmented with embedded instrumentation has become the preferred method of testing these high capacity foundations. Mainly because STATNAMIC load testing is a very efficient, cost effective, and reliable means of applying the large test loads needed to verify these demanding designs. Test loads up to 4,500 tons are available with current STATNAMIC equipment. The largest STATNAMIC load test to date on a concrete cylinder pile was 2,500 tons. The St. George Island Bridge project was the first in a long line of high capacity cylinder pile projects where STATNAMIC load testing was successfully used. The St. George Island Bridge project included a pile load test program consisting of 4-static load tests and 6-STATNAMIC load tests, all of which included multiple levels of embedded strain gages. Dynamic pile testing was also performed on the test piles and upwards of 50 production piles. All dynamic pile testing and static load testing was performed independently by the project geotechnical consultant. The data obtained from embedded instrumentation, dynamic, STATNAMIC and static load testing provided engineers a better understanding of cylinder pile structural and geotechnical performance as well as a perspective on the methods used to test them. Monitoring the embedded strain gages during post tensioning showed pre-stress magnitudes ranging from 760 psi to 1,010 psi and that some eccentricity was locked-in the pile during the process. Using these measurements, a composite modulus of elasticity of 5,725 ksi was calculated. The eccentricity is believed to be partly from non-uniform contact points between the segments and arching of the pile during tensioning. Strain measurements made during the pile driving show the propagation of the stress wave and actual driving stresses within the pile. This information was useful in demonstrating the differences between dynamic testing and STATNAMIC testing. Capacity predictions from dynamic testing showed as much as 41-percent under-prediction between the CAPWAP restrike and the static load tests. The CAPWAP derived skin friction and end bearing compared to the measured load distribution during the static tests showed a much greater disparity to the point of being totally unreliable. During subsequent STATNAMIC and static load testing, the instrumentation was used to determine load distribution e.g. side shear and end bearing resistance. The data also shows the high reliability of STATNAMIC load testing of cylinder piles when compared to static testing. In three of four piles tested, the STATNAMIC

2 method was within 2-percent of the maximum static capacity. In the fourth case, STATNAMIC was 9-percent below the maximum static capacity because with only 2-days between tests the pile did not re-gain its full side shear capacity. CYLINDER PILE DESCRIPTION Cylinder piles are constructed by spin casting multiple cylindrical segments and posttensioning them together to make up the desired length. The most popular pile diameters vary from 36 inches to 66 inches with wall thicknesses of 5 to 8 inches. Individual segment lengths which make up a pile typically range from 4 feet to 16 feet. The piles discussed in this paper were all 54 inches O.D. by 8 inch wall thickness and comprised of five 16-foot sections for a total length of 80 feet. The pile segments were constructed with longitudinal ducts in which post-tensioning strands were threaded after castings. High strength, low slump concrete was placed in the rotating forms. The centrifugal forces impel the concrete to the walls of the forms which results in a very strong and dense structural element. The 54 inch piles on this project had ultimate capacities ranging from 750 tons to 900 tons. But ultimate capacities as much as 1,630 tons have been used on 54 inch cylinder piles in the Chesapeake Bay Area. INSTRUMENTATION Due to the manufacturing process of cylinder piles, successful instrumentation presents many challenges. Figures 1 and 2 show some of the instrumentation processes. To the author s knowledge, this was the first time cylinder piles were successfully instrumented with embedded strain gages. Embedded strain gages were installed in the test piles for the purpose of measuring load distribution during STATNAMIC and static load testing. However, to gain additional knowledge of this pile type, the gages were monitored during the post tensioning process and during pile driving as well. As shown in Figure 6 following the Reference section. The bottom 4-sections of the piles were instrumented with 3 gages on a plane for a total of 12 gages per pile. Figures 1 and 2: Instrumentation of cylinder piles. Courtesy of Applied Foundation Testing, Inc. PILE INSTALLATION Installation of cylinder piles are most commonly done by means of large air, steam or hydraulic powered hammers. Heavy ram - short stroke hammers seem to be the preferred combination in the industry. Typical air and steam hammers driving cylinder piles are shown in Figures 3, 4 and 5. The 54 inch diameter piles presented in this paper were driven with a 40,000 lb ram air-hammer capable of a maximum stroke of 3-feet. Therefore providing a maximum rated energy of 120,000 ft-lbs. As is typical of air-steam hammers, this hammer was equipped with half-stroke capabilities. Three of the test piles (LT-1, LT-2 and LT-3) were driven to practical refusal of 20 blows per inch. Test Pile LT-5 was driven to a final blow count of 10 blows per inch. This was the only pile of the four stopped prior to practical refusal.

3 Figures 3, 4 and 5: Driving of cylinder piles with 40,000 lb air hammer (left) and 60,000 lb ram steam hammer (center and right). Courtesy of Boh Brothers and Weeks Marine Construction, Inc. SOIL CONDITIONS The subsurface conditions at the project generally consisted of four major strata. Water depths ranged from 10 to 20 feet. The upper layer was soft or loose silty bay bottom soils with N-values from 0 to 2. Underlying this was a more dense silty fine sand layer with N-values from 20 to 50. This strata was underlain by a weathered limestone formation ranging in thickness from 7 to over 15 feet. Below the limestone, dense silty fine sands and stiff sandy silts were present with N-values of 70 decreasing to 30 with depth. Soil conditions at each test pile location are shown in Figure 6 attached following the References. DYNAMIC TESTING METHOD Dynamic pile testing was performed on all of the test piles at the St. George Island Bridge project using a Pile Driving Analyzer (PDA). Dynamic testing techniques are well documented in many references. It was accomplished by externally attaching accelerometers and strain transducers near the pile top and taking measurements during driving. Pile capacity during driving was estimated by the Maximum CASE Method. Other data obtained include maximum compression stress, maximum tension stress and hammer energy transferred to the pile at the gage locations. It should be common practice to use 4-sets of external gages due to the large diameter of typical cylinder piles. A signal matching approach was used to back calculate various dynamic soil parameters and estimate pile load distribution. The computer program CAPWAP uses the data measured during a single blow as a boundary condition and the user performs many iterations on soil parameters to make a calculated force wave match the measured one. This approach is highly user dependent and does not provide a unique answer. STATNAMIC LOAD TEST METHOD The STATNAMIC load test is based on Newton's second and third laws which state that force is equal to mass times acceleration and that for every action there is an equal and opposite reaction. Loads up to 4,500 tons can be generated (axially or laterally) by propelling a reaction mass off the foundation. Since the mass is in contact with the foundation prior to the test, the force associated with propelling of this mass acts equally and oppositely onto the foundation. STATNAMIC load testing requires no reaction piles, no reaction beam, and no

4 hydraulic jack. The STATNAMIC device (Figure 7) mounts on the pile top and includes a load cell and displacement measuring system. Although not necessary, embedded strain instrumentation is always recommended in the foundation. A special solid fuel is burned to generate gas pressure inside a cylinder and ram (analogous to a gas actuated jack). As the pressure builds, it reacts against a heavy mass above the pile. The pressure eventually builds high enough to propel the reaction mass upward; in turn a downward load is simultaneously applied to the pile top which is many times greater than the weight of the reaction mass. The stages of a STATNAMIC test are shown in Figure 8. The STATNAMIC device typically produces a time dependent load on the order of 1/2 second or less. The fuel burn rate produces a smooth increasing force and controlled venting of the pressure produces a soft unloading. The load produced is not an impact which makes the analysis more simplified and reliable than dynamic testing. Load is measured with a calibrated load cell and displacement is measured with a photo-voltaic sensor triggered by a stationary laser reference. Three to four additional motion sensors also provide measurement of displacement at the pile top. Figure 7: 2,200 Ton STATNAMIC Load Test device used on cylinder piles at St. George Island Bridge. Courtesy of Applied Foundation Testing, Inc.

5 A - Foundation Member B - Calibrated Load Cell C - Laser Displacement System D - Piston & Cylinder E - Silencer F - Reaction Mass G - Catch Mechanism Stage 1 - Before The Test - reaction mass is in contact with pile. Stage 2 - The Test - Burning fuel creates high pressures, simultaneously propelling the reaction mass up and loading the pile in downward compression. The applied load and pile displacement are measured using high precision instrumentation and a data acquisition systems. Stage 3 - After The Load Test - The reaction mass is safely caught using hydraulic systems or by mechanical means. It is easily lowered for cyclic loading on the same pile. Figure 8: Stages of a STATNAMIC Load Test STATIC LOAD TESTING METHOD The load test set-up shown in Figures 9 and 10 was capable of applying almost 1,600 tons. As one can imagine from these photos, this test was very time consuming and costly. The axial load was applied to the pile using three 600 ton hydraulic jacks coupled in parallel. Multiple load cells (one above each jack) within this system provided a direct within this system provided a direct measure of the applied force. Multiple LVDT s were used to measure displacement. All instrumentation including the strain gages were used to measure displacement. All instrumentation including the strain gages were monitored with a data acquisition system. Reaction load was provided through frame supported water filled barges. Four pipe piles supported his weighted box apparatus. Loading rate was generally governed by filling the barges with water. The barge filling rate was about 7 tons of water per minute. The total duration of the test including loading and unloading was in most cases over 5 hours. In the interest of safely, the load on the test pile was always kept a minimum of 200 tons below the dead weight of the reaction mass. Thus, the four reaction piles were constantly under an approximate load around 50 tons each. The same is true for the unloading, where the pressure on the jack was slowly released as the water was drained from the tanks. Since the pipe pile supports were nearly 25-feet clear distance from the test pile and under minimal compression load, side effects on the test results from reaction piles were effectively negated. POST TENSION MONITORING RESULTS Sixteen tendons were stressed two at a time, 180 degrees from each other to a force of 63 kip each. Strand loading was monitored via gage pressure on the two calibrated jacks. Figure 11 contains the strain measurements from 11 individual gages (one gage did not survive the casting process). The data shows significant eccentricity to the point of going into tension in one line of gages. However, when gages at each level are averaged the eccentric stress appear more uniform. The eccentricity is believed to be partly from non-uniform contact points between the segments and arching of the pile during tensioning. It is also interesting to note that the point of jacking was only 2.5 feet from the yellow gage level which shows the

6 highest average strain but also the most uniform strain. Since we know the jacking force, strain in the pile and the cross section area, the overall pile modulus was measured. The modulus based on the average of all strain gages was 5,725 ksi and corresponds to a concrete compressive strength of over 10,000 psi. The stress in the pile can then be determined based on the calculated modulus which is shown in Figure 12. This information can be used to validate structural design assumptions and also be used to more accurately determine allowable driving stresses for spun cast concrete cylinder piles. Figure 9: Static load test set-up. Courtesy of Boh Brothers Constructions Co. Figure 10: Detail pile top of static load test set-up. Courtesy of Boh Brothers Construction Co, Inc.

7 Post Tensioning Strain (All Gages) Strain (ue) Blue1 ue Blue2 ue Blue3 ue Green1 ue Green2 ue Red1 ue Red2 ue Red3 ue Yellow1 ue -300 Yellow2 ue yellow3 ue Time (seconds) Figure 11: Strain measurements during post tensioning Post Tensioning Stress Stress (ksi) Blue Green Red Yellow Time (seconds) Figure 12: Average stress at each gage level during post tensioning

8 MEASUREMENTS DURING DRIVING Measurements of the embedded strain gages were made during pile driving on selected test piles. Conventional dynamic monitoring was also performed on all test piles during initial drive and restrike. An example of the calculated force datfrom the strain measurements within the pile for a single hammer blow is shown in Figure 13. The force measured with the PDA is also superimposed on this figure. The internal measurements clearly indicate the effects of stress wave propagation. Due to this wave propagation, load distribution can not be simply interpreted from these data. The data shows the presence of compression and tension waves in the upper gages but the toe gages remain in compression. It is interesting to note that the highest tension was recorded near the head of the pile after several wave periods. It is also noted that the maximum compression and tension forces corresponded very well to the calculated values from the PDA. An interesting comparison of the mechanics of a hammer impact and the STATNAMIC test may be made from this information. The hammer blow impact duration is approximately 1 millisecond as shown in Figure 13. The STATNAMIC load test produced a compressive load lasting 100 milliseconds as shown in Figure 15. The STATNAMIC load is applied in a linearly increasing manner with a gradually decreasing unloading. The load is not an impact because the reaction mass is in contact with the pile prior to the test. Because the STATNAMIC load duration is sufficiently longer than the natural period of the foundation, a much simpler and more accurate analysis can be made. The natural period of the pile is its length divided by its overall wave speed, L/c or 6 milliseconds for this pile. The STATNAMIC loading duration was approximately 16 times longer than the natural period of the pile. Where, a hammer impact is many times shorter than the natural period of the pile. This longer loading duration has several interesting characteristics. The most important is tensile stress waves are not present. This is shown in Figures 13 and 15 where the hammer blow produces over 800 kips of tension and the STATNAMIC test none. The figures also show that the pile is straining in-phase during the STATNAMIC test compared to those from an impact load. Therefore, the pile may be analyzed as a unit with all parts mobilizing capacity along its length simultaneously, like in a conventional static load test. But the static capacity is not simply the measured load and deflection. Because the pile, as a whole, undergoes rapid translation during the compressive loading, inertia and damping forces are easily subtracted. Force vs. Time During Pile Driving Level 1 Level 2 Level 3 Level 4 PDA Force Force (kips) Time (Seconds) Figure 13: Measured Driving Forces in a Cylinder Piles

9 In contrast to the STATNAMIC loading, a hammer blow produces a wave down and wave back up the pile several times which mobilizes resistance at different locations at different points in time. This is especially noticeable in the upper strain gages. Thus, a more complex analysis technique involving a signal match approach is required to determine the resistance distribution. The signal match approach introduces approximately 18 unknowns and has no unique solution. CAPWAP analyses were performed on the dynamic test data at end of initial drive and restikes with elapsed times ranging from 7 to 17 days. Only the CAPWAP restrike results are presented in Table 1. Table 1: CAPWAP results from restrike tests CAPWAP CAPWAP CAPWAP Skin End Pile Total Friction Bearing No. (kips) (kips) (kips) LT LT LT LT STATNAMIC AND STATIC LOAD TEST RESULTS The load applied during a STATNAMIC test is of sufficient duration to maintain the pile in compression during the entire load event (like a static test). But because the pile is pushed rapidly, the loading force is also resisted by damping and inertia forces from the soil. Therefore, these forces must be subtracted to obtain the static resistance component. The derived static capacity from the STATNAMIC tests was determined using the Segmental Unloading Point Method (SUP) developed at the University of South Florida (Mullins et al., 2002). The Segmental Unloading Point Method (SUP) discretizes a foundation into segments defined by the locations of the embedded strain gages. This allows the standard Unloading Point Method (UPM) to be applied to each segment using measured data. Then the total derived static response is calculated as the sum of the derived static response from the individual segments. The applied STATNAMIC load and derived static load (via SUP method) for test pile 3 at the St. George Island project is shown in Figure 14. The difference between these two curves in Figure 14 is the inertia and damping components. The load calculated at each strain gage versus time from the same STATNAMIC test is shown in Figure 15. The loads in this figure are not corrected for inertia and damping. Note that the upper three levels of strain gages showed almost no load transfer with all the capacity being contributed by the bottom 16 feet of pile. The physical set-up of the STATNAMIC equipment devised by the Contractor was quite ingenious in that it was self supported solely by the test pile. Therefore, falsework piles were not necessary to support the test equipment. This set up produced an atypical bouncing effect of the pile caused when the reaction mass was caught. This can be seen at the end of the data set in the load-displacement data as well as the strain data. Data reduction of the static load test is very straight forward. A typical plot of the measured load versus measured displacement is shown in Figure 16 for test pile 3. The load distribution calculated from the strain gages as a function of time during the static test are shown in Figure 17. As was typical for most of the piles, the strain data for LT-3 show that all the load was transferred to the bottom 16 feet of pile. Using these data reduction approaches, the static and STATNAMIC results were plotted together in Figures 18 through 21. As shown in these figures the ultimate capacity was achieved in two of the piles (LT-1 and LT-5). In pile LT-1, Figure 18, the STATNAMIC testing was done in three load cycles to a maximum of 2,166 kips following the static test which went to 2,136 kips. The STATNAMIC test showed both the stiffness and ultimate capacity that would be expected during a reload. It is also interesting to note that the pile developed more end bearing and less skin friction in the subsequent STATNAMIC test. The test order was reversed for LT-2, which is shown in Figure 19. STATNAMIC testing of LT-2 included three load cycles to a maximum of 3,372 kips. The following static test was taken to the limits of the equipment at 3,109 kips. Since this pile demonstrated an elastic response in each test, the comparison should be based on loads from similar deflections. Using this logic, the results were nearly identical from each test

10 method. The STATNAMIC and Static load test results for Pile LT-3 were plotted on top of each other in Figure 20 to show the nearly perfect agreement in every way. It is believed that this pile was on the verge of achieving plunging failure. The skin friction and end bearing distribution on pile LT-2 and LT-3 also had very good agreement. Test pile LT-5 shown in Figure 21 had a different response than the other test piles in that it had the most skin friction capacity of the four piles. The pile had a maximum static capacity of 2,889 kips of which 1,280 kips was end bearing. The STATNAMIC test was performed only two days later and showed a lower capacity of 2,631 kips. What is interesting is the STATNAMIC test showed a similar end bearing of 1,300 kips. So it is reasonable to assume the difference in capacity was due to a loss in skin friction between tests. A summary of results from the static and STATNAMIC tests is presented in Table 2.

11 Load vs. Displacement from STATNAMIC Test - LT-3 Displacement (inches) Statnamic Applied Load Derived Static Load Load (kips) Figure 14: Applied STATNAMIC load and derived static load based on SUP method Load vs. Time from STATNAMIC Test - LT Load (kips) Load Cell L 1 L 2 L3 L 4 (Bottom) Time (sec) Figure 15: Load distribution within the pile during the STATNAMIC load test (uncorrected for inertia and damping)

12 Load vs. Displacement from Static Test - LT Displacement (inches) Load (kips) Figure 16: Applied load vs displacement during static load test of LT-3 0 Load vs Time from Static Load Test - Test Pile LT Load (kips) Top L 1 L 2 L 3 L 4 (Bottom) Time (hours) Figure 17: Load distribution based on strain measurements during the Static load test of LT-3

13 Load vs. Displacement from STATNAMIC and STATIC Tests 0.00 Displacement (inches) Test Pile 1 Static Load Test Statnamic Load Cycle 1 Statnamic Load Cycle 2 Statnamic Load Cycle Load (kips) Figure 18: Static and STATNAMIC load test results from LT-1 Load vs. Displacement from Statnamic and Static Tests Test Pile 2 Statnamic Load Tests Static Load Test Displacement (inches) Load (kips) Figure 19: Static and STATNAMIC load test results from LT-2

14 Load vs. Displacement from STATNAMIC and STATIC Tests Test Pile 3 Statnamic Load Test Static Load Test Displacement (inches) Load (kips) Figure 20: Static and STATNAMIC load test results from LT Load vs. Displacement from Statnamic Test and Static Test Test Pile 5 Displacement (inches) Static Load Test Statnamic Load Test Load (kips) Figure 21: Static and STATNAMIC load test results from LT-5

15 Table 2: Summary of static and STATNAMIC load test results Static Total (kips) Static Skin Friction (kips) Static End Bearing (kips) STATNAMIC Total (kips) STATNAMIC Skin Friction (kips) STATNAMIC End Bearing (kips) Pile No. LT LT LT LT CONCLUSIONS AND COMPARISON OF THREE TEST METHODS Three types of load tests were performed on the St. George Island Bridge project consisting of dynamic testing, STATNAMIC load testing, and static load testing. Four of the test piles utilized all three methods on the same pile which are the focus of this paper. In these comparisons, the static load test was selected as the bench mark reference test. Of the four piles tested, only two (LT-1 and LT-5) achieved the ultimate pile capacity. In all cases, the CAPWAP restrike underpredicted the total pile static capacity. These under-predictions ranged from 9 percent to 41 percent as shown in Figure 22. The predicted load distribution from CAPWAP had much larger disparities though. The best CAPWAP comparison was at LT-1, where the restrike was only 9 percent below the ultimate static capacity. However, it did not match so favorably to the skin friction and end bearing distribution where it under-predicted the skin friction by 222% and over-predicted the end bearing by 79%. At LT-5, the CAPWAP restrike under-predicted the ultimate static capacity by 30 percent. It also under-predicted the skin friction by 245% and over-predicted the end bearing by 21%. In LT-2 and LT-3, the CAPWAP restrike again showed significant under-prediction of 35% and 41%, respectively. At LT-2, the skin friction was over-predicted by 127% and the end bearing was under-predicted by over 117%. Similar magnitude discrepancies were shown in LT-3 with an under-prediction on skin friction of 194% and 54% under-prediction of end bearing. In three of the four piles, STATNAMIC derived static capacities were within 2 percent of the static load tests. In the fourth pile, the STATNAMIC derived capacity was 9 percent below the static load test primarily due to the short time interval (only 2 days) between the static test and the STATNAMIC test. Figure 23 graphically depicts this comparison. In LT-1 the end bearing during the reload was 71 % greater than the initial static test. Also accompanied by a reduction in side shear capacity of 35%. In LT-2 the STATNAMIC showed 107 kips lower side shear capacity and 50 kips higher end bearing capacity than in the static test. The side shear and end bearing capacity from STATNAMIC was within 1% to 2% of the static test for LT-3. In LT-5 the STATNAMIC end bearing was within 2 % of the static test, but was 17% lower on side shear as discussed above. Although CAPWAP significantly underpredicted the pile capacity as illustrated in Figure 22, dynamic testing of cylinder piles still adds benefit in gaining driving stress and hammer energy data. The high reliability of determining pile capacity with STATNAMIC load testing augmented with strain instrumentation was demonstrated on this project and illustrated in Figure 23. In this application, STATNAMIC has demonstrated it can provide engineers, owners and contractors a more cost effective means to test high capacity marine foundations.

16 CAPWAP / Static Comparison REFERENCES Mullins, G., Lewis, C., and Justason, M.D., Advancements in Statnamic data Reduction Techniques. ACSE Geotechnical Special Publication 116, pp CAWAP (kips) Under-Prediction Williams Earth Sciences, Inc. Report of Load Test Results (Static, STATNAMIC, and PDA), St. George Island Bridge SR 300 over Apalachicola Bay, January, 31, Static Load (kips) Figure 22: CAPWAP restrike to static test 3500 STATNAMIC / Static Comparison 3000 Statnamic Load (kips) Static Load (kips) Figure 23: STATNAMIC to static test

17 Figure 6: Soil and pile profiles St. George Island Bridge

Bi-Directional Static Load Testing of Driven Piles

Bi-Directional Static Load Testing of Driven Piles Bi-Directional Static Load Testing of Driven Piles Paul J. Bullock, PhD Fugro Consultants Inc. Loadtest Bi-Directional Osterberg Cell Testing Specialized jack in pile uses bearing to mobilize side shear

More information

Pile Driving Analyzer (PDA) and CAPWAP Proven Pile Testing Technology: Principles and Recent Advances

Pile Driving Analyzer (PDA) and CAPWAP Proven Pile Testing Technology: Principles and Recent Advances Pile Driving Analyzer (PDA) and CAPWAP Proven Pile Testing Technology: Principles and Recent Advances Frank Rausche, Ph.D., P.E. Pile Dynamics, Inc. 2013 Louisiana Transportation Conference 1 Introduction

More information

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT CHAPTER Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 19 By Dr. Ibrahim

More information

APPENDIX B. LOAD FRAME. This Appendix will describe the philosophy in the design and operation of the loading system.

APPENDIX B. LOAD FRAME. This Appendix will describe the philosophy in the design and operation of the loading system. APPENDIX B. LOAD FRAME This Appendix will describe the philosophy in the design and operation of the loading system. LOAD FRAME The large-scale gusset plate testing required a unique loading fixture. A

More information

Offshore pile acceptance using dynamic pile monitoring

Offshore pile acceptance using dynamic pile monitoring Offshore pile acceptance using dynamic pile monitoring Webster, S. & Givet, R. GRL Engineers, Inc. Charlotte, NC, USA Griffith, A. Saudi Aramco, Dhahran, Saudi Arabia ABSTRACT: Dynamic pile monitoring

More information

PDPI 2015 STATIC ANALYSIS LATERALLY LOADED PILE DESIGN. Chapter 9

PDPI 2015 STATIC ANALYSIS LATERALLY LOADED PILE DESIGN. Chapter 9 PDPI 2015 STATIC ANALYSIS LATERALLY LOADED PILE DESIGN Chapter 9 Lateral Capacity of Single Piles Potential sources of lateral loads include vehicle acceleration & braking, wind loads, wave loading, debris

More information

SAMPLE SPECIFICATION for HIGH STRAIN DYNAMIC TESTING of DRIVEN PILES

SAMPLE SPECIFICATION for HIGH STRAIN DYNAMIC TESTING of DRIVEN PILES SAMPLE SPECIFICATION for HIGH STRAIN DYNAMIC TESTING of DRIVEN PILES October 2014 In using this sample specification, it should be recognized that each site and structure is unique. Therefore, geotechnical

More information

Rapid Axial Load Testing of Drilled Shafts

Rapid Axial Load Testing of Drilled Shafts Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial

More information

Dynamic Testing of Drilled Shafts

Dynamic Testing of Drilled Shafts TRANSPORTATION RESEARCH RECORD 1336 65 Dynamic Testing of Drilled Shafts MOHAMAD HUSSEIN, FRANK TOWNSEND, FRANK RAUSCHE, AND GARLAND LIKINS Concerns about the construction of drilled shafts lead to the

More information

Over the last decade, drilled and postgrouted micropile foundations have

Over the last decade, drilled and postgrouted micropile foundations have Seismic Design of Micropile Foundation Systems Leo Panian, S.E., and Mike Korolyk, S.E. Over the last decade, drilled and postgrouted micropile foundations have come to be increasingly relied on for resisting

More information

SUPPLEMENTAL TECHNICAL SPECIFICATION

SUPPLEMENTAL TECHNICAL SPECIFICATION July 14, 2015 HIGH STRAIN DYNAMIC LOAD TESTING OF DRILLED SHAFTS 1.0 GENERAL This work shall consist of performing high-strain dynamic testing using a drop weight loading system on a test drilled shaft

More information

OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION

OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION Supplemental Specification 901-S-803-1 LFRD Driven Pile Specifications. DATE: May 24, 2010 OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION SUBJECT: LRFD Driven Pile Specifications

More information

Presenters. Dan Brown, Ph.D., P.E., D.GE President and Senior Principal Dan Brown and Associates, PC

Presenters. Dan Brown, Ph.D., P.E., D.GE President and Senior Principal Dan Brown and Associates, PC Presenters Dan Brown, Ph.D., P.E., D.GE President and Senior Principal Dan Brown and Associates, PC Robert Thompson, P.E., D.GE Principal Engineer Dan Brown and Associates, PC NCHRP Synthesis 478 Design

More information

Dynamic Pile Load Testing. James A. Baigés, PE September 3, 2015

Dynamic Pile Load Testing. James A. Baigés, PE September 3, 2015 Dynamic Pile Load Testing James A. Baigés, PE September 3, 2015 Pile Design Outline Ø Project Scope Ø Subsoil Exploration Program- Ø Site Geology, Aerial Photo interpretation stereo pairs Ø Ø Ø SPT, CPT,

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

SECTION DUCTILE IRON PILES

SECTION DUCTILE IRON PILES SECTION 31 66 13 DUCTILE IRON PILES PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. B.

More information

Softening Coefficients for Prestressed Steel Fiber Reinforced Concrete. Prestressed Steel Fiber Reinforced Concrete in Tension.

Softening Coefficients for Prestressed Steel Fiber Reinforced Concrete. Prestressed Steel Fiber Reinforced Concrete in Tension. Constitutive Relationships of Prestressed Steel Fiber Reinforced Concrete in Tension Justin Mickey Softening Coefficients for Prestressed Steel Fiber Reinforced Concrete Thomas Kelleher NSF REU Summer

More information

Pile Design from Constructability Perspective

Pile Design from Constructability Perspective Pile Design from Constructability Perspective Prestressed Concrete Piles in Coastal Georgia Presented by: Guoming Lin, Ph.D., G.E., D.GE Senior Principal / Senior Consultant Savannah, Georgia November

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS 1.0 DESCRIPTION This work shall consist of furnishing all materials and labor necessary for conducting an Osterberg Cell (O-cell)

More information

GEOTECHNICAL RESISTANCE FACTORS

GEOTECHNICAL RESISTANCE FACTORS Chapter 9 GEOTECHNICAL RESISTANCE FACTORS Final SCDOT GEOTECHNICAL DESIGN MANUAL 9-i Table of Contents Section Page 9.1 Introduction... 9-1 9.2 Soil Properties... 9-2 9.3 Resistance Factors for LRFD Geotechnical

More information

REPORT ON DRILLED SHAFT LOAD TESTING (OSTERBERG METHOD) I-215 Airport Connector - Las Vegas, NV - TS-1 Las Vegas, NV (LT )

REPORT ON DRILLED SHAFT LOAD TESTING (OSTERBERG METHOD) I-215 Airport Connector - Las Vegas, NV - TS-1 Las Vegas, NV (LT ) REPORT ON DRILLED SHAFT LOAD TESTING (OSTERBERG METHOD) I-215 Airport Connector - Las Vegas, NV - TS-1 Las Vegas, NV (LT - 9289) Prepared for: Anderson Drilling 2545 S. Bruce Street, Suite H1 Las Vegas,

More information

Large-scale dynamic high-strain load testing of a bridge pier foundations

Large-scale dynamic high-strain load testing of a bridge pier foundations Large-scale dynamic high-strain load testing of a bridge pier foundations Hussein, M. GRL Engineers, Inc., Orlando, Florida, USA Bullock, P., & Rausche, F. GRL Engineers, Inc., Cleveland, Ohio, USA McGillivray,

More information

477 kcmil, 3M Brand Composite Conductor Mechanical Properties, Volume 1 Tensile and Stress-Strain Tests

477 kcmil, 3M Brand Composite Conductor Mechanical Properties, Volume 1 Tensile and Stress-Strain Tests 477 kcmil, 3M Brand Composite Conductor Mechanical Properties, Volume 1 Tensile and Stress-Strain Tests Minnesota Mining and Manufacturing (3M) Company Purchase Order 0000227040 NEETRAC Project Number:

More information

Foundation Innovations Ensure Successful Bridge Replacement

Foundation Innovations Ensure Successful Bridge Replacement COVER STORY Foundation Innovations Ensure Successful Bridge Replacement Rhode Island s new $163.7 million, 2,265 ft (690 m) long, fourlane Sakonnet River Bridge sits just south of the existing bridge in

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX B-2 FLOODWALL PILE ANALYSES EAST WALLS

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX B-2 FLOODWALL PILE ANALYSES EAST WALLS HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX B-2 FLOODWALL PILE ANALYSES EAST WALLS Revised March 2015 Preliminary Flood Wall Pile Analysis

More information

Merrimack and Suwannee ACSS/TW/HS285 Conductor Stress-Strain Tests. Southwire Company

Merrimack and Suwannee ACSS/TW/HS285 Conductor Stress-Strain Tests. Southwire Company Merrimack and Suwannee ACSS/TW/HS285 Conductor Stress-Strain Tests Southwire Company NEETRAC Project Number: 05-204 November, 2005 A Research Center of the Georgia Institute of Technology Requested by:

More information

Testing Methods of Driven Piles on INDOT Demonstration Projects

Testing Methods of Driven Piles on INDOT Demonstration Projects 66 Testing Methods of Driven Piles on INDOT Demonstration Projects by Firooz Zandi, P.E. Chief Geotechnical Engineer Division of Materials & Tests, I NDOT INTRODUCTION: This paper provides an overview

More information

SECTION 552 HELICAL ANCHORS AND HELICAL PILES

SECTION 552 HELICAL ANCHORS AND HELICAL PILES SECTION 552 HELICAL ANCHORS AND HELICAL PILES DESCRIPTION 552.01 This work pertains to furnishing and installing helical anchors and helical piles shown in the Contract in accordance with the Drawings

More information

USE OF DIPP PILES FOR A NEW SUP BRIDGE IN WEST MELBOURNE

USE OF DIPP PILES FOR A NEW SUP BRIDGE IN WEST MELBOURNE USE OF DIPP PILES FOR A NEW SUP BRIDGE IN WEST MELBOURNE If you want to put a photo on the title slide use this layout with colour photos (delete this box) Michael Wei, Jawad Zeerak & David Barton 8 th

More information

ITEM 404 DRIVING STEEL PILING

ITEM 404 DRIVING STEEL PILING AFTER MARCH 1, 2012 ITEM 404 DRIVING STEEL PILING 404.1 Description. This Item shall govern the driving of steel piling. The piling shall be of the size and weight shown on the plans and shall be in accordance

More information

Earthquake Design of Flexible Soil Retaining Structures

Earthquake Design of Flexible Soil Retaining Structures Earthquake Design of Flexible Soil Retaining Structures J.H. Wood John Wood Consulting, Lower Hutt 207 NZSEE Conference ABSTRACT: Many soil retaining wall structures are restrained from outward sliding

More information

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall

More information

CHAPTER 23 PILES TABLE OF CONTENTS TABLE OF CONTENTS. 23.TOC Table of Contents... 30Jan Introduction... 30Jan2018

CHAPTER 23 PILES TABLE OF CONTENTS TABLE OF CONTENTS. 23.TOC Table of Contents... 30Jan Introduction... 30Jan2018 CHAPTER 23 TABLE OF CONTENTS FILE NO. TITLE DATE TABLE OF CONTENTS 23.TOC Table of Contents... 30Jan2018 23.00 Introduction... 30Jan2018 DESIGN GUIDE FOR LATERALLY UNSUPPORTED 23.01-1 Notes and Definitions...

More information

Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil

Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil Introduction Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil The Unified Design procedure involves two main steps. The first is verifying that the loads

More information

Deformation Capacity of RC Structural Walls without Special Boundary Element Detailing

Deformation Capacity of RC Structural Walls without Special Boundary Element Detailing Proceedings of the Tenth Pacific Conference on Earthquake Engineering Building an Earthquake-Resilient Pacific 6-8 November 2015, Sydney, Australia Deformation Capacity of RC Structural Walls without Special

More information

In-plane testing of precast concrete wall panels with grouted sleeve

In-plane testing of precast concrete wall panels with grouted sleeve In-plane testing of precast concrete wall panels with grouted sleeve P. Seifi, R.S. Henry & J.M. Ingham Department of Civil Engineering, University of Auckland, Auckland. 2017 NZSEE Conference ABSTRACT:

More information

STATIC ALTERNATING CYCLIC HORIZONTAL LOAD TESTS ON DRIVEN

STATIC ALTERNATING CYCLIC HORIZONTAL LOAD TESTS ON DRIVEN STATIC ALTERNATING CYCLIC HORIZONTAL LOAD TESTS ON DRIVEN STEEL PIPE PILES OF FOUNDATIONS FOR HIGHWAY BRIDGES Kouichi TOMISAWA, Civil Engineering Research Institute of Hokkaido, Japan Satoshi NISHIMOTO,

More information

FRP Composite Piles Applications & Durability Considerations

FRP Composite Piles Applications & Durability Considerations FRP Composite Piles Applications & Durability Considerations by Miguel A. Pando, Felipe J. Acosta, P.E. UPRM mpando@uprm.edu, facosta@uprm.edu Jack Lesko Virginia Tech Virginia Fiber-Reinforced Composites

More information

1970 s and. Site Location Map. and shed transform the. Gateway Project.

1970 s and. Site Location Map. and shed transform the. Gateway Project. Bayview Gateway and Tulare Park Improvements Project August 2013 Page 2 of 10 Tulare Park Improvement Project Tulare Park is an existing 8,000 square foot park that is located within the Port s portion

More information

ST7008 PRESTRESSED CONCRETE

ST7008 PRESTRESSED CONCRETE ST7008 PRESTRESSED CONCRETE QUESTION BANK UNIT-I PRINCIPLES OF PRESTRESSING PART-A 1. Define modular ratio. 2. What is meant by creep coefficient? 3. Is the deflection control essential? Discuss. 4. Give

More information

CHAPTER 11: PRESTRESSED CONCRETE

CHAPTER 11: PRESTRESSED CONCRETE CHAPTER 11: PRESTRESSED CONCRETE 11.1 GENERAL (1) This chapter gives general guidelines required for the design of prestressed concrete structures or members with CFRM tendons or CFRM tendons in conjunction

More information

In-Plane and Out-of-Plane Performance of the MINI-MC Flange Connector

In-Plane and Out-of-Plane Performance of the MINI-MC Flange Connector Lehigh University Lehigh Preserve ATLSS Reports Civil and Environmental Engineering 7-1-2009 In-Plane and Out-of-Plane Performance of the MINI-MC Flange Connector Clay Naito Ruirui Ren Follow this and

More information

A Case History of Pile Freeze Effects in Dense Florida Sands

A Case History of Pile Freeze Effects in Dense Florida Sands A Case History of Pile Freeze Effects in Dense Florida Sands By Ching Kuo 1, Guoan Cao 2, Amy L. Guisinger 3, and Paul Passe 4 Submission Date: August 1, 2006 2,804 Words 1 Table 5 Figures 1 Professional

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GEOTECH ENTERPRISES, INC.

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GEOTECH ENTERPRISES, INC. 0 Most Widely Accepted and Trusted ICC ES Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3623 Reissued 04/2017 This report is subject to renewal 04/2018. DIVISION: 31 00 00 EARTHWORK

More information

Concrete-filled fiber reinforced polymer tube-footing interaction in bending

Concrete-filled fiber reinforced polymer tube-footing interaction in bending Fourth International Conference on FRP Composites in Civil Engineering (CICE2008) 22-24July 2008, Zurich, Switzerland Concrete-filled fiber reinforced polymer tube-footing interaction in bending Y. C.

More information

New I-95 Woodrow Wilson Bridge Foundations

New I-95 Woodrow Wilson Bridge Foundations Missouri University of Science and Technology Scholars' Mine International Conference on Case Histories in Geotechnical Engineering (2008) - Sixth International Conference on Case Histories in Geotechnical

More information

Proceedings of the ASME nd International Conference on Ocean, Offshore and Arctic Engineering OMAE2013 June 9-14, 2013, Nantes, France

Proceedings of the ASME nd International Conference on Ocean, Offshore and Arctic Engineering OMAE2013 June 9-14, 2013, Nantes, France Proceedings of the ASME 2013 32nd International Conference on Ocean, Offshore and Arctic Engineering OMAE2013 June 9-14, 2013, Nantes, France Driveability Analysis Techniques for Offshore Pile Installations

More information

Florida Method of Test for NONREPETITIVE STATIC PLATE LOAD TEST OF SOILS AND FLEXIBLE PAVEMENT COMPONENTS

Florida Method of Test for NONREPETITIVE STATIC PLATE LOAD TEST OF SOILS AND FLEXIBLE PAVEMENT COMPONENTS Florida Method of Test for NONREPETITIVE STATIC PLATE LOAD TEST OF SOILS AND FLEXIBLE PAVEMENT COMPONENTS 1. SCOPE Designation: FM 5-527 Modified AASHTO T-222-78 1.1 This method covers the making of nonrepetitive

More information

FINITE ELEMENT ANALYSIS OF REINFORCED CONCRETE BRIDGE PIER COLUMNS SUBJECTED TO SEISMIS LOADING

FINITE ELEMENT ANALYSIS OF REINFORCED CONCRETE BRIDGE PIER COLUMNS SUBJECTED TO SEISMIS LOADING FINITE ELEMENT ANALYSIS OF REINFORCED CONCRETE BRIDGE PIER COLUMNS SUBJECTED TO SEISMIS LOADING By Benjamin M. Schlick University of Massachusetts Amherst Department of Civil and Environmental Engineering

More information

Don Theobald, V.P., Gulf Coast Pre-Stress. Standardizing Existing Spliced Girder Systems

Don Theobald, V.P., Gulf Coast Pre-Stress. Standardizing Existing Spliced Girder Systems Standardizing Existing Spliced Girder Systems Hugh D. Ronald, P.E. Abstract: Correlation of the span and girder spacing requirements for an existing spliced girder system can be completed using a parametric

More information

EXPERIENCES WITH BASE GROUTED DRILLED SHAFTS IN THE

EXPERIENCES WITH BASE GROUTED DRILLED SHAFTS IN THE EXPERIENCES WITH BASE GROUTED DRILLED SHAFTS IN THE SOUTHEASTERN UNITED STATES Steven D. Dapp, Ph.D., P.E., Dan A. Brown and Associates, Sequatchie, Tennessee, U.S.A. Mike Muchard, P.E., Applied Foundation

More information

IMPACT ECHO TESTING OF IN-SITU PRECAST CONCRETE CYLINDER PIPE

IMPACT ECHO TESTING OF IN-SITU PRECAST CONCRETE CYLINDER PIPE IMPACT ECHO TESTING OF IN-SITU PRECAST CONCRETE CYLINDER PIPE Dennis A. Sack; Larry D. Olson, P.E. 1 Abstract This paper presents recent research and field work performed in the area of Nondestructive

More information

OPEN CELL. (800) SWC 120. SWC Weld-on. Charts and Pictures courtesy of: 120 o

OPEN CELL. (800) SWC 120. SWC Weld-on. Charts and Pictures courtesy of: 120 o OPEN CELL The OPEN CELL bulkhead, used primarily on docks and similar structures, is a cellular flat sheet pile structure in which each cell s sheet piles are driven in the shape of a U when viewed from

More information

Interaction Testing Report. 24 SF Units with Synteen Geogrids. Stone Strong Systems Lincoln, Nebraska

Interaction Testing Report. 24 SF Units with Synteen Geogrids. Stone Strong Systems Lincoln, Nebraska Interaction Testing Report 24 SF Units with Synteen Geogrids Stone Strong Systems Lincoln, Nebraska Prepared for: Stone Strong Systems 1620 South 70th Street Suite 105 Lincoln, Nebraska 68506 September

More information

Standard Test Method for Piles Under Lateral Loads 1

Standard Test Method for Piles Under Lateral Loads 1 Designation: D 3966 90 (Reapproved 1995) Standard Test Method for Piles Under Lateral Loads 1 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from

More information

Lateral Loads on Micropiles. Thomas Richards Nicholson Construction Company

Lateral Loads on Micropiles. Thomas Richards Nicholson Construction Company Lateral Loads on Micropiles Thomas Richards Nicholson Construction Company Micropile Names Micropile ( DFI & FHWA) = Pin Pile SM ( Nicholson) = Minipile (previously used by Hayward Baker and used in UK)

More information

Implementation of this Special Provision requires a complete understanding of the following documents:

Implementation of this Special Provision requires a complete understanding of the following documents: VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009

More information

CHAPTER III METHODS AND MATERIALS

CHAPTER III METHODS AND MATERIALS CHAPTER III METHODS AND MATERIALS 3.1: Tensile Tests 3.1.1: Introduction The first phase of testing for the experimental program, was to conduct tensile tests of No. 4, No. 5, and No. 6 nominal diameter

More information

ADAPT-PT 2010 Tutorial Idealization of Design Strip in ADAPT-PT

ADAPT-PT 2010 Tutorial Idealization of Design Strip in ADAPT-PT ADAPT-PT 2010 Tutorial Idealization of Design Strip in ADAPT-PT Update: April 2010 Copyright ADAPT Corporation all rights reserved ADAPT-PT 2010-Tutorial- 1 Main Toolbar Menu Bar View Toolbar Structure

More information

Combined Pile Foundation System for a Residential Complex

Combined Pile Foundation System for a Residential Complex Combined Pile Foundation System for a Residential Complex Alvin K.M. Lam, Geotechnical Engineer, Ove Arup & Partners Hong Kong Limited, Hong Kong, China; email: alvin.lam@arup.com Daman D.M. Lee, Civil

More information

Appendix D.2. Redundancy Analysis of Prestressed Box Girder Superstructures under Vertical Loads

Appendix D.2. Redundancy Analysis of Prestressed Box Girder Superstructures under Vertical Loads Appendix D.2 Redundancy Analysis of Prestressed Box Girder Superstructures under Vertical Loads By Jian Yang, Giorgio Anitori, Feng Miao and Michel Ghosn Contents 1. Introduction...1 2. Prestressed Concrete

More information

Originally Issued: 01/16/2015 Revised: 01/30/2018 Valid Through: 01/31/2019

Originally Issued: 01/16/2015 Revised: 01/30/2018 Valid Through: 01/31/2019 FOUNDATION SUPPORTWORKS, INC. FOUNDATION SUPPORTWORKS PP288 PUSH PIER SYSTEM CSI Section: 31 62 00 Driven Piles 1.0 RECOGNITION Foundation Supportworks, Inc. (FSI) Model PP288 push pier systems recognized

More information

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction

More information

Introduction to Statically

Introduction to Statically Introduction to Statically Indeterminate Analysis Support reactions and internal forces of statically determinate structures can be determined using only the equations of equilibrium. However, the analysis

More information

CHAPTER 5 PILE DRIVING

CHAPTER 5 PILE DRIVING SDDOT Standard Specifications Section 510 CHAPTER 5 PILE DRIVING PILE DRIVING CHECKLIST U:\op\inspection list Structures Manual, Chapter 5 Pages 5-54 to 5-96 USE IT, LEARN IT, KNOW IT!!!!! PILE TYPES:

More information

DESIGN-BUILD-TEST PROCESS FOR HIGH CAPACITY MICROPILES: CONSTRUCTION CASE STUDY ON DUTCHESS RAIL TRAIL BRIDGE FOUNDATIONS, POUGHKEEPSIE, NEW YORK

DESIGN-BUILD-TEST PROCESS FOR HIGH CAPACITY MICROPILES: CONSTRUCTION CASE STUDY ON DUTCHESS RAIL TRAIL BRIDGE FOUNDATIONS, POUGHKEEPSIE, NEW YORK ABSTRACT DESIGN-BUILD-TEST PROCESS FOR HIGH CAPACITY MICROPILES: CONSTRUCTION CASE STUDY ON DUTCHESS RAIL TRAIL BRIDGE FOUNDATIONS, POUGHKEEPSIE, NEW YORK James Barron 1, P.E., Thomas Hattala 2, P.E.,

More information

Ravi Sundaram. Cengrs Geotechnica Pvt. Ltd. Noida A-100 Sector 63, Noida Ph: (O): (M):

Ravi Sundaram. Cengrs Geotechnica Pvt. Ltd. Noida A-100 Sector 63, Noida Ph: (O): (M): Ravi Sundaram Cengrs Geotechnica Pvt. Ltd. Noida A-100 Sector 63, Noida Ph: (O): 0120-42067111 (M): 9810538095 1 What makes a Good Pile? To perform successfully, a pile should: Have adequate soil resistance

More information

Structural System Design

Structural System Design Structural System Design STRUCTURAL SYSTEM DESIGN DESIGN CRITERIA The primary goals and criteria governing the alternate concrete superstructure design are as follows: -maintain an open office layout,

More information

ADAPT-PTRC 2016 Getting Started Tutorial ADAPT-PT mode

ADAPT-PTRC 2016 Getting Started Tutorial ADAPT-PT mode ADAPT-PTRC 2016 Getting Started Tutorial ADAPT-PT mode Update: August 2016 Copyright ADAPT Corporation all rights reserved ADAPT-PT/RC 2016-Tutorial- 1 This ADAPT-PTRC 2016 Getting Started Tutorial is

More information

Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications

Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications Authors: 1. George Piscsalko, PE, Pile Dynamics, Inc., 30725 Aurora Road, Solon, Ohio, USA, gpiscsalko@pile.com;

More information

Displacement Based Assessment and Improvement of a Typical New Zealand Building by an Average Engineer

Displacement Based Assessment and Improvement of a Typical New Zealand Building by an Average Engineer Displacement Based Assessment and Improvement of a Typical New Zealand Building by an Average Engineer M.L. Grant LGE Consulting, Masterton 2016 NZSEE Conference ABSTRACT: The Radiohouse building is a

More information

3.5 Tier 1 Analysis Overview Seismic Shear Forces

3.5 Tier 1 Analysis Overview Seismic Shear Forces Chapter 3.0 - Screening Phase (Tier ) 3.5 Tier Analysis 3.5. Overview Analyses performed as part of Tier of the Evaluation Process are limited to Quick Checks. Quick Checks shall be used to calculate the

More information

Design and Construction of Drilled Full Displacement Piles using the Penetration Resistance Method

Design and Construction of Drilled Full Displacement Piles using the Penetration Resistance Method SUPERPILE 2009 Burlingame, CA Design and Construction of Drilled Full Displacement Piles using the Penetration Resistance Method Peter Faust Malcolm Drilling Company Inc. Alexandria Parking Garage, San

More information

Influence of Orientation of Piles on Seismic Response of Pile Groups

Influence of Orientation of Piles on Seismic Response of Pile Groups International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 3 (2014), pp. 261-268 Research India Publications http://www.ripublication.com/ijcer.htm Influence of Orientation of

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: HELICAL ANCHORS, INC BOONE AVENUE, NORTH MINNEAPOLIS, MINNESOTA 55428

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: HELICAL ANCHORS, INC BOONE AVENUE, NORTH MINNEAPOLIS, MINNESOTA 55428 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3982 Reissued 09/2017 This report is subject to renewal 09/2019. DIVISION: 31 00

More information

Pressure Grouting Drilled Shaft Tips: Full-Scale Research Investigation for Silty and Shelly Sands. Steven D. Dapp* and Gray Mullins**

Pressure Grouting Drilled Shaft Tips: Full-Scale Research Investigation for Silty and Shelly Sands. Steven D. Dapp* and Gray Mullins** Pressure Grouting Drilled Shaft Tips: Full-Scale Research Investigation for Silty and Shelly Sands Steven D. Dapp* and Gray Mullins** *Graduate Researcher, University of South Florida, Department of Civil

More information

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights 1 Exam Prep Placing Reinforcing Bars Tabs and s These 1 Exam Prep Tabs are based on the CRSI Placing Reinforcing Bars Recommended Practices, 9 th Edition. Each 1 Exam Prep tabs sheet has five rows of tabs.

More information

Pile Acceptance A System View

Pile Acceptance A System View Pile Acceptance A System View AGS Perth, WA 12 May, 2015 Dr. Julian Seidel Paper #1 Overview of The Role of Testing and Monitoring in the Verification of Driven Pile Foundations ANZ 2015 Wellington, NZ

More information

APPROXIMATE ANALYSIS OF PILED RAFT. Rameez Gahlot1, Roshni J John2

APPROXIMATE ANALYSIS OF PILED RAFT. Rameez Gahlot1, Roshni J John2 APPROXIMATE ANALYSIS OF PILED RAFT Rameez Gahlot1, Roshni J John2 1 PG Student, Dept of Civil Engg, Saraswati College of Engineering, Kharghar-4121, India rameezgahlot@gmail.com.2 Head of Civil Engineering

More information

Downloaded from Downloaded from /1

Downloaded from  Downloaded from  /1 PURWANCHAL UNIVERSITY VI SEMESTER FINAL EXAMINATION-2003 LEVEL : B. E. (Civil) SUBJECT: BEG359CI, Foundation Engineering. Full Marks: 80 TIME: 03:00 hrs Pass marks: 32 Candidates are required to give their

More information

UPDATE ON ISU DRILLED SHAFT LRFD CALIBRATION STUDY. Jeramy C. Ashlock, Ph.D. Richard L. Handy Associate Professor

UPDATE ON ISU DRILLED SHAFT LRFD CALIBRATION STUDY. Jeramy C. Ashlock, Ph.D. Richard L. Handy Associate Professor UPDATE ON ISU DRILLED SHAFT LRFD CALIBRATION STUDY Jeramy C. Ashlock, Ph.D. Richard L. Handy Associate Professor jashlock@iastate.edu Ongoing Drilled Shaft Research Projects 2 1.Verification of LRFD Resistance

More information

ANALYSIS OF OSTERBERG AND STATNAMIC AXIAL LOAD TESTING AND CONVENTIONAL LATERAL LOAD TESTING

ANALYSIS OF OSTERBERG AND STATNAMIC AXIAL LOAD TESTING AND CONVENTIONAL LATERAL LOAD TESTING ANALYSIS OF OSTERBERG AND STATNAMIC AXIAL LOAD TESTING AND CONVENTIONAL LATERAL LOAD TESTING By MYOUNG-HO KIM A THESIS PRESENTED TO THE GRADUATE SCHOOL OF THE UNIVERSITY OF FLORIDA IN PARTIAL FULFILLMENT

More information

Numerical Modeling of Dynamic Soil-Structure Interaction in Bridges with HP Driven Piles

Numerical Modeling of Dynamic Soil-Structure Interaction in Bridges with HP Driven Piles Numerical Modeling of Dynamic Soil-Structure Interaction in Bridges with HP Driven Piles Yu Bao, Andrew Rietz and Steven Halewski, Rochester Institute of Technology, Rochester, NY, USA HP-Pile foundations

More information

Our Tour Stops. A Foundation Engineering gtrip down the Mississippi River. Dan Brown, P.E. Dan Brown and Associates 9/6/2010.

Our Tour Stops. A Foundation Engineering gtrip down the Mississippi River. Dan Brown, P.E. Dan Brown and Associates 9/6/2010. A Foundation Engineering gtrip down the Mississippi River Dan Brown, P.E. Dan Brown and Associates Our Tour Stops I 35W Minneapolis US U.S. 61 Bridge, Hastings, MN New Mississippi River Bridge (I 70),

More information

THE STUDY OF t-z AND q-z CURVES ON BORED PILE BASED ON THE RESULTS OF INSTRUMENTED PILE LOAD TEST IN MEDIUM AND STIFF CLAYS

THE STUDY OF t-z AND q-z CURVES ON BORED PILE BASED ON THE RESULTS OF INSTRUMENTED PILE LOAD TEST IN MEDIUM AND STIFF CLAYS Proceedings of Pile 2013, June 2-4 th 2013 THE STUDY OF t-z AND q-z CURVES ON BORED PILE BASED ON THE RESULTS OF INSTRUMENTED PILE LOAD TEST IN MEDIUM AND STIFF CLAYS Aswin Lim 1, Aksan Kwanda 2 and Paulus

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 1 Project Development and Seismic Evaluation of Pier Systems w/ Pocket Connections and Square

More information

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Overall Information Location: Singapore Date of Completion: 2010 Cost: $5.7 billion Architect: Moshe Safdie Executive Architect: Aedas, Pte

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICE EVALUATION CRITERIA FOR

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICE EVALUATION CRITERIA FOR INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICE EVALUATION CRITERIA FOR HELICAL PILES FOR USE UNDER THE INTERNATIONAL RESIDENTIAL CODE EC027-2017 (Adopted November

More information

STRENGTH AND FATIGUE RESISTANCE OF CLUSTERED SHEAR STUDS

STRENGTH AND FATIGUE RESISTANCE OF CLUSTERED SHEAR STUDS STRENGTH AND FATIGUE RESISTANCE OF CLUSTERED SHEAR STUDS JASON PROVINES JUSTIN OCEL BIOGRAPHY Jason Provines received his BS degree from Michigan State University and MS from Purdue University. He is a

More information

ES230 Strength of Materials Exam 6 - Compilation Prof. Kurtz, ES230 STRENGTH OF MATERIALS Exam 6 Wednesday, April 26, 2017, 7pm

ES230 Strength of Materials Exam 6 - Compilation Prof. Kurtz, ES230 STRENGTH OF MATERIALS Exam 6 Wednesday, April 26, 2017, 7pm Given Formulae Bending M/EI = 1/ = -y/ =My/I = E Beam Shear Stress = VQ/It q = VQ/I q = F/s Torsion I = ( /4)r 4 for a solid, circular shape of radius r Pressure Vessels hoop = Pr/t long = Pr/2t ES230

More information

Steven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates

Steven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates LA Transportation Conference: 10 Jan 2011 Drilled Shaft Foundations For Two Mississippi River Bridges in Louisiana Dan Brown and Associates Projects John James Audubon Bridge, St. Francisville New Construction

More information

MECHANICS OF MATERIALS

MECHANICS OF MATERIALS Lecture Notes: Dr. Hussam A. Mohammed Al- Mussiab Technical College Ferdinand P. Beer, E. Russell Johnston, Jr., and John T. DeWolf Introduction Concept of Stress The main objective of the study of mechanics

More information

Recent Developments in the Axial, Lateral and Torsional Response of Drilled Shaft Foundations

Recent Developments in the Axial, Lateral and Torsional Response of Drilled Shaft Foundations Recent Developments in the Axial, Lateral and Torsional Response of Drilled Shaft Foundations Armin W. Stuedlein, PhD P.E. Associate Professor Geotechnical Engineering Presentation Outline Motivation and

More information

Crack detection in composite bridges with relative displacement sensors

Crack detection in composite bridges with relative displacement sensors Crack detection in composite bridges with relative displacement sensors *Jun Li 1) and Hong Hao 2) 1), 2) Department of Civil Engineering, Curtin University, Kent Street, Bentley, WA6102 1) junli@curtin.edu.au,

More information

SEISMIC TEST OF CONCRETE BLOCK INFILLED REINFORCED CONCRETE FRAMES

SEISMIC TEST OF CONCRETE BLOCK INFILLED REINFORCED CONCRETE FRAMES SEISMIC TEST OF CONCRETE BLOCK INFILLE REINFORCE CONCRETE FRAMES Yoshiaki NAKANO 1, Ho CHOI 2, Yasushi SANAA 3 and Naruhito YAMAUCHI 4 1 Associate Professor, Institute of Industrial Science, The University

More information

POST TENSIONED SLABS. Imagineering the possibilities

POST TENSIONED SLABS. Imagineering the possibilities POST TENSIONED SLABS Imagineering the possibilities imagineering... CCL post - tensioned slab solutions represent continuous development through involvement in building structures worldwide. CCL systems

More information

A PRODUCT FROM KANTAFLEX (INDIA) PVT LIMITED

A PRODUCT FROM KANTAFLEX (INDIA) PVT LIMITED ELASTOMERIC BRIDGE BEARING TO LATEST IRC: 83-015 (PART - II) Kanta System of Elastomeric bridge bearing is made out of Poly chloroprene rubber having low crystallization rates and adequate shelf life,

More information

CFRP STRENGTHENING OF CONCRETE BRIDGES WITH CURVED SOFFITS

CFRP STRENGTHENING OF CONCRETE BRIDGES WITH CURVED SOFFITS CFRP STRENGTHENING OF CONCRETE BRIDGES WITH CURVED SOFFITS Nagaraj Eshwar Dr Tim Ibell Dr Antonio Nanni Graduate Research Assistant Senior Lecturer Jones Professor CIES, # 223 ERL University of Bath CIES,

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: CANTSINK MANUFACTURING, INC. 71 FIRST AVENUE LILBURN, GEORGIA 30047

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: CANTSINK MANUFACTURING, INC. 71 FIRST AVENUE LILBURN, GEORGIA 30047 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-1559 Reissued 12/2016 This report is subject to renewal 12/2018. DIVISION: 31 00

More information

Drivability of an Instrumented 2,440-mm Diameter Rammed Pipe

Drivability of an Instrumented 2,440-mm Diameter Rammed Pipe North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 TM1-T4-04 Drivability of an Instrumented 2,440-mm Diameter Rammed Pipe Armin W. Stuedlein,

More information