1 Commonly used Construction codes: ASME B 31.1 (Power piping) ASME B31.3 Process Piping, ASME B31.4 Liquid transportation piping ASME 31.8 Liquid petroleum transmission piping API 1104 Welding of pipeline Inspection Engineer Interview points Piping What are the main deference between ASME B 31.3 & ASME B31.4? The allowable stress is not the same. Minimum thickness formula is not same. One is for the piping inside the plant and the other one is for transportation. Inspection: API 570, API RP 574 Material: ASTM A53, ASTM A106, SA 135, SA 333, SA 671, SA 672, API 5L, SA 268, SA 213, SA 312, SA 790, etc., a) Carbon Steel Pipe API 5L, Grade A or B, seamless API 5L, Grade A or B, SAW, str. seam, Ej 0.95 API 5L, Grade X42, seamless API 5L, Grade X46, seamless API 5L, Grade X52, seamless API 5L, Grade X56, seamless API 5L, Grade X60, seamless ASTM A 53, seamless ASTM A 106 ASTM A 333, seamless ASTM A 369 ASTM A 381, Ej 0.90 ASTM A 524 ASTM A 671, Ej 0.90 ASTM A 672, Ej 0.90 ASTM A 691, Ej 0.90 (b) Low and Intermediate Alloy Steel Pipe ASTM A 333, seamless ASTM A 335 ASTM A 369 ASTM A 426, Ec 0.90 ASTM A 671, Ej doc Page 1 of 39

2 ASTM A 672, Ej 0.90 ASTM A 691, Ej 0.90 (c) Stainless Steel Alloy Pipe ASTM A 268, seamless ASTM A 312, seamless ASTM A 358, Ej 0.90 ASTM A 376 ASTM A 451, Ec 0.90 (d) Copper and Copper Alloy Pipe ASTM B 42 ASTM B 466 (e) Nickel and Nickel Alloy Pipe ASTM B 161 ASTM B 165 ASTM B 167 ASTM B 407 (f) Aluminum Alloy Pipe ASTM B 210, Tempers O and H112 ASTM B 241, Tempers O and H112 Low temperature service material & fittings Product Form ASTM Spec. No. Pipe A 333 Tube A 334 Fittings A 420 Forgings A 350 Castings A 352 Bolting A 320 Plate A doc Page 2 of 39

3 The primary elements in determining the minimum acceptable diameter of any pipe network are system design flow rates and pressure drops. The design flow rates are based on system demands that are normally established in the process design phase of a project. The hydraulic design of a piping system is premised on selecting the optimum pipe size (diameter) and thickness (schedule), for the design flow rate and the allowable pressure drop in the system doc Page 3 of 39

4 For a specific flow rate, as the pipe diameter increases, the pressure drop increases at a fast rate (pressure drop varies approximately with the square of the velocity). This means that the pumping horsepower required would increase resulting in a higher pump cost and on-going operating energy costs. On the other hand, as the pipe diameter decreases, the installed cost of the piping system (pipe, fittings, valves) also decreases. The optimal solution is to find the pipe size that would result in the lowest life cycle costs (initial installed cost plus operating costs over the life of the piping system. Piping and Instrumentation Diagram (P&ID) The primary element of a piping design is the piping and instrumentation diagram (P&ID). Both the process engineer and the instrument and controls engineer provide design information. The first version should represent all major equipment, process piping with sizes, utility piping with sizes, and line-mounted instrument hardware. The piping design team is responsible for drafting the P&ID. The P&ID is commonly referred to as the control document for design and construction and subsequently for operation and maintenance. For the pipe designer, the diagram is a complete mechanical description. It is an engineering expression of the processscope of work. It is imperative to maintain the P&ID up to date and to control and communicate the revisions to the design group to ensure that the design is based on the latest revision. Piping components shall be designed for an internal pressure representing the most severe condition of coincident pressure and temperature expected in normal operation. This condition is by definition the one that results in the greatest required pipe thickness and the highest flange rating doc Page 4 of 39

5 doc Page 5 of 39

6 doc Page 6 of 39

7 MATERIAL SELECTION Materials selection is an optimization process, and the material selected for an application must be allowed by the applicable code; and chosen for the sum of its properties (strength, toughness, corrosion resistance, etc), availability, and cost. Thus, the selected material may not rank first in each evaluation category; but it should be the best overall choice In practice it is usual to select materials which corrode slowly at a known rate and to make an allowance for this in specifying the material thickness. Material Selection Process Piping material is selected by optimizing the basis of design. 1. Eliminate from consideration those piping materials that: a. Are not allowed by code or standard; b. Are not chemically compatible with the fluid; c. Have system rated pressure or temperatures that do not meet the full range of process operating conditions; and d. Are not compatible with environmental conditions such as: external corrosion potential, heat tracing requirements, ultraviolet degradation, impact potential, and specific joint requirements. 2. The remaining materials are evaluated for advantages and disadvantages such as capital, fabrication and installation costs; support system complexity; compatibility to handle thermal cycling; and cathodic protection requirements. The highest ranked material of construction is then selected. 3. The design proceeds with pipe sizing, pressure integrity calculations and stress analyses. If the selected piping material does not meet those requirements, then the second ranked material is used and the pipe sizing, pressure-integrity calculations and stress analyses are repeated doc Page 7 of 39

8 doc Page 8 of 39

9 doc Page 9 of 39

10 PRESSURE-INTEGRITY DESIGN The pressure-integrity design of a piping system normally requires the consideration of at least two issues. The first is the determination of the minimum or nominal pipe wall thickness, and the second is the determination of the pressure rating of the in-line components such as valves and fittings. The design process for consideration of pressure integrity uses allowable stresses, thickness allowances based on system requirements, and manufacturing wall thickness tolerances to determine minimum wall thickness Current Basis for Determining the Allowable Stress (S) As a result of the introduction of new materials and increases in service temperatures, use of Safety factors was abandoned and the factor became part of the allowable stress for a material at any temperature. The allowable stress is based on the least of the following: Room-temperature tensile strength / 3.5 Room-temperature yield strength / 1.5 The stress required to cause a creep rate of %/1000 hours The average stress to cause rupture at 100,000 hours / 1.5 The minimum stress to cause rupture at 100,000 hours / 1.25 Today, fracture mechanics allows an engineer to establish the minimum toughness required in a material based on the stress applied and the maximum credible size flaw. These changes eliminated concern over brittle fracture. In addition, Section VIII requires that hydrostatic testing be performed at the minimum design metal temperature plus atleast 30 F, ensuring that brittle failure will not occur during hydrostatic testing Design Margin ( Safety Factor ) in the ASME Boiler and Pressure Vessel Code In the 1999 addenda of the ASME Boiler Code, the design margin (formerly known as the Safety Factor ) was changed from 4.0 to 3.5. ASME B31.3 has had a design margin of 3.0 for more than 20 years ASME B31.1 is in the process of changing to 3.5, but may change to doc Page 10 of 39

11 PIPING SYSTEM DESIGN PROCEDURE The following flowchart shows the typical procedure used in designing piping systems PIPING LAYOUT AND ISOMETRIC DRAWINGS Flow diagrams, line lists and design specifications are all used by the piping designer to lay out the piping and generate design drawings. Piping of the size and schedule must be routed between the appropriate pieces of equipment as shown on the flow diagrams. Routing will be affected by system operating temperature, pipe weight, installation and material costs, applicable code requirements, pressure drop requirements and equipment and building structure locations. Piping isometrics are three-dimensional representations of the piping system using a ±30 orientation of the two horizontal axes. Piping not running parallel to one of the main axes is shown by its components in each direction. Isometrics need not be drawn to scale; the piping segments may be drawn as long as is necessary for clarity doc Page 11 of 39

12 Bolting material: ASTM A 193 grade B7 bolting for ordinary service. ASTM A 193 grade B7M bolting for areas exposed to hydrogen sulfide service Hydro test pressure: 1.5 X design pressure What is the difference between pipe & tube? The word pipe is used, as distinguished from tube, to apply to tubular products of dimensions commonly used for pipeline and piping systems. Pipes NPS 12 (DN 300) and smaller have outside diameters numerically larger than their corresponding sizes. In contrast, the outside diameters of tubes are numerically identical to the size number for all sizes. Minimum required thickness calculation: Pipe the minimum required thickness is t, the nominal thickness is t + corrosion allowance The t as per API RP 574 is t=pd / 2SE where P-Design Pressure, D-OD of pipe, S-allowable stress as per the code, E-quality factor (for Seamless pipe it is One). This formula is used for in-service piping. The t as per ASME B31.3 is t=pd / 2(SE+PY) where P-Design Pressure, D-OD of pipe, S-allowable stress as per the code, E-quality factor (for Seamless pipe it is One), Y-0.4 for carbon steel upto 400 F. This formula is used only for new construction. For OD of piping up to 12 refer API RP 574 piping schedule table. Above 12 the OD is the size of the pipe. ASME B 31.3 formula PD t m = + C 2( SE + Py) Where S Allowable Stress D - Outside diameter E - longitudinal joint factor obtained from relevant Table P - Design Pressure Y - temperature factor C - Corrosion & mechanical allowance ASME B 31.4 formula PD t m = + C 2S Where S Allowable Stress from ASME B 31.4 D - Outside diameter P - Design Pressure C - Corrosion & mechanical allowance doc Page 12 of 39

13 API RP 574 formula t m = PD + C 2SE Where S Allowable Stress D - Outside diameter E - longitudinal joint factor obtained from relevant Table P - Design Pressure C - Corrosion & mechanical allowance doc Page 13 of 39

14 What is PMI? Positive Material Identification by using isotopes, light or chemical. First two are portable. The code used is API RP 578. It is being used only for alloy steel verification. CUI Corrosion under insulation occurs at what temperature range? What are the NDT methods can be used to find the corrosion under insulation? What are all the possible locations where one can expect CUI? Piping components: Flanges: ASME B 16.5 upto 24 diameter, B16.47 for diameter above 24 Flange Material: SA 105, SA 694, Forged Fittings: SA 234, SA 403 Type of flanges: Weld neck, blind, slip on, orifice, threaded etc., Type of flanges: Weld neck, Lap, socket weld, slip on, blind & threaded doc Page 14 of 39

15 Piping system hydrotest pressure Vs flange rating Flange rating Hydrotest pressure in psi 150# # # # # 5400 How will you identify flange rating if in doubt? Look for punch marking on the flange sides & check the dimension against the code Where will you find the details of pipe fittings (elbows, reducers etc.,) On the sides of fittings (elbow-sides, reducers-sides, flanges-sides) API Std.1160 Hydrotest (Page 25 & 26) Hydrostatic testing validates integrity at the time of the test by demonstrating the integrity of a pipeline with respect to the established MOP and the leak tightness of a pipeline. Within limits, the greater the ratio of test pressure to operating pressure, the more effective the test. ASME B31.4 currently requires a test pressure of not less than 1.25 times MOP for not less than four hours when the pipe is visually inspected during the test, and not less than an additional four hours at 1.1 times MOP when the pipe is not visually inspected during the test. An alternative test commonly called a spike test is conducted at 1.39 times MOP for approximately 30 minutes to detect linear type defects associated with longitudinal seams Retesting Frequency (Page 26) The frequency of hydrostatic retesting required to assure continued serviceability of a pipeline segment depends on the test-pressure-to-operatingpressure ratio, and the rates of growth of the particular type of defects that exist in the pipeline. Typical defects that tend to become larger with the passage of time are: external and internal corrosion-caused metal loss, stress-corrosion cracks, and any longitudinally oriented crack-like defect that is subjected to pressure-cycle-induced Determination of Inspection Interval/ Frequency (Page 26) A hydrostatic test is one method to assess the integrity of a pipeline. When hydrostatic testing is selected to verify the integrity of a pipeline segment, tests should be conducted at intervals sufficient to eliminate or prove the absence of critical defects before they reach a condition that can cause an unintentional release doc Page 15 of 39

16 Suggested Welding repair methods for piping according to API 1104 / API doc Page 16 of 39

17 doc Page 17 of 39

18 doc Page 18 of 39

19 doc Page 19 of 39

20 API 570 suggested repair methods EXAMPLES OF REPAIRS C.1 Repairs Manual welding utilizing the gas metal-arc or shielded metal-arc processes may be used. When the temperature is below 50 F (10 C), low-hydrogen electrodes, AWS E-XX16 or E-XX18, shall be used when welding materials conforming to ASTM A-53, Grades A and B; A-106, Grades A and B; A-333; A-334; API 5L; and other similar material. These electrodes should also be used on lower grades of material when the temperature of the material is below 32 F (0 C). The piping engineer should be consulted for cases involving different materials. When AWS E-XX16 or E-XX18 electrodes are used on weld numbers 2 and 3 (see Figure C-1 below), the beads shall be deposited by starting at the bottom of the assembly and welding upward. The diameter of these electrodes should not exceed 5/32 inch (4.0 mm). Electrodes larger that 5/32 inch (4.0 mm) may be used on weld number 1 (see Figure C-1), but the diameter should not exceed 3/16 inch (4.8 mm). The longitudinal welds (number 1, Figure C-1) on the reinforcing sleeve shall be fitted with a suitable tape or mild steel backing strip (see note) to avoid fusing the weld to the side wall of the pipe. Note: If the original pipe along weld number 1 has been checked thoroughly by ultrasonic methods and it is of sufficient thickness for welding, a backing strip is not necessary. All repair and welding procedures for on-stream lines must conform to API Publ 2201 for hot tapping doc Page 20 of 39

21 C.2 Small Repair Patches The diameter of electrodes should not exceed 5/32 inch (4.0 mm). When the temperature of the base material is below 32 F (0 C), low-hydrogen electrodes shall be used. Weaving of weld beads deposited with low-hydrogen electrodes should be avoided. All repair and welding procedures for on-stream lines must conform to API Publication Examples of small repair patches are shown below in Figure C doc Page 21 of 39

22 doc Page 22 of 39

23 Intelligent Pigging This method involves the movement of a device (pig) through the piping either while it is in service or after it has been removed from service. Several types of devices are available employing different methods of inspection. The line to be evaluated must be free from restrictions that would cause the device to stick within the line, i.e., usually five diameter bends are required (standard 90 pipe ells may not pass a pig). The line must also have facilities for launching and recovering the pigs. Most plant piping systems are typically not suited to intelligent pigging Underground piping Leak Testing Underground lines that cannot be visually inspected should be periodically tested for leaks. Several methods are available to achieve this objective: a. Pressure decay methods involve pressurizing the line to a desired amount, blocking it in, and then removing the source of pressure. Monitoring the line pressure over a period of time will provide an indication of system tightness. Tests may be conducted at a single pressure or multiple pressures b. Volume in/volume out methods make use of volumetric measuring meters at each end of the line c. A marker chemical (tracer) may be added to the line as a leak detection method. Soil gas samples near the line are collected and tested for the presence of the marker chemical. The absence of any marker chemical in the soil gas samples indicates the line is not leaking d. Acoustic emission technology detects and locates leaks by the sound created by the leak. Sensors must be spaced to allow the sound generated by a leak to be detected at the sensor locations. Sensors are attached directly to the pipe, so testing may require the removal of any protective coating doc Page 23 of 39

24 Acceptable under tolerances as per API RP doc Page 24 of 39

25 doc Page 25 of 39

26 doc Page 26 of 39

27 doc Page 27 of 39

28 doc Page 28 of 39

29 doc Page 29 of 39

30 doc Page 30 of 39

31 doc Page 31 of 39

32 doc Page 32 of 39

33 doc Page 33 of 39

34 doc Page 34 of 39

35 Check list from API 570 APPENDIX A EXTERNAL INSPECTION CHECKLIST FOR PROCESS PIPING A.1 Leaks a. Process. b. Steam tracing. c. Existing clamps. A.2 Misalignment a. Piping misalignment/restricted movement. b. Expansion joint misalignment. A.3 Vibration a. Excessive overhung weight. b. Inadequate support. c. Thin, small bore, or alloy piping. d. Threaded connections. e. Loose supports causing metal wear. A.4 Supports a. Shoes-off support. b. Hanger distortion or breakage. d. Brace distortion/breakage. e. Loose brackets. f. Slide plates/rollers. g. Counterbalance condition. h. Support corrosion. A.5 Corrosion a. Bolting support points under clamps. b. Coating/painting deterioration. c. Soil-to-air interface. d. Insulation interfaces. e. Biological growth. A.6 Insulation a. Damage/penetrations. b. Missing jacketing/insulation. c. Sealing deterioration. d. Bulging. e. Banding (broken/missing). REVIEW OF RECORDS Records of previous inspections and of inspections conducted during the current operating period should be reviewed soon after the inspections are conducted to schedule the next inspection date. This review should provide lists of areas that are approaching retirement thickness, have previously shown high corrosion rates, and current inspection has indicated a need for further investigation. From these lists, a work schedule should be prepared for additional on-stream inspection, if possible, and for inspections to be conducted during the next shutdown period. Such a schedule will assist in determining the number of inspectors to be assigned to the work doc Page 35 of 39

36 In addition, from the review of the records of previous inspections, a list should be made of all predictable repairs and replacements. This list should be submitted to the maintenance department far enough in advance of the shutdown to permit any required material to be obtained or, if necessary, fabricated. This list will also assist the maintenance personnel in determining the number of personnel required during the shut-down period. THICKNESS DATA A record of thickness data obtained during periodic or scheduled inspections provides a means of arriving at corrosion or erosion rates and expected material life. Some companies use computerized record systems for this purpose. The data may be shown on sketches or presented as tabulated information attached to the sketches SKETCHES Isometric or oblique drawings provide a means of documenting the size and orientation of piping lines, the location and types of fittings, valves, orifices, etc. and the locations at which thickness measurements are to be taken. Although original construction drawings may be used, normally separate sketches are made by, or for, the inspection department. Sketches have the following important functions: a. Identify particular piping systems and circuits in terms of location, size, material specification, general process flow, and service conditions. b. Inform the mechanical department of points to be opened for visual inspection and parts that require replacement or repair. c. Serve as field data sheets on which can be recorded the locations of thickness measurements, serious corrosion, and sections requiring immediate replacement. These data can be transferred to continuous records at a later date. d. Assist at future inspections in determining locations that urgently require examination doc Page 36 of 39

37 ASME B 31.3 Acceptance Table Acceptance Criteria for welds and Examination Methods for Evaluating Weld Imperfections Criteria (A to M) for Types of Welds and for Service Conditions [Note(1)] Normal and Category M Severe Cyclic conditions Category D fluid Service fluid Service Type of Weld Type of Weld Type of Weld Girth, Miter Groove & Branch Connection (Note(4) Longitudinal Groove Note(2) Fillet Note(3) Girth, Miter Groove & Branch Connection (Note(4) Longitudinal Groove Note(2) Fillet Note(3) (Note(4)Girth, Miter Groove & Branch Connection Longitudinal Groove Note(2) Fillet Note(3) Branch Connection (Note(4) Weld Imperfection Examination Methods A A A A A A A A A A Crack A A A A A A C A N/A A Lack of fusion.... B A N/A A A N/A C A N/A B Incomplete penetration.... E E N/A D D N/A N/A AN/A N/A N/A Internal porosity G G N/A F F N/A N/A AN/A N/A N/A Internal slag inclusion, tungsten inclusion, or elongated indication H A H A A A I A H H Undercutting A A A A A A A A A A Surface Porosity or exposed slag inclusion [Note(5)] N/A N/A N/A I I I N/A N/A N/A N/A Surface finish K K N/A K K N/A K K N/A K Concave root surface (suck up).... L L L L L L M M M M Weld reinforcement or internal protrusion Visual Radiography Magnetic particle Liquid Penetrant doc Page 37 of 39

38 General Notes: a. Weld imperfections are evaluated by one or more of the types of examination methods given, as specified in paras , , & M341.4 or by the engineering design b. N/A indicates the Codes does not establish acceptance criteria or does not require evaluation of this kind of imperfection for this type of weld c. Check ( ) indicates examination method generally used for evaluating this kind of weld imperfection. d. Ellipsis (..) indicates examination method not generally used for evaluating this kind of weld imperfection Criterion Criterion Value Notes for Table Symbol Measure Acceptable Value Limits [Note (6)] A Extent of imperfection Zero (no evident imperfection) B C Depth of incomplete penetration Cumulative length of incomplete penetration Depth of Lack of fusion & incomplete penetration Cumulative length of Lack of fusion & incomplete Penetration [Note (7)] 1 mm (1/32 ) and 0.2Ťw 38 mm (1.5 ) in any 150 mm (6 ) weld length 0.2Ťw 38 mm (1.5 ) in any 150 mm (6 ) weld length D Size and distribution of internal porosity See BPV Code, Section. VIII, Division 1, Appendix 4 E Size and distribution of internal porosity For Ťw 6 mm (1/4 ) limit is same as D For Ťw > 6 mm (1/4 ) limit is 1.5 X D F Slag inclusion, tungsten inclusion, or elongated indication Individual length Ťw/3 Individual Width 2.5 mm (3/32 ) and Ťw/3 Cumulative length Ťw in any 12 Ťw weld length G Slag inclusion, tungsten inclusion, or elongated indication Individual length Individual Width Cumulative length 2 Ťw 3 mm (1/8 ) and Ťw/2 4Ťw in any 150 mm (6 ) weld length H Depth of undercut 1 mm (1/32 ) and Ťw/4 I Depth of undercut 1.5 mm (1/16 ) and [Ťw/4 or 1 mm (1/32 )] J Surface roughness 500 min. Ra per ASME B46.1 K Depth of root surface concavity Total joint thickness, incl. Weld reinforcement, Ťw L Height of reinforcement or internal protrusion [Note (8)] in any plane through the weld shall be within limits of the applicable height value in the tabulation at right, except as provided in Note (9). Weld metal shall merge smoothly into the component surfaces. For Ťw mm (in) 6 (1/4) >6 (1/4) 13 (1/2) >13 (1/2) 25 (1) >25 (1) Limit is twice the value applicable for L above Height, mm (in) 1.5 (1/16) 3.0 (1/8) 4.0 (5/32) 5.0 (3/16) doc Page 38 of 39

39 Table Acceptance Criteria for Welds and Examination Methods for Evaluating Weld Imperfections (Cont d) NOTES: (1) Criteria given are for required examination. More stringent criteria may be specified in the engineering design. See also paras and (2) Longitudinal groove weld includes straight and spiral seam. Criteria are not intended to apply to welds made in accordance with a standard listed in Table A-1 or Table Alternative Leak Test requires examination of these welds; see para (3) Fillet weld includes socket and seal welds, and attachment welds for slip-on flanges, branch reinforcement, and supports. (4) Branch connection weld includes pressure containing welds in branches and fabricated laps. (5) These imperfections are evaluated only for welds 5 mm (3 16 in.) in nominal thickness. (6) Where two limiting values are separated by and, the lesser of the values determines acceptance. Where two sets of values are separated by or, the larger value is acceptable. T w is the nominal wall thickness of the thinner of two components joined by a butt weld. (7) Tightly butted unfused root faces are unacceptable. (8) For groove welds, height is the lesser of the measurements made from the surfaces of the adjacent components; both reinforcement and internal protrusion are permitted in a weld. For fillet welds, height is measured from the theoretical throat, Fig A; internal protrusion does not apply. (9) For welds in aluminum alloy only, internal protrusion shall not exceed the following values: (a) for thickness 2 mm (5 64 in.): 1.5 mm (1 16 in.); (b) for thickness > 2 mm and 6 mm (1 4 in.): 2.5 mm (3 32 in.) For external reinforcement and for greater thicknesses, see the tabulation for Symbol L doc Page 39 of 39

ASTM Standards for Pipe & Fittings

ASTM Standards for Pipe & Fittings for Pipe & Fittings There are many International Standards for stainless and carbon steel pipes and fittings. The list below is a basic overview of some of these. For more in-depth details of these Standards

More information

BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION

BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION October 2009 (Replaces November 2008) API Authorized Aboveground Storage Tank Inspectors must have a broad knowledge

More information

PART UF REQUIREMENTS FOR PRESSURE VESSELS FABRICATED BY FORGINGS

PART UF REQUIREMENTS FOR PRESSURE VESSELS FABRICATED BY FORGINGS p 1 of 6 UF-1 UF-12 PART UF REQUIREMENTS FOR PRESSURE VESSELS FABRICATED BY FORGING the test temperature be higher than 20 F ( 29 C). Certification is required. An ultrasonic examination shall be made

More information

ASME B31.3 Process Piping. 19. What s Different in B31.1

ASME B31.3 Process Piping. 19. What s Different in B31.1 ASME B31.3 Process Piping Charles Becht IV, PhD, PE Don Frikken, PE Instructors BECHT ENGINEERING COMPANY, INC. What s Different in B31.1-1 19. What s Different in B31.1 Scope Organization of the Code

More information

CONTENTS. Foreword... xiii Statements of Policy... xv Personnel... xvii Organization of Section III... xxvii Summary of Changes...

CONTENTS. Foreword... xiii Statements of Policy... xv Personnel... xvii Organization of Section III... xxvii Summary of Changes... CONTENTS Foreword... xiii Statements of Policy... xv Personnel... xvii Organization of Section III... xxvii Summary of Changes... xxxi Article NB-1000 Introduction... 1 NB-1100 Scope... 1 NB-1110 Aspects

More information

NATURAL GAS COMPRESSOR STATION PIPELINE WELDING AND RELATED FACILITIES. Engr. Md. Saidur Rahman 1,*

NATURAL GAS COMPRESSOR STATION PIPELINE WELDING AND RELATED FACILITIES. Engr. Md. Saidur Rahman 1,* Proceedings of the International Conference on Mechanical Engineering and Renewable Energy 2015 (ICMERE2015) 26 29 November, 2015, Chittagong, Bangladesh ICMERE2015-PI-243 NATURAL GAS COMPRESSOR STATION

More information

ASME B31.3 CUMULATIVE INDEX INTERPRETATIONS VOLS SUBJECT INDEX. Assembly and Erection Authorized Inspector (see Owner s Inspector)

ASME B31.3 CUMULATIVE INDEX INTERPRETATIONS VOLS SUBJECT INDEX. Assembly and Erection Authorized Inspector (see Owner s Inspector) SUBJECT INDEX Acceptance Criteria pressure tests 1-2 weld 1-1 1-9 1-14 1-41 2-8 5-09 5-13 5-17 5-18 5-20 6-04 7-06 8-32 12-22 13-16 14-02 14-07 24-03 24-26 Additive Manufacturing 25-39 25-40 Allowable

More information

49 CFR Part 192. Not applicable to welding during manufacture of pipe and components

49 CFR Part 192. Not applicable to welding during manufacture of pipe and components 49 CFR Part 192 Not applicable to welding during manufacture of pipe and components --- and other strange nomenclature A joining process that produces a coalescence of metals (or non-metals) by heating

More information

CONTENTS. Fittings, Bends, and Intersections

CONTENTS. Fittings, Bends, and Intersections CONTENTS Foreword.............................................................................. Committee Roster Introduction Summary of Changes Chapter I 100 Chapter II Part 1 101 102 Part 2 103 104 Part

More information

Subpart E Welding of Steel in Pipelines

Subpart E Welding of Steel in Pipelines Subpart E Welding of Steel in Pipelines 192.221 Scope This subpart prescribes minimum requirements for welding steel materials in pipelines. This subpart does not apply to welding that occurs during the

More information

A Comparison: ASME B31.1 Power Piping versus ASME B31.3 Process Piping

A Comparison: ASME B31.1 Power Piping versus ASME B31.3 Process Piping A Comparison: ASME B31.1 Power Piping versus ASME B31.3 Process Piping Don Frikken, PE BECHT ENGINEERING COMPANY, INC. 1 Topics Discussed B31 History Scopes Organization of the Codes Bases for Allowable

More information

INSPECTION AND TEST. PROCEDURE Total Page 13

INSPECTION AND TEST. PROCEDURE Total Page 13 PROCEDURE Total Page 13 Client : Project Name: P/O No. : Item No. : 3 2 1 0 FOR APPROVAL Rev Description Date Prepared By Checked By Approved By PROCEDURE Page 1 of 8 1. General 1.1 Scope This specification

More information

Standard Specification for Forged Carbon and Alloy Steel. Flanges for Low-Temperature Service¹ ASTM A707/707M Scope :-

Standard Specification for Forged Carbon and Alloy Steel. Flanges for Low-Temperature Service¹ ASTM A707/707M Scope :- Standard Specification for Forged Carbon and Alloy Steel Flanges for Low-Temperature Service¹ 1. Scope :- 1.1 This specification covers forged carbon and alloy steel flanges intended primarily for petroleum

More information

GUJARAT NARMADA VALLEY FERTILIZERS & CHEMICALS LIMITED

GUJARAT NARMADA VALLEY FERTILIZERS & CHEMICALS LIMITED CONTENTS 1. Scope 2. Referenced Documents 3. Abbreviations 4. Materials and Manufacture 5. Dimensions 6. Inspections and Tests 7. Markings 8. Preparation for Shipment - 1 - 1. Scope 1.1 This specification

More information

ASTM A420-Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Low-Temperature Service

ASTM A420-Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Low-Temperature Service ASTM A420-Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Low-Temperature Service 1. Scope 1.1 This specification 2 covers wrought carbon steel and alloy steel fittings

More information

ASME B31.3 Process Piping

ASME B31.3 Process Piping ASME B31.3 Process Piping Charles Becht IV, PhD, PE Don Frikken, PE Instructors BECHT ENGINEERING COMPANY, INC. Fabrication and Installation - 1 Piping Development Process 1. Establish applicable system

More information

Welding. What is Welding?

Welding. What is Welding? Welding Welding What is Welding? Welding is a joining process in which metals are heated, melted and mixed to produce a joint with properties similar to those of the materials being joined. Parent Metal

More information

Welding Inspection Defects/Repairs Course Reference WIS 5

Welding Inspection Defects/Repairs Course Reference WIS 5 Copy from Welding Inspection Defects/Repairs Course Reference WIS 5 Weld Defects Defects which may be detected by visual inspection can be grouped under five headings Cracks Surface irregularities Contour

More information

Table of Contents Page No.

Table of Contents Page No. Table of Contents Page No. Personnel... iii Foreword...v List of Tables...xii List of Figures... xiii 1. General Requirements...1 1.1 Scope...1 1.2 Approval...1 1.3 Definitions...1 1.4 Welding Symbols...1

More information

Standard Specification for Ferritic/Austenitic (Duplex) Stainless Steel Pipe Electric Fusion Welded with Addition of Filler Metal 1

Standard Specification for Ferritic/Austenitic (Duplex) Stainless Steel Pipe Electric Fusion Welded with Addition of Filler Metal 1 Designation: A 928/A 928M 04 www.tubingchina.com Standard Specification for Ferritic/Austenitic (Duplex) Stainless Steel Pipe Electric Fusion Welded with Addition of Filler Metal 1 This standard is issued

More information

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS - June 2013 Addendum GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS SUBSECTION "A" : GENERAL RULES SUBSECTION "B" : CLASS 1 COMPONENTS SUBSECTION "C" : CLASS 2 COMPONENTS SUBSECTION "D" : CLASS

More information

AWS B1.10:1999 An American National Standard. Guide for the Nondestructive Examination of Welds

AWS B1.10:1999 An American National Standard. Guide for the Nondestructive Examination of Welds AWS B1.10:1999 An American National Standard Guide for the Nondestructive Examination of Welds Key Words Guide, eddy current examination, magnetic particle examination, nondestructive examination, penetrant

More information

METROPOLITAN. O & M Procedure No: E UTILITIES DISTRICT I. GENERAL

METROPOLITAN. O & M Procedure No: E UTILITIES DISTRICT I. GENERAL Page: 1 of 10 I. GENERAL * Before any welder may weld on the Metropolitan Utilities District gas distribution and transmission system piping and facilities, the welder shall be qualified to perform the

More information

ASTM A105/A105M-10. Standard Specification for Carbon Steel Forgings for. Piping Applications ¹

ASTM A105/A105M-10. Standard Specification for Carbon Steel Forgings for. Piping Applications ¹ Standard Specification for Carbon Steel Forgings for Piping Applications ¹ 1. Scope :- 1.1 This specification covers forged carbon steel piping components for ambient and higher temperature service in

More information

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION 2018 (Replaces February 2017) API Authorized Piping Inspectors must have a broad knowledge base relating to maintenance,

More information

Weld Inspection D (2000)

Weld Inspection D (2000) DESIGN STANDARD Weld Inspection D03-104 (2000) Enbridge Pipelines Inc. Enbridge Energy Partners L.P. Revision: 2 Approval Date: January 6, 2000 Table of Contents 1 Scope... 1 1.1 Intent...1 1.2 Responsibility...1

More information

ASTM A335 Chrome Moly Pipe. Welcome to Sunny Steel Enterprise Ltd. By Mr. Sum Xu

ASTM A335 Chrome Moly Pipe. Welcome to Sunny Steel Enterprise Ltd. By Mr. Sum Xu ASTM A335 Chrome Moly Pipe By Mr. Sum Xu ASTM A335 Pipe (ASME S/A335, Chrome-Moly) is a seamless ferritic Alloy-Steel Pipe for high temperature service. Welcome to Sunny Steel Enterprise Ltd. Sunny Steel

More information

AWS B1.10M/B1.10:2009 An American National Standard. Guide for the Nondestructive Examination of Welds

AWS B1.10M/B1.10:2009 An American National Standard. Guide for the Nondestructive Examination of Welds An American National Standard Guide for the Nondestructive Examination of Welds An American National Standard Approved by the American National Standards Institute July 1, 2009 Guide for the Nondestructive

More information

Review of ASME Guidance Articles on Repair Strategies

Review of ASME Guidance Articles on Repair Strategies Review of ASME Guidance Articles on Repair Strategies Clay Rodery BP Chemicals Technology & Engineering Member/ASME Post Construction Standards Committee ASME PCC-2: Repair of Pressure Equipment and Piping

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-40 17 26.00 20 (April 2006) -------------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-15216N (September 1999) UNIFIED FACILITIES GUIDE

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-40 17 26.00 20 (April 2006) -------------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-15216N (September 1999) UNIFIED FACILITIES GUIDE

More information

wall Seamless ASTM A333 Grade 6. Item 1.36 (Outdoor) wall Electric Fusion Welded

wall Seamless ASTM A333 Grade 6. Item 1.36 (Outdoor) wall Electric Fusion Welded Number: 6503-4.1.611 Rev. 5 Process Piping System CCNR IPC Plant Service: Process Gas Low Pressure & Process Gas Vent Legend: (PG) Rev Issued Revised Approved Reviewed 2 January 14, 1993 November 30, 1998

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 15590-3 First edition 2004-11-01 Petroleum and natural gas industries Induction bends, fittings and flanges for pipeline transportation systems Part 3: Flanges Industries du

More information

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems. Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to provide design guidelines for Utility Direct Buried

More information

Manual. Standards WOC HSE WOC LP. 1 tel) ( W. McIntosh. WO Executive Vice President Operations DOCUMENT NO: WOC-HSE-ST Section H003 Hot Tapping

Manual. Standards WOC HSE WOC LP. 1 tel) ( W. McIntosh. WO Executive Vice President Operations DOCUMENT NO: WOC-HSE-ST Section H003 Hot Tapping 1_91,,(16,.. r - A. 4 On. c WOC LP & EP Department WOC HSE Standards Manual DOCUMENT NO: WOC-HSE-ST-0001 Section H003 Hot Tapping REV ISSUE PREPARED BY REVIEWED BY APPROVED BY ISSUE DATE 0 Issued for Use!.1v/A

More information

OIL TECH SERVICES, INC.

OIL TECH SERVICES, INC. OIL TECH SERVICES, INC. 800 Wilcrest, Suite 100 Houston, TX 77042-1359 (310)-527-2695 (713) 789-5144 E Mail: mlombard@itmreps.com Website: www.itmreps.com WELDING Weld Procedure Specifications (WPS): Welding

More information

API 653 Training Course

API 653 Training Course API 653 Training Course The API 653 Classes consist of "Pre-Course Home Study" materials and "5 days of Classroom" instructor lead training. Registration for the API 653 Training Course should be received

More information

For ASME Committee use only.

For ASME Committee use only. Page 1 of 7 (c) In the event that compliance with (a) and (b) is not inherent in the design of the closure and its holding elements, provision shall be made so that devices to accomplish this can be added

More information

ACCREDITATION OF MANUFACTURERS AND INSTALLERS OF PRESSURE PIPING PARTS AND SYSTEMS

ACCREDITATION OF MANUFACTURERS AND INSTALLERS OF PRESSURE PIPING PARTS AND SYSTEMS ACCREDITATION OF MANUFACTURERS AND INSTALLERS OF PRESSURE PIPING PARTS AND SYSTEMS TSSA GUIDE FOR SURVEY TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division

More information

HIGH ENERGY PIPING INSPECTION PROGRAM

HIGH ENERGY PIPING INSPECTION PROGRAM HIGH ENERGY PIPING INSPECTION PROGRAM JOEL LUNDQUIST STRESS ANALYSIS SECTION B&V ENERGY AGENDA About Black & Veatch Introduction Power Piping Code Initial Baseline Assessment Evaluation by Non-Destructive

More information

POWER PIPING J\$ME TO ASME B3I.I THE COMPLETE GUIDE. Charles Becht IV PRESS

POWER PIPING J\$ME TO ASME B3I.I THE COMPLETE GUIDE. Charles Becht IV PRESS POWER PIPING THE COMPLETE GUIDE TO ASME B3I.I by Charles Becht IV J\$ME PRESS Contents About the Author List of Figures List of Tables iii ix xi Chapter 1 Background and General Information 1 1.1 History

More information

Monolithic Isolation Fittings

Monolithic Isolation Fittings Monolithic Isolation Fittings The ElectroStop TM monolithic isolation fittings will serve as a positive leak proof, long lasting block against the flow of electric current in all piping systems. When you

More information

ANSI/AWS D An American National Standard. Structural Welding Code Sheet Steel

ANSI/AWS D An American National Standard. Structural Welding Code Sheet Steel ANSI/AWS D1.3-98 An American National Standard Structural Welding Code Sheet Steel Key Words Sheet steel, allowable stresses, details of welded joints, workmanship qualification, visual acceptance criteria,

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 906 FEBRUARY 1993 CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL 906.01 SCOPE 906.02 REFERENCES 906.03 DEFINITIONS TABLE OF CONTENTS 906.04 SUBMISSION

More information

Owner: Purchaser: Unit No.:

Owner: Purchaser: Unit No.: Owner: KPIC Costumer: Namvaran namvaran Consulting Engineers Managers Stack-4201 Location: Kermanshah- Iran K.P.I.C. Document No.: SEC-PJ045-ST-IFP-0008-3 SEC-Project No.: PJ045 Radiography Test Procedure

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13686.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529-1 SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1.1 SUMMARY A. Section Includes: 1. Metal pipe hangers and supports.

More information

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Refer to Division 33 and Division 23 - Underground Steam and Condensate Piping.2 Refer to Division 23 - Steam and Condensate Piping Above Grade 1.2

More information

PROLONG THE INTEGRITY OF HIGH ENERGY PIPING SYSTEMS: UNIT SPECIFIC STRATEGIC PLANNING

PROLONG THE INTEGRITY OF HIGH ENERGY PIPING SYSTEMS: UNIT SPECIFIC STRATEGIC PLANNING 2013 Thielsch Engineering, Inc. Pamela Smoske, Executive Director of Development and Operations; 4-SYTE Systems PROLONG THE INTEGRITY OF HIGH ENERGY PIPING SYSTEMS: UNIT SPECIFIC STRATEGIC PLANNING High-energy

More information

BUREAU OF INDIAN STANDARDS. Draft Indian Standard

BUREAU OF INDIAN STANDARDS. Draft Indian Standard For official use only BUREAU OF INDIAN STANDARDS Draft Indian Standard DOC: WRD 12(575)C November 2011 RECOMMENDATIONS FOR INSPECTION, TESTING AND MAINTENANCE OF RADIAL GATES AND ROPE DRUM HOISTS PART

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler

More information

MATERIALS OF CONSTRUCTION FOR PROCESS EQUIPMENT AND PIPING SYSTEMS

MATERIALS OF CONSTRUCTION FOR PROCESS EQUIPMENT AND PIPING SYSTEMS MATERIALS OF CONSTRUCTION FOR PROCESS EQUIPMENT AND PIPING SYSTEMS SECTOR / ENGINEERING NON-TECHNICAL & CERTIFIED TRAINING COURSE Appropriate material selection is the cornerstone of pressure equipment

More information

ASME B31.3 INTERPRETATIONS NO. 18

ASME B31.3 INTERPRETATIONS NO. 18 ASME B31.3 INTERPRETATIONS NO. 18 Replies to Technical Inquiries December 1, 1999 through March 31, 2001 General Information It has been agreed to publish interpretations issued by the B31 Committee concerning

More information

Case N GENERAL REQUIREMENTS. Record No Approval Date: March 22, 2007

Case N GENERAL REQUIREMENTS. Record No Approval Date: March 22, 2007 Approval Date: March 22, 2007 Record No. 15-668 Approved SG-RRA Nov. 4, 2015 10-0-1 Case N-661-23 Alternative Requirements for Wall Thickness Restoration of Class 2 and 3 Carbon Steel Piping for Raw Water

More information

Standard Specification for Seamless and Welded Ferritic and Martensitic Stainless Steel Tubing for General Service

Standard Specification for Seamless and Welded Ferritic and Martensitic Stainless Steel Tubing for General Service SA-268/SA-268M ASME BPVC.II.A-2015 Standard Specification for Seamless and Welded Ferritic and Martensitic Stainless Steel Tubing for General Service 1. Scope 1.1 This specification covers a number of

More information

QC Inspection and Qualification Procedure- TX-EDU-VT-1-07, Revision # by Richard J DePue, Supersedes IW-VT-1 Visual Inspection Procedure

QC Inspection and Qualification Procedure- TX-EDU-VT-1-07, Revision # by Richard J DePue, Supersedes IW-VT-1 Visual Inspection Procedure 1.0 Scope: QC Inspection and Qualification Procedure- TX-EDU-VT-1-07, Revision #6 03-04-2016 by Richard J DePue, Supersedes IW-VT-1 Visual Inspection Procedure The purpose of this procedure is to define

More information

Weld Imperfections and Preventive Measures

Weld Imperfections and Preventive Measures FOURTH EDITION Weld Imperfections and Preventive Measures Published by FOURTH EDITION Weld Imperfections and Preventive Measures Kita-Shinagawa, Shinagawa-Ku, Tokyo, 141-8688 Japan Published by KOBE STEEL,

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION HVAC PIPES AND TUBES

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION HVAC PIPES AND TUBES SECTION 23 20 00 - HVAC PIPES AND TUBES PART 1 - GENERAL 1.1 SUMMARY: A. Section includes pipe and pipe fittings for: heating water, chilled water, steam and steam condensate, condenser water, glycol,

More information

Canadian Standards Association Oil and gas pipeline systems. Technical Committee on Petroleum and Natural Gas Industry Pipeline Systems and Materials

Canadian Standards Association Oil and gas pipeline systems. Technical Committee on Petroleum and Natural Gas Industry Pipeline Systems and Materials Canadian Standards Association Oil and gas pipeline systems Contents Technical Committee on Petroleum and Natural Gas Industry Pipeline Systems and Materials Executive Committee on Petroleum and Natural

More information

Specification for Pipe Fittings

Specification for Pipe Fittings Specification for Pipe Fittings Specification for Pipe Fittings Page 1 of 11 Table of Contents 1.0 SCOPE...3 2.0 DEFINITIONS...3 3.0 REFERENCES, CODES AND STANDARDS...3 4.0 CONTRACTOR'S RESPONSIBILITIES...4

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Common Operating Problems

Common Operating Problems SYDNEY Pressure Vessels Field Manual Common Operating Problems and Practical Solutions Maurice Stewart Oran T. Lewis AMSTERDAM BOSTON HEIDELBERG LONDON NEW YORK OXFORD PARIS SAN DIEGO SAN FRANCISCO SINGAPORE

More information

A. Product Data: For Piping, fittings, transition fittings and dielectric fittings.

A. Product Data: For Piping, fittings, transition fittings and dielectric fittings. SECTION 22 11 16 - DOMESTIC WATER PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Requirements for bending and flaring of piping Objective, target group and warrant...3 Requirements...3 Cold Bending...4 Induction Bending...

Requirements for bending and flaring of piping Objective, target group and warrant...3 Requirements...3 Cold Bending...4 Induction Bending... Technical and professional requirements, TR1969, Final Ver. 2, Valid from 2006-09-29 Publisher/follow-up: Chiefengineer Materials Technology Classification: Open Validity area: Statoil Group/All locations/all

More information

Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels 1

Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels 1 Designation: A 372/A 372M 03 An American National Standard Standard Specification for Carbon and Alloy Steel Forgings for Thin-Walled Pressure Vessels 1 This standard is issued under the fixed designation

More information

SPECIFICATION FOR COMMON REQUIREMENTS FOR STEEL FLANGES, FORGED FITTINGS, VALVES, AND PARTS FOR PIPING APPLICATIONS

SPECIFICATION FOR COMMON REQUIREMENTS FOR STEEL FLANGES, FORGED FITTINGS, VALVES, AND PARTS FOR PIPING APPLICATIONS SPECIFICATION FOR COMMON REQUIREMENTS FOR STEEL FLANGES, FORGED FITTINGS, VALVES, AND PARTS FOR PIPING APPLICATIONS 01 (Identical with ASTM Specification A 961-99.) 1. Scope 1.1 This specification covers

More information

PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping

PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping July 2017 Piping PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES

MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 2471 November 2016 MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES TABLE OF CONTENTS 2471.01 SCOPE 2471.02 REFERENCES 2471.03

More information

Inspection and Welding Repairs of Pressure Vessels

Inspection and Welding Repairs of Pressure Vessels Inspection and Welding Repairs of Pressure Vessels BY S. V. GUPTE B.E., D.M.E. ASNT LEVEL III - RT,MT,PT,VT PRESSURE VESSEL INSPECTOR (API 510), (CCOE) PAINT AND COATING INSPECTOR (NACE INDIA) LEAD AUDITOR

More information

NAPCA Workshop August 19, 2010 Houston, Texas Kenneth Y. Lee Office of Pipeline Safety

NAPCA Workshop August 19, 2010 Houston, Texas Kenneth Y. Lee Office of Pipeline Safety Pipeline Construction Challenges NAPCA Workshop August 19, 2010 Houston, Texas Kenneth Y. Lee Office of Pipeline Safety PHMSA Mission To ensure the operation of the Nation s pipeline transportation system

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

1. Division 23 Section Hangers and Supports for HVAC Piping and Equipment for pipe insulation shields and protection saddles. SECTION 23 07 19 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Course: Quality Assurance Module 5 Welders/Welding personnel

Course: Quality Assurance Module 5 Welders/Welding personnel Version 1.0 2010.11.02 1 of 7 Course: Quality Assurance Module 5 Welders/Welding personnel Version 1.0 2010.11.02 2 of 7 Table of Contents MODULE 5...3 Surface inspection on cracks and other surface imperfections

More information

ASME BPVC.CC.BPV.S Approval Date: October 7, 2015

ASME BPVC.CC.BPV.S Approval Date: October 7, 2015 CASE Approval Date: October 7, 2015 Code Cases will remain available for use until annulled by the applicable Standards Committee. Case Manufacture of a Hoop-Wrapped, Wire-Reinforced Cylindrical Pressure

More information

PART 2 REPAIR WELDING CONSIDERATIONS FOR Cr-Mo STEEL PRESSURE VESSELS ARTICLE 2.15 Guide for Selection of Repair Technique. Local wall Pitting

PART 2 REPAIR WELDING CONSIDERATIONS FOR Cr-Mo STEEL PRESSURE VESSELS ARTICLE 2.15 Guide for Selection of Repair Technique. Local wall Pitting Proposed Supplement to PCC-2 2015 Repair of Pressure Equipment and Piping Tentative Subject to Revision or Withdrawal Specific Authorization Required for Reproduction or Quotation ASME Codes and Standards

More information

Welding Job Knowledge

Welding Job Knowledge Defects - lamellar tearing BP Forties platform lamellar tears were produced when attempting the repair of lack of root penetration in a brace weld Lamellar tearing can occur beneath the weld especially

More information

Stainless Steel Pipe ASME B36.19M (Revision of ANSI/ASME B36.19M-1985) AN AMERICAN NATIONAL STANDARD

Stainless Steel Pipe ASME B36.19M (Revision of ANSI/ASME B36.19M-1985) AN AMERICAN NATIONAL STANDARD ASME B36.19M-2004 (Revision of ANSI/ASME B36.19M-1985) Stainless Steel Pipe www.tubingchina.com AN AMERICAN NATIONAL STANDARD A N A M E R I C A N N A T I O N A L S T A N D A R D STAINLESS STEEL PIPE ASME

More information

ASME B16.5 History Rev Page 1 of 9

ASME B16.5 History Rev Page 1 of 9 Page 1 of 9 Presented here is a history of the development of ASME B16.5, Pipe Flanges and Flanged Fittings prepared by Guy Jolly and Don Frikken. Topics included in separate sections are: 1. General History

More information

Table of Contents Page No.

Table of Contents Page No. Table of Contents Personnel... iii Foreword...v List of Tables... xiii List of Figures...xiv List of Forms...xvi 1. General Provisions...1 1.1 Application...1 1.2 Base Metal...1 1.3 Welding Processes...2

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B SECTION 05 5213 - PIPE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated.

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated. SECTION 23 07 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Stainless Steel Aeration Equipment Specification

Stainless Steel Aeration Equipment Specification Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion

More information

INSULATED JOINTS. Monolithic Joints for Electrically Isolating Pipelines

INSULATED JOINTS. Monolithic Joints for Electrically Isolating Pipelines INSULATED JOINTS Monolithic Joints for Electrically Isolating Pipelines INSULATED JOINTS TUBE TURNS INSULATED JOINTS are a pre-fabricated, non-separable, union used to isolate specific sections of pipelines

More information

71T1 - Gas Shielded Flux Cored Welding Wire Provides excellent performance in all position welding. Weld Metal - Chemistry

71T1 - Gas Shielded Flux Cored Welding Wire Provides excellent performance in all position welding. Weld Metal - Chemistry Flux Cored Wire 71T1 - Gas Shielded Flux Cored Welding Wire Provides excellent performance in all position welding Description: Provides a stable arc, low spatter, easy to remove slag, and neat weld metal.

More information

HT-406 Specification Guide

HT-406 Specification Guide 2.101 Part 1 - General Pre-insulated HDPE-Jacketed Steel Piping Systems suitable for Steam, Condensate Return, and High Temperature Heating Water. 1.1 Pre-insulated Piping - Furnish a complete HDPE jacketed

More information

This specification describes the minimum requirements for piping systems for the following service: Plant air systems operating up to 125 PSIG.

This specification describes the minimum requirements for piping systems for the following service: Plant air systems operating up to 125 PSIG. SPEC-3501 2016/11/0 1/9 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Plant air systems operating up to 125 PSIG. Design Conditions

More information

Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service 1

Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service 1 Designation: A 234/A 234M 02 Used in USDOE-NE Standards An American National Standard Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature

More information

ASTM B363-06a Standard Specification for Seamless and Welded Unalloyed

ASTM B363-06a Standard Specification for Seamless and Welded Unalloyed Standard Specification for Seamless and Welded Unalloyed Titanium and Titanium Alloy Welding Fittings 1. Scope :- 1.1 This specification cover fittings intended for general corrosion resisting and elevated

More information

AASHTO/AWS D1.5M/D1.5:2008. Table of Contents

AASHTO/AWS D1.5M/D1.5:2008. Table of Contents Table of Contents Personnel...v Foreword...ix List of Tables... xviii List of Figures...xix List of Forms...xxi 1. General Provisions...1 1.1 Application...1 1.2 Base Metal...1 1.3 Welding Processes...1

More information

Cast Steel Propellers W27. (May 2000) (Rev.1 May 2004)

Cast Steel Propellers W27. (May 2000) (Rev.1 May 2004) (May 2000) (Rev.1 May 2004) Cast Steel Propellers 1. Scope 1.1 These unified requirements are applicable to the manufacture of cast steel propellers, blades and bosses. 1.2 Where the use of alternative

More information

SECTION METAL WELDING

SECTION METAL WELDING SECTION 05222 - METAL WELDING PART 1 - GENERAL 1.01 SECTION INCLUDES A. Welding Rod/Electrodes B. Stud Shear Connectors C. Shop Welding D. Inspections and Tests by the Contractor E. Inspections and Test

More information

Standard Specification for Electric-Fusion (Arc)-Welded Steel Pipe (NPS 4 and Over) 1

Standard Specification for Electric-Fusion (Arc)-Welded Steel Pipe (NPS 4 and Over) 1 Designation: A 39/A 39M 04 Standard Specification for Electric-Fusion (Arc)-Welded Steel Pipe (NPS 4 and Over) This standard is issued under the fixed designation A 39/A 39M; the number immediately following

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 10675-1 First edition 2008-03-01 Non-destructive testing of welds Acceptance levels for radiographic testing Part 1: Steel, nickel, titanium and their alloys Essais non destructifs

More information

Standard Specification for Seamless and Welded Ferritic/Austenitic Stainless Steel Pipe

Standard Specification for Seamless and Welded Ferritic/Austenitic Stainless Steel Pipe SA-790/SA-790M ASME BPVC.II.A-2015 Standard Specification for Seamless and Welded Ferritic/Austenitic Stainless Steel Pipe 1. Scope 1.1 This specification covers seamless and straight-seam welded ferritic/austenitic

More information

Pipeline Systems PLSC0017 Requirements for Welder Qualifications in Accordance with ASME Section IX

Pipeline Systems PLSC0017 Requirements for Welder Qualifications in Accordance with ASME Section IX June 2018 Pipeline Systems PLSC0017 Requirements for Welder Qualifications in Accordance with ASME Section IX PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process