1 Federal Project No. TAP 5670(604) DEPARTMENT OF THE PRESIDENT, **************** ADDENDUM NO. TO PLANS AND SPECIFICATIONS FOR TOWER GROVE PARK NEIGHBORHOOD ACCESS ENHANCEMENTS CITY PROJECT NO ST. LOUIS, DATE: /3/8 CITY LETTING NUMBER: 8677 ADDENDUM TO BID PROPOSAL. Two items were omitted in the Bid Proposal form. The bid form is being revised to add the following two items. Please use the revised bid form when submitting your bid. SIGNING, STRIPING, SIGNALS AND LIGHTING ITEMS UNIT QUANTITY Signal Head, Type 3S EACH Cable 8 AWG, CONDUCTOR, POWER L.F The traffic signal controller quantity should be three (3) instead of two. The bid form is being revised to add the additional controller quantity as noted below. Please use the revised bid form when submitting your bid. SIGNING, STRIPING, SIGNALS AND LIGHTING ITEMS UNIT QUANTITY Controller Assembly Housing NEMA TS2 EACH 3 Controller ADDENDUM TO PROJECT PLANS:. The SUMMARY OF QUANTITIES on plan sheet QU-0 (sheet 2 of

2 5) has been revised to include the items one () and two (2) noted above. The revised plan sheet QU-0 is included as part of this addendum and is being distributed to the plan holders. Please discard the original plan QU-0 and insert the revised plan sheet QU-0 into the plan set. 2. The plan sheet SG-04 (Sheet 38 of 5) has been revised to add the table CONTROLLER ASSEMBLY AND AUILIARY EQUIPMENT. The traffic Controller is being replaced at the intersection of Arsenal and Spring Ave. The revised plan sheet SG-04 is included as part of this addendum and is being distributed to the plan holders. Please discard the original plan SG-04 and insert the revised plan sheet SG-04 into the plan set. END OF ADDENDUM NO.

3 Seal TAP-5670(604) BPS SUMMARY OF QUANTITIES ITEM NO. DESCRIPTION UNIT QUANTITY ROADWAY ITEMS TRAFFIC CONTROL L.S CONSTRUCTION STAKEOUT L.S REMOVAL OF IMPROVEMENTS L.S REMOVE AND RELOCATE DECORATIVE CONCRETE BOLLARD EACH ATG GAS VALVE EACH 3 DEPARTMENT OF THE PRESIDENT ATG WATER METER MANHOLE EACH ATG TRAFFIC PULLBO EACH ATG WATER VALVE EACH 2 ROOM 30 CITY HALL ST. LOUIS, 6303 PHONE (34) ATG UTILITY MANHOLE EACH FA (34) GRANULAR BASE (UNDER PCCP) C.Y J. CZERNIKIEWICZ, P.E PCC CURB L.F.,942. Chief of Design Division REMOVAL OF EIST. GRANITE CURB L.F. 2,20 J:\207\70539\CAD\Data\002_QU_0_70539_I0.dgn /3/ INSTALLATION OR ADJUSTMENT OF GRANITE CURB L.F PICKUP/DELIVERY OF ADDITIONAL GRANITE CURB L.F. 2, SODDING S.F. 5, LAWN RESTORATION S.F CONCRETE MEDIAN WITH DOWELED 6-INCH CONCRETE CURB S.Y MOBILIZATION L.S TOPSOIL C.Y A CURB INLET CHECK EACH IN. SURFACE MOUNT DELINEATOR POST EACH 37 SIGNING, STRIPING, SIGNALS, AND LIGHTING ITEMS HIGH BUILD WATERBORNE PAVEMENT MARKING PAINT, 4 IN., WHITE L.F. 39, HIGH BUILD WATERBORNE PAVEMENT MARKING PAINT, 4 IN YELLOW EACH 4, PLURAL COMPONENT LIQUID PAVEMENT MARKING, 24 IN. WHITE (MMA) L.F. 2, HIGH BUILD WATERBORNE PAVEMENT MARKING PAINT, 24 IN. YELLOW L.F HIGH BUILD WATERBORNE PAVEMENT MARKING PAINT, LEFT/RIGHT ARROW EACH HIGH BUILD WATERBORNE PAVEMENT MARKING PAINT, STRAIGHT ARROW EACH HIGH BUILD WATERBORNE PAVEMENT MARKING PAINT, YIELD LINE TRIANGLES EACH HIGH BUILD WATERBORNE PAVEMENT MARKING PAINT, BICYCLIST EACH HIGH BUILD WATERBORNE PAVEMENT MARKING PAINT, SHARROW EACH PLURAL COMPONENT LIQUID PAVEMENT MARKING, 5' WIDE GREEN (MMA) L.F SIGNAL HEAD, TYPE 3S EACH SIGNAL HEAD, TYPE 3C EACH SIGNAL HEAD, TYPE S, PEDESTRIAN EACH SIGNAL HEAD, MOUNTING HARDWARE EACH POST, SIGNAL 8 FT. EACH POST, SIGNAL 5 FT. EACH SPAN WIRE ASSEMBLY, SINGLE MESSENGER L.F SPAN WIRE ASSEMBLY, MESSENGER WITH TETHER L.F CONTROLLER ASSEMBLY HOUSING, NEMA TS2 CONTROLLER EACH DETECTOR, PUSH BUTTON EACH CONDUIT, 3 IN., TRENCH WITH TRACER WIRE L.F CONDUIT, 3 IN., PUSHED WITH TRACER WIRE L.F CABLE 8 AWG CONDUCTOR, POWER L.F CABLE, 6 AWG 2 CONDUCTOR L.F. 4, CABLE, 6 AWG 5 CONDUCTOR L.F. 2, CABLE, 6 AWG 7 CONDUCTOR L.F. 3, POWER SUPPLY ASSEMBLY, TYPE 2 EACH PULL BO, PERFORMED CLASS 2 EACH BASE, CONCRETE C.Y DECORATIVE SIGNAL POLES EACH A SH-FLAT SHEET S.F EISTING SIGN RELOCATION EACH 22 BIKE AND PEDESTRIAN ITEMS DETECTABLE WARNING PANELS S.F., PCC SIDEWALKS (EPOSED AGGREGATE) S.F. 8, " PCC CURB RAMP S.F. 6, TRAVERSABLE CONCRETE FLARE S.F NON-PARTICIPATING ITEMS DECORATIVE SIGNAL POLES EACH 2 NOTES: SEE SIGNAL PLAN SHEETS FOR SIGNAL QUANTITY TABULATION. AJS /3/8 Designed: AJS /3/8 Detailed: JSD /3/8 Checked: HR GREEN, INC SWINGLEY RIDGE ROAD, SUITE 205 ST. LOUIS, 6307 PHONE: (636) CORPORATE LICENSE # TO W ER GROVE PARK NEIGHBOR. ACCESS ENHANCEM ENTS CITY OF ST. LOUIS, SHEET TITLE QU-0 SHEET 02 OF 5 Addendum # /3/8 Revision No. The professional whose personal seal and/or signature appears on this sheet assumes responsibility only for what appears on this sheet and disclaims (Pursuant to Section RSMo) any responsibilities for all other drawings, supplemental drawings, plats, surveys, revisions, specifications, estimates, reports or other documents or instruments not sealed by the undersigned professional relating to or intended to be used for any part or parts of the project to which this sheet refers. REGISTERED STATE OF PROFESSI ONAL ENGINEER JASON S. DOHRMANN NUMBER PE JASON S. DOHRMANN PE /3/ File Number SU M M ARY OF QUANTITIES

4 P6 SPRING Seal TAP-5670(604) BPS DEPARTMENT OF THE PRESIDENT ROOM 30 CITY HALL ST. LOUIS, 6303 PHONE (34) FA (34) J. CZERNIKIEWICZ, P.E. J:\207\70539\CAD\Data\038_SG_04a_70539_I20_SpringArsenal.dgn /3/208 Designed: Detailed: Checked: ECN AJS DTS /3/8 /3/8 /3/8-5C#6 (PED)(NEW) -2C#6 ()(NEW) -7C#6 3" P -7C# C#6 (PED)(NEW) 4-2C#6 ()(NEW) 6-5C#6 (PED)(NEW) 6-2C#6 ()(NEW) 6 P2 P E2 WIRING DIAGRAM ARSENAL 2-5C#6 (PED)(NEW) 2-2C#6 ()(NEW) -7C#6 3-5C#6 (PED)(NEW) 3-2C#6 ()(NEW) P3 P5 P4 04 E4 05 DISCLAIMER 3" THE PROFESSIONAL WHOSE SIGNATURE AND PERSONAL SEAL APPEAR HEREON ASSUMES RESPONSIBILITY ONLY FOR WHAT APPEARS ON THIS PAGE, AND DISCLAIMS (PURSUANT TO SECTION RSMO) SPECIFICATION, ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTS NOT SEALED BY THE UNDERSIGNED PROFESSIONAL RELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS OF THE PROJECT TO WHICH THIS PAGE REFERS. -7C#6-5C#6 (PED)(NEW) -2C#6 ()(NEW) 2-5C#6 (PED)(NEW) 2-2C#6 ()(NEW) NOT TO SCALE * INCIDENTAL TO APS PUSH BUTTON -c LIC LEGEND CONDUIT CONTAINING CABLE WITH SIZE CABLE MULTI-CONDUCTOR CABLE #2 AWG (UNLESS OTHERWISE INDICATED) #4 AWG DETECTOR LEAD-IN CABLE (2C TWISTED SHIELDED) PULL BO WITH NUMBER POST WITH NUMBER POST WITH MAST ARM POST WITH MAST ARM AND LUMINAIRE DETECTOR WITH NUMBER SIGNAL HEAD WITH NUMBER SIGNAL CONTROLLER POWER SUPPLY LIGHTING CONTROLLER LED STREET NAME SIGN SENSYS DETECTION ACCESS POINT RADIO ANTENNA S. SPRING AVE. & ARSENAL ST. HR GREEN, INC SWINGLEY RIDGE ROAD, SUITE 205 ST. LOUIS, 6307 PHONE: (636) CORPORATE LICENSE # Chief of Design Division TO W ER GROVE PARK NEIGHBOR. ACCESS ENHANCEM ENTS CITY OF ST. LOUIS, SHEET TITLE SG-04 SHEET 38 OF 5 Addendum # /3/8 Revision No. The professional whose personal seal and/or signature appears on this sheet assumes responsibility only for what appears on this sheet and disclaims (Pursuant to Section RSMo) any responsibilities for all other drawings, supplemental drawings, plats, surveys, revisions, specifications, estimates, reports or other documents or instruments not sealed by the undersigned professional relating to or intended to be used for any part or parts of the project to which this sheet refers. REGISTERED OF STATE PROFESSI ONAL ENGINEER DANIEL T. SHANE NUMBER E DANIEL T. SHANE PE /3/ File Number SIGNAL PLAN SHEETS

5 DEPARTMENT OF THE PRESIDENT, **************** CLARIFICATION NO. TO PLANS AND SPECIFICATIONS FOR Federal Project No. TAP 5670(604) TOWER GROVE PARK NEIGHBORHOOD ACCESS ENHANCEMENTS FEDERAL PROJECT NO. TAP 5670(604) ST. LOUIS, DATE: /3/208 LETTING NUMBER: 8677 The following clarifications have been provided to questions received from various prospective bidders regarding the project plans and specifications. The question received is listed with the response immediately following the question. Please acknowledge receipt of this clarification on the bid proposal. CLARIFICATION TO PLANS:. Drawing Sheet SG-06 (Sheet 43 of 5): Construction Note No. 2 and General Note No. 5: The APS push buttons and signal indications referenced are the units which include voice communication. 2. Drawing Sheets SG-03 (sheet 35 of 5), Sheet SG-04 (Sheet 38 of 5) and Sheet SG-05 (Sheet 4 of 5); The table labeled Controller Assembly and Auxiliary Equipment: The new traffic signal controllers shall be supplied and installed without battery back-up systems. END OF CLARIFICATION NO.

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds

More information

BID PROPOSAL FORM

BID PROPOSAL FORM GENERAL BID INFORMATION EXHIBIT A PROJECT BID PROPOSAL FORM (ATTACHMENT FOR FORM NO. 96) A. Bidder:. B. Project Name: Parking Lot Remediation #15-01-192 C. Project Location: 1501 W. Washington Street,

More information

ADDENDUM NO. 2 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 2 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 2 LANCASTER BOULEVARD AND 15 th STREET WEST ROUNDABOUT This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans,

More information

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008 BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00

More information

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 Date: April 22, 2009 To: Prospective Bidders/Plan Holders From: Abraham Campos, PE on behalf of City of El

More information

Annual 2012 Asphalt Overlay Work Order Construction Contract Job No Solicitation No. B MR BID PROPOSAL. PROPOSAL OF, a corporation a

Annual 2012 Asphalt Overlay Work Order Construction Contract Job No Solicitation No. B MR BID PROPOSAL. PROPOSAL OF, a corporation a Job No. 12-0101 Solicitation No. B-12-013-MR BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction

More information

C. W. Matthews Contracting Co., Inc. (L)

C. W. Matthews Contracting Co., Inc. (L) BID TABULATION Page 1 of 5 E.R. Snell Contractor, 001 Photograph Documentation 8 MO $110.00 $880.00 $250.00 $2,000.00 $97.17 $777.36 $1,250.00 $10,000.00 002 Traffic Control Project No. F-1056 1 LS $192,000.00

More information

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000.

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000. LAS VEGAS PAVING CORP. CONTRI CONSTRUCTION COMPANY AGGREGATE INDUSTRIES-SWR, INC. TAB CONTRACTORS, INC. ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT

More information

At a minimum, the cost estimate should address the following specific items if applicable to your project:

At a minimum, the cost estimate should address the following specific items if applicable to your project: The Pennsylvania Department of Transportation s application process for the Green Light Go program requires the development of a project cost estimate. In order to provide consistency in the cost estimating

More information

Addendum 1 City of Portsmouth Bid # Chestnut Street Streetscape Project. Issued: July 21, 2017

Addendum 1 City of Portsmouth Bid # Chestnut Street Streetscape Project. Issued: July 21, 2017 Addendum 1 City of Portsmouth Bid # 61-17 Issued: July 21, 2017 This Addendum forms part of the original document marked: Bid#61-17 Chestnut Street Streetscape Project. Item 1 Clarification Existing gas

More information

ADDENDUM NO. 1. ISSUED: March 23, 2018 PROJECT: Aurora, Indiana. BID DATE: March 27, 2018

ADDENDUM NO. 1. ISSUED: March 23, 2018 PROJECT: Aurora, Indiana. BID DATE: March 27, 2018 ADDENDUM NO. 1 ISSUED: March 23, 2018 PROJECT: 2 nd Street CCMG Project BID DATE: March 27, 2018 The following addenda items modify, change, delete from or add to the requirements of the Contract Documents

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

ADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1

ADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1 CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT- ENGINEERING DIVISION ADDENDUM DATE: 10/12/15 PROJECT: BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: 41506 BID DATE: 10/27/15 ADDENDUM

More information

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS General Description: Date Prepared: November 1, 2017 (253) 604-6600 KHouse@Parametrix.com Bid Number: J2017-30 ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO

More information

For Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of

For Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned

More information

ADDENDUM NO. 1 - OUTLINE AND SUMMARY INFORMATION

ADDENDUM NO. 1 - OUTLINE AND SUMMARY INFORMATION CAMPUS PLANNING, DESIGN & CONSTRUCTION Sixth Avenue and Grant Street P.O. Box 172760 Bozeman, Montana 59717-2760 Phone: (406) 994-5413 Fax: (406) 994-5665 ADDENDUM NO. 1 - OUTLINE AND SUMMARY INFORMATION

More information

Acknowledgment: Each bidder shall indicate in the place provided for the same on the Proposal Form his acknowledgment of receipt of this Addendum.

Acknowledgment: Each bidder shall indicate in the place provided for the same on the Proposal Form his acknowledgment of receipt of this Addendum. All Mandatory Meeting Attendees: Re: Addendum #2 February 12, 2019 (Updated February 14, 2019) To PROJECT MANUAL AND DRAWINGS For PROJECT NUMBER 19-003 SPINE ROAD The following shall become as fully a

More information

Bidder Name: ITEMIZED BID: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the

More information

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6 SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO. 18-4501 SOLICITATION NO. CO-00198 ADDENDUM 6 (September 10, 2018) To Respondent of Record: This addendum, applicable to work referenced

More information

CITY OF EL CERRITO PUBLIC WORKS DEPARTMENT

CITY OF EL CERRITO PUBLIC WORKS DEPARTMENT CITY OF EL CERRITO PUBLIC WORKS DEPARTMENT OHLONE GREENWAY BART STATION AREA ACCESS, SAFETY, AND PLACEMAKING IMPROVEMENTS City Project No. C3076 Federal Project No. CML-5239 (025) ADDENDUM NO. 1 TO: All

More information

5-1 Street Lights Required Street Lights on Private Roadways Developer s Responsibility...5-1

5-1 Street Lights Required Street Lights on Private Roadways Developer s Responsibility...5-1 SECTION 5 STREET LIGHTING CONTENTS Page 5-1 Street Lights Required...5-1 5-2 Street Lights on Private Roadways...5-1 5-3 Developer s Responsibility...5-1 5-4 Utility Company Authorization...5-1 5-5 General

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF ADDENDUM #1 AUGUST 25, 2016 INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project

More information

Addendum No. 1 Issue Date: March 29, 2016

Addendum No. 1 Issue Date: March 29, 2016 Addendum No. 1 Issue Date: Project: Bonson and Short Street Reconstruction Contract: #1-16 Owner: City of Platteville, Wisconsin Engineer: Delta 3 Engineering, Inc. Daniel J. Dreessens, P.E. 875 South

More information

Tabulation of Bids 8 September 2017 MILL CREEK / PEAKS BRANCH / STATE THOMAS DRAINAGE RELIEF PROJECT

Tabulation of Bids 8 September 2017 MILL CREEK / PEAKS BRANCH / STATE THOMAS DRAINAGE RELIEF PROJECT SCHEDULE 1 BASE BID: PROJECT-WIDE ITEMS All work exclusive of Items listed separately, including tunnel between Station 8+00 and 1 1 LS Station 271+85 $191,675,695.00 $191,675,695.00 $190,592,000.00 $190,592,000.00

More information

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction

More information

The following is a summary of parameters for preparation of a traffic impact analysis when such analysis is required by the City of Highland:

The following is a summary of parameters for preparation of a traffic impact analysis when such analysis is required by the City of Highland: 9.0 TRAFFIC Traffic studies shall be prepared in accordance with criteria adopted by the City of Highland. Check with the City Engineer for details before starting any traffic reports. Traffic signals

More information

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018 Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA-2019-004 TMWA Capital Project No.: 10-0001.053 October 3, 2018 The following information, clarifications, changes and modifications are by reference

More information

ENGINEERS ESTIMATE MARYLAND STATE HIGHWAY ADMINISTRATION

ENGINEERS ESTIMATE MARYLAND STATE HIGHWAY ADMINISTRATION ENGINEERS ESTIMATE The Engineer s Estimate is an important part of the overall design process. It is a determination of the construction costs for any given project. The estimate is then used for programming

More information

ADDENDUM #1 ISSUE DATE: WEDNESDAY, MARCH 16, 2016 BID DATE: TUESDAY, MARCH 22, 2016 AT 12:00 PM (NOON)

ADDENDUM #1 ISSUE DATE: WEDNESDAY, MARCH 16, 2016 BID DATE: TUESDAY, MARCH 22, 2016 AT 12:00 PM (NOON) PROJECT #: 150081 CLIENT: PROJECT TITLE: CITY OF WILMINGTON, OH AIRBORNE CONNECTOR ROAD, PHASE 1 ISSUE DATE: WEDNESDAY, MARCH 16, 2016 BID DATE: TUESDAY, MARCH 22, 2016 AT 12:00 PM (NOON) THIS IS TO CERTIFY

More information

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged. 1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax 6 March 2018 Arizona California Colorado Kansas Louisiana Missouri Nebraska New Mexico Texas Utah ADDENDUM NO. 2 RE: City of Kingman,

More information

City of Redding Construction Standards Index

City of Redding Construction Standards Index City of Redding Construction Standards Index A. Purpose and Reference Documents... A1 B. Modifications to the Standard Specifications for Public Works Construction (Greenbook)... B1 I. Streets Materials...

More information

Addendum 3 City of Portsmouth Bid # Chestnut Street Streetscape Project. Issued: August 1, 2017

Addendum 3 City of Portsmouth Bid # Chestnut Street Streetscape Project. Issued: August 1, 2017 Addendum 3 City of Portsmouth Bid # 61-17 Issued: August 1, 2017 This Addendum forms part of the original document marked: Bid#61-17 Chestnut Street Streetscape Project. NOTE: THIS ADDENDUM REPLACES ADDENDUM

More information

Acknowledgment: Each bidder shall indicate in the place provided for the same on the Proposal Form his acknowledgment of receipt of this Addendum.

Acknowledgment: Each bidder shall indicate in the place provided for the same on the Proposal Form his acknowledgment of receipt of this Addendum. All Mandatory Meeting Attendees: Re: Addendum #2 February 12, 2019 To PROJECT MANUAL AND DRAWINGS For PROJECT NUMBER 19-003 SPINE ROAD The following shall become as fully a part of the above named Project

More information

FC-9403, Street Resurfacing and Associated Street Maintenance Activities - Group A Addendum No. 3 January 24, 2017 Page 2

FC-9403, Street Resurfacing and Associated Street Maintenance Activities - Group A Addendum No. 3 January 24, 2017 Page 2 FC-9403, Street Resurfacing and Associated Street Maintenance Activities - Group A Addendum No. 3 January 24, 2017 Page 2 ADDENDUM NO. 3 This Addendum No. 3 forms a part of the Invitation to Bid and modifies

More information

2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02

2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02 2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02 Date: March 3, 2015 To: Prospective Contractors From: Jack Fleming, PE City of El Centro 1275 W. Main St. El Centro, CA 92243 Telephone:

More information

TABULATION OF BIDS DODGE CITY REGIONAL AIRPORT DODGE CITY, KANSAS RECONSTRUCT RUNWAY 14-32: SUMMARY PROJECT NO.: AIP

TABULATION OF BIDS DODGE CITY REGIONAL AIRPORT DODGE CITY, KANSAS RECONSTRUCT RUNWAY 14-32: SUMMARY PROJECT NO.: AIP RECONSTRUCT RUNWAY 14-32: SUMMARY., BID SUMMARY TOTAL COST TOTAL COST TOTAL COST TOTAL COST TOTAL COST Schedule 1 Cost of Construction $4,717,480.00 $5,106,762.00 $5,697,026.50 $4,430,910.42 $4,640,166.10

More information

ADDENDUM NO. 1 LAWRENCE MERRIMACK STREET UTILITY IMPROVEMENTS PROJECT RESPONSE TO CONTRACTOR QUESTIONS:

ADDENDUM NO. 1 LAWRENCE MERRIMACK STREET UTILITY IMPROVEMENTS PROJECT RESPONSE TO CONTRACTOR QUESTIONS: City of Lawrence Office of Planning & Development Merrimack Street Utility Improvements Project IFB ADDENDUM NO. 1 September 15, 2017 To Prospective Bidders and Others on: LAWRENCE MERRIMACK STREET UTILITY

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information

Project Title NW 72 nd Street Improvements Federal STP-3451(401) Information to Bidders The following is provided to Bidders for information only:

Project Title NW 72 nd Street Improvements Federal STP-3451(401) Information to Bidders The following is provided to Bidders for information only: ADDENDUM NUMBER 5 Project Number 89008230 Project Title NW 72 nd Street Improvements Federal STP-3451(401) ISSUE DATE: 1/17/2019 Bidders are hereby notified that the Bidding and Contract Documents for

More information

PAGE 1 BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

PAGE 1 BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 21, 2012 : 7,023,234.75 CONTRACT NO.120475 DOWNTOWN LINKS - ST. MARY'S ROAD INTERSTATE 10 (I-10) TO CHURCH AVENUE ROADWAY IMPROVEMENTS 1055001 0 HR RESTAKING FEES (150.00) 0.00

More information

CITY OF ROCKLIN STANDARD DRAWINGS

CITY OF ROCKLIN STANDARD DRAWINGS CITY OF ROCKLIN STANDARD DRAWINGS November 2016 Table of Contents Page # Section 1 Section 2 Section 3 General Notes and Review Boxes 01-01 Signature Blocks... 1 01-02 General Notes (Sheet 1 of 8)... 2

More information

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER COMMUNICATIONS LIGHTING Street Lighting Plan 710 Riser... 287 730 Collar for street light pole... 289 731 Pull box... 291 732 Trench for street light

More information

Forsyth County Procurement

Forsyth County Procurement July 7, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 BID 17-63-3150 For: Providing all labor, materials and equipment for the construction of the Brookwood

More information

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE, CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE FOR THE CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS RQ# 41677 BIDS DUE ON: May 1, 2018, at 2:00 p.m. ADDENDUM NUMBER 1, April 25, 2018, Page

More information

Southern Arizona Paving Item No. Item Description Unit Quantity Unit Cost Extended Amount Unit Cost Extended Amount

Southern Arizona Paving Item No. Item Description Unit Quantity Unit Cost Extended Amount Unit Cost Extended Amount BID A (BASE DESIGN) LINE ITEM BID TABULATION 1070001 NPDES (ORIGINAL) L.S. 1 100,000.00 100,000.00 35,000.00 35,000.00 1070011 NPDES (MODIFICATIONS) F.A. 10,000 1.00 10,000.00 1.00 10,000.00 2010001 CLEARING

More information

General Water Bid Items Item No.

General Water Bid Items Item No. BID PROPOSAL PROPOSAL OF, a corporation organized and existing under the laws of the State of, a partnership consisting of, an individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, May 03, 2013 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 26 CONFIRMATION

More information

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION CONTRACTOR S PROPOSAL COMPANY ADDRESS CITY, STATE, ZIP ( ) TELEPHONE NUMBER City of Hesperia 9700 Seventh Avenue Hesperia, CA 92345 Ladies and Gentlemen: STATE LICENSE NUMBER Pursuant to the Public Notice

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST COST COST PAGE 1 BID OPENING: MAY 17, 2012 : $8,863,123.00 CONTRACT NO.120486 GRANT ROAD AND ORACLE ROAD INTERSECTION IMPROVEMENTS 1055001 0 HR. RESTAKING FEES (150.00) 0.00 (150.00) 0.00 (150.00) 0.00 (150.00)

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

November 29, CITY OF PLANT CITY Purchasing Division (813)

November 29, CITY OF PLANT CITY Purchasing Division (813) November 29, 2018 CITY OF PLANT CITY Purchasing Division (813) 659-4270 IFB 18-014UM-LG 12-inch Water Transmission Main-Franklin St., Hancock St. and Terrace Drive West ADDENDUM No. 3 *Bidders are required

More information

Department of Transportation Mitchell Region Office

Department of Transportation Mitchell Region Office Connecting South Dakota and the Nation Department of Transportation Mitchell Region Office PO Box 1206 Mitchell, SD 57301-7206 605/995-8129 FAX: 605/995-8135 September 28, 2018 TO: Interested Bidders (pdf

More information

November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION SPECIFICATION NO C (Re-Issued) ADDENDUM NO. 1

November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION SPECIFICATION NO C (Re-Issued) ADDENDUM NO. 1 Department of Public Works Engineering Division November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION ADDENDUM NO. 1 Dear Bidder: The following amendments are hereby made to the subject

More information

June 5, Prepared By: Thompson Engineering, Inc Cottage Hill Road Ste. 190 Mobile, Al Office (251) Fax: (251)

June 5, Prepared By: Thompson Engineering, Inc Cottage Hill Road Ste. 190 Mobile, Al Office (251) Fax: (251) Addendum No. 3 to the Water Street Signal Planning And Striping Plan Concrete Sidewalk Phase Mobile, Alabama For the City of Mobile, Alabama Project No. 2017-2060-06 June 5, 2017 Prepared By: Thompson

More information

BID FORM. Alt. Bid: Additional extension of proposed taxiway from STA: to TW F/G intersection, approximately 1,095 feet.

BID FORM. Alt. Bid: Additional extension of proposed taxiway from STA: to TW F/G intersection, approximately 1,095 feet. BID FORM TxDOT CSJ 1812CONRO Project Description: TW Extension, Lighting and Signage Improvements Base Bid: The project consists of the extension of existing 50 TW approximately 2,640 feet. The proposed

More information

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications Addendum No. 2 Project No. 2016-01EL West Barbour Street 12kV Underground Reconductoring Revisions to Drawings and Specifications Pre-Bid Meeting Notes and Scope of Work Clarifications Replace Section

More information

NOTICE TO BIDDERS. August 24, 2016 ADDENDUM NO. 1. Gosling Road Pedestrian, Bike & Related Improvements

NOTICE TO BIDDERS. August 24, 2016 ADDENDUM NO. 1. Gosling Road Pedestrian, Bike & Related Improvements NOTICE TO BIDDERS August 24, 2016 ADDENDUM NO. 1 Gosling Road Pedestrian, Bike & Related Improvements TO ALL FIRMS OF RECORD: This addendum forms a part of and modifies the bidding and contract documents

More information

Federal Project No.: HSIP-5A27(394)

Federal Project No.: HSIP-5A27(394) Order : M08 Schedule of Items Page: 2 Oversight/State Project : (NFO)0250-043-797, M501 Federal Project : HSIP-5A27(394) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

City of Walterboro 242 Hampton Street Walterboro, SC

City of Walterboro 242 Hampton Street Walterboro, SC City of Walterboro 242 Hampton Street Walterboro, SC 29488 843.782.1000 BID: CPST-14 I-95 Loop Project Streetscape Phases 1B & 1E BID DUE: Thursday, January 24, 2019 @ 11:00am ADDENDUM 1 DATED: JANUARY

More information

City of Kettering. Bid Tabulations SWR PROJECT. Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # PO#

City of Kettering. Bid Tabulations SWR PROJECT. Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # PO# City of Kettering Bid Tabulations 05-117 2017 SWR PROJECT Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # 5212-77750 PO# Engineer's Estimate (1) America's Decorative Concrete (2) RA

More information

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810 STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS 3 East Pulteney Square Bath, New York 14810 County Route 22 over Canisteo River Bridge Replacement Project BIN 3333290 D035511 PIN 6755.06 ADDENDUM #1 October

More information

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB #4320 2014 RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN The following changes, additions, and/or deletions shall be made to the Bid Documents

More information

BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2

BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2 BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2 The original Contract Documents entitled BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT are amended

More information

A new Proposal Form is being issued with this Addendum, the following is an explanation of the changes, disregard originally issued form.

A new Proposal Form is being issued with this Addendum, the following is an explanation of the changes, disregard originally issued form. Courtyards Phase ADDENDUM NO. 1 May 2, 2016 PROJECT: Courtyards at the Oaks Phase 2 Paving & Incidental Drainage Improvements BID DATE: Tuesday, May 3, 2016, at 2:00 PM City Hall, City of Derby 611 Mulberry

More information

ADDENDUM NO. 1 CITY OF SOUTH PORTLAND, MAINE WATERMAN DRIVE PARKING IMPROVEMENTS BID # August 21, 2014 PREPARED BY:

ADDENDUM NO. 1 CITY OF SOUTH PORTLAND, MAINE WATERMAN DRIVE PARKING IMPROVEMENTS BID # August 21, 2014 PREPARED BY: ADDENDUM NO. TO CITY OF SOUTH PORTLAND, MAINE WATERMAN DRIVE PARKING IMPROVEMENTS BID #04-5 August 2, 204 PREPARED BY: SEBAGO TECHNICS, INC. 75 John Roberts Road Suite A South Portland, ME 0406 3036 Addendum

More information

CITY OF TACOMA Department of Public Utilities - Water Division

CITY OF TACOMA Department of Public Utilities - Water Division CITY OF TACOMA Department of Public Utilities - Water Division ADDENDUM NO. 1 DATE: October 12, 2015 REVISIONS TO: Request for Bids Specification No. WD15-0133F Water Main Replacement Project No. MRP 2014-27,

More information

Date of Advertisement: December 30, 2009 in the Herald Newspapers

Date of Advertisement: December 30, 2009 in the Herald Newspapers Date of Advertisement: December 30, 2009 in the Herald Newspapers ADVERTISEMENT FOR BIDS BOARD OF CHOSEN FREEHOLDERS CAPE MAY COUNTY NEW JERSEY Notice is hereby given that sealed proposals addressed to

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 1 EA 202-00035 Removal of Pipe 30 LF 202-00200 Removal of Sidewalk 431 SY 202-00203 Removal of Curb and Gutter 973 LF 202-00205 Removal of

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division. CONTRACT NO PROJECT NAME: 2018 Citywide Contract Overlay

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division. CONTRACT NO PROJECT NAME: 2018 Citywide Contract Overlay CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division CONTRACT NO. 201841976 PROJECT NAME: 2018 Citywide Contract Overlay ADDENDUM NO. 3 TO CONTRACT DOCUMENTS Bidders are hereby instructed

More information

May 31, Prepared By: Thompson Engineering, Inc Cottage Hill Road Ste. 190 Mobile, Al Office (251) Fax: (251)

May 31, Prepared By: Thompson Engineering, Inc Cottage Hill Road Ste. 190 Mobile, Al Office (251) Fax: (251) Addendum No. 1 to the Water Street Signal Planning And Striping Plan Concrete Sidewalk Phase Mobile, Alabama For the City of Mobile, Alabama Project No. 2017-2060-06 May 31, 2017 Prepared By: Thompson

More information

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR Miscellaneous Concrete Repairs 2014 3600-3900 Blocks of Potomac Avenue and Town Hall, 2014 To: The Honorable Mayor and Town Council Town of Highland Park

More information

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2 UTILITY UNDERGROUNDING GRAUWYLER ROAD @ IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. ADDENDUM IS

More information

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2 MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item

More information

COMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No ADDENDUM NO.

COMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No ADDENDUM NO. COMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No. 15-1079 2015 CONTRACTOR S BID DATE: PLACE FOR CONTRACTOR S TO SUBMIT BIDS: Thursday, June 25th, 2015,

More information

HALIFAX REGIONAL MUNICIPALITY MUNICIPAL DESIGN GUIDELINES

HALIFAX REGIONAL MUNICIPALITY MUNICIPAL DESIGN GUIDELINES HALIFAX REGIONAL MUNICIPALITY MUNICIPAL DESIGN GUIDELINES 2013 PART B STANDARD DETAILS Municipal Design Guidelines Contents PART B: STANDARD DETAILS Municipal Roads/Streets HRM 1 HRM 2 HRM 3 HRM 4 HRM

More information

Franklin County Engineer's Office - Highway Design FRA-Hamilton Road Bid Tabulation

Franklin County Engineer's Office - Highway Design FRA-Hamilton Road Bid Tabulation 7/07/2015 Page 1 of 20 Group: A Roadway 005 201E11000 Clearing And Grubbing 008 202E20010 Headwall Removed 10.00 EA 010 202E23000 Pavement Removed, 88.00 SQYD Concrete 012 202E23010 Pavement Removed, Asphalt

More information

8 PROJECT IMPLEMENTATION

8 PROJECT IMPLEMENTATION 8 PROJECT IMPLEMENTATION 8.1 Opinions of Costs The construction cost estimate for Grant Road Improvement Plan, based on quantities from the 30 percent construction plans is $102,120,380 in 2008 dollars.

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018: ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 24, 208: Q#32 Addendum # answered Question #7 indicating that an average depth of 3 feet for the

More information

CITY OF ELKO BID TABULATION FOR Sports Complex

CITY OF ELKO BID TABULATION FOR Sports Complex CITY OF ELKO BID TABULATION FOR Sports Complex 2017-2018 NAME Granite Construction Great Basin Engineering Contractors Road & Highway Builders CLEARING EARTHWORK 1 33701200 Mobilization @ Per Lump Sum

More information

4TH STREET SEWER EXTENSION TO MBR PLANT BID SOLICITATION NO

4TH STREET SEWER EXTENSION TO MBR PLANT BID SOLICITATION NO ADDENDUM NO. 2 March 12, 2019 Engineer: Owner: Parametrix The Tulalip Tribes 1019 39th Avenue SE 8802 27th Avenue NE Suite 100 Tulalip, WA 98271-9694 Puyallup, Washington 98374 4TH STREET SEWER EXTENSION

More information

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1 APRIL 24, 2017 DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE

More information

04/19/2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION PAGE 1 DIVISION OF CONSTRUCTION CONSTRUCTION CONTRACT ESTIMATE (CONR20)

04/19/2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION PAGE 1 DIVISION OF CONSTRUCTION CONSTRUCTION CONTRACT ESTIMATE (CONR20) 04/19/2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION PAGE 1 DOT CONTRACT NUMBER: D261458 NYS PROJECT NUMBER: 1805.81.000 FISCAL SHARE: 01 ENGINEERING SHARE: 001 ENGINEERING SHARE TITLE: BRIDGE SHARE

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

MAY 11, 2017 T-MC-107A & T-MC-107B1

MAY 11, 2017 T-MC-107A & T-MC-107B1 Schedule of Bid Items - Part A ROADWAY 107A 201(A) - CLEARING AND GRUBBING - LSUM 1.00 30,000.00 30,000.00 $100,000.00 $100,000.00 $65,000.00 $65,000.00 $120,000.00 $120,000.00 $50,000.00 $50,000.00 $18,262.05

More information

TABULATION OF BIDS DENVER INTERNATIONAL AIRPORT. Denver, Colorado CONTRACT NO. CE CONCOURSE C EAST APRON EXPANSION BID SUMMARY

TABULATION OF BIDS DENVER INTERNATIONAL AIRPORT. Denver, Colorado CONTRACT NO. CE CONCOURSE C EAST APRON EXPANSION BID SUMMARY Contract No. CE 80017 Bid Date: 1/29/2008 TABULATION OF BIDS Denver, Colorado BID SUMMARY Bid Bond DBE Goals Addendum One Schedule I Schedule II Total Bid 34,030,330.50 4,560,072.50 38,590,403.00 Page

More information

BID TABULATION Page 1 of 10. CMES, Inc. (L) E. R. Snell Contractor, Inc. (L) Est. Bid Quantity

BID TABULATION Page 1 of 10. CMES, Inc. (L) E. R. Snell Contractor, Inc. (L) Est. Bid Quantity BID TABULATION Page 1 of 10 CMES, Inc. C. W. Matthews Contracting Co., Inc. E. R. Snell Contractor, Inc. Units Unit Price Total Price Unit Price Total Price Unit Price Total Price 001 Aerial Photograph

More information

The following clarifications, changes, additions, and/or deletions are hereby made part of the Contract Documents

The following clarifications, changes, additions, and/or deletions are hereby made part of the Contract Documents CITY OF TAMARAC PURCHASING AND CONTRACTS DIVISION 7525 NW 88 TH AVENUE TAMARAC, FL 33321 Committed to Excellence...Always ADDENDUM NO. 1 BID NO.13-19B BID NO. 13-20B CITY OF TAMARAC NW 108 TERRACE / NW

More information

PUBLIC WORKS DEPARTMENT THORNTON ROAD WIDENING PROJECT NO. PW1428

PUBLIC WORKS DEPARTMENT THORNTON ROAD WIDENING PROJECT NO. PW1428 PUBLIC WORKS DEPARTMENT BID FORMS FOR THORNTON ROAD WIDENING PROJECT NO. PW1428 DO NOT DETACH ANY OF THIS MATERIAL THIS CONSTITUTES YOUR BID PROPOSAL SUBMIT ONE ORIGINAL OF THIS BID PROPOSAL Job Walk:

More information

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 105 ELECTRICAL DETAILS. base. base. base.

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 105 ELECTRICAL DETAILS. base. base. base. Schedule H to Bylaw 7452, Subdivision Bylaw Page 105 4.3.7 Electrical Details ELECTRICAL DETAILS MMCD Standard Detail Drawing Saanich Supplemental Specification E1.1 Concrete Base Index E1.2 Type A and

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 01/22/02 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : GRADING, BIT MILL & SURFACING, LIGHTING AND UTILITIES CONTRACT LOCATION: LOCATED ON TH 210 FROM 100 FT WEST OF GRAND AVE TO SIXTH STREET IN CARLTON RECOMMENDATION: AWARD

More information

City of Eagle Point Main Street Lighting Phase II Addendum No. 1 April 30, 2014

City of Eagle Point Main Street Lighting Phase II Addendum No. 1 April 30, 2014 City of Eagle Point Main Street Lighting Phase II Addendum No. April 0, 204 The following revisions and/or additions are made to the contract documents (plans and/or specifications) and are to be reflected

More information

EXHIBIT E SCHEDULE OF UNIT PRICES

EXHIBIT E SCHEDULE OF UNIT PRICES SCHEDULE OF UNIT PRICES TO ACCOMPANY THE BID OF (Bidder/Contractor) ON CALL UTILITY SERVICES AND MISCELLANEOUS CONSTRUCTION FOR SEWER AND WATER LINES SOLICITATION NO.: IFB SA1703 Any bidder who enters

More information

ADDENDUM NO. 3 TO SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CITY OF DENTON, TEXAS MAYHILL ROAD WIDENING AND IMPROVEMENTS IFB 6389

ADDENDUM NO. 3 TO SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CITY OF DENTON, TEXAS MAYHILL ROAD WIDENING AND IMPROVEMENTS IFB 6389 ADDENDUM NO. 3 TO SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CITY OF DENTON, TEXAS MAYHILL ROAD WIDENING AND IMPROVEMENTS IFB 6389 TO: PROSPECTIVE BIDDERS AND PLAN HOLDERS The Specifications and Contract

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

SCHEDULE OF QUANTITIES AND PRICES

SCHEDULE OF QUANTITIES AND PRICES SCHEDULE OF QUANTITIES AND PRICES BIDDER: SANTA ANA Schedule 33B - City of Santa Ana, 17th Street Crossing BID ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE 33-01570-01 MAINTENANCE AND PROTECTION