1 CITY OF TACOMA Department of Public Utilities - Water Division ADDENDUM NO. 1 DATE: October 12, 2015 REVISIONS TO: Request for Bids Specification No. WD F Water Main Replacement Project No. MRP , Shoshone Street West ET AL. NOTICE TO ALL BIDDERS: This addendum is issued to clarify, revise, add to or delete from, the original specification documents for the above project. This addendum, as integrated with the original specification documents, shall form the specification documents. The noted revisions shall take precedence over previously issued specification documents and shall become part of this contract. REVISIONS TO THE SUBMITTAL DEADLINE: The submittal deadline remains the same. REVISIONS TO THE SPECIFICATIONS: The Request for Bids page is deleted and replaced with the attached document titled REQUEST FOR BIDS-ADDENDUM 1 The following are additions and changes to the Request for bids, and are listed here to provide the bidder with information on the changes. On the Request for Bids page: PROJECT SCOPE Is revised to read: The work to be performed consists of furnishing all labor, tools and materials for constructing approximately 5020 linear feet of 8-inch, 6-inch and 4-inch water mains together with all necessary valves, specials, etc. all in accordance with these specifications and approved plans. The work is located in Alameda Avenue West from 44 th Street West to 42 nd Street West, 42 nd Street West from Alameda Avenue West to Alturus Street West, Kootnai Street West from Emerson Street to end of cul-de-sac south of 42 nd Street West, Shoshone Street West from Emerson Street to end of cul-de-sac south of 42 nd Street West, and Alturus Street West from end of cul-de-sac north of 42 nd Street West to end of cul-de-sac south of 42 nd Street West. All located in the SE ¼ - Sec 14 T.20N R.2E W.M., Pierce County, WA. On the Request for Bids page: Estimate: $785, plus applicable sales tax Form No. SPEC-220A Revised: 07/30/2015

2 Is revised to read: Estimate: $770, plus applicable sales tax The Specification Contents page is deleted and replaced with attached form titled SPECIFICATION CONTENTS ADDENDUM 1. Under Attachments, the reference to DWG , 2-pages has been deleted. Under Attachments, the reference to SU-03, SU-04, SU-05, and SU-05A 4 pages has been deleted. REVISIONS TO THE SPECIAL PROVISIONS: The section DESCRIPTION OF WORK that read: DESCRIPTION OF WORK (******) The work to be performed under these Specifications consists of furnishing all labor, tools and materials for constructing approximately 4836 lineal feet of 8-inch, and 4-inch water mains together with all necessary valves, specials, etc., all in accordance with these specifications and approved plans. Schedule A work is located in Alameda Avenue West from 44 th Street West to 42 nd Street West, 42 nd Street West from Alameda Avenue West to Alturus Street West, Kootnai Street West from Emerson Street to end of cul-de-sac south of 42 nd Street West, Shoshone Street West from Emerson Street to end of cul-de-sac south of 42 nd Street West, and Alturus Street West from end of cul-de-sac north of 42 nd Street West to end of cul-de-sac south of 42 nd Street West. All located in the SE ¼ - Sec 14 T.20N R.2E W.M., Pierce County WA. The second work site for Schedule B work, is to replace curbs and sidewalks at the intersection of South 64 th St and South Park Avenue, Tacoma WA. This project is the replacement of existing asbestos cement water main, in the identified area of the City of University Place, and sidewalk restoration in the City of Tacoma. All materials required and not listed herein, to be furnished by Tacoma Water, shall be furnished by the Contractor. END OF SECTION Is revised to read: DESCRIPTION OF WORK (******) The work to be performed under these Specifications consists of furnishing all labor, tools and materials for constructing approximately 4836 lineal feet of 8-inch, and 4-inch water mains together with all necessary valves, specials, etc., all in accordance with these specifications and approved plans. The work is located in Alameda Avenue West from 44 th Street West to 42 nd Street West, 42 nd Street West from Alameda Avenue West to Alturus Street West, Kootnai Street West from Emerson Street to end of cul-de-sac south of 42 nd Street West, Shoshone Street West from Emerson Street to end of cul-de-sac south of 42 nd Street West, and Form No. SPEC-220A Revised: 07/30/2015

3 Alturus Street West from end of cul-de-sac north of 42 nd Street West to end of cul-de-sac south of 42 nd Street West. All located in the SE ¼ - Sec 14 T.20N R.2E W.M., Pierce County WA. This project is the replacement of existing asbestos cement water main, in the identified area of the City of University Place and the City of Fircrest. All materials required and not listed herein, to be furnished by Tacoma Water, shall be furnished by the Contractor. END OF SECTION Section Permits and Licenses that read: Before beginning and during all phases of work, the Contractor shall obtain and comply with all provisions of the Right of Way and Miscellaneous Trench permits as issued by the City of University Place, City of Tacoma and the City of Fircrest for this project. For reference in this project, the City of Fircrest has jurisdiction over Alameda Avenue West, the City of University Place has jurisdiction over 42 nd Street West, Kootnai Street West, Shoshone Street West, and Alturus Street West. A copy of the City of University Place Right of Way permit ROW is attached to this specification. A copy of the City of Fircrest Street Work Permit # SW002 is attached to this specification. Contractor shall be responsible for obtaining a Miscellaneous Trench permit from the City of Tacoma for sidewalk restoration at South 64 th Street and South Park Avenue. A miscellaneous trench permit application for this project has been submitted to Building and Land Use Services by Tacoma Water. The permit will be issued to the Contractor following approval of the Contractor s traffic control plan. Fees for this permit will be paid by Tacoma Water. Traffic control plans shall be submitted to the City of University Place, City of Tacoma, and the City of Fircrest, for review and comment. When using the WSDOT Standard K Plans, the street names are to be listed on the plans with construction start date and intended working hours. Water used during construction can be obtained from an approved Tacoma Water fire hydrant. The Contractor will be billed for the water used and shall pay for a Hydrant Use Permit and make a deposit on the water meter. The Contractor shall contact the Water Permit Counter at (253) , for information regarding water consumption fees, Hydrant Use Permit fees, meter deposits and approved Tacoma Water hydrant locations. Permit fees and deposits shall be paid prior to using an approved Tacoma Water hydrant. Is revised to read: Before beginning and during all phases of work, the Contractor shall obtain and comply with all provisions of the Right of Way permits as issued by the City of University Place, and the City of Fircrest for this project. For reference in this project, the City of Fircrest has jurisdiction over Alameda Avenue West and 44 th Street West, the City of University Place has jurisdiction over 42 nd Street West, Kootnai Street West, Shoshone Street West, and Alturus Street West. A copy of the City of University Place Right of Way permit ROW is attached to this specification. Form No. SPEC-220A Revised: 07/30/2015

4 A copy of the City of Fircrest Street Work Permit # SW002 is attached to this specification. Traffic control plans shall be submitted to the City of University Place, and the City of Fircrest, for review and comment. When using the WSDOT Standard K Plans, the street names are to be listed on the plans with construction start date and intended working hours. Water used during construction can be obtained from an approved Tacoma Water fire hydrant. The Contractor will be billed for the water used and shall pay for a Hydrant Use Permit and make a deposit on the water meter. The Contractor shall contact the Water Permit Counter at (253) , for information regarding water consumption fees, Hydrant Use Permit fees, meter deposits and approved Tacoma Water hydrant locations. Permit fees and deposits shall be paid prior to using an approved Tacoma Water hydrant. Section (1)A Traffic Control Management The first sentence is revised to read: Traffic control plans (TCP) shall be submitted to the City of University Place, and the City of Fircrest, for review and comment Section Description that read: The curbs and gutters shall be constructed to match existing that was removed, and reconstructed to meet City of Tacoma Standards SU-03 when working within the City of Tacoma (S 64 th St and S Park Ave.). Is revised to read: The curbs and gutters shall be constructed to match existing that was removed. Section 8-14 is revised to read: 8-14 CEMENT CONCRETE SIDEWALKS Description This section is supplemented with the following: The cement concrete sidewalks shall be constructed to match existing sidewalks that were removed during construction of water mains. REVISIONS TO THE PLANS: END OF SECTION Drawing number sheets 1 and 2, are deleted from this specification. City of Tacoma Standard plans, SU-03, SU-04, SU-05, and SU-05A are deleted from this specification. REVISIONS TO THE PROPOSAL PAGES: The following are additions and changes to the proposal items, and are listed here to provide the bidder with information on the changes. The bidder will submit the revised proposal pages labeled BID PROPOSAL SPECIFICATION WD F - ADDENDUM 1 which incorporates these changes. Form No. SPEC-220A Revised: 07/30/2015

5 The following items have been revised in the proposal: The references to Schedule A and Schedule B have been removed. Bid item 47, the item description is revised to read Cement Concrete Sidewalk, (8-14). Bid Items 61 through 66 are deleted. NOTE: Acknowledge receipt of this addendum by initialing the corresponding space as indicated on the signature page. Vendors who have already submitted their bid/proposal may contact the Purchasing Division at and request return of their bid/proposal for acknowledgment and re-submittal. Or, a letter acknowledging receipt of this addendum may be submitted in an envelope marked Request for Bids Specification No. WD F Addendum No. 1. The City reserves the right to reject any and all bids, including, in certain circumstances, for failure to appropriately acknowledge this addendum. cc: Ryan Flynn PE - Tacoma Water Form No. SPEC-220A Revised: 07/30/2015

6 City of Tacoma Department of Public Utilities - Water Division REQUEST FOR BIDS -ADDENDUM 1 Specification No. WD F Water Main Replacement Project No. MRP Shoshone Street West ET AL. Submittal Deadline: 11:00 a.m., Pacific Time, Tuesday, October 20, 2015 Submittal Delivery: Sealed submittals will be received and time stamped at this location only: City of Tacoma Procurement and Payables Division Tacoma Public Utilities - Administration Building North, Main Floor 3628 South 35 th Street, Tacoma, WA Submittal Opening: Sealed submittals in response to a RFB will be opened by a Purchasing representative and read aloud during a public bid opening held in Conference Room M-1, located on the main floor in the same building. Submittals in response to an RFP or RFQ are recorded as received but are not typically opened and read aloud. After 1:00 p.m. the day of bid opening, the names of vendors submitting proposals are posted to the website for public viewing. Solicitation Documents: An electronic copy of the complete solicitation documents may be viewed and obtained by accessing the City of Tacoma Purchasing website at Register for the Bid Holders List to receive notices of addenda, questions and answers and related updates. Click here to see a list of vendors registered for this solicitation. Pre-Proposal Meeting: A pre-proposal meeting will be held at 8:00 a.m. Pacific Time, Friday October 9, 2015, at Tacoma Public Utilities, 3628 South 35 th Street, Tacoma WA, conference room ABN-M1. The purpose of the pre-bid meeting is to answer questions about this solicitation and any special or technical requirements, as well as the City's SBE and LEAP goals. Project Scope: The work to be performed consists of furnishing all labor, tools and materials for constructing approximately 5020 linear feet of 8-inch, 6-inch and 4-inch water mains together with all necessary valves, specials, etc. all in accordance with these specifications and approved plans. The work is located in Alameda Avenue West from 44 th Street West to 42 nd Street West, 42 nd Street West from Alameda Avenue West to Alturus Street West, Kootnai Street West from Emerson Street to end of cul-de-sac south of 42 nd Street West, Shoshone Street West from Emerson Street to end of cul-de-sac south of 42 nd Street West, and Alturus Street West from end of cul-de-sac north of 42 nd Street West to end of cul-de-sac south of 42 nd Street West. All located in the SE ¼ - Sec 14 T.20N R.2E W.M., Pierce County, WA. Estimate: $770, plus applicable sales tax Additional Information: Requests for information regarding the specifications may be obtained by contacting Marie Holm, senior buyer, by to marie.holm@cityoftacoma.org. Protest Policy: City of Tacoma protest policy, located at specifies procedures for protests submitted prior to and after submittal deadline. Meeting sites are accessible to persons with disabilities. Reasonable accommodations for persons with disabilities can be arranged with 48 hours advance notice by calling Form No. SPEC-040C Revised: 02/09/2015

7 This Specification contains the following: SPECIFICATION CONTENTS ADDENDUM 1 1. Cover Sheet 2. Engineer Cover Sheet 3. Request for Bids 4. Specification Contents 5. Bidder's Check List 6. General Provisions 7. Bid Proposal Signature Page 8. Bid Proposal 9. Bid Bond 10. Performance Bond to the City of Tacoma 11. Insurance Certificate Requirements 12. Record of Prior Contracts (Construction Contracts) 13. Final Contract Verification Form 14. Subcontract Verification Form 15. General Release (Construction Contracts) 16. Sample Contract 17. Special Notice to Bidders Responsible Bidder Criteria 18. State Responsibility Information Form 19. SBE Goal Utilization Form 20. SBE Special Reminder to All Bidders 21. SBE Tacoma Municipal Code Chapter SBE Utilization Form 23. SBE Prime Contractor s Pre-work Form 24. Local Employment and Apprenticeship Training Program (LEAP) Instructions and Goal Form 25. Prime Contractor LEAP Utilization Plan 26. Local Employment and Apprenticeship Training Regulations 27. State Amendments to the Standard Specifications 28. Special Provisions 29. Benefit Code Key and Prevailing Wage URL Links to the Washington State Department of Labor and Industries Attachments: MRP Drawings 15 Pages Standard Detail 2 Pages Construction Stormwater General Permit #WAR pages City of University Place Right of Way Permit # ROW pages City of Fircrest Street Work Permit # SW page Pierce County standard drawing # page Soil sample location map - 14 pages Soil sample lab report dated pages Soil sample lab report dated pages WD F ADDENDUM 1

8 BID PROPOSAL SPECIFICATION NO. WD F - ADDENDUM 1 Bidder ITEM NO. ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 1 Mobilization (1-09.7) Project Temporary Traffic Control. (See Special Provisions) (1-10) Removal and disposal of existing pavement, sidewalks, curbs, and gutters includes all thicknesses & combinations, (2-02.3(3)) Planing Bituminous Pavement (5-04.3(14)) Temporary HMA Class ½ PG64-22, 2- inch minimum depth, installed & removed (5-04 & ) 6,898 SY $ $ 1,253 SY $ $ 2,231 SY $ $ 6 HMA Cl ½, PG64-22 (5-04 & ) 1,431 TN $ $ 7 Trench Excavation & Disposal (7-09.3(7)) 2,634 CY $ $ 8 Roadway Excavation Incl. Haul (2-03) 383 CY $ $ 9 Trench Shoring (7-09.3(7)) 5,019 LF $ $ 10 8-inch Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, (7-09.3(15)A & (1)) 4,086 LF $ $ 11 6-inch Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, (7-09.3(15)A & (1)) 122 LF $ $ inch Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, (7-09.3(15)A & (1)) Trench Compaction Test (as directed by the Inspector). (7-09.3(11)) Test Holes (See Special Provisions). (7-09.3(6)) Temporary Concrete Thrust Anchor, installed and removed. (7-09.3(21)) Concrete Thrust Anchor, installed. (7-09.3(21)) 811 LF $ $ 100 EA $ $ 4 EA $ $ 18 EA $ $ WD F - MRP ADDENDUM 1 1 of 4

9 BID PROPOSAL SPECIFICATION NO. WD F - ADDENDUM 1 Bidder ITEM NO. ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 17 Crushed Surfacing Top Course for trench backfill per Section (3) of the 2014 WSDOT Standard Specifications, shoulder restoration, and as directed by the Inspector. (9-03.9(3)) 4,087 TN $ $ 18 Crushed Surfacing Top Course (4-04) 517 TN $ $ 19 Topsoil Type A (8-02) 20 TN $ $ inch Ductile Iron Cross, 4-B, M.J., installed. (7-09, & (1)) 8-inch Ductile Iron Tee, 3-B, M.J., installed. (7-09, & (1)) 8-inch x 6-inch Ductile Iron Tee, 3-B, M.J., installed. (7-09, & (1)) 8-inch x 6-inch Ductile Iron Reducer, 2-B, M.J. with concrete anchor, installed. (9-30.2(1)) 8-inch x 4-inch Ductile Iron Reducer, 2-B, M.J. with concrete anchor, installed. (9-30.2(1)) 8-inch Ductile Iron Ell, M.J., 45, installed. (7-09, & (1)) 6-inch Ductile Iron Ell, M.J., 45, installed. (7-09, & (1)) 6-inch Ductile Iron Ell, M.J., 11 1/4, installed. (7-09, & (1)) 4-inch Ductile Iron Ell, M.J., 45, installed. (7-09, & (1)) 4-inch Ductile Iron Cap, M.J., tapped 2, installed (7-09, & (1)) 8-inch Ductile Iron Cap, M.J., tapped 2, installed and removed (7-09, & (1)) 6-inch Ductile Iron Solid Sleeve(Long), M.J., installed (9-30.2(1)) 8-inch Ductile Iron Solid Sleeve(Long), M.J., installed (9-30.2(1)) 2 EA $ $ 9 EA $ $ 2 EA $ $ 5 EA $ $ 4 EA $ $ 2 EA $ $ 4 EA $ $ 2 EA $ $ WD F - MRP ADDENDUM 1 2 of 4

10 BID PROPOSAL SPECIFICATION NO. WD F - ADDENDUM 1 Bidder ITEM NO. ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT inch Transition Coupling with 7-inch center ring, epoxy coating, and stainless steel bolts, A.C. to D.I. (7-09 & (7)) 6-inch End Cap Coupling, tapped 2-inch, with 7-inch center ring, epoxy coating, and stainless steel bolts, (A.C.) (7-09 & (7)) 4-inch End Cap Coupling, tapped 2-inch, with 7-inch center ring, epoxy coating, and stainless steel bolts, (A.C.) (7-09 & (7)) 2-inch Blow-Off Assembly, installed (Dwg ) (7-09.3(22) Temporary 2-inch Blow-Off Assembly, installed & removed. (Dwg ) (7-09.3(22) 6-inch Mechanical Joint Restraining Glands, installed. (7-09 & (6)) 8-inch Tapping Gate Valve, M.J., ANSI/AWWA, C509/C515, with C.I. Valve Box. Installed (7-12 & ) 8-inch Tapping Sleeve, installed (7-12 & (8)) 8-inch Gate Valve, M.J., ANSI/AWWA, C509/515, with C.I. Valve Box. installed (7-12 & ) 6-inch Gate Valve, M.J., ANSI/AWWA, C509/515, with C.I. Valve Box. installed (7-12 & ) 6-inch Hydrant, M.J., 5-ft bury, with 4-inch Tacoma Standard Threads & 4-inch Quick Coupling (7-14 & (2)) 6-inch Hydrant, M.J., 4½-ft bury, with 4- inch Tacoma Standard Threads & 4-inch Quick Coupling (7-14 & (2)) Storm, Sanitary, Side Sewer Restoration (7-04, 7-17, & 7-18) Replacement of Cement Concrete Curb & Gutter (8-04) 4 EA $ $ 4 EA $ $ 36 EA $ $ 15 EA $ $ 10 EA $ $ 2 EA $ $ 7 EA $ $ 12 EA $ $ 20 LF $ $ 47 Cement Concrete sidewalk (8-14) 12 SY $ $ 48 Cement Conc. Driveway Restoration (8-06) 14 SY $ $ WD F - MRP ADDENDUM 1 3 of 4

11 BID PROPOSAL SPECIFICATION NO. WD F - ADDENDUM 1 Bidder ITEM NO. ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL AMOUNT 49 Traffic Lane Markings (8-22) 50 Street cleaning with powered sweeper/vacuum equipment. (5-04.3(5)A & ) 41 HR $ $ 51 Inlet Protection (8-01) 23 EA $ $ NPDES Construction Stormwater General Permit (8-01) Storm Water Pollution Prevention Plan (SWPPP) (8-01) Erosion and Sediment Control (ESC) Specialist (8-01) Asbestos cement Pipe removal and disposal plan (7-09.3) Removal and disposal of abandoned AC pipe all sizes (7-09.3) Fill abandoned water main with Controlled Density Fill (CDF), (7-09.3(1)A) 30 LF $ $ 1 CY $ $ 58 SPCC Plan ( (1)) 59 Force Account - Erosion/Water Pollution Control ( & 8-01) 1 EST $ 5, $ 5, Force Account (1-09.6) 1 EST $ 30, $ 30, BASE BID $ 9.4% Sales Tax $ TOTAL OF BID $ WSDOT Standard specifications, 2014, M41-10 referenced as guide in parenthesis ( ). WD F - MRP ADDENDUM 1 4 of 4

SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT

SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT CALL FOR BIDS KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 1589 SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT BID OPENING: DATE: FEBRUARY 27, 2018 TIME: 11:00 AM Sealed

More information

General Water Bid Items Item No.

General Water Bid Items Item No. BID PROPOSAL PROPOSAL OF, a corporation organized and existing under the laws of the State of, a partnership consisting of, an individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion

City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion City of Tacoma Tacoma Public Utilities Tacoma Power REQUEST FOR BIDS PG14-0667F Alder Lake Park Sewage Treatment Expansion Submittal Deadline: 11:00 a.m., Pacific Time, Tuesday, April 14, 2015 Submittal

More information

CITY OF TACOMA Department of Public Utilities Tacoma Power

CITY OF TACOMA Department of Public Utilities Tacoma Power CITY OF TACOMA Department of Public Utilities Tacoma Power ADDENDUM NO. 1 DATE: August 4, 2017 REVISIONS TO: Request for Bids Specification No. PG17-0130F TPU Eductor Waste Decant Facility NOTICE TO ALL

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2

BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2 BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2 The original Contract Documents entitled BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT are amended

More information

4TH STREET SEWER EXTENSION TO MBR PLANT BID SOLICITATION NO

4TH STREET SEWER EXTENSION TO MBR PLANT BID SOLICITATION NO ADDENDUM NO. 2 March 12, 2019 Engineer: Owner: Parametrix The Tulalip Tribes 1019 39th Avenue SE 8802 27th Avenue NE Suite 100 Tulalip, WA 98271-9694 Puyallup, Washington 98374 4TH STREET SEWER EXTENSION

More information

November 29, CITY OF PLANT CITY Purchasing Division (813)

November 29, CITY OF PLANT CITY Purchasing Division (813) November 29, 2018 CITY OF PLANT CITY Purchasing Division (813) 659-4270 IFB 18-014UM-LG 12-inch Water Transmission Main-Franklin St., Hancock St. and Terrace Drive West ADDENDUM No. 3 *Bidders are required

More information

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018 Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA-2019-004 TMWA Capital Project No.: 10-0001.053 October 3, 2018 The following information, clarifications, changes and modifications are by reference

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 3690 NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Commissioners Kitsap County 614 Division Street Port

More information

CITY OF TACOMA Department of Public Utilities Tacoma Power

CITY OF TACOMA Department of Public Utilities Tacoma Power CITY OF TACOMA Department of Public Utilities Tacoma Power ADDENDUM NO. 2 DATE: August 11, 2017 REVISIONS TO: Request for Bids Specification No. PG17-0130F TPU Eductor Waste Decant Facility NOTICE TO ALL

More information

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS General Description: Date Prepared: November 1, 2017 (253) 604-6600 KHouse@Parametrix.com Bid Number: J2017-30 ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO

More information

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018 155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated

More information

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6 SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO. 18-4501 SOLICITATION NO. CO-00198 ADDENDUM 6 (September 10, 2018) To Respondent of Record: This addendum, applicable to work referenced

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

SPECIAL SPECIFICATION 2022 Water Mains and Wastwater Main Appurtenances

SPECIAL SPECIFICATION 2022 Water Mains and Wastwater Main Appurtenances 2004 Specifications CSJ 1316-01-034 & 0902-48-502 SPECIAL SPECIFICATION 2022 Water Mains and Wastwater Main Appurtenances 1. Description. Furnish all materials, equipment, labor and incidentals necessary

More information

BID FORM (LUMP SUM CONTRACT)

BID FORM (LUMP SUM CONTRACT) BID FORM (LUMP SUM CONTRACT) Place County of El Paso Purchasing Department Date Project No. 11-016 Proposal of (hereinafter called Bidder), a corporation organized under the laws of the State of /a partnership/an

More information

Whatcom County Bid ADDENDUM NO. 2 West Badger Road / Bertrand Creek Bridge #50 Replacement CRP Federal Aid BRS-2037(107)

Whatcom County Bid ADDENDUM NO. 2 West Badger Road / Bertrand Creek Bridge #50 Replacement CRP Federal Aid BRS-2037(107) WHATCOM COUNTY ADMINISTRATIVE SERVICES DEPARTMENT FINANCE/ACCOUNTING Whatcom County Courthouse 311 Grand Avenue, Suite #503 Bellingham WA 98225-4082 Brad Bennett, Finance Manager March 19, 2019 Whatcom

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, May 03, 2013 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 26 CONFIRMATION

More information

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF ADDENDUM #1 AUGUST 25, 2016 INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project

More information

INVITATION TO BIDDERS. Solicitation No. CO-00157

INVITATION TO BIDDERS. Solicitation No. CO-00157 INVITATION TO BIDDERS Solicitation No. CO-00157 Sealed bids are requested by the San Antonio Water System for the construction of approximately 5,900 LF of 6 to 8-inch of water main and approximately 3,000LF

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, July 25, 2014 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering CONFIRMATION OF RECEIPT OF ADDENDUM PROJECT:

More information

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information

Replace BID SCHEDULE with attached revised BID SCHEDULE.

Replace BID SCHEDULE with attached revised BID SCHEDULE. CONTRACT ADDENDUM Project: 9 st Ave SE & 4 th Street SE Sidewalk Improvements Project No: 00 Addendum No: Date: 0 September 0 Addendum: Replace BID SCHEDULE with attached revised BID SCHEDULE. Section

More information

Addendum No: 3 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO.3. Closing Time: 2:00 P.M., December 18, 2018 Opening Time: 2:01 P.M., December 18, 2018

Addendum No: 3 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO.3. Closing Time: 2:00 P.M., December 18, 2018 Opening Time: 2:01 P.M., December 18, 2018 CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-8405 Fax: 254 / 750-8063 www.waco-texas.com Date: 12/18/2018 RFB No: 2018-078 Commodity: South 26 th Street Improvements

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

SECTION FIRE HYDRANTS

SECTION FIRE HYDRANTS SECTION 21 11 10 PART 1. GENERAL 1.1 SUMMARY: A. Work consists of furnishing and installing new fire hydrants, (boot with ductile iron retainer gland, standpipe and hydrant complete) plus constructing

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 - PART 1 GENERAL 1.01 THE REQUIREMENT A. Payment for various items of the Bid Schedule, as further specified herein, shall include all compensation to be received by the CONTRACTOR for furnishing

More information

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction

More information

WATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS

WATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS WATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS City Utilities of Springfield, Missouri REVISED: 06/18/2018 **DISCLAIMER** IT IS THE RESPONSIBILITY OF THE END USER OF THIS WATER STANDARDS BOOK TO MAKE

More information

Job Order Sewer Repair Services

Job Order Sewer Repair Services Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified

More information

EXHIBIT E SCHEDULE OF UNIT PRICES

EXHIBIT E SCHEDULE OF UNIT PRICES SCHEDULE OF UNIT PRICES TO ACCOMPANY THE BID OF (Bidder/Contractor) ON CALL UTILITY SERVICES AND MISCELLANEOUS CONSTRUCTION FOR SEWER AND WATER LINES SOLICITATION NO.: IFB SA1703 Any bidder who enters

More information

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR 99.0 PUBLIC AND PRIVATE IMPROVEMENTS CODE 99.0 PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR TABLE OF CONTENTS 99.1. ADMINISTRATION AND GENERAL REGULATIONS...2 99.1.1. Title...2

More information

OCONEE COUNTY PROCUREMENT OFFICE 415 S. PINE STREET, ROOM 100 WALHALLA, SC Robyn M. Courtright, CPPO, Procurement Director

OCONEE COUNTY PROCUREMENT OFFICE 415 S. PINE STREET, ROOM 100 WALHALLA, SC Robyn M. Courtright, CPPO, Procurement Director OCONEE COUNTY PROCUREMENT OFFICE 415 S. PINE STREET, ROOM 100 WALHALLA, SC 29691 Robyn M. Courtright, CPPO, Procurement Director Tronda Spearman, CPPB, Assistant Procurement Director Telephone: 864-638-4141

More information

SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT

SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 1589 SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT ADDENDUM #3 Date of Addendum February 23, 2018 1. The Contract Provisions

More information

Sample. Bid Proposal. Not Valid for Use

Sample. Bid Proposal. Not Valid for Use BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions Invitations to Bidders, the undersigned proposes

More information

CITY OF TACOMA Department of Neighborhood and Community Services

CITY OF TACOMA Department of Neighborhood and Community Services CITY OF TACOMA Department of Neighborhood and Community Services ADDENDUM NO. 3 DATE: January 31, 2017 REVISIONS TO: Request for Bids Specification No. NC16-0353F On-Call Building Demolition NOTICE TO

More information

SECTION 1500 REMOVALS

SECTION 1500 REMOVALS SECTION 1500 REMOVALS REMOVALS PART 1 GENERAL 1.01 Section Summary A. Removal of structures, obstructions, surfacing, and miscellaneous items. 1.02 Related Sections A. Section 1800 Excavation and Embankment

More information

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances 2004 Specifications CSJ 2250-01-021, etc SPECIAL SPECIFICATION 5243 Water and Sewer System and Appurtenances 1. Description. This Item governs for the furnishing of all equipment, labor and materials to

More information

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged. 1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax 6 March 2018 Arizona California Colorado Kansas Louisiana Missouri Nebraska New Mexico Texas Utah ADDENDUM NO. 2 RE: City of Kingman,

More information

TO THE SAN ANTONIO WATER SYSTEM:

TO THE SAN ANTONIO WATER SYSTEM: BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Each Respondent shall acknowledge receipt of this Addendum No. 1 by noting such and signing the Bid Proposal.

Each Respondent shall acknowledge receipt of this Addendum No. 1 by noting such and signing the Bid Proposal. ACKNOWLEDGEMENT BY RESPONDENT Each Respondent shall acknowledge receipt of this Addendum No. 1 by noting such and signing the Bid Proposal. This undersigned acknowledges receipt of this Addendum No. 1

More information

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater

More information

INVITATION TO BID. August 3, Dear Vendor,

INVITATION TO BID. August 3, Dear Vendor, INVITATION TO BID August 3, 2016 Dear Vendor, Enclosed you will find a bid package for a Route 13 Water Main Project Materials for the City of Seaford. All pertinent information is contained within. The

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2017

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2017 SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2017 STANDARD SPECIFICATIONS 102.12 Best Value Contracting Partial payments shall be withheld if contractor is working on site and has not satisfied

More information

For Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of

For Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned

More information

Addendum No. 1 Issue Date: March 29, 2016

Addendum No. 1 Issue Date: March 29, 2016 Addendum No. 1 Issue Date: Project: Bonson and Short Street Reconstruction Contract: #1-16 Owner: City of Platteville, Wisconsin Engineer: Delta 3 Engineering, Inc. Daniel J. Dreessens, P.E. 875 South

More information

1. Will have water lines designed by a North Carolina Registered Professional Engineer.

1. Will have water lines designed by a North Carolina Registered Professional Engineer. 03/07/16 DEVELOPER/OWNER RESPONSIBILITES 1. Will have water lines designed by a North Carolina Registered Professional Engineer. 2. Will have the water line installed by a North Carolina Licensed Utility

More information

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014 Sunnyside Valley Irrigation District Addendum No. 1 Enclosed Lateral Improvements Projects 2010-2011 Issued: 8/30/2010 Contract 10-003: Regions 011, 013 & 014 Page 1 of 7 Sunnyside Valley Irrigation District

More information

County of Georgetown, South Carolina

County of Georgetown, South Carolina County of Georgetown, South Carolina 129 Screven Street, Suite 239 Georgetown, SC 29440-3641 Post Office Box 421270, Georgetown, SC 29442-4200 (843)545-3082 Fax (843)545-3500 purch@gtcounty.org ADDENDUM

More information

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications Addendum No. 2 Project No. 2016-01EL West Barbour Street 12kV Underground Reconductoring Revisions to Drawings and Specifications Pre-Bid Meeting Notes and Scope of Work Clarifications Replace Section

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 28, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1 APRIL 24, 2017 DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS

More information

ROUTE 3 OLD WINTHROP ROAD PROJECT LOCATION I-95 PROJECT LOCATION WESTERN AVENUE NORTH BELFAST AVE.

ROUTE 3 OLD WINTHROP ROAD PROJECT LOCATION I-95 PROJECT LOCATION WESTERN AVENUE NORTH BELFAST AVE. PROJECT LOCATION PROJECT LOCATION NORTH BELFAST AVE. ROUTE 3 WESTERN AVENUE I-95 OLD WINTHROP ROAD INSTALL NEW 3" x 1" CC DOUBLE STRAP SERVICE SADDLE, 1" CC x 1 1/4" COMPRESSION CORPORATION AND 1 1/4"

More information

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION

More information

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS (Easement 6 & 11, 4200 block of Versailles Avenue and Belclaire Avenue and the 4300 block of Westway

More information

Forsyth County Procurement

Forsyth County Procurement August 1, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 Bid 17-72-3340 For: Providing all materials, equipment and labor for the Jot em Down Road Water Tank

More information

YAKIMA COUNTY, WASHINGTON. Special Provisions For Water Main Construction

YAKIMA COUNTY, WASHINGTON. Special Provisions For Water Main Construction YAKIMA COUNTY, WASHINGTON Special Provisions For Water Main Construction The 2014 Standard Specifications for Road, Bridge, and Municipal Construction as prepared by the Washington State Department of

More information

CURRENT NORTH LAS VEGAS ADDENDA

CURRENT NORTH LAS VEGAS ADDENDA SECTION 1 Section 1.01.73 Fire Service Meter ADD: Type I is not approved for installation in the City of North Las Vegas service area. Section 1.01.107 Pressure Reducing Valve (PRV) or Pressure Regulator

More information

CARGO HARDSTAND IMPROVEMENTS. at Seattle-Tacoma International Airport BID PACKAGE. Addendum No. 3

CARGO HARDSTAND IMPROVEMENTS. at Seattle-Tacoma International Airport BID PACKAGE. Addendum No. 3 CARGO HARDSTAND IMPROVEMENTS at Seattle-Tacoma International Airport BID PACKAGE Addendum No. 3 MC-0317700 Primary Work Project #: 104648 Cargo 2 Hardstand Expansion (103801) Cargo 5 Hardstand Construction

More information

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR Miscellaneous Concrete Repairs 2014 3600-3900 Blocks of Potomac Avenue and Town Hall, 2014 To: The Honorable Mayor and Town Council Town of Highland Park

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

CITY OF TACOMA Tacoma Power & Public Works Engineering

CITY OF TACOMA Tacoma Power & Public Works Engineering CITY OF TACOMA Tacoma Power & Public Works Engineering ADDENDUM NO. 1 DATE: August 22, 2017 REVISIONS TO: Request for Bids Specification No. PE17-0235F Citywide LED Streetlight Installation NOTICE TO ALL

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California 93030 Tel 805.385.8280 October 24, 2018 ADDENDUM NO. 2 Vineyard Avenue Street Resurfacing Project PW 16-12 SCHEDULED

More information

TO THE SAN ANTONIO WATER SYSTEM:

TO THE SAN ANTONIO WATER SYSTEM: BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1 DATE: May 18, 2016 TO: FROM: All Bidders/Proposers Willie Velez, CPPB Procurement Administrator City of Casselberry Purchasing Division SUBJECT: ITB-2016-0023, Oxford Road Complete Street Improvements

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.

More information

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009

More information

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS*** 00005B *** *** BOLD ITALICIZED Item is bound within this specification manual. Regular non-italicized Item is not bound within this specification manual, however item is part of the contract. Contents

More information

Masterson 24-Inch Water Main Extension Solicitation Number: CO Job No.: ADDENDUM 2 July 3, 2018

Masterson 24-Inch Water Main Extension Solicitation Number: CO Job No.: ADDENDUM 2 July 3, 2018 Masterson 24-Inch Water Main Extension Solicitation Number: CO-00177 Job No.: 18-1018 ADDENDUM 2 July 3, 2018 To Bidder of Record: This addendum, applicable to work referenced above, is an amendment to

More information

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds

More information

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. THIS ADDENDUM IS ISSUED

More information

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 Date: April 22, 2009 To: Prospective Bidders/Plan Holders From: Abraham Campos, PE on behalf of City of El

More information

Date of Advertisement: December 30, 2009 in the Herald Newspapers

Date of Advertisement: December 30, 2009 in the Herald Newspapers Date of Advertisement: December 30, 2009 in the Herald Newspapers ADVERTISEMENT FOR BIDS BOARD OF CHOSEN FREEHOLDERS CAPE MAY COUNTY NEW JERSEY Notice is hereby given that sealed proposals addressed to

More information

ADDENDUM NUMBER ONE (1) December 6, The following Addendum shall be incorporated into the Contract Documents for the above referenced project.

ADDENDUM NUMBER ONE (1) December 6, The following Addendum shall be incorporated into the Contract Documents for the above referenced project. TO: ALL HOLDERS OF CONTRACT DOCUMENTS FOR: City of Carlsbad, New Mexico Sanitary Sewer Interceptor 118 Upgrades Phase I Wade M. Chacon P.E. HDR Project Manager/Engineer Bid # 2016-32 ADDENDUM NUMBER ONE

More information

ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013

ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013 ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013 BIDDING AND CONTRACT DOCUMENTS FOR THE HORRY COUNTY SOLID WASTE AUTHORITY YARD WASTE MANAGEMENT AND COMPOSTING FACILITY HORRY COUNTY, SOUTH CAROLINA ****************************************************************************************************

More information

ADDENDUM NO. ONE REHABILITATION OF TAXIWAY G AND RECONSTRUCTION OF TAXIWAY D FOR THE TRENTON-MERCER AIRPORT AB

ADDENDUM NO. ONE REHABILITATION OF TAXIWAY G AND RECONSTRUCTION OF TAXIWAY D FOR THE TRENTON-MERCER AIRPORT AB ADDENDUM NO. ONE Notice is hereby given that on June 22, 2017 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Agent in the Mercer County McDade Administration

More information

ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM

ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM WELLS COUNTY HIGHWAY DEPARTMENT 1600 W. WASHINGTON STREET BLUFFTON, INDIANA 46714 PHONE 260/824-6430 FAX 260/824-6431 WELLS COUNTY HIGHWAY DEPARTMENT & BOARD OF COMMISSIONERS Date: January 8, 2019 To:

More information

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1 UPPER SKAGIT INDIAN TRIBE COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO. 1 (7 pages total) Issue Date: May 11, 2016 General: Recitations of each and every section of the bid documents impacted

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information

ADDENDUM NO. 1 NOVEMBER 8, 2016

ADDENDUM NO. 1 NOVEMBER 8, 2016 SAN ANTONIO WATER SYSTEM C_13 BROADWAY CORRIDOR PROJECT SEWER REHABILIATION PACKAGE 2.C AND 4.C SAWS JOB NO. 15-45111 (2.C) & 15-4514 (4.C) SOLICITATION NO. CO-00097 ADDENDUM NO. 1 NOVEMBER 8, 2016 TO

More information

REQUEST FOR SEALED BIDS No

REQUEST FOR SEALED BIDS No REQUEST FOR SEALED BIDS No. 2018-013 Project: Granger Site Development Phase 2 Issued: December 19, 2018 CONTENTS Section 1. Bid Announcement and General Information Section 2. Bid Specifications and Bid

More information

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 23, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 Project: Coteau Street & Utility Improvements Bid Date: 1:00 P.M., Local Time, March 20, 2017 Bid Location: Office of the City Administrator/Clerk, City of Lake Benton 106 S. Center Street

More information

10:00 AM, Wednesday, May 6, Peters Creek Sanitary Sewer Rehabilitation Project

10:00 AM, Wednesday, May 6, Peters Creek Sanitary Sewer Rehabilitation Project NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, May 6, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

Addendum No. 1 STMGID ARROWCREEK BPS MAIN. PWP Bid No.: WA TMWA Capital Project No.: April 16, 2018 QUESTIONS AND RESPONSES

Addendum No. 1 STMGID ARROWCREEK BPS MAIN. PWP Bid No.: WA TMWA Capital Project No.: April 16, 2018 QUESTIONS AND RESPONSES Addendum No. 1 STMGID ARROWCREEK BPS MAIN PWP Bid No.: WA-2018-157 TMWA Capital Project No.: 50-0001.08 April 16, 2018 The following information, clarifications, changes and modifications are by reference

More information

CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION

CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION ADDENDUM #4 DATE: 02/08/2016 PROJECT: CONTRACT No: 40604 BID DATE, TIME: 02/11/2016, 2:00PM NOTICE TO ALL CONTRACTORS

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 012000 Applies only to Collier County Public Utilities Projects or Works and Utilities Portions of Collier County Transportation Projects, but not to Private Developments PART 1 GENERAL 1.1 SECTION

More information

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860)

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860) City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT 06457 TEL: (860) 638-3500 FAX: (860) 343-8091 GENERAL REQUIREMENTS WATER MAIN AND SERVICE INSTALLATION JANUARY 2017 WATER MAINS:

More information

INVITATION TO BID FOR PUBLIC WORKS MATERIALS

INVITATION TO BID FOR PUBLIC WORKS MATERIALS 1 February 4, 2019 INVITATION TO BID FOR PUBLIC WORKS MATERIALS CITY OF BAKER CITY BID NO.: 2019-01 BID CLOSING DATE AND TIME: February 28, 2019 2:00 P.M. PST DESCRIPTION: Ductile Iron Pipe & Fittings

More information

CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No ADDENDUM 2

CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No ADDENDUM 2 CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No. 11078 ADDENDUM 2 Date Issued: December 2, 2015 **** Receipt of addenda must be acknowledged

More information