1 PRE FEASIBILITY REPORT

2 TABLE OF CONTENTS Sr. No. Content Page No. 1.0 Executive Summary Introduction of Project / Background Information Project Description Site Analysis Planning Brief Proposed Infrastructure Rehabilitation & Resettlement Plan Project Schedule Analysis of Proposal 22 2

3 1. EXECUTIVE SUMMARY Particulars Project name Location Details River Bed Mining project of minor mineral (Sand, Bajri and Stone) Near Village Nayagaon, Tehsil Nalagarh Distt Solan, Himachal Pradesh. Latitude N to N Longitude E to E Toposheet No. 53 A/12 Total Mine Lease area Present Status Capacity Estimated project cost EMP Cost Power Requirement Fuel Requirement DG Set hect. Mining will commence after getting EC. Proposed production TPA (ROM) Rs. 53 Lacs 5.0 Lac / annum NA 150 lits. /day NA Highest and Lowest Elevation S. No. Particulars Elevation (mrl) 1. Highest Lowest 384 Land use Nearest habitation/ town Nearest Airport Nearest Highway Nearest Railway Station Power supply Nearest Telephone Nearest Dispensary and Govt. Hospital Educational facility Water demand and supply Nearest tourist places Defense installations Archeological Features Ecological sensitive zones Nearest streams/ rivers/ water bodies (from mine boundary) Seismic zone The lease area is Govt. waste land Nalagarh, 16 km Chandigarh. 55 km N.H.-22, 38 km, Chandigarh- Panchkula- Shimla Kalka (42 Km), Nalagarh, 16 km Nalagarh, 16 km Nalagarh, 16 km Nalagarh, 16 km 12 KLD, Source- water will available from Tube well in the area. None within the study area None within the study area None within the study area None within the study area Kundlu river Seismic zone II. 3

4 2.0 INTRODUCTION OF PROJECT / BACKGROUND INFORMATION 2.1 Identification of the Project and Project Proponent: Mining project for mineral Sand, Bajri and Stone. M.L. area Ha. The project is located near village - Nayagaon, Tehsil Nalagarh and District Solan, Himachal Pradesh. Lease area hect. Proposed production TPA (ROM). Project Proponent: Name of the Lessee Address Phone Status of the lessee Shri Bidhi Chand Village Raipur Jakoli, P.O. Lodhi Majra, Tehsil Nalagarh, Dist. Solan Himachal Pradesh Individual 2.2 Copy of Mining Lease / Letter Of Intent The letter of Intent was issued in favour of Shri Bidhi Chand s/o Shri Taru Ram for the transfer of Mining lease and for renewal for five years. The copy of letter no. Udyog-Bhu(Khani-4)Laghu-350/86/301 dt from Director of Industries, Himachal Pradesh Government is enclosed as Annexure no.1. The mining lease Deed was executed for Sand, Bajri and Stone by Himachal Pradesh Government vide registration No. 741/2010 dated , for an area of hectares from to in favour of Shri Sunil Garg.( Annexure No.2). The Sale Deed agreement dt for sale of Land and Machinery of M/S Nalagarh Stone Crusher at Village Nayagaon, Tehsil Nalagarh, Dist. Solan H.P. in Favour of Shri Bidhi Chand is enclosed. (Annexure no.3) A Court case was filed by The Member Secretary, State Pollution Control Board for illegal mining activities, letter no Dt (Annexure no.4) 4

5 Copy of Lease map and Khasra Details is enclosed. (Annexure no.5). 2.3 Nature of the Project: Mining of Sand, Bajri and Stone will be done by open cast method of mining. Proposed production of mineral is TPA (ROM). 2.4 Need For The Project And Its Importance To The Country: The Mining project falls in the area of the district Solan, Himachal Pradesh devoid of sufficient agriculture activities and other industrial growth. The earning sources of the region are limited. Most of the people are dependent on agriculture. The region has scarcity of Mineral wealth of the state Himachal Pradesh provides the employment opportunity to the people of the state as well as region also. Mining is one of the major core sector industries which play a crucial role in the process of country economic development. 2.5 Demands-Supply Gap: The greater part of the Sand Bajri for consumption is reduced to fine mesh before use in the industry, and sold to industry in powder form of 50 to 100 mesh size, though major quantity is of 50 mesh. The mineral is being sold in India for indigenous consumption. Sand and Bajri is used in construction industry in varying particle sizes for mixing with Cement and Lime for building construction purpose. 2.6 Imports vs. Indigenous Production There will be no import for the project. There will be indigenous inputs in the entire mining activity. 2.7 Export Possibility The mining activity is not prospecting exports. 5

6 2.8 Domestic/Export Markets Lessee would like to sale out the mineral in domestic market as per requirement. No export is proposed. 2.9 Employment Generation (Direct or Indirect) The mining project will generate direct & indirect employment. About people will get direct employment and 25 people will also be affected indirectly and employed with allied and related industries, such as transportation, maintenance, etc. 3.0 PROJECT DESCRIPTION 3.1 Type of Project including interlinked and interdependent projects: Mining project for mineral Sand, Bajri and Stone. M.L. area Ha. The project is located near village - Nayagaon, Tehsil Nalagarh and District Solan, Himachal Pradesh Lease area hect. Proposed production TPA (ROM). No Interlinked or Interdependent project. 3.2 Location State : Himachal Pradesh District : Solan Tehsil : Nalagarh Village : Nayagaon The entire project area is hectares. The lease area is Govt. waste land. TOPOSHEET NO. WITH LATITUDE AND LONGITUDE The lease area forms a part of Survey of India topo-sheet no. 53 A/12. The lease is located at following latitude and longitudes: Latitude: N to N

7 Longitude: E to E The highest elevation of the lease area is 453 mrl and lowest being 384 mrl. 3.3 Details of Alternate Site Considered and the Basis of Selecting the Proposed Site, Particularly the Environmental Considerations Gone Into Should Be Highlighted: Mining is site specific project and limited to mineralized area. 3.4 Size/Magnitude of Operation: It is proposed to produce Sand, Bajri and Stone at TPA in the plot area of hectares by open cast method of mining. 3.5 Project Description with process details & Flow diagram Mining project for mineral Sand, Bajri and Stone. M.L. area Ha. The project is located near village - Nayagaon, Tehsil Nalagarh and District Solan, Himachal Pradesh Lease area hect. Proposed production TPA (ROM). Year Wise Production: Year Mineral production (tones) Waste from mineralized zone (tones) 1 st Year nd Year rd Year th Year th Year Total

8 GENERAL DESCRIPTION The aim and object to carry out mining operations within the said lot as well as in other mining lots in the vicinity thereof happens to be imperative and unavoidable. According to experience and rough estimation of the state Government whatever quantity of the same is automatically replenished every year by the River Kundlu, the tributary of Satluj itself on account of its flow and velocity. It is also submitted that if mining of minor minerals is not at all affected in the said lot then the river bed is likely to be raised in height with galloping speed leading to diluvium of riverbanks and may lead to disturbance of environmental and ecological balance as well; whereby large areas of human habitation shall become dangerously prone to inundation from river waters. Besides the above, the process of mining of minor minerals (Sand, Bajri & Stone; in mixed state) is a constant source of revenue generation to the state Government. It also ensures constant supply of building material to the society as well as creates several opportunities of employment to the traditional mining tribes of the state which are purely dependent upon the process of mining because they are not skilled in any other trade and vocation. ABOUT PROJECT PROPONENT Sh. Bidhi Chand, resident of Village- Raipur Jakoli, P.O. Lodhi Majra, Tehsil- Nalagarh, District- Solan, has been is granted a mining lease for extraction of Sand, Bajri and Stones over an area of hect ( bighas). The applicant is engaged in minor minerals mining profession since last 8-10 years. The Applicant is experienced person in mining profession with a sound financial background. The applicant has also setup a stone crusher near village Nayagaon to process the stones. The applicant have an unblemished track-record of doing mining operations absolutely in accordance with the terms and conditions of lease deed in safe, scientific and environment friendly manner. STATUS OF THE PROJECT The mining lease for extraction of Sand, Bajri and stone was granted for an area of Hect.( bighas). The area is situated in Mauza/village Baniala, 8

9 Baglehar, Kharooni and Taperin in Tehsil Nalagarh, District- Solan, State Himachal Pradesh. S.no. SURVEY NUMBER MAUZA/VILLAGE 1 130min.(65.0 Bighas), 130min.(75-17 Bighas) Mauza Baniala 2 535(122-05Bighas),580( Bighas), Mauza Baglehar 772/636( Bighas) 3 85min.(142-09Bighas),85min.( Bighas) Mauza Taperin 4 41/4(11-17 Bighas)42/4(39-09 Bighas), 35min.(14-12Bighas),35min.(40-10 Bighas) Mauza Kharooni The area is granted/renewed vide order no. Udhyog-Bhu (Khani-4) Laghu- 350/86/5897 Dt for a period of 5 years for mining of minor mineral, to be used for manufacture of Grit. The lease was registered and executed on (Refer to Annexure No.1). The sand, bajri & stone extracted from this quarry is used for manufacture of grit in stone crusher. The Sand and Bajri are directly sold to prospective buyers. LEGAL STATUS OF THE PROJECT Himachal Pradesh Minor Minerals (Concession) Revised Rules 1971 provides method for allotments of Minor Minerals Concessions as follows: The mining lease for excavation of minor mineral ( Sand, Bajri and Stones ) will be granted to the persons or parties, who will set up a industrial crusher in the state for processing of stones to grit, and this shall be committed by lease holder and will be a primary condition for grant of the lease. In accordance of the above the lessee applied for mining lease as well as proposal for set up of stone crusher to the state Govt. LOCATION AND ACCESSIBILITY The mining lease area under reference is situated in Mauza/village Baniala, Baglehar, Kharooni and Taperin Tehsil- Nalagarh, District- Solan of Himachal Pradesh. The area is approachable by Tar road to Panjaira village in NNE 9

10 direction to above villages. The Panjiara village lies at a distance of 12 Km from Nalagarh Town in north direction. The area lies at a distance of 16 km from Nalagarh town. The river beds are approached by the approach road from Baniala, Baglehar, Kharooni and Taperin village at a distance of km. Nalagarh can be approached from Solan(district HQ) at a distance of 85 km. The Nearest Railway station is at Kalka at a Distance 42 Km on Kalka- Delhi Broad gauge Railway Line. The Nearest National highway (No.22) is Shimla- Chandigarh at a distance of 38 kms. The Nearest Airport is Chandigarh Airport At a Distance of 55 kms. PROPOSED METHOD OF WORKING The minerals will be mined out in a uniform way so that the river flow/course shall not get disturbed in its uniformity. Extraction of minerals/ working shall be started from the centre towards the bank periphery in ½ m slice so that the river course could not get affected. Unused material including silt and clay or spillage if any should not be stacked on the banks as it will hinder the flow of the river in monsoon season. It will be stacked at a distance away from the river banks. Suitable mitigation measures have been adopted so that the condition of water logging will not arise. The vehicle for transport of Bajri from mine to the destination is provided by the contractor. The workmen to load also are employed from a contractor. Sometimes extra loads which are not booked by the buyers are unloaded at the Stack yard made for temporary storage of Bajri for a day or two. It is proposed that a JCB model 3D loader cum excavator, tyre mounted shall be used for loading in the Stack yard only. The loading will take place in a Truck or Dumper of 10 ton capacity or a Tractor Trolley of 4 ton capacity. This will ensure supply to the consumer or buyer directly from the mine. 10

11 DESIGN PARAMETERS Besides manual loading of dry Bajri in the river bed, the wet river bed containing Bajri with the water body can be mined by using a high discharge pump which is mounted on a boat. The brief description of this mining method is given below. The main equipment is a Diesel operated engine of TATA make coupled with a heavy duty Suction pump. This engine from the TATA vehicle is of 120 H.P. The pump has a suction pipe of about 6 m length; diameter of plastic pipe varies from 6 to 10. The entire pump, pipes and manpower are mounted on a boat afloat on the river. It moves in all directions with the boat but a swivel arrangement is provided on the suction side of the pump, which swings up to 70 0 to facilitate collection of Bajri and pebbles up to 5 cm dia. from the river bed along with water being sucked by the pump, from the places up to the swing of the suction pipe. The delivery side of the pump is usually 6 dia. Pipe of Plastic, with length varying from 60 m to 75 m to reach the shore of the river where the stackyard for Bajri storage is made. Two persons are deployed to sieve the Bajri and large size pebbles. Gravel particles are kept separately. On the shore, at the stack yard, water is separated from the silt received from the river bed. Filtration with Sieves is made to collect different sizes of Bajri from 0.5 cm to 1 cm size. Rest of the Gravel particles is kept separately. Sand collected through the sieve is loaded on to a waiting Truck of 10 Tonne capacity by manual means by a gang of 4 workmen. One Truck Bajri is loaded within 2 hours, ready to be dispatch to the buyer. This system of mining Bajri is slow but the only possible method for underwater mining. 11

12 3.6 Availability of water its source, energy/power requirement and source : Total water requirement in the mine will be about 12 KLD for drinking, spraying and plantation. Water will available from nearby Tube well. Detail of water requirement in KLD is given below: 1. Dust Suppression Drinking Green belt 5.0 Total 12 Diesel for trucks/equipment about 150 Lt. per day is assumed to be consumed. Diesel will be brought from outside, from nearby diesel pumps. No electricity will be required at mine site. 3.7 Quantity of wastes to be generated (liquid and solid) and scheme for their management /disposal: There are five dump sites in this area. They are situated on either side of working pits, at river Bank, See Plate no.4. At present, waste is being dumped on these dumps. The waste being generated consists of fine silt and sand. 3.8 Resource Optimization/Recycling and Reuse Envisaged In the Project, If any, Should Be Briefly Outlet: Not applicable. 3.9 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final Products, Mode of Transport of Raw Material and Finished Product. The project will itself generate raw material i.e mineral Sand, Bajri and proposed production is tones/annum. 12

13 3.10 Schematic Representations Of The Feasibility Drawing Which Give Information Of EIA Purpose: Layout Plan is enclosed which gives schematic representation of Mineral Exploration, Mining, Ultimate Pit Limit, Disposal of waste and Post Mining land use pattern. 13

14 4.0 SITE ANALYSIS The lease area is for mineral Sand, Bajri and Stone which is suitable for use in Construction industry, it is site specific. The selected site has the following advantages. 1. The area chosen is not having habitation. 2. The site is well connected by road. 3. There are no industries near the site and there is no pollution. 4. No endangered species around the mine site. 5. Availability of labors from nearby villages. 6. Proximity to the market. 4.1 Connectivity: Connectivity details from Project Site: Sr.No. Particulars Details 1. Road Connectivity 2. Nearest Highway 3. Nearest Railway Station The lease area is located at a distance of km from Baniala, Baglehar, Kharooni and Taperin village and Nalagarh is 16 km far from the lease area. N.H.-22 at 38 km, Chandigarh-Panchkula- Shimla Kalka at 42 km 4. Nearest Airport Chandigarh at 55 km Land form, land use and land ownership The lease area is Govt. waste land. Major portion of the area is occupying central & southern portion is partially rocky and partially soil covered. Lease Area : Ha. State : Himachal Pradesh 14

15 District : Solan Tehsil : Nalagarh Village : Nayagaon 4.3 Topography: The northern and north west part is occupied by small NE-SW trending hill with a gentle slope towards south-west with little undulations. Major portion of the area is occupying central & southern portion is partially rocky and partially soil covered. Highest elevated point of the hill is 453 mrl of the lease area and the lowest RL is 384 m. Rest part of lease is plain land. In summer season water table level goes down to 350 m. above mean sea level and in monsoon it rises up to 360 m. MSL. Fair growth of the vegetation is observed in the hill. There is no railway line or canal in this area. There is no forest land in the lease. An agricultural land also exists due south and north of lease area. There is no village in the lease area Existing Land use Pattern The lease area is government waste land. Present Land use pattern within the Lease is given below: Particulars Present( Hect) Pits 0.0 Dumps 0.0 Road & building 0.0 Plantation 0.0 Water storage 0.0 Remaining Govt. waste land Total

16 4.5 Existing Infrastructure A Office and Rest room is constructed in the lease area. Nayagaon village is 3 km. in SW from the Mine, which is the site of Crusher. A tube-well and a well have also been dug by lessee in the lease area for drinking water. Electricity is available for domestic use at the Mine area and for Water pumps in the well. No electricity is used in mining operation. 4.6 Soil / rock classification Soil, Sand, Bajri and Stone are present in the area. The major rock types in the area are Sand, Bajri and Stone Description of the rocks units within the lease area: REGIONAL GEOLOGY Solan District lies within the lesser Himalaya and the Siwalik foothills comprises rocks ranging in age from Proterozoic to quaternary. The oldest rocks of Proterozoic belongs to Jutog group comprising carbonaceous phyllite, Schists, Gniesses, quartzites and marble. In the western side of the Solan District Shimla groups of rocks are exposed. It is divisible into four formations on the basis of certain characterstic litho- logical association and order of super position. Out of four formation, three are exposed in the Solan District. Formation Members Lithology Remarks Sanjauli Upper Conglomerate,arkosic Exposed in Shimla. sandstone, protoquartzites, grey and purple shales Greywacke sandstone, lower greywacke siltstones, shales orthoquartzites Chhaosa Shales and siltstone alteration with siltstone and orthoquartzites Kunihar Shales and siltstone alterations with limestones Basantpur D Thick bedded to platy greyish blue limestone with 16

17 interbedded shales C Massive to bedded limestones- dolomite. B Shales, siltstone with interbeds of lenticular limestones,shales carbonaceous, bands of quartzites and dolomite. A Greyish white quartzites and conglomerate. Partially exposed in Shimla district and partially exposed in Solan Dist. In the eastern side of the Solan District, Shimla sequences are succeeded by a younger sequence of formation as Blaini, Infra Krol and Krol forming two parallel and apparently independent belts. These are respectively referred as outer Krol belt over the Shimla group and the inner krol belt over the Jaunsar group. Local Geology In Solan district the formations exposed are Krol Sandstones. The black Shales and Slaty Quartzite can be seen in transition stage in Krol Sandstones. The krol Sandstone formation are massive formation with pale grey, coarse to medium grained sandstones. The Sirmour group is represented by a thick pile of Paleogene sediment exposed in the foothills, bounded by Main boundary fault Siltstones,Clay, Sandstones and local Pebble bed. The Siwalik group of middle Miocene and early Pleistocene age comprises coarse clastic fluviatile deposits of Sandstones,Clay conglomerates. The Quaternary Sediments (Older Alluvium and Newer Alluvium ) along prominent channels consisting of Sand, Silt, Clay, Pebbles and Cobbles of Middle to Late Pleistocene and Holocene age. The general trends of the rocks suggests it is NW-SE and E-W directions with dips varying from 10º to 40º on either side. The rocks of Kundlu catchments are represented by the Siwalik group, Older Alluvium and Newer Alluvium. 4.7 CLIMATIC DATA FROM SECONDARY SOURCES As usual there are 3 types of seasons, (1) Summer, (2) Rainy and (3) Winter in this region. Summer season during March - June is hot and 17

18 temperature rises up to 35 C. Rainy season is neither hot nor cold. Only due to cold breeze coming from Bay of Bengal and Arabian Sea following the depression of pressure the temperature goes down from 3 0 C to 2 0 C. Winter season (Dec Jan) is very cold with minimum temperature of 2 C. Rains are average at 1368 mm. annually. General wind direction is S- W to N-E., N-E to S-W directions of winds indicates heavy rain fall. Relative humidity varies from 20% - 65%. Average wind velocity is 5 km/h. 4.8 Social Infrastructure The basic infrastructure already exists in the lease area like office, store, and shelter for the workers. A first aid station will also be constructed and maintained. Drinking water will be brought from the nearby water source. Communication services like post office and telephones are available in the nearby village. Some of the villagers are having mobile phones. 5. PLANNING BRIEF 5.1 Planning Concept: It is a mining project of mineral Sand, Bajri and Stone. The proposed production of is TPA. Opencast method of mining will be adopted and transportation of mineral shall be done through road by trucks. 5.2 Man Power requirement: Man power requirement for mining is estimated to be Nos. Most of the employees will be recruited from neighboring village. 5.3 Land use Planning: Land use pattern is given below:- Particulars Present ( Hect) Position at the end of 5 th year ( Hect) Pits

19 Dumps Road & building Plantation Water storage Remaining Govt. waste land Total Facilities Provided: Infrastructure The infrastructure required is office, store, and shelter for workers which already exist at the mine site. For drinking, water will be brought from the tube well in the lease area & this water is potable. Most workers will be from nearby villages so no accommodation at mine site will be required Landscaping and Green Belt Development Year Proposed plantation Area in hect. No. of saplings I II III IV V Total Health and safety System During the opencast working, and allied activities, all the precautionary measures shall be taken into account as per MMR 1961 and MCDR 1988 for safety and security. Following Safety & security measures will be enforced; 19

20 Moving front of the quarry shall have temporary fencing. Permanent fencing will be provided where quarry has reached the ultimate pit limit. Mine entrance will have a permanent check post and record shall be maintained of all persons / vehicles entering the mine area. Round the clock security arrangement shall be provided to prevent inadvertent entry of persons Disaster Management and Risk Assessment The mining activities will involve accident like landslides, fall of material or equipment from benches and failure of dump retaining wall. The applicant will prepare a detailed emergency plan in consultation with DGMS. 6. PROPOSED INFRASTRUCTURE S.NO Details 1 Mining Area hectares. 2 Residential Area Not Applicable 3 Connectivity The lease area is located at a distance of 3 km. in north from Nayagaon Village and 38 km from N.H.no.22 and Solan is 85 km far from the lease area. 4 Green Belt 200 saplings will be planted per year. 5 Water 12 KLD, Source- well in nearby village. Management 6 Power N.A. Management 7 Waste Water Domestic and office effluent will be treated in individual septic tanks. 8 Solid Waste The undersized mineral will be stacked in Management the mine. It will be stacked on the river 20

21 bank outside the mined out area. 9 Hazardous waste Management N.A. 7. REHABILITATION & RESETTLEMENT PLAN Since the project site is Government waste land and there is no reserve forest or protected forest land within the lease area. There is no village or hutments within the lease area. R&R is not applicable to this project. 8. PROJECT SCHEDULE 8.1 Likely date of start of construction and likely date of completion (time schedule for the project to be given) The project activity will be started after getting the Environmental Clearance from MoEF. 8.2 Project Cost Estimation Estimated Project Cost with the proposed production is Rs 53 Lacs. (A) Capital investment A site office, store & First Aid Station = Rs. 1, 00,000/- Machinery & Tools = Rs 35, 00,000/- Financial assurance = Rs. 1, 00,000/- PMCP = Rs. 2,00,000 /- Social fund & activities = Rs. 5, 00,000/- EMP = Rs. 8, 00,000/- Miscellaneous = Rs. 1, 00,000/- Total cost = Rs. 53,00,000/- (B) Operational cost- 21

22 The mineral will be mined from the lease area and the cost of per ton of mining will be app. Rs. 220/- per tonne. 8.3 Economic Viability The anticipated cost of mining is Rs. 220/- per ton. Average sale value is Rs. 600/- ton for Sand, Bajri. Hence the project will be viable. 9. ANALYSIS OF PROPOSAL Project will create direct & indirect employment opportunities within the surrounding region. Unit will use good faith efforts to employ local people from the nearby villages depending upon the availability of skilled & unskilled man-power surrounding the project site. In operation phase, the proposed project would require significant workforce of non-technical and technical persons. Migration of highly education and skilled experience will result in increase of literacy in the surrounding villages. In addition, the proposed expansion of project shall enhance the prospects of employment. Assessment of the potential socioeconomic benefits during mining focused primarily on work force requirements, acquisition of supplies, and the temporary increased demand for services related to the mining project like food, housing, communications, law enforcement, medical care, local transportation etc. Due to these, additional revenue to local suppliers for required products and services related to the construction and operation phases of the project will generate. Thus, mining activities will provide numerous new, although temporary, work opportunities for both skilled and unskilled labor, as well as contribute significantly to the local economy. Additional government revenue expected from royalty, taxes, duties and other fees. 22

23 An added benefit to the proposed project will result in considerable growth of stimulating the industrial and commercial activities in the state. Small and medium scale industries may be further developed as a consequence ********

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MINING PROJECT LOCATED AT TIKKA/ MOHAL SACHUHI, MAUJA JANGAL RAJGIR TEHSIL SUJANPUR, DISTRICT HAMIRPUR IN KHASRA NO 6, 7, 8 AND 9 MEASURING 04-84-35 HACTARES (126 03 KANALS) FOR

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

EXECUTIVE SUMMARY. 1.1 Executive Summary

EXECUTIVE SUMMARY. 1.1 Executive Summary 1.1 Executive Summary EXECUTIVE SUMMARY Chobe ki Guwari Sand Stone Mining Project (M.L. No- 26-R-01/2001) is situated near village Chobe ki Guwari, Tehsil Sapotra, District Karoli, State Rajasthan over

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY Particulars Details Project name Bannour lime stone mines Location Near Village Bannour, Tehsil Paonta sahib,distt Sirmou, H.P. Latitude 30 0 35 20 N to 30 0

More information

Prepared by M/s Udaipur Min-Tech. Pvt.Ltd PRE FEASIBILITY REPORT

Prepared by M/s Udaipur Min-Tech. Pvt.Ltd PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 21 TABLE OF CONTENT Prepared by M/s Udaipur Min-Tech. Pvt.Ltd Sr. No. Content Page No. 1.0 Executive Summary 24 2.0 Introduction of Project and Background 25 Information 3.0 Project

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT TABLE OF CONTENTS Sr. No. Content Page No. 1.0 Executive Summary 23 2.0 Introduction of Project and Background Information 24 3.0 Project Description 26 4.0 Site Analysis 33 5.0

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

PRE-FEASIBILIY REPORT

PRE-FEASIBILIY REPORT BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT

More information

S. No Parameter Details 1 Name & Address of the Applicant

S. No Parameter Details 1 Name & Address of the Applicant 1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

ha and falls under Category- A as per EIA Notification 2006 as amended thereof of the Ministry of Environment and Forests, New Delhi.

ha and falls under Category- A as per EIA Notification 2006 as amended thereof of the Ministry of Environment and Forests, New Delhi. 1. EXECUTIVE SUMMARY: The proposed project is mining of Sand, Stone and Bajri from Terrace of Chaki khad (River) falling in Mauza & Mohal Mohatli, dist Kangra, HP proposed by Smt. Asha Pathania Prop. M/s

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Table of Contents 1 EXECUTIVE SUMMARY:... 1 2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION:... 1 2.1 Identification of the Project:... 1 2.2 Details of the Project Proponent:...

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

CHAPTER VII ADDITIONAL STUDIES

CHAPTER VII ADDITIONAL STUDIES 7.1 INTRODUCTION CHAPTER VII ADDITIONAL STUDIES The proposed project is for the mining (removal/ collection of sand), from the river bed of Saraswati & Sagarmati by opencast manual method of mining. As

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal

PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal 1.0 SUMMARY OF THE PROJECT PRE-FEASIBILITY REPORT Project Name of Company / Mine Location Village Taluka District State Sand mine Gram Panchayat Tarrighat, Sand mine Tarrighat Tarrighat Patan Durg Chhattisgarh

More information

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8.

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8. PRE-FEASIBILITY EXECUTIVE SUMMARY Shri Vishwas Parmani S/o Shri H. Parmani is the lessee for the RBM (River Betwa) for an area of 22 Acres (8.90 Ha) in Gata No. 747/16,Village- Patharehta, Tehsil- Kalpi,

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT This proposal of Nuagaon Iron ore mines of M/s K.J.S.Ahluwalia is for expansion of Iron ore production capacity from 5.62 MTPA to 7.99MTPA of ROM along with existing beneficiation

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT Page 0 of 14 EXECUTIVE SUMMARY The proposed project of 24.0 Ha or 59.28 Acre area is of stream bed sand mining and falls under Category- B1 as per EIA Notification 2006 amended till

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent PRE FEASIBILITY REPORT PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent M/s Veet Rag Homes Pvt. Ltd. 267, Ganesh Phadnavis Bhavan,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Krishna Construction Company AT Khasra No.1046 Vill.-Pipalya Hamir, Tehsil-Barod, District-Agar Malwa (M.P.) Production Capacity: 40000 Cu.mt Crusher Stone for 18 Months

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Metal Stone Area 2.000 Hectare, Khasra No. 1127/1 Village Tehsil District State AT KHILCHIPUR KHILCHIPUR RAJGARH MADHYA PRADESH Proponent SHRI ALTAF KHA S/O SHRI

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Parsen : Gwalior : Gwalior (M.P.) : 3.345 Hectare : Stone KHASRA No : 4154 PRODUCTION CAP : 50,000 Cu.mt/year (avg.) Stone APPLICANT

More information

PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF

PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF Indulal C. Vora AT VILLAGE:- Palakhda, TALUKA:- Porbandar, DIST.:-Porbandar 1 (B) CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT This is an existing mine, proposal for obtaining Environmental Clearance for Masonry Stone with production capacity 37,300 TPA Near Village: Velangri, Tehsil-Sirohi,

More information

(A govt. of Kerala Undertaking)

(A govt. of Kerala Undertaking) Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy

More information

Ministry of Environment, Forests & Climate Change Northern Regional Office Dehradun

Ministry of Environment, Forests & Climate Change Northern Regional Office Dehradun Dr. Mahesh K. Verma Arki Limestone Project 1 Name and address of the project In-charge along with their telephone, fax, mobile and email address ARKI, Distt. Solan 173208 (H.P.) Mob. 0945 942 9428 Tel:0177-2674052

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone APPLICANT

More information

Risk Assessment Nagla

Risk Assessment Nagla Risk and Hazards HAZARD Major Risks involved in River Bed Mining are following: 1. River Bed Inundation 2. Soil Erosion 3. Disturbance of Ground water Level 4. Damage of River bank due to access of Ramps

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

Action Plan along with the budgetary allocation for the queries raised in the public hearing is given below:

Action Plan along with the budgetary allocation for the queries raised in the public hearing is given below: 7.1 PUBLIC CONSULTATION Public hearing was conducted on 04 th Oct 2016, at Stone crusher site of M/s Sukker Stone Crusher, for mining of riverbed (production capacity 106875 TPA) at Khasra No. 1324 situated

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd.

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report

More information

M/s.NEERAJ KUMAR JAIN

M/s.NEERAJ KUMAR JAIN EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Siddapur Natural Sand Mining in Patta land Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] 3 Environmental

More information

Ministry of Environment, Forests & Climate Change Northern Regional Office Dehradun Dr. Mahesh K. Verma Sr. Manager (Geol) & OIC

Ministry of Environment, Forests & Climate Change Northern Regional Office Dehradun Dr. Mahesh K. Verma Sr. Manager (Geol) & OIC Dr. Mahesh K. Verma 1 Arki Limestone Project Name and address of the project In-charge along with their telephone, ARKI, Distt. Solan 173208 (H.P.) fax, mobile and email address Mob. 0945 942 9428 Tel/Fax:0177-2674051

More information

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY PRE FEASIBILITY REPORT OF AZHAGAPPAPURAM EARTH FOR OVER AN EXTENT OF 0.61.0HA IN AZHAGAPPAPURAM VILLAGE, AGASTEESWARAM TALUK, KANNIYAKUMARI DISTRICT, TAMIL NADU OF, (Under the Guidelines of Ministry of

More information

Table 1-1:- Salient Features of the Project

Table 1-1:- Salient Features of the Project PRE FEASIBILITY REPORT OF LAMBA & BHATIA BAUXITE MINE MINERALS - BAUXITE LAMBA SURVEY. NO. 30/P, 415/A, 949, BHATIA-358 (LEASE PERIOD 14.06.2000 TO 13. 06.2020) LEASE AREA 54.0861 HECTARE MINING PROJECT

More information

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA)

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) PRE FEASIBILITY REPORT ON GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) Lease Area: 18.687 acres or 7.562 Ha. of Sri Rama chandra Dash Polasara CHAPTER 1 EXECUTIVE SUMMARY Ghodapalana sand Quarry

More information

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara PROJECT PARTICULARS Name of the project - Sand mining Lease address - Village panchayat - Nara, Tahsil -Kanker, Dist Kanker (C.G.) Khasra No. - 1025 Sand mining area - 5.00 Hectares Name of the mineral

More information

1/1, Index INDEX ANY, SHOULD

1/1, Index INDEX ANY, SHOULD River Sand (Minor Mineral) Mining Project for River Yamuna in Gata No. 1/1, Production (9, 47,368 TPA), M.L Area 52.63 ha, near village: Index 1 2 INDEX EXECUTIVE SUMMARY... 2 INTRODUCTION OF THE OBJECT/

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT The proposal for obtaining Environmental Clearance for Marble Mining Project M. L. No. 56/02, Area 4.0 ha with production capacity 40,000 TPA Near Village:

More information

Pre- Feasibility Report

Pre- Feasibility Report 1. EXECUTIVE SUMMARY Application of mining for soil used in Brick Kiln -M/S M D Bricks Field from Khasra/Gata Nos 1229,1233,1161,1044, -2.292 Hectare at Village-Katka Manapur,Tehsil-Sadar,District- Pratapgarh,Uttar

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

P.F.R. TABLE OF CONTENTS

P.F.R. TABLE OF CONTENTS P.F.R. TABLE OF CONTENTS Sr. No. Content Page No. 1.0 Executive Summary 24 2.0 Introduction of Project / Background Information 25 3.0 Project Description 27 4.0 Site Analysis 34 5.0 Planning Brief 39

More information

Dt:18/04/2016. Dear Sir,

Dt:18/04/2016. Dear Sir, Dt:18/04/2016 Dear Sir, As per amendment to EIA notification S.O. no. 141(E) dated 15.01.2016, this is a minor mineral mining project of marble and the proposal falls under cluster situation for which

More information

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P. PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.O, Ernakulam (Dist.) Survey No. 129/1-4,129/2-1, Arakuzha Village,

More information

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details:

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details: 2015 PRE-FEASIBILITY REPORT (FOR TOR) OF GADABAVALASA MANGANESE ORE MINES, AT: GADABAVALASA, GARIVIDI MANDAL, DIST: VIZIANAGRAM FOR PRODUCTION OF 12,000TPA OF MANGANESE ORE OVER AN AREA OF 12.691 HA. OF

More information

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF 0.80.0Ha IN ANAIMALLUR VILLAGE, ARCOT TALUK, VELLORE DISTRICT, TAMILNADU OF THIRU.R.VINOTHKUMAR, (Under

More information