1 Request for Bids At The Greenville-Spartanburg International Airport Addendum No. 1 June 21, 2011 All Bidders shall include with their bid submittal a signed statement indicating they have reviewed and accepted Addendum #1, dated June 21, 2011 as part of the bid documents. Item 1. Questions received to date: Question No. 1 There are no bridge models or fixed walkways mentioned in the RFB. Would it be possible to receive a CAD drawing of the layout, in order for the manufacturer to determine the models? If so, could you also provide finished floor elevations at the terminal building? If neither of these are possible, could you please provide the desired bridge models and fixed walkways, if any? Answer No. 1 CAD files are not available. A drawing is attached showing the aircraft gate and bridge locations. No fixed walkways are required. Finished floor elevations at the terminal building will be provided in Addendum #2. All bidders are encouraged to visit the site to confirm field conditions. New bridges shall be mounted on the existing concrete bridge foundations and utilize the existing anchor bolts. For informational purposes only, the existing passenger boarding bridges models are as follows: Question No. 2 Gate Mfg. Model No. Serial No. Max Ext. Length A1 FMC Jetway A ' (36.27m) A2 FMC Jetway A ' (36.27m) A3 FMC Jetway A ' (36.27m) A4 FMC Jetway A ' (36.27m) B4 FMC Jetway A3-58/ ' (33.53m) B3 FMC Jetway A3-58/ ' (33.53m) B2 FMC Jetway A3-58/ ' (33.53m) B1 FMC Jetway A3-58/ ' (33.53m) Page 11, Items B~E, 400 Hz and PCA Scope Please confirm that the PBB Contractor is to supply just the mounting provisions and input power and communications cabling for the 400 Hz and PCA units and the units, ducting, elbows, fittings, hoses and hose baskets, output cables, pushbutton stations, any other associated ancillary items, freight, installation, training and commissioning of this equipment will be done by Others. Page 1 of 6
2 Answer No. 2 The PBB contractor is responsible for providing the mounting provisions, the input power and communications cabling for the 400HZ and PCA Units and the external plenum with 10 inlet for bridge pre-cool and the inside bridge grill for bridge pre-cool. The 400Hz and PCA units will be provided and installed under separate contract by the PCA contractor. 400Hz and PCA training will also be provided by the PCA contractor. Question No. 3 Will cable hoists be required? If so, how many and who is to provide and install the hoist(s)? Answer No. 3 Cable hoists will be provided and installed by the PCA contractor on all eight (8) bridges. Mounting provisions are to be provided on all eight (8) bridges by the PBB contractor. Question No. 4 Item D on Page 11 requires an exhaust fan to be located on the rotunda end of the PBB, but on Page 10, Item 10 there is also a requirement for a ventilator to be located on the cab. Please confirm if one or two exhaust fans are required. If only one is required, where is this to be located? Answer No. 4 Delete the requirement for a ventilator on the cab. Question No. 5 Pages 19 & 20, Regional Jet Service On Page 19, Item 11 there is a requirement for a sideshifting cab if regional jets are in the scheduled aircraft mix, then on Pages 19 and 20, Items 1 through 6 there is a requirement for a floor that we manufacture that meets all requirements and services all scheduled aircraft, without the side-shift capability. If we can prove that our regional jet floor, that meets the specification Pages 19 and 20, Items 1 through 6, is able to service the scheduled aircraft mix, would this be acceptable? Answer No. 5 Delete the requirement for a side-shifting cab. A side-shift cab is not required. The PBB bidder is responsible for ensuring the proposed bridge can service all required aircraft. Question No. 6 Page 20, Item F, Aircraft Closure There is a requirement that the aircraft enclosure color shall be white. The industry standard color for the aircraft enclosure is gray. This is the same color as the existing enclosures we have supplied to GSP. Would the Airport accept the industry standard color of gray for aircraft enclosure? Answer No. 6 Revise the aircraft enclosure color to the color gray to match existing. Page 2 of 6
3 Question No. 7 Page 21, Item 4, Maintenance Ladder There is a requirement for a maintenance ladder with safety cage and handrails. We do not have any equipment on the roof that would require routine maintenance, so there is no need to have access to the roof of our bridges. Therefore, we ask that the maintenance ladder is to be removed if no roof access is needed for routine maintenance. Even if we provide roof access ladder, there is no need to provide roof handrail on top of tunnel C. JBT bridges need to have such a handrail since the electric motors on top of the lift column requires periodic maintenance. Previous bridges that TKAS supplied to GSP do not have these items. Please confirm that that maintenance ladder with safety cage can be removed if no routine maintenance is required on top the bridge. Also, please confirm that no handrails are required on top of the bridge if no routine maintenance is required. Answer No. 7 Delete the requirement for maintenance ladder, safety cage and handrails if no maintenance is required on top of the bridge. If the manufacturer has any serviceable equipment located on top of the bridge, the requirement for the maintenance ladder, safety cage and handrails shall remain. Question No. 8 Pages 30~32, Section 2.5, Baggage Lifting System/Baggage Valet To our knowledge, there is not a service stair-mounted baggage lift that will meet all the requirements of the specifications. The unit that comes the closest to meeting these requirements is supplied by a manufacturer in Florida. We are using them for several of our projects over the past year and the units have failed miserably. Our company is no longer utilizing the lifts from this company because of poor quality and support. There is another manufacturer in Utah, but we have no knowledge if this product is viable; however, we do know that the capacity of that unit is only 350 lbs, which does not meet the specifications. Aside from service landing-mounted lifts, there is an option for a baggage conveyor that can be service stair mounted or bridge cab mounted, supplied by at least two, maybe three manufacturing companies. There is also an option for rotunda mounted, terminal mounted and walkway mounted baggage lifts that are manufactured by a few reliable companies. In the best interests of all involved, especially the airport, we ask that the service stair platform mounted baggage lift be removed from the requirements and substituted for either a baggage conveyor or baggage lift, mounted on the rotunda, at the terminal or walkway (if applicable). Answer No. 8 Delete the requirement for a baggage lifting system/bag valet. Question No. 9 Please confirm whether this bid is tax exempt or should taxes be added to the bid. If taxes need to be added to the bid, please confirm the tax rate. Answer No. 9 This bid is not tax exempt. The state sales tax rate is 6% and is to be included in the bid amount. The contractor is responsible for paying all applicable taxes on this project. Page 3 of 6
4 Question No. 10 Section 14950, Pg 18, Clause 2.2.D.4: The specification calls for a minimum clear with of 5-0 for the cab rollup door. Our standard design is a clear width of 44. Please allow our standard design to be supplied. Answer No. 10 Not approved. Specification remains the same. Question No. 11 Section 14950, Pg 19, Clause 2.2.D.9: The specification calls for LED cab light fixture. Our standard design incorporates a fluorescent fixture. Please allow our standard design to be supplied. Answer No. 11 Not approved. A fluorescent fixture will not be accepted. The LED light fixture specification remains. Question No. 12 3Section 14950, Pg 21, Clause 2.2.G.1: The specification calls for a 30 to 36 wide service door. Our standard design is a 28 door. Please allow our standard design to be supplied. Answer No. 12 Not approved. Specification remains the same. Question No. 13 Section 14950, Pg 21, Clause 2.2.G.1: The specification calls for the provision of a cipher lock with key override to match the existing airport key/lock system. Please provide details on the existing system. Answer No. 13 The existing airport cipher key/lock system is a Kaba 5000 Combination Lock and accepts an ILCO cylinder. KABA Model # 5021XSWL26D41 Question No. 14 Section 14950, Pg 22, Clause 2.2.H.1.a.12: Our standard offering is a warning bell which alerts that the PBB is about to move. Please allow the warning bell in lieu of a horn. Answer No. 14 Approved. This is acceptable. Page 4 of 6
5 Question No. 15 Section 14950, Pg 33, clause 3.2.A: Per this clause we are to furnish all anchors for the hurricane tie downs. Who is responsible for the installation of these anchors? Answer No. 15 Delete the requirement for hurricane anchors. Question No. 16 Section 14950, Pg 34, clause 3.7.A : The specification calls for training is to be provided, however no details have been given on the training required. Please advise on the duration and type of training to be performed Answer No. 16 The following training is required to be provided. Airline / Operator Training approved manufacturer training for airline and airport operators 2 half day classes for each airline currently servicing GSP. Each airline will be trained individually. Train-the-Trainer Training approved manufacturer training for supervisor and trainer level operators, 2 classes will be provided. Maintenance Training approved manufacturer training for airport facilities maintenance technicians involving two 8 hour days of maintenance training, including preventative maintenance and servicing, troubleshooting and basic repairs. Question No. 17 Page 11, Item A: The scope of work includes the removal of existing bridges and all associated equipment prior to the installation. Please provide details on the type of additional equipment located at each gate location which is to be removed. Answer No. 17 Removal of all equipment mounted to the existing passenger boarding bridges including, but not limited to pre-conditioned air (PC Air) and fixed ground power units shall be the responsibility of the PBB contractor. Question No. 18 The tender documents do not include drawings or any other information that can be used to generate equipment sizing. We request that you provide an AUTOCAD layout drawing, or specify what equipment we need to supply. Without this information we cannot correctly size the new PBB equipment. Answer No. 18 See Question and Answer #1. Page 5 of 6
6 Question No. 19 Are taxes to be included or is the project to be tax exempt? Answer No. 19 See Question and Answer #9. Question No. 20 The tender documents did not include commercial terms. Please provide if applicable. Answer No. 20 The owner shall pay the complete invoice within 30 days of final acceptance. Question No. 21 Please confirm that adequate power will be supplied by the airport and the bidder has no responsibility for power requirements. Answer No. 21 Power will be provided at each gate location and will be located at the terminal building face near the passenger boarding bridge pedestal/base. -END- Page 6 of 6
7 GSP Bridges A-1 - A-4 Bridges B-1 - B-4 1 inch = 200 feet
Fayetteville Regional Airport Airline Terminal Improvements Part 1; APN 1515
6-16-2017 ADDENDUM #2: DATE: June 16, 2017 JOB: OWNER: ARCHITECT: Fayetteville Regional Airport Airline Terminal Improvements Part 1; APN 1515 City of Fayetteville Gordon Johnson Architecture The following
More informationPassenger Boarding Bridges
Passenger Boarding Bridges Enhancing airport operations worldwide Improving turnaround operations and ensuring total safety and comfort for both passengers and operators AIRPORT ENGINEERING SOLUTIONS ADELTE,
More informationElectric Service Standards
V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are
More informationCHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 27, 2014 ITB NO. 14-33 WAKEFIELD PUMPING STATION UPGRADE ADDENDUM NUMBER
More informationANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists
SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationELVORON LU/LA ELEVATOR
Creating An Accessible World ELVORON LU/LA ELEVATOR DESIGN AND PLANNING GUIDE www.garaventalift.com Please note: Dimensions provided in this Guide are for REFERENCE ONLY and should not be used for site
More informationEDS Upgrades and CBRA Improvements. Addendum No. 2 DATE OF ADDENDUM: 08/17/2016
EDS Upgrades and CBRA Improvements Addendum No. 2 DATE OF ADDENDUM: 08/17/2016 The following changes, additions, and/or deletions are considered as Addendum No. 1, and are hereby made a part of the contract
More informationFreight Elevator Series GFM-T
Freight Elevator Series GFM-T Mitsubishi Freight Elevators Can Improve our Goods-Handling Ability Elevator Selection 1. Rated capacity and car size What is the maximum weight or size of goods to be transported
More informationDIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...
DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements
More informationCooling Tower Depot, Inc. 651 Corporate Circle, Suite 206 Golden, CO Phone (720) Fax: (720)
CTD Proposal : - Project: Project Location: Cooling Tower Design Conditions and Dimensions: Water Flow Rate (gpm) 0 CTD Model # Hot Water Temp (F) 0 Cell Dimensions (ft) L x W x H Cold Water Temp (F) 0
More informationBUREAU Joe Iuviene, AIA January 20, 2017
architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends
More informationSPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders
Welcome to the O Keeffe s Guide Specification System prepared as an aid to specify in preparing written construction documents. For specification assistance with specific product applications, please contact
More informationSEMINOLE TRIBE OF FLORIDA
SEMINOLE TRIBE OF FLORIDA Denise DeCarolis Carpenter Purchasing Department Director 6300 STIRLING ROAD HOLLYWOOD, FLORIDA 33024 PHONE (954) 966-6300 x11170 FAX (954) 967-3478 E-MAIL: dcarpenter@semtribe.com
More informationSECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?
SECTION 08360 SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Glazed Aluminum
More informationMARCH 16, 2011 DALLAS/FORT WORTH INTERNATIONAL AIRPORT BOARD ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS FOR REROOF DFW BUSINESS CENTER SOUTH
MARCH 16, 2011 DALLAS/FORT WORTH INTERNATIONAL AIRPORT BOARD ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS FOR REROOF DFW BUSINESS CENTER SOUTH CONTRACT NO. 9001810 The specifications are revised as follows.
More informationINSTRUCTIONS AND GUIDELINES
INSTRUCTIONS AND GUIDELINES NOISEBLOCK TM MODULAR PANEL SYSTEMS ENCLOSURES & PRESSURIZED PLENUMS PLANNING HINTS & NOTES: 1. Review the Kinetics Noise Control submittal and installation drawings and bill
More informationIntroduction. Disclaimer. Table of contents
Updated July 18, 2012 Introduction The Cambridge Elevating Limited-Use / Limited-Application Elevator is designed to service schools, libraries, low rise, low occupancy commercial buildings, churches and
More informationBUILDING CODES & DESIGN CRITERIA
BUILDING CODES & DESIGN CRITERIA Adopted Building Codes: 2006 International Building Code (IBC) 2006 International Residential Code (IRC) 2006 International Mechanical Code (IMC) 2006 International Plumbing
More informationThe following document can be provided to an Engineer, Contractor, or Owner to allow them to
MESAN series MXL Engineering Guide Specifications The following document can be provided to an Engineer, Contractor, or Owner to allow them to properly specify MESAN s MXL series Cooling Towers. 15XXX-
More informationSECTION BASIC ELECTRICAL REQUIREMENTS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies
More informationAviation Capital Construction Program Update
Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance
More informationCommunications Page 1 of 9
Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a
More informationSECTION COOLING TOWER
PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue
More informationREQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS
REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS Introduction An applicant applying for permanent electric service who opts to have the padmounted transformers installed inside his building
More informationPHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS
1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new
More informationPRESCRIPTIVE COMPLIANCE METHOD
CHAPTER PRESCRIPTIVE COMPLIANCE METHOD 3 SECTION 301 GENERAL 301.2 Building materials. Building materials shall comply with the requirements of this section. 301.2.1 Existing materials. Materials already
More information1. Vertical reciprocating conveyor, Hydraulic straddle VRC.
PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related
More informationADDENDUM NUMBER ONE (1) September 30, 2015
ADDENDUM NUMBER ONE (1) September 30, 2015 TO: LAWRENCE H. PEEK ARCHITECTS P.O. Box 2932; Homer, Alaska 99603 CITY OF WHITTIER PUBLIC SAFETY FACILITY WHITTIER, ALASKA ARCHITECT S PROJECT NUMBER - 14003
More informationACCIDENT INTERVETION SYSTEMS
Protection for structural platforms, in-plant offices, conveyors, water mains, valuable equipment & personnel Easy installation with all hardware included 10,000 lb. Load at 4 mph rating Columns are 4
More informationECNAMRFO ER P R FO ED EER IN G EN / S N TIO LU O S E G A R TO S
STORAGE PRODUCTS STORAGE SOLUTIONS / ENGINEERED FOR PERFORMANCE STORAGE SYSTEMS The Company Excel Storage Products, LP is one of the leading manufacturers of high quality industrial storage rack and mezzanine
More informationHURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R
HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:
More informationPROGRAM OVERVIEW WALKING/WORKING SURFACE INDUSTRIAL SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR
PROGRAM OVERVIEW WALKING/WORKING SURFACE INDUSTRIAL SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.21-23 INTRODUCTION: Thousands of workers are injured every year due to slips, trips, or falls
More informationA. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.
SECTION 10530 - EXTRUDED ALUMINUM WALKWAY COVERS PART I - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division
More informationSECTION HYDRAULIC DRIVE MACHINE ROOM (MR) RESIDENTIAL ELEVATORS
SECTION 14 20 10 HYDRAULIC DRIVE MACHINE ROOM (MR) RESIDENTIAL ELEVATORS PART 1 - GENERAL 1.1 CONDITIONS AND REQUIREMENTS A. The General Conditions, Supplementary Conditions, and Division 01 General Requirements
More informationEffective Date: 14-March Table of Contents
Version: 2 Page: 1 of 10 Table of Contents 1.0 Introduction... 2 1.1 Purpose... 2 1.2 Scope... 2 1.3 Definitions... 2 2.0 Guarding of Floor Openings, Wall Openings and Holes... 3 2.1 Stairway Floor Openings...
More informationSection BUILDINGS, SHELTERS, ENCLOSURES
Section 13121 BUILDINGS, SHELTERS, ENCLOSURES Part 1 GENERAL 1.1 SECTION INCLUDES 1.2 A. Pre-engineered buildings. B. Pre-engineered shelters. C. Pre-engineered enclosures. D. Electrical wiring and devices
More informationFLOORS 3, 14 & 21 D322, D1422, D2122 Qty. 3 Size 2-6 x 6-0
entirely and masonry as required for installation of new door & frame (Kitchen Floors 5, 12, & 19). 4. At the DEMOLITION NOTES, DELETE Note D-4 in its entirety and REPLACE with the following: Saw cut and
More informationThis guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.
SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial
More informationPIP STF05521 Details for Angle Railings for Walking and Working Surfaces
TECHNICAL CORRECTION January 2017 Structural PIP STF05521 Details for Angle Railings for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of
More informationCITY OF LOS ANGELES LARUCP PLUMBING/MECHANICAL PLAN CHECK LIST
CITY OF LOS ANGELES LARUCP PLUMBING/MECHANICAL PLAN CHECK LIST Plan Check No. Plan Check Expiration Date Job Address: Square Footage Use Zone Fire Zone Occ. Group Type of Construction No. of Stories Applicant
More informationFACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision
FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision 1. Intent This program has been developed to reduce the risk of physical injury or property
More informationSECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER
PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract including general and supplementary conditions and specifications section apply to this section. B. Related Sections:
More informationTelecommunication Spaces
Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137
More informationModel Safety Program
Model Safety Program DATE: SUBJECT: Walking/Working Surface Safety Program (Industrial). REGULATORY STATUTES: OSHA 29 CFR 1910.21 23 RESPONSIBILITY: The company Safety Officer is. He/she is solely responsible
More informationThis product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.
Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral
More informationSECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT
SECTION 11322 MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT PART 1 GENERAL 1.01 SCOPE There shall be furnished ( ) Grit Separator Mechanism(s) suitable for installation in (a) concrete tank(s) -ft.
More information2012 Fiscal Impact International Mechanical Code
2012 Section No. 306.5 Item 2 2012 Code Information - bold text = new text found in 2012 strike out = text deleted and not found in the 2012 Equipment and appliances on roofs or elevated structures: Item
More informationWALL MOUNTED ARTICULATING JIB CRANE
SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and
More informationSECTION ACTIVE VEHICLE BARRIERS
SECTION 34 71 13.19 ACTIVE VEHICLE BARRIERS PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
More informationBuilding 17 Roof Safety Assessment. Not Applicable - No fall restraint system. Within handrailed and marked painted areas NA
Roof Safety Survey GENERAL INFORMATION CAMPUS: Wollongong Campus BUILDING: I.T. Resource Centre (17) DESCRIPTION: Concrete roof surrounded by handrail and parapets. 2 x large pyramid shaped glass skylights.
More informationPROCUREMENT OF FORK LIFT. Yale Inc Sullivan Drive Greenville, NC Item Description Model No. GP050VX.
Ernest N. Morial New Orleans Exhibition Hall Authority 900 Convention Center Boulevard New Orleans, LA 70130 ADDENDUM NO. One (1) Project Name: Procurement of Fork Lift Contract No.: C-1320 Date: April
More informationSECTION AIR DUCT CLEANING
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:
More informationSTREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.
General The following general requirements shall apply to street lights installed in new underground residential subdivisions or developments located within the service area of Springville City Power (within
More informationRead Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED
Chapter 17 Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.1.1 Applicability The regulations in this chapter apply to any private potable water supply system where plumbing fixtures are
More informationSECTION ALTERNATES
SECTION 01 23 00 - ALTERNATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationMarch 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen:
March 6, 2018 Subject: Addendum No. 2 Toyota Park Transit Center Phase II Ladies and Gentlemen: This Addendum No. 2 is being issued to provide responses to questions submitted by potential bidders and
More informationSECTION ACOUSTICAL PANEL CEILINGS
SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSeries - 1
SECTION 08360 SECTIONAL OVERHEAD DOORS 591 SERIES THERMACORE INSULATED STEEL DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word click
More informationThe Columbus Regional Airport Authority (CRAA) hereby issues addenda to the subject solicitation:
February 13, 2015 NOTICE OF ADDENDUM ADDENDUM #4 Subject: Date Due: Wireless System Design and Replacement; Request For Proposals (RFP) # FIT-2015-001 February 23, 2015 at 2:00 PM EDT Dear Sir or Madam:
More information(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-02 42 91 (May 2010) ------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS SECTION TABLE
More informationKlamath Communications District Request for Proposal Emergency Communications Dispatch Consoles
Klamath 9 1 1 Communications District Request for Proposal Emergency Communications Dispatch Consoles RFP Response Deadline October 1, 2010 INDEX 1. Purpose of RFP. 3 2. Project Description. 4 3. Project
More informationDUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS
DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Responsibilities 1 Scaffolding 2 Ladders
More informationMSC Guidelines for Review of Ventilation System Plans
K. B. FERRIE, CDR, Chief, Hull Division Purpose: This Plan Review Guideline (PRG) explains the requirements for seeking plan approval of ventilation systems from the Marine Safety Center (MSC) for most
More informationPLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS
PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS NOTE: Building Code compliance is the obligation of design professionals and/or contractors. Plan review and inspection guidelines are to be used to ensure
More informationSECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM
Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING
More informationROOFTOP EQUIPMENT Guide
ROOFTOP EQUIPMENT Guide VERSION 1.0 REVISED 09/24/15 GENERAL The purpose of this inspection checklist is to clarify the minimum building code requirements when installing rooftop equipment and preparing
More informationThis guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.
GORBEL PRODUCT SPECIFICATIONS 2010 Gorbel, Inc., P.O., Box 593, Fisher, New York 14453-0593 PHONE: 800-821-0086, FAX: 585-924-6273; WEBSITE: www.gorbel.com November SECTION 41 22 31PRIVATE FREE STANDING
More informationHIGH MAST CAMERA POLE ASSEMBLY GENERAL
10-3.24 HIGH MAST CAMERA POLE ASSEMBLY GENERAL The Contractor must furnish and install the following equipment for high mast camera pole assembly as described herein and as shown on the plans: 1. Camera
More informationQuestions and Answers for RFP No. 010 for the provision of prefabricated pharmacy storage units
December 6, 2017 Questions and Answers for RFP No. 010 for the provision of prefabricated pharmacy storage units 1. Question: In the site annex attachments mention is made of distance from the DHO What
More information2. Cab, interior finishes, control panel and facings including cab doors. 3. Fire rated hoistway doors, sills, and frames.
PART 1: GENERAL 1.01 Summary Section Includes: 1. Electric traction Dumbwaiter system. 2. Cab, interior finishes, control panel and facings including cab doors. 3. Fire rated hoistway doors, sills, and
More informationConstruction Summary
Construction Summary Project Name Item of Work Base Building Add-ons Total Cost Code Site Development $ 18,150.00 $ - $ 18,150.00 Landscaping $ 500.00 $ - $ 500.00 Cast-in-place Concrete $ 7,806.00 $ -
More informationSeries - 1
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word
More informationSteelwork and Security Kiosks
Steelwork and Security Kiosks Staircases, Fire Escapes and Ladders 282 Handrails and Guardrails 283 Platforms and Flooring 284 Fencing 285 Kiosks 286 Cages 287 Bar Sets and Grilles 288 Ancillary Items
More informationSupplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC)
Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC) Plan Check Submittal Date: Plan Check / PCIS App #: Job Address: Applicant: P.C. Engineer: (Print first / last name) Phone:
More informationSPECIFYING AN O KEEFFE S LADDER
SPECIFYING AN O KEEFFE S LADDER When including an O Keeffe s Aluminum Ladder in your specification, use the following steps to choose the right ladder for your project. Step 1 Select Your Model 531 532
More informationSPACE TYPE: OUTSIDE PARKING (STRUCTURE)
SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.
More informationFACT SHEET Standard: Fall Protection
ROOFTOP FALL PROTECTION GUIDANCE EH&S acknowledges the varied nature of work on roofs, uncertain frequency of exposure, wide range of potentially hazardous conditions, and the confusion among trades groups,
More informationBasic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.
Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Franklin County Septic & Zoning permit application: A septic and zoning permit is required for residential or commercial
More informationSolicitation No Passenger Wait Time System, please be advised of the following clarifications to the above referenced Solicitation.
February 2, 2018 CLARIFICATION LETTER No. 1 Re: Solicitation No. 7006612 Passenger Wait Time System, please be advised of the following clarifications to the above referenced Solicitation. (Note: Other
More informationAccess Ladders And Disappearing Stairways: Code Compliant Solutions
Ron Blank & Associates, Inc. 2009 Please note: you will need to complete the conclusion quiz online at ronblank.com to receive credit Access Ladders And Disappearing Stairways: Code Compliant Solutions
More informationPre-installation Manual CONCEPT 301 D/401 D/501 D
Pre-installation Manual CONCEPT 301 D/401 D/501 D Pre-installation Manual CONCEPT 301 D/401 D/501 D Concept 301 D T11416 Edition BA, January 2015 This book has part No 10077155 0-2 This manual is published
More informationJOINT GUIDELINE #5. Temporary Job Utilities and Services. Construction Industry Survival Kit. The Second in a Series
The Second in a Series JOINT GUIDELINE #5 Temporary Job Utilities and Services tion between parties to the construc- tion contract. When adequate iden- tification of temporary services is pro- vided and
More information3D Home Improvement and Inspection Services, Inc
Property Inspection Report Cover Page ABC Disney Lane, Winter Garden FL, 34787 Inspection prepared for: John Doe Inspection Date: 7/15/2010 Time: 11:00 am Age: 6 Years Size: 3,378 LSF / 4,427 TSF Weather:
More informationSteelwork and Security Kiosks
Steelwork and Security Kiosks Staircases, Fire Escapes and Ladders 282 Handrails and Guardrails 283 Platforms and Flooring 284 Fencing 285 Kiosks 286 Cages 287 Bar Sets and Grilles 288 Ancillary Items
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission
More informationUNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 2005 SECTION WALKING/WORKING SURFACE AND FALL PROTECTION
SECTION 01911 - WALKING/WORKING SURFACE AND FALL PROTECTION 1.1 GENERAL This design standard requires that a safe means of access and fall protection be incorporated into the design of new buildings and
More informationSECTION SECTIONAL OVERHEAD DOORS
SECTION 08360 SECTIONAL OVERHEAD DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Doors B. Track and Framing 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry Assemblies: Prepared opening in masonry.
More informationEXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS
HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS POLICY STATEMENT This policy applies to NEW Hood and Duct systems. The Authority Having Jurisdiction will not waive major criteria in the applicable standards
More informationRice University Ancillary Furniture Request for Proposal February 14, 2017
Rice University Ancillary Furniture Request for Proposal February 14, 2017 Contents Project Background Information Project Profile... 04 Project Location... 05 Schedule... 06 Dealer Responsibilities and
More informationCode Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)
Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently
More informationDATE: December 15, 2009 BID NO.: FWC 09/ CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM DECEMBER 18, 2009 to DECEMBER 22, 2009 AT 3:00 PM
DATE: December 15, 2009 ADDENDUM NO.: 1 BID NO.: FWC 09/10-48 BID TITLE: CHANGE: ADD: RENOVATION OF THE PRAIRIE LAKES FIELD OFFICE AT THE THREE LAKES WMA CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM
More informationSECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS
Page 1 of 6 SECTION 08 32 20 HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED BI-FOLD GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationAccordion Doors / Zone 2. Woodfold Accordion Door Guide for Commercial and Residential Installations Detailed Architectural Shop Drawings Available
SINCE 1957 Accordion Doors / Zone 2 Woodfold Accordion Door Guide for Commercial and Residential Installations Detailed Architectural Shop Drawings Available Suggested List Prices / All Continental States
More information4188 East Andrew Johnson Highway Morristown, TN
4188 East Andrew Johnson Highway Morristown, TN 37814 800-225-7814 education@precisionladders.com Super Simplex Disappearing Stairway Automatic Electric Disappearing Stairway Automatic Super Simplex FL
More informationEvergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program
Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program The following table provides a brief description of the documentation that will be required of successful LIHTC
More informationINSTALLATION PROCEDURE
INSTALLATION PROCEDURE ELECTRA-flo/FI INSPECTION & HANDLING. The ELECTRA-flo/FI should be carefully inspected for damage prior to installation. Report damage to your Freight Department, or contact delivery
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationDUKE UNIVERSITY CONSTRUCTION STANDARDS
1 07 40 00 Roofing 1. General Several factors repeatedly show up during the inspection of roofs that have failed prematurely. They include inappropriate use of materials, poor drainage systems, poor details
More informationPAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV
NORTH SHORE CONNECTOR TUNNELS AND STATION SHELL LIGHT RAIL PROJECT PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV North Shore Connector Alignment 7300 lf Extension to existing 25 mile system 18 Contracts $435
More informationThese guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development.
PIER GUIDELINES 1 PIER CONSTRUCTION GUIDELINES These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development. 1. DEFINITIONS The following definitions
More information