1 Executive Summary ABSA Building October 2014 Project Brief The project brief requested that the professional team conduct a visual only, conditional assessment of the building condition, services and structural integrity of the ABSA Building. Recommendations with regard to the repairs, renovations and upgrading of the building are to be included in this assessment. Introduction The professional team, whom carry vast knowledge throughout all facets of the construction industry, have performed a high-level evaluation of the building, with the objective of achieving all targets set out in the clients Request for Proposal of April The building is located on the corner of Albertina Sisulu and Fraser Street, in the Central Business District of Johannesburg, Gauteng. The building has two sections, one lower portion on the western side which comprises of a ground floor, mezzanine and 5 floors above ground and a higher portion to the east which comprises of a ground floor, mezzanine and 11 floors above ground. The building has 2 basements but a singular entrance which only accommodates one car at a time. This building is partially occupied. The fire escape staircases are non-compliant to regulations and are currently a hazard to the occupants. Despite this fact, all levels will require renovation works which must comply with the latest National Building Regulations, SANS10400 and the B-Grade SAPOA grading. All Town Planning prescripts of the local authority must furthermore be conformed to. The building holds a gross building area of approximately m 2 with a Gross leasable Area of m 2 which results in an efficiency factor of 58%. As per the SANA the population is calculated on the basis of 1 person per 15m 2 which equates to occupancy of 460 people. However, should the Client opt for 10 m 2 per person, then the maximum occupancy would be 693 people. A table indicating the various occupancy allowable per floor has been included in the detailed Architectural assessment. The building condition assessment carried out, is detailed and documented herein accordingly under each specific building discipline. It must further be noted that the assessment conducted is of a visual nature and where required, advanced comprehensive testing is recommended. The professional team s findings are evaluated, but limited to: Best practice; Future usage of the building; Compliance to SANS 10400; Compliance to the OHS Act; Compliance to the factories act; Compliance to the Environmental ACT.

2 Architectural Detailed as-built drawings are furnished within Annexure A. External The building envelope on the street facing remains intact and appears to be in a fairly good condition. The fascade comprises of pre-cast concrete panels with window openings clad with marble stone on the ground and first floor level, followed by face brickwork on the levels above. The façade in the courtyard needs remedial works and gutters and downpipes replaced. Vegetation can be seen growing on the fascade cracks. Basement Level There are currently 2 basement parking levels of which the head restriction is 1.95m which is very low. No trucks allowed. There is only one entry/exit route to this parking which can only accommodate one car at a time. This is only wide enough for one vehicle at a time which could lead to congestions during peak times. There is apparent water penetration in the basement which would need further investigation and remedial works. Staircases from the basement are narrow and do not comply with the National Building Regulations. Ground Level There are currently 3 entrances to this building. The entrances is to host an additional disability friendly ramp in order to comply with SANS10400 universal access regulations; The lobby area requires a redesign to make more efficient use of the space, and additionally a complete fit out to this area is required. Levels - mezzanine, 1-11 Concrete staircases to be repaired on edges and an additional handrail installed. Finishes are poor and outdated. Level 2-6 appear to have undergone a recent refurbishment and appear to be in a fair condition. Glazing through the building to be replaced to energy efficient glazing. Ablutions are located on split levels and therefore do not cater for disable persons. The top two floors have been stripped and all rubble left behind. The banking hall appears in good condition but would a complete renovation should office space be introduced. The banking area has many safes and must be relocated if a new space planning layout is implemented. Some ablutions are leaking and water spread to passage. The offices on the levels above the banking hall are in a relatively good condition, with some remedial works where necessary.

3 Roof Levels All waterproofing requires advanced assessment, and replacement may be necessary, as per the Structural Engineers report. Full-bore outlets to be checked for blockages All gutters and downpipes to be replaced as it is not functional, rusted and inadequate. Structural The building has no links; however there is a possibility of joining this building to FNB Building and/or a bridge link across to Rand Water Building. The building has a combination of soft roof (corrugated sheeting), which has gutters and downpipes discharging onto concrete slab with screed to fall (with torch on waterproofing). Certain higher portions of roof are localised concrete roof slabs. The building has a substantial number of level differences via steps on the external pavement, without and disabled access ramps. The ablutions on the buildings are at mid stair landing heights, which is an issue from a disabled access perspective. The external fascade needs cleaning; however the internal fascade needs more remedial works. Windows will have to be replaced to comply with regulations. It is recommended that the slab systems are not populated with new air-conditioning plant as the slabs are not designed for such loadings. The concrete flat slabs will require replacement of the torch on waterproofing as it is showing signs of perishing and degradation. Some local areas show areas of local ponding which can be resolved by local screeding. The major issue with the concrete roof is the outlets from the various roofs are not being maintained. These outlets are extensively blocked with organic matter and rubbish. In general the existing slab system is in good condition; however there are many local details and local damage that needs to be repaired. The building is supported by concrete columns which are in good condition. Most of the columns require surface repainting to improve their appearance. The building shows no signs of settlement and hence foundations and bearing strata below are in good condition. Structural Floor loadings must be adhered to as per the Structural Engineers report. No masonry brickwork partitions are allowed unless verified by the Structural Engineer. Fire Existing fire hose reels and hydrants are installed with fire extinguishers in all areas of the building. The system is operational and within its service window. The statutory fire signage does not comply with SANS requirements and must be replaced.

4 The hose reels are fed by a hose connected in the fire hydrants. This does not comply with SANS. All hose reels are to have a separate valve and connection to the fire water mains installed. Some fire extinguishers are mounted too high for easy use by the office occupants. These need to be lowered to an accessible height. The fire water system is supplied with a twin booster connection at the main vehicle ramp. The pressure gauge on the booster indicates a good water supply to the building but this cannot be confirmed without a full flow test. The fire water system has no back up water supply, a hose reel pump and small storage tank should be installed to serve all hose reels in the building. There is currently a sprinkler system in the basements which is connected directly to the council supply main. Sprinkler heads to be tested and minor remedial works required. Smoke extraction to be tested and verified as compliant. External fire escapes have been locked with gates and also show signs of server rust and corrosion. These are hazardous and must be replaced. Fire rated walls to be erected to ensure fire exits and fire seal all penetrations. Smoke detection to be installed. HVAC The building is currently air-conditioned by the following types of systems: o Dunham Bush Rooftop DX Packaged units not in operation o Daikin R22 Heat Pump type VRV Systems not in operation o DX Split type units (various makes) some in operation, some beyond repair Ablutions are naturally ventilated. No mechanical extraction systems are installed. Basements are mechanically ventilated and seem intact. Recommendation to check all systems, and replace with new energy efficient system. Proposal to install a Chilled water system with distribution throughout the building. Wet Services The building has very little cold water storage located on the roof level. There is also a concrete water tank which is empty and does not seem operational. Pipes and fitting are intact and show signs of corrosion. Water reticulation is transferred to the water tank via municipal main supply and then fed through the building via gravity pressure. No booster pumps found. The sanitary ware is old and is in a poor condition. All the current fittings consume considerable amounts of water. There is only 1 geyser in the kitchen but is not operational. The drainage system is extremely rusted and is at the end of its lifespan. Electrical Services The switchgear and its cabling are in the basement in the transformer room. The switchgears are intact, well maintained but very old. The room is not well ventilated and very hot. There are 2 x 500kva transformers and in a good condition but very old. The room is not well ventilated and therefore very hot.

5 There is a 125kVA generator set in the basement and seems to be well maintained, however it seems very old. The change over panel is well maintained and must be checked. There is a very old UPS system (20kVA) and the batteries look old and dusty. DB board to be upgraded to modern technology and wiring to be replaced. Most plugs and light fitting are in working condition but seems to be very old. No energy efficient fittings have been used. System to be upgraded and replaced due to its age and to bring in line with SANS and SANS Electronic Services Life systems currently limited to fire detection system only. The system currently has faults on 3 loops on the panel. As this system does not comply with SANS 10139, the system will have to be replaced and upgraded for early detection. No zoning diagrams present. Entrances are secured by physical guards. The branch area has no detection visible. Floors 2 to roof level contain convention detectors, break glass units and strobes/sirens. Lift lobbies and fire escapes also contain break glass units and strobes/sirens. No fire brigade installed next to panel. Intruder detection is evident in the branch part of the office but is not operational as the head-end of the alarm system has been removed. Only a DSTV satellite dish installed on the roof. Town Planning The property identification is Erf 5151 Marshalls Town, and holds a building footprint extent of 1488 m 2. There is currently a 2.5m wide servitude for street purposes registered against this property and affects the boundaries on Fraser and Albertina Sisulu Street. The building is registered in the name of Gauteng Provincial Government and is held in terms of the Deed of Transfer No T /2005. A copy of the title deed is attached under the detailed town planning report. In addition to this, certain standard conditions are stipulated in the Title Deed concerning mineral rights and the enforcement of Town Planning regulations. Zoning to the building does not restrict the building plan approval process, and the dual possession of Site Development Plan approval in submission is not a prerequisite; The existing building complies with the 59 o height line and is presently zoned Business 1 in terms of the Johannesburg Town Planning Scheme, 1979.

6 Vertical Transport The status of the lifts to the building are as follows: Core 1 (Albertina Sisulu Road Entrance) : 3 Passenger lifts with one not being operational. Core 2 (Fraser Street Entrance) : 3 Passenger lifts and not in operation at the time of inspection. One lift from each core serviced the basement to the respective floors. The lifts and equipment are old and recommend replacing the lifts in excess of 30 years old and those not functional. Upgrade lift motor rooms and ensure that all lifts comply with SANS 10400, SANS 1543, SANS 1545 and SANS Heritage ABSA building is considered to be a Heritage building with Section 34 as it is over 60 years old and it has been designed by the prominent Architect Louw & Louw. This is the same Architect that designed the New Library Hotel. The building was constructed in 1950 and maintains Heritage significance. The key architectural elements are the marble fascade on the first 2 levels. This must be maintained and cleaned. Minor repairs are required and the detailed Heritage report stipulates the history and recommendations to refurbish this building. Recommendations provided herein, must fall in line with any other applicable legislation or regulations to meet acceptable office accommodation standards and an application process to the Heritage Council must be carried out prior to commencement with any remedial works. Environmental Heaps of building rubble, rubbish, electrical waste cables, broken florescent lighting, broken windows and birds are found on the top floors of the building. This is a health& safety risk for the current occupants as the floor can be accessed by anyone within the building. Various elements such as poor ventilation, outdated electrical infrastructure, inefficient layouts, penetrating water and damp could lead to negative and a poor working environment. The emergency escape routes are deteriorated, locked in all cases and not in accordance with the regulations, thus providing this building unsafe for its occupants during emergencies. Proposals for a green courtyard, energy efficient materials and services, water management solutions, rain water harvesting, etc. have been included in the detailed report.

7 Proposed Cost Estimate The estimated high level budget is as per the attached QS Report provided herein and is based on the proposed refurbishment work furnished by the professional team concluded at the end of October.

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES ABSA BUILDING

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES ABSA BUILDING Report for Department of Infrastructure Development Wet Services Preliminary Report: ABSA Building October 2014 GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT STRUCTURAL FOR CUSTOMS HOUSE JULY 2014 i P a g e Table of Contents 1. INTRODUCTION 3 1.1 Design Criteria and Specifications..

More information

GAUTENG DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT HVAC FOR ABSA Building OCTOBER 2014 Report for Gauteng Department of Infrastructure Development HVAC Services Preliminary Report:

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES 78 FOX STREET BUILDING

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES 78 FOX STREET BUILDING Report for Department of Infrastructure Development Wet Services Preliminary Report: 78 Fox Street Building October 2014 GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT STRUCTURAL FOR CORNER HOUSE AUG 2014 i P a g e Table of Contents 1. INTRODUCTION... 3 1.1 Design Criteria and Specifications...

More information

SIMULATED OFFICE PROJECT 2008 TECHNICAL REPORT

SIMULATED OFFICE PROJECT 2008 TECHNICAL REPORT SIMULATED OFFICE PROJECT 2008 TECHNICAL REPORT NEW FACILITY FOR ADULT BASIC EDUCATION AND VOCATIONAL TRAINING By Leigh Hartl Student Number: 207514952 A Report Submitted in Partial Fulfilment of the Requirements

More information

Administration Building Needs Assessment

Administration Building Needs Assessment Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural

More information

Tanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1)

Tanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1) Tanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1) 216, Sataish Road, Gazipura, Tongi, Gazipur, Bangladesh (23.921458N,90.386581E) 22 September 2013 1 2 Local concrete spalling caused by

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT STRUCTURAL FOR 75 FOX STREET AUGUST 2014 i P a g e Table of Contents 1. INTRODUCTION 3 1.1 Design Criteria and Specifications..

More information

SPECIFICATION OUTLINE. 28 November 2017 REV 2

SPECIFICATION OUTLINE. 28 November 2017 REV 2 P a g e 1 ORIGIN PARK, RICHMOND PARK, MILNERTION N7 CAPE TOWN 28 November 2017 REV 2 1. EXTERIOR 1.1 MAIN BUILDING - Main Building design to warehousing building type class J2 as per SANS 10400. Goods

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist

More information

UCC Permit Application Procedures

UCC Permit Application Procedures How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.

More information

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and & &01 GENERAL To be developed. All of the exceptions have to be coordinated. &02 SPECIAL USE AND OCCUPANCY &02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections &02.1.1 and &02.1.2.

More information

4. Number of drawings required: ( ) Locations of nearest streets

4. Number of drawings required: ( ) Locations of nearest streets CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us COMMERCIAL BUILDING PLAN REQUIREMENTS

More information

The Magna Standard January 2015

The Magna Standard January 2015 Version: 2 Effective Date: 22/03/17 The Magna Standard January 2015 A guide for residents We have designed The Magna Standard to make sure that we maintain and improve your home above the Decent Homes

More information

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA 94596 (925) 943-5834 phone (925) 256-3500 fax Issued August 3, 2011 Information Bulletin No. IB-002 Submittal Requirements

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:

More information

EH Textiles Ltd EH Fabrics Ltd

EH Textiles Ltd EH Fabrics Ltd EH Textiles Ltd EH Fabrics Ltd 221 225 Sataish Rd, Khortoil, Dhaka (23.9208N, 90.3880E) 31 October, 2013 1 2 Building Observations 3 Engineering Checks on columns required C2 perimeter columns drawings

More information

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement.

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement. NW Corridor Transit Planning Union Station Existing Conditions Technical Memorandum (Physical and Operational Assessments) Executive Summary Capitol Region Council of Governments Prepared in cooperation

More information

CTC MEETING #25 CHILD WINDOW SAFETY REPORT

CTC MEETING #25 CHILD WINDOW SAFETY REPORT CTC MEETING #25 CHILD WINDOW SAFETY REPORT The Child Window Safety SG has not met following the 2012 Final Action Hearing. Group B activities did not necessitate SG meetings as the activity will be limited

More information

APPENDIX 3E HAZELWOOD HOTEL SPECIFICATIONS

APPENDIX 3E HAZELWOOD HOTEL SPECIFICATIONS APPENDIX 3E HAZELWOOD HOTEL SPECIFICATIONS 1. GENERAL 1.1 Refer to Section 2.1 of Schedule 3 [Design and Construction Specifications] regarding compliance with Schedule 3 and this Building Specification.

More information

SPRINGWOOD COMMUNITY & CULTURAL FACILITIES

SPRINGWOOD COMMUNITY & CULTURAL FACILITIES SPRINGWOOD COMMUNITY & CULTURAL FACILITIES REPORT ON PROPOSED HYDRAULIC AND FIRE SERVICES Issue Date Revision Author Status A September 2011 Preliminary G. Barnes Current Prepared by: Prepared for: WARREN

More information

SCHEDULE OF CONDITION. Fulham, London SW6 FOR. Mr S Of XXXX Limited. Prepared by: INDEPENDENT CHARTERED SURVEYORS

SCHEDULE OF CONDITION. Fulham, London SW6 FOR. Mr S Of XXXX Limited. Prepared by: INDEPENDENT CHARTERED SURVEYORS SCHEDULE OF CONDITION Fulham, London SW6 FOR Mr S Of XXXX Limited Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Internal Rooms page 12 GROUND

More information

Village of Gurnee Construction Documents Submittal Requirements

Village of Gurnee Construction Documents Submittal Requirements Commercial New Construction 4 sets of complete plans Commercial Alterations 2 sets of complete plans Residential New Construction, Remodel and/or Addition 2 sets of complete plans DETAILED PLAN REQUIREMENTS

More information

PENNSAFE BUILDING INSPECTION SERVICES LLC NEW COMMERCIAL BUILDING UCC PLAN REVIEW HANDOUT AND CHECKLIST

PENNSAFE BUILDING INSPECTION SERVICES LLC NEW COMMERCIAL BUILDING UCC PLAN REVIEW HANDOUT AND CHECKLIST PENNSAFE BUILDING INSPECTION SERVICES LLC NEW COMMERCIAL BUILDING UCC PLAN REVIEW HANDOUT AND CHECKLIST Every item below must be checked as completed (if applicable), or marked n/a (if not applicable),

More information

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014 Mondol Fabrics Ltd Nayapara,kasimpur, Gazipur (23.990028N, 90.317336E0) 8th March 2014 1 2 Observations 3 Column Stresses in Toilet Area North of Building Cursory calculations indicate that column size

More information

CHAPTER 34 EXISTING BUILDINGS

CHAPTER 34 EXISTING BUILDINGS CHAPTER 34 EXISTING BUILDINGS SECTION 3401 GENERAL 3401.1 Scope. Provisions of this chapter shall govern the application of this code to existing buildings. Exception: Buildings and structures located

More information

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard.

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard. City of Gibraltar Pre-Sale Inspection Report Checklist FLATWORK: Repair or replace section of driveway, approach, or sidewalk that are a trip hazard. EXTERIOR PROPERTY: Fences/Sheds/Retaining walls: Repair,

More information

West & North Yorkshire Chamber of Commerce. Serviced offices project, Bradford. Information for contractor Expressions of Interest

West & North Yorkshire Chamber of Commerce. Serviced offices project, Bradford. Information for contractor Expressions of Interest West & North Yorkshire Chamber of Commerce Serviced offices project, Bradford Information for contractor Expressions of Interest Background West & North Yorkshire Chamber of Commerce (the Chamber) plans

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: HS FOR MATH, SCI & ENGINEERING-M, 240 CONVENT AVENUE, New York, 10031 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-12-20

More information

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format Basic Construction of the CANADACAR System The CANADACAR System is a prefabricated, engineered and constructed freestanding parking garage structure that utilizes superior technology combining pre-cast

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

Exhibit A Library Shell Construction

Exhibit A Library Shell Construction Exhibit A Library Shell Construction Library Component Building Requirements Approximately 15,000-17,000 square feet plus 900 square feet for mechanical room and additional space on roof for installation

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

APPENDIX 3C DOMINION HOTEL SPECIFICATIONS

APPENDIX 3C DOMINION HOTEL SPECIFICATIONS APPENDIX 3C DOMINION HOTEL SPECIFICATIONS 1. GENERAL 1.1 Refer to Section 2.1 of Schedule 3 [Design and Construction Specifications] regarding compliance with Schedule 3 and this Building Specification.

More information

Administrative Offices

Administrative Offices CUYAHOGA COUNTY PUBLIC LIBRARY EXISTING FACILITY ASSESSMENT December 2009 Administrative Offices 2111 Snow Road, Parma, Ohio 44134 Location Entry Site View of Staff Entrance ADM Administrative Offices

More information

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,

More information

Eastern Cape Development Corporation invites developers to submit proposal calls with concept, designs and funding. and Motor Town Land

Eastern Cape Development Corporation invites developers to submit proposal calls with concept, designs and funding. and Motor Town Land REQUEST FOR PROPOSAL Eastern Cape Development Corporation invites developers to submit proposal calls with concept, designs and funding. RFP Reference Number Description Briefing Meeting Closing Date/Time

More information

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012 2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,

More information

Preliminary Inspection Plan Certification On Site Inspection. Ancillary Design... Ancillary Construction Inspecti... Testing Requirement

Preliminary Inspection Plan Certification On Site Inspection. Ancillary Design... Ancillary Construction Inspecti... Testing Requirement 1 Commencement Setting Out Ground Location of existing below ground service Ground Location of site gas CSD Ground Location of site water mains CSD Ground Location of below ground drainage FFA Ground Location

More information

Preliminary Inspection Plan Certification On Site Inspection. Ancillary Design... Ancillary Construction Inspecti... Testing Requirement

Preliminary Inspection Plan Certification On Site Inspection. Ancillary Design... Ancillary Construction Inspecti... Testing Requirement 1 Commencement Setting Out Ground Location of existing below ground service Ground Location of site gas CSD Ground Location of site water mains CSD Ground Location of below ground drainage FFA Ground Location

More information

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com

More information

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested. Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure

More information

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL Permit Application #: Date: mm/dd/yy Project Address Applicant s Name NOTE TO PERMIT APPLICANTS: All permit applications must

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS New Construction, Addition, or Alteration All plans submitted must be prepared, sealed, and signed by a Registered Nebraska Design Professional

More information

City of South Pasadena COMMUNITY IMPROVEMENT

City of South Pasadena COMMUNITY IMPROVEMENT City of South Pasadena COMMUNITY IMPROVEMENT Office Address: Mailing Address: 6940 Hibiscus Ave S 7047 Sunset Dr S South Pasadena, FL 33707 South Pasadena, FL 33707 *PHONE: (727) 343-4192 * FAX: (727)

More information

OPERATIONAL POLICY AND PROCEDURE

OPERATIONAL POLICY AND PROCEDURE OPERATIONAL POLICY AND PROCEDURE Overv iew Building & Environment Asbestos Policy Cleaning Policy Passenger and Goods Lifts Ladders and Access Equipment Policy Sanitary Bins Policy Waste Management Policy

More information

PHILMONT WAREHOUSE BUILDING PRELIMINARY STRUCTURAL ASSESSMENT

PHILMONT WAREHOUSE BUILDING PRELIMINARY STRUCTURAL ASSESSMENT PHILMONT WAREHOUSE BUILDING PRELIMINARY STRUCTURAL ASSESSMENT Prepared for: GATTER ARCHITECTS 111 MAIN ST. PHILMONT, NY 12565 Prepared by: TACONIC ENGINEERING, DPC PO BOX 272 CHATHAM, NY 12037 TACONIC

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT A-23, 24, 25, 26 BSCIC, Industrial Estate, Kalurghat, Chittagong The Alliance for Bangladesh Worker Safety Page 1/15 Introduction to the Report The following

More information

(Old examination format for reference only)

(Old examination format for reference only) The Institution of Structural Engineers Associate-Membership Examination 11 APRIL 2003 INSTRUCTIONS TO CANDIDATE 1. The examination comprises two sessions separated by a lunch break of 1 2 hour, during

More information

DAVIS ELEMENTARY SCHOOL

DAVIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-

More information

LORD'S VIEW INDUSTRIAL PARK

LORD'S VIEW INDUSTRIAL PARK P a g e 1 LORD'S VIEW INDUSTRIAL PARK APPLICATION: - BUILDING PLANS CHECKLIST APPROVAL PROCESS Contents 1 Property Information...Page 2 2 Owner/Title Holder...Page 2 3 Designer... Page 2 4 Scrutiny Fees...

More information

Property Services Design Standard Volume 5 Hydraulic Systems Issue

Property Services Design Standard Volume 5 Hydraulic Systems Issue Design Standard Volume 5 Issue 7 2015 August 2015 RMIT University Design Standards Volume Five August 2015 Version Control This document will be updated and re-issues to reflect approved change to content,

More information

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan Brief Building Overview: 200 Minuteman Park stands as a 200,000 square foot Class A office building in Andover, Massachusetts, worth roughly $15,000,000. Although the building has a large square footage,

More information

PRESCRIPTIVE COMPLIANCE METHOD

PRESCRIPTIVE COMPLIANCE METHOD CHAPTER PRESCRIPTIVE COMPLIANCE METHOD 3 SECTION 301 GENERAL 301.2 Building materials. Building materials shall comply with the requirements of this section. 301.2.1 Existing materials. Materials already

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space. CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street, Room 201, Manassas, VA 20110 P.O. Box 560 Manassas, VA 20108 Phone: 703-257-8278 Fax: 703-257-5831

More information

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION OFFICIAL USE ONLY Date: Permit #: Received by: For Staff Use Only: OFD ELEC Planning SITE LOCATION Site Address: Tax Parcel Number: TYPE OF WORK Building

More information

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding

More information

CODE ANALYSIS REPORT SECOND FLOOR

CODE ANALYSIS REPORT SECOND FLOOR CODE ANALYSIS REPORT SECOND FLOOR 384 DWIGHT STREET HOLYOKE, MA Prepared by Dietz & Company Architects, Inc. 17 Hampden Street Springfield, MA March 2014 INTRODUCTION The following report is a preliminary

More information

Leaseholder Information Booklet

Leaseholder Information Booklet Leaseholder Information Booklet This information booklet provides details about the lease on your home. It will give you information about: What your lease means Your rights and responsibilities, as well

More information

Area The University s responsibilities The Occupier s responsibilities External Area Bicycle sheds

Area The University s responsibilities The Occupier s responsibilities External Area Bicycle sheds Responsibilities of University and Occupier of University Buildings (Schools) Below lists the University s responsibilities and your responsibilities as the Occupier of University buildings Area The University

More information

Area The University s responsibilities The Occupier s responsibilities External Area Bicycle sheds

Area The University s responsibilities The Occupier s responsibilities External Area Bicycle sheds Responsibilities of University and Occupier of University Buildings (Schools) Below lists the University s responsibilities and your responsibilities as the Occupier of University buildings Area The University

More information

Overall Existing Conditions Summary

Overall Existing Conditions Summary September 12, 2002 Overall Executive Summary: The multi-use project on 250 West Street is a 7-story building with space for offices, retail, storage and parking. The project is a small part of the development

More information

Scope of Work. Invitation to Bid Interior Renovation Works for the United Nations University, Macau (Phase 1) (UNUCS-ITB/001/2015)

Scope of Work. Invitation to Bid Interior Renovation Works for the United Nations University, Macau (Phase 1) (UNUCS-ITB/001/2015) Scope of Work Invitation to Bid Interior Renovation Works for the United Nations University, Macau (Phase 1) (UNUCS-ITB/001/2015) 1. Technical Specifications 1.1 The United Nations University Computing

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1951 3,813 Page 1 of 25 1. Architectural / Structural & Site Exec Summary Hillcrest Public School is a two storey structure of masonry

More information

Site Bldg Fiscal Yr System Sub-System. Verde Valley Site site 2014/15 Parking Paving. Verde Valley Site site 2014/15 Sidewalks

Site Bldg Fiscal Yr System Sub-System. Verde Valley Site site 2014/15 Parking Paving. Verde Valley Site site 2014/15 Sidewalks Site Bldg Fiscal Yr System Sub-System Site site 2014/15 Parking Paving Site site 2014/15 Sidewalks Skill Center L 2015/16 Architectural Partitions Site Site 2015/16 Parking Striping Arc Center M 2014/15

More information

TEXAS A&M ENGINEERING

TEXAS A&M ENGINEERING TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director, Texas

More information

Building Consent COMMERCIAL

Building Consent COMMERCIAL Building Consent COMMERCIAL About this checklist This checklist is required for all BC applications. The applicant should identify if, and where, information is shown on the plan drawings. This is to help

More information

Draft Feasibility Study for the Expansion of Southeast Library

Draft Feasibility Study for the Expansion of Southeast Library DC public Library KH KEAST & HOOD METROPOLITAN E N G I N E E R I N G I N C S H A P I RO-O BRIEN Draft Feasibility Study for the Expansion of Southeast Library Draft Submission: November 4, 2016 1 OVERVIEW

More information

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS NOTE: Building Code compliance is the obligation of design professionals and/or contractors. Plan review and inspection guidelines are to be used to ensure

More information

CONSTRUCTION DOCUMENTS NECESSARY FOR PLAN REVIEW

CONSTRUCTION DOCUMENTS NECESSARY FOR PLAN REVIEW 2012 International Residential Code 2012 International Building Code 2012 International Fire Code 2014 NFPA 70 National Electrical Code 2012 International Existing Building Code 2012 International Plumbing

More information

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018 G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake

More information

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS November 2018 Contents 1. Introduction... 1 2. Ontario Building Code and Second Dwelling Units... 1 3. How Do I Make My Secondary Dwelling Unit

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory 191-192 Baizid Bostami Road, Nasirabad Industrial Area, Chittagong 24 May 2014 The Alliance for Bangladesh Worker Safety Page 1/13 24 May 2014 Introduction

More information

NOTE: For construction other than new commercial or additions (renovations), only those areas below describing the scope of work will be applicable.

NOTE: For construction other than new commercial or additions (renovations), only those areas below describing the scope of work will be applicable. Applicant s Name: New Commercial - Commercial Additions Renovations Permit Plan Submittal Check List Applicant s Phone Number (s): Project Address: Project Type: _New Commercial or Commercial Addition

More information

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of: 02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"

More information

FORM NO. Certificate of Stability for Continued Use of School

FORM NO. Certificate of Stability for Continued Use of School FORM NO. Certificate of Stability for Continued Use of School 1. Name of the Building: 2. Address: 3. Phone No. /Email: 4. Name of the Occupier of the Premises: 5. Use of Occupancy: 6. No. of floors: I

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

Paulsboro Public Schools

Paulsboro Public Schools BOND REFERENDUM PRESENTATION January 27, 2015 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com 1 05-12-14 AGENDA NJDOE

More information

Uniform Construction Code

Uniform Construction Code Uniform Construction Code When the UCC Requires Permits and Inspections (A Zoning Certificate may be required even though the project does not require a UCC Building Permit.) As a general rule, the UCC

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT Factory C.D.A Plot No. C-49, Sagarika Road, Pahartaly, Chittagong Chittagong 18 May 2014 The Alliance for Bangladesh Worker Safety Page 1/12 18 May 2014

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 I DATE: May 9-11, 2017 ****************************************************************************** SUBJECT: SDSU Harding Hall Renovation

More information

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 1. Upgrade Video Security and Surveillance Systems - Replace with New a. Existing

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION Town of Hague Building Inspector: Dale Wagner Home #: 306-225-2265 Cell #: 306-241-4741 Fill all part of the permit application including the date and signature.

More information

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition Summary

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District NATATORIUM CAMPUS DATA NATATORIUM 22628 Hwy 105 West, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 30,420 n/a Current Enrollment n/a Building Levels 1 1 MASTER PLAN 2

More information

Columbia County Health Care Center Added Amenities

Columbia County Health Care Center Added Amenities Columbia County Health Care Center Added Amenities Columbia County Board Meeting on January 16th, 2013 Building Exterior Added Amenities 1. Upgraded nail-base roofing insulation to 3 thickness on Center

More information

MultiProof -design compliance with Building Code clauses

MultiProof -design compliance with Building Code clauses MultiProof -design compliance with Building Code clauses Applicants and designers should use this table as a starting point for MultiProof. It lists the Building Code clauses, summarises what you need

More information

How to Prepare Your LSE Report

How to Prepare Your LSE Report LSE Rule Category Required Documentation Information Comments / Applicable Code Sections/ 10.1 Building Height Provide the Building height in Feet Provide the number of stories above grade Helpful Hints

More information