1 Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Operation Name: Java-Bali Power Sector Restructuring and Strengthening Project Stage: Implementation Seq.No: 16 Status: ARCHIVED Archive Date: 12-Apr-2011 Project (P063913) Country: Indonesia Approval FY: 2003 Product Line: IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): Perusahaan Listrik Negara (Persero) (PLN), PGN Key Dates Board Approval Date 26-Jun-2003 Original Closing Date 31-Dec-2008 Planned Mid Term Review Date Last Archived ISR Date 12-Apr-2011 Effectiveness Date 07-Jul-2004 Revised Closing Date Actual Mid Term Review Date 16-Jun-2008 Project Development Objectives Project Development Objective (from Project Appraisal Document) The development objective of the Project is to improve the reliability and efficiency of the power system in Java-Bali and strengthen PLN and PGN's management capabilities. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost 500KV AND 150KV TRANSMISSION SYSTEM PLN'S ERP SYSTEM TA TO PLN 1.75 TA TO PGN 6.00 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Implementation Status Overview The project has made good progress towards achieving its development objectives. Most of the investments to improve the reliability and efficiency of the Java-Bali transmission network are already completed, while those that are pending are expected to be completed by end 2013, provided the national power utility PLN is able to obtain right of way clearances to finish construction of the outstanding transmission lines that are needed to carry power to the beneficiaries. The Enterprise Resource Planning (ERP) system deployed Page 1 of 6
2 under the project has substantially improved the management of finances, materials, and human resources of PLN's business units in Java and Bali and the system is being expanded to Sumatra and Sulawesi. Technical studies have provided valuable inputs for improving energy markets and institutions, and for improving generating capacity in Java. Locations Country First Administrative Division Location Planned Actual Indonesia Not Entered Daerah Istimewa Yogyakarta Indonesia Not Entered Ungaran Indonesia Not Entered Ujung Indonesia Not Entered Surabaya Indonesia Not Entered Perak Indonesia Not Entered Paiton Indonesia Not Entered Klaten Indonesia Not Entered Kediri Indonesia Not Entered Propinsi Jawa Timur Indonesia Not Entered Propinsi Jawa Tengah Indonesia Not Entered Daerah Khusus Ibukota Jakarta Raya Indonesia Not Entered Grati Indonesia Not Entered Gandul Indonesia Not Entered Drajat Indonesia Not Entered Cirebon Indonesia Not Entered Cibinong Indonesia Not Entered Ciamis Indonesia Not Entered Bandung Indonesia Not Entered Propinsi Bali Indonesia Not Entered Propinsi Banten Indonesia Not Entered Banaran Indonesia Not Entered Mandirancan Page 2 of 6
3 Country First Administrative Division Location Planned Actual Indonesia Not Entered Provinsi Irian Jaya Barat Indonesia Not Entered Manisrejo Indonesia Not Entered Pembangkit Listrik Tenaga Uap Kamojang Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Natural Gas Pricing and PGN's restructuring Completed by Nov and partial privatization studies completed Increased dispatch capability of generation units in East Java Reduced substation loadings at key Java-Bali 500kV and 150kV substations Text Value Natural Gas Pricing and PGN's restructuring and partial privatization have not been undertaken Natural Gas Pricing and PGN's restructuring and partial privatization studies completed Date 04-Jun Dec-2009 Text Value Around 2000 MW of dispatch Dispatch capability of Additional 2000 MW of capability in 2002 generation units in east Java dispatch capability by project has been increased closing date Dispatch capability of generation units in east Java has been increased. However, the main benefit of the increased dispatch from the Grati steam plant to South Surabaya S/S (and corresponding reduction of the oil fired generation at Gresik) has not materialized yet due to the delay in the construction of the transmission line from Grati to South Surabaya Text Value The majority of substations have loadings at 80% of the capacity or more in 2002 Substation loadings considerably reduced by The majority of substations have loadings at 50%-60% of the capacity Page 3 of 6
4 Improved voltages at key 150kV substations in southeastern Java PLN issues reconciled financial statements for the Java-Bali System within 45 days upon the completion of the fiscal year Text Value The majority of key 150kV substations voltages are operating at 90% of capacity, or at 135kV in 2002 Text Value 90 days when performed manually Date 19-Jun-2008 commissioning of four 500/150 kv inter-bus transformers and a majority of the twenty 150/MV transformers. One 500/150 kv ITB transformer was used to meet a system emergency caused by the failure of a transformer at NewCilegon thus averting major system outages in this area. System voltages in project areas have improved and exact information is being collected. More precise quantitative information is being collected. Within 45 days in Target was achieved in The majority of key 150kV substations voltages are operating at 100% ofcapacity 45 days since ERP fully deployed in Java-Bali System 31-Dec-2009 Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Implementation milestones and the commissioning dates of 500kV substation expansions Text Value component not begun South Surabaya substation awaiting completion of transmission line. The four west Java and Jakarta substations are now completed as required and the South Surabaya substation is virtually ready although the transmission line for its energization (funded under a JICA project) has not been completed. Completed by project closing date Page 4 of 6
5 Implementation milestones and the commissioning dates of 150kV substation expansions and uprated lines ERP system deployed to entire Java-Bali System after completing initial pilot roll-out Progress report on PLN TA - Supplemental Study on Upper Cisokan Pump Storage Project Text Value Upgrade not begun Central and West Java line uprating awaiting resolution of price escalation negotiations; and land acquisition. Completed by project closing date Date 04-Jun-2003 Most of the substation expansions have been accomplished and the 150 kv line in East Java has been completed. However, the upratingof lines in Central and West Java are delayed due to land acquisition and contract problems. Contract problems relate to the request for price escalation by contractors caused due to delays in processing the contracts by PLN. Text Value PLN does not employ ERP Rollout completed and "golive" ERP succesfully completed system targets met. 31-Dec-2009 Targets met by Nov Text Value TA has not begun TA completed in June TA completed 31-Dec-2009 Progress on TA studies for PGN Text Value TA studies not begun TA studies completed in FY06-07 PGN has also completed training activities and remaining unused loan balance has been canceled. Data on Financial Performance (as of 09-Jun-2011) Financial Agreement(s) Key Dates TA studies completed by project closing date 31-Dec-2008 Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P IBRD Closed 26-Jun Oct Jul Dec-2011 P IBRD Closed 06-Jul Jul Jul Dec-2011 Page 5 of 6
6 Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P IBRD Effective 08-Jun Jun Apr-2011 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IBRD Closed USD P IBRD Closed USD P IBRD Effective USD Disbursement Graph Key Decisions Regarding Implementation The next mission is planned for September - October Restructuring History Board Approved on 19-Jun-2008, Level two Approved on 22-Dec-2009, Level two Approved on 15-Jul-2010, Level two Approved on 29-Dec-2011 Related Projects P Additional Financing for ERP Expansion beyond Java-Bali Project, P The Extended Deployment of an Enterprise Resource Planning System Page 6 of 6
Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project
More informationImplementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Operation Name: ID-Urban Water Supply and
More informationImplementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Operation Name:
More informationImplementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Africa Central African Backbone - APL2 (P117652)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Operation Name: Central African Backbone - APL2
More informationImplementation Status & Results India Andhra Pradesh Road Sector Project (P096021)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Operation Name: WAPP APL 2 - OMVS
More informationImplementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated
More informationImplementation Status & Results Indonesia Barefoot Engineers III (P131387)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Barefoot Engineers III (P131387) Operation
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Indonesia Geothermal Power Generation Development (P099757)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Geothermal Power Generation Development
More informationImplementation Status & Results India Andhra Pradesh Road Sector Project (P096021)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project
More informationImplementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Operation Name: Ministry
More informationImplementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Operation Name: Rio de Janeiro Mass Transit
More informationImplementation Status & Results Cameroon Agricultural Competitiveness Project (P112635)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) o C Operation
More informationImplementation Status & Results Vietnam Second Transmission and Distribution Project (P084871)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Second Transmission and Distribution Project
More informationPublic Disclosure Copy. Public Disclosure Copy. The World Bank
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Sustainable Integrated Ecosystem
More informationImplementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329) Operation Name: Rajasthan Rural Livelihoods
More informationImplementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)
More informationPublic Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Governance Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 9 ARCHIVED on 05-Jan-2016 ISR22346 Implementing Agencies: BAPPENAS,
More informationImplementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Operation Name: IQ-TF EMERG. WATER, SANITATION
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Transport Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 17-Jun-2015 ISR19767 Implementing Agencies: Hanoi Urban
More informationImplementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy EUROPE AND CENTRAL ASIA Croatia Water Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 15 ARCHIVED on 24-Dec-2015 ISR22041 Implementing
More informationINDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)
Public Disclosure Authorized INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU) (P159191) EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global
More informationImplementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 04-Nov-2015 ISR21002 Implementing Agencies:
More informationImplementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)
More informationPublic Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Public Sector Governance Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 22-May-2015 ISR18498 Implementing Agencies:
More informationImplementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 14 ARCHIVED on 30-Jun-2016 ISR23059 Implementing Agencies:
More informationImplementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)
More informationThe World Bank AO-Market Oriented Smallholder Agriculture Project (P093699)
Public Disclosure Authorized AFRICA Angola Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 06-Nov-2015 ISR21246 Implementing Agencies: Ministry of Agriculture
More informationImplementation Status & Results Benin Benin Emergency Urban Env. Project (P113145)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project
More informationImplementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977) Operation Name: Energy Sector Technical
More informationImplementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Operation Name: Second Agricultural Technology
More informationImplementation Status & Results Brazil Sustainable Cerrado Initiative (P091827)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827) Operation Name: Sustainable Cerrado Initiative (P091827)
More informationImplementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Operation Name: Second Agricultural Technology
More informationThe World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841)
Public Disclosure Authorized AFRICA Senegal Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 10 ARCHIVED on 26-Dec-2017 ISR30717
More informationPlant Project, Muara Tawar Gas Fired Power Plant Extension Project and South Sumatra-West Java Gas Pipeline Project.
Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tanjung Priok Gas Fired Power Plant Extension Project External Evaluator: Masumi Shimamura, Mitsubishi UFJ Research and Consulting
More informationThe World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy Overall Ratings
Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project (P113145) Project Stage: Implementation Seq.No: 3 Status: ARCHIVED
More informationImplementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Operation
More informationThe World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841)
Public Disclosure Authorized AFRICA Senegal Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 9 ARCHIVED on 30-Jun-2017 ISR26846 Implementing
More informationThe World Bank KI: Telecommunications and ICT Development Project (P126324)
Public Disclosure Authorized EAST ASIA AND PACIFIC Kiribati Transport & ICT Global Practice IBRD/IDA Technical Assistance Loan FY 2013 Seq No: 7 ARCHIVED on 15-Jun-2016 ISR23726 Implementing Agencies:
More informationImplementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P086341)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P86341) o C Operation
More informationImplementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Operation
More informationKey Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions
The World Bank LATIN AMERICA AND CARIBBEAN Chile Governance Global Practice Institutional Development Fund FY 2013 Seq No: 3 ARCHIVED on 13-Nov-2015 ISR21160 Implementing Agencies: Dirección Nacional de
More informationImplementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Operation
More informationName Previous Rating Current Rating
Public Disclosure Authorized Public Disclosure Copy MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Environment & Natural Resources Global Practice Global Environment Project Investment Project Financing
More informationCurrent Indonesia s ENERGY SITUATION
Current Indonesia s ENERGY SITUATION Seminar on COGEN 3: A Business Facilitator Inter-Continental Hotel Jakarta, Indonesia 26-27 August 2002 Dr. Ferdi Ardiansyah Country Co-ordinator SOCIAL ECONOMIC PARAMETERS
More informationThe World Bank Sustainable Land Management Project (P133133)
Public Disclosure Authorized AFRICA Ethiopia Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 9 ARCHIVED on 04-Dec-2017 ISR28418 Implementing Agencies:
More informationRepublic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi
Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi Shimamura, Mitsubishi UFJ Research and Consulting Co.,
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name Indonesia Power Transmission Development Project Region EAST ASIA AND PACIFIC Sector Power (100%) Project ID P117323 Borrower(s)
More informationThe World Bank Pernambuco Rural Economic Inclusion (P120139)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF PERNAMBUCO RURAL ECONOMIC INCLUSION APPROVED ON MARCH 6, 2012 TO STATE
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal
More informationZAMBIA Lusaka Transmission and Distribution Rehabilitation Project Abbreviated Procurement Plan [January 10, 2014 to December 2019] Procurement Plan
Public Disclosure Authorized Public Disclosure Authorized I. General ZAMBIA Lusaka Transmission and Distribution Rehabilitation Project Abbreviated Procurement Plan [January 10, 014 to December 019] Procurement
More information1. Project Description
Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project South Sumatra West Java Gas Pipeline Project External Evaluator: Masumi Shimamura, Mitsubishi UFJ Research and Consulting Co.,
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET
More informationEx-Post Evaluation of Japanese Grant Aid Project Project for Rehabilitation of Gresik Steam Power Plant Units 3 and 4
Indonesia Ex-Post Evaluation of Japanese Grant Aid Project Project for Rehabilitation of Gresik Steam Power Plant Units 3 and 4 1. Project Description External Evaluators: Junko Fujiwara, OPMAC Corporation
More information(1) Current State and Issues of the Electricity Sector in Indonesia
Japanese ODA Loan Ex-ante Evaluation 1. Name of the Project Country: The Republic of Indonesia Project: Lumut Balai Geothermal Power Plant Project Loan Agreement: March 30, 2011 Loan Amount: 26,966 million
More informationFOR OFFICIAL USE ONLY
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 57895-ID Public Disclosure Authorized PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN IN THE AMOUNT OF US$640 MILLION
More informationProposed Results-Based Loan Indonesia: Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program
Concept Paper Project Number: 50016 June 2016 Proposed Results-Based Loan Indonesia: Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program CURRENCY EQUIVALENTS (as of 30 May
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 3 9 PROJECT PREPARATORY TECHNICAL ASSISTANCE A. Justification 1. A project preparatory technical assistance (PPTA) is required to prepare all documents for the sector project framework and core
More informationMeter Data Management System (MDMS) Sharing. Ricky Ip CLP Project Manager
Meter Data Management System (MDMS) Sharing Ricky Ip CLP Manager Agenda Introduction Objectives Critical Success Factors Change Management Lessons Learned 2 CLP Power Hong Kong Limited (CLP Power) is the
More informationFundamentals of Transmission Operations
Fundamentals of Transmission Operations Equipment Outages PJM State & Member Training Dept. Objectives At the end of this presentation the Learner will be able to: Identify how weather may influence outage
More informationRepublic of Indonesia FY 2015 Ex-post Evaluation of Japanese ODA Loan Project Lahendong Geothermal Power Plant Project
Republic of Indonesia FY 2015 Ex-post Evaluation of Japanese ODA Loan Project Lahendong Geothermal Power Plant Project External Evaluator: Keiko Watanabe Mitsubishi UFJ Research & Consulting Co., Ltd.
More informationThe World Bank Ethiopia: Supporting Open Data Initiative (P156400)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ETHIOPIA: SUPPORTING OPEN DATA INITIATIVE APPROVED ON OCTOBER 15, 2015
More informationA-A 3c2'0 - /-VL) Document of The World Bank FOR OFFICIAL USE ONLY. Repon No IND
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY A-A 3c2'0 - /-VL) STAFF APPRAISAL REPORT
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22361 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK R95-01 28 June 2001 TECHNICAL ASSISTANCE TO INDONESIA FOR PREPARING A GAS SECTOR DEVELOPMENT PLAN (FINANCED FROM THE JAPAN SPECIAL FUND) The attached Report is circulated for the
More informationthink about the ENVIRONMENT
October 2017 think about the ENVIRONMENT 2 Cement companies in Indonesia Domestic Capacity (2017) 2017F Design Capacity : 106.3 mt Production Capacity: 74.0 mit Domestic Growth : 5.0% Domestic Utilization:
More informationFinancial Results of PGNiG SA Q August 13th 2008
Financial Results of PGNiG SA 28 August 13th 28 Financial Highlights PGNiG Group (PLN m) 27 28 change Sales revenue 3,392 3,929 16% EBIT 412 294 (29%) EBITDA 785 665 (15%) Net profit 326 28 (14%) Net margin
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SUSTAINABLE PROD. IN AREAS PREVIOUSLY CONVERTED TO AGRICULTURAL USE APPROVED ON JULY 18, 2014
Public Disclosure Authorized The World Bank REPORT NO.: RES27088 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF Public Disclosure Authorized SUSTAINABLE PROD. IN
More informationIMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-73590) ON A LOAN IN THE AMOUNT OF US$259.6 MILLION TO THE ARAB REPUBLIC OF EGYPT FOR A
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-73590)
More informationTeamcenter Page 1. Siemens PLM Software Siemens Product Lifecycle Management Software Inc. All rights reserved
Teamcenter 2007 Page 1 Teamcenter 2007 Launch Sammy Sit Marketing Director Teamcenter Marketing Asia Pacific Announcing Teamcenter 2007 Delivering as promised Fully Integrated PLM suite End-to-End, Collaborative
More informationImplementation Status & Results Report Coastal Watersheds Conservation in the Context of Climate Change Project (P131709)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Mexico Environment & Natural Resources Global Practice Global Environment Project Investment Project Financing FY 2014 Seq No: 9 ARCHIVED on 30-Oct-2017
More informationDocument of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48170) ON A LOAN
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00001790 IMPLEMENTATION COMPLETION AND RESULTS
More informationTransmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008
Transmission Planning at the Midwest ISO Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008 Midwest ISO: What We Do Monitor flow of power over the high voltage
More informationNationally Appropriate Mitigation Actions (NAMAs) National Integrated Process - Energy Sectors
KOMITE NASIONAL INDONESIA Nationally Appropriate Mitigation Actions (NAMAs) National Integrated Process - Energy Sectors PECC at 30: New Vision for APEC and Toward Further Regional Economic Cooperation
More informationSimulation to Attain Optimal Composition of Power Plant Technology in Java-Madura-Bali up to year of
Simulation to Attain Optimal Composition of Power Plant Technology in Java-Madura-Bali up to year of 2026 11 Ronald Winardi 1 *, PY.TopoSuprihadi 2, and Sudi Ariyanto 3 Physics Department, Faculty Science
More informationPromoting JCM scheme in Indonesia. Dicky Edwin Hindarto Head of Indonesia JCM Secretariat
Promoting JCM scheme in Indonesia Dicky Edwin Hindarto Head of Indonesia JCM Secretariat All stakeholders work together to promote JCM 2 22 6 2 108 3 3 Some challenges on Indonesia JCM implementation Reliability
More informationDoD Competency Management Overview. May 2013
DoD Competency Management Overview May 2013 Overview Competency Management/Development Competency Management Drivers Competency Development Process Competency Model Development Considerations Draft Competency
More informationEconomic and Environmental Emissions Analysis in Indonesian Electricity Expansion Planning: Low-rank Coal and Geothermal Energy Utilization Scenarios
Economic and Environmental Emissions Analysis in Indonesian Electricity Expansion Planning: Low-rank Coal and Geothermal Energy Utilization Scenarios Yusak Tanoto a, *, Muhammad Ery Wijaya b a Electrical
More informationThe World Bank Burkina Faso - Bagre Growth Pole Project (P119662)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF BURKINA FASO - BAGRE GROWTH POLE PROJECT APPROVED ON JUNE 21, 2011 TO
More informationINTEGRATING NATURAL GAS INFRASTRUCTURE TO MARKET
INTEGRATING NATURAL GAS INFRASTRUCTURE TO MARKET PT Perusahaan Gas Negara (Persero) Tbk May 2014 GEO ENERGY CONFERENCE AND EXIBITION : 4th LNG Supply, Transport & Storage INTRODUCTION PGN IS A STATE OWNED
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE FOREST PROTECTION AND REFORESTATION PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Indonesia Project: Engineering Services (E/S) for Construction of Jakarta Mass Rapid Transit East-West
More informationIndonesia Ex-Post Evaluation of Japanese ODA Loan Project Railway Double Tracking on Java South Line (1) (2)
Indonesia Ex-Post Evaluation of Japanese ODA Loan Project Railway Double Tracking on Java South Line (1) (2) External Evaluator: Takako Haraguchi, International Development Associates 0. Summary The double
More informationDECADES Tool to Make Comparative Assessment of Electricity Generation in Indonesia 1
DECADES Tool to Make Comparative Assessment of Electricity Generation in Indonesia 1 Abubakar Lubis Agus Sugiyono Agency for the Assessment and Application of Technology (BPPT) Indonesia 1. Introduction
More informationENTERPRISE SURVEYS WHAT BUSINESSES EXPERIENCE. Indonesia 2015 Country Profile ENTERPRISE SURVEYS
ENTERPRISE SURVEYS ENTERPRISE SURVEYS WHAT BUSINESSES EXPERIENCE Indonesia Country Profile 1 Contents Introduction... 3 Firms Characteristics... Workforce... Firm performance... Physical Infrastructure...
More informationAdministration Division Public Works Department Anchorage: Performance. Value. Results.
Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,
More informationREQUEST FOR PROPOSALS FOR AUTOMATED METERING INFRASTRUCTURE
REQUEST FOR PROPOSALS FOR AUTOMATED METERING INFRASTRUCTURE October 16, 2017 Revised October 27, 2017 Northern Wasco County People s Utility District ( NWCPUD ) is issuing this Request for Proposal (RFP)
More informationJapan s Assistance for the Reconstruction of Iraq
Japan s Assistance for the Reconstruction of Iraq - Contents - I. Overview II. Reconstruction Assistance by Japan s Self-Defense Force III. Japan s Official Development Assistance (ODA) (1) General view,
More informationECONOMIC AND ENVIRONMENTAL EMISSION ANALYSIS IN INDONESIAN ELECTRICITY EXPANSION PLANNING: LOW-RANK COAL AND GEOTHERMAL ENERGY UTILIZATION SCENARIOS
International Journal of Renewable Energy Resources 1 (2011) 61-66 ECONOMIC AND ENVIRONMENTAL EMISSION ANALYSIS IN INDONESIAN ELECTRICITY EXPANSION PLANNING: LOW-RANK COAL AND GEOTHERMAL ENERGY UTILIZATION
More informationDevelopment of District Energy Supply Business by Introducing Co-generation
JCM Feasibility Study (FS) 2015 Summary of the Final Report Development of District Energy Supply Business by Introducing Co-generation ( Implementing Entity: JGC Corporation ) 1.Overview of the proposed
More informationCluster Study Process
Cluster Study Process This presentation is a tool to supplement the FERC approved Generator Procedures (GIP) found in Attachment I of PG&E s Wholesale Distribution Tariff (WDT) and Appendix Y of CAISO
More information