1 CITY OF MIAMI Capital Improvements Program BID NO.: Museum Park Baywalk and Promenade Phase II and III, B ADDENDUM NO. 9 August 17, 2012 Additional Plan Sheets - Irrigation The detail sheets and general notes referenced below were erroneously omitted from Phase III. Posted as part of this Addendum are pdf s of those sheets. The details are included in the Baywalk plans; therefore, the bidder should have sufficient information to price the system. To reiterate, as discussed at the Mandatory Pre-Bid meeting held on July 10, 2012, Phase III irrigation completely replaces the Phase II irrigation. IRR-11 (no revisions, re-posted for legibility) IRR-13 IRR-14 IRR-15 Revision to Insurance Requirements New language is in red text and deletions have been struck through. 7. Insurance 7.9 Contractor s Professional/Pollution Liability A. Limits of Liability Each Occurrence $3,000,000 Police Aggregate $3,000,000 Contractors Pollution Liability (CPL) policy with limits of $3m each loss, $3m policy aggregate affording (A) through (I) coverage s, with an extending period of 36 months, and listing the City, Bayfront and FDOT as additional insured. General, Auto and Umbrella/Excess Liability coverage s and Builder s Risk, will require the City, Bayfront and FDOT (when applicable) to be listed as an additional insured. Museum Park Baywalk and Promenade Phase II and III Addendum No 9 ITB

2 Request for Information Q1. The Phase II Description for Line Item # four (4) and five (5) indicates colored concrete pavement The Phase II Drawings do not indicate color concrete. Will the eight (8) inch & four (4) inch concrete pavement require color? If so, please provide the color. Please clarify. A1. Both require eight & four require color. Color to be Scofield Chromix Admix #6063 winter beige per Cast-inplace concrete specification p. Q2. Phase II Detail on Sheets PGD-15, PGD-20, and PGD-22 indicate installation of Woven & Non-Woven Geotextile Fabric. However, no Line Item can be located for this Insulation. Please identify in what Line Item this cost is to be included. Please clarify. A2. Filter Fabric on sheet PGD-15 should be added to Line Item 21A, and the filter fabric on PGD-20 and PGD-22 should be included on line items 4 and 5 depending on the thickness of the slab. Q3. Phase II Line Description of Line Item # three (3), Move, Place, and Compact Material, does not identify Excess Material. Is this Line Item to include the cost of the Hauling & Removal of Excess Material from the site? Please clarify. A3. The Cut and fill on site was designed to balance. Q4. The Bid Form Category of Earthworks does not provide a Line Item for Clearing & Grubbing. Is Line Item # three (3), Move, Place, and Compact Material, to include the cost for Clearing & Grubbing? Please clarify. A4. Cost of clearing and grubbing to be included in line item #2. Q5. Phase II Drawing PGD-15 indicates an eight (8) inch Geo-Web Material for Section Cut Type one (1) and Type two (2) for the Fire Lane ~ Reinforced Grass Surface. However, no Line Hern can be identified for this cost what Line Item in the Bid Form is associated with this cost? Please clarify. A5. Refer to Line Item 7A. Q6. No Line Item identifies the Phase III two (2) inch Domestic Waterline Service to the Restroom Building. Please clarify. A6. Refer to line items for restroom utilities. Q7. Please clarify if Phase II Paver quantities indicated on Line Items nine (9), twelve (1 and fifteen (15) are the exact actual quantities to be installed? If so, please provide the waste factor (%] that should be used so that all bidders bid the same quantities. Please clarify. A7. Quantities nine, twelve and fifteen are actual. Q8. Pavers with Grass Band Section A of Phase iii Drawing PGD-17 indicates a blocking beneath the sand fill. However, the material of the blocking is not provide, what is the material of the blocking? Please clarify. A8. Blocking is to be vehicular paver, cut to size indicated on detail. Q9. Phase III Drawing PGD-18 indicates a New Concrete Slab beneath the Burle Marx Pavers. However, no one Item in the Phase HI Bid Form indicates this cost. What Line Item is associated with this cost? Is there an existing concrete slab beneath? The demolition drawings do not indicate any work in this area. Please clarify. Museum Park Baywalk and Promenade Addendum No. 9 ITB Page 2

3 A9. Concrete slab is existing. If no slab is present, the pavers are to be installed per Detail 6 on sheet PGD-25. Q10. The Phase ill Bid Form under the Water Main Loop Category does not provide line items for the following items: 1) 12" x 6" Tees (Fitting not identified); 2) Air Release Values: 3) 45 Degree Bends. Please clarify. Part # 2 Of 2: We are in receipt. A10. Valves are to be included in the fire hydrant assembly price and fittings are to be incorporated into the pipe line item. Q11. Addendum # 5 - Section "c" (Pursuant to Section 1 -Instructions for Submission, Article 17, Community Small Business Enterprise [CSBE]) - Subpart B states "Five percent (5%) of the bid amount shall be retained by the City for the CSBE requirements until said requirements are fulfilled and verified within six (6) months of Contract Completion pursuant to Ordinance No "Is this five percent (5%) included within the overall ten percent (10%) of Retainage? A11. Yes. Q12. Addendum # 5 - Section "c" (Pursuant to Section 1 -Instructions for Submission, Article 17, Community Small Business Enterprise [CSBE]) - Subpart B states ""Five percent (5%) of the bid amount shall be retained by the City for the CSBE requirements until said requirements are fulfilled and verified within six (6) months of Contract Completion pursuant to Ordinance No ". What Line Item in the Bid Form is associated with the cost of the General Contractor to hire an independent third party professional to certify compliance with the CSBE? A12. The bidder s costs for the Independent the third party professional shall be included in the bid as part of the overhead, Bid Form page 2 of ten, second paragraph. Q13. Phase II Drawing PGD-16 provides Concrete Sidewalk Details. Detail Type D titled. Sealed Expansion Joints, notes a half inch (1/2") Premolded Expansion Joint Material to be Sealed. However, no notes or specifications are provided for this Sealant. Please provide specifications for this Sealant please clarify. A13. Contractor is to submit shop drawings in accordance with the City of Miami Public Works standard specifications for approval. Q14. We have noticed there is no material schedule listed nor is there a zone chart provided as there was for Phase II Irrigation. In addition, on sheet IR-2, phase III, the 6 mainline just stops in the middle of the page. There are no instructions as to what to do with this termination. A14. See Sheets IRR-13 through IRR-15 which are posted as part of this addendum. The 6 water main printed as a grey line. The dark dashed line is to be ignored. Q15. There is an item on drawings page GEN-2 Note #38, Exploring and Pre-Trenching. Can you provide a unit price for this item so that it is fair to the owner and the contractor? A15. The Price to be included in the individual line items. Q16. There is no line item for Testing on phase III as there is on phase II. Will this be required? If so, please let us know where to include this pay item. A16. Refer to line item 89 on Phase II Bid. Since this will be bid as one project, include testing for all items in this line item. Q17. We have noticed there is no material schedule listed nor is there a zone chart provided as there was for Phase II Irrigation. In addition, on sheet IR-2, phase III, the 6 mainline just stops in the middle of the page. There are no instructions as to what to do with this termination. A17. See Sheets IRR-13 through IRR-15 which are posted as part of this addendum. Museum Park Baywalk and Promenade Addendum No. 9 ITB Page 3

4 Q18. Please identify the line item of the bid form that needs to include 1 rebound per detail 8/LP-20. A18. Disregard Rebound and 1 topsoil layer, label to be removed. Q19. Please provide the specifications of 1 rebound per detail 8/LP-20. A19. Not Applicable See A19. Q20. We understand unless otherwise clarified that 6 Backfill mixture needs to be spread on top of the sod per detail 8/LP-20. Please review & clarify. A20. Backfill mixture callout refers to soil beneath sod. Soil shall be either approved fill/borrow soil per Earth moving Specification section or 4 soil blanket as shown in Ph. 3 add alternate No. 16. Q21. We understand unless otherwise clarified that cost of 6 Backfill mixture per detail 8/LP-20 is part of sod line item of the bid forms. A21. Correct. Q22. Per Addenda #5 Plans - We have noticed there is no material schedule listed nor is there a zone chart provided as there was for Phase II Irrigation. In addition, on sheet IR-2, phase III, the 6 mainline just stops in the middle of the page. There are no instructions as to what to do with this termination. A22. See Sheets IRR-13 through IRR-15. Q23. The spec section , 2.8 A. 2. Specifies a Hunter ACC-99D decoder controller, but the plans specify an ACC A23. Refer to specification on the plans. Q24. While reviewing the irrigation sheets (IR-11 for phase III and there is no material schedule, but the symbols for the heads are completely different from all the other sheets. Also, the plans are almost illegible. In addition, there are supposed to be 15 sheets, but we only received 12. Please advise. For example there is symbol that shows up on the irrigation plans for phase III, SD, but since there is no material legend, we cannot determine what it is. Please clarify. A24. See Sheet IRR-11 which has been posted as part of this Addendum. Q25. Do we need to provide separated prices for the long term maintenance? Is it part of this bid? Please clarify period of long term. Please advise. A25. Per planting spec Planting, section 3.09, Maintenance begins as soon as the plant is installed and continues until final acceptance. However, watering will be until final acceptance or for a minimum of 42 days after planting, whichever is greater in time. For example, if they plant a tree a week before final acceptance, they still need to water the tree until they reach the 42 day minimum requirement. Museum Park Baywalk and Promenade Addendum No. 9 ITB Page 4

5

INVITATION FOR BID (IFB) IFB NO. GSWA

INVITATION FOR BID (IFB) IFB NO. GSWA INVITATION FOR BID (IFB) IFB NO. GSWA 003-18 LAYON LANDFILL CONSTRUCTION OF CELL 3 ADDENDUM NO. 1 OCTOBER 8, 2018 ALL BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS ADDENDUM ON THE SPACE PROVIDED BELOW, AND

More information

QUESTIONS & ANSWERS ITB HELEN MCCALL PARK IMPROVEMENTS

QUESTIONS & ANSWERS ITB HELEN MCCALL PARK IMPROVEMENTS QUESTIONS & ANSWERS ITB 017-030 HELEN MCCALL PARK IMPROVEMENTS QUESTION: Site Lighting. The prints show that the existing site lighting structures are to be relocated on site. Is this the only site lighting

More information

November 29, CITY OF PLANT CITY Purchasing Division (813)

November 29, CITY OF PLANT CITY Purchasing Division (813) November 29, 2018 CITY OF PLANT CITY Purchasing Division (813) 659-4270 IFB 18-014UM-LG 12-inch Water Transmission Main-Franklin St., Hancock St. and Terrace Drive West ADDENDUM No. 3 *Bidders are required

More information

CITY OF VENICE PROCUREMENT- FINANCE DEPARTMENT 401 W. VENICE AVE. - ROOM # 204 VENICE, FL (941) FAX (941) ADDENDUM NO.

CITY OF VENICE PROCUREMENT- FINANCE DEPARTMENT 401 W. VENICE AVE. - ROOM # 204 VENICE, FL (941) FAX (941) ADDENDUM NO. CITY OF VENICE PROCUREMENT- FINANCE DEPARTMENT 401 W. VENICE AVE. - ROOM # 204 VENICE, FL. 34285 (941) 486-2626 FAX (941) 486-2790 ADDENDUM NO. 1 Date: June 23, 2014 To: All Prospective Proposers Re: ITB#

More information

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1 DATE: May 18, 2016 TO: FROM: All Bidders/Proposers Willie Velez, CPPB Procurement Administrator City of Casselberry Purchasing Division SUBJECT: ITB-2016-0023, Oxford Road Complete Street Improvements

More information

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum:

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum: ADDENDUM #1 AIRFIELD IMPROVEMENTS EXTEND, MARK, AND LIGHT RUNWAY 6-24 AND TAXIWAY ALPHA REHABILITATE RUNWAY 6-24 at the LAKE WALES MUNICIPAL AIRPORT FAA AIP NO: TBD FDOT FM NO: TBD BID NO: 16-412 5/11/16

More information

JANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair

JANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair JANUARY 25, 2016 ADDENDUM NO. 3 FOR ORD Baggage Service Road Retaining Wall Repair Specifications and Contract Documents Number: 132110 CDA Project Number: H6163.15-02 For which bids are scheduled to be

More information

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF ADDENDUM #1 AUGUST 25, 2016 INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project

More information

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS (Easement 6 & 11, 4200 block of Versailles Avenue and Belclaire Avenue and the 4300 block of Westway

More information

City of Miami ADDENDUM NO. 5. January 12, 2017 INVITATION TO BID NO.: CURTIS PARK NEW SWIMMING POOL FACILITY

City of Miami ADDENDUM NO. 5. January 12, 2017 INVITATION TO BID NO.: CURTIS PARK NEW SWIMMING POOL FACILITY City of Miami ADDENDUM NO. 5 January 12, 2017 INVITATION TO BID NO.: 15-16-040 CURTIS PARK NEW SWIMMING POOL FACILITY OFFICE OF CAPITAL IMPROVEMENTS ( OCI ) PROJECT NO.: TO: ALL PROSPECTIVE BIDDERS: The

More information

QUESTIONS AND ANSWERS SET # 4

QUESTIONS AND ANSWERS SET # 4 QUESTIONS AND ANSWERS SET # 4 Q75: Page 99 Sheet C501 for McKee Road, new AC pavement legends refers you to DWG DL-C530 for structural section, but this reference is not shown on that drawing. A75: The

More information

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds

More information

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 3690 NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Commissioners Kitsap County 614 Division Street Port

More information

ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM

ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM WELLS COUNTY HIGHWAY DEPARTMENT 1600 W. WASHINGTON STREET BLUFFTON, INDIANA 46714 PHONE 260/824-6430 FAX 260/824-6431 WELLS COUNTY HIGHWAY DEPARTMENT & BOARD OF COMMISSIONERS Date: January 8, 2019 To:

More information

REQUEST FOR BIDS CULVERT REPLACEMENT PROJECT FREEPORT, MAINE

REQUEST FOR BIDS CULVERT REPLACEMENT PROJECT FREEPORT, MAINE REQUEST FOR BIDS 1. RECEIPT OF BIDS The Town of Freeport will receive sealed Bids, clearly marked and addressed to: Bid for Culvert Replacement Project 2015-1, Freeport Town Engineer, Town Hall, 30 Main

More information

The Metropolitan Sewer District of Greater Cincinnati

The Metropolitan Sewer District of Greater Cincinnati The Metropolitan Sewer District of Greater Cincinnati Dry Run Area Sewers, Phase 1 and Phase 2 Contract A, Project ID 10270000_10270005 Date Issued: 03/25/2010 ADDENDUM NO. 2 This addendum will only be

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO.

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO. SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO. 2017-1 43 SOUTH GRANVILLE WATER AND SEWER AUTHORITY H STREET BY-PASS

More information

RPQ ADDENDUM. Project Manager Frank Ramirez

RPQ ADDENDUM. Project Manager Frank Ramirez Port of Miami Contracts, Procurement & Materials Management 1007 N. America Way, Suite 311 Miami Fl 33132 MIAMI-DADE COUNTY, FLORIDA REQUEST FOR PRICE QUOTATION (RPQ) Contract No: MCC 7360 Plan - CICC

More information

Questions & Responses RFP No Design-Build Services, Twin Brooks Golf Course Renovations

Questions & Responses RFP No Design-Build Services, Twin Brooks Golf Course Renovations Q1. LASCO Fittings, Inc. is a manufacturer of PVC fittings and specialized irrigation components such as Swing Joints. I noticed in the specifications shown below that Toro Company is listed as the lead

More information

We will need to keep a minimum of 6-0 wide pathway.

We will need to keep a minimum of 6-0 wide pathway. 2 April 16, 2018 FRESNO CHAFFEE ZOO WARTHOG EXHIBIT 894 West Belmont Avenue Fresno, CA 93728 Architect Project Number: 1616 FCZ Project Number: 0192 To: Prospective Bidders ADDENDUM NO. 2 The following

More information

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB #4320 2014 RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN The following changes, additions, and/or deletions shall be made to the Bid Documents

More information

EXHIBIT E SCHEDULE OF UNIT PRICES

EXHIBIT E SCHEDULE OF UNIT PRICES SCHEDULE OF UNIT PRICES TO ACCOMPANY THE BID OF (Bidder/Contractor) ON CALL UTILITY SERVICES AND MISCELLANEOUS CONSTRUCTION FOR SEWER AND WATER LINES SOLICITATION NO.: IFB SA1703 Any bidder who enters

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information

ADDENDUM NO. 1. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax:

ADDENDUM NO. 1. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax: ADDENDUM NO. 1 GOODWYN, MILLS AND CAWOOD, INC. 2701 1 st Avenue South Suite 100 Birmingham, Alabama Ph: 205-879-4462 Fax: 205-879-4493 To: ALL PLAN HOLDERS Date: March 24, 2017 Fax #: Pages: 10, including

More information

ADDENDUM No.2 NOTES SKI-001. NMSD Site Improvements Phase 2 Santa Fe, New Mexico Scale: 1" = 20'-0"

ADDENDUM No.2 NOTES SKI-001. NMSD Site Improvements Phase 2 Santa Fe, New Mexico Scale: 1 = 20'-0 ADDENDUM No.2 NOTES THE CONTRACTOR SHALL BE AWARE OF THESE CHANGES AND MODIFICATIONS TO THE IRRIGATION PLAN ADDENDA [No.2]: MAJOR CHANGES EFFECTING BID PRICE: ADDED SPRAY IRRIGATION TO NATIVE GRASS AREA

More information

For Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of

For Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned

More information

VANDERBILT UNIVERSITY

VANDERBILT UNIVERSITY VANDERBILT UNIVERSITY CAMPUS PLANNING & CONSTRUCTION PROJECT MANUAL GUIDELINES INTRODUCTION These instructions are intended to guide the Architect in preparing the Project Manual for Vanderbilt University

More information

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m.

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m. ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP ADDENDUM DATE: February 10, 2017 BID DATE: February 15, 2017, 11:30 a.m. This ADDENDUM is issued to institute the included changes and/or

More information

General Water Bid Items Item No.

General Water Bid Items Item No. BID PROPOSAL PROPOSAL OF, a corporation organized and existing under the laws of the State of, a partnership consisting of, an individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No Addendum 1 June 20, 2018

ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No Addendum 1 June 20, 2018 ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No. 2014-10 Addendum 1 June 20, 2018 ALBEMARLE COUNTY SERVICE AUTHORITY ALBEMARLE COUNTY, VIRGINIA Prepared for: Albemarle County

More information

ADDENDUM NO. 5. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications.

ADDENDUM NO. 5. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications. ADDENDUM NO. 5 ITB-CD-CME-16-10 Southern Well Field Expansion: Equip 5 Wells and New Raw Water Main Phase 2 ISSUE DATE: August 22, 2016 DUE DATE: August 25, 2016 @ 2:00 p.m. SUBJECT: Addendum No. 5 INTENT:

More information

SPECIAL SPECIFICATION 2022 Water Mains and Wastwater Main Appurtenances

SPECIAL SPECIFICATION 2022 Water Mains and Wastwater Main Appurtenances 2004 Specifications CSJ 1316-01-034 & 0902-48-502 SPECIAL SPECIFICATION 2022 Water Mains and Wastwater Main Appurtenances 1. Description. Furnish all materials, equipment, labor and incidentals necessary

More information

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows: ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan

More information

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018 Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA-2019-004 TMWA Capital Project No.: 10-0001.053 October 3, 2018 The following information, clarifications, changes and modifications are by reference

More information

DOCUMENT BID DOCUMENT

DOCUMENT BID DOCUMENT DOCUMENT 00 40 00 BID DOCUMENT 1 Submit bids in compliance with Document 00 21 00Instructions to Bidders. Fill in blanks which pertain to the project or indicate N/A. The Owner reserves the right to reject

More information

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/3/2014 Project 140485 Addendum No. 8 PID No. 77254 LUC IR 75

More information

SECTION BID FORM. Garfield Street Drainage Improvements

SECTION BID FORM. Garfield Street Drainage Improvements SECTION 00410 BID FORM Garfield Street Drainage Improvements ARTICLE 1 - BID RECIPIENT 1.01 This Bid is submitted to: City of Lindsborg, Kansas City Clerk s Office 101 S. Main Street Lindsborg, KS 67456

More information

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS General Description: Date Prepared: November 1, 2017 (253) 604-6600 KHouse@Parametrix.com Bid Number: J2017-30 ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO

More information

AD 1-1 ITB U CITATION BLVD./OLD KINGS ROAD TO S.R. 100 WATER MAIN

AD 1-1 ITB U CITATION BLVD./OLD KINGS ROAD TO S.R. 100 WATER MAIN ADDENDUM NO. 1 ITB-U-11-05 CITATION BLVD./OLD KINGS ROAD TO S.R. 100 WATER MAIN ISSUE DATE: February 14, 2011 BID DATE: TO: SUBJECT: INTENT: March 1, 2011 @ 2:00 P.M. All Prospective Bidders and Others

More information

Florida Department of Environmental Protection Bureau of Design and Construction 3540 Thomasville Road Tallahassee, Florida 32309

Florida Department of Environmental Protection Bureau of Design and Construction 3540 Thomasville Road Tallahassee, Florida 32309 Florida Department of Environmental Protection Bureau of Design and Construction 3540 Thomasville Road Tallahassee, Florida 32309 Rick Scott Governor Jennifer Carroll Lt. Governor Herschel T. Vinyard Jr.

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 6/2/2014 Project 140353 Addendum No. 1 PID No. 86675 MOT IR 75 11.75/11.80

More information

Please ensure receipt of this Addendum is acknowledged on page 1 of the Form of Tender.

Please ensure receipt of this Addendum is acknowledged on page 1 of the Form of Tender. No. 1 Project: 47th Ave Road Reconstruction Owner: District of Chetwynd Date: March 5, 2019 Ref. No.: 1320.0095.01 This Addendum is issued prior to Tender Closing Date, in accordance with the Tender Documents

More information

BID ADDENDUM #1 September 24, 2010

BID ADDENDUM #1 September 24, 2010 BID ADDENDUM #1 September 24, 2010 To: Prospective Bidders/Planholders For: Science 1 Seismic Retrofit & Renovation California State University Stanislaus One University Circle, Turlock, CA 95382 Bid /

More information

Questions and Answers Construction of New Amenities At Folly Beach County Park

Questions and Answers Construction of New Amenities At Folly Beach County Park Questions and Answers Construction of New Amenities At Folly Beach County Park 2019-003 1. A410, Keynotes 11.34 Responsibility Chart -stainless steel table does not indicate if it is provided by the owner

More information

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 28, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1 APRIL 24, 2017 DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

SECTION FOUNDATION DRAINAGE

SECTION FOUNDATION DRAINAGE SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

00900 ADDENDUM #1. All Document Holders of Record. Date: February 16, Bayfield Waterline Replacement Project

00900 ADDENDUM #1. All Document Holders of Record. Date: February 16, Bayfield Waterline Replacement Project 00900 ADDENDUM #1 Issued to: All Document Holders of Record Date: February 16, 2016 Project: Bayfield Waterline Replacement Project This Addendum forms a part of the Contract described above. The original

More information

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR Miscellaneous Concrete Repairs 2014 3600-3900 Blocks of Potomac Avenue and Town Hall, 2014 To: The Honorable Mayor and Town Council Town of Highland Park

More information

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 23, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

ADDENDUM No. 2. ITB No WTP LIME RESIDUAL REMOVAL CONTRACT No. 2 DREDGING AND HAULING

ADDENDUM No. 2. ITB No WTP LIME RESIDUAL REMOVAL CONTRACT No. 2 DREDGING AND HAULING ADDENDUM No. 2 ITB No. 4561 WTP LIME RESIDUAL REMOVAL CONTRACT No. 2 DREDGING AND HAULING Bids Due: February 4, 2019 at 2:00 P.M. (Local Time) The following changes, additions, and/or deletions shall be

More information

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS*** 00005B *** *** BOLD ITALICIZED Item is bound within this specification manual. Regular non-italicized Item is not bound within this specification manual, however item is part of the contract. Contents

More information

ADDENDUM NO. 1 TENDER NO RE: WATER RESCUE SIMULATOR POOL-2016 AT 21 OLD EGLINGTON AVENUE, TORONTO.

ADDENDUM NO. 1 TENDER NO RE: WATER RESCUE SIMULATOR POOL-2016 AT 21 OLD EGLINGTON AVENUE, TORONTO. Michael Pacholok Director Purchasing and Materials Management Division City Hall, 18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 Joanne Kehoe Manager Construction Services June

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018 155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated

More information

ADDENDUM 3 Contractor Questions Essex County Courthouse Square Drainage Improvements IFB Responses Issued March 30, 2016

ADDENDUM 3 Contractor Questions Essex County Courthouse Square Drainage Improvements IFB Responses Issued March 30, 2016 ADDENDUM 3 Contractor Questions IFB 2016-154-01 Responses Issued March 30, 2016 Sealed Bids are due no later than 3:00 PM, April 4, 2016 at the Essex County Purchasing Office, 202 S. Church Lane, Tappahannock,

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 012000 Applies only to Collier County Public Utilities Projects or Works and Utilities Portions of Collier County Transportation Projects, but not to Private Developments PART 1 GENERAL 1.1 SECTION

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

OCONEE COUNTY PROCUREMENT OFFICE 415 S. PINE STREET, ROOM 100 WALHALLA, SC Robyn M. Courtright, CPPO, Procurement Director

OCONEE COUNTY PROCUREMENT OFFICE 415 S. PINE STREET, ROOM 100 WALHALLA, SC Robyn M. Courtright, CPPO, Procurement Director OCONEE COUNTY PROCUREMENT OFFICE 415 S. PINE STREET, ROOM 100 WALHALLA, SC 29691 Robyn M. Courtright, CPPO, Procurement Director Tronda Spearman, CPPB, Assistant Procurement Director Telephone: 864-638-4141

More information

PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS

PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS SECTION 32 14 13.16 PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs used as ballast and/or paving on

More information

Snow Removal Equipment Storage Building

Snow Removal Equipment Storage Building June 6, 2011 ADDENDUM 2 (Rev.1) For Snow Removal Equipment Storage Building URS Project No. 25338534 Prepared For 2933 Airport Blvd. Abilene, TX 79602 Prepared By URS Corporion 1950, North Stemmons Freeway

More information

Addendum! Project No: HFX A0 Client Project No: MISC Project: MacAulay Sports Field Project Date: March 23, 2015 Addendum No: 2

Addendum! Project No: HFX A0 Client Project No: MISC Project: MacAulay Sports Field Project Date: March 23, 2015 Addendum No: 2 Addendum! Project No: HFX-00222868-A0 Client Project No: MISC-14-06 Project: MacAulay Sports Field Project Date: March 23, 2015 Addendum No: 2 The following information supplements and/or supersedes the

More information

CITY OF ATLANTA PARTNERSHIP Small Business Development Program Contractor/Consultant Questionnaire

CITY OF ATLANTA PARTNERSHIP Small Business Development Program Contractor/Consultant Questionnaire Instructions: A completed Questionnaire with all attachments must be delivered via e-mail, facsimile, or handdelivery no later than January 18, 2018, to the attention of Laura Cook at the address below.

More information

BID FORM. (Firm) FOR CONSTRUCTION OF

BID FORM. (Firm) FOR CONSTRUCTION OF BID FORM BY Rancho California Water District 42135 Winchester Road Post Office Box 9017 Temecula, CA 92589-9017 (Firm) FOR VIA VISTA GRANDE [PROJECT 20161], AVOCADO MESA [PROJECT 20162], AND CARANCHO WEST

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18.1 18-2 ROADWAY EXCAVATION... 18.1 18-2.01 General... 18.1 18-2.02 Unsuitable Roadway Excavation and Backfill... 18.1 18-2.03 Surplus

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 Project: Coteau Street & Utility Improvements Bid Date: 1:00 P.M., Local Time, March 20, 2017 Bid Location: Office of the City Administrator/Clerk, City of Lake Benton 106 S. Center Street

More information

BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2

BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2 BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2 The original Contract Documents entitled BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT are amended

More information

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014 Sunnyside Valley Irrigation District Addendum No. 1 Enclosed Lateral Improvements Projects 2010-2011 Issued: 8/30/2010 Contract 10-003: Regions 011, 013 & 014 Page 1 of 7 Sunnyside Valley Irrigation District

More information

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR TOWN OF LABRADOR CITY FORM OF TENDER TLC-04-18 SUPPLY & INSTALLATION OF CONCRETE FLOOR Tenderer Address Telephone # The undersigned bidder has carefully examined the Form of Tender, Instructions to Bidders,

More information

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1 UPPER SKAGIT INDIAN TRIBE COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO. 1 (7 pages total) Issue Date: May 11, 2016 General: Recitations of each and every section of the bid documents impacted

More information

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION

More information

ADDENDUM #4. Lanier Filter Plant Ozone System Safety Improvements BL079-14

ADDENDUM #4. Lanier Filter Plant Ozone System Safety Improvements BL079-14 September 24, 2014 ADDENDUM #4 Lanier Filter Plant Ozone System Safety Improvements BL079-14 Q1. Please clarify how many submarine doors the perimeter gaskets and gasket hardware must be replaced on. A1.

More information

CITY OF TACOMA Department of Public Utilities - Water Division

CITY OF TACOMA Department of Public Utilities - Water Division CITY OF TACOMA Department of Public Utilities - Water Division ADDENDUM NO. 1 DATE: October 12, 2015 REVISIONS TO: Request for Bids Specification No. WD15-0133F Water Main Replacement Project No. MRP 2014-27,

More information

EXHIBIT F STUDIO GC DRAWINGS

EXHIBIT F STUDIO GC DRAWINGS STUDIO GC DRAWINGS GENERAL NOTES 4700 S Ravinia Ave, Orland Park, IL 6046 DRAWING INDEX. BEFORE BEGINNING WORK AT THE SITE AND THROUGHOUT THE COURSE OF THE WORK, INSPECT AND VERIFY THE LOCATION AND CONDITION

More information

The purpose of this addendum is to respond to RFI s submitted to the County and issue a revised SECTION BID FORM.

The purpose of this addendum is to respond to RFI s submitted to the County and issue a revised SECTION BID FORM. HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS (HCBCC) PURCHASING DEPARTMENT DATE: 6/19/15 BID NO. ITB 15-044 ADDENDUM No. 2 Project.: Owner: Lake Josephine Drive resurfacing Highlands County BCC Attn:

More information

AGENDA. PRE-BID / SITE VISIT MEETING Tuesday, August 7, 2018, 9:00 am

AGENDA. PRE-BID / SITE VISIT MEETING Tuesday, August 7, 2018, 9:00 am AGENDA PRE-BID / SITE VISIT MEETING Tuesday, August 7, 2018, 9:00 am Project #217090 & 218041 Britt Place Washout / Precinct Road Washout CBJTC, Starke, FL 1. SIGN-IN OF ALL ATTENDEES: 2. INTRODUCTIONS:

More information

Construction Contract Basics

Construction Contract Basics PDHonline Course P120 (2 PDH) Construction Contract Basics Instructor: Kevin D. Waddell, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

INVITATION TO BID NUMBER ITB/PI-12/13-50 CONSTRUCTION OF CITRUS GERMPLASM INTRODUCTION PROGRAM BUILDING AND GREENHOUSE FOUNDATION / SLAB AND SITE WORK

INVITATION TO BID NUMBER ITB/PI-12/13-50 CONSTRUCTION OF CITRUS GERMPLASM INTRODUCTION PROGRAM BUILDING AND GREENHOUSE FOUNDATION / SLAB AND SITE WORK ADDENDUM 3 TO: FROM: RE: Vendors Christie Hutchinson, Purchasing Director INVITATION TO BID NUMBER ITB/PI-12/13-50 CONSTRUCTION OF CITRUS GERMPLASM INTRODUCTION PROGRAM BUILDING AND GREENHOUSE FOUNDATION

More information

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT DIVISION IV CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 4100 MEASUREMENT AND PAYMENT 4100 SCOPE... 2 4101 Clearing and Grubbing...

More information

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction

More information

ADDENDUM #1 BL Construction of Club Drive Park: Phase II

ADDENDUM #1 BL Construction of Club Drive Park: Phase II October 25, 2017 ADDENDUM #1 BL094-17 Construction of Club Drive Park: Phase II 1389 Peachtree Street, NE Suite 200 Atlanta, GA 30309 Phone: 404.873.6730 www.tsw-design.com Principals: William Tunnell

More information

CITY OF KANSAS CITY, MISSOURI

CITY OF KANSAS CITY, MISSOURI KCMO Supplement April 2000 Document No. 000079 CITY OF KANSAS CITY, MISSOURI SUPPLEMENT TO APWA STANDARD SPECIFICATIONS AND DESIGN CRITERIA SECTION 2600 This is the Kansas City, Missouri Supplement to

More information

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and Town of Milton No. 17 and Milton Fire Station No. 5 Tender No. 19-500-1 and 19-500-2 BID SUBMISSION 19-500-2 Part Two In accordance with Tender No. 19-500-2, Tender Form Part Two must be submitted electronically

More information

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road Financial Services Purchasing Division 215 N. Mason St. 2 nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS

More information

BID FORM. (Firm) FOR CONSTRUCTION OF RECYCLED WATER STORAGE POND RELINING, POND NO. 1/2 [PROJECT NO. D1904]

BID FORM. (Firm) FOR CONSTRUCTION OF RECYCLED WATER STORAGE POND RELINING, POND NO. 1/2 [PROJECT NO. D1904] BID M BY (Firm) Rancho California Water District 42135 Winchester Road Post Office Box 9017 Temecula, CA 92589-9017 Attention: Heath McMahon, Construction Contracts Manager The undersigned declares, as

More information

CITY OF ATLANTIC BEACH BID NUMBER PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA (904)

CITY OF ATLANTIC BEACH BID NUMBER PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA (904) CITY OF ATLANTIC BEACH BID NUMBER 1314-08 PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA 32233 (904) 247-5880 REQUEST FOR BID CONTRACT - CONCRETE REPAIRS FOR THE PUBLIC WORKS/UTILITIES

More information

Avenue 52/Grapefruit Boulevard Railroad Grade Separation Project PRE-BID REQUEST FOR INFORMATION

Avenue 52/Grapefruit Boulevard Railroad Grade Separation Project PRE-BID REQUEST FOR INFORMATION The City received a total of 67Pre-Bid Questions listed in table below. Note that some of the questions are duplicate. Formal responses are forthcoming via addendum shortly. No. 1 2 3 4 5 6 Plan/SSP/ Page

More information

CITY OF PUNTA GORDA, FLORIDA

CITY OF PUNTA GORDA, FLORIDA CITY OF PUNTA GORDA, FLORIDA PHONE: (941) 575-3351 FAX: (941) 575-3340 EMAIL: pgpurch@pgorda.us PROCUREMENT DIVISION 326 West Marion Avenue Punta Gorda, Florida, 33950 October 9, 2014 SOLICITATION #F2013124/CONS-PIPEREPL/WWTP

More information

Department: Corporate Services Fax: To: Distribution List From: Bernadette Lawler/Marla Sutherland

Department: Corporate Services Fax: To: Distribution List From: Bernadette Lawler/Marla Sutherland Department: Corporate Services Fax: 705-876-4607 To: Distribution List From: Bernadette Lawler/Marla Sutherland Fax: 705-876-4607 Date: February 23, 2015 Phone: Pages: 13 including this cover page Re:

More information

The following clarifications, changes, additions, and/or deletions are hereby made part of the Contract Documents

The following clarifications, changes, additions, and/or deletions are hereby made part of the Contract Documents CITY OF TAMARAC PURCHASING AND CONTRACTS DIVISION 7525 NW 88 TH AVENUE TAMARAC, FL 33321 Committed to Excellence...Always ADDENDUM NO. 1 BID NO.13-19B BID NO. 13-20B CITY OF TAMARAC NW 108 TERRACE / NW

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information