1 Historic Scodand Board Meeting 26 th April 2007 HSB 08/ 07 Appendix M - Tabulation of proposed works, by room 24

2 Tabulation of proposed works, by room. Room Room Name Analysis of significant elements In Proposed Impact Inspectorate Review 1 Basement Beams and joints survive in ceiling but Recessed pointing to be raked No proposed use indicated kitchen lath and plaster removed out and re-pointed Re~plastering would remains of earlier finishes and stonework Suggestion that area could be obscure evidence for earlier to fireplace have been retained re~plastered finishes Some original plaster within well! aumbry area (room 2??) 3 doset Partially stripped back Suggestion that electrical No proposed use indicated Iron yen from stair 4 to east installation be improved Timber boarded ceiling and masonry walls, some pointed, others left with finishes Door missing but evidence of hinge pins and mortices 4 Stair to from Spanning stone treads built into walls Proposed re~plastering and No proposed use indicated (upper) basement to Ceiling is stone until stair turn limewashing of walls round 5 Room! stair 5 to Stair at lower level is of stone Some confusion as this space No proposed use indicated entrance hall W wall retains old plaster, exposed edges mentioned in various contexts Servicing required of which are protected by fillets of - under policy 35 alterations cementitious material are to be avoided, but under Ceiling on various levels policy 43 cabling, lighting and Two surviving painted boards extending handrail works are proposed from the S 1

3 Room Room Name Analysis of significant elements In Proposed Impact Inspectorate Review 6 Basement Generally exposed stonework with Alterations to be avoided No proposed use indicated corridor/ pend variety of treatments, incl original plaster/harl finishes Qiling has two distinct treatments (shallow stone vault for much of the length and spanning flat slabs towards east) Some surviving doors 7 Vault Original lime finishes generally intact, No proposed use indicated apart from localised areas and the north wall Floor is mixture of paving slabs, lime concrete and rammed earth 8 Vault Early lime finishes on vault and some on No proposed use indicated N &S walls Galvanised expanded lath has been fitted to gun loop on south wall Floor is rammed earth 9 Vault remains of old plaster finishes are visible No proposed use indicated on some stones Some remains of door frame 10 Stair Straight intramural stair, flush lime finish; No proposed use indicated 16 Lobby (stair?) Mix of 18 th & 19 th C joinery with some Qiling repairs, modem No proposed use indicated, between 17 & 20 quality paint finishes elements to be replastered but active use assumed Staircase is timber of uncertain date Areas of original plaster Original joinery identified Areas of original plaster and joinery-not to be covered 2

4 . Room Room Name Analysis of significant elements In Proposed Impact Inspectorate Review 17 Entrance level Retention of ceiling finishes, moulded All decorative additions should Proposed for use as kitchen west room cornice and wall finishes; be additive Significant impact on Some original wall panels timber mouldings survive Lack of paint layers suggests that paint has been stripped at some point New floorboards laid over old historic character Servicing required Further technical details 18 doset off room Fitted out as wc Gunloop to be retained Proposed for use as utility 17 Gunloop room Servicing required 19 doset Evidence for original ceiling level Installation of new w.c. Proposed for use as a Some remains of original plaster visible Reinstatement of lime plaster, cloakroom on the base of the stone as are some retaining original elements Servicing required, areas of lime wash Suggestion of new window including toilet and wash Survival of evidence for other fittings Re-instatement of missing basin; East wall door appears to be original Jomery Lime plaster would mask On S side is a cabinet with pair of evidenc.e of original finish panelled doors - char. is 18 th C with Further technical details newspaper fragment attached 20 Entrance hall Original flagstones in floor, tho' relaid reinstatement of door case to Proposed for use as Original doorcase on east wall, reinstated original position entrance hall following conservation work plasterboard to be replaced this will form the primary with lime plaster entrance to the inhabited walls and ceilings to be rooms repainted with exception of Servicing required early joinery new heater and electrical works 3

5 Room Room Name Analysis of significant elements In Proposed Impact Inspectomte Review 21 Dining hall W wall has repaired and reinstated Cornice to be reinstated Proposed for use as a doorease Modem lining and plasterboard dining room Fireplace wall consists of two distinct should be replaced with lime Lime plaster will have a areas of panelling plaster direct impact upon original Floor partially original elements Panelling on N wall to be reset fabric - Evidence for original paint finish Walls and ceiling to be Servicing required survives on 18 th c panelling repainted according to Further technical details surviving evidence New heaters to be installed Electrical wirin~ required 22 Chamber (or A multi-period room Walls to be lime plastered Proposed for use as sitting solar) exposed masoruy and ceiling structure Plaster to be lime washed to room two early timber beams with evidence of match surviving Significant impact on early finishes Suggestion of new ceiling to character One ceiling brander remains hide modem timbers Restoration will not be to a N wall retains plaster with remains of Original panelling to be specific period decoration returned from current position Original evidence will be Some residual decoration on moulded in new castle masked by lime plastering stone and lime plaster in the aumbry Fitting of replica cupboard detailed analysis of the Fireplace has had 18 th C refill removed; it door surviving elements would was rebuilt in 1982 Addition of paving stones? be required Door to the stair is 18 th C Modem replacement of Evidence of lime plaster and limewash finishes to the adjacent garderobe cupboard door New door to be fitted to garderobe New heater and lighting proposed 4

6 Room Room Name Analysis of significant elements In Proposed Impact Inspectorate Review 25 & 43 Stair Fine timber screen at head of stairs with Walls to be re-plastered flush No proposed use indicated carving to upper section with surviving fragments Original evidence masked Narrow door is panelled by modem treatment 28 & 26 Woman house Some surviving plaster Masoruy to be repointed using No proposed use indicated building lime plaster Permanent security barriers to be installed 29 Chamber (descr. partially stripped back, To be replastered to match Proposed for use as an as some edge pointed plasterwork remains surviving evidence interpretation room guardhouse/ cha Remains of original plaster to Original evidence will he mber to N) be retained and not painted masked by modem treatment Interpretation panels to be installed Lighting proposals, but no heating 30 Entrance pend vaulted with arched openings to east and repointing proposed west floor is flagged with some originals survlvmg walls have recessed joints with lime mortar 31 North guard some original timber in ceiling Repointing proposed Proposed for use as a chamber Walls have small areas retain early lime bootroom finishes Electrical works may be required 32 Turret Some original finishes Overhaul of joineiy and latches No proposed use indicated Wmdow retains an early timber lintel

7 . Room Room Name Analysis of significant elements In Proposed Impact Inspectorate Review 33 South guard Lower section of the north wall retains lighting suggested Proposed for use as an room lime finishes at higher levels and also to external store rear of aumbry Electrical works may be Ceiling is open to the floor above, which required retains early joists and beams 34 south entrance East wall retains a lime finish No alterations proposed No proposed use indicated tower Stone flags above are set over an early although lighting suggested beam 35 North bedroom Stripped back open to floor structure Cement pointing to be raked Proposed for use as a and floorboards of room above; out and re-pointed bedroom Surviving traces of plaster and finishes Could be re-plastered Significant impact on character Electrical works would be required 36 Garderobe in SE some plaster remains on S wall Hanging rail to be installed Proposed for use as a Comer wardrobe 37 Turret Modem ceiling boards on older assembly No proposed use indicated marked timbers Walls retain substantial amounts of plaster, protected with coarse cement mortar 39 South turret No mention made 6

8 Room Room Name Analys is of significant elements in Proposed Impact Inspectorate Review 40 & 38 Lobby and Substantial area of white finished plaster Repointing proposed, and No proposed access given corridor survives replastering suggested but assumed for use as Some old joinery survives on the north Original plaster should be pnmary access space tower ceiling, incl assembly marks retained and not painted Significant impact on Graffiti on original plaster West wall to be lime plastered historic character Suggestion for reinstatement of Further technical details door and internal window on south wall New steps proposed into room for reinstatement works Further details of servicing 41 Proposals for lighting and heating 41 East and south walls - vertical studs with Wall structure to be repaired. Proposed for use as a horizontal laths (mud brick) including reinstatement of bathroom Original door panel in west part of south wall Significant impact on Also evidence for the original partition ~eansofd~playmgand historic character construction protecting cob partition to be Physical impact of works considered thro' outside wall for new New duct proposed on north waste pipe wall to carry servicing for Details for conservation bathroom fittings and maintenance of cob Removal of Victorian fitting walling Proposals for lighting and Assessment of heated towel rail environmental impact on features within this room 7

9 Room Room Name Analysis of significant elements In Proposed Impact Inspectorate Review 42 Bedroom Timber bed recess under a masonry arch Room to be restored Proposed for use as a which support stair to the gallery above Reirtstatement of lime plaster bedroom timber former of plaster vault still ceiling and walls Significant impact on survives Original plaster to be retained historic character evidence for paint and plaster finishes and not painted Further details for the within the bed recess MiSsing joinery on box bed to conservation and line of original plaster ceiling over the be reirtstated with existing protection of original room is evident joinery retained and conserved timber fabric would be Beaded skirting to be restored required Hanging rails to be fitted in cupboards Further details of electrical works. 44 Bedchamber Lighting and heating proposed Graffiti to be 'softened' fireplace with corbelled lintel New corridor to be irtstalled to Proposed for use as a provide access to new room to west bedroom Further details of servicing, including that for the new passage area 45 Currendy attic Proposed for use as a space bathroom Further details of servicing and drainage would be required 8

10 Room Room Name Analysis of significant elements in Proposed Impact Inspectorate Review 46 Evidence for panelling and fixings Room to be restored, with Proposed for use as a Evidence of paint surfaces survive 'stretch' [fabric] materials to be bedroom reinstated according to evidence Rooms should be reinstated on basis of paint sampling Further details of servicing Further technical details Heating and lighting proposed 47 doset off room plaster finishes New fittings to be installed Proposed for use as a 46 bathroom Further details of servicing, including drainage would be required 49 The gallery panelled masonry survives below the Suggestion that walls could b~ No proposed use indicated south window replastered some evidence of plaster possible on chimney breast towards the east south bats in the roof of this room original door, with fleur-de-lis ended hinges 52 End of pend walls of rubble and substantial areas of No proposed use indicated old lime harling stone slabs of floor above form the ceiling external door 19 th C character 53 Ruined tower Evidence for the oldest structure on the Masonry to be repainted No proposed use indicated site - remains of a tower house Suggestion of turf topping 9

Planning Applications Received

Planning Applications Received 1 - South East Application Number 0056/14 Irene Connolly Location 32, Lombard Street West, Dublin 8 EXPP: (1) Removal of existing window and wall below, strip pebble dash from wall and repair any bricks

More information

Observations and suggestions, rehabilitation and re-use of stable building, 12, Back Newton Grove, Chapeltown, Leeds,

Observations and suggestions, rehabilitation and re-use of stable building, 12, Back Newton Grove, Chapeltown, Leeds, Observations and suggestions, rehabilitation and re-use of stable building, 12, Back Newton Grove, Chapeltown, Leeds, 12, Back Newton Grove is a brick-built stable building formerly attached to 12 Newton

More information

MAJOR DEFECTS BUILDING SURVEY REPORT

MAJOR DEFECTS BUILDING SURVEY REPORT MAJOR DEFECTS BUILDING SURVEY REPORT XXXXXX Road Bedminster Bristol BS3 XXX Prepared for Mr XXXXXXX July 2017 T J Maggs MRICS MAGGS AND ALLEN 22 Richmond Hill Clifton Bristol BS8 1BA 0117 973 4049 survey@maggsandallen.co.uk

More information

SCHEDULE OF CONDITION IN RESPECT OF HEN & CHICKENS 143 DEANSGATE BOLTON BL1 1EX ON BEHALF OF PUNCH TAVERNS. Prepared by:

SCHEDULE OF CONDITION IN RESPECT OF HEN & CHICKENS 143 DEANSGATE BOLTON BL1 1EX ON BEHALF OF PUNCH TAVERNS. Prepared by: SCHEDULE OF CONDITION IN RESPECT OF HEN & CHICKENS 143 DEANSGATE BOLTON BL1 1EX ON BEHALF OF Prepared by: McBains Cooper Consulting Ltd 120 Old Broad Street London EC2N 1AR Tel No: 020 7786 7900 Fax No:

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

The Butler Gallery at the Evans Home CONSERVATION REPORT. McCullough Mulvin Architects. September 2016

The Butler Gallery at the Evans Home CONSERVATION REPORT. McCullough Mulvin Architects. September 2016 The Butler Gallery at the Evans Home CONSERVATION REPORT McCullough Mulvin Architects September 2016 To be read in conjunction with impact statement and condition survey / recommendations in Carrig reports

More information

SNAGGING REPORT. Plot 19 Snag Close Unfinished Avenue Oxford OX90 1AB. for. Mr T & Mrs N Sample

SNAGGING REPORT. Plot 19 Snag Close Unfinished Avenue Oxford OX90 1AB. for. Mr T & Mrs N Sample SNAGGING REPORT on Plot 19 Snag Close Unfinished Avenue Oxford OX90 1AB for Mr T & Mrs N Sample Prepared By: Marshalls Chartered Surveyors Rochester House The Grange Farm Eynsham Road Oxford OX2 9NH Tel:

More information

TOFT HOUSE, THRESHFIELD Heritage Statement Feature: Window frames in South Elevation - windows 5,6,7,12,13 Description Softwood painted casements with side hung opening lights. Single glazed. Simply constructed

More information

SCHEDULE OF CONDITION

SCHEDULE OF CONDITION SCHEDULE OF CONDITION Public House Bucks Mr C INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Internal Rooms page 8 Other Matters page 27-28 FIRE REGULATIONS

More information

INSPECT DIRECT Pty Ltd

INSPECT DIRECT Pty Ltd Web Page: www.inspectdirect.com.au INSPECT DIRECT Pty Ltd Property Address: Sample.Dilapidation.Report Victoria Building Status / Dilapidation Report This is not a Pest Inspection The Building Status /

More information

PJD CONSTRUCTION Client : HOUSE Stand number : ELDORAIGNE X. Project Manager : PIETER

PJD CONSTRUCTION Client : HOUSE Stand number : ELDORAIGNE X. Project Manager : PIETER PJD CONSTRUCTION Client : HOUSE Stand number : ELDORAIGNE X Project Manager : PIETER 0823715897 A SUBTITLE: STARTING COST CONNECTION FEES DEPOSIT WATER BUILDING PLAN PROFESSIONAL FEES PROF. FEES - ARCHITECT

More information

SCHEDULE OF CONDITION

SCHEDULE OF CONDITION SCHEDULE OF CONDITION A Public House In Somerset FOR Ms M Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Internal Rooms page 17 Limitations

More information

Schedule of Condition

Schedule of Condition Schedule of Property Address: Outlet Number: 203328 Document Reference: Sow & Pigs Cambridge Road Thundridge Ware SG12 0ST N/A Document Date: 17th August 2017 Rev. Contents Page 2 A. Document Control Sheet

More information

Schedule of Condition

Schedule of Condition Schedule of Property Address: Outlet Number: 202068 Document Reference: Shipwrights Ferryboat Lane Sunderland SR5 3HW N/A Document Date: 21st August 2018 Rev. Year 0 Contents Page 2 A. Document Control

More information

Reliance House Investors Report. IR11 September 2018

Reliance House Investors Report. IR11 September 2018 Reliance House Investors Report IR11 September 2018 Extension & Conversion of Reliance House to Create 139 Luxury Apartments The 3 storey extension, refurbishment, adaptation and the sub-division works

More information

SPECIFICATION. for REMEDIAL WORKS. Sparrow Hall Farm Stonea March PE15 0DU

SPECIFICATION. for REMEDIAL WORKS. Sparrow Hall Farm Stonea March PE15 0DU SPECIFICATION for REMEDIAL WORKS to Sparrow Hall Farm Stonea March PE15 0DU Carried out by: PRP UK Limited Catherine House Old Harborough Road Brixworth Northampton NN6 9BH Tel : 01604 889870 Project Number:

More information

Schedule of Condition

Schedule of Condition Schedule of Property Address: Outlet Number: 201780 Document Reference: The Bowling Green Tavern 164 Church Path Deal CT14 9UD N/A Document Date: 6th May 2018 Rev. Contents Page 2 A. Document Control Sheet

More information

CONSTRUCTION SMARTSCREEN

CONSTRUCTION SMARTSCREEN 6704 Level 1 Construction Trade Occupations - 325 + VAT (SS6704-LV1 ) Unit 102 - Construction Trade Occupations - Painting and Decorating Unit 103 - Construction Trade Occupations - Plastering Unit 104

More information

SCHEDULE OF CONDITION

SCHEDULE OF CONDITION SCHEDULE OF CONDITION West Hampstead, London NW6 FOR Mr J Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Limitations page 28 Signature Document

More information

Residencial Center Avda. de la Estación

Residencial Center Avda. de la Estación Almería - A BUILDING SET APART FROM THE REST Set apart from the rest because of its style and good taste, Center Housing Development is a modern, elegant and functional building which adapts perfectly

More information

SCHEDULE OF CONDITION

SCHEDULE OF CONDITION SCHEDULE OF CONDITION Nottinghamshire Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations Internal Rooms GROUND FLOOR BASEMENT FIRST FLOOR Other Matters/Services FIRE REGULATIONS DISABILITY DISCRIMINATIONS

More information

SCHEDULE OF CONDITION

SCHEDULE OF CONDITION SCHEDULE OF CONDITION Of a Large Industrial Unit in Norfolk FOR Mr B Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Internal Areas page 19 WORKSHOPS

More information

Schedule of Condition

Schedule of Condition Schedule of Property Address: Outlet Number: 300001 Document Reference: Devon & Cornwall West Street Millbrook Plymouth PL10 1AA N/A Document Date: 15th August 2018 Rev. Year 0 Contents Page 2 A. Document

More information

Customer Specification

Customer Specification Customer Specification Dubford, Bridge of Don Houses & self-contained apartments Plots 107-129, 136-140, 226-231, 802-810, 1505-1522, 1607-1610, 1616-1618, 1621-1624, 1707, 1711-1714, 1717 & 1907-1908

More information

Customer Specification

Customer Specification Customer Specification Hamilton Gardens, Elgin Plots 55-59, 87, 201-223 & 260-305 Page 1 Walls External walls will be of timber frame construction with external leaf of render block-work, or feature timber

More information

6.0 GLENTHORNE FARM. 6.1 Description of Glenthorne Farm/Campus

6.0 GLENTHORNE FARM. 6.1 Description of Glenthorne Farm/Campus 76 6.0 GLENTHORNE FARM 6.1 Description of Glenthorne Farm/Campus Glenthorne Campus is based on the former Glenthorne Farm, later the CSIRO property and is essentially rural agricultural setting which retains

More information

CONDITION SURVEY Punch Taverns Angel Inn North Street Scarborough CONDITION SURVEY

CONDITION SURVEY Punch Taverns Angel Inn North Street Scarborough CONDITION SURVEY CONDITION SURVEY 200090 Angel Inn 44-46 North Street Scarborough UK CONDITION SURVEY 25 June 2018 Gleeds Wilford House 1 Clifton Lane Wilford Nottingham NG11 7AT CONTENTS 1. Property Overview... 3 2. Element

More information

The Alcalá Residential Development combines the peace and quiet of a residential area with the convenience of living in the city.

The Alcalá Residential Development combines the peace and quiet of a residential area with the convenience of living in the city. Your new life starts here In Parque Almunia, one of the areas in Granada with the most growth, Inmobiliaria Osuna is building a development for you that is unique in its specifications, amenities, location

More information

BRIEF SPECIFICATION OF SCHOOL BUILDING. 1.1 Foundation Isolated and combined foundation as per structure design for G+1 story.

BRIEF SPECIFICATION OF SCHOOL BUILDING. 1.1 Foundation Isolated and combined foundation as per structure design for G+1 story. BRIEF SPECIFICATION OF SCHOOL BUILDING S.No. ITEM Specification 1 Foundation 1.1 Foundation Isolated and combined foundation as per structure design for G+1 story. 2 Superstructure 2.1 Superstructure RCC

More information

PRELIMINARY INSPECTION FRAMEWORK

PRELIMINARY INSPECTION FRAMEWORK PRELIMINARY INSPECTION FRAMEWORK 1. Oversite Striping of topsoil Forming site entrance Clearing off topsoil for service roadway Roadside drainage continued under entrance bay Any mature trees in vicinity

More information

2003 International Residential Building Code

2003 International Residential Building Code 2003 International Residential Building Code Section R305 Ceiling Height Habitable rooms, hallways, corridors, bathrooms, toilet rooms, laundry rooms and basements shall have a ceiling height of not less

More information

TOWER-1A: TERRACE FLOOR SLAB

TOWER-1A: TERRACE FLOOR SLAB TOWER-1A: TERRACE FLOOR SLAB TOWER NO: 1A (Overall completion 70.10%) Total Floors: - Stilt + 12 Upper floors Total Flats: - 24 (Duplex Type-A1) 1. Structural works up to terrace floor slab completed.

More information

Schedule of Condition

Schedule of Condition Schedule of Property Address: Scotia Mile End Road South Shields NE33 1TA Outlet Number: 300324 Document Reference: N/A Document Date: 6th November 2018 Rev. Year 0 Contents Page 2 A. Document Control

More information

BUILDING CONDITION REPORT THE OLD COTTAGE 35 MIGHELL STREET BRIGHTON

BUILDING CONDITION REPORT THE OLD COTTAGE 35 MIGHELL STREET BRIGHTON THE OLD COTTAGE 35 MIGHELL STREET BRIGHTON Prepared for: American Express STILES HAROLD WILLIAMS Prepared by: Mark Haskell BSc (Hons) MRICS BUILDING CONSULTANCY Our Ref: BN08050018/MH/SH STERLING HOUSE

More information

LOT 25 Blueleaf Place. Brookfield $511,879 SUMMARY

LOT 25 Blueleaf Place. Brookfield $511,879 SUMMARY RENDERS ARE INDICATION ONLY Home size 27sq Land Size 512m2 LOT 25 Blueleaf Place Brookfield 5 2 2 $511,879 SUMMARY Land Price: $219,000 House Price: $292,879 (Fixed Price) Land Size: 512m2 House Size:

More information

STRUCTURAL ASSESSMENT SURVEY REPORT

STRUCTURAL ASSESSMENT SURVEY REPORT Level 6, River Park House, 225 High Road, Wood Green, London N22 8HQ Tel: 020 8489 5504 Fax: 020 8489 5229 Email: building.control@haringey.gov.uk www.haringey.gov.uk Head of Building Control Robert McIver

More information

Annexure C: Schedule of Finishes and Specifications

Annexure C: Schedule of Finishes and Specifications Annexure C: Schedule of Finishes and Specifications 1. Introduction 1.1. The dwelling will be erected in compliance with the provisions of the NHBRC, The National Building Regulations and the Local Authority.

More information

Schedule of Condition

Schedule of Condition Schedule of Condition Prepared with regard to The Drill Hall, High Street, Wellingborough Produced for and on behalf of The Borough Council of Wellingborough 2nd October 2014 BS1715 Contents Page 1 Preliminaries

More information

Schedule of Condition

Schedule of Condition Schedule of Property Address: Swan Noss Mayo Plymouth PL8 1EE Outlet Number: 300029 Document Reference: N/A Document Date: 25th April 2018 Rev. Year 0 Contents Page 2 A. Document Control Sheet B. Background

More information

Customer Specification

Customer Specification Customer Specification Hamilton Gardens, Elgin Plots 60-62 Page 1 Walls Timber frame construction with external leaf of render block-work. Timber studs with insulation and plasterboard finish internally.

More information

Project Specifications

Project Specifications Project Specifications Unit 1, 2 & 3 / 1 Carmen Street, NEWPORT These specifications form part of the building contract. The owner shall therefore ensure that the project specifications are fully and accurately

More information

Schedule of Condition

Schedule of Condition Schedule of Property Address: Outlet Number: 300228 Document Reference: Old Comical 15 St. John s Road Isle of Wight PO36 8ES N/A Document Date: 21st March 2018 Rev. Contents Page 2 A. Document Control

More information

SAVANNAH HILLS. DOUBLE STOREY SPECIFICATIONS - TYPE D (N) 186m² & D (S) 191m²

SAVANNAH HILLS. DOUBLE STOREY SPECIFICATIONS - TYPE D (N) 186m² & D (S) 191m² SAVANNAH HILLS Updated 14/11/2016 DOUBLE STOREY SPECIFICATIONS - TYPE D (N) 186m² & D (S) 191m² 1. Preliminary and General Engineers certificates for all slabs N H B R C Registration Geological engineer

More information

Heritage Statement. Alterations and Improvements to. Well House Standard Road Wells-next-the-Sea NR23 1JY

Heritage Statement. Alterations and Improvements to. Well House Standard Road Wells-next-the-Sea NR23 1JY Heritage Statement for Alterations and Improvements to Well House Standard Road Wells-next-the-Sea NR23 1JY Prepared by Hudson Architects 9-10 Redwell Street Norwich NR2 4SN October 2011 CONTENTS Statement

More information

Specialists in Acoustic Flooring and House to Flat Conversions

Specialists in Acoustic Flooring and House to Flat Conversions Sound Solution Consultants Ltd Po Box 755 Capel St Mary Ipswich Suffolk IP9 2WF Tel No: 0845 5212096 Fax No: 0845 5212097 Email: mpconsultservice@aol.com Specialists in Acoustic Flooring and House to Flat

More information

Example Schedule of Condition Report

Example Schedule of Condition Report 1 INTERIOR Ground Garage Ceiling Timber members. Members appear to be in a fair and reasonable condition with no signs of any penetration marks noted. Walls Flank wall Brickwork. Part solid construction,

More information

BUILDING SURVEYOR S INSPECTION REPORT THE STABLES, WEST CALDER FOR WEST CALDER AND HARBURN COMMUNITY DEVELOPMENT TRUST LTD.

BUILDING SURVEYOR S INSPECTION REPORT THE STABLES, WEST CALDER FOR WEST CALDER AND HARBURN COMMUNITY DEVELOPMENT TRUST LTD. BUILDING SURVEYOR S INSPECTION REPORT OF THE STABLES, WEST CALDER FOR WEST CALDER AND HARBURN COMMUNITY DEVELOPMENT TRUST LTD Prepared by SEPTEMBER 2017 Building Surveyor s Inspection Report Old Co-Operative

More information

SEI APPENDIX 7.4 LISTED BUILDINGS BACKGROUND DATA

SEI APPENDIX 7.4 LISTED BUILDINGS BACKGROUND DATA SEI APPENDIX 7.4 LISTED BUILDINGS BACKGROUND DATA BLAEN-NANT-DU CWM YR HOB BLAEN-NANT-DU Blaen-nant-du, including attached farm ranges Street Name and Number:, Listed Building Reference: 82989 Grade: II

More information

Denis Creedon, B.E., MIEI. CONSULTING ENGINEER

Denis Creedon, B.E., MIEI. CONSULTING ENGINEER Denis Creedon, B.E., MIEI. CONSULTING ENGINEER PROPERTY INSPECTION REPORT PROPERTY: CLIENT: DATE: Denis Creedon, B.E., MIEI, CONSULTING ENGINEER Tel: 02221157, 0868072327 N0.6 Chapel Lane, Mallow, Co.

More information

SCHEDULE 1. Survey Report. [Property Address] Customer: Customer address: Date of inspection: Prepared by:

SCHEDULE 1. Survey Report. [Property Address] Customer: Customer address: Date of inspection: Prepared by: SCHEDULE Survey Report On [Property Address] Customer: Customer address: Date of inspection: Prepared by: . INFORMATION AND SCOPE OF INSPECTION This section tells you about the type, accommodation, neighbourhood,

More information

FOREST PLACE 59 UNITS ERF 5586 PARKLANDS

FOREST PLACE 59 UNITS ERF 5586 PARKLANDS ANNEXURE "C" MATERIAL AND FINISHES SPECIFICATION FOREST PLACE 59 UNITS ERF 5586 PARKLANDS 1. FOUNDATIONS AND STRUCTURE Foundation walls are to be built in strict accordance with the municipal building

More information

Section 10. Rendering, Plasterboard & Fibre Cement Sheeting

Section 10. Rendering, Plasterboard & Fibre Cement Sheeting MARKETING PROPERTY-PROJECT SERVICES STD - D905 VOLUME 2 Service Station Construction SPECIFICATION Section 10 Rendering, Plasterboard & Fibre Cement Sheeting Index 10.1 Extent of Work 10.2 Rev 07.8 General

More information

Homebuyers Survey. Final Report. Mr Client. A Home, A Street, A Town. 3rd July 2014

Homebuyers Survey. Final Report. Mr Client. A Home, A Street, A Town. 3rd July 2014 Homebuyers Survey Final Report Mr Client A Home, A Street, A Town 3rd July 2014 Alpine Water Management Ltd Dorset House Regent Park Kingston Road Leatherhead KT22 7PL Tel: 0845 319 9 319 www.alpinedamp.co.uk

More information

cjd N02 Canon Hill Crescent - Scope Of Refurbishment Works September 2014 External

cjd N02 Canon Hill Crescent - Scope Of Refurbishment Works September 2014 External External 1 Driveway & Forecourt Entry Remove / replace existing iron gate (new modernised iron design). Remove / replace existing brick columns & up stands (new block with plaster finish). Remove / replace

More information

THE CAMBRIDGE, PHASE 2, ROYAL PARK, RAMSEY

THE CAMBRIDGE, PHASE 2, ROYAL PARK, RAMSEY THE CAMBRIDGE, PHASE 2, ROYAL PARK, RAMSEY The Second Phase of Homes at Royal Park, Ramsey, Will be Made up of 81 Detached 4 & 5 Bed Houses Situated just a Minute Away from Mooragh Park, Promenade & Beach.

More information

RENDERS ARE INDICATION ONLY. Land. Home size 26sq. 28 Ajay Way, Kurunjang LEGACY 26 $545,500 ACTUAL HOUSE IMAGE PRESENTED BY

RENDERS ARE INDICATION ONLY. Land. Home size 26sq. 28 Ajay Way, Kurunjang LEGACY 26 $545,500 ACTUAL HOUSE IMAGE PRESENTED BY RENDERS ARE INDICATION ONLY Land 28 Ajay Way, Kurunjang LEGACY 26 $545,500 Home size 26sq 5 2 2 ACTUAL HOUSE IMAGE Home Size 26sq Land Size 451m2 FUSION 27 5 2 2 Plans and illustrations are for marketing

More information

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018 G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake

More information

REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR. Prepared by: Global Village Engineers

REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR. Prepared by: Global Village Engineers REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR Prepared by: Global Village Engineers 23 JANUARY, 2001 23 January 2001 Senor Carlos Cortez Hernandez Alcaldia Municipal de Tecoluca San Vicente, El

More information

CIVIL WORKS Mahesh G. Nair

CIVIL WORKS Mahesh G. Nair MEASUREMENT BOOK SUNIL Date Work Order Contractor : : EARTH WORKS CIVIL WORKS Mahesh G. Nair GROUND FLOOR 1 EARTH WORKS EXCAVATION : Earth work excavation for foundation trenches in all classes of soil

More information

20 THINGS YOU NEED TO KNOW ABOUT LOFT CONVERSIONS

20 THINGS YOU NEED TO KNOW ABOUT LOFT CONVERSIONS 01 IS THERE A MINIMUM HEADROOM REQUIREMENT TO THE NEW LOFT ROOM? Not to the room itself, although of course you need to be able to use the space. However, the new stairs will need a minimum 2.0m clear

More information

Schedule of Condition

Schedule of Condition Schedule of Property Address: Outlet Number: 200414 Document Reference: The Golden Hind 470 Nacton Road Ipswich IP3 9NF N/A Document Date: 4th January 2018 Rev. Contents Page 2 A. Document Control Sheet

More information

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached

More information

Hill. Brockma Gill. Kearton. Home Farm. Sheep Wash. Langhorne House. Scale 1:1,250. Date 13/12/11. Brockma Gill East

Hill. Brockma Gill. Kearton. Home Farm. Sheep Wash. Langhorne House. Scale 1:1,250. Date 13/12/11. Brockma Gill East This drawing is the property of Niche Design Architects. Copyright is reserved Hill Low Top Brockma Gill NORTH.. Planning Issue 3 Red line boundary revised to include access. 3.. 05.0. Sheep Wash Kearton

More information

Residencial Las Américas - Edificio California C/ Sierra de Gredos,

Residencial Las Américas - Edificio California C/ Sierra de Gredos, Don t you think it s time to change your life? Then, bear this in mind! One more step in the creation of one of the best urban developent conceptions in Almería: Residencial Las Américas. Edificio Californi

More information

footings are provided with a concrete grade of M20. The maximum axial load 1600 KN as arrived from design is taken for the design of the footing.

footings are provided with a concrete grade of M20. The maximum axial load 1600 KN as arrived from design is taken for the design of the footing. ISSN XXXX XXXX 2017 IJESC Research Article Volume 7 Issue No.8 Planning, Designing and Estimation of a Bank Building D.Gangasekhar 1, B.Ramakrishna 2 M.Tech, (Structural Engineering) 1, Assistant Professor

More information

Schedule of Condition

Schedule of Condition Schedule of Property Address: Wheatsheaf Whitley Road Benton Square NE12 9SU Outlet Number: 200823 Document Reference: N/A Rev. Year 0 Document Date: 10th November 2017 Contents Page 2 A. Document Control

More information

Via Parque Alicante BUILDING SPECIFICATIONS

Via Parque Alicante BUILDING SPECIFICATIONS WE BUILD YOUR HOUSE, SO YOU CAN MAKE IT A HOME Via Parque Alicante BUILDING SPECIFICATIONS f\ acciona Inmobiliaria First impressions do count 01. FAÇADE Facing brick façade to feature two colours, depending

More information

CHIMNEYS AND FIREPLACES

CHIMNEYS AND FIREPLACES CHAPTER 10 CHIMNEYS AND FIREPLACES SECTION R1001 MASONRY FIREPLACES R1001.1 General. Masonry fireplaces shall be constructed in accordance with this section and the applicable provisions of Chapters 3

More information

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE II RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING

More information

CONDITION REPORT and PROPOSED WORKS January 2014

CONDITION REPORT and PROPOSED WORKS January 2014 Birsay Heritage Trust Buildings at HMS TERN Twatt, Birsay CONDITION REPORT and PROPOSED WORKS January 2014 Leslie Burgher Chartered Architect Introduction This survey was carried out to make an assessment

More information

Property Address: Sample.Prehandover.report

Property Address: Sample.Prehandover.report Web Page: www.inspectdirect.com.au INSPECT DIRECT Pty Ltd Property Address: Sample.Prehandover.report Building Construction Advice Inspection Report This is not a Pest Inspection Stage of construction:

More information

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017 Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins

More information

Refurbishment Case Study 18. Earlston Conservation works to a mid-18 th century terraced house

Refurbishment Case Study 18. Earlston Conservation works to a mid-18 th century terraced house Refurbishment Case Study 18 Earlston Conservation works to a mid-18 th century terraced house The views expressed in commissioned case studies are those of the authors and do not necessarily represent

More information

SCHEDULE OF CONDITION

SCHEDULE OF CONDITION SCHEDULE OF CONDITION A Public House in Surrey FOR Mrs R INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Internal Rooms page 15 GROUND FLOOR TRADING AREA

More information

SCHEDULE OF CONDITION OF

SCHEDULE OF CONDITION OF JOB REFERENCE: O/G SCHEDULE OF CONDITION OF A Listed Tudor 16 th /17 th Public House And Restaurant FOR Mr and Mrs H Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 4 Internal Rooms page 10

More information

BUDGET ESTIMATE - ISSUE No. 2

BUDGET ESTIMATE - ISSUE No. 2 REPAIRS & ESSENTIAL UPGRADING WORK AT WINGERWORTH PARISH HALL NEW ROAD, WINGERWORTH DERBYSHIRE, S42 6TB BUDGET ESTIMATE - ISSUE No. 2 OCTOBER 2016 GENERAL NOTES Patrick Meeds & Associates were asked to

More information

STATE PREFERENTIAL PROPERTY TAX ASSESSMENT PROGRAM

STATE PREFERENTIAL PROPERTY TAX ASSESSMENT PROGRAM GEORGIA DEPARTMENT OF NATURAL RESOURCES (DNR) - HISTORIC PRESERVATION DIVISION (HPD) PART A PRELIMINARY CERTIFICATION Section I Property and Owner Information STATE PREFERENTIAL PROPERTY TAX ASSESSMENT

More information

SUB: TENDER FOR BUILDERS WORK, WATER SUPPLY, SANITARY INSTALLATION, ELECTRICAL INSTALLATION, LIFTS, INTERIOR FURNISHING WORK AND OTHER ANCILLARY WORKS FOR PROPOSED CONSTRUCTION OF SALES TRAINING CENTRE

More information

56 Acres of Pasturland at Ger y Cwm Lower Snead, Churchstoke, SY15 6EA Lower Snead, Churchstoke, SY15 6EA. Shropshire, SY15 6TR

56 Acres of Pasturland at Ger y Cwm Lower Snead, Churchstoke, SY15 6EA Lower Snead, Churchstoke, SY15 6EA. Shropshire, SY15 6TR 56 Acres of Pasturland at Ger y Cwm 56 Upper Acres Pant of Land Glas, at Ger Churchstoke, y Cwm, Lower Snead, Churchstoke, SY15 6EA Lower Snead, Churchstoke, SY15 6EA 01588 O1588 638755 638755 Shropshire,

More information

1542 CARS Closes, Elgin Walker s Close

1542 CARS Closes, Elgin Walker s Close 1542 CARS Closes, Elgin Walker s Close Summary of work and Photos Location Description Recommendations Status Cost Paving Entrance concrete slabs marker slab required Pend in situ concrete slab Option

More information

Inclusions FRAMING GARAGE FIXED SITE COSTS & CONNECTIONS EXTERNAL. 90mm pine wall frames with stabilised pine roof trusses

Inclusions FRAMING GARAGE FIXED SITE COSTS & CONNECTIONS EXTERNAL. 90mm pine wall frames with stabilised pine roof trusses Inclusions FRAMING 90mm pine wall frames with stabilised pine roof trusses GARAGE Brick veneer garage including sectional overhead door to front (garage size product specific) Painted fibrous cement sheet

More information

INTRODUCTION. Photo 1: View of the Pulda House from the northwest. Pulda Farm Conditions Assessment Page 1 HMR Architects

INTRODUCTION. Photo 1: View of the Pulda House from the northwest. Pulda Farm Conditions Assessment Page 1 HMR Architects INTRODUCTION Photo 1: View of the Pulda House from the northwest. The Pulda Farm is located at 300 Old Georges Road, North Brunswick Township, Middlesex County, New Jersey. It is situated on the south

More information

SCHEDULE OF CONDITION XXXX City of London, EC3V XXX

SCHEDULE OF CONDITION XXXX City of London, EC3V XXX SCHEDULE OF CONDITION XXXX City of London, EC3V XXX XXXX JOB REFERENCE: XXXX FOR Mr X Prepared by: XXXX INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS SCHEDULE OF CONDITION Elevations page 6 Front

More information

BUILDING SPECIFICATIONS

BUILDING SPECIFICATIONS BUILDING SPECIFICATIONS FOUNDATION AND STRUCTURE Foundations using reinforced concrete slabs, according to the data of the geotechnical study, complying with building standard CTE-DB-SE-C. Concrete walls

More information

Copyright 2002-present, Natural Element Homes naturalelementhomes.com CABIN (2224)

Copyright 2002-present, Natural Element Homes naturalelementhomes.com CABIN (2224) 28'-0" 11'-2" Copyright 2002-present, Natural Element Homes naturalelementhomes.com 1-800-970-CABIN (2224) 105'-2 7/8" 29'-6 3/8" DECK 29'-6 3/8" 14'-6 1/2" 25'-3" 14'-6 1/2" 25'-7 1/2" 25'-3 3/8" 26'-4"

More information

Middle Barn, Front Street, Chedzoy, Nr. Bridgwater TA7 8RE

Middle Barn, Front Street, Chedzoy, Nr. Bridgwater TA7 8RE Middle Barn, Front Street, Chedzoy, Nr. Bridgwater TA7 8RE Highly appointed converted stone barn with substantial garden and double garage. Grand entrance hall, substantial 28' lounge/diner, re-fitted

More information

TOWN OF PERINTON 1350 TURK HILL ROAD. FAIRPORT, NEW YORK (585) , Fax: (585) ,

TOWN OF PERINTON 1350 TURK HILL ROAD. FAIRPORT, NEW YORK (585) , Fax: (585) , BUILDING PERMIT REQUIREMENTS FOR BASEMENT REMODELING 1. Provide two copies of a detailed floor plan and elevation drawing, see sample drawings on page 9 and 10. Include materials, sizes, supports, heating,

More information

SITE AND BUILDING INSPECTION CHECKLIST

SITE AND BUILDING INSPECTION CHECKLIST PARISH BUILDING Page 1 of 6 SITE AND GROUNDS DATE INIT COMMENTS DATE INIT COMMENTS Ramps & Provisions for Handicap Designated parking spaces for Handicap Has soil dropped or heaved Is there standing water

More information

Bill of Quantities Project: Tenant Installations Address: Suncadia, First Floor, Pretoria SAHRA/FAC/01/05/2018

Bill of Quantities Project: Tenant Installations Address: Suncadia, First Floor, Pretoria SAHRA/FAC/01/05/2018 T: +27 21 462 4502 F: +27 21 462 4509 E: info@sahra.org.za South African Heritage Resources Agency - Head Office 111 Harrington Street Cape Town P.O. Box 4637 Cape Town 8001 Bill of Quantities Project:

More information

The Springs Dawbourne Wood, Heather Drive, St Michaels, Tenterden, Kent TN30 6PP

The Springs Dawbourne Wood, Heather Drive, St Michaels, Tenterden, Kent TN30 6PP HASTINGS BEXHILL RYE BATTLE NORTHIAM ST LEONARDS TENTERDEN The Springs Dawbourne Wood, Heather Drive, St Michaels, Tenterden, Kent TN30 6PP 615,000 Freehold Available to the market for the first time in

More information

Renovation Progress. May 12 18, Week 32

Renovation Progress. May 12 18, Week 32 Renovation Progress May 12 18, 2012 Week 32 May 12 Furring strips along back wall of Sisters new Dining Area completed; projection room holes to be covered up when sheetrock is installed May 12 Another

More information

STANDARD SPECIFICATIONS. Page 1

STANDARD SPECIFICATIONS. Page 1 STANAR SPECIFICATIONS Page 1 Page 2 CERTIFICATION AN APPROVALS Complete soil test and engineer s report. Preparation and lodgement of evelopment including drafting of Architectural Plans and all applicable

More information

Schedule of Condition

Schedule of Condition Schedule of Property Address: Outlet Number: 122943 Document Reference: The Crown The Street Eythorne, Dover CT15 4BG N/A Document Date: 31st May 2018 Rev. Year 0 Contents Page 2 A. Document Control Sheet

More information

PassivTEN - Scottish Tenements and the Passivhaus Standard

PassivTEN - Scottish Tenements and the Passivhaus Standard PassivTEN - Scottish Tenements and the Passivhaus Standard Alan Benson Milnbank HA Matt Bridgestock John Gilbert Architects Tenements stats that influenced the study.. 23% of Scottish housing stock 35%

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT STRUCTURAL FOR CUSTOMS HOUSE JULY 2014 i P a g e Table of Contents 1. INTRODUCTION 3 1.1 Design Criteria and Specifications..

More information

Schedule of Condition

Schedule of Condition Schedule of Property Address: Outlet Number: 200903 Document Reference: The Kings Arms Hotel Station Road Stanstead CM24 8BE Document Date: 9th June 2018 G18-7009 Rev. Contents Page 2 A. Document Control

More information

Home Inclusions $410, HOME & LAND PACKAGE MARCOOLA Land Content $ MARCOOLA. 4 Bedroom 2 Bathroom Multiple living zones Alfresco

Home Inclusions $410, HOME & LAND PACKAGE MARCOOLA Land Content $ MARCOOLA. 4 Bedroom 2 Bathroom Multiple living zones Alfresco HOME & LAND PACKAGE MARCOOLA Land Content $180000.00 $410,000.00 Please note: actual façade may vary slightly from picture. MARCOOLA 4 Bedroom 2 Bathroom Multiple living zones Alfresco Double Lockup Garage

More information

/503 Level 3 Plastering (Fibrous) Version 1.0 November Sample Marking Scheme

/503 Level 3 Plastering (Fibrous) Version 1.0 November Sample Marking Scheme 7908-003/503 Level 3 Plastering (Fibrous) Version 1.0 November 2016 Sample Marking Scheme The correct responses to the multiple questions are in BOLD. 1 Where would multi-foil insulation most commonly

More information

REMEDIAL WORKS REQUIRED. Allow to clean down brickwork and repoint/repair brick elevations.

REMEDIAL WORKS REQUIRED. Allow to clean down brickwork and repoint/repair brick elevations. 2.0 SCHEDULE OF DILAPIDATIONS External Areas 2.1 Rear elevation 2.1.1 Rear brickwork elevations 3.5 Brickwork is lightly soiled and stained at low level with some minor repointing required. Allow to clean

More information

NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI ESTATE MAINTENANCE DEPARTMANT NAME OF THE CONTRACTOR / FIRM :

NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI ESTATE MAINTENANCE DEPARTMANT NAME OF THE CONTRACTOR / FIRM : NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI- 620015 ESTATE MAINTENANCE DEPARTMANT SCHDULE OF WORK Name of Work :Renovation of Geotechnical Lab and Environmental lab in Civil Engineering Departemnt

More information