CITY OF GRAND RIVERS LIVINGSTON COUNTY, KENTUCKY

Size: px
Start display at page:

Download "CITY OF GRAND RIVERS LIVINGSTON COUNTY, KENTUCKY"

Transcription

1 CONTRACT I CONTRACT II CONTRACT III WASTEWATER TREATMENT PLANT INFLUENT PUMP STATION, FORCE MAIN, AND WATER MAIN EXTENSION WWTP & INFLUENT PUMP STATION ELECTRICAL CITY OF GRAND RIVERS LIVINGSTON COUNTY, KENTUCKY ICA No ADDENDUM NO.1 April 24, 2014 This document is an Amendment to the Contract Documents and shall be a part of and included in the Contract. When the Addendum conflicts with the original Specifications and/or Drawings, this Addendum shall govern. Item No.1: Item No.2: Item No.3: All Contracts The open channel flow meter, all level transducers and transmitters, and all control panels will be provided and installed by the Electrical Contractor awarded Contract III. The only exception to this are the panels that come with specific equipment noted in the specifications (mechanical bar screen, screening screw compactor, grit pumps, and oxidation ditch). The parshall flume and all magnetic flow meters will be provided and installed by the General Contractor awarded Contract I. Contracts I and II All exposed ductile iron pipe, fittings, and valves shall be prepped and painted by the General Contractors awarded Contracts I and II per specification section This includes, but is not limited to, the piping, valves, and fittings located in the following areas: beneath the concrete walkways in the oxidation ditch, basement of the service building, concrete vaults, on the concrete walls in the sludge drying beds, above the minimum water line in the two digesters. Color scheme will be provided during construction. Contracts I and II In lieu of spare parts, the General Contractor shall include in his bid, a spare pump for each submersible pump model. Spare pumps shall include one (1) large influent pump, one (1) small influent pump, one (1) plant drain pump, and one (1) scum pump. These pumps shall be provided to the Owner prior to start-up. Page 1 of 6

2 Item No.4: Item No.5: Item No.6: Contracts I and II All new motors that will be connected to VFDs must be equipped with factory installed shaft grounding rings. A warranty against VFD-induced bearing damage or failure for the life of the motor is required. Pumps will be provided and installed by the General Contractors. Contracts I and II Hatches shall be by USF Fabrication or Halliday Products and shall be equipped with fall through protection. Refer to specifications. Contracts I and III Insulating equipment/pipe noted on the plans will be the responsibility of the General Contractor awarded Contract I. Heat tracing will be the responsibility of the Electrical Contractor awarded Contract III. Item No.7: Contract I In specification sections Sludge Dewatering System and Oxidation Ditch, remove Part I, section 1.03.A, items 2 and 2(a) and in specification section Clarifiers, remove Part I, section 1.04.A, items 2 and 2(a). In all three of these sections, rename item 2(b) to become the new item 2. The items to be removed are as follows: 2. The Contract, if awarded, will be on the basis of material and equipment specified without consideration of alternate equipment. In the event an alternate is allowed, the Contract price will be adjusted accordingly by a change order. (a) By submitting a bid, the Contractor agrees and understands that Contract award will be made on the basis of the specified equipment. Rename item 2(b) to become the new item 2. The result is shown below: 2. If an alternate is found to be not acceptable, the Contractor shall be responsible for supplying the equipment specified. Item No.8: Contract I For clarification, there are two specifications in the Project Manual that were inserted in error into the body of the set of specifications. These two specifications are not listed in the table of contents and need to be removed. They are sections Influent Pump Station, and Sewer Manhole Rehabilitation. Section was inserted between sections and 02740, and Section was inserted between sections and Please note, section Plant Drain and Scum Pump Stations is correctly placed and is to remain. Item No.9: Contract I The three (3) 18 plug valves with electric actuators shown on Plan Sheet 10, 10B, and 10C shall be Model PEF 100% Port Eccentric Plug Valves manufactured by Dezurik with Model AT1000 on/off electric actuators manufactured by Bernard Controls, or Engineer approved equal. The actuators shall have the following specs: Electrical 460-3P-60Hz, 90 degree travel 75 seconds, planetary mechanical self-locking gear, IP67 weatherproof enclosure, external corrosion protection, extra set of limit switches, manual Page 2 of 6

3 handwheel override, torque switches, heater, visual position indicator, mechanical travel limit stops, local open and close with indicating lights, and each one shall include an extended mounting system (estimated 7 feet above centerline). Contact Chris Hosack ( ) at King Mechanical Specialty, rd Street, Newburgh, IN Item No.10: Item No.11: Item No.12: Item No.13: Item No.14: Item No.15: Contract I The General Contractor is responsible for insulating a section of 6 RAS pipe depicted on Sht.10C, Section K-K. The section to be insulated is above grade, beneath the stair access. Contract I All valves in the basement of the service building shall be equipped with handwheel operators. Installation shall be per the manufacturer s instructions. Contract I Aeration will be supplied to both digesters and it will be the same for both as shown on Plan Sheet 15. Contract II For clarification, there is a specification in the Project Manual that has the wrong section number. It is correctly called out in the table of contents but is incorrect numbered within the body of the set of specifications. Specification section Influent Pumps is correctly called out in the table of contents but in the body of the specifications it is numbered Section needs to be renamed Contract II All four (4) influent submersible pumps shall be equipped with both explosion proof rated motors and factory installed cooling jackets. The cooling jackets will allow for continuous pump operation when the pumps are operated indefinitely with the motors non-submerged. Contract II Recommended Construction Sequence. Abandoning the sewer mains and manholes, converting the existing pump station into a manhole, and constructing the gravity sewers will be performed after the new influent pump station, force main, and WWTP (Contract I) are online and ready to receive wastewater. At that time, the existing pump station (wetwell) will be isolated, the 16 plug valve between the existing and proposed wetwells will be closed, and wastewater bypass pumped from the manhole immediately upstream from the existing wetwell to the bypass quick connection on the 16 gravity main upstream from the new wetwell. This will allow conversion of the existing wetwell and partial construction of the two 16 gravity sewers. Once completed, the two 16 gravity sewers will be plugged, the 16 plug valve opened, and the bypass pump moved. Two bypass pumps will be needed for the next phase. They will be located upstream from two unaffected manholes. Both bypass lines will discharge into the newly converted wetwell. The remaining gravity sewers and new manholes will then be constructed. The General Contractor is responsible for rehabilitating and coating the interior of the existing wetwell and manhole per specification section Sewer Manhole Rehabilitation. Construction in the roadway will be coordinated with Jeff Deweese (Grand Rivers) and the Livingston County Road Department. Page 3 of 6

4 Item No.16: Item No.17: Item No.18: Item No.19: Item No.20: Item No.21: Item No.22: Item No.23: Item No.24: Item No.25: Item No.26: Contract II The General Contractor is responsible for abandoning the existing manhole located in the corner of the existing fenced in area at the Koon Road Pump Station. The gravity sewers connected to this manhole will also be abandoned. Abandonment of the manhole will include removal of the top slab down to 3 below grade, breaking/cracking the base slab so it won t be able to hold water, and filling it with sand. Contract II The General Contractor is responsible for providing and installing the FRP Building that will house the VFDs and pump controls. Contract II The General Contractor is responsible for removing and disposing of the trees on Plan Sheet 5 that are noted To Be Removed. Contract III The electrical contractor is responsible for providing and installing control panels for the two clarifiers. Contract III The Electrical Contractor is responsible for providing and installing the two generators and the concrete pads for the generators. Both generators are to be rated for standby duty not primary duty and they shall include level 1 sound attenuation. The noise level shall not exceed 72 dba measured 10 feet from the unit under free field conditions. Contract III The Electrical Contractor is responsible for heat tracing the section of pipe noted in Item No.10. Contract III The Electrical Contractor shall, at the appropriate time, disconnect and remove the electrical components of the existing Koon Road pump station. Contract III Pole lights at the influent pump station and wastewater treatment plant shown mounted on handrails shall be as shown on the lighting fixture schedule as Types F and G. Type F is the fixture and Type G is the swivel mounting pole. Contract III Underground conduits on the site may be PVC with concrete cover or rigid galvanized steel. Aboveground conduits shall be rigid galvanized steel. Conduits in the service building chemical feed room shall be PVC coated rigid conduit ( Rob-Roy, or equal). Other conduits in the service building shall be rigid galvanized steel. Concealed conduits in the service building on the main floor, above ceilings, or in the walls, may be EMT. Contract III The Electrical Contractor is responsible for providing and installing float type level controls as backup to the level transducers in the influent, plant drain, and scum pump stations. Contract III The conductors shown in the influent flowmeter vault and not described are for solenoid valve operation. Control is from the Grit Pumps. When grit pump 1 and/or 2 initiate, the corresponding solenoid valve 1 and/or 2 will open. Page 4 of 6

5 Item No.27: Item No.28: Item No.29: Item No.30: Contract III Only NEMA rated devices are to be used. IEC devices are not to be used. Contract III Only 30mm size pushbuttons and indication lights are to be used. Contract III All Start-Stop controls and alarms are to be carried back to the Service Building and controlled from the HMI panel. Contract III Bidders shall submit with their bids, the following documentation to assist in bid evaluation: A. Input/Output list for the Influent Pump Station and Wastewater Treatment Plant. B. Sample of Control Drawings on similar projects the bidder has completed within the past 5 years. C. Provide brief narratives of the bidder s understanding of the operational sequence for the Influent Pump Station and Wastewater Treatment Plant. Item No.31: Item No.32: Item No.33: Item No.34: Item No.35: Item No.36: Item No.37: Item No.38: Contract III The existing Koon Road Pump Station is connected to the existing SCADA system. The new Koon Road Pump Station (Influent Pump Station) shall be reconnected and made operational with the existing SCADA system. Contract III For Clarification, it is the intent for the submersible pumps with seal leak detection, temperature detection, etc., to be connected to the control panels and also indicated as alarms. Contract III For Clarification, it is the intent that both Devicenet and Ethernet Systems be utilized and that the finish control systems be SCADA ready. Contract III Bidders are NOT required to have in-house capabilities for building and programming PLCs provided this service is provided by a company approved by the City. Approved companies include HTI and Matrix Engineering. Contract III The bidder shall delete the requirement to include fees and cost for services by Jackson Purchase Energy. The owner will contract direct with Jackson Purchase Energy for services to the Influent Station and the Wastewater Plant. The bidder shall still include in the bids the cost for any temporary services that may be required during construction. Contract III Correction, the Disconnect Switches, Pushbuttons, and Selector Switches located and shown in the basement of the Service Building shall be in NEMA 4X Stainless Steel enclosures in lieu of NEMA 12. Contract III Correction, the motor control center is to be Standard design, not Arc Flash Protected design. Contract III Correction, the circuit breakers feeding the 15hp VFDs shall be 3P/40A and the circuit breakers feeding the 75hp VFDs shall be 3P/150A. The wire sizes to the 15hp and 75hp VFDs shall be #8's and #1's, respectively. Page 5 of 6

6 Item No.39: Contract III The breaker for the electric range in the service building shall be a 2P/50A instead of a 2P/20A. ICA ENGINEERING, INC. Michael W. Rogers, P.E. KY License No Please sign this addendum and return today to this office via. Fax at or scan and to jhouser@icaeng.com and mrogers@icaeng.com Signature Date Company Page 6 of 6

City of Wentzville. Standard Specifications and Construction Details Amendment List

City of Wentzville. Standard Specifications and Construction Details Amendment List Amendment No. 1 Standard Specifications and Construction Details Amendment List Date: September 21, 2009 Subject: SCD 700.23 - Residential Entrance Layout and drawing revised to more clearly show the location

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure

More information

BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83

BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83 Item No. BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83 DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL PRICE GENERAL BID ITEMS 1 Per Plans and Specifications

More information

SECTION SANITARY WASTE INTERCEPTORS

SECTION SANITARY WASTE INTERCEPTORS SECTION 22 13 23 SANITARY WASTE INTERCEPTORS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

SEMINOLE TRIBE OF FLORIDA

SEMINOLE TRIBE OF FLORIDA SEMINOLE TRIBE OF FLORIDA Denise DeCarolis Carpenter Purchasing Department Director 6300 STIRLING ROAD HOLLYWOOD, FLORIDA 33024 PHONE (954) 966-6300 x11170 FAX (954) 967-3478 E-MAIL: dcarpenter@semtribe.com

More information

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Village of Arlington Heights. Sewer Back-up Rebate Program

Village of Arlington Heights. Sewer Back-up Rebate Program Village of Arlington Heights Sewer Back-up Rebate Program (Including Enhanced Program Information) Updated: October 1, 2017 Village of Arlington Heights Building & Life Safety Department 33 S. Arlington

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT SECTION 11322 MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT PART 1 GENERAL 1.01 SCOPE There shall be furnished ( ) Grit Separator Mechanism(s) suitable for installation in (a) concrete tank(s) -ft.

More information

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 27, 2014 ITB NO. 14-33 WAKEFIELD PUMPING STATION UPGRADE ADDENDUM NUMBER

More information

SECTION INFLUENT EQUALIZATION TANK PUMPS

SECTION INFLUENT EQUALIZATION TANK PUMPS PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor and equipment to put into service the Influent Equalization Pumps in accordance with the Contract Drawings

More information

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps: Effluent Pumps: Effluent pumps are the pumps most often used in small on-site systems. They are designed to pump effluent, the effluent flowing out of a septic tank. This effluent is relatively clear liquid

More information

TECHNICAL SPECIFICATIONS DIVISION 16 - ELECTRICAL SECTION DETAIL SPECIFICATIONS FOR ELECTRICAL INSTALLATION

TECHNICAL SPECIFICATIONS DIVISION 16 - ELECTRICAL SECTION DETAIL SPECIFICATIONS FOR ELECTRICAL INSTALLATION PART 1 - GENERAL 1.01 SCOPE The work covered by this section shall include furnishing and/or installation of all electrical and instrumentation equipment and necessary wiring systems required to provide

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

FAIRBANKS NIJHUIS SUBMERSIBLE SOLIDS HANDLING PUMPS.

FAIRBANKS NIJHUIS SUBMERSIBLE SOLIDS HANDLING PUMPS. FAIRBANKS NIJHUIS SUBMERSIBLE SOLIDS HANDLING PUMPS www.fairbanksnijhuis.com FAIRBANKS NIJHUIS Introduction Fairbanks Nijhuis manufactures a complete line of submersible pumps for municipal and industrial

More information

Residential Sewer Backup Prevention Program

Residential Sewer Backup Prevention Program City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

Fiberglass Cooling Towers

Fiberglass Cooling Towers Fiberglass Cooling Towers Available in sizes from 100 to 240 tons. FC Series 700 Fiberglass Cooling Tower Available in sizes from 170 to 240 tons. No other fiberglass cooling tower comes with as many high-quality

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

HUP. Performance Data. Wholesale Products Page: Section: Performance Data Dated: January RPM: 1550 Discharge: 1" Solids: 1/8" GPM: TDH:

HUP. Performance Data. Wholesale Products Page: Section: Performance Data Dated: January RPM: 1550 Discharge: 1 Solids: 1/8 GPM: TDH: Performance RPM: 1550 Discharge: 1" Solids: 1/8" Wholesale Products Page: 6660-1 Section: Performance The curves reflect maximum performance characteristics without exceeding full load (Nameplate) horsepower.

More information

HYDROMATIC W/D/V-A1 SUBMERSIBLE SUMP/EFFLUENT

HYDROMATIC W/D/V-A1 SUBMERSIBLE SUMP/EFFLUENT PERFORMANCE DATA Wholesale Products Page: 6570-1 RPM: 1550 Discharge: 1 ½ Solids: ½ V-A1 W-A1 D-A1 Head, meters 8 4 Head, feet 30 20 10.3 HP 0 0 Capacity, US GPM 0 10 20 30 40 50 60 liters/second 0.0 1.0

More information

SECTION SLUDGE HOLDING TANK DECANTER PUMP

SECTION SLUDGE HOLDING TANK DECANTER PUMP PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor and equipment to put into service the Sludge Holding Tank Decanter Pumping System in accordance with the

More information

SPECIAL SPECIFICATION 3504 Septic Tank System

SPECIAL SPECIFICATION 3504 Septic Tank System 1993 Specifications CSJ s 3136-01-126, etc. & 0683-01-070, etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for

More information

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION TABLE OF CONTENTS 2. Description of Water and Wastewater Systems... 2 2.1 General... 2 2.2 Existing Facilities Reference and Record Documents... 2 2.3 Existing Infrastructure Location and Legal Description...

More information

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:

More information

HYDROMATIC SKV50 SEWAGE EJECTOR PERFORMANCE DATA SKV50. Wholesale Products Page: RPM: 1650 Discharge: 2 Solids: 2.

HYDROMATIC SKV50 SEWAGE EJECTOR PERFORMANCE DATA SKV50. Wholesale Products Page: RPM: 1650 Discharge: 2 Solids: 2. PERFORMANCE DATA Wholesale Products Page: 6280-1 RPM: 1650 Discharge: 2 Solids: 2 12 40 9 30 HEAD-METERS 6 HEAD-FEET 20 3 10 0 0 Capacity - U.S. G.P.M. 0 30 60 90 120 150 180 Liters/Second 0 2 4 6 8 10

More information

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER Updated January 2018 RP-2 Installation Specifications 1. In W.H.U.D s service area

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

SECTION AUTOMATIC TRANSFER SWITCH

SECTION AUTOMATIC TRANSFER SWITCH SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH PART 1: GENERAL 1.01 SCOPE A. Furnish all labor, materials, equipment and appurtenances, install and test electrically operated, automatic transfer switch (ATS)

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

DELTA WASTEWATER TREATMENT PLANT UPGRADES

DELTA WASTEWATER TREATMENT PLANT UPGRADES Delta, Ohio Environmental and Electrical Engineering, Grant Administration Cost $2.6 million $3.2 million OWDA Loan 1,100 SF Admin Building Addition 0.725 MGD Average Daily Flow 1.5 MGD Peak Capacity Professional

More information

Section 2: Underground

Section 2: Underground Section 2: Underground GENERAL INSTALLATION REQUIREMENTS FOR UNDERGROUND FACILITIES Underground electric service and meter location will be established by NHEC upon site visit. In some instances the type,

More information

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM Form 15 Work Write-Up Owner-Builder Applicant Owner-Builder Co-Applicant Physical Address: City,

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE

More information

RESIDENTIAL BUILDING PLAN REQUIREMENTS

RESIDENTIAL BUILDING PLAN REQUIREMENTS CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us RESIDENTIAL BUILDING PLAN REQUIREMENTS

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 26 ELECTRICAL SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 26 ELECTRICAL SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS SECTION 260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes raceways, fittings, boxes, enclosures, and cabinets for electrical wiring. B. See Division

More information

MODELS PH PH PH

MODELS PH PH PH WWW.BURCAM.COM 2190 Boul. Dagenais West TEL: 514.337.4415 LAVAL (QUEBEC) FAX: 514.337.4029 CANADA H7L 5X9 info@burcam.com Your pump has been carefully packaged at the factory to prevent damage during shipping.

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

The following document can be provided to an Engineer, Contractor, or Owner to allow them to

The following document can be provided to an Engineer, Contractor, or Owner to allow them to MESAN series MXL Engineering Guide Specifications The following document can be provided to an Engineer, Contractor, or Owner to allow them to properly specify MESAN s MXL series Cooling Towers. 15XXX-

More information

Series Sump and Sewage Systems

Series Sump and Sewage Systems Series 000 Sump and Sewage Systems file no: 0. date: may 17, 13 supersedes: 0. date: march 29, 13 Series 000 Sump Series 0 & 2 Armstrong offers a complete range of high performance, easily maintained Column

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1

ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1 ADDENDUM Project: BYU-I Smith Building Chiller Replacement Project No.: 11162 Addendum No.: 1 Project Address: BYU-Idaho Operations Building Rm. #213, Rexburg, Idaho 83460 Date: 2/18/16 Owner: BYU-Idaho

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS 2190 Dagenais Blvd.West Laval (Quebec) Canada H7L 5X9 Tel. : 514.337.4415 Fax : 514.337.4029 info@burcam.com see us at www.burcam.com VERSION Z MODELS 300500 SUMP PUMPS Your pump

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

Simplex Fiberglass Lift Station: Hard Piped

Simplex Fiberglass Lift Station: Hard Piped www.cranepumps.com Simplex Fiberglass Lift Station: Hard Piped Pre-Packaged Fiberglass Systems Specifications: inches (mm) BASIN... Fiberglass w/ 3 (76) Ballast Support Flange DISCHARGE CONNECTION:...

More information

REQUEST FOR PROPOSALS FOR SLUDGE DEWATERING EQUIPMENT HORTONVILLE WASTEWATER TREATMENT FACILITY VILLAGE OF HORTONVILLE.

REQUEST FOR PROPOSALS FOR SLUDGE DEWATERING EQUIPMENT HORTONVILLE WASTEWATER TREATMENT FACILITY VILLAGE OF HORTONVILLE. REQUEST FOR PROPOSALS FOR SLUDGE DEWATERING EQUIPMENT HORTONVILLE WASTEWATER TREATMENT FACILITY VILLAGE OF HORTONVILLE August 4, 2016 The Village of Hortonville, Wisconsin is requesting proposals for sludge

More information

Legacy Environmental Process, LLC 1445 Ashville Road, Suite 103 Leeds, Alabama In USA Fax:

Legacy Environmental Process, LLC 1445 Ashville Road, Suite 103 Leeds, Alabama In USA Fax: Legacy Environmental Process, LLC 1445 Ashville Road, Suite 103 Leeds, Alabama 35094 In USA 1-205-640-1035 Fax: 1-205-640-1039 www.legacyenvpro.com Pre-Plant Delivery And Installation Manual For Project

More information

BIOFILTRATION ODOR CONTROL SYSTEM PLANT EXPANSION PROJECT

BIOFILTRATION ODOR CONTROL SYSTEM PLANT EXPANSION PROJECT SECTION 441000 PART 1 - GENERAL 1.1 SUMMARY A. Description of Work: 1. Furnish, install, and test a complete biofiltration odor control system contained in a concrete reactor. Odor control system shall

More information

OPERATING PROCEDURE NO. 310

OPERATING PROCEDURE NO. 310 OPERATING PROCEDURE NO. 310 Related Operating Procedures: 310A; 310B; 310C; 310D SUBJECT: Conditions of Service Issued: February 10, 2014 Revised: March 28, 2016 OBJECTIVE: To establish the rules, regulations

More information

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003 University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003 May 16, 2016 Addendum #1 Contract Number: UMA16-25 Project Number: 1000730 Speedtype: 157194 Title:

More information

G2D Series Performance Data Discharge: 1-1/4 Solids: 1/4. Wholesale Products Page: JP10075SSD-1 Section: Performance Data Dated: January, 2011

G2D Series Performance Data Discharge: 1-1/4 Solids: 1/4. Wholesale Products Page: JP10075SSD-1 Section: Performance Data Dated: January, 2011 100 Best Efficiency Point 90 80 70 TDH (ft) 60 50 40 30 20 10 The curve reflects maximum performance characteristics without exceeding full load (Nameplate) horsepower. Operation is recommended near the

More information

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities ADDENDUM NO. TO Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities Date of Addendum: December, 00 Hethcoat & Davis, Inc. 78 Franklin Road,

More information

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART

More information

SECTION A-A. Control Panel

SECTION A-A. Control Panel SaniTEE 818-B Blower Housing Settling Zone 1050 Gallon MIN 4500 Gallons Control [4000 L MIN] [17000L] Panel 183 MX 72 MX Height of Effluent Line 1. Blower piping to BioBarrier MBR may not exceed 40 FT

More information

SERVICE LINES, METERS AND APPURTENANCES

SERVICE LINES, METERS AND APPURTENANCES AUGUST02 SECTION 02646 SERVICE LINES, METERS AND APPURTENANCES PART 1 - GENERAL 1.1 DESCRIPTION A. This section concerns materials and installation of corporation stops, curb stops, service lines, meters,

More information

SECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION

SECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION SECTION 22 11 16.13 CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION PART 1: GENERAL 1.01 SUMMARY A. This Section includes water-distribution backflow prevention products and installation specifications.

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

ADDENDUM # 3 DATE: February 16, 2018

ADDENDUM # 3 DATE: February 16, 2018 ADDENDUM # 3 DATE: February 16, 2018 REFERENCE: Invitation for Bid No.: S-LB-18607 IFB Issue Date: January 25, 2018 Title: Stonewall Middle School Addition and Renovations Architect/Engineer: Architecture

More information

VPL-3200B Residential Vertical Platform Lift Technical Specifications

VPL-3200B Residential Vertical Platform Lift Technical Specifications Page 1 of 5 VPL-3200B Residential Vertical Platform Lift Technical Specifications MODEL NUMBER: VPL-3200B Series: Models VPL-3210B, VPL-3212B and VPL-3214B (DC-powered units) U.S. F.D.A. CLASSIFICATION:

More information

Experior as an Energy Savings Solution for Wastewater Lift Stations. Lisa Riles NA Marketing and Business Development Manager Xylem

Experior as an Energy Savings Solution for Wastewater Lift Stations. Lisa Riles NA Marketing and Business Development Manager Xylem Experior as an Energy Savings Solution for Wastewater Lift Stations Lisa Riles NA Marketing and Business Development Manager Xylem Did you know? Municipal water and wastewater systems Consume 3% of all

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

ADDENDUM NO 1. TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP B)

ADDENDUM NO 1. TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP B) Office of the Capital Planning, Design & Construction Phone: 973-720-2352 Fax: 973-720-2829 WWW.WPUNJ.EDU ADDENDUM NO 1 TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP-16-01-99-B)

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11241 - Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S PART 1 - GENERAL... 1 1.01 Scope... 1 1.02 Scope of Work... 1 1.03

More information

Homeowner electrical wiring guide. Including the 2015 Canadian Electrical Code amendments

Homeowner electrical wiring guide. Including the 2015 Canadian Electrical Code amendments Homeowner electrical wiring guide Including the 2015 Canadian Electrical Code amendments Table of Contents Homeowner electrical wiring guide... 1 Required inspections... 2 Rough inspections (prior to any

More information

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Perdue Stadium Seating Bowl Improvements

More information

SECTION VI Duplex Lift Station with Above Grade Valve Pit

SECTION VI Duplex Lift Station with Above Grade Valve Pit SECTION VI Duplex Lift Station with Above Grade Valve Pit DESCRIPTION The contractor shall furnish and install one submersible sewage lift station with concrete wet well, pumps, piping, and factory built

More information

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL 8.01 GENERAL This material is not intended to cover service from OPPD s network in the downtown Omaha area. See Chapter 12 for details

More information

SECTION OUTLET, PULL, AND JUNCTION BOXES

SECTION OUTLET, PULL, AND JUNCTION BOXES SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:

More information

2. Water Pressure Booster Systems. 3. Duplex Pedestal Type Sump Pumps.

2. Water Pressure Booster Systems. 3. Duplex Pedestal Type Sump Pumps. PART 1: GENERAL 1.01 Purpose: A. The design guidelines contained herein includes the requirements for pumps utilized for plumbing systems at Texas State University. It is the intention of this document

More information

SEPTIC TANK CONSTRUCTION GUIDELINES

SEPTIC TANK CONSTRUCTION GUIDELINES SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic

More information

16. Design of Pipeline Structures.

16. Design of Pipeline Structures. 16. Design of Pipeline Structures. a. General. 1) The following guidelines are for the design of structures for water and sewer pipelines including structural concrete and miscellaneous metals design.

More information

Place & Connect Pumping Stations

Place & Connect Pumping Stations Place & Connect Pumping Stations Flo-Pak Integrated Municipal Pumping Systems www.pattersonpumps.com When Quality Matters Flo-Pak Municipal Packaged Pumping Systems Setting the Bar for Packaged Systems

More information

LI STATIONS N-03 & N-06 PLACEMENT BID # B May 18, 2016 Addendum 2

LI STATIONS N-03 & N-06 PLACEMENT BID # B May 18, 2016 Addendum 2 revard Central Services Florida's Coast CENTRAL SERVICES GROUP Telephone (321) 617 7390 PURCHASING SERVICES Fax (321) 617-7391 Brevard County Government Center 2725 Judge Fran Jamieson Way, Bldg. C, Suite

More information

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment.

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment. STATE OF ARKANSAS REVENUE LEGAL COUNSEL Department of Finance Post Office Box 1272, Room 2380 Little Rock, Arkansas 72203-1272 and Administration Phone: (501) 682-7030 Fax: (501) 682-7599 http://dfa.arkansas.gov

More information

SECTION SLUICE GATES

SECTION SLUICE GATES SECTION 11100 SLUICE GATES PART 1--GENERAL Fill in the blank with a short description of sluice gate usage, i.e., for isolation of wastewater, or for tank drainage, or for control of water surface. 1.01

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

CLARIFICATIONS. Item 3. Specification Sections and A. All finish wood shall have sealer coat and two coats of finish material REVISIONS

CLARIFICATIONS. Item 3. Specification Sections and A. All finish wood shall have sealer coat and two coats of finish material REVISIONS Addendum #2 Project Name: Global Campus Interior Renovation Project Address: 2 E. Center Street Fayetteville, AR 72701 Date: 06/14/17 This document is issued as a response to Clarifications. These revisions

More information

ONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,

ONE PIPE LENGTH MAX (REFER TO 1/4/FT SLOPE (MIN) 5'-0 (MIN) OR 4 LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4x6 REFER TO TYPICAL EXCAVATION, VENT CAP (MUSHROOM TYPE) SOLID CAP EXIST GRADE MIN BUILDING REFER TO NOTE #4 MIN CONCRETE SIDEWALK CURB OR EDGE OF SIDEWALK STREET CLEANOUT (REFER TO NOTE #3) VENT PIPE 4" PVC 6" PVC CLEANOUT CONCRETE

More information

City of Branson APPLICATION FOR CONSTRUCTION PERMIT

City of Branson APPLICATION FOR CONSTRUCTION PERMIT 110 W. Maddux St., Ste. 215 Branson, MO 65616 417 337 8549 Fax 417 334 2391 Project Project 911 Name Address Owner City of Branson licensed contractor Missouri registered architect/engineer Residential

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

4. Number of drawings required: ( ) Locations of nearest streets

4. Number of drawings required: ( ) Locations of nearest streets CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us COMMERCIAL BUILDING PLAN REQUIREMENTS

More information

LARGE STORAGE TANK PROJECT

LARGE STORAGE TANK PROJECT INTRODUCTION The Fairbanks Large Storage Tank is part of the Interior Energy Project (IEP) designed to expand natural gas distribution in Fairbanks and Interior Alaska. A tank with a capacity of 0.44 Bcf

More information

POSITIVE DISPLACEMENT BLOWERS & VACUUM PUMPS. Water & Wastewater Treatment Solutions

POSITIVE DISPLACEMENT BLOWERS & VACUUM PUMPS. Water & Wastewater Treatment Solutions POSITIVE DISPLACEMENT BLOWERS & VACUUM PUMPS Water & Wastewater Treatment Solutions Water & Wastewater Treatment Solutions Gardner Denver understands the complex needs and challenges of the water and wastewater

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

INSTALLATION INSTRUCTIONS. MODEL Version W SUBMERSIBLE SUMP PUMP

INSTALLATION INSTRUCTIONS. MODEL Version W SUBMERSIBLE SUMP PUMP www.burcam.com 2190 Dagenais Blvd. West TEL: 514.337.4415 LAVAL (QUEBEC) FAX: 514.337.4029 CANADA H7L 5X9 info@burcam.com Your pump has been carefully packaged at the factory to prevent damage during shipping.

More information

THE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK

THE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK THE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK or our breadth of capability. Of all the storage tank manufacturers doing business today, no other offers Caldwell s range of capability. We are the only manufacturer

More information

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification. SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,

More information

SK75/100. Performance Data TOTAL HEAD IN FEET HEAD-METERS 6 SK100 SK Liters/Second Capacity-U.S. G.P.M.

SK75/100. Performance Data TOTAL HEAD IN FEET HEAD-METERS 6 SK100 SK Liters/Second Capacity-U.S. G.P.M. Performance SK75/100 RPM: 1750 Discharge: 2" Solids: 2" Wholesale Products Page: 6300-1 Section: Performance 12 40 9 30 HEAD-METERS 6 3 TOTAL HEAD IN FEET 20 10 SK75 SK100 0 0 Capacity-U.S. G.P.M. 20 40

More information

INSTALLATION OF A STEP-SCREEN & VORTEX GRIT REMOVAL SYSTEM AT THE GRIFFITH SEWAGE TREATMENT PLANT. Peter Shanahan. Griffith City Council

INSTALLATION OF A STEP-SCREEN & VORTEX GRIT REMOVAL SYSTEM AT THE GRIFFITH SEWAGE TREATMENT PLANT. Peter Shanahan. Griffith City Council INSTALLATION OF A STEP-SCREEN & VORTEX GRIT REMOVAL SYSTEM AT THE GRIFFITH SEWAGE TREATMENT PLANT Paper Presented by : Peter Shanahan Author: Peter Shanahan, Senior Wastewater Operator, Griffith City Council

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information