WORK AND PROJECT REQUIREMENTS
|
|
- Elisabeth Bryan
- 6 years ago
- Views:
Transcription
1 WORK AND PROJECT REQUIREMENTS BID PACKAGE 3A SITE CONCRETE & CONCRETE TURNKEY CRABAPPLE MIDDLE SCHOOL REPLACEMENT April 26, 2018 EXHIBIT B CONSTRUCTION DOCUMENTS AND SPECIFICATIONS shall be acknowledged by subcontractor. Subcontractor has reviewed 100% Construction Document GADOE Final drawings dated 04/13/2018 and Specifications dated 04/13/2018. Subcontractor has reviewed the following specification sections including, but not limited to: Cast-In-Place Concrete, Rigid Paving and Site Concrete SUBCONTRACTOR shall prosecute and complete the Site Concrete & Concrete Turnkey scope of work: The following items are included as part of this subcontract and are listed for clarification only. They are not intended to limit the scope of work nor do they diminish the subcontractor obligation to provide a complete and fully functional installation. The scope of work included but is not limited to, the following: A. General Requirements 1. Subcontractor agrees to comply with photo badging system for all workers and to supply all workers with a reflective safety vest with Subcontractor s name or logo in a prominent location on the vest. Vests are to be worn at all times while on site. 2. There is no on-site parking. WINTER cannot guarantee access to a remote parking area. Costs associated with transportation to the jobsite will be at the responsibility of the Subcontractor. Subcontractor will be limited to no more than one (1) crew vehicle on the project. 3. The campus and jobsite are 100% tobacco and smoke-free. This includes but is not limited to all forms of smoked and smokeless tobacco, as well as vaping and e-cigs. 4. Subcontractor employees are not permitted to enter campus buildings or dining halls. Workers are confined within the limits of the construction fence. 5. Subcontractor employees shall not fraternize or socialize with campus employees, students, and parents. Infractions will be subject to immediate and permanent removal from the project. 6. Deliveries to will not be permitted during the timeframe of student drop-off and pick-up. Actual times will be posted at the project office and are subject to change based on school s activities. 7. Due to logistical and space constraints, Subcontractor will be required to provide Just-in-Time deliveries. Storage containers (Conex) may not be allowed on site. No Subcontractor office trailers will be allowed. 8. Due to construction occurring on an occupied school campus, Subcontractor will be required to refrain from certain noise-making or disruptive activities because of school activities. 9. Walking through the campus from off-site parking area to the jobsite will not be permitted. 10. Compliance with BIM Coordination Execution Plan as applicable. 11. Work onsite is subject to compliance with the City of Roswell Noise Ordinance. Outside work is permitted between the hours of 7:00 AM to 7:00 PM, Monday through Saturday. 12. Where work is required within a specially controlled access environment, or where students are or may be present, work shall be performed by personnel who have passed, or can pass, a security screening. B. Trade Specific Requirements 1. Subcontractor includes the following: Site Concrete:
2 EXHIBIT B a. See Addendum #1 sheets 1-C100, 1-C200 and 1-C300 included with Addendum #1 indicating work associated with new northeast main entrance drive that will completed prior to the start of this subcontractor s scope of work. b. Concrete Walks i. Including reinforcing c. Heavy Duty Concrete Paving i. Including GAB ii. Including reinforcing d. Concrete Steps on grade and reinforcing e. Cast-in-place retaining walls and reinforcing i. Walls B, C, & D f. Flared Concrete Ramps g. Raised Vehicular Concrete crosswalk h. Handicap ramps, including tactile pavers i. Brick Pavers, including entry plaza and exterior courtyards. i. Includes granular base j. Concrete walls and footings at knee walls/benches (See A1.11) k. Installation of bollards. Bollards provided by others. l. Installation of flag pole base m. Monument sign footing n. Fine grading to achieve subgrade for concrete flatwork o. All exterior equipment pads and supports. i. Includes but is not limited to dumpster pad and curb, cooling tower, transformer, and generator p. Header curb at track to be by others. Concrete: a. Spread Footings b. Pier or concrete cover at footings as required (details 1 and 7 on S3.01) c. Continuous Footings d. Slab on Grade a. Concrete mix for slabs on grade shall have maximum Water Cement Ratio of e. Gravel placement under Lower Level slab-on-grade (per detail below) a. Includes furnishing and installing of 57 stone at lower level slab on grade to complete underslab drainage system. Site contractor shall provide 57 stone to 24 below finished floor, +/ f. Sloping & Depressions within Slab on Grade as required g. Concrete conveyance h. Pan stair fill i. Topping slab at elevator pit j. All concrete accessories k. Steel pipe bollard (furnished by others) fill and installation (see sheet A1.11) l. Turndowns at Slab Edge m. Turndowns at Doors as required n. Thickened slabs including, but not limited to, CMU partitions and pan stair bottoms o. Concrete base and footing at site benches (sheet A1.11) p. Concrete work at Art area exterior courtyard benches (sheet A1.11, S and S1.14.1) q. Footings at entry walkway canopy (see sheet A1.11) r. Rebar s. 15 mil Vapor Barrier beneath all slabs on grade except areas to receive wood flooring and lower level slab on grade t. Stone Base u. Basement Foundation Wall v. Interior Amphitheater Walls w. Concrete at Metal Pan Stairs x. Elevator Pit Walls a. Concrete to have waterproofing admix. y. Setting Trench Drain for Food Service Equipment z. Structural Steel Embed Installation aa. All MEP pads bb. Column Concrete Fill
3 EXHIBIT B cc. Setting of Anchor Bolts (furnished by others) a. Subcontractor shall provide as-built anchor bolt survey prior to commencement of structural steel dd. Grouting of Base Plates ee. Undercut of columns a. Reference S1.10A, perform undercut of spread column footings with stone backfill based upon geotechnical engineer recommendation b. Undercut and stone backfill for Wall Footing to be performed by others. ff. Footing spoils to placed in location directed by WINTER for removal by others a. Provide approximate quantity of footing spoils on Bid Form gg. Include $20,000 for Cold and Hot Weather Concreting C. Unit Prices: In accordance with Article 3.2, the following unit prices shall be used in connection with the following items of Work. Unit Prices includes all costs of Subcontractor's performance of this Work, including, by way of example and not limitation, the costs of labor, supervision, materials, equipment, insurance, taxes, jobsite overhead, home office overhead, profit and any other costs or expenses in connection with, or incidental to, the performance of that portion of the Work to which such unit prices apply D. Allowances: The Subcontract Price specified in the Subcontract includes the following allowances, if any, to be furnished by Subcontractor in accordance with the Contract Documents. Each allowance and costs associated with each allowance must be reconciled by change order. If work associated with an allowance is performed on a unit price basis, Subcontractor shall provide a record of time and material no later than the following business day. Subcontractor shall not perform work associated with an allowance without prior written approval from WINTER. Subcontractor shall not exceed the amount of the allowance without prior written approval from WINTER. Such Allowances are considered complete and include all materials, taxes, equipment, labor, delivery, installation, overhead, and profit and any other costs or expenses in connection with or incidental to, the performance of that portion of the Work to which such Allowances apply. N/A E. Temporary Site Facilities Pursuant to the terms of the Subcontract, WINTER will furnish Subcontractor with the following temporary site facilities and equipment: Item By WINTER By Subcontractor Dumpsters XX Temporary Power XX Temporary Toilets XX Temporary Water XX Drinking Water XX F. Performance Schedule Without limiting any provisions contained in the Subcontract, Subcontractor shall perform the Work and its several parts per the following schedule, as the same may be revised from time to time by WINTER pursuant to the terms of the Subcontract. Note that "days" as indicated in the attached Schedule indicate work Days in lieu of Calendar Days. Work days shall comply with work hours specific to the project.
4 EXHIBIT B
5 PHASE 1 MARKUP: PLEASE DO NOT INCLUDE THE BLUE HIGHLIGHTED AREA IN YOUR PHASE 2-5 PRICING. THIS AREA WILL BE COMPLETE D IN PHASE 1 OF CONSTRUCTION. Pages from Crabapple MS_100% CD_GaDOE Final_ dwgs.tif (11) (36% of Scale); Takeoff in Active Area: All Areas; Crabapple Middle School - 100% Documents; FCS Crabapple CD; 4/25/ :42 PM
6
7
Phase IIIA Education Building
Phase IIIA Education Building George University Prince George County, Virginia Prepared: 5/25/2007 This takeoff has been prepared by Walsh Estimating Service, a division of Maracorp International: Although
More informationCherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12
SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and
More informationDIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS
DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION 02001 Bus Traffic. Separation between bus traffic, regular vehicular flow, service traffic and pedestrian traffic. Bus traffic must have adequate
More informationSee the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.
As a customer service initiative, the Kansas City, Missouri, City Planning and Development Department/Development Services, in cooperation with the Greater Kansas City Home Builders Association, has developed
More informationOne and Two Family Additions
One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri
More informationHURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R
HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:
More informationREQUEST FOR PROPOSAL Asphalt & Concrete Repair
REQUEST FOR PROPOSAL 2017 Asphalt & Concrete Repair English Landing Elementary School Union Chapel Elementary School Lakeview Middle School Park Hill High School Prairie Point Elementary School Congress
More informationJobsite Layout Considerations
1 Jobsite Layout Considerations The controlling contractor must consider many factors when laying out a site to support construction operations Site and building size and Equipment requirements configuration
More informationBUREAU Joe Iuviene, AIA January 20, 2017
architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends
More informationSECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM
ARCHITECTURAL SPECIFICATIONS MANUFACTURER: InterBlock LLC PO Box 1123, Sheboygan, WI 53082 Phone Number 920-207-7234 SECTION 03100 STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM PART 1 GENERAL 1.01 Summary
More informationJanuary 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT
January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority
More informationCALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%
CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that
More informationArbor Heights Elementary School. Concrete for South Building Foundation Stem Walls
Arbor Heights Elementary School Concrete for South Building Foundation Stem Walls Arbor Heights Elementary School Workers Placing Concrete for South Building Foundation Stem Walls Arbor Heights Elementary
More informationREQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.
REQUEST FOR TENDER - SERVICES 1. PURPOSE AND SCOPE This specification is intended to govern the supply of all labour, materials and equipment for the dismantling, demolition of a single dwelling on the
More informationTOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:
TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be
More informationTable of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
More informationJEFFERSON PARISH SHERIF S OFFICE
ADDENDUM NO. 1 TO THE BID DOCUMENTS FOR: NEW JEFFERSON PARISH SHERIFF S OFFICE 1 ST DISTRICT STATION 3620 HESSMERAVENUE METAIRIE, LOUISIANA 70002 JEFFERSON PARISH SHERIF S OFFICE Jefferson Parish Bid No.:
More informationExisting Project Conditions. General Conditions Estimate. Michael Vergari Construction Management Advisor: Dr. Riley
Existing Project Conditions General Conditions Estimate The Center for Health Research and Rural Advocacy is constructed under the supervision of the Geisinger Facilities Division. The project team develops
More informationThe designer shall also submit additional information required by the University as described and underlined below.
I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design
More informationSECTION UNCLASSIFIED EXCAVATION AND GRADING
SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on
More informationTHE LAST 100 FEET >> BIM IN THE FIELD TULALIP RESORT HOTEL 2009 AIA TAP BIM AWARDS
THE LAST 100 FEET >> BIM IN THE FIELD TULALIP RESORT HOTEL 2009 AIA TAP BIM AWARDS TULALIP RESORT HOTEL >> TABLE OF CONTENTS Architect Statement Descriptive Data Contractor Statement Owner Statement Introduction
More informationSPACE TYPE: OUTSIDE PARKING (STRUCTURE)
SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.
More informationCITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements
CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY
More information03 CONCRETE TAKEOFF SUMMARY REPORT Takeoff and Items Cost Summary. Ryan Manocchio
03 CONCRETE TAKEOFF SUMMARY REPORT Takeoff and Items Cost Summary Ryan Manocchio rmanocchio@stackct.com Concrete Takeoff Summary Report The STACK To Go Team is capable of performing takeoff for concrete
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationRequired Information for Permit Issuance
Required Information for Permit Issuance 1. Parcel #: It is very important that we have this information. It can be accessed in different ways. It may already be on your septic application, you can get
More informationBasic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.
Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Franklin County Septic & Zoning permit application: A septic and zoning permit is required for residential or commercial
More informationSection X - Miscellaneous
Section X - Miscellaneous A. Introduction This section provides design criteria, specific requests/recommendations and preferences related to specifying and constructing systems and materials used in HRSD
More informationMCCARTY ARCHITECTS, P.A. POST OFFICE BOX 440 / 533 WEST MAIN STREET TUPELO, MS / FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON
ADDENDUM NUMBER FROM: MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 0 / 533 WEST MAIN STREET TUPELO, MS 3880 / 3880 FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON PHONE: -8-00 PROJECT: ACADEMIC STUDENT
More informationMidwester State University Health Science Center
Bid Proposal For: Bid Due: Bids Received At: Email Bid to: Midwester State University Health Science Center 8-Aug-17 Midwestern State University Attn: Steven Shelley - Director of Purchasing/Contract Management
More informationConstruction Summary
Construction Summary Project Name Item of Work Base Building Add-ons Total Cost Code Site Development $ 18,150.00 $ - $ 18,150.00 Landscaping $ 500.00 $ - $ 500.00 Cast-in-place Concrete $ 7,806.00 $ -
More informationSECTION SITE CONCRETE
SECTION 321313 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationBUILDING SCOPE OF WORK
BUILDING SCOPE OF WORK 1. The Contractor shall furnish all supervision, materials, labor, equipment, tools, supplies, incidental items, etc, (unless noted otherwise) to complete all sections of the Building
More informationTHE STRATA UNIT May 25, 2008
THE STRATA UNIT May 25, 2008 Over the years, we have been asked time and time again from our experience as a cost consultant and a project manager from both a restoration and renovation point of view What
More informationSECTION CONSTRUCTION OPERATIONS AND SITE UTILIZATION PLAN
SECTION 01 14 11 CONSTRUCTION OPERATIONS PART 1 - GENERAL 1.1 SUMMARY A. The Construction Operations Plan provides a coordinated construction environment to ensure an orderly, secure and safe operation
More informationSection 4 - Design and Construction Overview
Section 4 - Design and Construction Overview 4-1 Building Architecture/Enclosure The Pearland Recreation Center and Natatorium houses a recreation center and natatorium as shown in Figures 4-1.1 First
More informationAttachment D-1: Civil/Structural Scope of Work
Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,
More informationCONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:
CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project
More informationCity of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)
City of Hughson Building Safety Division 7018 Pine Street Hughson, CA 95326 (209) 883-4054 RESIDENTIAL ATTACHED PATIO COVERS Patio covers are one story roofed structures not more than 12 feet above grade,
More informationInspection of New One- and Two- Family Dwellings
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Inspection of New One- and Two- Family Dwellings Planning and Development
More informationC P A. Presented By Jason G. Smith, CCM, LEED AP. Founder and Principal of Construction Analysis and Planning, LLC
C P A CONSTRUCTION ANALYSIS AND PLANNING, LLC Presented By Jason G. Smith, CCM, LEED AP Founder and Principal of Author of Construction Management: Subcontractor Scopes of Work 1 Division of work: Primary
More informationDivision 09 FINISHES TABLE OF CONTENTS
Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING
More informationLandscaping and Fencing
Landscaping and Fencing Fences, driveways, paving, retaining walls, landscaping & other garden features To be read in conjunction with General Requirements: A guide to building on properties containing
More informationSTATE OF NEW HAMPSHIRE DEPARTMENT OF NATURAL AND CULTURAL RESOURCES DIVISION OF PARKS AND RECREATION SKI PATROL HUT PROJECT #: CAP 1804
STATE OF NEW HAMPSHIRE DEPARTMENT OF NATURAL AND CULTURAL RESOURCES DIVISION OF PARKS AND RECREATION PROJECT #: CAP 1804 FRANCONIA NOTCH STATE PARK FRANCONIA, NEW HAMPSHIRE BID SET 8/4/2017 DRAWING LIST:
More informationRESIDENTIAL CONSTRUCTION New Dwellings and Additions
How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:
More informationSECTION PERMANENT FORMS Insulating Concrete Forms Rev
SECTION 03 11 19 PERMANENT FORMS Insulating Concrete Forms Rev 5.20.14 PART 1 GENERAL 1.01 SUMMARY A. Supply and installation of permanent insulating concrete forms as formwork, placement of steel reinforcement
More informationVANDERBILT UNIVERSITY
VANDERBILT UNIVERSITY CAMPUS PLANNING & CONSTRUCTION PROJECT MANUAL GUIDELINES INTRODUCTION These instructions are intended to guide the Architect in preparing the Project Manual for Vanderbilt University
More informationForsyth County Procurement
August 1, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 Bid 17-72-3340 For: Providing all materials, equipment and labor for the Jot em Down Road Water Tank
More informationPurchasing and Property Services AOC East Fowler Avenue Tampa, Florida (813)
Purchasing and Property Services AOC 200 4202 East Fowler Avenue Tampa, Florida 33620 (813) 974-2481 Web Address: http://usfweb2.usf.edu/purchasing/purch2.htm April 23, 2015 Invitation to Bid No. Entitled:
More informationApplying for Permits to build a new house in Linn County
Planning & Development Linn County, Iowa Building Division Linn County Building Code Residential Guidelines Single Family Dwellings Page 1 of 4 Applying for Permits to build a new house in Linn County
More informationUnderground Exhaust System
Operation and Maintenance Manual Underground Exhaust MONOXIVENT - SOURCE CAPTURE SYSTEMS - info@ Oct. - 2015 Underground Duct Construction Standards 1. Dig trench depth to allow for minimum distance from
More informationItem Name Description Unit of Measure Mobilization Per WSDOT Lump Sum
Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of
More informationCIRCLE K SUB-CONTRACTOR BID FORM
CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill
More informationSECTION PRECAST CONCRETE BUILDING PREFABRICATED. ACI , "Building Code Requirements for Reinforced Concrete".
SECTION 13120 PRECAST CONCRETE BUILDING PREFABRICATED PART I - GENERAL 1.01 SUMMARY Contractor to furnish precast concrete building. Building to be field erected on customer prepared crushed stone foundation
More informationSLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu
INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular
More information4 EXTREME FOUNDATION PANELS
4 EXTREME FOUNDATION PANELS For Garages On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils
More informationADDENDUM NO. 2. DATE: January 19, 2017 INVITATION FOR BID: IFB J Monroe Park Renovations Project DATED: December 20, 2016
ADDENDUM NO. 2 DATE: January 19, 2017 INVITATION FOR BID: IFB J170012535 Monroe Park Renovations Project DATED: December 20, 2016 RECEIPT DATE: February 8, 2017 (CHANGED) OPENING DATE: February 9, 2017
More informationProject Information Session / Meet and Greet # 3
ATL WEST DECK COMPONENT Project Information Session / Meet and Greet # 3 Holder-Austin-Moody-Bryson, a Joint Venture October 10 th, 2017 Agenda 1. HAMB, a JV Company Overview 2. ATL West Deck Project Description
More informationBUILDING CODES Presented by CORUM ENGINEERING
BUILDING CODES Presented by CORUM ENGINEERING AGENDA I. The Basics of Foundations A. Footer Designs B. Foundation Walls 1. Non-Backfilled Walls 2. Backfilled Walls (Retaining Walls) C. Slabs vs. Crawl
More informationPROJECT XYZ. SAMPLE CONSTRUCTABILITY REVIEW 1-Jan-00
PROJECT XYZ SAMPLE CONSTRUCTABILITY REVIEW 1-Jan-00 Note: The items in this section can be provided in the form of leveling Section V, Bid Scope Comments/Suggestions sheets as suggested scope divisions
More informationTHE CONSTRUCTION SUPERVISOR
City of Aurora Building Inspections 15151 E Alameda Pkwy Aurora, CO 80012 (303) 739-7420 THE CONSTRUCTION SUPERVISOR When a building permit has been issued for any construction within the City, the Supervisor
More informationPITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008
BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00
More informationSTATE UNIVERSITY CONSTRUCTION FUND
STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant
More informationFacility Improvements
CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation
More information5. Partially filled fuel tanks within the building shall be pumped empty. The oil and tanks shall be removed and deposed of in a legal manner.
Page 1 of 1. A pre bid site walk though was held at the site, 200 West Street, Ware MA, at 2:00pm August 24, 2011. The following attended: a. Chief Thomas Coulombe Ware Fire Department b. Mr. Thomas Martens
More informationCONSTRUCTION PROCEDURES. AWWA D110 Type I Prestressed Concrete Tanks
CONSTRUCTION PROCEDURES AWWA D110 Type I Prestressed Concrete Tanks 2-3 4-5 6-7 8-9 10-11 12-13 14-15 16-17 Site Preparation Floor & Footings Wall Construction Roof Options Vertical Prestressing Abrasive
More informationRESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST
This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general
More informationTable of Contents for Guide Specifications
Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationDivision 02 - Site Work Section
NWIT-11-26 Page 1 1 GENERAL 1.1 REQUIREMENTS INCLUDED.1 Furnish all labour, material, services and equipment necessary to carry out and complete excavation work and shoring, as indicated on the drawings
More informationPROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California
PROGRAM COST MODEL for PEER Tall Buildings Study Concrete Structural Option Los Angeles, California March 8, 2010 PEER Tall Buildings Study Concrete Structural Option March 8, 2010 CONTENTS Page Nos. Overall
More informationSCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements
SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC. 320-226.5189 www.101developmentresources.com While every attempt has been made to insure the correctness of this handout, no guarantees are made to its accuracy
More informationSchedule of Values Cruise Terminal 2 Expansion
Schedule of Values The Schedule of Values outlined below is intended to reflect the standard format that would be used in a Contractors Application for Payment. Values reflect materials and labor. General
More informationMANUFACTURER S SPECIFICATIONS Section LIME CONCRETE. A. This section describes the requirements for floors and slabs on grade.
MANUFACTURER S SPECIFICATIONS Section 03330 LIME CONCRETE ST. ASTIER NATURAL HYDRAULIC LIME CONCRETE PART 1 GENERAL 1.01 General A. This section describes the requirements for floors and slabs on grade.
More informationSECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 012200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationG-001 & 2750 LAKE VILLA DRIVE METAIRIE, LOUISIANA PHONE(504) FAX(504) INDEX OF DRAWINGS W. ESPLANADE AVE.
CAUSEWAY BLVD W. ESPLANADE AVE. DIVISION ST. HESSMER AVE. EDENBORN AVE. VETERANS MEMORIAL BLVD. VICINITY MAP SCALE: 1"=500'-0" 0 500 1,000 FT INDEX OF DRAWINGS & 2750 LAKE VILLA DRIVE METAIRIE, LOUISIANA
More informationBASED ON DFD MASTER SPECIFICATION DATED 2/24/2014
1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,
More informationStructural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)
Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction
More information1 AND 2 FAMILY DWELLING REQUIREMENTS
PLAN REQUIREMENTS: 1 AND 2 FAMILY DWELLING REQUIREMENTS All residential plans including additions and attached garages shall be designed to the current edition of the International Residential Code. Plans
More informationSTANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS
STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking
More information2003 International Residential Building Code
2003 International Residential Building Code Section R305 Ceiling Height Habitable rooms, hallways, corridors, bathrooms, toilet rooms, laundry rooms and basements shall have a ceiling height of not less
More informationFOOTINGS AND FOUNDATIONS
DHI_Book15_C01.qxd 28/05/2003 12:37 Page 3 I P A R T O N E FOOTINGS AND FOUNDATIONS We re going to talk about footings and foundations from a performance standpoint. We re looking to see whether they re
More informationThe Homeowner s Building Application Checklist for Constructing a Residential Addition
The Homeowner s Building Application Checklist for Constructing a Residential Addition This checklist provides homeowners a summary of the Building Permit submission requirements for constructing a residential
More informationRequest for Proposal: Due October 11, :00 pm
Remove and replace approx. 6000 sq. ft. of asphalt, clean and tack 1200 sq. ft. of low spots, seal coat and stripe parking lot at 1030 Temple Ave Camarillo, CA 93010 Request for Proposal: Due October 11,
More informationARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.
ARTICLE 987. PD 987. SEC. 51P-987.101. LEGISLATIVE HISTORY. PD 987 was established by Ordinance No. 30512, passed by the Dallas City Council on June 14, 2017. SEC. 51P-987.102. PROPERTY LOCATION AND SIZE.
More informationPlan Check No. Checked by: An Appointment Is Required for Verification
SUPPLEMENTAL CORRECTION SHEET UNREINFORCED MASONRY (URM) RETROFIT ( 2002 LABC ) Plan Check No. Checked by: Permit Appl. # An Appointment Is Required for Verification Job Address: For appt. call: APPLICATION
More informationLOT GRADING GUIDELINES
LOT GRADING GUIDELINES RESIDENTIAL PROPERTIES The Drainage Bylaw 18093 came into effect on January 1, 2018 replacing previous versions of the Drainage Bylaw 16200. This Bylaw requires that all single family,
More informationCOUNTY OF SAN JOAQUIN
August 1, 2012 COUNTY OF SAN JOAQUIN General Services Department 44 North San Joaquin Street, Suite 590 Stockton, California 95202-2778 (209) 468-3357, Fax (209) 468-2186 GABRIEL E. KARAM Director Capital
More informationQUEEN ALEXANDRA COMMUNITY CENTRE
BRICK REPOINTING AND NEW BARRIER FREE RAMP 180 BARNARDO AVENUE PETERBOROUGH, ON. ARCHITECTURAL A1 A1 A2 SITE PLAN AND DEMOLITION NOTATION NEW CONSTRUCTION DETAIL PLANS AND SECTIONS NEW CONSTRUCTION SECTION
More informationDetached Garages and Building Permits. 1 and 2 Family Dwellings
Detached Garages and Building Permits 1 and 2 Family Dwellings Why do I need a permit? The City of Minneapolis adopts the State of Minnesota Building Code (MNSBC) and its associated state statutes and
More informationMeriter Heights Renovations Madison, Wisconsin
Urban Design Submittal s 12 ebruary 2007 Owner Developer W. Mifflin St. STATE CAPITOL SQUARE Meriter Retirement Services, LLC 333 West Main Street 53703 W. Washington Ave. S. airchild St. STATE CAPITOL
More informationA. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.
SECTION 10530 - EXTRUDED ALUMINUM WALKWAY COVERS PART I - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division
More informationSTRUCTURAL ABBREVIATIONS S-001 GENERAL NOTES CONCRETE MASONRY NOTES DESIGN NOTES SOF NSWG-10 UAS SUPPORT FACILITY FY 2016 MILCON P-225
GENERAL NOTES DESIGN NOTES (CONTINUED) FOUNDATION NOTES STRUCTURAL ABBREVIATIONS CONCRETE MASONRY NOTES DESIGN NOTES S-001 CONCRETE NOTES COLD-FORMED STEEL FRAMING NOTES PRE-ENGINEERED METAL BUILDING NOTES
More informationITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS
ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown
More informationUniversity of New Mexico Environmental Services Design & Development Standard Requirements
University of New Mexico Environmental Services Design & Development Standard Requirements Please review the following standards to be considered on all construction specifications. Your consideration
More informationScope of Work Bid Package C-3 - West Precast Concrete
Scope of Work Bid Package C-3 - West Precast Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,
More informationKolorines Glass Mosaic Tiles Project Specification
Kolorines Glass Mosaic Tiles Project Specification SUGGESTED SPECIFICATION Glass Mosaic Tile Installation for Swimming Pools NOTES TO SPECIFIER: 1. Specify PremiumPlus Thin-Set mixed with CustomFlex Additive
More informationGWINNETT COUNTY STORM SEWER PIPE STANDARDS
1.0 Standard Specifications GWINNETT COUNTY STORM SEWER PIPE STANDARDS 1.1 Unless otherwise specifically set forth herein or in the Gwinnett County Standard Drawings, all of the materials, methods of the
More informationSECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION
820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing
More informationScope of work (To be completed previously, shown here as reference.) DIVISION 2- SITEWORK: Site work (Scheduled to start September 18 th, 2017)
Divisions Not Sent To Bid Construction of the Hygienic Art Inc., Frank Loomis Palmer Amphitheater, Art Park Covering. 79 Bank Street, New London, CT. 06320 Scope of work (To be completed previously, shown
More information