1 Jackson Rd (CR 534) Reconstruction Project Between NJSH RT #73 (MP 12.67) To Atco Ave. (MP 14.92) Townships of Berlin & Waterford County of Camden, New Jersey Bi-Weekly Progress Report Monday 4/23/18 thru Friday 5/4/18 Monolithic Concrete Curb and Gutter Figure 1 Monolithic Concrete Curb and Gutter Sta /- (RS) 1 P age

2 Concrete Driveway, 6 Thick Figure 2 Concrete Driveway, 6 Thick Sta /- (LS) 2 P age

3 Detectable Warning Surface Concrete Sidewalk, 4 Thick Figure 3 Concrete Sidewalk and Detectable Warning Surface Sta /- (LS) 3 P age

4 9 x 18 Concrete Vertical Curb Figure 4 9 x 18 Concrete Vertical Curb Sta /- (LS) 4 P age

5 Full Depth Reclamation Figure 5 Full Depth Reclamation between Sta /- 5 P age

6 Image Detector Camera Figure 6 Image Detector Camera at the Intersection of Jackson Rd. and Hopewell Rd. 6 P age

7 Reset Water Curb Box Figure 7 Reset Water Curb Box at 259 Jackson Rd. (LS) 7 P age

8 The following Construction Activities took place during the period stated above. 9 X 18 Concrete Vertical Curb The contractor poured 58 LF of 9 x 18 Vertical Curb between Sta / RS 10 LF RS 20 LF LS 28 LF Concrete Driveway, 6 Thick The contractor poured 20 SY of Concrete Driveway, 6 Thick between Sta / LS 20 SY Detectable Warning Surfaces The contractor placed (4) Detectable Warning Surfaces between Sta / RS 1 SY LS 1 SY RS 1 SY LS 1 SY Concrete Sidewalk, 4 Thick The contractor poured 42 SY of Concrete Driveway, 4 Thick RS 8.5 SY LS 8.5 SY RS 8.5 SY LS 16.5 SY 8 P age

9 Monolithic Concrete Curb and Gutter The contractor poured 193 LF of Monolithic Concrete Curb and Gutter between Sta / LS 20 LF LS 20 LF LS 20 LF LS 20 LF LS 20 LF LS 20 LF RS 20 LF RS 33 LF LS 20 LF Full Depth Reclamation The contractor reclaimed 17,000 SY of Asphalt Pavement between Sta / ,200 SY ,800 SY ,000 SY ,200 SY ,800 SY Detectable Warning Surfaces The contractor placed (4) Detectable Warning Surfaces between Sta /-. Image Detector Camera The contractor installed (8) Image Detector Cameras - Jackson and Hopewell 4 Units - Jackson and Cooper 4 Units 9 P age

10 Reset Curb Box The contractor re-set (1) Water Curb box at 259 Jackson Rd Jackson Rd. 4 Units Traffic Safety The contractor maintained a safe construction area and flow of traffic by using a (2) lane undivided, lane and shoulder closure w/ flaggers or a traffic detour as needed. Anticipated Work for 4/23/18 thru 5/4/18 Continue Full Depth Reclamation. Complete masonry work (concrete curb, inlet reconstruction, sidewalks and driveway(s)). Notice to Proceed (2): 3/12/18 Anticipated Completion Date: Summer 18 Prepared By: Micah Jones Resident Engineer 10 P age

Date of Advertisement: December 30, 2009 in the Herald Newspapers

Date of Advertisement: December 30, 2009 in the Herald Newspapers Date of Advertisement: December 30, 2009 in the Herald Newspapers ADVERTISEMENT FOR BIDS BOARD OF CHOSEN FREEHOLDERS CAPE MAY COUNTY NEW JERSEY Notice is hereby given that sealed proposals addressed to

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division. CONTRACT NO PROJECT NAME: 2018 Citywide Contract Overlay

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division. CONTRACT NO PROJECT NAME: 2018 Citywide Contract Overlay CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division CONTRACT NO. 201841976 PROJECT NAME: 2018 Citywide Contract Overlay ADDENDUM NO. 3 TO CONTRACT DOCUMENTS Bidders are hereby instructed

More information

SECTION 1500 REMOVALS

SECTION 1500 REMOVALS SECTION 1500 REMOVALS REMOVALS PART 1 GENERAL 1.01 Section Summary A. Removal of structures, obstructions, surfacing, and miscellaneous items. 1.02 Related Sections A. Section 1800 Excavation and Embankment

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 05/10/2018 PC.A1.2 Arterial with Cement

More information

T. P. Concrete, Inc. Wood Sewer & Excavating, Inc. 589 CY , , , SF

T. P. Concrete, Inc. Wood Sewer & Excavating, Inc. 589 CY , , , SF 30051 FURNISH AND INSTALL AGGREGATE SLURRY BACKFILL 589 CY 50.00 29,450.00 55.00 32,395.00 50.00 29,450.00 30584 FURNISH AND INSTALL 8" CRUSHED AGGREGATE DRIVEWAY APPROACH BASE 480 SF 0.75 360.00 0.85

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 04/01/2019 PC.A1.2 Arterial with Cement

More information

City of Naples Utilities Department Wastewater Collections Division

City of Naples Utilities Department Wastewater Collections Division City of Naples Utilities Department Wastewater Collections Division Request for Proposal Reclaimed Water Fire Hydrant & Water Service Installations February 2015 Reclaimed Water Fire Hydrant & Services

More information

VILLAGE OF MORTON GROVE DEPARTMENT OF PUBLIC WORKS RIGHT-OF-WAY (ROW) PERMIT APPLICATION REQUIREMENTS

VILLAGE OF MORTON GROVE DEPARTMENT OF PUBLIC WORKS RIGHT-OF-WAY (ROW) PERMIT APPLICATION REQUIREMENTS VILLAGE OF MORTON GROVE DEPARTMENT OF PUBLIC WORKS RIGHT-OF-WAY (ROW) PERMIT APPLICATION REQUIREMENTS For general information concerning submittal requirements, please refer to Village Code 7-9-4 (c.).

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Comment Form Date: To: From:

More information

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8" 8" 8" 8" 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT.

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8 8 8 8 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT. } SURVEY SR 429 { CONST. SR 429 (WEKIVA PKWY) R/W (15 MIN.) 0'-10.4' R/W (15 MIN.) STANDARD CLEARING & GRUBBING 24'-36' 24'-48' 94' BORDER (2-30.) (2-30.) 94' BORDER 10' 4' 10' NATURAL GROUND, MAX. CUT

More information

MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT PROJECT OFFICE PARK 7, SUITE 112, 4020 MINNESOTA AVENUE NE, WASHINGTON, DC 20019 MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT 12/04/2017 12/09/2017 12/07/2017

More information

Kansas Department of Transportation DISTRICT 5. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 5. Project(s): Min: Max: Page 1 of 11 518105 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025603 FIELD OFFICE 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 025200 REMOVAL OF EXISTING STRUCTURES 6 012340

More information

MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT PROJECT OFFICE PARK 7, SUITE 112, 4020 MINNESOTA AVENUE NE, WASHINGTON, DC 20019 MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S 12/11/2017 12/16/2017 12/14/2017 Minnesota Ave. NE Sta.

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ) FREQUENTLY ASKED S (FAQ) The purpose of this document is to provide detailed information about the Harvard Road Reconstruction & Water Main Replacement Project. This project will directly affect residents

More information

City of Kettering. Bid Tabulations SWR PROJECT. Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # PO#

City of Kettering. Bid Tabulations SWR PROJECT. Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # PO# City of Kettering Bid Tabulations 05-117 2017 SWR PROJECT Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # 5212-77750 PO# Engineer's Estimate (1) America's Decorative Concrete (2) RA

More information

DAVID RHODES NEWARK CITY DIRECTOR OF PUBLIC SERVICE

DAVID RHODES NEWARK CITY DIRECTOR OF PUBLIC SERVICE DAVID RHODES NEWARK CITY DIRECTOR OF PUBLIC SERVICE City Hall 40 West Main Street Newark, Ohio 43055-5531 www.newarkohio.net (740) 670-7703 drhodes@newarkohio.net CITY OF NEWARK TREE TRIMMING NOTICE TO

More information

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Baltic Avenue, Maine to Mississippi Avenues Project ID Numbers: S1702 / 173620 This project will mill and repave the roadway, upgrade ADA ramps, and improve drainage, thermoplastic stripping, manholes,

More information

East Atlantic Avenue (C.R. 729) over Nicholson Road (C.R. 635) Bridge Replacement Project

East Atlantic Avenue (C.R. 729) over Nicholson Road (C.R. 635) Bridge Replacement Project East Atlantic Avenue (C.R. 729) over Nicholson Road (C.R. 635) Bridge Replacement Project Borough of Audubon County of Camden, New Jersey Weekly Progress Report Monday 05/07/2018 thru Friday 05/11/2018

More information

New Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS PAGE : 409-1 CONTRACT TIME : 02/28/13 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : STATE ROUTE 45 ROADWAY DRAINAGE IMPROVEMENT CONTRACT DP 12409 BOROUGH OF WESTVILLE, GLOUCESTER COUNTY VENDOR

More information

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction

More information

CHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK

CHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK ------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A CHESSIE BIKE-PED TRAIL - PHASE I TRUESDELL AVENUE TO KIAWANIS TELEDYNE PARK DES.

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

ADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1

ADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1 CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT- ENGINEERING DIVISION ADDENDUM DATE: 10/12/15 PROJECT: BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: 41506 BID DATE: 10/27/15 ADDENDUM

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Foreword This manual contains

More information

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT April 17, 2018 Please find the following addendum to the below mentioned QUOTE. Addendum No.: 1 Quote#: 310-00-18-08-1 Project Name: Greenleaves

More information

ENGINEERING MEMORANDUM

ENGINEERING MEMORANDUM ENGINEERING MEMORANDUM April 10, 2017 TO: FROM: City Council Mike Payne, City Engineer SUBJECT: Consideration and action to award contract for Bid Schedule C - 2017: C2017-12 Landfill Paving Improvements

More information

ADA Training Design Case Studies MnDOT

ADA Training Design Case Studies MnDOT ADA Training Design Case Studies 2018 MnDOT 2 ADA Design Case Studies Overview TH 61 (Mounds Blvd) Mill & Overlay Lesson: Steep Slopes and Construction Limits Snelling Avenue Mill & Overlay Lesson: Strategies

More information

TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY

TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS (HCBCC) PURCHASING DEPARTMENT DATE: 3/08/16 ITB NO. 16-012 ADDENDUM No. 1 Project.: TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY Owner: Highlands County BCC

More information

Curb and Gutter Replacement Project Phase I

Curb and Gutter Replacement Project Phase I Phase I Prepared for: Prepared by: Cheyenne Downtown Development Authority / Main Street 1601 Capitol Avenue Cheyenne, WY 82001 307 433 9730 BenchMark Engineers, PC 1920 Thomes Avenue, Suite 620 Cheyenne,

More information

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018 155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated

More information

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6 : Curb Ramps 1 [ 4.7.3] Only measure the width of the ramp section of the curb ramp (labeled ramp to the right). The ramp section of a curb ramp is also known as the ramp run. If the curb ramp has flared

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) ADA South, Contract 1 w/o ROW DBNUM: 15420 / UPC: 154200 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction

More information

Bidder Name: ITEMIZED BID: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the

More information

February 27th, 2018 City of Mayville

February 27th, 2018 City of Mayville February 27th, 2018 City of Mayville Project Location and Schedule Construction work Detour Route Business Access During Construction Temporary Business Signs What WisDOT Can Do During Construction What

More information

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center Traffic Management Guide to Concrete Overlay Solutions December 5, 2014 ACPA Annual Meeting Dale S. Harrington P.E. Representing CP Tech Center Traffic Management- Concrete Overlays Traffic Management

More information

ISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS

ISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS ISSUED: 1/16/15 1.0 COMBINATION 6'' CURB & GUTTER ISSUED: 1/16/15 1.0 SIDEWALK DETAIL ISSUED: 7/7/15 1.0 VALLEY GUTTER ISSUED: 2/11/16 1.0 BRICK PAVER SIDEWALK DETAIL 1''=1' WIDTH VARIES SEE SHEET 2 MIN.

More information

For Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of

For Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned

More information

CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS

CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS December 2012 CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard

More information

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1 DATE: May 18, 2016 TO: FROM: All Bidders/Proposers Willie Velez, CPPB Procurement Administrator City of Casselberry Purchasing Division SUBJECT: ITB-2016-0023, Oxford Road Complete Street Improvements

More information

ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP # June 7, 2016

ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP # June 7, 2016 ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP #2017-01 NOTICE TO PROSPECTIVE BIDDERS June 7, 2016 Prospective bidders are hereby informed of the following corrections, additions, deletions, and/or modifications

More information

To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project

To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project 5180 SOQUEL DR. SOQUEL, CA 95073 PO Box 1550 CAPITOLA, CA 95010 TEL 831-475-8500 FAX 831-475-4291 BOARD OF DIRECTORS To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project Dr. THOMAS LAHUE

More information

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max:

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max: Page 1 of 18 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD OFFICE AND LABORATORY (TYPE A) 4 012340 FOUNDATION STABILIZATION (SET PRICE) 5 020100 CONTRACTOR CONSTRUCTION

More information

November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION SPECIFICATION NO C (Re-Issued) ADDENDUM NO. 1

November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION SPECIFICATION NO C (Re-Issued) ADDENDUM NO. 1 Department of Public Works Engineering Division November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION ADDENDUM NO. 1 Dear Bidder: The following amendments are hereby made to the subject

More information

Transportation Asset Management Plan. Shannon Foss Asset Management Planning Director Met Council: Funding & Programming Committee May 17 th, 2018

Transportation Asset Management Plan. Shannon Foss Asset Management Planning Director Met Council: Funding & Programming Committee May 17 th, 2018 Transportation Asset Management Plan Shannon Foss Asset Management Planning Director Met Council: Funding & Programming Committee May 17 th, 2018 mndot.gov 2 Timeline 2014: Pilot TAMP Completed April 30

More information

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one)

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one) Des Plaines Utility Permit #: PUBLIC WORKS AND ENGINEERING 1420 Miner Street Des Plaines, IL 60016 P: 847.391.5390 F: 847.391.5619 desplaines.org CITY OF DES PLAINES UTILITY PERMIT APPLICATION All entities

More information

GENERAL MAINTENANCE OF TRAFFIC

GENERAL MAINTENANCE OF TRAFFIC ESTIMATE OF QUANTITIES GENERAL MAINTENANCE OF TRAFFIC STATE OF SOUTH DAKOTA PROJECT 090EF-452, 044-452. 016EB-452, 016WB-452 SHEET TOTAL NO. SHEETS 2 24 PCN I24A PCN I23U PCN I24B I24C SPECIFICATIONS Standard

More information

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds

More information

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction

More information

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 Date: April 22, 2009 To: Prospective Bidders/Plan Holders From: Abraham Campos, PE on behalf of City of El

More information

07170 Bid Tabs.txt New Jersey Department of Transportation DATE : 01/24/08 PAGE : TABULATION OF BIDS

07170 Bid Tabs.txt New Jersey Department of Transportation DATE : 01/24/08 PAGE : TABULATION OF BIDS PAGE : 170-1 CONTRACT TIME : 09/23/08 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : STATE ROUTE 80 EB & WB RESURFACING MP 8-12.8 CONTRACT NO.008064090, RESURFACING KNOWLTON, BLAIRSTOWN AND HOPE TOWNSHIPS,

More information

CITY OF DELRAY BEACH LAKE IDA DRAINAGE IMPROVEMENTS

CITY OF DELRAY BEACH LAKE IDA DRAINAGE IMPROVEMENTS LAKE IDA DRAINAGE IMPROVEMENTS = LIMITS OF PROJECT AREA 1760G01.DWG SURVEY LEGEND: SURVEY SYMBOL LEGEND: PLAT LEGEND: STATEMENT OF PURPOSE: SURVEY TREE LEGEND: SITE BENCHMARKS: SURVEY PREPARED BY: DENNIS

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 107-1 CONTRACT TIME : 08/31/12 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-078-5(110) ROUTE I-78 RAMP C OVER BEAVER BROOK DECK REPLACEMENT AND RESURFACING CONTRACT NO.019113160

More information

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1 PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road STAFFING MATRIX Construction Engineering and Inspection-Wiles Road JAMES JEFFERS, P.E. Senior Project Engineer Years of Experience:

More information

ADVERTISEMENT SET DECEMBER 2013

ADVERTISEMENT SET DECEMBER 2013 Sheet List Table GREELEY CANAL #2 WCR 21 PROJECT AREA N SH-392 ADVERTISEMENT SET DECEMBER 2013 LINE DESCRIPTION PROPOSED LINE POWER / COMMUNICATIONS EXISTING LINE LINE DESCRIPTION PROPOSED LINE BOUNDARY

More information

SECTION 55A1 ROBINSON TOWNSHIP, WASHINGTON COUNTY

SECTION 55A1 ROBINSON TOWNSHIP, WASHINGTON COUNTY WEEK ENDING SEPTEMBER 14, 2018 SECTION 55A1 ROBINSON TOWNSHIP, WASHINGTON COUNTY Contractor: Independence Excavating, Inc 1. Work Shift Day shift (M-F) with Saturday as a makeup day. 2. Traffic Candor

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017 VT 14 East Montpelier Bridge Project Informational Meeting February 22, 2017 Welcome & Introductions VTrans Mark Sargent, Project Manager Wayne Symonds, Structures Program Manager Chris Barker, Resident

More information

CITY AND COUNTY OF DENVER

CITY AND COUNTY OF DENVER 2-1.1b REMOVE COMBINATION CONCRETE CURB, GUTTER AND SIDEWALK (3'-11") 2-1.2a REMOVE 6" CONCRETE CURB AND/OR GUTTER S Holly: See near STA: 25+56 S Poplar 300 LF 25 LF 2-1.4 REMOVE HANDICAP CONCRETE CURB

More information

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE GENERAL Final restoration of areas within the public right-of-way associated with Street Excavation Permits shall be completed as determined

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown

More information

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2011) Cover Photo: Joint Utility Trench installation along Fifth Street just north of Bridge Street. Page 1

More information

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF ADDENDUM #1 AUGUST 25, 2016 INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP &

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP & TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP 4910-29 & 0504-14 Contract No. 1002252 Project Overview is in need of professional and technical assistance to provide detail design for State

More information

Statement of Quantities

Statement of Quantities 01-21.26.01 GROUND WATER TREATMENT CONSUMABLES ALLOWANCE 1 A/A 01-52.13 ACCOUNT - PROJECT SPECIAL PROVISIONS TEMPORARY OFFICE FACILITIES 2-1.2a REMOVE 6" CONCRETE CURB AND/OR GUTTER REMOVE 780 LF 2-1.4

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor

More information

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT

More information

PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION

PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION SECTION DESCRIPTION PAGE 1 General Quantities 3-1 2 Maintenance of Roadway and Drives 3-1 3 Liquid Asphalt Binder in Paving Mixture

More information

MOBILIZATION CURB AND GUTTER, REM EXCAVATION, EARTH DR STRUCTURE, RECONST, CASE 1 AGGREGATE BASE, CONDITIONING COLD MILLING HMA SURFACE

MOBILIZATION CURB AND GUTTER, REM EXCAVATION, EARTH DR STRUCTURE, RECONST, CASE 1 AGGREGATE BASE, CONDITIONING COLD MILLING HMA SURFACE 7/13/18 GENERAL NOTES SPECIFICATIONS: ALL WORK AND MATERIALS, UNLESS OTHERWISE STATED IN THESE PLANS, SHALL BE IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT) 01 STANDARD SPECIFICATIONS

More information

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. All private construction and/or maintenance activities which take place within the City right-of-way are subject to oversight

More information

Please ensure receipt of this Addendum is acknowledged on page 1 of the Form of Tender.

Please ensure receipt of this Addendum is acknowledged on page 1 of the Form of Tender. No. 1 Project: 47th Ave Road Reconstruction Owner: District of Chetwynd Date: March 5, 2019 Ref. No.: 1320.0095.01 This Addendum is issued prior to Tender Closing Date, in accordance with the Tender Documents

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) South Inlet Transportation Improvement Project DBNUM: 09361 / UPC: 093610 The Casino Redevelopment Authority (CRDA) has identified certain road improvements to be performed in Atlantic City on certain

More information

BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2

BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2 BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2 The original Contract Documents entitled BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT are amended

More information

COUNTY OF BEXAR. Curbed Streets. Residential PUBLIC WORKS DEPARTMENT

COUNTY OF BEXAR. Curbed Streets. Residential PUBLIC WORKS DEPARTMENT COUNTY OF BEXAR PUBLIC WORKS DEPARTMENT 233 N. Pecos La Trinidad, Suite 420 San Antonio, Texas 78207-3188 Main 210-335-6700 DRIVEWAY APPROACH SPECIFICATIONS Curbed Streets Residential Applicability: All

More information

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P401: ITEM 254 - PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P402: ITEM 254 - PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER PLAN P403: ITEM 304 - AGGREGATE BASE, AS PER PLAN P404: DELETED P405:

More information

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES SUMMARY AND INTENT OF PROJECT The City of Des Plaines Curb and Sidewalk Program is intended to repair hazardous sidewalk and

More information

CITY OF TACOMA Department of Public Utilities - Water Division

CITY OF TACOMA Department of Public Utilities - Water Division CITY OF TACOMA Department of Public Utilities - Water Division ADDENDUM NO. 1 DATE: October 12, 2015 REVISIONS TO: Request for Bids Specification No. WD15-0133F Water Main Replacement Project No. MRP 2014-27,

More information

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT August 7, 2018 Please find the following addendum to the below mentioned BID. Addendum No.: 1 Bid#: 314-00-18-38-2 Project Name: Johnny F. Smith

More information

MISCELLANEOUS PAVING PROJECTS & SIGNAL INSTALLATION

MISCELLANEOUS PAVING PROJECTS & SIGNAL INSTALLATION TAMPA-HILLSBOROUGH COUNTY EXPRESSWAY AUTHORITY LETTER OF CLARIFICATION NO. 1 REQUESTS FOR PROPOSALS FOR MISCELLANEOUS PAVING PROJECTS & SIGNAL INSTALLATION RFQ No. O-01616 THEA Page 1 of 6 LETTER OF CLARIFICATON

More information

PAVEMENT DESIGN MEMORANDUM

PAVEMENT DESIGN MEMORANDUM PAVEMENT DESIGN MEMORANDUM FOR SR 70 (15TH STREET EAST) ROUNDABOUT MANATEE COUNTY FINAL SUBMITTAL FPID 435090-1-52-01 PREPARED FOR: FLORIDA DEPT. OF TRANSPORTATION DISTRICT 1 FEBRUARY 16, 2018 PREPARED

More information

CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996.

CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996. CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996. DATE ADDRESS OF INSTALLATION OWNER ADDRESS CITY STATE ZIP CODE NATURE OF WORK: (check

More information

EXHIBIT "A" County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640.

EXHIBIT A County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640. EXHIBIT "A" County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640.00 SECTION I PURPOSE This document describes the scope of work and the

More information

COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 Elmhurst Street Hayward, CA (510)

COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 Elmhurst Street Hayward, CA (510) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 Elmhurst Street Hayward, CA 94544-137 (51) 67-548 AGENDA ITEM NO. July 1,212 June 13 212 The Honorable Board of Supervisors County Administration Building 1221

More information

SECTION ASPHALT PAVING AND SURFACING

SECTION ASPHALT PAVING AND SURFACING SECTION 02500 ASPHALT PAVING AND SURFACING PART 1 - GENERAL 1.01 WORK INCLUDED A. Traffic control as required to divert vehicular and pedestrian traffic around construction. B. Spreading and compacting

More information

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation Design and Construction of Concrete Overlays By: James K. Cable, P.E. Cable Concrete Consultation PCC OVERLAY AGENDA Current design & construction features What is needed in a PCC overlay set of plans?

More information

Department of Street Services

Department of Street Services Department of Street Services FY 07-08 Proposed Budget Briefing to the City Council September 5, 2007 Purpose An overview of the Department of Street Services Scope of operation and maintenance activities

More information

Residential Street Rebuild Program (RSRP) Test Project Updates Rogerson Drive & Ralston Avenue. Council Presentation January 23, 2018

Residential Street Rebuild Program (RSRP) Test Project Updates Rogerson Drive & Ralston Avenue. Council Presentation January 23, 2018 Residential Street Rebuild Program (RSRP) Test Project Updates Rogerson Drive & Ralston Avenue Council Presentation January 23, 2018 1 RSRP Test Projects PURPOSE Obtain up-to-date pricing Better define

More information

ENCROACHMENT/EXCAVATION PERMIT APPLICATION

ENCROACHMENT/EXCAVATION PERMIT APPLICATION PERMIT / PROJECT INFORMATION: PARCEL INFO: APPLICANT S INFO: Public Works/Engineering 595 SILVER LACE BLVD, FERNLEY, NV 89408 (775)-784-9910 ENCROACHMENT/EXCAVATION PERMIT APPLICATION PERMIT APPLICATIONS,

More information

33rd Street Outfall (Curtis to Lafayette) Schedule A

33rd Street Outfall (Curtis to Lafayette) Schedule A 01-21.23.01 ALLOWANCE ACCOUNT - SEE PROJECT SPECIAL PROVISIONS Add'l Info: For coordination and installation of power supply to upgraded traffic signals at MLK and Downing and MLK and Marion. Please see

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 1 EA 202-00035 Removal of Pipe 30 LF 202-00200 Removal of Sidewalk 431 SY 202-00203 Removal of Curb and Gutter 973 LF 202-00205 Removal of

More information

Annual 2012 Asphalt Overlay Work Order Construction Contract Job No Solicitation No. B MR BID PROPOSAL. PROPOSAL OF, a corporation a

Annual 2012 Asphalt Overlay Work Order Construction Contract Job No Solicitation No. B MR BID PROPOSAL. PROPOSAL OF, a corporation a Job No. 12-0101 Solicitation No. B-12-013-MR BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction

More information

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II 7/12/18 GENERAL NOTES SPECIFICATIONS: ALL WORK AND MATERIALS, UNLESS OTHERWISE STATED IN THESE PLANS, SHALL BE IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT) 2012 STANDARD SPECIFICATIONS

More information

Addendum No. 1 Issue Date: March 29, 2016

Addendum No. 1 Issue Date: March 29, 2016 Addendum No. 1 Issue Date: Project: Bonson and Short Street Reconstruction Contract: #1-16 Owner: City of Platteville, Wisconsin Engineer: Delta 3 Engineering, Inc. Daniel J. Dreessens, P.E. 875 South

More information

New Jersey Department of Transportation DATE : 04/06/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/06/10 PAGE : TABULATION OF BIDS PAGE : 423-1 CONTRACT TIME : 12/31/10 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100 % STATE RE-ADVERTISEMENT MAINTENANCE DRAINAGE REPAIR CONTRACT, CENTRAL-2010 VARIOUS LOCATIONS IN THE COUNTIES

More information

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT AUGUST Resurfacing of Aldrich Road West Contract # 11-06

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT AUGUST Resurfacing of Aldrich Road West Contract # 11-06 TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE DIVISION OF ENGINEERING 251 Preventorium Road Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 919-1080 Howell, NJ 07731-0580

More information

Full Depth Pavement Reclamation

Full Depth Pavement Reclamation Full Depth Pavement Reclamation Delaware County, Ohio Chris Bauserman, PE, PS April 28, 2015 Background Population has increased from 55,000 in 1989 to approximately 200,000 Explosive growth in residential,

More information